Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL18-1010 - ARIZONA TILE - ADD PANEL, (3) 200A PANELS, LIGHTING, POWER, AND EQUIPMENT CONNECTIONS
ARIZONA TILE 11060 TUKWILA INTL BLVD COMPLEX ELI8-1010 Parcel No: Address: City of Tukwila a of --,---'Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206'431-3670 Inspection Request Line: 206-08'9350 Web site: http://www.TukwlIaWA.gov ELECTRICAL PERMIT 0423049014 Permit Number: EL18-1O1O 11060 TUKWIIA INTL BLVD COMPLEX Project Name: ARIZONA TILE Issue Date: 1/23/2019 Permit Expires On: 7/22/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: SEBCO INC 4O2OEMADISON 5T#3ZD,SEATTLE, WA, 98112 STAN RONFELDT 482G85TNVV#lO1'AUBURN, WA, 98001 KIRBY ELECTRIC INC 4826 B ST NW #101, AUBURN, WA, 98001 K|RgY8O77BN ''' Phone: (253) 859-2000 Phone: (253) 859-2000 Expiration Date: 1/13/2021 DESCRIPTION OF WORK TENANT IMPROVEMENT INCLUDING ADDING (1) PANEL, (3) 200A PANELS, LIGHTING, POWER, AND EQUIPMENT CONNECTIONS. Valuation of single family: $0.0 Valuatior of mf/comm: $268,00000 Type of Work: TENANT IMP Fees Collected: $4,948.42 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: VALLEY VIEW Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International FueI Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Date: 2017 2017 20152017 461 r..r I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: 9 Print Name: �1P9 1.{1...d' Date: ot(1110( This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWI Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Electrical Permit No. Ld-IoIo Project No. Date Application Accepted: Date Application Expires: (For office use o 1 �Iq :!v) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 11060 Tukwila International Blvd Tenant Name: Arizona Tile King Co Assessor's Tax No.: Suite Number: New Tenant: PROPERTY OWNER Name: Stan Ronfeldt Name: Sebco Inc. Address: 4826 B St NW #101 Address: 4020 E MADISON ST #320 City: Auburn State: WA City: Seattle State: WA Zip: 98112 CONTACT PERSON — person receiving all project communication Name: Stan Ronfeldt Address: 4826 B St. NW #101 Address: 4826 B St NW #101 Phone: (253) 859-2000 Fax: (253) 859-2363 City: Auburn State: WA Zip: 98001 Phone: (253) 859-2000 Fax: (253) 859-2363 Email: stanr@kirbyelectric.com Floor: ® Yes ❑ .. No ELECTRICAL CONTRACTOR INFORMATION Company Name: Kirby Electric Inc. Address: 4826 B St. NW #101 City: Auburn State: WA Zip: 98001 Phone: (253) 859-2000 Fax: (253) 859-2363 Contr Reg No.: KIRBYEI077BN Exp Date: Tukwila Business License No.; BUS -0992935 Valuation of Project (contractor's bid price): $ 268,000 Scope of Work (please provide detailed information): Tenant improvement including adding (1) 100A panel, (3) 200A panels, lighting, power, and equipment connections. Will service be altered? m Yes m No Adding more than 50 amps? Yes ❑ No Type of Use: Retail/Warehouse Type of work: ❑ New ❑ Addition ❑ Service Change ❑ Remodel 1 Tenant Improvement ❑ Low Voltage ❑ Generator ❑ Fire Alarm ❑ Telecommunication ❑ Temporary Service Property Served by: ❑ Puget Sound Energy 21 Seattle City Light NY Permit Censer Applications -I Iandouts1Penn it Applications1PDF". Electrical Permit Application Revised 1-1-1T.docx Revised: January 2117 bh Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $155.91 (including an attached garage) ❑ Garages, pools, spas and outbuildings $83.54 ea ❑ Low voltage systems (alarm, furnace thermostat) $61.05 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $83.54 (no added/altered circuits) ❑ Service change with added/altered circuits $83.54 number of added circuits $12.00 ea ❑ Circuits added/altered without service change $55.69 (up to 5 circuits) ❑ Circuits added/altered without service change $55.69 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $69.62 ❑ Low voltage systems $61.05 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $66.30 ❑ Temporary service (generator) $82.52 ❑ Manufactured/mobile home service $87.98 (excluding garage or outbuilding) ❑ Carnivals $82.21 Number of concessions $11.02 ea Each ride and generator truck $11.02 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justiciable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: Vitaly Kalchik Date: 11/27/2018 Day Telephone: (253) 859-2000 Mailing Address: 4826 B St NW #101 Auburn WA 98001 City VV Permit Center Applications -I landoutc`.Permit Applications, PDF'v, Electrical Permit Application Revised I-I-17.docx Revised: Januar 21117 bh State hip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY I PAID $3,996.80 EL18-1010 Address: 11060 TUKWILA INTL BLVD COMPLEX Apn: 0423049014 $3,996.80 ELECTRICAL $3,806.48 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $3,806.48 TECHNOLOGY FEE $190.32 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R16608 R000.322.900.04.00 0.00 $190.32 $3,996.80 Date Paid: Wednesday, January 23, 2019 Paid By: KIRBY ELECTRIC INC Pay Method: CHECK 521010 Printed: Wednesday, January 23, 2019 3:25 PM 1 of 1 SYSTEMS Q Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID $951.62 EL18-1010 Address: 11060 TUKWILA INTL BLVD COMPLEX Apn: 0423049014 $951 62 ELECTRICAL $951.62 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R15915 R000.345.832.00.00 0.00 $951.62 $951.62 Date Paid: Tuesday, November 27, 2018 Paid By: KIRBY ELECTRIC Pay Method: CHECK 520876 Printed: Tuesday, November 27, 2018 4:17 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-367 Project: / I —.0" . - 2-17-61/\i/e. I (akL Type of Inspection: ,6er Address: ( ( 040 77( -6, Date Called: Special Instructions: 'Date Wanted: a.m. P.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. OMMENTS: 62kg-crix),9 4 -(71\74111 Inspector: E Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD 64E-(004 Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: !'.14J`/t ,�f I`A--ri z Type of Inspection: �, Address:/ 0 0 -�^ Date Called: Special Instructions: - ` W 4 A -I, G ', %L t.l Date Wanted: a.m. 2."2,0 p.m. Requester: Phone No:2c_-1 /c723IJ EiApproved per applicable codes. Corrections required prior to approval. COMMENTS: — iCF4k. 73 tact Cn[p £r r c., `tai 64-1>iL.. 5'UL - P`.c'_U 1 ..c)' t ,—, (V A 604 b `zco t t,{ll `f ©4- ri. - ` W 4 A -I, G ', %L t.l — t -A -66c, &TV (11,1 ) _ AF0 6 Krtte-0 . r9 Date: e az REINSPECTIONEE REQUIRED. Prior to next inspection. fee must p be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Inspector: INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-36 Permit Inspection Request Line (206) 438-9350 Project: 44 ,/, l Type of Inspection:,, j Address: 1ID,o TiJ Date Called: Special Instructions: Date Wanted: m p 1 p.m. Requester: Phone No: K, qi7 2-37c Approved per applicable codes. u Corrections required prior to approval. OMMENTS: A00 `�r� 4ti o- 1 P Inspector: Date: ,-)1/17 I REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 4 Lvi City of Tukwila Department of Community Development December 28, 2018 STAN RONFELDT 4826 B ST NW #101 AUBURN, WA 98001 RE: Correction Letter # 2 ELECTRICAL Permit Application Number EL18-1010 ARIZONA TILE - 11060 TUKWILA INTERNATIONAL BLVD Dear STAN RONFELDT, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - C DEPARTMENT: Jim Benner at 206-431-3679 if you have questions regarding these comments. • CORRECTIONS 1). SHEET E3.1 CORRECTIONS NOT REFLECTED ON DRAWING SUBMI II ED 2). SHEET E3.1 ONE -LINE DRAWING IS NOT LEGIBLE Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. 1 have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-433-7165. Permit Technician File No. ELI8-1010 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development December 12, 2018 STAN RONFELDT 4826 B ST NW #101 AUBURN, WA 98001 RE: Correction Letter # I ELECTRICAL Permit Application Number EL18-1010 ARIZONA TILE - 11060 TUKWILA INTERNATIONAL BLVD Dear STAN RONFELDT, Allan Ekberg, Mayor Jack Pace, Director This Letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Jim Benner at 206-431-3679 if you have questions regarding these comments. • CORRECTIONS/ #1 1). Sheet E3.1 Panel LI and L3 to be Main Breaker, not MLO. 2). Sheet E3.1 Feeder Schedule ID 10 -No neutral on transformer primary. 3). Sheet E3.1 Feeder Schedule ID 21 -Specify #4 Cu Ground or #2 Al per 250.102(C)(1) Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. Sincerely, Bill Rambo Permit Technician File No. ELI8-1010 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 0 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL18-1010 DATE: 01/04/19 PROJECT NAME: ARIZONA TILE SITE ADDRESS: 11060 TUKWILA INTERNATIONAL BLVD Original Plan Submittal X Response to Correction Letter # 2 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: tfe'14{ uilding Division Public Works Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 01/08/19 Structural Review Required REVIEWER'S INITIALS: DATE: r APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: 02/05/19 Approved with Conditions I- 7 Denied /corrections entered in Reviews) (ie: Zoning Issues) P Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire 0 Ping 0 PW Staff Initials: 12/18/2013 PERMIT COORD CORD PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL18-1010 DATE: 12/19/18 PROJECT NAME: ARIZONA TILE SITE ADDRESS: 11060 TUKWILA INTERNATIONAL BLVD Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: As. °oft Q-11-1,6 Building Division Public Works r Fire Prevention Structural Planning Division Permit Coordinator IIII PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: DATE: 12/20/18 Structural Review Required DATE: P APPROVALS OR CORRECTIONS: Approved Approved with Conditions Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 1/17/19 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Ping PWLJ Staff Initials: AS 12/18/2013 PLAN REVIEW/ROUTING SLIT PERMIT NUMBER: EL18-1010 DATE: 11/27/18 PROJECT NAME: ARIZONA TILE SITE ADDRESS: 11060 TUKWILA INTERNATIONAL BLVD X Original Plan Submittal Response to Correction Letter # Revision # before Permit Is, led Revision # after Permit Issu 'I DEPARTMENTS: Cerle `;uilding Division '.'ublic Works 10 Fire Prevention Structural Planning Divis �n ❑ Permit Coordir'?tor 1 PRELIMINARY REVIEW: DATE: 11/r118 Not Applicable n (no approval/review required) Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 12/2"; '18 Approved Corrections Required C Approved with Conditions (corrections entered in Reviews) Denied (ie: Zoning Issues) i' Notation: 4110, y REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: V-12:('�� �/ 14/6 Departments issued corrections: Bldg Fire 0 Ping 0 PW 0 Staff Initials: ,,, 12/18/2013 City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov RECEIVED 3:fit 04 201 (;OMM )NI 1 Y )1 VI l ()MI IJT Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: O dykg Plan Check/Permit Number: EL18-1010 ❑ Response to Incomplete Letter # Z Response to Correction Letter # 2 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: ARIZONA TILE Project Address: 11060 TUKWILA INTERNATIONAL BLVD Contact Person: S.4 -an R n-re(c(} Phone Number: 1S'3 ti 57- 22) LI Summary of Revision: L` hl C'c eh' - 101,e .rowjl�y) r i�c4 co rrecpi "R-t.w► e e44r 1l 411\Ct w42re Vi, c�3JJ actdr-evt Sheet Number(s): 1 r "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: 0 Entered in TRAKiT on W?Permit Center (Brenda)Worms\Permit Center Documents (Word)'Revision Submittal Form.doc Revised: August 2015 City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: --)-ois Plan Check/Permit Number: 111 Response to Incomplete Letter # g Response to Correction Letter # ▪ Revision # after Permit is Issued El Revision requested by a City Building Inspector or Plans Examiner D Deferred Submittal # Project Name: Project Project Address: Contact Person: fLle_ 0-(r) OhO Tvv-oAila, Ty, r3 1 k-cto feloi Phone Number: •xovo Summary of Revision: VT)(4i1 Fc(ke gr4 am r r ueis e4Q, $ 5c:31 eci,,Le 0 -cloc) Tr) 2( RECEIVED CITY OF TUKOLA. DEC 19 2018 PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including IaJ of revision Received at the City of Tukwila Permit Center by: 4 Entered in TRAKiT on W.Termit Centerifemplates TormskRovtsion Submittal Formdoc Revised August 2015 KIRBY ELECTRIC INC Home Espanol. Contact Safety & Health Claims & Insurance C:11 Washington State Department of Labor & Industries Page 1 of 4 Search L&I AZ ",ndex My L&.1 Workplace Rights Trades & Licensing KIRBY ELECTRIC INC Owner or tradesperson Principals KIRBY, DOUGLAS E, PRESIDENT Kirby, Douglas, AGENT KIRBY, SHANNON, AGENT (End: 01/04/2012) KIRBY, SHANON E, AGENT (End: 01/04/2012) Doing business as KIRBY ELECTRIC INC WA UBI No. 601 433 048 4826 B ST NW STE 101 AUBURN, WA 98001 253-859-2000 KING County Business type Corporation Governing persons DOUGLAS EDGAR KIRBY SHANON ELAINE KIRBY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. Meets current requirements. License specialties GENERAL License no. KIRBYEI077BN Effective — expiration 01/15/1993— 01/13/2021 Designated administrator KIRBY, DOUGLAS E Active. Meets current requirements. License type License no. Master Electrician KIRBYDE962LZ Bond WESTERN SURETY CO Bond account no 70607132 $4,000.00 Received by L&I Effective date 11/05/2008 01/14/2009 Expiration date Until Canceled Savings No savings accounts during the previous 6 year period. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601433048&LIC=KIRBYE1077BN84SAW= 1/23/2019 SEBCO BUSINESS PARK E ECTR CAL��u €fW NGS ELECTRICInc. C'MMERCIAL• INDUSTRIAL www.kirbyelectric.com EIJ REVISIONS No changes shall be made to the scope of work witnout prior aporoval of the Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review. FIL P Permit No. YAA, Plan review approval Is subject to errors and omissions Approval of construction documents does not auth nze the violation of any adopted code or ordinance Receipt of approved Fielo Copy and con lion Is acknowledged: By: Date: at(y f ( c\ City of TuKwila BUILDING DIVISION ND .O N P 70CED Ate 2 0 2019 V City of Tuk If UILDING DIVISION SEPARATE PERMIT REQUIRED FOR: 10, Mechanical Nqi J Electrical Plumbing [ r Gas Piping City of Tukwila BUILDING DIVISION 101.0 CORRECTION LTR# 2. EL E CTR I CInc. COMMERCIAL. INDUSTRIAL www.ktrbyolectric.com 4826 "B" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: A 2019-01-04 PER CITY REVIEW REVIEWED FOR )DE (OMPLIANC AP°ROVED JAN 2 019 C •of Tukwila DING DIVISION COVER SHEET SCALE:SEE PLAN DA1E:11-27-18 ar. V.S.K. E SHEET E1.1 "0.:18-090 SHEET INDEX PAGE: DESCRIPTION E1.1 COVER SHEET fECEq'� C E1.2 SCHEDULES CITY OF TUKWILA JAN 04 2019 E2.1 WEST WAREHOUSE PLAN PERMIT CENTER E2.2 EAST WAREHOUSE PLAN E2.3 ENLARGED SHOWROOM POWER PLAN E2.4 ENLARGED SHOWROOM LIGHTING PLAN E3.1 ELECTRICAL SYSTEM DETAILS E3.2 PANEL SCHEDULES EL E CTR I CInc. COMMERCIAL. INDUSTRIAL www.ktrbyolectric.com 4826 "B" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: A 2019-01-04 PER CITY REVIEW REVIEWED FOR )DE (OMPLIANC AP°ROVED JAN 2 019 C •of Tukwila DING DIVISION COVER SHEET SCALE:SEE PLAN DA1E:11-27-18 ar. V.S.K. E SHEET E1.1 "0.:18-090 LUMINAIRE SCHEDULE CALLOUT SYMBOL DESCRIPTION MODEL INPUT WATTS VOLTS QUANTITY B1 2X2 FIXTURE PHILLIPS 2FGG38B8352DSUNVDIM 33 277V 1P 2W 135 C • CAN LIGHT INTENSE SS6G3DRL5358 32 277V 1P 2W 18 D s TRACK HEAD 1 CONTECH CTL8062HM35CD—S 14 120V 1P 2W 231 D1 TRACK HEAD 2 AMERLUX MURH-31—LED—ST—TJ1-120—WW-35 31 120V 1P 2W 79 D—T ESSEBEMSENEBEZSIM TRACK LIGHTING CONTECH LT—*—S 120V 1P 2W 59 E 0 Pendant Fixture TECH 700TDECGPKS—LED927 10 120V 1P 2W 3 G High Bay Fixture LITHONIA IBG 24KLM SEF AFL WD MVOLT GZ 40K 90CRI 215 277V 1P 2W 279 H Walipack Lithonia KAXW LED P3 50K 4R MVOLTDDBXD 79 277V 1P 2W 31 X1 Exit/Emergency Combo w/ Remote Egress Head Lithonia ECG LED HO M6/ELA LED WP M12 5 277V 1P 2W 16 X2 EMERGENCY LIGHT 10 120V 1P 2W 10 EQUIPMENT SCHEDULE CALLOUT SYMBOL VOLTS AMPS KVA CIRCUIT DESCRIPTION AC 208V 2P 2W 14.42 3 L3-2,4 AIR COMPRESSOR, EF 277V 1P 2W 1.44 0.4 H1-2 EXHAUST FAN EH 120V 1P 2W 8.33 1 L1-5 WALL HEATER ERV -1 208/120V 2P 3W 5 1.04 L2-36,38 VENTILATOR ERV -2 208/120V 2P 3W 4.5 0.94 L2-40,42 VENTILATOR HF 120V 1P 2W 4.17 0.5 L2-5 HOOD FAN IAC -1 208/120V 2P 3W 1 0.21 L2-32,34 SPLIT SYSTEM IH 208/120V 2P 3W 7.21 1.5 L2-6,8 INSTAHOT IHP-1 208/120V 2P 3W 1.73 0.36 L2-37, 39 SPLIT SYSTEM OAC -1 208/120V 2P 3W 11.2 2.33 L2-32,34 SPLIT SYSTEM OHP -1 208/120V 2P 3W 19.05 3.96 L2-37,39 SPLIT SYSTEM RG 208/120V 2P 3W 38.46 8 L2-2,4 RANGE RTU -1 480V 3P 3W 31 25.77 H2-15,17,19 ROOFTOP UNIT RTU -2 480V 3P 3W 14 11.64 H2-21,23,25 ROOFTOP UNIT RTU -3 480V 3P 3W 14 11.64 H2-27,29,31 ROOFTOP UNIT UH 120V 1P 2W 5 0.6 L1-1 REZNOR UNIT HEATER RECEPTACLE SCHEDULE CALLOUT SYMBOL VOLTS QUANTITY COUNTER 4t 120V 1P 2W 4 DUPLEX CE 120V 1P 2W 43 QUAD 30 120V 1P 2W 15 SWITCH SCHEDULE CALLOUT SYMBOL NOTE 1 QUANTITY OC—C o© CEILING OCCUPANCY SENSOR 14 OC—W $ oc WALL OCCUPANCY SENSOR 10 PC—C @c CEILING PHOTO—CELL 8 SWITCH $ SINGLE SWITCH 3 EL1.9IOl0 REC:�',? E ) CITY OF TUKWILA JAN 042019 PERMIT CENTER mar ELE CTR I CInc. COMMERCIAL. INDUSTRIAL www.klrbyelectric.com 4826 "B" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZ ONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: Q 2019-01-04 PER CITY REVIEW SCHEDULES SCALE: SEE PLAN 1A'E:11-27-18 DRAWN BY: V.S.K. CHECKED BY: SHEET E1.2 JOB Na:18-090 — ,, • e H3-1 H 2-4 H2-14 H2— ..G 7 H2-12 1 1 1 1 ic;zziG—E • „ ------------ - - - 1,4G UH L1- 1 1 „ ----------- ENLARGED ON PAGES E2.3 & E2.4 IN RTER —1 IN VERTER 2 H1-1 (1)WAREHOUSE POWER PLAN - WEST SCALE: 1/16" = 1' X1 ELI 1010 • Q°tr,PLiiNg - 54E0 ” JAN 2 0 2019 City of Tukwila BUILDING DIVISION 11ECF."..niEn CITY OF TUKWILA JAN 04 2019 PERMITCENTER ELECTRICInc. COMMERCIAL. INDUSTRIAL www.kirbyelectrIc.com 4826 "B" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: A 2019-01-04 PER CITY REVIEW WAREHOUSE POWER PLAN WEST SCALE SEE PLAN DATE:11 27-1 8 DRAM BY: V. S.K. CHECKED BY - SHEET E2.1 JOB NO.: 18-090 1 1 111 1 101 „ G -E INVERTER -3 lag 010 031 G L3-1 H DP ei H3-2 G lag IOU G -E • L3=1- DP G G 101111 IOU 113 IOU H3-5 PI -4 H G -E 3 11.11J 011.11.11 G H3-9 • • DPH3-6 DPeH3-8 H3-11 G rim 011.11.1 011. 11.11.1.1 W1.11)111 G -E X1 G -E H3-1 Wit 01.11.11.1 11. G H3-15 Wit to - 01.1.111 H3-17 011.11.1 fill2.111 WSJ EF H1-4 011.11.11.1 101 UH L1-3 lag WI !Jill.' 01.1.131.1 011.11.11 1 e UH L1-3 G 011.11.11 EF H1-4 020 lag G Z Z 11 I 011.1.11.1 01.11,11 -5 G -E INVERTER -4 lag G -E +84" 01_3-9 _ ------ WAREHOUSE POWER PLAN - EAST SCALE: 1/16" = 1' O" G-E EH eL1 FACP (11) L1-7 G G -E H 1 011.1311 • G E lag G -E al!.11.11 01.11.13.11 G -E 031 G -E L3-3# WED GoaVppioni,rc OF JAN 2 0 2019 City of Tukwila BUILDING DIVISION nEce,,mr? CITY OF IUKINIA JAN 04 2019 PERMIT CENTER ELECTRICInc. COMMERCIAL. INDUSTRIAL wwvalrbyelectric.com 4826 "B" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: WAREHOUSE POWER PLAN - EAST SCALE: SEE PLAN SHEET DME: 11-27-18 BY: V.S.K. E E. 2 UG TRENCH FLOOR // UG TRENCH TO / j/ MILLWORK/ / // // L2-1 AFF" " FF L 18" AFF ENLARGED ON PAGE E3.1 P-1 N ROOF 42" AFF 84" AFF ICRO 2-37,39 E7.7_1171 +84" AFF L2-3 RTU -1 H2-15,17,19 i+ L L2-5 L2-9 52" AFF tAW*4-41447 11741 +1.8"s 194 42" AFF 2" AFF 42" AFF i+142" AFF +18" AFF AFF +18" AFF +18" AF +42" AFF L2-33 +34" AFF +34" AFF +34" AFF +34" AFF +34" AFF +34" AFF +34" AFF Dt+34" AFF - -- UG - - — FU +18" AFF +18" AFF L2-35 GFCI 7-3 ERV -2e +34" AFF L2-40,42 +42" AFF L2-13 18" AFF 18" AFF +18" AFF RENCH TO ITURE ERV -1 L2-36, +18" L2-7 G FOR OLTAGE PULLSTRING FOR LOW VOLTAGE 4 CIRCUITS FOR FURNITURE L2-17,19,21,23 118 AFF +18" F +18" A ENLARGED SHOWROOM POWER PLAN (1) SCALE: 1/8" = 1' 0" L2-15 +60" AF INC0t I CONDUIT & DEMARK OAC -1 ON ROOF L2-32,34 MICRO +42 " AFF L2-16 CM +42" AFF L2-12 (11 D/W +18" AFF L2-14 ENLARGED KITCHEN PLAN SCALE: 1/4" = 1' 0" ELL g 1010 w PU�NCF fdFPA 0 - C JAN 2 0 2019 City of Tukwila BUILDING DIVISION CITY OF IuK.W LA JAN 04 2019 PERMIT CENTER mar ELECTRICinc. COMMERCIAL. INDUSTRIAL www.kirhyelectric.aorn 4826 "8" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZ ONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: Q 2019-01-04 PER CITY REVIEW ENLARGED SHOWROOM POWER PLAN SCALE` SEE PLAN DATE 11-27-18 DRAWN BY: V.S.K. CHECKED BY: SHEET E2.3 JOB NO.: 18-090 OF 2 TYP. TRACK DAYLIGHT LIGHTING ZONE D—T D D1 D AFC P .. i t 40, is Peery r 2 Dr— B1 -9T I?1 (1), ENLARGED SHOWROOM LIGHTING PLAN SCALE: 1/8" = 1' 0" �' B r sts� '1 ii : rid If • t 111111111911 74071 EUB- 1010 OMPA 70 - PJC�C JAN 2 0 2019 City of Tukwila BUILDING DIVISION RECENED CITY OF a'URVALA JAN Q4 2019 PERMIT CEMTER ELECTRICInc. COMMERCIAL. INDUSTRIAL www.Wrbyelectric.com 4826 "B" St. NW Suite 101 Auburn. Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA. WA 98168 REVISIONS: A 2019-01-04 PER CITY REVIEW ENLARGED SHOWROOM LIGHTING PLAN SCALE: SEE PLAN DATE`11-27-18 DRAWN BY: V.S.K. CHECKED 8Y: — SHEET E2.4 JOB NO. 18-090 OF (----- rr�gation /- ,� ` AL1 -9 Phoae 7,.T2 1-1'r ,2 , ,.�� H1 ' f ,, .ST H2 �� ' . • „ , // , a L1 , ,y / L2 / UTILITY SECTION 1600A SECTION M SB 3G METE ELEC/RISER ROOM PLANS SCALE: 1/4" = 1' 0 FEEDER SCHEDULE ID FEEDER AMPS CONDUIT AND FEEDER 3G 100 1-1/4"C,3#1 AL,#1 AL N 1-1/4"C,3#1 AL 1600A 11 100 B 200 2-1 /2"C,3#250I cmil AL,#250kcmil AL N 21 200 2-1/2"C,3#250ltcmil AL,#250kcrnil AL N,#4CU G I" " IJ 1600 (5)3-1/2"C,3#600kcmil AL,#600kcmii AL N cLijcLij - 1 #4 BARE CU MSB 480Y/277V 3P 4W VSB ROOM MOUNTING FED NOTE VOLTS 480Y/277V 3P 4W AIC 22,000 FLUSH BUS AMPS 1600 MAIN BKR 1600 FROM Utility NEUTRAL 100% LUGS STANDARD 3G METER STACK BREAKER TRIP/POLES CIRCUIT DESCRIPTION 1600A FEEDER RACEWAY AND CONDUCTORS A B c LOAD KVA ) l PANEL H1 PANEL H2 PANEL H3 SPACE NI� I` 8 I" " IJ 1.28 41.8 13.7 0 2-1 /2"C,3#250kcmil AL,#250kcmil AL N 2-1/2"C,3#250kcmil AL,#250kcmii AL N 1-1/4"C,3#1 AL,#1 AL N cLijcLij 1 A TENANT 0 0 0 1 20/1 SECTION 64.5 UFER PANEL H2 200A MLO 480Y/277V 3P 4W TRANSFORMER T2 75 KVA 480V' 208Y/120V PANEL L2 200A MCB 208Y/120V 3P 4W PANEL H3 100A MLO 480Y/277V 3P 4W TRANSFORMER T3 75 KVA 480V 208Y/120V PANEL L3 200A MCB 208Y/120V 3P 4W PANEL H1 200A MLO 480Y/277V 3P 4W TRANSFORMER T1 75 KVA 480V 208Y/120V PANEL Li 200A MCB 208Y/120V 3P 4W L1 VSB ROOM MOUNTING FED NOTE VOLTS 480Y/277V 3P 4W AIC 22,000 FLUSH BUS AMPS 1600 MAIN BKR 1600 FROM Utility NEUTRAL 100% LUGS STANDARD CKT # BREAKER TRIP/POLES CIRCUIT DESCRIPTION LOAD KVA FEEDER RACEWAY AND CONDUCTORS A B c LOAD KVA 11 12 13 4 200/3 200/3 100/3 -/3 PANEL H1 PANEL H2 PANEL H3 SPACE 4.13 42.6 17.8 0 2.18 41.7 16 0 1.28 41.8 13.7 0 2-1 /2"C,3#250kcmil AL,#250kcmil AL N 2-1/2"C,3#250kcmil AL,#250kcmii AL N 1-1/4"C,3#1 AL,#1 AL N BKR 1 A B C 1 20/1 TOTAL CONNECTED 1KVA BY PHASE 64.5 59.9 56.7 2 CONN KVA CALC KVA CONN KVA CALC KVA West Warehouse EF LIGHTING 65.2 81.5 (125%) CONTINUOUS 1.6 2 (125%) LARGEST MOTOR 25.8 32.2 (125%) HEATING 1 1 (100%) OTHER MOTORS 50.7 50.7 (100%) COOLING 0 0 (N/A) RECEPTACLES 22 16 (50%>10) NONCONTINUOUS 3.8 3.8 (100%) KITCHEN EQUIP 11 9 (MAX 2) DIVERSE 0 0 (N/A) METERED DEMAND 0 0 (125%) TOTAL KVA 181 196 BALANCED 3-PHASE AMPS 236 480V 208Y/120V PANEL Li 200A MCB 208Y/120V 3P 4W L1 ---1 ROOM VOLTS 480Y/277V 3P 4W AIC 22,000 MOUNTING FLUSH BUS AMPS 200 MAIN BKR MLO FED FROM MSB NEUTRAL 100% LUGS STANDARD NOTE CKT CKT N OTE LOAD KVA CKT CKT LOAD KVA LOAD KVA # BKR CIRCUIT DESCRIPTION A 6 c # BKR CIRCUIT DESCRIPTION A B C 1 20/1 Exterior LIGHTING 2.45 20/1 West Warehouse UH 2 20/1 West Warehouse EF 0.4 20/1 SPACE 3 20/1 West Warehouse 3 0 East Warehouse UH 4 20/1 East Warehouse EF 4 0.8 SPACE 5 20/1 West Warehouse 5 20/1 0 6 20/1 Mid Warehouse Lighting 6 20/1 0 7 20/1 West Warehouse 0 20/1 FACP RECEPTACLE 8 20/1 Mid Warehouse Lighting 0 20/1 SPACE 9 20/1 West Warehouse 9 0 Irrigation RECEPTACLE 10 20/1 Mid Warehouse Lighting 10 0 SPACE 11 20/1 West Warehouse 11 20/1 0 12 20/1 Mid Warehouse Lighting 12 20/1 0 13 20/1 Mid Warehouse 0 20/1 SPACE 14 20/1 Mid Warehouse Lighting 0 20/1 SPACE 15 20/1 Mid Warehouse 15 0 SPACE 16 20/1 SPACE 16 0 SPACE 17 20/1 Mid Warehouse 17 20/1 0 18 20/1 SPACE 18 20/1 0 19 20/1 Mid Warehouse 0 20/1 SPACE 20 20/1 SPACE ,0 20/1 SPACE 21 20/1 Mid Warehouse 21 0 SPACE 22 20/1 SPACE 22 0 SPACE 23 20/1 East Warehouse 23 20/1 0 24 20/1 SPACE 24 20/1 0 25 20/1 East Warehouse 0 20/1 SPACE 26 20/1 SPACE !0 20/1 SPACE 27 20/1 East Warehouse 27 0 SPACE 28 20/1 SPACE 28 0 SPACE 29 20/1 East Warehouse 29 20/1 0 30 20/1 SPACE 30 20/1 0 31 20/1 East Warehouse 0 20/1 SPACE 32 20/1 SPACE 0 20/1 SPACE 33 20/1 East Warehouse 33 0 SPACE 34 20/1 SPACE 34 0 SPACE 35 20/1 SPACE 35 20/1 0 36 20/1 SPACE 36 20/1 0 37 20/1 SPACE 0 20/1 SPACE 38 125/3 XFMR T1 1! 28 20/1 SPACE 39 20/1 SPACE 39 0 SPACE 40 1 1 40 1.38 SPACE 41 20/1 SPACE 41 20/1 0 42 0 42 20/1 1.28 0 TOTAL CONNECTED KVA BY PHASE 4.13 2.18 1.28 1.38 CONN KVA CALC KVA 1.18 CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 2.45 3.06 (125%) CONTINUOUS 0 0 (125%) LARGEST MOTOR 0.6 0.75 (125%) HEATING 1 1 (100%) OTHER MOTORS 3 3 (100%) COOLING 0 0 (N/A) RECEPTACLES 0.54 0.54 (50%>10) NONCONTINUOUS 0 0 , (100%) KITCHEN EQUIP 0 0 (N/A) DIVERSE 0 0 (N/A) METERED DEMAND 0 0 (125%) TOTAL KVA 7.59 8.35 (125%) BALANCED 3-PHASE AMPS 10 480V 208Y/120V PANEL Li 200A MCB 208Y/120V 3P 4W L1 ROOM VOLTS 208Y/120V 3P 4W AIC 22 000 MOUNTING FLUSH BUS AMPS 200 MAIN BKR 200 FED FROM T1 NEUTRAL 100% LUGS STANDARD N OTE CKT CKT LOAD KVA CKT CKT LOAD KVA # BKR CIRCUIT DESCRIP110N A B C # BKR CIRCUIT DESCRIPTION A B C 1 20/1 West Warehouse UH 1.2 2 20/1 SPACE 0 3 20/1 East Warehouse UH 1.2 4 20/1 SPACE 0 5 20/1 Riser Room EH 1 6 20/1 SPACE 0 7 20/1 FACP RECEPTACLE 0.18 8 20/1 SPACE 0 9 20/1 Irrigation RECEPTACLE 0.18 10 20/1 SPACE 0 11 20/1 Phone RECEPTACLE 0.18 12 20/1 SPACE 0 13 20/1 SPACE 0 14 20/1 SPACE 0 15 20/1 SPACE 0 16 20/1 SPACE 0 17 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 21 20/1 SPACE 0 22 20/1 SPACE 0 23 20/1 SPACE 0 24 20/1 SPACE 0 25 20/1 SPACE 0 26 20/1 SPACE 0 27 20/1 SPACE 0 28 20/1 SPACE 0 29 20/1 SPACE 0 30 20/1 SPACE 0 31 20/1 SPACE 0 32 20/1 SPACE 0 33 20/1 SPACE 0 34 20/1 SPACE 0 35 20/1 SPACE 0 36 20/1 SPACE 0 37 20/1 SPACE 0 38 20/1 SPACE 0 39 20/1 SPACE 0 40 20/1 SPACE 0 41 20/1 SPACE 0 42 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 1.38 1.38 1.18 CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 0 0 (125%) CONTINUOUS 0 0 (125%) LARGEST MOTOR 0.6 0.75 (125%) HEATING 1 1 (100%) OTHER MOTORS 1.8 1.8 (100%) COOLING 0 0 (N/A) RECEPTACLES 0.54 0.54 (50%>10) NONCONTINUOUS 0 0 (100%). KITCHEN EQUIP 0 0 (N/A) DIVERSE 0 0 (N/A) METERED DEMAND 0 0 (125%) TOTAL KVA 3.94 4.09 BALANCED 3-PHASE AMPS 11.4 � Ll 1o( 00 PLI EB�VVII NFPA bC f cc JAH 2 0 2019 City of Tukwila BUILDING DIVISION REC `,1F. c1'T'Y OF .+ LI K A JAN 0 4 2019 PERMIT CENTER 71237 ELECTRICInc. COMMERCIAL. INDUSTRIAL www.kirbyelectric.com 4826 "B" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: 2019-01-04 PER CITY REVCE 8 ELECTRICAL SYSTEM DETAILS SCALE: SEE PLAN DA1E:11-27-18 DRAWN BY: V.S.K. CHECKED BY: SHEET E3.1 JOB NO.: 18-090 H 2 ROOM INPUT VOLTS 208Y/120V 3P 4W AIC 22,000 MOUNTING FLUSH OUTPUT VOLTS 208Y/120V 3P 4W INPUT KVA 5 FED FROM UTILITY OUTPUT KVA 5 NOTE ROOM VOLTS 208Y/120V 3P 4W AIC 22,000 MOUNTING FLUSH BUS AMPS 200 MAIN BKR 200 FED FROM T2 NEUTRAL 100% LUGS STANDARD NOTE ROOM MOUNTING FLUSH FED FROM MSB NOTE ROOM MOUNTING FLUSH FED FROM MSB NOTE VOLTS 480Y/277V 3P 4W AIC 22,000 BUS AMPS 200 MAIN BKR ALO NEUTRAL 100% LUGS STANDARD CKT LOAD KVA CKT CKT LOAD KVA CKT LOAD KVA CKT CKT CIRCUIT DESCRIPTION A LOAD KVA # BKR CIRCUIT DESCRIPTION CIRCUIT DESCRIPTION A B c # BKR CIRCUIT DESCRIPTION RECEPTACLE, SWITCHED QUAD A B C 1 20/1 SHOWROOM LIGHTING 1.72 2 20/1 2 20/1 WAREHOUSE LIGHTING 3.01 3 4 3 20/1 SHOWROOM LIGHTING 3.45 4 0.627 5 4 20/1 WAREHOUSE LIGHTING 2.88 1.86 3.88 20/2 5 20/1 SHOWROOM LIGHTING 0.75 7 0.576 6 20/1 WAREHOUSE LIGHTING 8 1 3.87 7 20/1 SHOWROOM LIGHTING 0.825 20/1 RECEPTACLE 8 20/1 WAREHOUSE LIGHTING 10 2.59 REFRIGERATOR 20/1 9 20/1 SHOWROOM LIGHTING 11 20/1 0.726 20/1 10 20/1 WAREHOUSE 20/1 COFFEE MAKER, RECEPTACLE 0 20/1 11 20/1 SHOWROOM LIGHTING 20/1 RECEPTACLE, SWITCHED 1.08 0.363 12 20/1 WAREHOUSE LIGHTING DISHWASHER 0.8 13 2.8 13 20/1 SHOWROOM LIGHTING 0.198 14 20/1 14 20/1 WAREHOUSE LIGHTING 2.37 15 15 15 40/3 RTU -1 0.72 8.59 20/1 16 20/1 WAREHOUSE LIGHTING 1 2.37 20/1 17 1 1 18 20/1 8.59 18 20/1 WAREHOUSE LIGHTING 1 19 20/1 2.37 19 ( 0 20 8.59 DISPOSAL 20/1 20 20/1 SPACE 21 0 FURNITURE CONNECTION 20/1 21 20/3 RTU -2 20/1 LIGHTING 3.88 20/1 22 20/1 SPACE 20/1 FURNITURE CONNECTION 0 20/1 23 1 20/1 LIGHTING 0 24 3.88 24 20/1 SPACE FURNITURE CONNECTION 1 25 20/1 0 25 1 0.882 3.88 20/1 27 26 20/1 SPACE 1 27 0 20/1 LIGHTING 27 20/3 RTU -3 28 29 3.88 FURNITURE CONNECTION 28 20/1 SPACE 30 20/1 LIGHTING 0 29 1 31 20/1 FURNITURE CONNECTION 1 3.88 30 20/1 SPACE IAC -1, OAC -1 SPACE 1.27 0 0 31 1 RECEPTACLE SPACE 3.88 0 34 32 20/1 SPACE SPACE 1.27 0 35 20/1 33 20/1 SPACE 0.9 36 0 ERV -1 34 20/1 SPACE 0.52 37 30/2 0 2.16 35 20/1 SPACE 1 0 0 36 20/1 SPACE 1 2.16 0 37 20/1 SPACE 0 0.468 20/1 38 125/3 XFMR T2 0 15.5 42 1 39 20/1 SPACE 0.468 0 SPACE 40 1 TOTAL CONNECTED KVA BY PHASE 17.8 17.8 17.8 41 20/1 SPACE KVA CALC KVA LIGHTING 0 42 1 2 (125%) LARGEST MOTOR 3.96 4.95 (125%) HEATING 0 0 (N/A) OTHER MOTORS 5.37 5.37 (100%) COOLING 0 15.5 RECEPTACLES 17.4 13.7 (50%>10) NONCONTINUOUS 3.8 3.8 (100%) KITCHEN EQUIP 11 9 (MAX 2) DIVERSE 0 0 (N/A) METERED TOTAL CONNECTED KVA BY PHASE 42.6 41.7 41.8 (125%) CONN KVA CALC KVA 0 (N/A) CONN KVA CALC KVA 0 (N/A) LIGHTING 33.9 42.4 (125%) CONTINUOUS 1.6 2 (125%) LARGEST MOTOR 25.8 32.2 (125%) HEATING 0 0 (N/A) OTHER MOTORS 32.6 32.6 (100%) COOLING 0 0 (N/A) RECEPTACLES 17.4 13.7 (50%>10) NONCONTINUOUS 3.8 3.8 (100%) KITCHEN EQUIP 11 9 (MAX 2) DIVERSE 0 0 (N/A) METERED DEMAND 0 0 (125%) TOTAL KVA 126 136 BALANCED 3-PHASE AMPS 163 L2 ROOM INPUT VOLTS 208Y/120V 3P 4W AIC 22,000 MOUNTING FLUSH OUTPUT VOLTS 208Y/120V 3P 4W INPUT KVA 5 FED FROM UTILITY OUTPUT KVA 5 NOTE ROOM VOLTS 208Y/120V 3P 4W AIC 22,000 MOUNTING FLUSH BUS AMPS 200 MAIN BKR 200 FED FROM T2 NEUTRAL 100% LUGS STANDARD NOTE ROOM MOUNTING FLUSH FED FROM MSB NOTE CKT CKT CKT LOAD KVA CKT CKT LOAD KVA CKT LOAD KVA # BKR CIRCUIT DESCRIPTION A B c # BKR CIRCUIT DESCRIPTION C A B C 20/1 RECEPTACLE, SWITCHED QUAD 1.26 1 20/1 2 40/2 RG 4 2 20/1 3 20/1 RECEPTACLE 0.72 3 4 1 3.45 4 4 5 20/1 HF, MICROWAVE, RECEPTACLE 2.88 1.86 6 20/2 IH 0.75 7 20/1 RECEPTACLE 1.08 8 1 20/1 LIGHTING 0.75 3.66 9 20/1 RECEPTACLE DP 0.72 2.88 10 20/1 REFRIGERATOR 20/1 LIGHTING 1.6 11 20/1 RECEPTACLE, SWITCHED RECEPTACLE 20/1 SPACE 1.26 12 20/1 COFFEE MAKER, RECEPTACLE 11 20/1 LIGHTING 0.68 13 20/1 RECEPTACLE, SWITCHED 1.08 20/1 SPACE 14 20/1 DISHWASHER 0.8 13 20/1 LIGHTING RECEPTACLE 14 20/1 SPACE 0 15 15 20/1 RECEPTACLE 0.72 16 20/1 MICROWAVE 1 17 20/1 FURNITURE CONNECTION 1 18 20/1 MICROWAVE SPACE 1 19 20/1 FURNITURE CONNECTION 1 0 20 20/1 DISPOSAL 20/1 1 0 21 20/1 FURNITURE CONNECTION 20/1 1 22 20/1 LIGHTING 22 20/1 1.32 23 20/1 FURNITURE CONNECTION 23 20/1 1 24 20/1 LIGHTING 0 24 20/1 1.1 25 20/1 FURNITURE CONNECTION 1 25 20/1 26 20/1 LIGHTING 0.882 26 20/1 27 20/1 FURNITURE CONNECTION 1 27 28 20/1 LIGHTING 0 0.702 28 29 20/1 FURNITURE CONNECTION 0 1 30 20/1 LIGHTING 1.27 31 20/1 FURNITURE CONNECTION 1 32 20/2 IAC -1, OAC -1 SPACE 1.27 0 33 20/1 RECEPTACLE SPACE 1.08 0 34 1 33 20/1 SPACE 1.27 35 20/1 RECEPTACLE 20/1 SPACE 0.9 36 20/2 ERV -1 35 20/1 SPACE 0.52 37 30/2 IHP-1, OHP -1 2.16 20/1 SPACE 38 1 0 0.52 20/1 SPACE 39 1 2.16 125/3 40 20/2 ERV -2 0.468 20/1 41 20/1 LIGHTING 0 0.421 42 1 3.03 0.468 20/1 SPACE TOTAL CONNECTED KVA BY PHASE 17.8 17.8 13.2 CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 5.68 7.1 (125%) CONTINUOUS 1.6 2 (125%) LARGEST MOTOR 3.96 4.95 (125%) HEATING 0 0 (N/A) OTHER MOTORS 5.37 5.37 (100%) COOLING 0 0 (N/A) RECEPTACLES 17.4 13.7 (50%>10) NONCONTINUOUS 3.8 3.8 (100%) KITCHEN EQUIP 11 9 (MAX 2) DIVERSE 0 0 (N/A) METERED DEMAND 0 0 (125%) TOTAL KVA 48.8 45.9 (125%) BALANCED 3-PHASE AMPS 127 H 3 ROOM INPUT VOLTS 208Y/120V 3P 4W AIC 22,000 MOUNTING FLUSH OUTPUT VOLTS 208Y/120V 3P 4W INPUT KVA 5 FED FROM UTILITY OUTPUT KVA 5 NOTE CKT # ROOM MOUNTING FLUSH FED FROM MSB NOTE VOLTS 480Y/277V 3P 4W AIC 22,000 BUS AMPS 100 MAIN BKR MLO NEUTRAL 100% LUGS STANDARD LOAD KVA CKT CKT B C LOAD KVA CKT CKT 0.573 0.43 0.43 0 0 0.573 0.43 0.43 ! 0.5731 0 0 1 LOAD KVA # BKR CIRCUIT DESCRIPTION A B C # BKR CIRCUIT DESCRIPTION A B C 1 20/1 LIGHTING 3.45 2 20/1 DP 2.88 3 20/1 LIGHTING 3.45 4 20/1 DP 2.88 5 20/1 LIGHTING 3.44 6 20/1 DP 2.88 7 20/1 LIGHTING 3.66 8 20/1 DP 2.88 9 20/1 LIGHTING 3.44 10 20/1 SPACE 0 11 20/1 LIGHTING 3.23 12 20/1 SPACE 0 13 20/1 LIGHTING 2.59 14 20/1 SPACE 0 15 20/1 LIGHTING 3.23 16 20/1 SPACE 0 17 20/1 LIGHTING 2.37 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 21 20/1 SPACE 0 22 20/1 SPACE 0 23 20/1 SPACE 0 24 20/1 SPACE 0 25 20/1 SPACE 0 26 20/1 SPACE 0 27 20/1 SPACE 0 28 20/1 SPACE 0 29 20/1 SPACE 0 30 20/1 SPACE 0 31 20/1 SPACE 0 32 20/1 SPACE 0 33 20/1 SPACE 0 34 20/1 SPACE 0 35 20/1 SPACE 0 36 20/1 SPACE 0 37 20/1 SPACE 0 38 125/3 XFMR T3 2.37 39 20/1 SPACE 0 40 1 SPACE 3.03 41 20/1 SPACE 0 42 1 SPACE 1.74 TOTAL CONNECTED KVA BY PHASE 17.8 16 13.7 CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 28.8 36.1 (125%) CONTINUOUS 0 0 (125%) LARGEST MOTOR 3 3.75 (125%) HEATING 0 0 (N/A) OTHER MOTORS 11.5 11.5 (100%) COOLING 0 0 (N/A) RECEPTACLES 4.14 4.14 (50%>10) NONCONTINUOUS 0 0 (100%) KITCHEN EQUIP 0 0 (N/A) DIVERSE 0 0 (N/A) METERED DEMAND 0 0 (125%) TOTAL KVA 47.5 55.5 BALANCED 3-PHASE AMPS 66.7 irL 3 ROOM INPUT VOLTS 208Y/120V 3P 4W AIC 22,000 MOUNTING FLUSH OUTPUT VOLTS 208Y/120V 3P 4W INPUT KVA 5 FED FROM UTILITY OUTPUT KVA 5 NOTE CKT # ROOM MOUNTING FLUSH FED FROM T3 NOTE VOLTS 208Y/120V 3P 4W Al . ' 00 BUS AMPS 200 MAIN BKR 200 NEUTRAL 100% LUGS STANDARD LOAD KVA CKT CKT B C LOAD KVA CKT CKT 0.573 0.43 0.43 0 0 0.573 0.43 0.43 ! 0.5731 0 0 1 LOAD KVA j# BKR CIRCUIT DESCRIPTION A B C # BKR CIRCUIT DESCRIPTION A B C 1 20/1 RECEPTACLE 1.44 2 20/2 AC 1.5 3 20/1 RECEPTACLE 0.72 4 1 1.5 5 20/1 RECEPTACLE 1.08 6 20/1 SPACE 0 7 20/1 RECEPTACLE 0.72 8 20/1 SPACE 0 9 20/1 RECEPTACLE 0.18 10 20/1 SPACE 0 11 20/1 SPACE 0 12 20/1 SPACE 0 13 20/1 SPACE 0 14 20/1 SPACE 0 15 20/1 SPACE 0 16 20/1 SPACE 0 117 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 21 20/1 SPACE 0 22 20/1 SPACE 0 23 20/1 SPACE 0 24 20/1 SPACE 0 25 20/1 SPACE 0 26 20/1 SPACE 0 27 20/1 SPACE 0 28 20/1 SPACE 0 29 20/1 SPACE 0 30 20/1 SPACE 0 31 20/1 SPACE 0 32 20/1 SPACE 0 33 20/1 SPACE 0 34 20/1 SPACE 0 35 20/1 SPACE 0 36 20/1 SPACE 0 37 20/1 SPACE 0 38 20/1 SPACE 0 39 20/1 SPACE 0 40 20/1 SPACE 0 41 20/1 SPACE 0 42 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 3.66 2.4 1.08 CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 0 0 (125%) CONTINUOUS 0 0 (125%) LARGEST MOTOR 3 3.75 (125%) HEATING 0 0 (N/A) OTHER MOTORS 0 0 (100%) COOLING 0 0 (N/A) RECEPTACLES 4.14 4.14 (50%>10) NONCONTINUOUS 0 0 (100%) KITCHEN EQUIP 0 0 (N/A) DIVERSE 0 0 (N/A) METERED DEMAND 0 0 (125%) TOTAL KVA 7.14 7.89 BALANCED 3-PHASE AMPS 21.9 I\VETE S ROOM INPUT VOLTS 208Y/120V 3P 4W AIC 22,000 MOUNTING FLUSH OUTPUT VOLTS 208Y/120V 3P 4W INPUT KVA 5 FED FROM UTILITY OUTPUT KVA 5 NOTE CKT # BREAKER TRIP/POLES CIRCUIT DESCRIPTION LOAD KVA FEEDER RACEWAY AND CONDUCTORS A B C 1 2 3 4 5 6 20/3 20/3 20/3 20/3 20/3 20/3 LIGHTING LIGHTING LIGHTING LIGHTING0.573 SPACE SPACE 0.573 0.43 0.43 0 0 0.573 0.43 0.43 ! 0.5731 0 0 1 0.573 0.43 0.43 0.573 0 0 1/2"C,3#12,#12G 1/2"C,3#12,#12G 1/2"C,3#12,#12G 1/2"C,3#12,#12G TOTAL CONNECTED KVA BY PHASE 2.01 2.01 2.01 CONN KVA CALC KVA CALC KVA LIGHTING 6.02 1 7.53 (125%) TOTAL BALANCED LOAD 7.53 3-PHASE AMPS 20.9 D FO .� °°N FPPLI %LSC JAN 202019 City of Tukwila BUILDING DIVISION CITY OF TUKWILA JAN 0 4 2019 PERMIT CENTER ELECTRICInc. COMMERCIAL• INDUSTRIAL www.Idrbyec.com 4826 "B" St. NW Suite 101 Auburn, Washington 98001 (253) 859-2000 (FAX) 859-2363 ARIZONA TILE TI 11060 TUKWILA INTERNATIONAL BLVD TUKWILA, WA 98168 REVISIONS: 1A 2019-01-04 PER CITY REVIEW PANEL SCHEDULES SCALE: SEE PLAN DA1:11-27-18 DRAM BY: V.S.K. CHECKED BY: SHEET E3.2 JOB NO.: 18-090 OF