Loading...
HomeMy WebLinkAboutPermit D19-0036 - ISRAEL RESIDENCE - DRY WALLISRAEL RESIDENCE 15210 MACADAM RD S UNIT D-210 D19-0036 Parcel No: Address: City of Tukwila Department of Community Development 6300 Sauthcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 7888950230 Permit Number: D19-0036 15210 MACADAM RD S D210 Issue Date: 2/19/2019 Permit Expires On: 8/18/2019 Project Name: ISRAEL RESIDENCE Owner: Name: Address: MATHEW WILSON+JESSIE K 4830 S 152ND ST, SEATTLE, WA, 98188 Contact Person: Name: WILSON MATHEW Address: Contractor: Name: Address: License No: Lender: Name: Address: 15210 MACADAM RD 5 , TUKWILA, WA, 98188 AFFIDAVIT MATTHEW WILSON /II Phone: (206) 234-5555 Phone: Expiration Date: DESCRIPTION OF WORK: MAY NEED TO INSTALL DRY WALL BACK. Remove and replace damaged sheetrock at washer/dryer wall in unit D210 - See plans Project Valuation: $500,00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: VB Electrical Service Provided by: Fees Collected: $119.22 Occupancy per IBC: Water District: Sewer District: Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Chan ne|bahon/Sthping: [urbCut/Acces$Sidwa|k: Fire Loop Hydrant: Flood Control Zone: Hau|inQ/OveoizeLoad: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut O R||: 0 Number: O No Permit Center Authorized Signature: |hearbycertify that I have read and examined th� permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting nfthis permit does not presume togive authority toviolate orcancel the provisions ufany other state orlocal laws regulating construction orthe performance ofwork. iamauthorized tnsign and obtain this development permit this permit, Signature: -- " ^m^ . `` ' Date: This permit shall become null and void ifthe work isnot commenced within 180 days for the date cfissuance, or if the work issuspended orabandoned for aperiod of1MOdays from the last inspecdon. PERMIT CONDITIONS: 1: 'BUILDING PERMIT ODND[OON5*~~ 2: Work shall be installed in accordance with the approved construction documents, and any changes made during constrvctonthat are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site ofwork and shall be ope-n to inspection by the Building Inspector until final inspection approval is granted. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in atimely manner. 5: Afinal report documenting required special inspections and correction mfany discrepancies noted inthe inspections shall besubmitted tnthe Building Official. The final inspection report shall beprepared bythe approved special inspection agency and shall be submitted to the Building Official prior to and as a condition nffinal inspection approval. 6: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 7: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 8: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other -ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670), 13: Code Enforcement identified a bed bug infestation at this property. * You must provide the City of Tukwila's Rental Housing Program with documentation -from a professional pest management company, certifying that the bed bug infestation has been fully abated and a copy of the invoice. * The documentation should be on company letterhead and must include the date and time of any inspections and treatments, as well as, methods used to treat the infestation. * This documentation must be received by the City prior to scheduling any City inspections for this permit. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0409 FRAMING 0502 LATH/GYPSUM BOARD Ni• CITY OF TUKCLA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http:llwww.Tukwi laWA.,gov Building Pe No. Project No, Date Application Accepted: Date Application Expires: nt P-510: 6745 11 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Site Address: 1 0 (\klir K- k Suite Number: 0 2-10 Floor: Tenant Name: ESC)ria S PROPERTY OWNER Name: kAi \ Lso Ni f\N..t.."1- kVEV./ Address: Ja s ts-2_ it_cl A -(-- City: 7 uKvi 1 L k State: (Ai Zip: 9 g I fie CONTACT PERSON - person receiving all project communication Name: _S 41,-TI) E-,_ eziS at It2r0 If 4-- Address: City: State: Zip: Phone: Emailli j w\cyf il (4,./ 4 e) GENERAL CONTRACTOR INFORMATION Company Name: rs _71 cp E Co ri viw 0 cyl Or) a c Address: City: State: Zip: Phone: 204 b i g 6333 Fax: Contr Reg No.: g ,TE...occe 7. pd Date: Tukwila Business License No.: New Tenant: Ll Yes LI .. No ARCHITECT OF RECORD Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: HAApplications \Forms -Applications On Line \2012 ApplicationsTennit Application Revised 2-7-12.docx Revised: February 2012 1113 Page 1 of 4 BUILDING PERMIT INFORMAT - 206-431-3670 Valuation of Project (contractor's bid price): $ 5700 — Existing Building Valuation: $ KL-e-e.) 4o1n S -Lk ke_ Describe the scope of work (please provide detailed information): fs/1,k‘i At\vVvik fS) l./30A\ 13.,<1.-kf, • Will there be new rack storage? LJ....Yes If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1st Floor 730 ‘LA 0 'Nq 0 N 0 rd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Z Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): 99 6D Floor area of principal dwelling: 6 50 s Floor area of accessory dwelling: 63'0 *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? El Yes FIRE PROTECTION/HAZARDOUS MATERIALS: __Sprinklers ..... Automatic Fire Alarm Compact: 0 Handicap: 0 [1?'. No If "yes", explain: Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? El Yes 0 No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. HAApplications \Forms -Applications On Line1.2012 Applications \Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 PUBLIC WORKS PERMIT INF TION — 206-433-0179 Scope of Work (please provide detailed information): \&\ 4-4 Ve_ 00.31e) O 41eMpOritli (\el Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District rg!. Tukwila 0 ...Water District #125 .. • Water Availability Provided Sewer District Tukwila 0 .. Sewer Use Certificate EK.-.Valley View D ...Sewer Availability Provided 0...Highline D... Renton ... Renton 0.., Seattle Septic System: El On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which aprilv): .. • Civil Plans (Maximum Paper Size — 22" x 34") .. Technical Information Report (Storm Drainage) .. Bond 0... Insurance 0... Easement(s) Proposed Activities (mark boxes that apply): • Right-of-way Use - Nonprofit for less than 72 hours 0 .. Right-of-way Use - No Disturbance .. Construction/Excavation/Fill - Right-of-way D Non Right-of-way D 0 .. Total Cut .. Total Fill cubic yards cubic yards Geotechnical Report 0...Maintenance Agreement(s) Li .. Traffic Impact Analysis Hold Harmless — (SAO) .. Hold Harmless — (ROW) 0... Right-of-way Use - Profit for less than 72 hours 0... Right-of-way Use — Potential Disturbance 0... Work in Flood Zone 0...Storm Drainage 0 .. Sanitary Side Sewer 0... Abandon Septic Tank 0... Grease Interceptor 0 .. Cap or Remove Utilities 0... Curb Cut 0.., Channelization 0 .. Frontage Improvements 0... Pavement Cut 0... Trench Excavation 0 .. Traffic Control D.., Looped Fire Line 0... Utility Undergrounding Backflow Prevention - Fire Protection Irrigation Domestic Water D .. Permanent Water Meter Size (I) , WO # (2) " WO # (3) " WO # D .. Temporary Water Meter Size (I) " WO # (2),.,,,_" WO # (3) " WO # 0 .. Water Only Meter Size 7 5 WO # 0 .. Deduct Water Meter Size 15 El .. Sewer Main Extension Public 0 Private 0 0 .. Water Main Extension Public 0 Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) .. Water 0 .. Sewer Monthly Service Billing to: Name: Mailing Address: Water Meter RefuncUBilling: Name: Mailing Address: .. Sewage Treatment Day Telephone: City State Zip Day Telephone: City State Zip HAApplicationsWorms-Applications On Line \2012 ApplicationsTermit Application Revised - 2-7-12,doeic Revised: February 2012 bh Page 3 of 4 PERMIT APPLICATION NOTES — aft Print Name: Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated, Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER ORJJTHORJZED Signature: kij S k_t< kdki Mailing Address: Z-Si a \ Iss a_ Day Telephone: \ 0140 \ Les City Date: 3 i-s‘ \kik 92g-,2 State Zip HAApplicationaorms-Applications On Line \2012 ApplicationsTermit Application Revised - 2-7-12.doce Revised: February 2012 bh Page 4 of 4 Cash Register Receipt City of Tula/vita DESCRIPTIONS A COUNT QUANTITY PAID PermitTRAK 9.22 D19-0036 Address: 15210 MACADAM RD 5 D210 Apn: 7888950230 $119.22 DEVELOPMENT $115.90 PERMIT FEE R000.322.100.00.00 0.00 $66.30 PLAN CHECK FEE R000.345.830.00.00 0.00 $43.10 WASHINGTON STATE SURCHARGE 8640.237.114 0.00 $6.50 TECHNOLOGY FEE $3.32 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R16637 R000.322.900.04.00 0.00 $3.32 $119.22 Date Paid: Friday, January 25, 2019 Paid By: WILSON A MATHEW Pay Method: CHECK 4950 Printed: Friday, January 25, 2019 12:57 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 1 ‘7eideM..-. Type o spection: T'etAavtAi t?"4„, Address: 1 '2.‘p is Date Called: - Special Instructions: Date Wanted: a, . Requester: Phone No: 7-4C;(67 2-34 ,SS.5. c Approved per applicable codes. COMMENTS: ns pector: Corrections required prior to approval. ,Aammeiggp .misura'""*.—Ai • irArfr 1 'It fla REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call. to schedule reinspection. CITY OF TUKWILA JAI12 5 2019 PERMIT CENTER FILE Peel No. Plan revew approval 's suolect to e rors and !Mons Approval of construction documents does lot authuae the violation of any aoopted code or ordinance Receipt of approved Field Cape and condo cK edged: By Date:. CO of Tukw la UILDING DIVISION REVISIONS No changes snag 9e'aaoe to Ine scope of worK gnu: pro: approval (YIN. Tukwila Building Division rKOTE: Revisions will require a new plan 6ufmrttal and may include additional plan (evle Jomittai d -,--y_, SEPARATE PERMIT REQUIRED FOR: :lam 1RIUrttbi Sao Of woRK CayOf.rukil BUILDING,DIVISION RE1^416 13.410 �n�66�1—�' Not fRa w - Guar krP WhSNER/PlzIR SPAce • R;pinta pre 14E GR,y►N- • No pR,4,51ck. oR Vf jlli t. Crtf CASs JtRE PRo►'oSED 1- M$95-0000 . UNIT D2oI Pao 1uIC KciatettvA ld 5' Tl wl0., w� ggtei, Dpre I24/ZoIq Code Enforcement identified a bed bug infestation at this property. You must provide the City of Tukwila's Rental Housing Program with documentation from a professional pest management company, certifying that the bed bug infestation has been • fully abated and a copy of the invoice, The documentation should be on company letterhead and must include the date and time of any inspections and treatments, as well as, methods used to treat the infestation. This documentation must be received by the City prior to scheduling any City inspections for this permit. UNIT 0 IMPROVEMEN I tr'I�1 afV • cqt r W�L� 0. 044 REVIEr,.6) fVI CODE COMPUANCE APPROVED FEB 07 219 City of Tukwila BUILDING DIVISION Hof. PLA' 4.1446-; TRSv • 0.11.77 971t "c2o'f0 50lo Mo14 S VskciAk 1 l l � h►SY Z Loyal Ise222120r 40 feet of Nat pectto of tract 71 Of ltmk1G qtd a0 f 0 Ott g2o2ded in robe 10 of pGG'u yoga 94, 9277.la7 hwtppahiMG., dnftfGd a follow; ..,' x it the 0l othooL of e111 heott1l NOoin9 tuue Ga! to thh 7701,27 142agGninpl tkonet South it ri2b .Anon u.ttt mttMMly rt9At 04.oly no,lo of Pronty'0Gt 1uY Ae u ewdn0id In MlrV fomty 0240AO, [putt Puma dW ty tG 1 to .0 xabinqun; Nt er Me0Gfit north old At of F Mu43P u t polo: .Alt port Ithe fit eOpoi Vu! j11 151no out obit eofd north l:o to the of plot Of, lopi2{y hn�aap 22. city Of Mkulle, county 0f 11e9, G 1ftloploptpe..,^. but !d of 0tcuroto 1stdtn ;recto, et for pia. IWY 1d of Plots m polo 41, recorie of 412 fount tolio�i34,t77 ocoona of'Loth tart 23; t 710 feet to the paint of M9Winq; th at right ,glee to a pol.t 0 tiro Ibrthetly ri ht is of thinly date 21191nny Ion, 2 et colored by' if Maatdn9G0 in Rim Io00ty aoperlor wort Mu x0. loot told rlgk! 0t math margin too point y2iih NuG Woof oath that 21; 0p 0014 North line to the point of Gglnnteti FS feettMeed to monad aloof tho,Port02t , Comfy of ;dog State of we ' an of MO 12:U geokvnle Carden 4110G rr pot 717E� Motto It of Plur,,ynge 47, wards 0f 1(177;7 0nle.: humph a Eauth .. at n pith thee South ltoc f sold hut 22 diatom' t Yet of tr. 9dutlistt oee point tuc0el t o 9ortb of t0 nitloct21 eTOa f fort heeldmt24 '2atn 22 tneno'Got,: penlle2'ulot to 00 thtK1 talon et right mkt, 7:0 t001 tO maid at a?.09 add Noah 1100 t,lntetuet to Mt94.24 729 1 u 0etlb11 o4 4y deed nc-;. 'a tole Mire o211Mnt0 uut2; theme gong; Youth lire fL0el0'Tmot22, theme Out G. plat of 1enlnpl.;1 11toothy ^i 02'10kyila, toothy 01 Fl;q, Pt0tOof.xa fee of nee 22. of 01ookvaln tuden trots, 02 9,2 97e. in Mao 17 of Plels, ra4o ti, etordr of #n9 Lamy, Mot 22, t &&touts of 22l.0i(ttth 2ael of. Lae ddote:motdsd of `' d dau 12N of Tnot 21 vitt ono Lotetly m0cgh of the coma d 0 thou •G uld not thoolth thong th0 Abeterly.ndr of A Ee0G"tbeno'R tot et richt aml,n t0 maid coat WO tot .o'tut 10vlh 0f tho Moat :the 0f note Trot 22 mad Na ,..:. trh4a071y1 •t4nen root petn2101 Nth 0J0 Netthl. Muth. et el9ht color, 7.7 foot -to to rode;; n0Not lnp: n3N•'ef1 floe 2000 ter Onto orythe t. eld Forth lit S O fort -Gotha gilt 0 Ip of lathy7.0 foe!ty277O feet. IN,V4�I17�L1'V CAT, th0677'1 a%nxtuwat 8 li4 '(bKKM .G" idoodd IQ.> 7' toc6 .Ir;72 I664f4a 2744' j7-Vo J 7°o' de. MWUP Tit M LRISLPIM."1/1 PAM 29,P2Ae'P ro von 210 A 01Rx0t PLR P,O.1. 9t 71701420 PK.t4tt 1 dNP Nyman MU W. 2201 UGiI O9I2A 2,0G Spt0el014 PLL PIMP. N0 P.L.C. Minn 1202 Ibl nbb N".wPis Slag CM M253217 MIVA. 9201 1 OF I/17 07 A2LA 0222M91 sot me 7.1,3 d0C71m 1207 lel 27727¢917.th 2LRPI OPIUM ,Ira O.S.1. RQ20N 110f Pn xt1. Ple"'ItfV' T:a. E'41RIQiJ PO'H3FA' 986)Q PAkIF '.NWY fjp "> y5A1'fl ' '$2.4•112n VJA KhlCsln",J1 J11 A22 h 6,CAJAIA?,t>Au 1t1l1JIi.;�.:4W 1y��ld lk CODE COMPLIANCE ' AP R VED lity of TuKwi,Ia UILDING DIVISION RECEIVED 'CITY OF TUKWILA J .N 2 g /019 PERMITCENTER HERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D19-0036 DATE: 1/25/19 PROJECT NAME: ISRAEL RESIDENCE SITE ADDRESS: 15210 MACADAM RD S D210 X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: PO PIO ir Building Division 1\i\V 14/2 0\ Pute\Works A-0 NIA - Fire Prevention Structural W7 ta" Planning Division Permit Coordinator ill PRELIMINARY REVIEW: Not Applicable 1-1 (no approval/review required) REVIEWER'S INITIALS: DATE: 1/29/19 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) DUE DATE: 2/26/19 Approved with Conditions ri Denied (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg El Fire 0 Ping 11 PW Staff Initials: 12/18/2013 CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (206) 431-3665 E-mail:: tukplan@ ci.tukwila.wa.us AFFIDAVIT IN LIEU OF CONTRACTOR STATE OF WASHINGTON) COUNTY OF KING ) SS. W i1<S he H-Ek/ [please print name] , states as follows: Permit Center/Building Division 206 431-3670 Public Works Department 206 433-0179 Planning Division 206 43i-367o GISTRATION PERMIT NO: )/ 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number 13, and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. .\\‘\``` 1111111 AWs �g1ON" A .c' — N "9I� lllllll5`29.. O, W S�� Residing at Signed and sworn to before me this 441 iq day of Fe- ''.1 t (r^t ✓ , 20 / % . G N i T ' Y PUBLIC in and for the State of Washington , County Name as commissioned: My commission exp /ate 18.27.090 Exemptions. The registration provisions of this 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.7o RCW who shall warranty service and repairs under chapter 46.7o RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; io. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed Ikt chapter do not apply to: by a registered contractor; >l <. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18. An entity who holds,a valid electrical contractor's license under chapter'1928 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, or an electrical tiaineemeeting the requirements of chapter 19.28 RCW to perform plumbing work that is incidentally, directly; and immediately appropriate to the like-iii-kind repiacement of a household appliance or other small household utilisation equipment that requires limited electric power andtliihited waste and/or water connections. An'electrical trainee must be supervised by a certified electrician while performing plumbing work. • Per Washington State Department of Labor and industries lessee has been interpreted to be equivalent to owner for purposes of exemptions.