HomeMy WebLinkAboutPermit D19-0036 - ISRAEL RESIDENCE - DRY WALLISRAEL RESIDENCE
15210 MACADAM RD S
UNIT D-210
D19-0036
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Sauthcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
DEVELOPMENT PERMIT
7888950230 Permit Number: D19-0036
15210 MACADAM RD S D210 Issue Date: 2/19/2019
Permit Expires On: 8/18/2019
Project Name: ISRAEL RESIDENCE
Owner:
Name:
Address:
MATHEW WILSON+JESSIE K
4830 S 152ND ST, SEATTLE, WA,
98188
Contact Person:
Name: WILSON MATHEW
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
15210 MACADAM RD 5 , TUKWILA,
WA, 98188
AFFIDAVIT MATTHEW WILSON
/II
Phone: (206) 234-5555
Phone:
Expiration Date:
DESCRIPTION OF WORK:
MAY NEED TO INSTALL DRY WALL BACK.
Remove and replace damaged sheetrock at washer/dryer wall in unit D210 - See plans
Project Valuation: $500,00
Type of Fire Protection: Sprinklers:
Fire Alarm:
Type of Construction: VB
Electrical Service Provided by:
Fees Collected: $119.22
Occupancy per IBC:
Water District:
Sewer District:
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Public Works Activities:
Chan ne|bahon/Sthping:
[urbCut/Acces$Sidwa|k:
Fire Loop Hydrant:
Flood Control Zone:
Hau|inQ/OveoizeLoad:
Land Altering:
Landscape Irrigation:
Sanitary Side Sewer:
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter:
Volumes: Cut O R||: 0
Number: O
No
Permit Center Authorized Signature:
|hearbycertify that I have read and examined th� permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting nfthis permit does not presume togive authority toviolate orcancel the provisions ufany other
state orlocal laws regulating construction orthe performance ofwork. iamauthorized tnsign and obtain this
development permit this permit,
Signature: -- " ^m^ . `` ' Date:
This permit shall become null and void ifthe work isnot commenced within 180 days for the date cfissuance, or if
the work issuspended orabandoned for aperiod of1MOdays from the last inspecdon.
PERMIT CONDITIONS:
1: 'BUILDING PERMIT ODND[OON5*~~
2: Work shall be installed in accordance with the approved construction documents, and any changes made
during constrvctonthat are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site ofwork
and shall be ope-n to inspection by the Building Inspector until final inspection approval is granted.
4: When special inspection is required, either the owner or the registered design professional in responsible
charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to
the first building inspection. The special inspector shall furnish inspection reports to the Building Official in
atimely manner.
5: Afinal report documenting required special inspections and correction mfany discrepancies noted inthe
inspections shall besubmitted tnthe Building Official. The final inspection report shall beprepared bythe
approved special inspection agency and shall be submitted to the Building Official prior to and as a
condition nffinal inspection approval.
6: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
7: There shall be no occupancy of a building until final inspection has been completed and approved by
Tukwila building inspector. No exception.
8: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other -ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
12: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670),
13: Code Enforcement identified a bed bug infestation at this property.
* You must provide the City of Tukwila's Rental Housing Program with documentation -from a professional
pest management company, certifying that the bed bug infestation has been fully abated and a copy of the
invoice.
* The documentation should be on company letterhead and must include the date and time of any
inspections and treatments, as well as, methods used to treat the infestation.
* This documentation must be received by the City prior to scheduling any City inspections for this permit.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1700 BUILDING FINAL**
0409 FRAMING
0502 LATH/GYPSUM BOARD
Ni•
CITY OF TUKCLA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
http:llwww.Tukwi laWA.,gov
Building Pe No.
Project No,
Date Application Accepted:
Date Application Expires:
nt P-510:
6745 11
(For office use only)
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
King Co Assessor's Tax No.:
Site Address: 1 0 (\klir K- k Suite Number: 0 2-10 Floor:
Tenant Name: ESC)ria S
PROPERTY OWNER
Name:
kAi \ Lso Ni
f\N..t.."1- kVEV./
Address: Ja s
ts-2_ it_cl
A -(--
City:
7 uKvi 1 L k
State: (Ai
Zip: 9 g I fie
CONTACT PERSON - person receiving all project
communication
Name:
_S 41,-TI) E-,_
eziS
at It2r0 If 4--
Address:
City:
State:
Zip:
Phone:
Emailli j w\cyf il (4,./ 4 e)
GENERAL CONTRACTOR INFORMATION
Company Name: rs _71 cp E Co ri viw 0 cyl Or) a c
Address:
City: State: Zip:
Phone: 204 b i g 6333 Fax:
Contr Reg No.: g ,TE...occe 7. pd Date:
Tukwila Business License No.:
New Tenant: Ll Yes LI .. No
ARCHITECT OF RECORD
Company Name:
Architect Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
ENGINEER OF RECORD
Company Name:
Engineer Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name:
Address:
City: State: Zip:
HAApplications \Forms -Applications On Line \2012 ApplicationsTennit Application Revised 2-7-12.docx
Revised: February 2012
1113
Page 1 of 4
BUILDING PERMIT INFORMAT - 206-431-3670
Valuation of Project (contractor's bid price): $ 5700 — Existing Building Valuation: $
KL-e-e.) 4o1n S -Lk ke_
Describe the scope of work (please provide detailed information): fs/1,k‘i
At\vVvik fS) l./30A\ 13.,<1.-kf, •
Will there be new rack storage? LJ....Yes
If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
Existing
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
IBC
Type of
Occupancy per
IBC
1st Floor
730
‘LA 0
'Nq 0
N 0
rd Floor
3rd Floor
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Z
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): 99 6D Floor area of principal dwelling: 6 50 s Floor area of accessory dwelling: 63'0
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Will there be a change in use? El Yes
FIRE PROTECTION/HAZARDOUS MATERIALS:
__Sprinklers ..... Automatic Fire Alarm
Compact: 0
Handicap: 0
[1?'. No If "yes", explain:
Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? El Yes 0 No
If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
HAApplications \Forms -Applications On Line1.2012 Applications \Permit Application Revised - 2-7-12.docx
Revised: February 2012
bh
Page 2 of 4
PUBLIC WORKS PERMIT INF
TION — 206-433-0179
Scope of Work (please provide detailed information):
\&\ 4-4 Ve_ 00.31e) O 41eMpOritli (\el
Call before you Dig: 811
Please refer to Public Works Bulletin #1 for fees and estimate sheet.
Water District
rg!. Tukwila 0 ...Water District #125
.. • Water Availability Provided
Sewer District
Tukwila
0 .. Sewer Use Certificate
EK.-.Valley View
D ...Sewer Availability Provided
0...Highline D... Renton
... Renton 0.., Seattle
Septic System:
El On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department.
Submitted with Application (mark boxes which aprilv):
.. • Civil Plans (Maximum Paper Size — 22" x 34")
.. Technical Information Report (Storm Drainage)
.. Bond 0... Insurance 0... Easement(s)
Proposed Activities (mark boxes that apply):
• Right-of-way Use - Nonprofit for less than 72 hours
0 .. Right-of-way Use - No Disturbance
.. Construction/Excavation/Fill - Right-of-way D
Non Right-of-way D
0 .. Total Cut
.. Total Fill
cubic yards
cubic yards
Geotechnical Report
0...Maintenance Agreement(s)
Li
.. Traffic Impact Analysis
Hold Harmless — (SAO)
.. Hold Harmless — (ROW)
0... Right-of-way Use - Profit for less than 72 hours
0... Right-of-way Use — Potential Disturbance
0... Work in Flood Zone
0...Storm Drainage
0 .. Sanitary Side Sewer 0... Abandon Septic Tank 0... Grease Interceptor
0 .. Cap or Remove Utilities 0... Curb Cut 0.., Channelization
0 .. Frontage Improvements 0... Pavement Cut 0... Trench Excavation
0 .. Traffic Control D.., Looped Fire Line 0... Utility Undergrounding
Backflow Prevention - Fire Protection
Irrigation
Domestic Water
D .. Permanent Water Meter Size (I) , WO # (2) " WO # (3) " WO #
D .. Temporary Water Meter Size (I) " WO # (2),.,,,_" WO # (3) " WO #
0 .. Water Only Meter Size 7 5 WO # 0 .. Deduct Water Meter Size 15
El .. Sewer Main Extension Public 0 Private 0
0 .. Water Main Extension Public 0 Private 0
FINANCE INFORMATION
Fire Line Size at Property Line Number of Public Fire Hydrant(s)
.. Water 0 .. Sewer
Monthly Service Billing to:
Name:
Mailing Address:
Water Meter RefuncUBilling:
Name:
Mailing Address:
.. Sewage Treatment
Day Telephone:
City
State Zip
Day Telephone:
City
State Zip
HAApplicationsWorms-Applications On Line \2012 ApplicationsTermit Application Revised - 2-7-12,doeic
Revised: February 2012
bh
Page 3 of 4
PERMIT APPLICATION NOTES —
aft
Print Name:
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated, Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER ORJJTHORJZED
Signature:
kij S k_t< kdki
Mailing Address: Z-Si a \ Iss a_
Day Telephone:
\ 0140 \ Les
City
Date:
3 i-s‘
\kik 92g-,2
State Zip
HAApplicationaorms-Applications On Line \2012 ApplicationsTermit Application Revised - 2-7-12.doce
Revised: February 2012
bh
Page 4 of 4
Cash Register Receipt
City of Tula/vita
DESCRIPTIONS A COUNT QUANTITY
PAID
PermitTRAK
9.22
D19-0036 Address: 15210 MACADAM RD 5 D210 Apn: 7888950230
$119.22
DEVELOPMENT
$115.90
PERMIT FEE
R000.322.100.00.00
0.00
$66.30
PLAN CHECK FEE
R000.345.830.00.00
0.00
$43.10
WASHINGTON STATE SURCHARGE
8640.237.114
0.00
$6.50
TECHNOLOGY FEE
$3.32
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R16637
R000.322.900.04.00
0.00
$3.32
$119.22
Date Paid: Friday, January 25, 2019
Paid By: WILSON A MATHEW
Pay Method: CHECK 4950
Printed: Friday, January 25, 2019 12:57 PM 1 of 1
SYSTEMS
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:
1 ‘7eideM..-.
Type o spection:
T'etAavtAi t?"4„,
Address:
1 '2.‘p
is
Date Called:
-
Special Instructions:
Date Wanted:
a, .
Requester:
Phone No:
7-4C;(67 2-34 ,SS.5. c
Approved per applicable codes.
COMMENTS:
ns pector:
Corrections required prior to approval.
,Aammeiggp
.misura'""*.—Ai
•
irArfr
1 'It fla
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call. to schedule reinspection.
CITY OF TUKWILA
JAI12 5 2019
PERMIT CENTER
FILE
Peel No.
Plan revew approval 's suolect to e rors and
!Mons Approval of construction documents does
lot authuae the violation of any aoopted code or
ordinance Receipt of approved Field Cape and
condo cK edged:
By
Date:.
CO of Tukw la
UILDING DIVISION
REVISIONS
No changes snag 9e'aaoe to Ine scope
of worK gnu: pro: approval (YIN.
Tukwila Building Division
rKOTE: Revisions will require a new plan
6ufmrttal and may include additional plan (evle
Jomittai d
-,--y_,
SEPARATE PERMIT
REQUIRED FOR:
:lam
1RIUrttbi
Sao Of woRK
CayOf.rukil
BUILDING,DIVISION
RE1^416 13.410 �n�66�1—�'
Not fRa w -
Guar krP WhSNER/PlzIR
SPAce
• R;pinta pre 14E GR,y►N-
• No pR,4,51ck. oR Vf jlli t.
Crtf CASs JtRE PRo►'oSED
1- M$95-0000 .
UNIT D2oI
Pao 1uIC KciatettvA ld 5'
Tl wl0., w� ggtei,
Dpre I24/ZoIq
Code Enforcement identified a bed bug
infestation at this property.
You must provide the City of Tukwila's Rental
Housing Program with documentation from a
professional pest management company,
certifying that the bed bug infestation has been •
fully abated and a copy of the invoice,
The documentation should be on company
letterhead and must include the date and time of
any inspections and treatments, as well as,
methods used to treat the infestation.
This documentation must be received by the
City prior to scheduling any City inspections for
this permit.
UNIT
0 IMPROVEMEN
I tr'I�1
afV •
cqt r W�L�
0.
044
REVIEr,.6) fVI
CODE COMPUANCE
APPROVED
FEB 07 219
City of Tukwila
BUILDING DIVISION
Hof. PLA'
4.1446-;
TRSv
• 0.11.77
971t
"c2o'f0
50lo Mo14 S
VskciAk 1 l l � h►SY
Z
Loyal Ise222120r
40 feet of Nat pectto of tract 71 Of ltmk1G qtd
a0 f 0 Ott g2o2ded in robe 10 of pGG'u yoga 94,
9277.la7 hwtppahiMG., dnftfGd a follow; ..,'
x it the 0l othooL of e111 heott1l NOoin9 tuue Ga!
to thh 7701,27 142agGninpl tkonet South it ri2b .Anon
u.ttt mttMMly rt9At 04.oly no,lo of Pronty'0Gt
1uY Ae u ewdn0id In MlrV fomty 0240AO, [putt Puma
dW ty tG 1 to .0 xabinqun; Nt er Me0Gfit north old
At of F Mu43P u t polo: .Alt port Ithe fit eOpoi
Vu! j11 151no out obit eofd north l:o to the of plot Of,
lopi2{y hn�aap 22. city Of Mkulle, county 0f 11e9,
G 1ftloploptpe..,^.
but !d of 0tcuroto 1stdtn ;recto, et for pia.
IWY 1d of Plots m polo 41, recorie of 412 fount
tolio�i34,t77 ocoona of'Loth tart 23;
t 710 feet to the paint of M9Winq;
th at right ,glee to a pol.t 0 tiro Ibrthetly ri ht
is of thinly date 21191nny Ion, 2 et colored by'
if Maatdn9G0 in Rim Io00ty aoperlor wort Mu x0.
loot told rlgk! 0t math margin too point y2iih
NuG Woof oath that 21;
0p 0014 North line to the point of Gglnnteti
FS feettMeed to monad aloof tho,Port02t
, Comfy of ;dog State of we '
an of MO 12:U geokvnle Carden 4110G rr pot 717E�
Motto It of Plur,,ynge 47, wards 0f 1(177;7 0nle.:
humph a Eauth ..
at n pith thee South ltoc f sold hut 22 diatom'
t Yet of tr. 9dutlistt oee point tuc0el t o 9ortb of
t0 nitloct21 eTOa f fort heeldmt24
'2atn 22 tneno'Got,: penlle2'ulot to
00
thtK1 talon et right mkt, 7:0 t001 tO maid
at a?.09 add Noah 1100 t,lntetuet to
Mt94.24 729 1 u 0etlb11 o4 4y deed nc-;.
'a tole Mire o211Mnt0 uut2; theme gong;
Youth lire fL0el0'Tmot22, theme Out
G. plat of 1enlnpl.;1
11toothy ^i
02'10kyila, toothy 01 Fl;q, Pt0tOof.xa
fee of nee 22. of 01ookvaln tuden trots, 02 9,2 97e.
in Mao 17 of Plels, ra4o ti, etordr of #n9 Lamy,
Mot 22, t &&touts of 22l.0i(ttth 2ael of. Lae ddote:motdsd of `'
d dau 12N of Tnot 21 vitt ono Lotetly m0cgh of the coma
d 0 thou •G uld not thoolth thong th0 Abeterly.ndr of
A Ee0G"tbeno'R tot et richt aml,n t0 maid coat WO tot
.o'tut 10vlh 0f tho Moat :the 0f note Trot 22 mad Na
,..:. trh4a071y1 •t4nen root petn2101 Nth 0J0 Netthl.
Muth. et el9ht color, 7.7 foot -to to rode;;
n0Not lnp: n3N•'ef1 floe 2000 ter Onto
orythe t. eld Forth lit S O fort -Gotha gilt 0
Ip of lathy7.0 foe!ty277O feet.
IN,V4�I17�L1'V
CAT, th0677'1
a%nxtuwat 8
li4 '(bKKM
.G" idoodd IQ.> 7'
toc6 .Ir;72 I664f4a
2744' j7-Vo J 7°o' de.
MWUP Tit M LRISLPIM."1/1 PAM
29,P2Ae'P ro von 210 A 01Rx0t PLR P,O.1. 9t 71701420
PK.t4tt 1 dNP Nyman MU W. 2201 UGiI O9I2A 2,0G
Spt0el014 PLL PIMP. N0 P.L.C. Minn
1202 Ibl
nbb N".wPis Slag CM M253217 MIVA.
9201 1 OF I/17 07 A2LA 0222M91 sot me 7.1,3
d0C71m 1207 lel
27727¢917.th 2LRPI
OPIUM
,Ira O.S.1. RQ20N 110f
Pn xt1. Ple"'ItfV'
T:a.
E'41RIQiJ PO'H3FA'
986)Q PAkIF '.NWY fjp ">
y5A1'fl ' '$2.4•112n VJA KhlCsln",J1
J11 A22 h
6,CAJAIA?,t>Au
1t1l1JIi.;�.:4W 1y��ld lk
CODE COMPLIANCE
' AP R VED
lity of TuKwi,Ia
UILDING DIVISION
RECEIVED
'CITY OF TUKWILA
J .N 2 g /019
PERMITCENTER
HERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D19-0036 DATE: 1/25/19
PROJECT NAME: ISRAEL RESIDENCE
SITE ADDRESS: 15210 MACADAM RD S D210
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
PO PIO ir
Building Division
1\i\V 14/2 0\
Pute\Works
A-0 NIA -
Fire Prevention
Structural
W7 ta"
Planning Division
Permit Coordinator ill
PRELIMINARY REVIEW:
Not Applicable 1-1
(no approval/review required)
REVIEWER'S INITIALS:
DATE: 1/29/19
Structural Review Required
DATE:
APPROVALS OR CORRECTIONS:
Approved
Corrections Required
(corrections entered in Reviews)
DUE DATE: 2/26/19
Approved with Conditions ri
Denied
(ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections:
Bldg El Fire 0 Ping 11 PW
Staff Initials:
12/18/2013
CITY OF TUKWILA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431-367o FAX (206) 431-3665
E-mail:: tukplan@ ci.tukwila.wa.us
AFFIDAVIT IN LIEU OF CONTRACTOR
STATE OF WASHINGTON)
COUNTY OF KING )
SS.
W i1<S he H-Ek/
[please print name]
, states as follows:
Permit Center/Building Division
206 431-3670
Public Works Department
206 433-0179
Planning Division
206 43i-367o
GISTRATION
PERMIT NO: )/
1. I have made application for a permit from the City of Tukwila, Washington.
2. I understand that state law requires that all building construction contractors be registered with the
State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the
Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have
read or am familiar with RCW 18.27.090.
3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the
City of Tukwila must verify either that the contractor is registered by the State of Washington, or that
one of the exemptions stated under RCW 18.27.090 applies.
4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I
hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090,
I consider the work authorized under this permit to be exempt under number 13, and will therefore
not be performed by a registered contractor.
5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to
persons making electrical installations on their own property or to regularly employed employees
working on the premises of their employer. The proposed electrical work is not for the construction
of a new building for rent, sale or lease.
I understand that I may be waiving certain rights that I might otherwise have under state law in any decision
to engage an unregistered contractor to perform construction work.
.\\‘\``` 1111111
AWs
�g1ON" A
.c' —
N "9I�
lllllll5`29..
O, W S��
Residing at
Signed and sworn to before me this
441
iq day of Fe- ''.1 t (r^t ✓ , 20 / % .
G
N i T ' Y PUBLIC in and for the State of Washington
, County
Name as commissioned:
My commission exp
/ate
18.27.090 Exemptions. The registration provisions of this
1. An authorized representative of the United States
government, the state of Washington, or any incorporated
city, town, county, township, irrigation district, reclamation
district, or other municipal or political corporation or
subdivision of this state;
2. Officers of a court when they are acting within the scope
of their office;
3. Public utilities operating under the regulations of the
utilities and transportation commission in construction,
maintenance, or development work incidental to their own
business;
4. Any construction, repair, or operation incidental to the
discovering or producing of petroleum or gas, or the
drilling, testing, abandoning, or other operation of any
petroleum or gas well or any surface or underground mine
or mineral deposit when performed by an owner or lessee;
5. The sale of any finished products, materials, or articles of
merchandise that are not fabricated into and do not become
a part of a structure under the common law of fixtures;
6. Any construction, alteration, improvement, or repair of
personal property performed by the registered or legal
owner, or by a mobile/manufactured home retail dealer or
manufacturer licensed under chapter 46.7o RCW who shall
warranty service and repairs under chapter 46.7o RCW;
7. Any construction, alteration, improvement, or repair
carried on within the limits and boundaries of any site or
reservation under the legal jurisdiction of the federal
government;
8. Any person who only furnished materials, supplies, or
equipment without fabricating them into, or consuming
them in the performance of, the work of the contractor;
9. Any work or operation on one undertaking or project by
one or more contracts, the aggregate contract price of
which for labor and materials and all other items is less
than five hundred dollars, such work or operations being
considered as of a casual, minor, or inconsequential nature.
The exemption prescribed in this subsection does not apply
in any instance wherein the work or construction is only a
part of a larger or major operation, whether undertaken by
the same or a different contractor, or in which a division of
the operation is made into contracts of amounts less than
five hundred dollars for the purpose of evasion of this
chapter or otherwise. The exemption prescribed in this
subsection does not apply to a person who advertises or
puts out any sign or card or other device which might
indicate to the public that he or she is a contractor, or that
he or she is qualified to engage in the business of
contractor;
io. Any construction or operation incidental to the
construction and repair of irrigation and drainage ditches
of regularly constituted irrigation districts or reclamation
districts; or to farming, dairying, agriculture, viticulture,
horticulture, or stock or poultry raising; or to clearing or
other work upon land in rural districts for fire prevention
purposes; except when any of the above work is performed
Ikt
chapter do not apply to:
by a registered contractor;
>l <. An owner* who contracts for a project with a registered
contractor, except that this exemption shall not deprive the
owner of the protections of this chapter against registered
and unregistered contractors. The exemption prescribed in
this subsection does not apply to a person who performs
the activities of a contractor for the purpose of leasing or
selling improved property he or she has owned for less than
twelve months;
12.* Any person working on his or her own property,
whether occupied by him or her or not, and any person
working on his or her personal residence, whether owned
by him or her or not but this exemption shall not apply to
any person who performs the activities of a contractor on
his or her own property for the purpose of selling,
demolishing, or leasing the property;
13. An owner* who performs maintenance, repair, and
alteration work in or upon his or her own properties, or
who uses his or her own employees to do such work;
14. A licensed architect or civil or professional engineer
acting solely in his or her professional capacity, an
electrician certified under the laws of the state of
Washington, or a plumber certified under the laws of the
state of Washington or licensed by a political subdivision of
the state of Washington while operating within the
boundaries of such political subdivision. The exemption
provided in this subsection is applicable only when the
person certified is operating within the scope of his or her
certification;
15. Any person who engages in the activities herein
regulated as an employee of a registered contractor with
wages as his or her sole compensation or as an employee
with wages as his or her sole compensation;
16. Contractors on highway projects who have been
prequalified as required by RCW 47.28.070, with the
department of transportation to perform highway
construction, reconstruction, or maintenance work;
17. A mobile/manufactured home dealer or manufacturer
who subcontracts the installation, set-up, or repair work to
actively registered contractors. This exemption only applies
to the installation, set-up, or repair of the
mobile/manufactured homes that were manufactured or
sold by the mobile/manufactured home dealer or
manufacturer;
18. An entity who holds,a valid electrical contractor's
license under chapter'1928 RCW that employs a certified
journeyman electrician, a certified residential specialty
electrician, or an electrical tiaineemeeting the
requirements of chapter 19.28 RCW to perform plumbing
work that is incidentally, directly; and immediately
appropriate to the like-iii-kind repiacement of a household
appliance or other small household utilisation equipment
that requires limited electric power andtliihited waste
and/or water connections. An'electrical trainee must be
supervised by a certified electrician while performing
plumbing work.
• Per Washington State Department of Labor and industries lessee has
been interpreted to be equivalent to owner for purposes of exemptions.