HomeMy WebLinkAboutPermit D19-0364 - BOEING #9-120 - REPLACE DOORWAY AND INFILL OPENINGBOEING #9-120
9725 E MARGINAL WAY S
BLDG 9-120
FINALED
08/18/2021
D19-0364
Parcel No:
Address:
��
��City of Tukwila
Department of Community Development
G30OSnuthcenterBoulevard, Suite #1OO
Tukwila, Washington 98288
Phone:2O6-431'367O
Inspection Request Line; 206-438'9350
Web site: http://www.TukwilaWA.gov
DEVELOPMENT PERMIT
0003400018 Permit Number: DI9-0364
97ZSEMARGINAL WAY 5BLDG9'lZO Issue Date: 11/26/201.9
Permit Expires On: 5/24/2020.
Project Name: BOE|NG#9'lZO
Contact Person:
Contractor:
License No:
Lender
BOE|NGCOMPANY THE
POBOX 3707KA/[2O-59PROPERTY
TAX DEPT,SEATTLE,WA, 981Z4
MARTIN PROBST
POBOX 37U7 M/[:46'2UO,5EATTLE,
VVA'98124
CLEMENTS GENERAL CONSTR INC
1E8O5SEZ64ST,[OVNGTQN,WA,
98042
CLEw1EG[05005
BOEING COMPANY THE
POBOX 37U7M/[2U+}OPROPERTY
Phone: (200)8524985
Phone: (25])6]1'0106
Expiration Date: 9/10/20I0
DESCRIPTION OFWORK:
REMOVE DOORWAY AND INFILL OPENING WITH LIKE CONSTRUCTION. ADD NEW DOOR FRAME, DOORS AND
HARDWARE. NOCHANGE TDOCCUPANCY ORUSE
Project Valuation: $2,000.00
Type of Fire Protection:
Sprinklers: YES
Fire Alarm: YES
Type cfConstruction: UB
Electrical Service Provided by: TUKWILA
Fees Collected; $467l5
Occupancy per IBC: FZ
Water District: TUKVV|L4
Sewer District: VALLEY VIEW,TUKWILA
Current Codes adopted bythe City pfTukwilla;
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
National Electrical Code:
VVACities Electrical Code:
VVA[Z96-468:
ate Energy Code:
Public Works Activities:
Channe|izadon/Strip in8:
[urbCut/Access/Sdmwa|k:
Fire Loop Hydrant:
Flood Control Zone:
Hau|ine/OveoizeLoad:
Land Altering:
Landscape Irrigation:
Sanitary Side Sewer:
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter:
Volumes: Cut: 8 Fill: O
Number: 0
No
Permit Center Authorized Signature:
�� ~-
�
Date: \ \�.�—�~ (
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting nfthis permit does not presume togive authority toviolate orcancel the provisions cfany other
state nrlocal laws regulating construction o,the performance ofwork. (nmauthorized tnsign and obtain this
development permit and agree to the conditions attached to this permit.
Signature:
Print Name:
Date: /'/ 12z�2,01�
This permit shall become null and void if the work isnot commenced within 1OOdays for the date ofissuance, or if
the work is suspended orr abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: 'BUILDING PERMIT [OND|T|ON5^**
Z: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: Remove all demo4ition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
onsatisfactory completion ofthis requirement.
0: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OFPERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming togive authority toviolate orcancel the provisions ofthe code orother
ordinances ofthe City ofTukwila shall not bevalid. The issuance ofapermit based nnconstruction
documents and other data shall not prevent the Building Official from requiring the correction oferrors in
the construction documents and other data.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (2W6)438'9350
1700 BU|LD|NGF|NAL~*
0409 FRAMING
0502 LATH/GYPSUM BOARD
CITY OF TUKWTLA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Building Permit No.
Project No.
Date Application Accepted: 1,1, -1 s---t
Date Application Expires:
(For office use only)
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION /„2,z) keigte: e poop. IlE?
Site Address: 9725 East Marginal Way South
Tenant Name: The Boeing Company
King Co Assessor's Tax No.: 00034000 8
Suite Number: 9-120
PROPERTY OWNER
Name: The Boeing Company
Address: PO Box 3707, M/C 46-208
City: Seattle State: WA
zip: 98124
CONTACT PERSON — person receiving all project
communication
Name: Martin Probst
Address: PO Box 3707; M/C 46-208
City: Seattle, State: WA
zip: 98124
Phone: (206) 852-4985 Fax:
Email: martin.r.probst@boeing.com
GENERAL CONTRACTOR INFORMATION
Company Name: Clement General Construction
Address: 15805 SE 264th Street
City: State: WA Zip:
Covington98042
Phone: (253) 631-8106 Fax:
Contr Reg No.: CLEMEGC05005 Exp Date: 09/10/2020
Tukwila Business License No.: 601578352
HAApplicationsWorms-Applications On Line \ 2011 ApplicalionsTerrnii Application Revised - 8-9-11.docx
RevisedAugust 201
bh
Floor: 1
New Tenant: 0 Yes 1..No
ARCHITECT OF RECORD
Company Name: The Boeing Company
Architect Name: Geoffrey Miller
Address: PO Box 3707, M/C 46-208
City: Seattle State: WA
zip: 98124
Phone: Fax:
(253) 657-0864
Email: Geoffrey.M .Mi11erboeing.com
ENGINEER OF RECORD
Company Name: The Boeing Company
Engineer Name: Sung Cho
Address: PO Box 3707, M/C 46-208
City: Seattle State: WA
Zip: 98124
Phone: (206) 612-6953 Fax:
Email: Sung.U.Cho@boeing.com
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name: The Boeing Company
Address: PO Box 3707; M/C 46-208
City: Seattle State: WA Zip: 98124
Page 1 of 4
BUILDING PERMIT INFORMA N 206-431-3670
Valuation of Project (contractor's bid price): $ 8,000 Existing Building Valuation: $ 80,307,300
Describe the scope of work (please provide detailed information):
Remove doorway and infill opening with like construction. Add new door frame, doors, and hardware. No change to occupancy or
use.
Will there be new rack storage' Yes
0.. No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
Existing
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
IBC
Type of
Occupancy per
IBC
Is' Floor
73,700
300
JIB
B & F
2^d Floor
73,700
3rd Floor
32,770
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Will there be a change in use? D Yes
Compact: Handicap:
If"yes", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
Sprinklers El Automatic Fire Alarm 0 None 0 .......0ther (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes
If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Materia
Sa
No
to Sheets.
SEPTIC SYSTEM
On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County ealth
Department.
IS: \ ApplicationsTorns-Applications On Line\ 201E ApplieationalPermii Application Revised - 8-9-1 1.docx
Revised: August 201
bh
Page 2 of 4
PUBLIC WORKS PERMIT INFOCATION — 206-433-0179
Scope of Work (please provide detailed information):
Remove doorway and infill opening with like construction. Add new door frame, doors, and hardwve. No change to occupancy or
use.
Call before you Dig: 811
Please refer to Public Works Bulletin #1 for fees and estimate sheet.
Water District
...Tukwila 0... Water District #125
El ...Water Availability Provided
Sewer District
ZJ ...Tukwila
O ...Sewer Use Certificate
D Highline
El...Valley View 0 .. Renton
0... Sewer Availability Provided
LI .. Renton
.. Seattle
Septic System:
▪ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department.
Submitted with Application (mark boxes which apply):
[1] ...Civil Plans (Maximum Paper Size — 22" x 34")
El ...Technical Information Report (Storm Drainage)
El ...Bond D .. Insurance 0 Easement(s)
Proposed Activities (mark boxes that apply):
0 ...Right-of-way Use - Nonprofit for less than 72 hours
0 ...Right-of-way Use - No Disturbance
0 ...Construction/Excavation/Fill - Right-of-way 0
Non Right-of-way
O ...Total Cut
D ...Total Fill
D ...Sanitary Side Sewer
o ...Cap or Remove Utilities
0 ...Frontage Improvements
El ...Traffic Control
D...Backflow Prevention - Fire Protection
Irrigation
Domestic Water
cubic yards
cubic yards
0.
a
0.
Geotechnical Report
LI .. Maintenance Agreement(s)
0 ...Traffic Impact Analysis
0 ...Hold Harmless — (SAO)
El ...Hold Harmless — (ROW)
O .. Right-of-way Use - Profit for less than 72 hours
.. • Right-of-way Use — Potential Disturbance
.. Work in Flood Zone
.. ▪ Storm Drainage
. Abandon Septic Tank
. Curb Cut
• Pavement Cut
. Looped Fire Line
I I
O ...Permanent Water Meter Size...
LI ...Temporary Water Meter Size..
... Water Only Meter Size 7,
0 ...Sewer Main Extension Public 0
0 ...Water Main Extension Public 0
I I
D .. Grease Interceptor
El Channelization
.. Trench Excavation
D .. Utility Undergrounding
wo #
wo #
wo # El ...Deduct Water Meter Size
Private El
Private
FINANCE INFORMATION
Fire Line Size at Property Line
El ...Water 0 ...Sewer
Monthly Service Billing to:
Number of Public Fire Hydrant(s)
El ...Sewage Treatment
Name: Day Telephone:
Mailing Address:
Water Meter Refund/Billing:
Name:
Mailing Address:
City
State
Zip
Day Telephone:
City
State
Zip
HAApplicationsWorms-Applications On Line \ 2011 ApplicationsTermit Application Revised - 8-9-II.docx
Revised: August 2011
bh
Page 3 of 4
PERMIT APPLICATION NOTES —
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWly R OR AUTHOR ED AGENT:
Signature:
Print Name: 9e2,-- f-s / b L 5f p,
Mailing Address: / • O. J,?7O7 + /�%[. q6--'" .os sa4,7il j �'� 91/2 1`
City State Zip
Date: (/// / /1
Day Telephone: .26C— 'fIcf..S—
H;\ApplicetionsTorms-Applications On Line \201 1 Applications\Permit Application Revised 9• I l.docn
Revised. August 2011
bh
Page 4 of 4
Cash Register Receipt
City of Tukwila
Receipt Number
DESCRIPTIONS ACCOUNT
PermitTRAK
QUANTITY '''.
PAID
$467.05
D19-0364 Address: 9725 E MARGINAL WAY S BLDG 9-120 Apn: 0003400018 $467.05
Credit Card Fee
$13.60
Credit Card Fee
R000.369.908.00.00
0.00
$13.60
DEVELOPMENT
, $440.85
PERMIT FEE
R000.322.100.00.00
0.00
$252.03
PLAN CHECK FEE
R000.345.830.00.00
0.00
$163.82
WASHINGTON STATE SURCHARGE
6640.237.114
0.00
$25.00
TECHNOLOGY FEE
$12.60
TECHNOLOGY FEE
TOTAL, FEES PAID BY RECEIPT: R19084
R000.322.900.04.00
0.00 $12.60
.,
$467.05
Date Paid: Friday, November 15, 2019
Paid By: MARTIN PROBST
Pay Method: CREDIT CARD 032788
Printed: Friday, November 15, 2019 9:12 AM 1 of 1
CR
Vf TCAA
CO TUKWILu ETxxuIT
6200 8]UTHCENTER 8LVD
TUKWILA, WA 98188
206-433'1870
CITY OF TUKwIL4
0017340000802374464500
Date: 11/15/2819 09:09:49 AM
CREDIT CARD SALE
MASTERCARD
X
{CARDHOLDER'S SZ6NATURE}
I AGREE TO PAY THE ABOVE TOTAL AMOUNT
ACCORDING TO THE CARD ISSUER AGREEMENT
(MERCHANT AGREEMENT IF CREDIT VOUCHER)
Thank you!
Merchant Copy
9ERMIT COORD COPY °
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D19-0364 DATE: 11/15/19
PROJECT NAME: BOEING #9-120
SITE ADDRESS: 9725 E MARGINAL WAY S
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
PO Ng/ 114
Building Division
IAN 1\\\O\
Public Works
PRELIMINARY REVIEW:
M Icg161
Fire Prevention
Structural
Planning Division
Permit Coordinator 111
Not Applicable
(no approval/review required)
DATE: 11/19/19
Structural Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
Approved with Conditions
Corrections Required Denied
(corrections entered in Reviews) (ie: Zoning Issues)
DUE DATE: 12/17/19
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg 0 Fire 0 Ping 0 I'W 0 Staff Initials:
12/18/2013
0 Some online services gie currently un vailable. See a list of service outages. ir .nliaviini.wa.aovraci?icvisystermstatus)
40 Lahr), & Industries (httos:inni.wa,gov
Contractors
CLEMENTS GENERAL CONSTR INC
Owner or tradesperson
Principals
CLEMENTS. LARRY E, PRESIDENT
CLEMENTS, SHARON L, SECRETARY
Doing business as
CLEMENTS GENERAL CONSTR INC
WA UBI No,
601 578 352
15805 SE 264
COVINGTON, WA 98042
253-631-8106
KING County
Business type
Corporation
Governing persons
LARRY
E
CLEMENTS
SHARON L CLEMENTS;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active
Meets current requirements.
License specialties
GENERAL
License no.
CLEMEGC05005
Effective — expiration
09/25/1995— 09/10/2020
Bond
WESTERN SURETY CO $12,000.00
Bond account no.
929246406
Received by L&I Effective date
04/26/2005 07/27/2006
Expiration date
Until Canceled
Insurance
Mt Hawley Ins Co $1,000,000,00
Policy no
MGL0182963
Received by L&I Effective date
06/12/2019 07/27/2015
Expiration date
07/27/2020
Insurance history
Savings
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
X:\_VAULT\KENTDC\MASTERS\DEVELOPMENTAL CENTER\9-120\ARCH\09-120—GOA — MILLER (US), GEOFFREY M — LAST SAVED: October 31, 2019 — PLOTTED: November 4, 2019
SYM
THE HI/El ' "` COMPANY
FACILITIES & ASSET MANAGEMENT
O 0 n
r
99
TVVA
D
PROJECT SITE
c7 FROM DOWNTOWN SEATTLE
EAST MARGINAL WAY
CORPORATE PART(
FROM SEATTLE—TACOMA AIRPORT
599
TUKWILA
900
DOT
158
FROM KENT
& AUBURN
NO SCALE
EXIT
157
900
REVISION
BY
APPROVED
DATE
SYM
REPLACE DOOR 11E3 (W6436179)
BOfl
9725
T
IVFLO
IASI vAB6
<WLA, WAS
T
VA
BUILDING ADDRESS:
9725 EAST MARGINAL WAY SOUTH
TUKWILA, WA 98108
NO SCALE
REVISION
BY
APPROVED
DATE
CDC RELOCATION -STRAIN GAUGE LAB -PHASE 1 J#19670-10
DLR GROUP
ECA
01.07.14
A
RELOC-STRAIN GAUGE LAB-PKG 6A-NORTH J#19670-10
DLR GROUP
ECA
02.17.14
REPLACE DOOR 11E3
W6436179
GMM
SC
10.30.19
D
g)ii.±111717.4EZAW
F\TAL CC-\IEP
AL WAY SO1
\GTO\ 98108
CODP S
V
ARV
TYPE OF APPLICATION: NEW ❑ ALTERATION ❑ ADDITION ❑ TENANT IMPROVEMENT EI
NARRATIVE
REMOVE A DOORWAY AND IN —FILL OPENING WITH LIKE CONSTRUCTION.
ADD NEW DOOR FRAME, DOORS AND HARDWARE.
NO OCCUPANCY, USAGE OR EXITING CHANGES.
CODES
2015 IBC, IFC, IMC, UPC AND THE WAC 51-20 AS ADAPTED OR AMENDED
BY LOCAL ORDINANCES AND COMPLIANCE WITH CITY OF TUKWILA ZONING.
ICC/ANSI A117.1 (LATEST EDITION)
OWNER. THE BOEING COMPANY
CONTRACTOR &STATE NUMBER• THE BOEING COMPANY (BOEING*294ML 01.22.2021)
BOEING PROJECT MANAGER CATALIN ARMASU (206)214-8986
BOEING CONTACT MARTIN PROBST (206)852-4985
FAX NUMBER.
E-MAIL.
martin.r.probst@boeing.com
ZONING. CITY OF TUKWILA
OCCUPANCY GROUP. GROUP B AND GROUP F (OFFICE AND FACTORY)
CONSTRUCTION TYPE• TYPE II—B NON—COMBUSTIBLE
ALLOWABLE AREA INCREASE. -
OCCUPANT LOAD: (ALLOWABLE) NO CHANGES
OCCUPANT LOAD: (ACTUAL) NO CHANGES
OFFICES OCC.-
STORAGE OCC.-
ASSEMBLY OCC.-
CANOPY OCC.-
OTHER OCC =
PENTHOUSE OCC =
BLDG GROSS 180,170 SQ FT
BASEMENT - SQ FT
FIRST FLOOR 73,700 SQ FT
SECOND FLOOR 73,700 SQ FT
THIRD FLOOR SQ FT
FOURTH FLOOR SQ FT
FIFTH FLOOR SQ FT
SIXTH FLOOR SQ FT
PENTHOUSE 32,770 SQ FT
PROJECT AREA 300 SQ FT
BUILDING HEIGHT: (ACTUAL) 55 FT
STORIES: 3 MEZZANINE ? 0 (YES) ® (NO) SQ FT
FIRE PROTECTION: SPRINKLERED THROUGHOUT (NFPA 13) ® (YES) 0 (NO)
SEISMIC DESIGN CATEGORY (SDC)• D
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
APPROVED BY
DEPT.
DATE
DRAWN
N. WEITZ
DATE
11.27.13
CHECKED
E. ANGULO
12.09.13
SUBTITLE
SEPARATE PERMIT
R UIRED FOR:
Mechanical
Electrical
Plumbing
I10l Gas Piping
City of Tukwila
BUILDING DIVISION
FILE DI�POY�M-
Pelrtntlt No.
Plan review approval is subject to errors and
omissions Approval of construction aocuments does
lot authorize the violation of any adopted cooe or
ordinance Receipt of approved Fiala Copy and
-ions is acKW:.gg:
By
Date: /! / 26 /2-e./ 9
City o1 Tukw, a
BUILDING DIVISION
REVISIONS
No ` . is s.riat! 5& ^.aje to ttie scope
of worn wrtnoUl ',' at:oroval or tale
Tukwila Building Division
NOTE: Revisions will require a new plan
submittal and may include additional plan review.
COL
J
\ D
D
TS
PROJECT TITLE: REPLACE DOOR 11E3 (W6436179)
QUANTITY SUBMITTED
D 5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURE TENANT IMPROVEMENT
• 4 SETS: TENANT IMPROVEMENT (NON-STRUCTURAL)
❑ 3 SETS: FIRE PROTECTION / SPRINKERS
❑ 2 SETS: TENANT IMPROVEMENT (REVISION)
SUBMITTED FOR PERMIT & REVIEW:
❑ BUILDING ❑ GRADING
❑ PLUMBING ❑ LANDSCAPE
❑ MECHANICAL ❑ DEMOLITION
❑ ELECTRICAL 0 - 0 -
*TO BE RENEWED UNDER SEPARATE PERMIT
WASHINGTON STATE NON—RESIDENTIAL ENERGY CODE —APPROACHES
COMPLIANCE OPTION
❑ BUILDING ❑ LPA 0 ANALYSIS ® N/A (NO CHANGE TO ENVELOPE)
SPECIAL INSPECTIONS REQUIRED: (PER IBC CH. 17)
❑ WELD 0
❑ REBAR 0
❑ STRUCTURAL BOLTING 0
0 OTHER
CALCULATIONS
TYPE:
❑ ELECTRICAL
❑ FIRE PROTECTION
❑ CANTILEVER RACKS
CONCRETE
ANCHOR BOLTS
STRUCTURAL OBSERVATION
ATTACHED (YES) __(NO)
\ERAL \OTFS
CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY CITY OF TUKWILA
MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION
WITHOUT ABOVE MENTIONED SET OF DOCUMENTS.
1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEFORE ANY WORK.
2. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDITIONS
REQUIRE DESIGN REVISIONS.
3. COORDINATE WORK WITH OTHER CRAFTS.
4. RETURN THIS SAME SET TO MARTIN PROBST AT BLDG. 9-51.2,
AFTER COMPLETION OF THIS CONSTRUCTION.
COVER SHEET
CURRENT REVISION
W6436179
REVIEWED FOR
CODE COMPLIANCE
. APPROVED
NOV 2 2 2019
City �
City of Tu ila
BUILDING DIVISION
SYMBOL
CITYVED
OF TUKWILA
NOV 15 2019
PERMIT CENTER
DATE
10.30.19
ENGINEER
CHECKED
APPROVED
APPROVED
TITLE
ARCHITECTURAL MASTER
REPLACE DOOR 11E3
BUILDING 9-120
COL. DEV. CENTER, WA
SHEET
GO
SEQUENCE NO.
DWG NO.
09-120—GOA
DETCAR: 10/31/2019 9:02:51 AM