Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Reg 2024-05-20 Item 5A - Document - 2024 Surface Water Comprehensive Plan Appendices
See 2024 Surface Water Comprehensive Plan 2024 City of Tukwila Surface Water Comprehensive Plan Appendices Appendix A Stormwater System Maps by Basin ERCER ISLAND 40S 099) - 181 167) FY OF SEATTLE ,594 UNINCORPORATED KING COUNTY Station #18 CITY OF BURIEN Biac,r River CITY OF RENTON reek 'yer •Pump P17 Pump 6+ec„'F;':=' '71'Station".Station #17 (King Co.) CITY OF SEATAC Pump Station #15 CITY OF KENT FIGURE A-1 CITY STORMWATER SYSTEM GREEN/DUWAMISH BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON Dolt sa,. w.io Cowrv. air m 1 *v.. c 9Io MBP, Dais 3,25.9024 wsdrwrer. This dme is na to survey ecrurocr and is rr r.t lot i nrrgc nooses or+r. G.0 i ECr<33fOVi133tleu:AW+iISPPRksia33K1 TuAriss SWDP Fwesr33341.3 TuRvele SVKLPFqurey.epra Legend 0 City Boundary Stormwater Facilities r I Neighboring Cities El Flow Control Facility — Streams and Rivers 0 Pump Station Q Green/Duwamish Basin • Water Quality Facility ■ ❑utfails Pipes and Ditches Closed Pipe Culvert Ditch 0 1 Otak FIGURE A-2 CITY STORMWATER SYSTEM RIVERTON BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON omaSMICeS Woo Comt..atrml!x k.cnooloM o Delo. 3,25.9024 Discioer. This dote Is ria to survey nrsurary nor! Is Rams for pilsnyt rrpme-, mh'. ❑PROJEC n3330Vi133tleu:AW+iISOPPRk5V33&T T0A3w0s SWOP Fqums+33341.3 Toks a SWLPFgores.¢pra Legend City Boundary Stormwater Facilities Pipes and Ditches r J Neighboring Cities • Water Quality Facility -- Closed Pipe — Streams and Rivers ■ Quttalls ■ u Culvert Q Riverton Basin — Ditch 0 Mile 0.25 Otak �r r FIGURE A-3 CITY STORMWATER SYSTEM SOUTHGATE BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON nen&a es Wap CaryMeark. Ga[91e Dela. ar2Sc2024 Diselmrer. Misdate, is ea ra wrvav accuracy end is merest for etaml]au v1roo- u+r. G)FTiWECrta,c3 Vi331150 :AW+i15laPRksV33xl Tuhroa SWOP Fqums033383 TukMe MCP Fgw...pex Legend 0 City Boundary Stormwater Facilities Pipes and Ditches Ti Neighboring Cities • Water Quality Facility -- Closed Pipe Streams and Rivers ■ Outtalls um Culvert 0 Southgate Basin — Ditch 0 Mile 0.5 Otak FIGURE A-4 CITY STORMWATER SYSTEM GILLIAM BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON Do% Sags weo eemrv. atr m Tolo,rok . c«9io 1.+B De1e. 3r2S,2024 Disua.rer. This Oro is MI to annev eccurecr nor, is soam1fos pamnO rnromes my. G)FTLWECI,On01Y63313O:CLNilS.APRk933]xl SWOP Fwresi33383 TOO SWCP o,es.00no Legend 0 City Boundary r r Neighboring Cities — Streams and Rivers Q Gilliam Basin Stormwater Facilities Pipes and Ditches ■ Flow Control Facility — Closed Pipe • Water Quality Facility um Culvert ■ Dutfalls — Ditch 0 Otak FIGURE A-5 CITY STORMWATER SYSTEM NELSEN BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON D.% 5wrare Kr, l'�omN Cary n1Gpoala Map: De1a. N25,2024 Disup.rer. This Orel is na to surrey. OCcurary mn is miamtrm pannrg p1rW+as my. o)FTLWEC1,3:n+341133eu:ALH IooI x5V33o1 T1Amroa 9/V0P Fqums,33383 TukMe VVOL?Fqures.¢prx Legend Q City Boundary Storrnwater Facilities Pipes and Ditches r j Neighboring Cities ❑ Flow Control Facility Closed Pipe - Streams and Rivers ■ Ouffalls u.s.. Culvert Nelsen Basin - Ditch 0 Mile 0.25 Otak FIGURE A-6 CITY STORMWATER SYSTEM SPRINGBROOK BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON omasa,oes ocounrv.curmrx k.coo31 Maps De1a. an5,2124 Disuo.rer. Thiedrn is na to array daumcr mn is msust lot Pamu1u nnou;es odr. G)FTLWEC1,3:FAVi3330%:AW+i15lgiPRk9V3361 ToArtroa SWOP F.:mm.33183 ToebW[.7Fp .op. Legend 0 City Boundary r j Neighboring Cities - Streams and Rivers Springbrook Basin Storrnwater Facilities Pipes and Ditches ❑ Flow Control Facility Closed Pipe O Pump Station ■ ❑utfalls uui. Culvert - Ditch 0 Mile 0.25 Otak Pump Station #17 FIGURE A-7 CITY STORMWATER SYSTEM P17 BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON NON Sono o Wog cowry. atr m n.r.orok . coo9lo Delo. 3i25.9024 Dissiwksr.T This dote is n« to arrrav ouuracr and i, Rater for p nu npwses odr. ❑PROJEC r<3:S10Vi333tl:ou:A W+iIS PPkkri53oot3 ToUwOs SWOP Fqumsl333413 Tuks v S nv Fglow spry Legend 0 City Boundary r I Neighboring Cities — Streams and Rivers 0 P17 Basin Stormwater Facilities IN Flow Control Facility • Water Quality Facility ■ Outfalls 0 Pump Station CITY OF SEATAC Pipes and Ditches — Closed Pipe ■ u Culvert — Ditch CITY OF KENT 0 Mile 0.5 Otak FIGURE A-8 CITY STORMWATER SYSTEM MILL CREEK BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON omaSM,CeS ocounrv.curmria k.GoogleMaps ova. 3a`D?024 Disuo.rer. mia dmo is na m array eaumcr mn is msust1m Pamu0u nnou;es odr. G)FTLWEsrsJ Vi333M:AD I10giPRksV33xl Taarinia SWOP F.:mm.33183 Tulrole SW[.7Fpures.ap. Legend 0 City Boundary Pipes and Ditches r j Neighboring Cities Closed Pipe - Streams and Rivers 11111 Culvert Mill Creek Basin Ditch ■ Outfalls Mile 0.25 Otak -�., FIGURE A-9 CITY STORMWATER SYSTEM JOHNSON BASIN TUKWILA SWCP 133383 TUKWILA, WASHINGTON omaSags waoe(,r.arm1 o k. GooLlio1.+B De1e. 3i2`E2024 Disua.re, This Oro is MI to anrvar accumcr nor, is soam1fos pansu0u P.Pooss my. G)FTLWECRTo.101763313u:M1LANi151APRko333xl Toisoroa SWOP Fwresi333133 TOO S CPI 5wes.00no Legend © City Boundary Stormwater Facilities Pipes and Ditches i J Neighboring Cities ❑ Flow Control Facility _ Closed Pipe — Streams and Rivers ■ Outfalls Culvert Q Johnson Basin — Ditch 0 Mile 0.5 Otak Appendix B Drainage, Water Quality, and Fish Habitat Characterization APPENDIX B Drainage, Water Quality, and Fish Habitat Characterization Appendix B was compiled in support of the 2013 Surface Water Comprehensive Plan, and only the fish habitat element of this appendix has been updated for the 2024 Surface Water Comprehensive Plan (2024 SWCP). Updates to the drainage and water quality characteristics of basins based on new information have been made directly into Section 2 of the 2024 SWCP. The bulk of Appendix B is provided for historic reference of the previously compiled detailed information. As of 2024, the City recognizes nine drainage basins. As of 2013, The City recognized eight drainage basins. This Appendix is organized by the eight drainage basins recognized as of 2013, as follows: • Green/Duwamish River Mainstem • Gilliam Creek • Nelsoe Place — Long Acres • P17 • Riverton Creek • Southeast Central Business District (CBD) • Southgate Creek • Johnson Creek The remaining content of Appendix B, with the exception of Attachment B, remains unaltered from its publication in 2013. Basin boundary delineation was based on information from field visits, the City Geographic Information System (GIS), and previously developed basin plans. The City of Tukwila is nearly finished with an inventory and mapping of the drainage network. Basin boundaries should be re -visited once this inventory and mapping is complete. Green/Duwamish River Mainstem Basin Drainage Characterization The Green/Duwamish River meanders from the southeast to northwest through the City of Tukwila. The Green/Duwamish River is tidally influenced along most of length of the river B-1 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) within the City of Tukwila. The Green/Duwamish River is called the Duwamish below the confluence with the Black River and is called the Green River upstream of that point. The flood and floodplain management of the Green/Duwamish River is outside of the scope of this surface water comprehensive plan. The Green/Duwamish River drainage basin shown in Figure B-1 has multiple outlets, or outfalls, into both the Green and Duwamish Rivers. This basin is almost entirely developed. Industrial areas, including portions of the Boeing Airfield, make up the development in the area north of the Riverton Creek Basin. The areas east of the Riverton and Southgate Creek basins and north of the Gilliam Creek basin are mostly residential. Foster Golf Course and Fort Dent Park are within this basin. The area east of the P17 basin is mostly commercial. City of Tukwila surface water pump stations #17, #18, and #19 are located within the Green Duwamish River Mainstem drainage basin (Figure B-1). B-2 NM City of Tukwila II. _1 King County Unincorporated I • • • . Other Municipalities N • Stormwater Pump Station • Outfall Stormwater Pipe Drainage Basins 0 1 2 Miles FIGURE B-1 City of Tukwila Drainage System (2013) City of Tukwila 2012 Surface Water Comprehensive Plan SEA \\SIMBA\PROD\TUKWILAWACITYOF\412954SWCOMPPL\GIS\LAYOUT\FIGUREB-1 DRAINAGESYSTEM.MXD TJANTZEN 4/2/2013 12:36:19 CH2MHILL APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Water Quality Characterization In 2003, Ecology adopted a water use -based classification for state surface waters (RCW 173-201A, Table 602) that determines the surface water quality standards applicable for that water body (RCW 173-201A-600(1)). The Duwamish River (below the confluence with the Black River) is classified as Salmonid Rearing/Migration Only and Secondary Contact Recreation. The Green River (above the confluence with the Black River) is classified as Salmonid Spawning/Rearing Only and Primary Contact Recreation. None of the tributaries to these rivers within Tukwila is listed in Table 602. Therefore, the uses defined for these tributaries are the same as the Green River to which they discharge. Table B-1 shows the classifications for surface waters in the City of Tukwila. Table B-1 Use -based Classification for Surface Waters in City of Tukwila Water Body Use -based Classification (Source: RCW 173-201A-600(1)) Aquatic Life Uses Recreational Uses Duwamish River (Green/Duwamish River, downstream of confluence with Black River) Riverton Creek (to Duwamish River) Southgate Creek (to Duwamish River) Green River (Green/Duwamish River, upstream of confluence with Black River) Gilliam Creek (to Green River) Johnson Creek (to Green River) Other Tukwila drainage basins (to Green River): Nelson Place / Long Acres Southeast CBD P17 Salmonid Rearing/Migration Only Salmonid Rearing/Migration Only Salmonid Rearing/Migration Only Salmonid Rearing/Migration Only Salmonid Rearing/Migration Only Salmonid Rearing/Migration Only Salmonid Rearing/Migration Only Secondary Contact Recreation Secondary Contact Recreation Secondary Contact Recreation Primary Contact Recreation Primary Contact Recreation Primary Contact Recreation Primary Contact Recreation B-4 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Ecology maintains a list of water bodies that do not meet water quality standards, known as the 303(d) List. The United States Environmental Protection Agency (EPA) approved the 2008 Water Quality Assessment 305(b) report and 303(d) list on January 29, 2009. This is the current water quality assessment and 303(d) list for the state of Washington. Four sections of the Green/Duwamish River within the City of Tukwila do not meet water quality standards according to the 2008 303(d) list. Both the Green River and Duwamish River are listed as Category 5 (at least one designated use is impaired) for dissolved oxygen, temperature, pH, and fecal coliform, based on water sampling and analysis. Figure B-2 shows the 303(d) listings for water bodies within the City of Tukwila and Table B-2 shows the 303(d) listings relevant for the City of Tukwila. B-5 King County International Airport ._._.— L"L King County Imes Burien 4 ... L Normandy Park Seattle -Tacoma International Airport SeaTac . Puget Sound King COUnty See Table B-2 for all 303(d) listed parameters. L. Data from http://www.ecy.wa.gov/programs/wq/303d/2008/index.html Seattle 303(d) List Categories n City of Tukwila 5 4C 4B 4A 2 1 1._.7 —.1 King County Unincorporated Other Municipalities Streams and Rivers 0 Mercer Island Buck R\ver ashingto Renton 3 Miles FIGURE B-2 Ecology 303(d) Listed Water Bodies (2013) City of Tukwila 2012 Surface Water Comprehensive Plan SEA\\SIMBA\PROJ\TUKWILAWACITYOF\412954SWCOMPPL\GIS\LAYOUT\FIGUREB-2 303D.MXD TJANTZEN 11/14/2011 17:11:20 CH2MHILL APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Table B-2 303(d) Water Quality Listings for Surface Waters within City of Tukwila Boundaries (2013) Water Body Listing Category Parameter Medium Duwamish River 1 Ammonia-N Water Duwamish River 1 Fecal Coliform Water Duwamish River 2 Bis(2-Ethylhexyl) Phthalate Water Duwamish River 2 Dissolved Oxygen Water Duwamish River 2 Temperature Water Duwamish Waterway 4A Ammonia-N Water Duwamish River 5 pH Water Duwamish Waterway 5 Dissolved Oxygen Water Duwamish Waterway 5 Fecal Coliform Water Green River 1 Ammonia-N Water Green River 1 pH Water Green River 2 Bis(2-Ethylhexyl) Phthalate Water Green River 4A Ammonia-N Water Green River 5 Dissolved Oxygen Water Green River 5 Fecal Coliform Water Green River 5 Temperature Water Springbrook (Mill) Creek 1 Ammonia-N Water In addition to Ecology's 303(d) listings, King County has collected monthly water quality data along the Green/Duwamish River for many years (King County, 2011). Two monitoring stations fall within the City of Tukwila: Duwamish River at E Marginal Way Bridge and Green River at West Valley Road. These data were reviewed for the period of 2003 through 2008. They reflect around 70 samplings and are the latest data available. The Duwamish station meets water quality standards for dissolved oxygen, pH, and fecal coliform. Temperature is exceeded in 11 percent of the total samples, during the months of July and August. For the Green River station, temperature is exceeded in 15 percent of the total samples, also during the same summer period. In addition, 15 percent of the dissolved oxygen samples from the Green River station fail to meet standards, mostly during the summer period. The lowest B-7 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) dissolved oxygen measurement at the Green River station was 7.0 milligrams per liter (mg/L). Fecal coliform and pH surface water quality standards were met at this station. Turbidity standards are expressed as an allowable increase over background conditions and the water quality data do not allow for a direct assessment. The maximum recorded turbidity at either station during this six -year period is around 70 Nephelometric Turbidity Units (NTUs) and that only four values at each station exceeded 10 NTUs, indicating relatively clear water conditions nearly all of the time. The northern -most portion of the City of Tukwila lies within the Lower Duwamish Waterway Superfund Site, designated by the EPA in 2001. King County, the Port of Seattle, and the cities of Seattle and Tukwila are working with the Washington Department of Ecology (Ecology) and the EPA to control sources of pollution in the Lower Duwamish Waterway. Decades of heavy industrial activity along both sides of the waterway have resulted in the accumulation of high levels of PCBs, polyaromatic hydrocarbons (PAHs), arsenic and other pollutants in the upland soils and within the waterway sediments (Windward Environmental, 2010). Dredging and capping projects in limited areas of the waterway have removed some of these pollutants and more removal actions are planned. Upland sources of these pollutants are also being addressed. Ecology is the lead agency for implementing source controls in the Lower Duwamish Waterway. In 2002 the entities listed above formed the Lower Duwamish Waterway Source Control Work Group to coordinate source control activities. The Norfolk Basin, located in the southern portion of the superfund site, lies partially within the jurisdiction of the City of Tukwila. This area is included in the Duwamish River Basin shown on Figure B-1. The Norfolk Basin discharges to the Lower Duwamish Waterway and includes both stormwater runoff and occasional combined sewer overflows. In 2007, the City of Tukwila signed a memorandum of agreement with the City of Seattle allowing the latter to inspect suspected contaminated sites in the Norfolk Basin that lie within the jurisdiction of the city of Tukwila. The City of Seattle has carried out sediment sampling and cleaning of storm sewers in the Norfolk Basin. Of the numerous chemical parameters analyzed in the storm sewers, phthalates and zinc consistently exceeded the cleanup screening level (CSL), above which adverse impacts on marine organisms would be likely. Total petroleum hydrocarbons were also consistently high. The City of Seattle removed sediment from the storm sewer serving Martin Luther King Way South prior to a recent sewer upgrade. In 2007, Ecology produced a Source Control Action Plan (SCAP) for Early Action Area 7 (the Norfolk Basin) (Ecology and Environment, 2007). The plan lists a number of potential upland sources of contaminants to the surface water system. Through the memorandum of B-8 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) agreement mentioned earlier, the City of Seattle is conducting inspections to determine whether cleanup measures should be carried out. The SCAP states that there is an incomplete mapping of the surface water system serving the Norfolk Basin. It identifies the need for a cooperative effort between the City of Seattle and the City of Tukwila to use available GIS and as -built storm sewer drawings to better delineate the surface water system. The EPA is sponsoring another round of storm drain sampling in 2011. The City has recently signed another agreement allowing continued inspection and sampling with the Norfolk Basin (Larson, 2011). Fish Habitat Characterization The Green/Duwamish River channel is significantly altered from its natural condition along most reaches in the City of Tukwila. Non-native and other less desirable trees and shrubs such as blackberry have replaced native riparian vegetation. Riprap also borders the river along many reaches. Urban development in and near the City has greatly reduced the vegetated buffer of the river and has encroached upon the banks. Flooding and drainage problems associated with this urban development throughout the basin (including the levees constructed to address flooding) have degraded fish and other wildlife habitat in and along the river. Productive, good quality fish habitat, both in the main channel and in off -channel refuge, is generally lacking (King County, 2000). Spawning gravel recruitment to the Green/Duwamish River in this area has been diminished due to the comprehensive effects of urban development, in particular the diversion of the White River and the Cedar/Black River away from the Duwamish River. Little, if any, spawning habitat occurs in the river reaches within the City. Gilliam Creek Basin Drainage Characterization The Gilliam Creek basin has a single outlet to the Green River through an outfall and flap gate located to the south of 1-405. Most of the Gilliam Creek basin is located within the central region of the City of Tukwila, with the remainder (27 percent) located in the City of SeaTac. The basin has been almost fully developed except for the steep slopes above the 1-5 corridor. The portion of the basin located north of 1-405 and east of 1-5 is mostly residential, with some commercial areas located along Southcenter Boulevard. Residential developments make up most of the basin west of 1-5, with the exception of the Tukwila International Boulevard corridor which contains commercial development. Southcenter Mall and other commercial areas dominate the portion of the basin east of I-5 and south of 1-405. B-9 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Tukwila Pond is within the 25-acre Tukwila Pond Park located to the south of Southcenter Mall. Historically, this area drained north into Gilliam Creek via both subsurface and surface flow. As this area was developed, Tukwila Pond was formed. Currently, under normal flow conditions, Tukwila Pond drains to the south into the P17 basin then on to the Green River. A conveyance system built along Andover Park West in the mid-1980s provides overflow conveyance north towards Gilliam Creek. A gate valve installed at the discharge point to Gilliam Creek is usually closed. When open, the City of Tukwila has the capability to either allow Tukwila Pond to flow into Gilliam Creek when the pond is at high levels or to provide storage when the Green River is at high levels and backs water into the storm drain systems in the lower portion of the Gilliam Creek Basin. Figure B-1 shows the location of Tukwila Pond. Water Quality Characterization Gilliam Creek's use -based classification is Salmonid Spawning/Rearing and Primary Contact Recreation, because Gilliam Creek enters the Green River upstream of the confluence with the Black River. The water quality characterization for Gilliam Creek in this section is drawn from the stormwater management plan prepared for Gilliam Creek in 2001 (Herrera, 2001). Water quality data for the creek was collected in support of that study. No additional water quality data for the creek has been found subsequent to this study. Thus, the discussion in this section is drawn from that study. The creek water samples were taken at eight locations during three different storm runoff events in the fall of 1999. The data therefore reflect the effects of active stormwater runoff and cooler temperature conditions. In summary, temperature, dissolved oxygen, and pH (the latter with the exception of one sample) all met current state water quality standards. Turbidity was somewhat elevated, generally ranging from 25 to 50 NTUs. Similarly suspended solids were also only modestly elevated, generally ranging from 20 to 60 mg/L. Dissolved lead met applicable water quality criteria, as did nearly 90 percent of the dissolved zinc samples. About half of the samples failed to meet the dissolved copper criteria. Finally, nearly all of the fecal coliform samples were above the state water quality standards. The study noted that the two sites most frequently exceeding the criteria for zinc and copper both directly drained Highway 99 and appear to be heavily influenced by the high level of traffic and parking lots in the upper basin. Similar conditions exist in the lower reaches of Gilliam Creek near Southcenter Mall, but the dilution effects occurring in the lower portion of the basin may mitigate against higher metals concentrations in the creek. In a study that had been conducted several years prior, two creek samples were collected during summer baseflow conditions (June and September of 1997). Several samples taken during these months did not meet the state dissolved oxygen standard, with one sample B-10 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) recorded at 3.2 mg/L, well below the state standard of 6 mg/L. These samples also fell slightly below the pH standard. In September, the measured stream temperature of 17.5 degrees Celsius barely fell below the state standard of 18 degrees. This suggests the likelihood that portions of the stream may exceed the state temperature standard during the warmer summer months. Gilliam Creek flows into a section of the Green River that is on Ecology's 303(d) list for temperature, dissolved oxygen and fecal coliform. Thus, the degraded water quality conditions in Gilliam Creek may be contributing to water quality problems in the Green River. Given both the age and the limited amount of water quality data available for Gilliam Creek, additional water quality data should be collected to determine if similar water quality conditions continue to persist in this creek. Fish Habitat Characterization Several species of anadromous fish, including coho salmon, chinook salmon, and sea -run cutthroat trout are reported to make use of the lower reach of Gilliam Creek, along the south shoulder of 1-405 between the Green River and the 1-5/1-405 interchange (Washington Department of Fish and Wildlife [WDFW], 2010; Herrera, 2001). This lower reach provides mostly rearing and possibly some scattered spawning habitat. Spawning gravels are covered by sediments deposited by upstream erosion and by historical construction activities. Habitat in the lower reach of Gilliam Creek is available to fish through the flap gate at the outlet of Gilliam Creek only under certain high flow conditions, when the Green River water level is elevated but remaining lower than the water level in Gilliam Creek. WDFW has characterized this flap gate a partial fish passage barrier (WDFW, 2010). Two more partial fish passage barriers exist in the lower reach of Gilliam Creek. A State of Washington Department of Transportation (WSDOT) -owned culvert that conveys at least 1,000 feet of the creek under the south shoulder of 1-405 is identified as a partial fish barrier (WDFW, 2010). Farther upstream, a log at the inlet of the WSDOT-owned culvert at the 1-405 on - ramp observed in spring of 2011 appears capable of blocking fish passage. WDFW determined that several of the tributaries to upper Gilliam Creek provide some rearing habitat (WSDOT, 2007). Since the culvert underneath the 1-5/1-405 interchange is a total barrier to anadromous fish, it is likely that only resident fish such as cutthroat trout and sculpin are utilizing the available habitat in the upper reaches of Gilliam Creek at this time. Fish barriers do exist in the upper reaches of Gilliam Creek, including a WSDOT-owned culvert beneath SR 518 that conveys one of these tributaries that is identified as a total fish passage barrier. B-11 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Figure B-3 shows the inventory of fish -blockages in the creek systems of Tukwila, including Gilliam Creek. Attachment A to this Appendix B contains a detailed inventory of barriers to fish passage within the City of Tukwila. Nelson Place - Long Acres Basin Drainage Characterization The Nelson Place — Long Acres basin is located east of the Green River on the eastern edge of the City of Tukwila (Figure B-1). The Renton city limits form the east boundary of the basin. Commercial developments line the West Valley Highway corridor. The areas east and west of the West Valley Highway corridor are mostly undeveloped. Runoff from the West Valley Highway and the area in the western part of the drainage basin drains directly into the Green River through numerous storm drainage outfalls. Runoff from the area east of the West Valley Highway drains to the open ditch and culvert system located on the east side of the basin adjacent to the Burlington Northern Santa Fe (BNSF) Railroad track. A 24-inch-diameter pipe located under the BNSF tracks directs drainage from this series of open ditches and culverts east to drainage systems in the City of Renton. Figure B-1 shows the Nelson Place — Long Acres Basin in relation to the city boundaries and to the other drainage basins in Tukwila. Water Quality Characterization The Nelson Place — Long Acres drainage basin use -based classification is Salmonid Spawning/Rearing and Primary Contact Recreation, because the drainage discharges to the Green River upstream of the confluence with the Black River. No water quality data is available for this drainage basin. Fish Habitat Characterization The former alignment of the Green River, prior to construction of 1-405 in 1962, extended through the Nelson farm property and into the property currently occupied by Homestead Studio Suites. Part of that former alignment has been filled, isolating a pond area and reducing off -channel habitat and floodplain connectivity in this reach of the river. Apart from along the mainstem Green River, which is described in an earlier section of this Appendix, no fish habitat was identified in this basin. B-12 Fish Passage Features Barrier Status o ■ N/A None Partial Potential • Total QAttachment A Figures City of Tukwila r 1 King County Unincorporated Stream QDrainage Basins 0 1 2 3 Miles FIGURE B-3 Inventory of Fish Blocking Culverts (2013) City of Tukwila 2012 Surface Water Comprehensive Plan CH2MHILL SEA\\SIMBA\PROJ\TUKWILAWACITYOF\412954SWCOMPPL\GIS\LAYOUT\FIGUREB-3 FISHBLOCKINGCULVERTS.MXD TJANTZEN 4/2/2013 12:43:59 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) P17 Basin Drainage Characterization The P17 drainage basin is located south of the Gilliam Creek basin (Figure B-1). Approximately 60 percent of this basin is located within the City of Tukwila, with the remaining portion in the City of SeaTac. The basin is almost fully developed for the exception of the steep slopes adjacent to the 1-5 corridor. The P17 basin includes a portion of the Tukwila South development site. Typically, flows from Tukwila Pond are routed through drainage basin P17. A drainage pipe adjacent to Andover Park West conveys pond outflow into the basin. As discussed earlier, drainage is routed north to Gilliam Creek when the gate valve at the overflow pipe to Gilliam Creek is open and the pond water level is elevated. The P17 drainage basin has multiple outlets, or outfalls, into the Green River. Runoff from the northern portion of the basin is routed to the P17 stormwater pump station located at the east end of Minkler Boulevard. This P17 pump station, owned and operated by King County, discharges to the Green River. The southern portion of the basin drains to the P17 pump station or directly into the Green River through a WSDOT outfall. City of Tukwila's surface water pump station #15 is located within this P17 drainage basin (Figure B-1). Water Quality Characterization The P17 drainage basin use -based classification is Salmonid Spawning/Rearing and Primary Contact Recreation, because the drainage discharges to the Green River upstream of the confluence with the Black River. No water quality data is available for this drainage basin. Fish Habitat Characterization Apart from along the mainstem of the Green River, which is described in an earlier section of this Appendix, no fish habitat was identified in this basin. Riverton Creek Basin Drainage Characterization The Riverton Creek basin is located in the northwest region of Tukwila. Nearly the entire basin is located within the City of Tukwila boundaries with the remaining portion of the basin in unincorporated King County and in the City of Sea-Tac. The basin is almost entirely developed except for about 50 acres of forested land west of Tukwila International Boulevard. Residential and commercial developments are located on the steep slopes in the southern and western portions of the basin. Light industrial developments are located in the valley floor in the northern portion of the basin. B-14 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) There are two major forks to Riverton Creek, named the East Fork and West Fork. The East Fork and West Fork of Riverton Creek merge just upstream of SR 599, and then pass underneath SR599 through approximately 300 feet of culvert, through about 1,000 feet of open channel and finally through two 48-inch culverts (each with a flap gate) into the Duwamish River downstream of the confluence with the Black River (Figure B-1). Water Quality Characterization The Riverton Creek use -based classification is Salmonid Spawning/Rearing and Secondary Contact Recreation, because the drainage discharges to the Duwamish River downstream of the confluence with the Black River. No water quality data is available for this drainage basin. Fish Habitat Characterization The flap gates at the Duwamish River are impassable to fish during low flows plus somewhat impassable all other times. Both west and east forks of Riverton Creek are characterized by narrow, straight channels and long sections of culvert in their lower reaches. Both forks are considered fish -bearing. Coho salmon, Chinook salmon, and resident cutthroat trout are potentially present in Riverton Creek (WDFW, 2010; Entranco, 1997). Overall, Riverton Creek provides some limited rearing habitat for salmon, but no longer provides substantial spawning habitat. The East Fork of Riverton Creek just upstream of the SR 599 culvert is characterized by a wide, exposed, sandy and silty streambed that provides fish passage but no spawning or rearing habitat. Upstream of that reach, a more than 2,000 linear foot (LF) culvert likely prevents at least some anadromous fish from accessing suitable habitat located in the upper reach between S 126th Street and S 128th Street, where good overhead cover from riparian plants, sufficient flows, and streambed gravel appears suitable for coho salmon spawning. Anecdotal evidence from a local resident during a February 2011 site visit suggests that anadromous salmon can and do access the east fork up to S 128th Street. The gradient upstream of S 128th Street is likely too steep for anadromous fish. Approximately 2,000 LF of restored channel in the West Fork of Riverton Creek just upstream of SR 599 has provided some spawning and rearing habitat. The culverts within this restored reach could fill with sediment from upper watershed erosion and stormwater runoff, which could potentially block fish passage. A log jam in the upper portion of the restoration area may also be a partial fish passage barrier. Just upstream of the restored reach, a 20-foot-tall manmade waterfall prevents fish from passing upstream to S 126th Street. Juvenile salmon are released from a city -operated fish hatchery at the base of the waterfall into the west fork at the upper end of the restored reach. B-15 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Upstream of the waterfall up to S 126th Street, there is about 500 feet of potential fish habitat, though that reach also includes two total fish passage barriers. Fish would likely not be able pass upstream of S 126th Street because of a steep gradient, even if the waterfall and other nearby barriers were removed. However, this upper reach beyond S 126t" Street has a cobble streambed that is likely supporting macroinvertebrates, a food source for fish downstream of the barriers. Figure B-3 shows the inventory of fish -blockages in the creek systems of Tukwila, including Riverton Creek. Attachment A to this Appendix B contains a detailed inventory of barriers to fish passage within the City of Tukwila. Southeast Central Business District (CBD) Basin Drainage Characterization The Southeast CBD drainage basin shown in Figure B-1 is formed by the Green River on the west and the BNSF railroad track to the east. Most of the basin contains developed commercial areas along the West Valley Highway corridor with some wetland areas located along the east side of the basin adjacent to the BNSF railroad track. The Southeast CBD basin has multiple outlets. Drainage from the West Valley Highway and the area in the west side of the drainage basin drain directly into the Green River through numerous storm drainage outfalls. The area east of the West Valley Highway drains into the wetlands on the east side of the basin. Overflow from these wetlands drains east into the City of Renton through culverts under the BNSF railroad tracks. City of Tukwila surface water pump station #16 is located within this CBD drainage basin (Figure B-1). Water Quality Characterization The use -based classification for the Southeast CBD basin is Salmonid Spawning/Rearing and Primary Contact Recreation, because the drainage discharges to the Green River upstream of the confluence with the Black River. No water quality data is available for this drainage basin. Fish Habitat Characterization Apart from along the mainstem Green River, which is described in an earlier section of this Appendix, no fish habitat was identified in this basin. B-16 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Southgate Creek Basin Drainage Characterization The Southgate Creek basin is located in the northwest region of Tukwila, south of Riverton Creek (Figure B-1). Most of the basin is located in the City of Tukwila with the remaining portion (approximately 11 percent) located in the City of SeaTac. Commercial and residential developments are located on the steep -sided slopes in the west portion of the basin (west of Tukwila International Boulevard) and lowlands in the central portion of the basin (between Tukwila International Boulevard and 42nd and 43rd Avenue S). The east portion of the basin, also located in the lowlands, is the least -developed portion of the basin. Private residences are the primary type of development in this area, covering nearly 80 percent of the basin. Water Quality Characterization The Southgate Creek use -based classification is Salmonid Spawning/Rearing and Secondary Contact Recreation, because the drainage discharges to the Duwamish River downstream of the confluence with the Black River. No water quality data is available for this drainage basin. Fish Habitat Characterization The East Fork of Southgate Creek begins as a relatively small channel just south of S 137' Street and flows north through a steep ravine, several culverts, and an asphalt -lined ditch before it merges with the west fork. The West Fork begins as three smaller tributaries that collect flow from the hillside just west of 40th Avenue S and merge just upstream of S 133rd Street. The West Fork then passes underneath S 133" Street and 42nd Avenue S through more than 500 feet of culvert and merges with the east fork coming from a ditch along S 132nd Street. From there, the main stem of Southgate Creek extends under SR 599 through about 320 feet of culvert, a fish ladder, and large arch culvert into the Duwamish River downstream of the Black River confluence. Coho salmon are potentially present in Southgate Creek, according to WDFW, and resident trout or and other types of non-anadromous fish are likely present. The fish ladder at the SR 599 culvert likely is a fish barrier to anadromous fish during low stream flows. As in other urbanized streams, development has altered Southgate Creek's riparian buffer and natural channel alignment, resulting in increased channel incision, stream bank erosion, and degraded water quality. Suitable fish habitat is limited to the following: • Rearing habitat in the main stem between SR 599 and S 132nd Street culvert • Rearing habitat in some small sections of the east fork along S 1315t Place and S 134" Place B-17 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) • Rearing and some spawning habitat in the recently -restored section of the west fork just upstream of S 133rd Street Bank erosion from the combination of steep gradients and stormwater runoff from urban development have deposited sediments in the lower reach, which have reduced effective culvert conveyance capacities and covered up salmon spawning gravels. The section of the main stem just downstream of the confluence of the West and East Forks is often completely blocked by sediment and debris. During a February 2011 site visit, juvenile salmonids were observed in the section of the east fork along S 131' Place, which are reportedly released into the stream by a nearby homeowner. Fish are unlikely to be present in the West Fork of Southgate Creek upstream of Macadam Way S due to the steep gradient. Some resident fish may use the upper reaches of the east fork within Southgate Park. Figure B-3 shows the inventory of fish -blockages in the creek systems of Tukwila, including Southgate Creek. Attachment A to this Appendix B contains a detailed inventory of barriers to fish passage within the City of Tukwila. Johnson Creek Basin Drainage Characterization The Johnson Creek basin is located to the south of the P17 basin and extends southward to the City of Tukwila boundary with the City of Kent and westward to 1-5. Much of the Johnson Creek basin was recently annexed into the City of Tukwila (Figure B-1). The approximately 850-acre basin includes about half of the Tukwila South commercial development site. The basin includes steep hillsides leading up to I-5 as well as Green River floodplain lowlands. In times of high Green River water levels, runoff ponds behind the Green River levees until the river stage drops, allowing discharge by gravity through the flap gate and outfall at the Johnson Creek outlet to the Green River. Water Quality Characterization The Johnson Creek use -based classification is Salmonid Spawning/Rearing and Primary Contact Recreation, because the drainage discharges to the Green River upstream of the confluence with the Black River. No water quality data is available for this drainage basin. B-18 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Fish Habitat Characterization The Johnson Creek flap gate and outfall to the Green River, partial blockages to fish passage, were replaced with a fish -passable structure as part of the mitigation for the proximate commercial development. No other barriers to fish passage were identified in Johnson Creek. Figure B-3 shows the inventory of fish -blockages in the creek systems of Tukwila, including Johnson Creek. Attachment A to this Appendix B contains a detailed inventory of barriers to fish passage within the City of Tukwila. The lower reach of Johnson Creek was reconstructed in 2011 as part of mitigation for the commercial development in the area. As the commercial development is completed, an aquatic habitat assessment should be conducted in order to assess conditions post - development and to assess the effectiveness of the mitigation. References Ecology and Environment. 2007. Lower Duwamish Waterway Source Control Action Plan. Ecology Publication No. 07-09-003, Lacey, Washington. Entranco, Inc., et al. 1997. Riverton Creek Storm water Quality Management Plan: Water Quality, Stream Habitat, and Flood Control. Prepared by Entranco Inc., Taylor Associates Inc., and Envirovision Inc. Prepared for the City of Tukwila. November. Herrera Environmental Consultants, Inc. 2001. Gilliam Creek Basin: Storm water Management Plan. Prepared for the City of Tukwila. March. King County and Washington State Conservation Commission. 2000. Habitat Limiting Factors and Reconnaissance Assessment Report: Green/Duwamish and Central Puget Sound Watersheds. December. King County. 2011. Stream and River Water Quality Monitoring. http://green.kingcounty.gov/wlr/waterres/streamsdata/ accessed on February 10, 2011. Larson. 2011. Personal communication (conversation with Ryan Larson, City of Tukwila Public Works Department). Tukwila City Hall, Tukwila, WA. November 30. WSDOT. 2007. SR 518 SeaTac Airport to 1-5/1-405 Interchange Widening Project: Culvert Mitigation. February. WDFW. 2010. Fish Passage Barrier Inventory Geodatabase. Accessed via email by Brian Benson, WDFW Habitat Program, on January 14, 2011. B-19 APPENDIX B: DRAINAGE, WATER QUALITY, AND FISH HABITAT CHARACTERIZATION (2013) Windward Environmental. 2010. Lower Duwamish Waterway Remedial Investigation, Seattle, Washington. B-20 ATTACHMENT B-1 Fish -blocking Culvert Inventory Otak Memorandum To: Sherry Edquid, City of Tukwila From: Brogan Kellerman, GIT; Shailee Jain, PE; Alessandra Capretti, PWS Copies: Trista Kobluskie Date: March 18, 2024 Subject: Revised Tukwila Revised Fish Barrier Inventory: 2024 Addendum to Appendix B Attachment A Fish -blocking Culvert Inventory from 2013 City of Tukwila Surface Water Comprehensive Plan Project No.: 33383 This memorandum updates Attachment A, Fish -blocking Culvert Inventory, to Appendix B of the 2013 Surface Water Comprehensive Plan (SWCP). The memorandum has been prepared for the 2024 update to the SWCP. This addendum documents the methodology used to update the status of the inventory. The fish -blocking culvert inventory in the 2013 SWCP documented only culverts and omitted some stream systems. It comprised a combination of data gathered from the Washington Department of Fish and Wildlife (WDFW) fish passage database and a windshield survey completed by CH2M HILL in 2011. Data sources used by CH2M HILL are listed in Table 1 of Appendix B, Attachment A. Table 1 is available in the original memorandum by CH2M HILL. For the purposes of this addendum, Otak reviewed both a WDFW fish passage geodatabase from 2022 and the WDFW current online database (as of February 2024) to determine if any of the fish -blocking culverts in Table 1 of the 2013 inventory have since been removed or now have a different status. Additional crossings and fish -blocking culverts also were documented. Table 2, below, presents the updated inventory of crossings and fish -blocking barriers with revised barrier status, survey date, owner type, data source, and problem where applicable. "Revised" means the most current information available documented by WDFW, as of February 2024. In some cases, the most current is the same information as in Table 1 where data was collected by CH2M HILL through the windshield survey, or where the WDFW survey date did not change. Otak added three waterways and the associated unnamed tributaries to the inventory. The table is organized with crossings listed from downstream to upstream in each stream system. Not all crossings listed are barriers. The Washington State Department of Transportation (WSDOT) operates highways and culverts in Tukwila. In 2013, in order to preserve the treaty rights of northwest Indian tribes, the U.S District Court ruled that WSDOT must refrain for building or operating culverts that restrict fish passage. The court issued a permanent injunction, and WSDOT developed a list of culverts subject to the injunction that must be removed by 2030. There are seven uncorrected WSDOT injunction barriers within the City of Tukwila. Table 3, below, presents the list of WSDOT Current Injunction Barriers; these are also listed in Table 2. Figures B-4 through B-7 present the revised mapped crossings documented from the WDFW databases within the City of Tukwila. Note that the WDFW database referenced for this update is available at 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com k:Iproject1333001333831waterres\task 600 - swcplt-620lfish passageladdendum to appendix b attachment a - revised 2024-03.docx Fish -blocking Culvert Inventory — 2024 Addendum Page 2 of 7 March 18, 2024 Washington State Fish Passage web map and does not allow features to be labeled. Therefore, labels in Figures B-4 through B-6 are derived from an older version of the database and are only shown where available. Records with survey dates in December 2023 through February 2024 are not labeled. 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com Fish -blocking Culvert Inventory — 2023 Addendum Page 3 of 7 March 18, 2024 Table 2 Tukwila Revised Fish Barrier Inventor (Former) ish Passag . Id" (WDFW Current) Location` Feature Type Barrier Status (Revised) Survey Dated (Revised) Owner (Revised) a ource (Revised) Probleme (Revised) Culvert Idf Riverton Creek 50002 No Data Unnamed road (Outfall to Duwamish River) Culvert (removed) Not a barrier N/A N/A Otak Barrier Removed through City's Riverton Creek Flapgate Removal Project Constructed in 2021-2022 ** 936306 Steel and concrete footbridge over confluence of Riverton Cr with the Duwamish R. Non Culvert Xing Not a barrier 3/16/2023 City WDFW None 50003 935937 SR 599 N Culvert Unknown 3/16/2023 WSDOT WDFW Insufficient Data ** 935936 SR 599 S Culvert Unknown 3/28/2023 WSDOT WDFW Insufficient Data 50004 935700 parking; S 120th PI Culvert Yes, % Passable Unknown 5/31/2022 County WDFW Rack 50009 935813 S 120t" PI (Restored stream length in industrial park) Culvert Passable 6/1/2022 City WDFW None 872 50010 935816 S 120t" PI (Restored stream length in industrial park) Culvert Passable 6/13/2022 Private WDFW None 920 50011 935779 driveway; S 120th PI (Restored stream length in industrial park) Culvert Not a barrier 8/23/2022 Private WDFW None 925 50022 No Data W of Group Health building (main stream reach) Log jam Partial 2/4/2011 Unknown CH2M HILL Insufficient pool downstream of log jam obstacle ** 936305 Behind building southwest of 35t" Ave S and S 124t" St (unnamed tributary to Riverton Creek) Artificial waterfall Total 3/28/2023 Private WDFW WS Drop ** 936344 Behind building southwest of 35f" Ave S and S 124t" St (unnamed tributary to Riverton Creek) Streambed Control Partial 3/28/2023 Private WDFW WS Drop 20533 09.0004X 0.47 W of 35t" Ave S Artificial waterfall Total 6/28/2022 Private WDFW Slope 20534 935819 W of 35t" Ave S Dam Partial 6/28/2022 Private WDFW WS Drop 14677 995968 S 126t" St Culvert Unknown 6/26/2022 Private WDFW Level B Required 14676 995967 S 126t" St Culvert Passable 6/26/2022 Private WDFW None 14675 995966 S 126t" St Culvert Partial 6/29/2022 City WDFW Slope 1077 19812 995965 N of S 128t" St Dam Total 10/2/2003 Private WDFW Unspecified 885 21065 995964 34t" Ave S Culvert Passable 7/5/2022 City WDFW None 1460 14674 995963 Tukwila International Blvd Culvert Total 7/6/2022 City WDFW Slope 14673 995962 W (upstream) of SR 99 Culvert Total 7/6/2022 Private WDFW Slope ** 936252 South of SR 599 Culvert Unknown 9/1/2021 City WDFW Insufficient Data 50005 No Data Adjacent to E Marginal Way just S of SR 599 Culvert Partial 2/4/2011 City CH2M HILL Length; others possible 50006 922617 S 126t" St Culvert Unknown 3/2/2022 City WDFW Insufficient Data 994 ** 922618 S 128t" St Culvert Total 3/2/2022 City WDFW Slope 50008 922620 S 128t" St Culvert Total 3/2/2022 City WDFW Slope ** 936044 Driveway; S 128t" St Culvert Unknown 9/19/2022 WSDOT WDFW Other ** 922621 35t" Ave S Culvert Unknown 3/2/2022 City WDFW WS Drop 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com Fish -blocking Culvert Inventory — 2023 Addendum Page 4 of 7 March 18, 2024 Fish Passage Ida (Former) ** wish Passage Idb (WDFW Current) 936345 Locations West of 35th Ave S (unnamed tributary to Riverton Creek) Feature Type Other Barrier StatusIL (Revised) Total Survey Dated (Revised) 9/15/2022 Owner Type (Revised) Private Data Source Revised) Problems (Revised) WS Drop Culvert Id WDFW ** 922622 Tukwila International Blvd (unnamed tributary to Riverton Creek) Culvert N/A 3/2/2022 City WDFW N/A ** 936042 Lot; E Marginal Way S Culvert Partial 9/1/2022 WSDOT WDFW Slope 50007 936043 access rd;S 128th St Culvert Unknown 9/1/2022 Private WDFW Insufficient Data 50023 936047 S 128th St Artificial waterfall Total 9/19/2022 Private WDFW WS Drop ** 922619 37th Ave S (unnamed tributary to Riverton Creek) Culvert N/A 3/3/2022 City WDFW N/A Southgate Creek 50012 922624 Unnamed road (Outfall to Duwamish River) Culvert Unknown (Information in WDFW appears to be incorrect) / Partial 3/2/2022 City WDFW Culvert with a flap gate at outlet. Possible debris dam US not allowing enough water pressure to open flap gate. 1487 50013 No Data Interurban Ave S Culvert Partial 2/3/2011 City CH2M HILL Fish ladder at low flows 1932 50014 935836 SR 599 Culvert Unknown 3/7/2022 WSDOT WDFW Insufficient Data 1932 50015 922625 S 132nd St Culvert Total 3/3/2022 City WDFW Slope 1420 50016 922635 44th PI S Culvert Passable 3/7/2022 City WDFW None 1035 50018 No Data S 133rd St Culvert None 2/3/2011 City CH2M HILL None 2086 50017 922636 S 132nd St Culvert Unknown 3/8/2022 City WDFW Insufficient Data 1591 50019 922640 Commercial lot just S of S 133rd St Culvert Unknown 3/7/2022 City WDFW Insufficient Data 2225 50025 945477 S 134th PI Culvert Not a barrier 12/20/2023 Private WDFW N/A 953 50026 945478 S 134th PI Culvert Not a barrier 12/20/2023 Private WDFW N/A 988 50027 945479 S 134th PI Culvert Not a barrier 12/20/2023 Private WDFW N/A 2068 50028 945481 S 134th PI Culvert Partial 12/20/2023 Private WDFW Slope 1285 50029 945482 S 134th PI Culvert Partial 12/202023 Private WDFW Slope 1370 50030 945483 S 134th PI Culvert Total 12/20/2023 Private WDFW Slope 1203 ** 945488 Non -motorized crossing Culvert Unknown 1/29/2024 Private WDFW Insufficient Data ** 922637 48th Ave S Culvert Total 3/8/2022 City WDFW WS Drop ** 922638 S 136th St Culvert Partial 3/8/2022 City WDFW Slope ** 945485 Macadam Ave S Culvert Total 1/8/2024 Private WDFW Slope ** 922639 Macadam Rd S Culvert N/A 3/8/2022 City WDFW N/A ** 945487 Macadam Ave S Culvert N/A 1/8/2024 City WDFW N/A ** 945500 Macadam Ave S Culvert N/A 1/8/2024 City WDFW N/A ** 945486 Macadam Ave S Culvert N/A 1/8/2024 City WDFW N/A 50020 420921 S 133rd St - Unnamed road (driveway in restored stream length just N of S 133rd St) Culvert Patial 11/28/2023 Private WDFW Slope 50021 922626 S 133rd St/E Marginal Way Culvert Total 3/3/2022 City WDFW WS Drop 1877 ** 945484 Non -motorized crossing Culvert Total 1/3/2024 Private WDFW Slope ** 922641 Macadam Rd S Culvert Total 3/8/2022 City WDFW Slope ** 922642 Abandoned Rd; S 137th St Culvert N/A 3/8/2022 City WDFW N/A ** 922644 S 137th St Culvert Total 3/9/2022 City WDFW Slope ** 420924 40th Ave S Culvert Total 12/12/2023 Private WDFW WS Drop ** 420923 40th Ave S Culvert Total 12/12/2023 Private WDFW WS Drop 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com Fish -blocking Culvert Inventory — 2023 Addendum Page 5 of 7 March 18, 2024 Fish Passage Ida (Former) Fish Passage Idb (WDFW Current) Locationc Feature Type Barrier Status (Revised) Survey Dated (Revised) Owner Type (Revised) Data Source Revised) Problems (Revised) Culvert Id ** 922627 40t" Ave S Culvert Total 3/3/2022 City WDFW WS Drop ** 922628 Access Rd; 40t" Ave S Culvert N/A 3/3/2022 City WDFW N/A ** 922629 40t" Ave S Culvert N/A 3/3/2022 City WDFW N/A ** 922631 40t" Ave S Culvert Unknown 3/7/2022 City WDFW Insufficient Data ** 922632 38t" Ave S Culvert Total 3/7/2022 City WDFW WS Drop ** 922633 37t" Ave S Culvert Total 3/7/2022 City WDFW WS Drop ** 922634 Tukwila International Blvd Culvert N/A 3/7/2022 City WDFW N/A Black River ** 606773 <Null> Non Culvert Xing Passable 10/9/2019 <Null> WDFW ** 938400 <Null> Non Culvert Xing Passable 8/26/2009 WSDOT WDFW ** 938399 <Null> Non Culvert Xing Passable 8/26/2009 WSDOT WDFW Gilliam Creek 44994 938435 Tukwila Pkwy Culvert Total 6/24/2020 City WDFW Tidegate 40864 998967 1-405; EB lanes Culvert Passable 12/22/2022 WSDOT WDFW None ** 935715 1-405 Culvert Unknown 10/7/2021 WSDOT WDFW Insufficient Data 14611 *995857 1-405; NB on -ramp Culvert Partial 6/24/2020 WSDOT WDFW Depth 40863 998966 61st Ave SE Culvert Passable 6/24/2020 City WDFW None 14737 *996030 1-5; NB to 1-405 Culvert Total 1/26/2022 WSDOT WDFW Slope 40861 *998964 1-5; NB off -ramp Culvert Total 1/24/2022 WSDOT WDFW WS Drop ** 930716 1-5 Culvert N/A 9/21/2009 WSDOT WDFW N/A ** 997696 SR 518; EB off -ramp Culvert N/A 9/20/2005 WSDOT WSFW N/A ** *997697 SR 518 Culvert Total 1/24/2022 WSDOT WDFW WS Drop / Slope ** 935800 SR 518 Culvert N/A 1/25/2022 WSDOT WDFW N/A 17539 997689 SR 518 Culvert N/A 2/7/2022 WSDOT WDFW None. Non -Fish Bearing Stream 44986 938438 Southcenter Blvd Culvert Total 9/9/2009 City WDFW Slope 44985 938437 51st Ave S Bridge Non -Culvert Crossing Passable 9/9/2009 City WDFW None 44984 938436 Southcenter Blvd Culvert Total 9/9/2009 City WDFW Slope ** 922646 51st Ave S Culvert N/A 3/9/2022 City WDFW N/A ** 922645 51st Ave S Culvert N/A 3/9/2022 City WDFW N/A 45118 992652 SR 518 (Upper Gilliam) Abandoned/ Non -Culvert Crossing Passable 9/16/2009 Unknown WDFW Abandoned 50031 No Data S 152nd St (Upper Gilliam) Culvert Potential City CH2M HILL Unknown 45078 938440 Gilliam Regional Detention Facility at SR 518/Southcenter Blvd (Upper Gilliam) Dam Partial 2/7/2022 WSDOT WDFW WS Drop 44989 938439 Southcenter Blvd Culvert Total 9/9/2009 City WDFW WS Drop 44992 930720 S 150t" St (Upper Gilliam) Culvert Partial 9/16/2009 City WDFW US end has aluminum collar insert with trash rack. Professional judgement barrier due to trash rack and velocity 44993 930721 N of S 150t" St (Upper Gilliam) Culvert Total 9/17/2009 Private WDFW WS Drop 44983 930719 SR 518 (Upper Gilliam) Culvert Partial 2/7/2022 WSDOT WDFW Slope 40532 *992651 SR 518 Culvert Total 2/7/2022 WSDOT WDFW WS Drop 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com Fish -blocking Culvert Inventory — 2023 Addendum Page 6 of 7 March 18, 2024 I Fish Passage Ida (Former) wish Passage Idb (WDFW Current) 930711 Locations 42nd Ave S Feature Type Culvert Barrier Status (Revised) Passable Survey Dated (Revised) 1/26/2022 Owner Type (Revised) County Data Source Revised) WDFW Problems (Revised) None. Corrected Barrier Culvert Id 3086 44990 44991 930712 W of 42nd Ave S (Upper Gilliam) Dam Total 9/10/2009 City WDFW WS Drop 40359 *998886 SR 518 Culvert Total 1/24/2022 WSDOT WDFW Slope 44979 930717 39th Ln S (Upper Gilliam) Culvert Total 9/15/2009 City WDFW PVC at DS end, CAL at US end. Combination depth, velocity and outfall drop with no plunge pool. 44981 930718 S 154th St (Upper Gilliam) Culvert Total 9/15/2009 Private WDFW WS Drop Cottage Creek (Tributary to Gilliam Creek) ** 998965 1-405 Culvert N/A 3/1/2007 WSDOT WDFW N/A ** 935811 1-405; WB ROW Natural Barrier N/A 10/21/2021 WSDOT WDFW Uknown Tributaries to Green River in P17 Basin ** 922650 Andover Park E Culvert Passable 3/9/2022 City WDFW N/A ** 922651 Andover Park W Culvert N/A 3/9/2022 City WDFW N/A ** 995976 1-5 Culvert Total 11/3/2003 WSDOT WDFW Slope ** 996037 180th St Culvert Total 11/3/2004 WSDOT WDFW WS Drop Johnson Creek 50000 No Data Outfall to Green River Flood gate Partial n/a City CH2M HILL Additional statistical analysis on flood gate recommended 50001 No Data S 204th St Culvert Potential 2/3/2011 Unknown CH2M HILL Unknown 50024 No Data Outfall to Green River Culvert None n/a City CH2M HILL Assumes newly installed culvert is fish -passable. Duwamish River ** 997686 SR 99 Culvert N/A 9/1/2005 WSDOT WDFW N/A ** 922611 S 102nd St Non Culvert Xing Passable 3/1/2022 City WDFW ** *997684 SR 99 (on unnamed tributary to Duwamish River) Culvert Total 5/12/2015 WSDOT WDFW WS Drop ** 997683 SR 99 (on unnamed tributary to Duwamish River) Culvert N/A 9/1/2005 WSDOT WDFW N/A ** 922614 Tukwila International Blvd Non Culvert Xing Passable 3/1/2022 City WDFW ** 922630 S 116th St (on unnamed tributary to Duwamish River) Culvert N/A 3/7/2022 City WDFW N/A ** 922615 East Marginal Way S Non Culvert Xing Passable 3/1/2022 City WDFW ** 922616 Allentown Footbridge Non Culvert Xing Passable 3/2/2022 City WDFW ** 922623 42nd Ave S Non Culvert Xing Passable 3/2/2022 City WDFW ** 997022 1-5 Non Culvert Xing Passable 9/7/2005 WSDOT WDFW ** 922643 56th Ave S Non Culvert Xing Passable 3/9/2022 City WDFW ** 922612 S 109th St Culvert Passable 3/1/2022 City WDFW N/A ** 922613 47th Ave S Culvert Unknown 3/1/2022 City WDFW Debris 11241 Willows Road NE, Suite 200 1 Redmond, WA 98052 1 Phone 425.822.4446 1 otak.com Fish -blocking Culvert Inventory — 2023 Addendum Page 7 of 7 March 18, 2024 Fish Passage Ida (Former) Fish Passage Idb (WDFW Current) Locations Feature Type Barrier Status (Revised) Survey Dated (Revised) Owner Type (Revised) Data Source (Revised) Problems (Revised) Culvert Id ** 922652 49th Ave S Culvert N/A 3/16/2022 City WDFW N/A Green River ** 922647 Starfire Way Non Culvert Xing Passable 3/9/2022 City WDFW ** 922977 Interurban Ave S Non Culvert Xing Passable 10/20/2022 City WDFW N/A ** 922976 1-405; SB on -ramp Non Culvert Xing Passable 10/20/2022 WSDOT WDFW N/A ** 606839 Southcenter Blvd Non Culvert Xing Passable 12/2/2019 <Null> WDFW ** 999117 1-405 Non Culvert Xing Passable 4/24/2007 WSDOT WDFW ** 922648 Strander Blvd Non Culvert Xing Passable 3/9/2022 City WDFW ** 922649 S 180th St Non Culvert Xing Passable 3/9/2022 City WDFW ** 922106 S 200th St Non Culvert Xing Passable 6/7/2021 City WDFW NOTES: (a) The Fish Passage ID (former) number is a unique identifier number that corresponds to the "Fish_Passage_ID" attribute within the GIS database and figures from the 2013 SWCP. The number was either assigned by WDFW (where WDFW was the data source for the fish passage feature) or by CH2M HILL (where CH2M HILL was the data source for the fish passage feature). **Records that were not included in the 2013 SWCP inventory are identified with a double -asterisk in this column. (b) The Fish Passage ID (WDFW Current) is the unique identification number that corresponds to "Site Id" in WDFW's current fish passage database. If the fish -blocking culvert was identified in the 2013 SWCP by CH2M HILL through a windshield survey but the culvert is not in the WDFW database, "No Data" is noted. For rows where the Fish Passage ID (WDFW Current) is "No Data", the corresponding barrier status, survey date, owner type, and data source information is the same as that in the 2013 SWCP. The Sites identified with * in this column are on WSDOT's Current Injunction list (2023). (c) The Location indicates the road crossing or other location description based on the nearest road or major landmark (taken from 2013 SWCP); WDFW database identifies this field as Road Name. (d) The Survey Date Revised indicates one of three things: 1) the survey date recorded in the 2013 SWCP, 2) an updated survey date from WDFW, or 3) date information updated by Otak. If no date is listed, the feature has not yet been assessed in the field. No fieldwork was done for the 2024 SWCP update. (e) The Problem listed here indicates the specific cause of fish impassability. It was taken from either 1) the problem recorded in the 2013 SWCP or 2) an updated reason for impassability from WDFW, whichever is more current. No fieldwork was done for the 2024 SWCP update. (f) The Culvert ID corresponds to the culvert feature ID number in the City's GIS database and has not been updated since 2013 SWCP. Table 3 *WSDOT Current Injunction Barriers Fish Passage Id (WDFW Location Feature Type current) I Survey Date Owner Type Data Source Barrier Status (Revised) (Revised) (Revised) (Revised) Problem (Revised) 996030 1-5; NB off -ramp to 1-405 Culvert Total 1/26/2022 WSDOT WSDOT Slope 997697 SR 518 Culvert Total 1/24/2022 WSDOT WSDOT WS Drop / Slope 992651 SR 518 Culvert Total 2/7/2022 WSDOT WDFW WS Drop 998886 SR 518 Culvert Total 1/24/2022 WSDOT WDFW Slope 998964 1-5; NB off -ramp Culvert Total 1/24/2022 WSDOT WDFW WS Drop 995857 1-405; NB on -ramp Culvert Partial 6/24/2020 WSDOT WDFW Depth 997684 SR 99 Culvert Total 5/12/2015 WSDOT WDFW WS Drop 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com FIGURE B-4 FISH PASSAGE LOCATOR MAP TUKWILA SWCP 133383 TUKWILA, WASHINGTON Mile 0 0.5 1 Otak , 0 LEGEND City Boundary Data Sources: King County, WDF W, WSDOT City of Tukwila, Google Maps Dale: 3/18/2020 Disclaimer: This data is not to survey accuracy and is meant for planning purposes only Tukwila Mask Streams and Rivers WSDOT_-_Functional_ Class_Data_for_State_Routes WSDOT -Functional Class Data for State Routes Streams and Rivers D N R_Hydrography_-_Water_Bod ies_-_Forest_Practices_Regulation K tProjecl\33300\33383\CADD\GIS APRXs\33383 Tukwila SWCP Fish Passage \33383 Tukwila SWCP Fish Passage Reveed aprx FIGURE B-5 FISH PASSAGE BARRIERS TUKWILA NORTH TUKWILA SWCP 133383 TUKWILA, WASHINGTON 0 Otak Mile Q.6 0 Date Sm... Kmg Cwnl,, WDFW. *SPOT. Oily d ivk . Gtogl ?Asps Oeb 3nWrOZ4 Pisdovnet This Eme a nd in purvey accwatr uW O moor fv domi g turnmep onr N'Psq6n03-90003.191,CRPP'.GISNAPRXM333g3Tnxwfk SWCP Fen PAs(,Tg0,39 q] hMxla DW; A FrJi n.-qo q.uisod.+p: LEGEND WDFW Fish Passage, Percent (2022) Percent Passable • Total Blockage C> Partial Blockage - 67%P or 33% • Passable • Unknown • N/A- Non -fish bearing stream WDFW Fish Passage, Percent (2024) Not a barrier A. Partial Fish Passage Blockage ■ Total Fish Passage Blockage Berner, Unknown Percent Passable • On a Non -Fish Bearing Stream • Unknown Drainage Basins FIGURE B-6 FISH PASSAGE MAP TUKWILA CENTRAL LEGEND WDFW Fish Passage, Percent (2022) Percent Passable TUKWILA SWCP 133383 • Total Blockage TUKWILA, WASHINGTON O Partial Blockage - 67°/0 or 33% • Passable Mile 0 0.5 • Unknown Otak • N/A - Non -fish bearing stream Data Sources: King County, WDF W, WSDGT City a( Tukwila, Google Maps Dale: 3/19/2024 DisGaimer: This data is not to survey accuracy and is meant for planning purposes only K tProjectl33300t333831CADDIGIS APRXs133383 Tukwila SWCP Fish Passage133383 Tukwila SWCP Fish Passage Revisectaprx WDFW Fish Passage, Percent (2024) Not a barrier L. Partial Fish Passage Blockage ■ Total Fish Passage Blockage Barrier, Unknown Percent Passable • On a Non -Fish Bearing Stream • Unknown Drainage Basins CITY OF SEATAC FIGURE B-7 FISH PASSAGE MAP TUKWILA SOUTH TUKWILA SWCP 133383 TUKWILA, WASHINGTON 0 Otak 0 Mile 0.5 Date Smearx Kmg Cwnl,, WDFW. WSPPT. Oily d isk4. Gt(MI ?Asps DB% 3,19r20I4 D!,d M er: This eh. c nd in $M^+eY xcwatr told La noon[ fv doming !wry... on, K'Pnu(uOM1739O 3Y:$]YAPD,GID Ry ;?331n Tnxw(N SWCP Fish Ppss1gp•.?93a2 $W(w Fr3i qo Rayso4,p, CITY OF KENT LEGEND WDFW Fish Passage, Percent (2022) Percent Passable • Total Blockage C> Partial Blockage - 67% or 33% • Passable • Unknown • N/A- Non -fish bearing stream CITY OF RENTON WDFW Fish Passage, Percent (2024) Not a barrier A Partial Fish Passage Blockage ■ Total Fish Passage Blockage Barrier, Unknown Percent Passable • On a Non -Fish Bearing Stream • Unknown Drainage Basins ATTACHMENT A Fish -blocking Culvert Inventory TECHNICAL MEMORANDUM CH2M HILL. City of Tukwila Fish Passage Barrier Inventory PREPARED FOR: Ryan Larson, City of Tukwila Surface Water Management PREPARED BY: Erin Thatcher/CH2M HILL Randy Whitman/CH2M HILL REVIEWED BY: Amy Carlson/CH2M HILL DATE: November 22, 2011 PROJECT NUMBER: 412954.TT.02 Introduction This memo documents the fish passage barrier inventory developed for the City of Tukwila (the City). The purpose of the inventory is to provide a baseline of information that will inform future planning efforts and prioritization of capital and programmatic improvements related to fish -bearing streams within the City's jurisdiction. The inventory includes information gathered from the Washington Department of Fish and Wildlife (WDFW) and a windshield survey completed for the City's 2010 Surface Water Comprehensive Plan. The inventory encompasses the four main fish -bearing streams in the City's jurisdiction: Riverton Creek, Southgate Creek, Gilliam Creek, and Johnson Creek. Each of these streams is identified by WDFW as having the potential to support anadromous fish such as coho salmon (Oncorhynchus kisutch). The WDFW fish passage barrier inventory does not currently identify any barriers on the Duwamish River, and the inventory in this memo does not include the Duwamish River. Determining a culvert's (or other structure's) fish passability according to accepted standards involves a detailed engineering analysis (developed by WDFW) beyond the scope of this effort. For the areas that were not covered by WDFW's existing inventory, a best professional judgment of fish passability was made based on information gathered during the windshield survey. The windshield survey was conducted by a CH2M HILL professional fish biologist and an assistant scientist on February 3 and 4, 2011. Method The steps outlined below summarize the method used to develop the fish passage barrier inventory. 1. Gathered existing information and data from WDFW and other sources (listed below) 2. Created a basemap from the existing data, which included roads, stream channels, WDFW-mapped fish presence, WDFW fish barrier inventory, and City -mapped culverts WBG031611103411SEA\APPXB_FISH _BARRIERS_MEMO_V2_20111111 1 COPYRIGHT 2011 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL CITY OF TUKWILA FISH PASSAGE BARRIER INVENTORY 3. Identified information gaps from the basemap and existing information (e.g., road crossings without a corresponding WDFW fish passage feature) 4. Completed a windshield survey to fill information gaps, determine fish passability of areas uncovered by WDFW's inventory, and assess general aquatic habitat conditions for the 2010 Surface Water Comprehensive Plan 5. Created a new GIS database file of fish passage barriers incorporating WDFW's existing inventory and new information from the windshield survey Sources of existing information on fish passage and habitat that were evaluated during development of the inventory include: • WDFW Fish Passage Barrier Inventory GIS data (WDFW, 2010) • WSDOT Fish Passage Inventory (WSDOT and WDFW, 2010) • WRIA 9 Limiting Factors Analysis (King County and Washington State Conservation Commission, 2000) • Existing knowledge of City of Tukwila staff (Personal communications) • Tukwila's 2003 Comprehensive Surface Water Management Plan (CH2M HILL, 2003) • Gilliam Creek Basin Plan (Herrera, 2001) • Riverton Creek Basin Plan (Entranc, 1997) • Fostoria (Southgate) Creek Basin Plan (Herrera, 1996) • Johnson Creek Restoration Plan (Cedarock Consultants, 2010) • Tukwila South Project Final Environmental Impact Statement • King County's WRIA 9 Salmon Habitat Plan • Wild Fish Conservancy (formerly Washington Trout) website: http://wildfishconservancy.org/ Of these, the primary sources of information used to create the inventory are the WDFW fish passage barrier inventory and the February 2011 windshield survey. The WDFW fish passage barrier data are collected under the auspices of the Fish Passage Barrier and Surface Water Diversion Screening Assessment and Prioritization Manual (WDFW, 2009). The data do not represent a complete and comprehensive inventory of all waters. Numerous fish passage inventories are being conducted across the state and the data set is updated when new information becomes available. Table 1 summarizes key information from the fish passage inventory GIS database. Road crossings and other fish passage features were not always covered by the WDFW inventory or accessible in the field during the windshield survey. Remaining information gaps are noted by the entry "Unknown" both in the GIS database and in Table 1. Figures 1, 2, 3, 4, and 5 on the following pages show the fish passage barrier inventory for Riverton Creek, Southgate Creek, Lower Gilliam Creek, Upper Gilliam Creek, and Johnson Creek, respectively. Attachment A to this memo provides photographs of the fish passage features observed during the February 2011 windshield survey; not all fish passage features were accessible for photographs. WBG031611103411SEA1APPXB_FISH _BARRIERS_MEMO_V2_20111111 2 COPYRIGHT 2011 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL CITY OF TUKWILA FISH PASSAGE BARRIER INVENTORY TABLE 1 Tukwila Fish Barrier Inventory Fish Passage IDa Riverton Creek Locationb Barrier Survey Problems Feature Type Status Date Owner Type Data Source (CH2M HILL Added) Culvert IDe 14673 W (upstream) of SR 99 14674 SR 99 14675 126th St 14676 S 126th St Culvert JAL_ None 10/2/2003 City WDFW None Culvert Total 10/2/2003 State WDFW Unknown Culvert Partial 10/2/2003 City WDFW Unknown 1077 Culvert Partial 10/2/2003 Private WDFW Unknown 14677 S 126th St Culvert None 10/2/2003 Private WDFW None 19812 N of S 128th St Dam Total 10/2/2003 Private WDFW Unknown 885 21065 34th Ave S Culvert Potential 10/2/2003 City WDFW Unknown 1460 20534 W of 35th Ave S Artificial waterfall Total 7/8/2003 Private WDFW Gradient n/a 20533 W of 35th Ave S Artificial waterfall Total 7/8/2003 Private WDFW Gradient n/a 50002 Unnamed road (Outfall to Duwamish River) Culvert Partial n/a City CH2M HILL Flap gate 50003 SR 599 Culvert Potential n/a State CH2M HILL Unknown 50005 Unnamed road (Adjacent to E Marginal Way just S of SR 599) Culvert Partial 2/4/2011 City CH2M HILL Length; others possible 50006 S 126th St Culvert None 2/4/2011 City CH2M HILL None 994 50007 S 128th St Culvert None 2/4/2011 City CH2M HILL None 1803 50008 S 128th St Culvert Total 2/4/2011 City CH2M HILL Gradient; length, others possible 1606 50004 Unnamed road (Just upstream of SR 599) Culvert Potential n/a Unknown CH2M HILL Unknown 50009 S 120th PI (Restored stream length in industrial park) Culvert None 2/4/2011 City CH2M HILL None 872 50010 Unnamed road (Restored stream length in industrial park) Culvert None 2/4/2011 City CH2M HILL None 920 50011 Unnamed (Restored stream length in industrial park) Culvert None 2/4/2011 City CH2M HILL None 925 50022 W of Group Health building (main stream reach) Log jam Partial 2/4/2011 Unknown CH2M HILL Insufficient pool downstream of log jam obstacle n/a 50023 S 128th St Southgate Creek 50012 Unnamed road (Outfall to Duwamish River) 50013 Interurban Ave S 50014 SR 599 50015 S 132nd St Artificial waterfall Total Culvert 2/4/2011 Private CH2M HILL Gradient n/a None 2/3/2011 City CH2M HILL None 1487 Culvert Partial 2/3/2011 City CH2M HILL Fish ladder at low flows 1932 Culvert Potential n/a State CH2M HILL Unknown 1932 Culvert Partial 2/3/2011 City CH2M HILL Sediment blockage 1420 50016 44th PI S Culvert None 2/3/2011 City CH2M HILL None 1035 50017 S 132nd St Culvert None 2/3/2011 City CH2M HILL None 1591 50018 S 133rd St Culvert None 2/3/2011 City CH2M HILL None 2086 50019 Commercial lot just S of S 133rd St Culvert Total 2/3/2011 Unknown CH2M HILL Perched; no flow 2225 WBG031611103411SEA1APPXB_FISH _BARRIERS _MEMO_V2_20111111 3 COPYRIGHT 2011 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL TABLE 1 Tukwila Fish Barrier Inventory Barrier Survey Problems Fish Passage !Da Locationb Feature Type Status Date` Owner Type Data Source (CH2M HILL Added) Culvert IDe 50020 Unnamed road (driveway in restored stream length just N of S 133rd St) Culvert 50021 S 133rd SUE Marginal Way Culvert 50025 S 134th PI 50026 S 134th PI 50027 S 134th PI 50028 S 134th PI Culvert None 2/3/2011 Unknown CH2M HILL None Total 2/3/2011 City CH2M HILL Gradient; others possible 1877 None 2/3/2011 City CH2M HILL None Culvert Culvert Culvert None 2/3/2011 City CH2M HILL None None 2/3/2011 City CH2M HILL None None 2/3/2011 City CH2M HILL None 50029 S 134th PI 953 988 2068 1285 Culvert None 2/3/2011 City CH2M HILL None 1370 50030 S 134th PI Gillia • -ek 14611 1-405; NB on -ramp Culvert None 2/3/2011 City CH2M HILL None 1203 Culvert Partial 12/11/2007 State WDFW Unknown 14737 1-5; NB to 1-405 Culvert Total 9/9/2009 State WDFW Unknown 40359 SR 518 40863 61 st Ave SE 40864 1-405 NB shoulder 44984 Southcenter Blvd 44985 51st Ave S 44986 Southcenter Blvd Culvert Total 9/15/2009 State WDFW Unknown Culvert None 3/1/2007 City WDFW Unknown Culvert Partial 9/8/2009 State WDFW High discharge during high flows; length Culvert Total 9/9/2009 City WDFW Unknown Bridge None 9/9/2009 City WDFW Unknown Culvert Total 9/9/2009 City WDFW Unknown 44989 Southcenter Blvd Culvert Total 9/9/2009 City WDFW Unknown 44990 42nd Ave S Culvert n/a Total 9/10/2009 City WDFW Unknown 3086 44994 Tukwila Pkwy Culvert Partial 9/8/2009 City WDFW Flap gate 17539 SR 518 40532 SR 518 Culvert N/A 9/13/2005 State WDFW Unknown Culvert Total 9/16/2009 State WDFW Unknown 40861 1-5; NB off -ramp Culvert Total 2/27/2007 State WDFW Unknown 44979 39th Ln S (Upper Gilliam) Culvert Total 9/15/2009 Unknown WDFW Unknown 44981 S 154th St (Upper Gilliam) Culvert Total 9/15/2009 Private WDFW Unknown 44983 SR 518 (Upper Gilliam) Culvert Partial 9/16/2009 Unknown WDFW Unknown 44991 W of 42nd Ave S (Upper Gilliam) Dam Total 9/10/2009 Private WDFW Gradient n/a 44992 S 150th St (Upper Gilliam) Culvert Partial 9/16/2009 City WDFW Unknown 44993 N of S 150th St (Upper Gilliam) Culvert Total 9/17/2009 Unknown WDFW Unknown 45078 Gilliam Regional Detention Facility at SR 518/Southcenter Blvd (Upper Gilliam) Dam Partial 9/10/2009 City WDFW Unknown n/a 45118 SR 518 (Upper Gilliam) Abandoned None 9/16/2009 Unknown WDFW Unknown 50031 S 152nd St (Upper Gilliam) Culvert Potential n/a City CH2M HILL Unknown WBG031611103411SEA\APPXB_FISH _BARRIERS _MEMO_V2_20111111 COPYRIGHT 2011 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL 4 TABLE 1 Tukwila Fish Barrier Inventory Barrier Survey Problems Fish Passage ID' Locationb Feature Type Status Datec Owner Type Data Source (CH2M HILL Added) Culvert IDe Johnson Creek 50000 Outfall to Green River Flood gate Partial n/a City CH2M HILL Assumes newly installed flood gate is fish -passable at most flows. 50001 S 204th St Culvert Potential 2/3/2011 Unknown CH2M HILL Unknown 50024 Outfall to Green River Culvert None n/a City CH2M HILL Assumes newly installed culvert is fish -passable. NOTES: a The Fish Passage ID number is a unique identifier number that corresponds to the "Fish_Passage_ID" attribute within the GIS database and figures. The number was either assigned by WDFW (where WDFW is the data source for the fish passage feature) or by CH2M HILL (where CH2M HILL was the data source for the fish passage feature). b The Location indicates the road crossing or other location description based on the nearest road or major landmark. ° The Survey Date indicates either 1) the date that WDFW surveyed the fish passage feature or 2) CH2M HILL visited the feature during windshield survey. If no date is listed, the feature has not yet been assessed in the field. s The Problem listed here corresponds to the "CH_Problem" attribute within the GIS database, and indicates the specific cause of fish impassability. Some information was not available from the WDFW inventory or windshield survey. e The Culvert ID corresponds to the culvert feature ID number in the City's GIS database. WBG031611103411SEA1APPXB_FISH _BARRIERS _MEMO _V2_20111111 5 COPYRIGHT 2011 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL References Cedarock Consultants, Inc. 2010. Tukwila South Project Fisheries Mitigation Plan. June. CH2M HILL. 2003. City of Tukwila Comprehensive Surface Water Management Plan. Prepared by CH2M HILL, Inc. Prepared for the City of Tukwila. November. Entranco, Inc., et al. 1997. Riverton Creek Stormwater Quality Management Plan: Water Quality, Stream Habitat, and Flood Control. Prepared by Entranco Inc., Taylor Associates Inc., and Envirovision Inc. Prepared for the City of Tukwila. November. Herrera Environmental Consultants, Inc. 1996. Fostoria Basin: Stormwater Quality Management Plan. Prepared for the City of Tukwila. March. Herrera Environmental Consultants, Inc. 2001. Gilliam Creek Basin: Stormwater Management Plan. Prepared for the City of Tukwila. March. Howat. 2010. Personal communication (conversation with John Howat, City of Tukwila Public Works Department). Tukwila City Hall, Tukwila, WA. November 30. King County and Washington State Conservation Commission. 2000. Habitat Limiting Factors and Reconnaissance Assessment Report: Green/Duwamish and Central Puget Sound Watersheds. December. Washington Department of Fish and Wildlife (WDFW). 2009. Fish Passage and Surface Water Diversion Screening Assessment and Prioritization Manual. Washington Department of Fish and Wildlife. Olympia, Washington. WDFW. 2010. Fish Passage Barrier Inventory Geodatabase. Accessed via email by Brian Benson, WDFW Habitat Program, on January 14, 2011. Whiting. 2011. Personal communication (email correspondence with Sandra Whiting, City of Tukwila Department of Community Development). CH2M HILL, Bellevue, WA. January 27. WSDOT and WDFW. 2010. Progress Performance Report for WSDOT Fish Passage Barrier Inventory. May. WSDOT. 2007. SR 518 SeaTac Airport to 1-5/1-405 Interchange Widening Project: Culvert Mitigation. February. WBG031611103411SEA1APPXB_FISH _BARRIERS_MEMO_V2_20111111 6 COPYRIGHT 2011 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL Appendix C Surface Water Regulations and Policies Surface Water Regulations and Policies Appendix C contains the detailed assessment of regulations applicable to the City of Tukwila's surface water program. The information presented here is summarized in Section 3 of the 2024 Surface Water Comprehensive Plan (2024 SWCP). Applicable Surface Water Regulations Regulatory changes have occurred since preparation of the 2013 Surface Water Comprehensive Plan. The changes most significant for Tukwila are with National Pollutant Discharge Elimination System (NPDES) Phase II permit. Regulations currently applicable to the City of Tukwila's surface water management program are shown in Table C-1. (Note that flood protection and flooding as a result of Green or Duwamish River flooding are outside the scope of the 2024 SWCP.) Table C-1 Summary of Applicable Surface Water Regulations Regulation or Program (organized by category) Tukwila Surface Water Management Program Areas Surface Water Water Quality Aquatic Habitat Surface Water Management Surface Water Management Ordinance, Tukwila Municipal Code 14.30, and resultant surface water planning Surface Water Design Manual Capital projects to address drainage problems; many needed projects await funding Adoption of the 2021 King County Surface Water Design Manual Capital projects to address water quality concerns; projects await funding Adoption of the 2021 King County Surface Water Design Manual Capital projects to address aquatic habitat concerns or opportunistically protect/restore habitat; projects await funding Not Applicable. C-1 APPENDIX C: SURFACE WATER REGULATION AND POLICIES Table C-1 Summary of Applicable Surface Water Regulations Regulation or Program (organized by category) Tukwila Surface Water Management Program Areas Surface Water Water Quality Aquatic Habitat Water Quality State surface water quality standards Section 303(d) list The NPDES Phase II permit does not authorize a discharge which would be a violation of State surface water quality standards and requires permittees to act if a stormwater system discharge is found to cause or contribute to a violation. The Green/Duwamish River, Riverton Creek, Black River, Gilliam Creek, do not meet State surface water quality standards for several parameters. Several water bodies do not meet standards. Anti -degradation standard difficult to achieve. Need to identify pollution sources and implement prevention programs. 303(d) impaired listings may require development of TMDLs; Tukwila would be one of several jurisdictions involved Degraded water quality impacts aquatic habitat, lessening benefits of habitat protection or restoration efforts Not Applicable. C-2 APPENDIX C: SURFACE WATER REGULATION AND POLICIES Table C-1 Summary of Applicable Surface Water Regulations Regulation or Program (organized by category) Tukwila Surface Water Management Program Areas Surface Water Water Quality Aquatic Habitat Habitat Protection Superfund Total Maximum Daily Loads (T M D Ls) NPDES Phase II permit Endangered Species Act No Applicable The Green River Temperature TMDL (Ecology, 2011) applies to Tukwila. Compliance with the NPDES permit constitutes compliance with the goals for of the TMDL. See Attachment C-1 City regulations and policies generally support compliance with the ESA and encourage salmon recovery. The Lower Duwamish Waterway (LDW) Superfund Site has polluted sediments. Tukwila cooperates with Ecology and King County to control sources of pollution. Not yet applicable to Tukwila (see above); however, studies and implementation may be initiated as a part of TMDL development See Attachment C- 1 City demonstrates understanding of environmental baseline conditions (see basin pans and other documents). Not Applicable. Not Applicable. The SEPA checklist includes consideration of endangered and threatened species. C-3 APPENDIX C: SURFACE WATER REGULATION AND POLICIES Table C-1 Summary of Applicable Surface Water Regulations Regulation or Program (organized by category) Tukwila Surface Water Management Program Areas Surface Water Water Quality Aquatic Habitat State Salmon Recovery Planning Act Growth Management Act Not Applicable. Not Applicable. City has implemented capital improvement projects that restore fish habitat for ESA - listed species and participates in Water Resource Inventory Area (WRIA) 9 salmon recovery efforts. Adopted Stormwater Management Manual for Western Washington Adopted Stormwater Management Manual for Western Washington Not Applicable. NPDES Municipal Stormwater Phase II Permit Attachment C-1 contains a detailed gap analysis of Tukwila's surface water management program against the NPDES permit as of 2020. Because the NPDES permit is expected to be reissued later in 2024, and its terms have not been finalized, Tukwila has not completed a gap analysis against the 2024-2029 NPDES permit. Environmental Species Act (ESA) The Environmental Species Act (ESA) of 1973 provided broad protection for listed threatened and endangered species and their designated critical habitat. As of March 2024, the salmon and trout listings applicable for Puget Sound are: • Chinook salmon (Threatened, Critical Habitat Designation) • Steelhead (Threatened, Critical Habitat Designation) • Bull trout (Threatened) C-4 APPENDIX C: SURFACE WATER REGULATION AND POLICIES The ESA prohibits a "take" of a listed species by any person subject to the jurisdiction of the United States, which applies to both public and private lands and activities. Both a person whose actions harm or harass a protected species and a government entity that authorizes that person's actions can violate the ESA prohibitions. Thus, the City of Tukwila is responsible for implementation of plans and policies that support the ESA prohibitions. Generally, City regulations and policies support compliance with ESA and encourage salmon recovery. Potential Changes to Surface Water Regulations This plan includes a discussion of potential changes to the following regulations: • Endangered Species Act listings • Clean Water Act-- NPDES Phase II • Clean Water Act — Total Maximum Daily Loads Endangered Species Act If additional species are listed or current listings are downgraded, the City's surface water program will need to be re -prioritized to place greater emphasis on habitat protection and restoration measures for these additional species. NPDES Phase II Permit The City of Tukwila is covered under the Washington State Department of Ecology's NPDES program for municipalities as a 'small MS4' with a Phase II municipal stormwater permit. The current Western Washington Phase II Municipal Stormwater Permit became effective August 1, 2019, and will expire July 31, 2024. Ecology will reissue the permit in June or July 2024, and it will become effective August 1, 2024. While the new permit has not been finalized, a draft has been distributed for comment. Based on this draft language, it is anticipated that the reissued Phase II permit will include requirements to: • Adopt tree canopy goals and policies to support stormwater management and water quality improvements and begin mapping tree canopy • Implement projects recommended by the SMAP or other water quality projects and activities • Develop a Stormwater Management Action Plan (SMAP) for another catchment or basin C-5 APPENDIX C: SURFACE WATER REGULATION AND POLICIES • Increase detail of stormwater system mapping • Update illicit discharge prohibitions and source control requirements to incorporate limitations on discharge of PCBs and other emerging pollutants • Adopt an updated stormwater management manual which includes new thresholds for providing runoff treatment facilities on development sites with multiple threshold discharge areas and new thresholds for requiring stormwater management on road - related redevelopment projects and commercial or industrial redevelopment projects • Continue at similar levels of effort for education, public involvement, operation and maintenance, and inspections. The impact of potential new requirements has not been assessed. Section 8 of the 2024 SWCP recommends the City conduct a gap analysis after the permit has been issued and plan for the appropriate technical, staffing, equipment, capital improvements, and professional services which may be required to maintain compliance. Establishment of a TMDL for the Green and Duwamish River System Ecology is required to establish a TMDL for each pollutant identified in each impaired water body on the Section 303(d) list. The Green/Duwamish River system is listed as Category 5 (impaired) for pH, dissolved oxygen, bacteria, and temperature. (A complete list of 303(d) listings is included in Table B-2 of Appendix B of this Plan). A TMDL for temperature has been published and includes waste load allocations (WLA) for discharge of warm water. Tukwila is assumed to meet its WLA by complying with its Phase II NPDES permit. While TMDLs have not yet been established for pH, dissolved oxygen, or bacteria, it is anticipated that a TMDL will be established in the future. Ecology can use mechanisms such as the municipal NPDES permit program to establish water quality control requirements for individual drainage basins. If TMDL requirements were to be incorporated into the NPDES permit mechanism, the earliest this likely would occur is with the next permit cycle (beginning approximately August 2030,). Before this can occur, Ecology would spearhead establishment of the TMDL using data collection and modeling. The impact of the anticipated TMDL on Tukwila's surface water program during this surface water planning cycle is likely in the form of staff time or financial resources during the technical portion of establishment of the TMDL. C-6 ATTACHMENT C-1 City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary Submitted to: City of Tukwila 6200 Southcenter Boulevard Tukwila, WA Prepared By: Otak, Inc. 700 Washington Street, Suite 300 Vancouver, WA 98660 March 18, 2020 Project No. 19340 Otak TABLE OF CONTENTS Page Section 1—Introduction 1 Section 2—Method 1 Documents Reviewed 1 Section 3—Program Review Summary 2 S5.C.1, Stormwater Planning 2 S5.C.4, MS4 Mapping and Documentation 4 S5.C.6, Controlling Runoff from New Development, Redevelopment, and Construction Sites (including Appendices 1 and 10) 6 S5.C.8, Source Control for Existing Development 7 Section 4—Summary of Recommendations and Implementation Schedule 9 Tables Table 1—Permit Requirements Implementation Summary (New/Changed Requirements Only) Error! Bookmark not defined. Figures Figure 1: Implementation Schedule (New/Changed Requirements Only) 15 Appendices Appendix A —Gap Analysis Matrix City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary Otak Section 1—Introduction The City of Tukwila (City) is an existing permittee under the National Pollutant Discharge Elimination Systems (NPDES) Western Washington Phase II Municipal Separate Storm Sewer (MS4) Permit (Permit), issued by Washington Department of Ecology (Ecology). Ecology recently reissued the Permit, effective August 1, 2019, through July 31, 2024. The reissued Permit includes several permit conditions which are new or have changed. The City has requested Otak's assistance in preparing to comply with the requirements of the 2019-2024 Permit. Section 2—Method Otak compared the City's 2019 Stormwater Management Program Plan and supporting documents with the Permit and looked for potential gaps in compliance focusing on the following permit conditions that are new or changed: • S5.C.1, Stormwater Planning • S5.C.4, MS4 Mapping and Documentation • S5.C.6, Controlling Runoff from New Development, Redevelopment, and Construction Sites (including Appendices 1 and 10) • S5.C.8, Source Control for Existing Development Documents Reviewed Otak submitted a detailed request for documents relevant to the Permit stormwater management program elements. The City provided documents specific to the existing Stormwater Management Program as well as numerous general City documents related to the new program requirements. Overall • 2019 Stormwater Management Program (SWMP) Plan • 2018 NPDES Permit Annual Report answers S5.C.1, Stormwater Planning • City of Tukwila Comprehensive Plan 2015 • City of Tukwila Surface Water Comprehensive Plan 2013 • Green Tukwila 20-Year Stewardship Plan 2017 • 2019-2024 Financial Planning Model and Capital Improvement Program • Transportation and Infrastructure Committee page, tukwilawa.gov S5.C.4, MS4 Mapping and Documentation • City of Tukwila GIS Database: Catch_basins, Drain_points, Pipes_and_Ditches, Storm_Clean_Out, Storm_Pump_Station, Storm_Vault_Lid, Stormwater_Detention_Water_Quality_Structure S5.C.6, Controlling Runoff from New Development, Redevelopment, and Construction Sites (including Appendices 1 and 10) • 2019 Stormwater Management Program (SWMP) Plan • 2018 NPDES Permit Annual Report answers City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary I Otak S5.C.8, Source Control for Existing Development • Tukwila Municipal Code - Title 14: Water and Sewers • Informal Source Control Inspection Program Standard Operation Procedures (SOP) • Historic Spill Kit Outreach and Source Control Business Inspections by ECOSS • Private Stormwater Facility Inspections (Residential and Business/Commercial) by Public Works staff • Source Control Inventories: Pools, Spas, Restaurants, Auto Lots • Private Drainage Inspection list (spreadsheet entitled "NPDES Properties") Section 3—Program Review Summary S5.C.1, Stormwater Planning Requirements Permit section S5.C.1., Stormwater Planning, is a new requirement for the 2019-2024 Permit term. The City will need to allocate additional effort to meet the new requirements. Some of the requirements may be met by modifying or expanding current activities. Upcoming long-term plan update efforts are applicable to the long-term planning requirements. Ongoing efforts to make Low Impact Development (LID) the preferred and commonly - used approach to site development under the Controlling Runoff from New Development, Redevelopment, and Construction Sites program now fall under this permit section. C.1.a. Convene an inter -disciplinary team to inform and assist in the development, progress, and influence of this program. C.1.b.i.a. On the 2021 NPDES Annual Report, respond to the Stormwater Planning questions to describe how anticipated stormwater impacts on water quality were addressed, if at all, during the 2013-2019 Permit term in updates to the Comprehensive Plan. C.1.b.i.b. On the 2023 NPDES Annual Report, respond to the Stormwater Planning questions to describe how anticipated stormwater impacts on water quality are informing the planning update process during the 2019-2024 Permit term. C.1.c. Continue to require LID principles and Best Management Practices (BMPs) to make LID the preferred and commonly -used approach to site development. C.1.d.i. Prepare a Receiving Water Assessment. C.1.d.ii. Prepare a Receiving Water Prioritization. C.1.d.iii. Develop a Stormwater Management Action Plan (SMAP) for at least one high priority catchment area. Findings Existing Activities • City has a long-term planning process for stormwater: Surface Water Comprehensive Plan • City has incorporated LID into the development code • City's Surface Water Comprehensive Plan includes information on basins within the City Observed Gaps • City needs to convene an inter -disciplinary team to inform stormwater planning • City will need to include NPDES coordinator in upcoming long-term plan updates • City will need to continue to assess and eliminate barriers to LID • City will need to: • Prepare a Receiving Water Assessment, which could be addressed by updating basin information in the Surface Water Comprehensive Plan • Prepare a Receiving Water Prioritization • Develop an SMAP for at least one high priority catchment area City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 2 Otak Recommendations The City currently forms temporary working groups to address specific projects. The City should establish a standing committee to inform and assist development of the stormwater planning program. The committee should include members from Public Works divisions including Transportation, Development Services, Facility and Street Maintenance, and Surface Water, as well as departments outside Public Works including Community Development, Economic Development, and Parks and Recreation. The committee should advise on the City's Surface Water Comprehensive Plan and Comprehensive Plan updates and any other long-term planning efforts or surface water program changes. The committee should first convene by August of 2020. At a minimum, the team should meet at the beginning of each planning process to establish tasks and agree on priorities, and at the end to review deliverables. Establishing the committee through a policy from the City Administrator would assist with broad participation. This effort may be addressed with existing staffing. The NPDES coordinator will need to answer questions about how stormwater management needs and protection/improvement of receiving water health were (or were not) addressed in existing long-term plans on the 2021 NPDES Annual Report. The relevant long-term plans include: • 2013 Surface Water Comprehensive Plan • 2015 City of Tukwila Comprehensive Plan • 2019 - 2024 Financial Planning Model and Capital Improvement Program • 2017 Green Tukwila 20-Year Stewardship Plan The NPDES Coordinator will need to review the Annual Report questions and collect the necessary information prior to March 31, 2021. This effort may be addressed with existing staffing. The NPDES Coordinator will also need to answer questions about how the how stormwater management needs and protection/improvement of receiving water health are (or are not) informing the planning update process and influencing policy and strategies on the 2023 Annual Report. The City's Surface Water Program Manager and NPDES Coordinator should be involved in the updates to the City's Comprehensive Plan and other long-term plans. • The City's Surface Water Comprehensive Plan will be updated in 2021 • The City's Comprehensive Plan will be updated in 2023 This effort may be addressed with existing staffing. The City will need to establish a process to continue to assess and consider any newly identified administrative or regulatory barriers to LID implementation. The process could be documented in the upcoming update to the Surface Water Comprehensive Plan, and the interdisciplinary stormwater committee could play a role in identifying and considering barriers. This effort may be addressed with existing staffing. The City will need to prepare a Receiving Water Assessment, Receiving Water Prioritization and develop an SMAP by March 2023 following a process similar to that described in Ecology's 2019 Storm water Management Action Planning Guidance. The basin descriptions in the City's current Surface Water Comprehensive Plan already contain much of the information needed for the Receiving Water Assessment, and the City may choose to include the whole process, including completing the SMAP, in the update of the Surface Water Comprehensive Plan planned for 2021. City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 3 Otak Although this would accelerate the timeline required by the Permit, it would avoid duplication of effort and would include the SMAP in the planned effort. This effort may be addressed with existing staffing with the support of professional services. S5.C.4, MS4 Mapping and Documentation Requirements Permit section S5.C.4, MS4 Mapping and Documentation, was previously categorized under Illicit Discharge Detection and Elimination. As a result, the new section includes continuing effort as well as new requirements. The following requirements represent continuing effort: C.4.a.i. Map the known MS4 outfalls and known MS4 discharge points. C.4.a.ii. Map receiving waters, other than groundwater. C.4.a.iii. Map stormwater treatment and flow control BMPs/facilities owned or operated by the permittee. C.4.a.iv. Map geographic areas served by the permittee's MS4 that do not discharge stormwater to surface waters. C.4.a.v. Map tributary conveyances to all known outfalls and discharge points with a 24-inch nominal diameter or larger, or an equivalent cross -sectional area for non -pipe systems. Include the following features/attributes: tributary conveyance type, material, and size where known; associated drainage areas; and land use. C.4.a.vi. Map connections between the MS4 owned or operated by the permittee and other municipalities or public entities. C.4.a.vii. Map all connections to the MS4 authorized or allowed by the permittee after February 16, 2007. (Do not need to map residential connections for individual driveways, sump pumps, or roof downspouts). C.4.d./e. Upon request, and to the extent appropriate, the permittee shall provide mapping information to Ecology, federally -recognized Indian Tribes, municipalities, and other permittees. The following requirements are new and will require additional effort by the City to meet the 2019-2024 Permit requirements: C.4.b.i. Begin to collect size and material for all known MS4 outfalls during normal course of business (e.g., during field screening, inspection, or maintenance) and update records. C.4.b.ii. Complete mapping of all known connections from the MS4 to a privately -owned stormwater system. C.4.c. Store all required mapping data in a GIS or CAD drawings and develop mapping standards. Findings The activities organized in the 2019-2024 Permit in the MS4 Mapping and Documentation section continue and expand on activities previously organized under the IDDE program. As a result, the City is already conducting many of the required activities. The Permit now requires electronic mapping of the MS4 in a GIS or in CAD with documented standards. City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 4 Otak The City GIS Coordinator maintains a GIS database of the MS4 and receiving waters. Additional data is maintained by the NPDES Coordinator in KML files (Google Earth), and a list of outfalls used for IDDE inspections is maintained in Excel spreadsheets. Many MS4 assets are also tracked in Lucity with attributes such as material and size. The City recently adopted a new GIS data dictionary. Implementing this data dictionary across the users of the City's GIS database will address the requirement to describe the City's electronic mapping standards. Existing Activities • The City has a GIS database which includes public stormwater infrastructure, receiving waters, and private stormwater facilities. • The City has an inventory of outfalls used for dry weather inspections under the Illicit Discharge Detection and Elimination (IDDE) program; this outfall list likely conforms to the definition' of outfall in the Permit. • As part of its IDDE inspection program, the City collects data such as pipe size and material of outfalls. • The City has a newly adopted GIS data dictionary. • The City has an asset management system, Lucity, which tracks many of the required attributes of the MS4 system, such as size and materials of outfalls. Observed Gaps Most or all of the required mapping elements (both existing and new) are already tracked by the City either in the GIS, in Excel, or in Lucity. However, some required mapped elements are not explicitly shown in the GIS, and elements and attributes that are tracked in a different data repository must be transferred or copied to the GIS. • The GIS database does not have an "outfall" feature that conforms to the definition of outfall in the Permit. The dry weather inspection outfall inventory and map likely conform to the definition of "outfall" in the Permit, but they do not qualify under the new electronic mapping standard. • The GIS database does not have a "discharge point" feature that conforms to the definition of discharge point in the Permit. • The GIS database does not appear to have a way to distinguish connections between interconnected systems and connections between different elements of the same system. • The attributes of stormwater assets such as pipes that are tracked within Lucity do not qualify under the new electronic mapping standard, and these attributes must be transferred to the GIS. • City will need to collect and record size and materials of pipes to MS4 outfalls where such data are missing. • City will need to establish mapping standards (see Mapping Guidance for Municipal Stormwater Permittees). Recommendations The City will need to perform some analyses of existing data and transfer information from other data repositories (e.g. Excel, Lucity) into the GIS to meet the following mapping requirements: • Map geographic areas served by the permittee's MS4 that do not discharge stormwater to surface waters. • Create an outfall feature type in the GIS and identify true outfalls from among the various "drain points" in the existing GIS. Attach attributes such as pipe size and materials. • Create a discharge point feature type in the GIS and identify true discharge points from among the various "drain points" in the existing GIS. • Create a system connection feature type in the GIS and identify connections between the City's storm sewer and storm sewers of adjacent • Ensure that attributes of tributary conveyances to outfalls of 24-inches in diameter or greater that are tracked in another repository are incorporated into the GIS (where known). The following new requirement may require field reconnaissance and manual entry of new data: • Create a system connection point feature type in the GIS. 1 Definitions are found beginning on page 49 of the 2019-2024 Phase II Permit. City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 5 Otak ■ Map connections from the MS4 to private stormwater systems. The City should include this work and updates to the GIS database in the existing GIS consultant contract. For a limited duration of six months to one year, this effort will require additional work by a staff member familiar with Permit definitions and with the City's MS4. Approximately 100 hours of staff time will be required to locate various source data (e.g. Lucity), coordinate the work of the contractor to ensure that the GIS updates conform to Permit requirements, and perform quality control checks on the resulting GIS data sets. Additional field reconnaissance that may be needed is not included in this estimate. S5.C.6, Controlling Runoff from New Development, Redevelopment, and Construction Sites (including Appendices 1 and 10) Requirements Changes to Permit section S6.C.6, Controlling Runoff from New Development, Redevelopment, and Construction Sites, are relatively minor. The 2019-2024 Permit adopts Appendix 10, which is new, and which is referenced by this section and by Appendix 1. The following requirements represent continuing effort and will see minor changes as a result of adopting the requirements of Appendix 10: C.6.a. Implement an ordinance or other enforceable mechanism to reduce pollutants in stormwater runoff to the MS4 from new development, redevelopment, and construction sites. C.6.b. Revise ordinance or other enforceable mechanism to meet the requirements of S5.C.6.b(i) through (iii). C.6.c.i. Review all stormwater site plans for proposed development activities. C.6.c. ii. Inspect, prior to clearing and construction, permitted development sites that have a high potential for sediment transport as determined through plan review based on definitions and requirements in Appendix 7 Determining Construction Site Sediment Damage Potential, or, alternatively, inspect all construction sites meeting the minimum thresholds adopted. C.6.c.iii. Inspect all permitted development sites during construction to verify proper installation and maintenance of required erosion and sediment controls. Enforce as necessary based on the inspection. C.6.c.iv. Manage maintenance activities to inspect all stormwater treatment and flow control BMPs/facilities, and catch basins, in new residential development every 6 months until 90% of the lots are constructed to identify maintenance needs and enforce compliance with maintenance standards as needed. C.6.c.v. Inspect all permitted development sites upon completion of construction and prior to final approval or occupancy to ensure proper installation of permanent stormwater facilities. Verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater facilities. C.6.c.vi. Document compliance with the inspection requirements in S5.C.6.b.ii. through v. Compliance shall be determined by achieving at least 80% of the required inspections. C.6.c.vii. Implement a procedure for keeping records of inspection and enforcement actions, including inspection reports, warning letters, notices of violation, and other enforcement records. Keep records of maintenance inspections and activities. C.6.c.viii. Implement an enforcement strategy in cases of non-compliance. City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 6 Otak C.6.d. Make available the electronic links to Ecology's Construction Stormwater General Permit Notice of Intent (NOI) form and the Industrial Stormwater General Permit NOI form, as applicable, to representatives of new development and redevelopment. C.6.e. Train all staff responsible for implementing the program to control stormwater runoff from new development, redevelopment, and construction sites (including permitting, plan review, construction site inspections, and enforcement) to conduct these activities. Keep training records. The City will need to adopt the standards contained in Appendix 1 as part of the Controlling Runoff from New Development, Redevelopment, and Construction Sites. Findings The City has adopted the 2016 King County Surface Water Design Manual (KCSWDM) and King County Stormwater Pollution Prevention Manual, a Phase I program equivalent to Appendix 1, and the 2014 Stormwater Management Manual for Western Washington. Existing Activities • The City currently implements the thresholds, definitions, and minimum requirements of Appendix 1 under the 2013-2018 permit. Observed Gaps • The City will need to update its standards for controlling runoff from development and construction sites by June 30, 2022. The City has several options to update its standards, including: • Wait for King County to update its own manuals and program to comply with the analogous Phase I Permit requirement (due by July 1, 2021), and then adopt the updated King County manuals and program. • Continue to enforce the 2016 King County manual and program, and adopt independent amendments or errata equivalent to Appendix 10. • Adopt Ecology's 2019 Stormwater Management Manual for Western Washington. • Develop an independent manual and program using the thresholds, definitions, and minimum requirements of the 2019-2024 Appendix 1. Recommendations The City of Tukwila plans to adopt the updated King County manuals and program prior to June 30, 2022. This recommendation assumes that King County will update its manuals and programs in accordance with Phase Permit's Appendix 1 by summer of 2021. This effort may be addressed with existing staffing. S5.C.8, Source Control for Existing Development Requirements Permit section S5.C.8., Source Control for Existing Development, is a new requirement for the 2019-2024 Permit term. The City will need to allocate additional effort to meeting the new requirement. Some of the requirements may be met by modifying or expanding current activities. City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 7 Otak C.8.b.i. Adopt and make effective an ordinance(s), or other enforceable documents, requiring the application of source control. C.8.b.ii. Establish an inventory that identifies publicly and privately owned institutional, commercial, and industrial sites which have the potential to generate pollutants to the MS4. C.8.b.iii. Implement an inspection program for sites identified in C.8.b.ii. C.8.b.iii.a Provide information to those identified sites about activities that may generate pollutants and the source control requirements applicable to those activities. C.8.b.iii.b Complete the number of inspections equal to 20% of the businesses and/or sites listed in the source control inventory to assess BMP effectiveness and compliance with source control requirements. May count follow-up inspections at the same site towards meeting the 20% inspection rate. C.8.b.iii.c/d Inspect 100% of sites identified through credible complaints. Permittee may count inspections conducted based on complaints, or when the property owner denies entry, to the 20% inspection rate. C.8.b.iv.a/b Implement a progressive enforcement policy that requires sites to comply with stormwater requirements within a reasonable time period. C.8.b.iv.c Maintain records, including documentation of each site visit (including denied entries), inspection reports, warning letters, notices of violations, and other enforcement records to demonstrated efforts to bring sites into compliance. C.8.b.iv.d The City may refer non -emergency violation (NOV) to Ecology, provided the Permittee also makes a documented effort of progressive enforcement (i.e., documentation of inspections and warning letters or NOVs). C.8.b.v. Provide training to staff responsible for implementing the source control program, including follow-up training to address changes in procedures, techniques, requirements, or staffing. Keep training records. Findings Source Control for Existing Development is an entirely new Permit requirement for Phase II permittees. The City conducts elements of this requirement under existing programs for IDDE and Operations and Maintenance. However, the new requirement will require additional authority for inspection and enforcement. Existing Activities • As part of its IDDE program, existing stormwater facilities inspection program, and business licensing, the City maintains an inventory of commercial sites which it inspects for illicit discharges. • As part of its IDDE program, the City enforces Tukwila Municipal Code - Title 14: Water and Sewers. • City conducts source control inspections as part of the IDDE program and existing stormwater facilities inspection program, and the City contracts with ECOSS to conduct source control outreach and provide spill kits to businesses. • The City conducts source tracing for complaints received as part of the IDDE program. • The City conducts source control training for field staff who may encounter illicit discharges or pollutant sources during normal work activities. Observed Gaps • Title 14 of the existing code appears insufficient to authorize inspections on existing private property, which may or may not have a drainage system that was authorized by the City, for the purposes of observing preventative source control measures and requiring application of BMPs to prevent pollution of stormwater runoff in the absence of an observed illicit discharge. • The City will need to adopt and implement a source control ordinance or other enforceable document that: • Applies to existing development • Authorizes entry City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 8 Otak Establishes standards for sites to follow (adopt a source control BMP manual) Develops or references enforcement procedures • The City will need to compile and maintain an inventory of sites which require source control. The current inventory of sites, as referenced under existing activities, does not fully meet the new requirement. • The City will need to implement a source control inspection program that is designed to conduct a number of inspections equal to 20% of the sites listed in the source control inventory. • The City will need to maintain records of source control inspections and enforcement actions. • The City will need to adopt and implement a progressive enforcement policy for sites which fail to implement source control. • The City will need to maintain specific records of source control staff training. Recommendations The City attorney should review the Permit requirement and determine if the City needs to adopt an ordinance or other enforceable document to provide sufficient authority. The City will need to compile and maintain an inventory of sites which require source control. Appendix 8 of the Permit contains a list of business types with North American Industry Classification System (NAICS) codes that are potential sources of pollutants. The City stopped licensing businesses in 2019, and the Washington State Department of Revenue took over licensing businesses. The Washington State Department of Revenue issues business licenses and maintains a database of businesses by NAICS available to the City through a partnership agreement. This database will allow the City to identify businesses in the City with NAICS codes included in Appendix 8 of the Permit. The City has approximately 6146 businesses licensed with the Department of Revenue. We reviewed the last list of business licenses issued by the City of Tukwila in November 2018. Approximately 47% of these businesses have an NAICS code included in Appendix 8. Based on that ratio, 2917 of the 6146 businesses licensed in Tukwila may require inspection under the Source Control Program. Reviewing each business license and confirming the business has a location in the City of Tukwila that should be included on the inventory will take approximately two weeks initially, and a week each year to maintain. Approximately 600 source control inspections will be required each year. Currently, the City is conducting source control -like inspections on approximately 500 sites each year as part of the City's stormwater Operations and Maintenance inspections. These inspections could qualify as source control inspections if some additional observations were made and recorded. These inspections require 0.25 full-time equivalent staff (FTE) each year. It is unknown how many of these sites may overlap the estimated 3,000-site source control inventory. Assuming that half the existing sites would qualify as a source control inspection (250 sites), then 350 additional source control inspections would be required each year to reach the annual 20% of inventory goal. Considering the work to create and maintain the inventory, inspection of 350 additional sites, additional record - keeping and reporting, and the additional education requirement, an additional 0.25-0.30 FTE may be required to address this permit requirement. Section 4—Summary of Recommendations and Implementation Schedule The City will need to begin new activities in the first quarter of 2020, particularly for the Stormwater Planning requirement. The majority additional effort for Mapping and Documentation should fall into 2020 or 2021 to meet an August 2021 Permit deadline to map all required elements in a GIS or CAD system. City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 9 Otak An additional 100 hours of staff time (one-time) outside of current FTE is recommended in 2020 to oversee consultant services for Mapping and Documentation. A total of 0.25-0.3 new ongoing FTE for Source Control beginning in 2021 is recommended. Table 1—Permit Requirements Implementation Summary (New/Changed Requirements Only) Permit Section : • • ire - 1 : - • .1 i , • Permit Due Date Current rogress ecommended Activities and Estimated Effort S5.C.1, Stormwater Planning C.1.a. Interdisciplinary stormwater planning team March 2020 August 1, 2020 (begin) Not started • NPDES Coordinator to invite a representative from various departments to the interdisciplinary team. ■ Team should plan to meet approximately twice a year. C.1.b.i.a. Existing long-term planning Annual Report December 2020 March 31, 2021 Plans identified NPDES Coordinator should review plans and Annual Report questions. C.1.b.i.b. New long-term planning Annual Report March 31, 2022 March 31, 2022 Plans identified NPDES Coordinator should be included on plan updates and prepare to answer report questions. C.1.c. Document policy for continuing to address barriers to LID when found; annually report on findings and resolutions Immediately Annually beginning March 31, 2020 Continuation of effort from 2013-2018 Permit Include LID barrier assessment process in Surface Water Comprehensive Plan update. C.1.d.i. Receiving Water Assessment Concurrently with the Surface Water Comprehens ive Plan update March 31, 2022 Build on Surface Water Comprehensive Plan Include in Surface Water Comprehensive Plan update. C.1.d.ii. Receiving Water Prioritization Concurrently with the Surface Water Comprehens ive Plan update June 30, 2022 Not started Include in Surface Water Comprehensive Plan update. C.1.d.iii. Stormwater Management Action Plan (SMAP) March 2022 March 31, 2023 Not started Include in Surface Water Comprehensive Plan update. City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 10 Otak Permit Section Requirement :egin Date Perm Due Date Current Progress Recommended Activities and Estimated Effort S5.C.4, MS4 Mapping and Documentation C.4.a.iv. Map geographic areas served by the permittee's MS4 that do not discharge stormwater to surface waters January 2020 August 1, 2021 Data available in the City's stormwater GIS database, but not explicitly mapped • Analyze existing GIS data • Include in existing GIS consultant contract work C.4.a.v. Map tributary conveyances to all known outfalls and discharge points with a 24-inch nominal diameter or larger January 2020 August 1, 2021 Data available in the City's stormwater GIS database, but outfalls themselves are not explicitly mapped Some field data collection may be required. • Analyze existing GIS data to identify outfalls to receiving waters • Create outfall feature type • Create discharge point feature type ' Assess whether tributary conveyances to outfalls and discharge points 24-inches diameter or greater are mapped • Include in existing GIS consultant contract work ■ Collect additional field data for mapping tributary conveyances, if needed C.4.b.i. Collect size and material for MS4 outfalls January 2020 January 1, 2020 (Begin) Data available in the City's stormwater GIS database • Analyze existing GIS data • Include in existing GIS consultant contract work C.4.b.ii. Map connections from the MS4 to a privately -owned stormwater system Immediately (as part of existing stormwater facility inspection program) August 1, 2023 Some data available in the City's stormwater GIS database • Analyze existing GIS data • Create system connection feature type ' Include in existing GIS consultant contract work ■ Some field reconnaissance may be required C.4.c. Electronic format for mapping with fully described mapping standards January 2020 (establish and implement standards) August 1, 2021 The City has a stormwater GIS database • Document mapping standards • Include in existing GIS consultant contract work City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 11 Otak Permit Section Requirement egin Date Perm Due Current ' rogress Recommended Activities and Estimated Effort S5.C.6, Controlling Runoff from New Development, Redevelopment, and Construction Sites (including Appendices 1 and 10) Appendix 1, Appendix 10 Amend any enforceable documents to be functionally equivalent to Appendix 1 and the required portions of 2019 SWMMWW. June 2021 June 30, 2022 Not started Adopt updated King County program and manuals S5.C.8, Source Control for Existing Development C.8.b.i. Ordinance(s), or other enforceable documents, requiring the application of source control BMPs August 2021 August 1, 2022 Not started • City attorney should review permit requirements and determine if ordinance is required. • If ordinance is required, the City may choose to prepare ordinance in house or hire consultant. C.8.b.ii. Inventory of publicly and privately owned institutional, commercial, and industrial sites which have the potential to generate pollutants to the MS4. January 2022 August 1, 2022 City maintains partial inventories of sites as part of the IDDE program, existing stormwater facilities inspection program, and business permits • Update inventory based on State business license database ' Approximately 0.05 FTE per year C.8.b.iii. Implement a source control inspection program. July 2022 January 1, 2023 City conducts informal source control inspections as part of the existing stormwater facilities inspection program • Conduct source control inspections of 20% of sites on the source control inventory ' Approximately 0.25-0.30 FTE additional per year City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 12 Otak Permit Section Requirement :egin Date Perm Due Date Current ' rogress Recommended Activities and Estimated Effort C.8.b.iii.a. Provide information to identified sites about source control requirements. July 2022 January 1, 2023 (Begin) City contracts with ECOSS (an environmental education, resources and technical assistance company) to provide information and spill kits to some businesses • The City can expand its contract with ECOSS to include all sites on the source control inventory, or • The City can obtain and distribute source control literature using City staff C.8.b.iii.b. Complete the number of inspections equal to 20% of the sites listed in the source control inventory January 2023 Annually beginning January 1, 2023 City conducts some source control inspections as part of the C.8.b.iii.c/d . Inspect 100% of sites identified through credible complaints. January 2023 January 1, 2023 (Begin) The City conducts inspections in response to complaints as part of the IDDE program No additional effort above current IDDE complaint response C.8.b.iv.(a/ b) Implement a progressive enforcement policy January 2022 January 1, 2023 The City may modify the IDDE enforcement policy to include source control The City should establish a source control enforcement policy and include this policy in the Surface Water Comprehensive Plan update C.8.b.iv.(c) Maintain records, including documentation of each site visit, inspection reports, warning letters, notices of violations, and other enforcement records July 2022 January 1, 2023 (Begin) Not started • The City should prepare an inspection and enforcement documentation system prior to the start of inspections • The City may be able to use Lucity to organize this documentation City of Tukwila NPDES Permit 2019-2024 Compliance Support Compliance Analysis Summary 13 Otak Permit Section Requirement egin Date Perm Due Date Current ' rogress Recommended Activities and Estimated Effort C.8.b.iv.(d) May refer non- emergency violation to Ecology, provided, the Permittee also makes a documented effort of progressive enforcement January 1, 2023 January 1, 2023 Not started No additional effort beyond source control record keeping City of Tukwila NPDES Permit 2019-2024 Compliance Support 14 Compliance Analysis Summary Otak Figure l: Implementation Schedule (New/Changed Requirements Only) Permit Element 2019 2020 2021 2022 2023 2024 Stormwater Planning Interdisciplinary stormwater planning team • ♦ 0 0 0 0 Low impact development code ■ ♦ ♦ ♦ ♦ ♦ Receiving water assessment ■ 0 ♦ Receiving water prioritization ■ 0 ♦ Stormwater Action Plan ■ 0 ♦ Mapping and Documentation Ongoing mapping requirements 0 0 0 0 0 0 Map geographic areas not discharging to surface waters in GIS ■ ♦ Map tributary conveyances to outfalls and discharge points in GIS ■ ♦ __- Collect and map size and materials of outfalls (begin)* ■ ♦ 0 0 0 Map connections to privately -owned stormwater systems ■ 0 0 ♦ 0 Establish & use fully described electronic mapping standards ■ ♦ • 0 0 Runoff from Development, Redevelopment, & Construction Sites Enforce standards through plan review & inspection (ongoing) 0 0 0 0 0 0 Adopt updated standards ■ ♦ Source Control for Existing Development Adopt an ordinance requiring source control BMPs on existing sites ■ ♦ Inventory commercial and industrial properties -__ ■♦ Implement an inspection program and enforcement strategy ■ ♦ 0 Source control education for sites (begin)* -__ • • 0 * Note: some permit due dates are the date by which a new activity must begin. These are denoted with the word "begin" in the task. Legend Begin Date ■ Continue Effort 0 Permit due date ♦ City of Tukwila NPDES Permit 2019-2024 Compliance Support 15 Compliance Analysis Summary Otak Appendix A Appendix A: Gap Analysis Matrix Gap Analysis - Selected Permit Section 2019-2024 Phase II Western Washington NPDES Municipal Stormwater Permit Status as of: December 10, 2019 Permit Condition Sub -Section Permit Section Permit Cross Reference Compliance Action Target Due Date Status Current Activities Gap from 2019-2024 Permit 55. C.1.a. Stormwater Planning Appendix 3: Q5 Convene a team to inform and assist in the development, progress, and influence of stormwater planning program. 8/1/2020 Not started New permit requirement. The City will need to establish an inter- disciplinary team to inform the stormwater planning program. Team make-up should include representatives from the stormwater program, long-term planning, transportation, and parks and recreation. The purpose is to inform future planning requirements and coordinate across City departments. The Permit does not state how frequently the team should meet or the precise duties of the team. At a minimum the team should meet at the beginning of each planning process to establish tasks and agree on priorities and at the end to review deliverables. The NPDES Coordinator should be a member of this team. 55. C.1.b.i.a. Stormwater Planning Appendix 3: Q6, Q7, Q8, Q9, Q10, Q10a, Q11, Q11a, Q12, Q12a, Q12b, Q12c, Q13, Q14 Describe (via responses to annual reporting questions) how stormwater management needs and protection/improvement of receiving water health were (or are not) addressed during the planning update process and influencing policy and strategies (e.g., updates to Comprehensive Plan or other long-range land use plans used to accommodate growth or transportation). 3/31/2021 Not started The relevant long-term plans include: - The City's 2013 Surface Water Comprehensive Plan - The 2015 City of Tukwila Comprehensive Plan - 2019 - 2024 Financial Planning Model and Capital Improvement Program - The 2017 Green Tukwila 20-Year Stewardship Plan The NPDES Coordinator will need to review the Annual Report questions and collect the necessary information prior to March 31, 2021. 55. C.1.b.i.b. Stormwater Planning Appendix 3: Q6, Q7, Q8, Q9, Q10, Q10a, Q11, Q11a, Q12, Q12a, Q12b, Q12c, Q13, Q14 Describe (via a report) how stormwater management needs and protection/improvement of receiving water health are (or are not) informing the planning update process and influencing policy and strategies (e.g., updates to Comprehensive Plan or other long-range land use plans used to accommodate growth or transportation). 1/1/2023 Not started Permit requirement refers to future planning efforts. The City's Surface Water Program Manager and NPDES Coordinator should be involved in the updates to the City's Comprehensive Plan and other long-term plans. - The City's Surface Water Comprehensive Plan will be updated in 2021. - The City's Comprehensive Plan will be updated in 2023. 55. C.1.c.i. Stormwater Planning Appendix 3: Q15, Q16, Q16a; Appendix 1; Appendix 10 Continue to require LID Principles and BMPs when updating, revising, and developing new local development codes, rules, standards, and other enforceable documents. Make LID the preferred and commonly used approach to site development. Ongoing Ongoing The City assessed and updated development codes during the 2013-2018 permit under the Controlling Runoff from New Development, Redevelopment and Construction Sites program. The purpose is to move this responsibility to staff responsible for long-term planning and continue progress toward making LID the preferred and commonly used approach during future updates to the development code and reduce barriers to implementing LID when they are newly identified. 1 of 7 Permit Condition 55. Sub -Section C.1.c.i.a. Permit Section Stormwater Planning Permit Cross Reference Appendix 3: Q16, Q16a Compliance Action Assess and document any newly identified admin or regulatory barriers to LID implementation. Describe (if any) mechanisms adopted to encourage or require implementation of LID principles or BMPs. Target Due Date Annually Status Not started Current Activities The City assessed and updated development codes during the 2013-2018 permit under the Controlling Runoff from New Development, Redevelopment and Construction Sites program. Gap from 2019-2024 Permit Continue to evaluate the existing and new development code for barriers to the implementation of LID. 55. C.1.d.i. Stormwater Planning Appendix 3: Q17, Q17a Receiving Water Assessment: Using a table format, document and assess existing info related to local receiving waters and contributing area conditions to identify receiving waters most likely to benefit from stormwater management planning. 3/31/2022 Additional work required The City's 2013 Surface Water Comprehensive Plan (specifically Chapter 2 and Appendix B) describes and assesses the basins located in the City. Review and update the basin information contained in the Surface Water Comprehensive Plan and place in table format. 55. C.1.d.ii. Stormwater Planning Appendix 3: Q18, Q18a Receiving Water Prioritization: Develop and implement a prioritization method and process to determine which receiving waters will receive the most benefit from the retrofits, SWMP actions, and other land/development management actions. Document the prioritized and ranked list of receiving waters. 6/30/2022 Not started Not yet started. Using the Receiving Water Assessment, the City will need to produce a prioritized list of receiving waters based on the potential benefits from retrofits, SWMP actions, and other land/development management actions. Resources for this process include Storm water Management Action Planning Guidance Phase 1 and Western Washington Phase 11 Municipal Storm water Permits by the Washington State Department of Ecology and Building Cities in the Rain: Watershed Prioritization for Storm water Retrofits by the Washington State Department of Commerce. 55. C.1.d.iii. Stormwater Planning Appendix 3: Q19, 19a Develop a SMAP for at least one high priority catchment area that identifies: a) Stormwater facility retrofits needed;; b) Land management/development strategies and/or actions for water quality management; c) Targeted, enhanced, or customized implementation of stormwater actions related to 55; d) Changes needed to local long-range plans; e) Implementation schedule and budget for short-term and long-term actions; f) Process and schedule for future assessment and feedback to improve planning process and implementation of procedures or projects. 3/31/2023 Not started Not yet started. Select one watershed from the Receiving Water Prioritization to prepare a Stormwater Management Action Plan (SMAP). Ecology published the Stormwater Management Action Planning Guidance Phase I and Western Washington Phase 11 Municipal Storm water Permits to assist with this process. S5. C.4.a.i. MS4 Mapping and Documentation Appendix 3: Q29 Map the known MS4 outfalls and known MS4 discharge points. Ongoing Ongoing The City maintains a geographic (GIS) mapping program of its stormwater drainage system.The data base includes 1955 drain points. Of these, 586 are categorized as "Flows Out" and owned by the City of Tukwila. The database also includes 370 closed pipes categorized as flowing to an "Open Pipe End." The Public Works department maintains a list of outfalls as part of the IDDE dry weather inspection program. The City may need to conduct a GIS map analysis and fieldwork to identify outfalls to receiving waters and eliminate geographic duplicates. 2 of 7 Permit Condition S5. Sub -Section C.4.a.ii. Permit Section MS4 Mapping and Documentation Permit Cross Reference Appendix 3: Q29 Compliance Action Map receiving waters, other than groundwater. Target Due Date Ongoing Status Ongoing Current Activities The GIS data provided through the public records request did not include receiving water data. The data may be included in other GIS data. Gap from 2019-2024 Permit The City's GIS data may need to be updated to include receiving waters or the receiving water data documented in stormwater mapping standards. S5. C.4.a.iii. MS4 Mapping and Documentation Appendix 3: Q29 Map stormwater treatment and flow control BMPs/facilities owned or operated by the permittee. Ongoing Ongoing The City's GIS data base includes Stormwater Detention and Water Quality facilities No gap identified. S5. C.4.a.iv. in and MS4 Ma pp g Documentation Appendix 3: Q29 MapThe geographic areas served by the permittee's MS4 that do not discharge stormwater to surface waters. Ongoing Ongoing The GIS data provided through the public records request did not specifically include parts of the MS4 that do not dishcarge to surface waters. City may need to conduct a GIS map analysis and fieldwork to identify areas of the City that do not outfall to receiving waters. S5. C.4.a.v. MS4 Mapping and Documentation Appendix 3: Q29 Map tributary conveyances to all known outfalls and discharge points with a 24 inch nominal diameter or larger, or an equivalent cross -sectional area for non -pipe systems. Include the following features/attributes: tributary conveyance type, material, and size where known; associated drainage areas; and land use. Ongoing Additional work required Diameter and material is included in records for pipes. The City may need to conduct additional analysis and fieldwork to map MS4 basins for outfalls with a 24-inch diameter and associate with land use. S5. C.4.a.vi. MS4 Mapping and Documentation Appendix 3: Q29 Map connections between the MS4 owned or operated by the permittee and other municipalities or public entities. Ongoing Additional work required The City's GIS database includes some drain points with notes indicating connections to non- city of Tukwila facilities. The City may need to conduct additional analysis and fieldwork to identify connections to the MS4 may be necessary. S5. C.4.a.vii. MS4 Mapping and pp g Documentation Appendix 3: Q29 Map all connections to the MS4 authorized or allowed by the permittee after February 16, 2007. (Do not need to map residential connections for individual driveways, sump pumps, or roof downspouts). Ongoing Additional work required In addition to city owned facilities, the City's GIS database includes some features categorized as owned by "King County" and "Private" or "null." The City may need to conduct additional analysis and fieldwork may be required to identify all private connections to the MS4. 541 out of 1955 drain points are categorized as "null." S5. C.4.b.i. MS4 Mapping and Documentation Appendix 3: Q30, Q30a Begin to collect size and material for all known MS4 outfalls during normal course of business (e.g., during field screening, inspection, or maintenance) and update records. 1/1/2020 Not started The City's GIS database does not include size and material for drain points. Diameter and material is included in records for pipes. The City may need to conduct additional analysis and fieldwork to associate this data with outfalls or collect additional data may be necessary. S5. C.4.b.ii. MS4 Mapping and Documentation Appendix 3: Q31 Complete mapping of all known connections from the MS4 to a privately owned stormwater system. 8/1/2023 Additional work requiredbe The City's GIS database annotates some drain points with "From Private," "From Priv."or "From pvt." The City should standardize the designation for private connections and additional analysis may needed to identify all connection to or from privately owned storm systems. S5. C.4.c. MS4 Mapping and Documentation Appendix 3: Q32 Require electronic format for mapping with fully described mapping standards. 8/1/2021 Additional work required The City has a GIS map of the surface water system. The City may need to describe in a policy memo or other document the mapping standards to meet the "...fully described mapping standards." requirement. The City should review the Mapping Guidance for Muncipal Storm water Permittees published by Ecology. S5. C.4.d./e. MS4 Mapping and Documentation Upon request, and to the extent appropriate, the permittee shall provide mapping information to Ecology, federally -recognized Indian Tribes, municipalities, and other permittees. When triggered by an event Complete Available on request. No gap identified. 3 of 7 Permit Condition Sub -Section Permit Section Permit Cross Reference Compliance Action Target Due Date Status Current Activities Gap from 2019-2024 Permit S5. C.6.a. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q43; Appendix 1; Appendix 10 Implement an ordinance or other enforceable mechanism to reduces pollutants in stormwater runoff to the MS4 from new development, redevelopment and construction sites. Ongoing Ongoing Minor changes may be required to address updates to the minimum requirements in Appendix 1. 55. C.6.b. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q44, Q44a, Q45, Q46; Appendix 1; Appendix 10 Revise ordinance or other enforceable mechanism to meet the requirements of 55.C.6.b(i) through (iii). 6/30/2022 Update See Otak's assessment of Appendix 10 on page 8. S5. C.6.c.i. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q47 Review all stormwater site plans for proposed development activities. Ongoing Ongoing No gap identified. S5. C.6.c.ii. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q47, Q48, Q48a; Appendix 7 Inspect, prior to clearing and construction, permitted development sites that have a high potential for sediment transport as determined through plan review based on definitions and requirements in Appendix 7 Determining Construction Site Sediment Damage Potential; or, alternatively, inspect all construction sites meeting the minimum thresholds adopted. Ongoing Ongoing No gap identified. S5. C.6.c.iii. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q49, Q49a; Appendix 1; Appendix 10 Inspect all permitted development sites during construction to verify proper installation and maintenance of required erosion and sediment controls. Enforce as necessary based on the inspection. Ongoing Ongoing No gap identified. S5. C.6.c.iv. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q49b; Appendix 1; Appendix 10 Manage maintenance activities to inspect all stormwater treatment and flow control BMPs/facilities, and catch basins, in new residential development every 6 months, until 90% of the lots are constructed to identify maintenance needs and enforce compliance with maintenance standards as needed. Ongoing Ongoing No gap identified. S5. C.6.c.v. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q50, Q51 Inspect all permitted development sites upon completion of construction and prior to final approval or occupancy to ensure proper installation of permanent stormwater facilities. Verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater facilities. Ongoing Ongoing No gap identified. S5. C.6.c.vi. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q52, Q53 Document compliance with the inspection requirements in S5.C.6.b.ii. through v. Compliance shall be determined by achieving at least 80% of the required inspections. Ongoing Ongoing No gap identified. 4 of 7 Permit Condition Sub -Section Permit Section Permit Cross Reference Compliance Action Target Due Date Status Current Activities Gap from 2019-2024 Permit S5. C.6.c.vii. Controlling Runoff from New Development, Redevelopment, and Construction Sites Implement a procedure for keeping records of inspection and enforcement actions, including inspection reports, warning letters, notices of violation, and other enforcement records. Keep records of maintenance inspections and activities. Ongoing Ongoing No gap identified. S5. C.6.c.viii. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 1; Appendix 10 Implement an enforcement strategy in cases of non-compliance. When triggered by an event As needed No gap identified. S5. C.6.d. Controlling Runoff from New Development, Redevelopment, and Construction Sites Appendix 3: Q54 pp Make available the electronic links to Ecology's CSWGP NOI form and the ISWGP NOI form, as applicable, to representatives of new pp p development and redevelopment. Ongoing g g Ongoing g g No gapidentified. S5. C.6.e. Controlling Runoff from New Development, Redevelopment, and Construction Sites S5.C.6.; Appendix 3: Q55 Train all staff responsible for implementing the program to control stormwater runoff from new development, redevelopment, and construction sites (including permitting, plan review, construction site inspections, and enforcement) to conduct these activities. Keep training records. Ongoing Ongoing Minor changes may be required to address updates to the minimum requirements in Appendix 1. S5. C.8.b.i. Source Control Program for Existing Development Appendix 3: Q73; Appendix 1; Appendix 10 Adopt and make effective an ordinance(s), or other enforceable documents, requiring the application of source control BMPs for pollutant generating sources using sources control BMPs in the SWMMWW or Ecology -approved Phase I Program. Require applicable operational source BMPs for all pollutant generating sources and structural source control BMPs if operational source control BMPs are inadequate. 8/1/2022 Not started Not yet started. The City does not currently have a source control ordinance. S5. C.8.b.ii. Source Control Program for Existing Development Appendix 3: Q74, Q74a Establish an inventory that identifies publicly and privately owned institutional, commercial, and industrial sites which have the potential to generate pollutants to the MS4. 8/1/2022 Additional work required The City currently maintains inventories of commercial, industrial, and residential sites which have the potential to generate pollutants to the MS4as part of the IDDE program and Controlling Runoff from New Development, Redevelopment, and Construction Sites private facility inspection programs. The City's available source control inventories were collected for several purposes and may be incomplete. The City will need to collect data from these inventories, city and state business licenses, and compare the data to Appendix 8 of the permit to identify properties where businesses and activities with potential outdoor pollutant generating sources that discharge to the MS4. The database/inventory compiled should be formatted to allow the City to track inspections and inspection rate. 55. C.8.b.iii. Source Control Program for Existing Development Appendix 3: Q77, Q78 Implement an inspection program for sites identified in C.8.b.ii. 1/1/2023 Additional work required The City currently conducts source tracing as part of the IDDE program and limited source control inspections Controlling Runoff from New Development, Redevelopment, and Construction Sites private facility inspection program. Additional work will be required to create a program specifically to inspect for source control. The city's existing source control inspection procedures likely satisfy the permit requirements, and the City will need a comprehesive inventory and inspection tracking system. 5 of 7 Permit Condition Sub -Section Permit Section Permit Cross Reference Compliance Action Target Due Date Status Current Activities Gap from 2019-2024 Permit 55. C.8.b.iii.a. Source Control Program for Existing Development Appendix 3: Q75, Q77 Provide information to those identified sites about activities that may generate pollutants and the source control requirements applicable to those activities. Beginning 1/1/2023 Additional work required The City currently contracts with ECOSS to provide source control information and spill kits to businesses in the City. The City will need to expand the information program to provide all identified sites with a business address information about activities that may generate pollutants and the source control requirements applicable to those activities at least once during the permit term. 55. C.8.b.iii.b. Source Control Program for Existing Development Appendix 3: Q78 Complete the number of inspections equal to 20% of the businesses and/or sites listed in the source control inventory to assess BMP effectiveness and compliance with source control requirements. May count follow-up inspections at the same site towards meeting the 20% inspection rate. Annually beginning 1/1/2023 Not started The City currently conducts limited source control inspections as part of other permit requirements. The City will need to systematize and expand the inspections. As part of the formalization of the program, the City will need to establish a system for tracking inspections and inspection rates. 55. C.8.b.iii.c/d. Source Control Program for Existing Development Inspect 100% of sites identified through credible complaints. Permittee may count inspections conducted based on complaints, or when the property owner denies entry, to the 20% inspection rate. Ongoing beginning 1/1/2023 Ongoing The City currently conducts source tracing inspections stemming from complaints as part of the IDDE program. No gap identified. 55. C.8.b.iv.(a/b) Source Control Program for Existing Development Appendix 3: Q76, Q77; Appendix 1; Appendix 10 Implement a progressive enforcement policy that requires sites to comply with stormwater requirements within a reasonable time period. Ongoing beginning 1/1/2023 Not started The City currently has an IDDE enforcement policy which addresses pollutant sources which result in an illicit discharge. The City will need to write an enforcement policy referencing the municipal code for source control inspections. The enforcement policy will need to include a process for maintaining records documenting enforcement actions. 55. C.8.b.iv.(c) Source Control Program for Existing Development Appendix 3: Q76, Q77 Maintain records, including documentation of each site visit (including denied entries), inspection reports, warning letters, notices of violations, and other enforcement records to demonstrated efforts to bring sites into compliance. Ongoing beginning 1/1/2023 Not started The current source control records document inspection locations and dates, and outreach records from ECOSS include whether a voluntary inspection took place and whether a spill kit was accepted by the sites visited. The City will need to establish a records and tracking system to track continuing engagement with sites to document site visits, inspections, reports and enforcement records that can be used to demonstrate efforts to bring sites into compliance over time. 55. C.8.b.iv.(d) Source Control Program for Existing Development Appendix 3: Q76, Q77 May refer non -emergency violation to Ecology, provided, the Permittee also makes a documented effort of progressive enforcement (i.e., documentation of inspections and warning letters or NOVs). Ongoing beginning 1/1/2023 Not started Not yet started. The City will need to establish a records and tracking system to track continuing engagement with sites to document site visits, inspections, reports and enforcement records that can be used to demonstrate efforts to bring sites into compliance over time. 55. C.8.b.v. Source Control Program for Existing Development 55.C.8; Appendix 3: Q79 Provide training to staff responsible for implementing the source control program, including follow-up training to address changes in procedures, techniques, requirements, or staffing. Keep training records. Ongoing beginning 1/1/2023 Additional work required The City currently trains public works staff to observe source control measures during site visits. The City will need to update and track this training as the City updates the municipal code, inspection requirements, and enforcement procedures. Appendix 1 Minimum Technical Requirements for New Development & Redevelopment Appendix 10 Identifies the exemptions, definitions related to the Minimum Requirements, applicability of the Minimum Requirements that need to included in the Ecology equivalent stormwater management manual. Ongoing Ongoing The City currently follows Minimum Requirements in compliance with the 2013- 2018 permit. The City will need to adopt minor changes to the minimum requirements as part of appendix 1. 6 of 7 Permit Condition Sub -Section Permit Section Permit Cross Reference Compliance Action Target Due Date Status Current Activities Gap from 2019-2024 Permit Appendix 10 Equivalent Programs for Runoff Controls for New and Redevelopment & Construction Sites Appendix 1 Amend any enforceable documents to be functionally equivalent to Appendix 1 and the required portions of 2019 SWMMWW. 6/30/2022 Not started The City currently follows Minimum Requirements in compliance with the 2013- 2018 permit. The City has several options to meet this new requirement. 1. Wait for King County to update the KCSWDM and adopt the updated manual 2. Adopt the 2019 SWMMWW 3. Write and adopt an addendum to the KCSWDM which includes the changes contained in Appendix 10 7 of 7 Appendix D Surface Water Issues and Solutions Otak Hof � Technical Memorandum To: Sherry Edquid (City of Tukwila) From: Trista Kobluskie, Sara Mardani Copies: File Date: May 17, 2023 Subject: City of Tukwila Surface Water Comprehensive Plan Review of Existing Data Project No.: 33383 Introduction The purpose of this memorandum is to document the discovery phase of the City of Tukwila Surface Water Comprehensive Plan (SWCP). This memorandum summarizes the review of available information as well as the process for summarizing useful information about problems and solutions to be carried forward in development of the recommendations for the SWCP. The planning area for the SWCP is defined by Tukwila city limits. Review of Existing Information The discovery phase began with a review of existing information pertaining to the stormwater infrastructure and stream systems within the planning area. This information includes stormwater reports, stormwater infrastructure plans, records of flooding and drainage issues, City's staff's individual informal records of issues, and community plans. Exhibit A contains a comprehensive list of documents provided by the client and reviewed by Otak staff. The existing information review was supplemented by meetings and email exchanges with City of Tukwila staff to collect additional background knowledge and discuss known issue locations for the stormwater infrastructure and stream corridors in the planning area. These meetings consisted of a site visit to known issue locations with the City's project manager and other team members on October 17, 2022, and six meetings with City staff on September 7 and 14, 2022, February 16, 2023, March 29, 2023, April 24, 2023, and May 10, 2023. Additionally, potential project ideas were discussed with City of Tukwila staff during the field visit on October 17, 2022. Collect and Categorize Issues The information about issues in the storm system collected during the discovery phase was compiled and classified in an ESRI geodatabase. The geodatabase was composed of a collection of geographic points that identify the location of known issues, site visit locations, and potential projects for the SWCP. The schema for the geodatabase and numbering conventions are presented in Exhibit B. Identifying known issues was the first step in the process of studying the storm system and developing solutions. Each known issue was given a unique identification number in the geodatabase. Additional fields provided descriptive information about the issue, such as the full name of the issue, a long description of the nature of the issue, last year of the issue, issue frequency, issue severity, as well as issue ownership. K: Project\3330003383�WaterRes\Task 600 - SWCP\T-620\Summary Memo\33383 Tukwila SWCP review of existing data memo.docx 11241 Willows Road NE, Suite 200, Redmond, WA 98052 Phone (425) 822-4446 otak.com Review of Existing Data Page 2 May 17, 2023 A group of fields were included to indicate if the known issue was primarily related to water quality, water quantity, erosion, habitat, or maintenance. An issue was designated as a water quality issue if there was a lack of water quality structures in the local storm system or if there was a known source affecting water quality. An issue was designated as a water quantity issue if there were consistent drainage problems or flooding at the location. An issue was designated as a habitat issue if the natural environment and living conditions of wildlife species were in danger. An issue was designated as an erosion issue if the land or soil is being worn away and transported by natural forces such as wind or water. An issue was designated as a maintenance issue if maintenance was needed to resolve the issue or if there was a problem performing maintenance. Table 1 shows the number of issues that fall into each category. Some issues fall into multiple categories. Table 1 Number of Known Issues Within EE Type of Issue Count Quantity 70 Maintenance 63 Quality 81 Erosion 3 Habitat 2 ch Category A complete list of known issues is presented in Exhibit C. To further describe some of the known issues, seven sites were selected (Figure 1) for field visits with approval from the City of Tukwila. Sites were selected when more information was needed to understand the issue. During the field visit, site conditions and potential solutions were documented using the ESRI Collector App. K:IProject1333001333831 WaterReslTask 600 - SWCPIT-6201Summary Memo133383 Tukwila SWCP review of existing data memo.docx Review of Existing Data Page 3 May 17, 2023 Cascade View/S 128th Street Landslide Issue Water Quality Issue in Tukwila Pond (Known Issue 88) Fort Dent Park 6PPD-Quinone Issue (Known Issue 8) Figure 1 Selected Site Visit Photos (October 17, 2022) (Known Issue 84) Flood Patrol, Storm Outfalls (Known Issue 35) K:IProject1333001333831 WaterReslTask 600 - SWCPIT-6201Summary Memo133383 Tukwila SWCP review of existing data memo.docx Review of Existing Data Solutions Page 4 May 17, 2023 For most known issues, a solution will be proposed. A solution could be a large capital improvement project or a program. Known issues that are candidates for large capital improvement projects are given a unique potential project identification number (PPID). The potential project list will be studied and further developed in a subsequent planning step. An attribute field for "no action" was created for instances in which the site visit or another source of information determined that no additional action was warranted for a known issue. The final list of potential projects will be rated and ranked for select CIPs. Programs are groups of similar small and medium projects that are tackled gradually over time with fixed yearly funding. Most of the known issues will be grouped into programs that will enable the City staff to address stormwater needs that require attention but do not rise to the scale or priority level of a capital project. Known issues that are program candidates will be identified in the Known Issues Geodatabase by a text field called "Program" and by a numeric field called "Program ID." Collect and Map Supporting Data To support the known issue identification and solutions analysis, various supporting data were collected and mapped. Planning Area The planning area is within Tukwila city limits. Basin Delineation The City has been divided into nine drainage basins. Portions of these basins are located outside City limits. The basin boundary delineation was based on information from field visits, the City's Geographic Information System (GIS) data, and previously developed basin plans. Aspect re -visited the 2013 SWCP basin boundaries to ensure the drainage network is up to date. Only minor changes to the existing basin delineations were found. Capital Improvements The City's existing capital improvement plans for transportation, parks, and other disciplines were mapped because it can be more cost-effective to coordinate with the City's other capital improvements. K:IProject1333001333831 WaterReslTask 600 - SWCPIT-6201Summary Memo133383 Tukwila SWCP review of existing data memo.docx Exhibit A SWCP Data Inventory Otak SWCP Data Inventory Doc ID Title Published Year Author Received From 1 Stormwater Outfall Water Quality Retrofit Project January, 2021 KPG Interdisciplinary Design City of Tukwila 2 2021-2025 Our Green Duwamish Implementation June 30, 2021 OGD Partner group Downloaded from Our Green Duwamish website 3 Gilliam Creek Final Report June 19, 2019 Megan Nageire; PBS Engineering and Environmental, Inc. Aspect 4 Southgate Creek Sedimentation Assessment October, 2010 CH2MHILL Aspect 5 City of Tukwila 2013 Surface Water Comprehensive Plan February, 2013 CH2MHILL Aspect 6 Technical Information Report for Starfire Fields at Fort Dent Park May 27, 2003 Essayons Consulting Engineers, Inc. Aspect p 7 Technical Specifications Starfire Sports Expansion at Fort Dent Park April 23, 2008 John Knowles & Associates, Inc. City of Tukwila 8 Starfire Sports Expansion at Fort Dent Park, Hydrology Map (Existing and develop condition) June 30, 2008 John Knowles & Associates, Inc. City of Tukwila 9 Inhouse Baseline Water Quality Assessment and Report Riverton Flap Gate Removal Project January, 2019 Russell Betterdge, NPDES Inspector, City of Tukwila Aspect 10 Riverton Sampling Report Riverton Flap Gate Removal Project February 26, 2020 Russell Betterdge, NPDES Inspector, City of Tukwila Aspect 11 2022 Small Drainage Project List_Staff Recommendation Only - Not Approved by City Administration or Council - Subject to Change 2022 City of Tukwila City of Tukwila 12 Flood Patrol Assets List Unknown City of Tukwila City of Tukwila 13 Salmon Habitat Plan 2021 Update February, 2021 Matthew Goehring, WRIA 9 Kollin Higgins, King County Doug Osterman, WRIA 9 Suzanna Smith, WRIA 9 Downloaded from Salmon Conservation and Restoration Green/Duwamish and Central Puget Sound Watershed 14 Southgate Fish Enhancement Project Report 1992 City of Tukwila 15 Tukwila Pond Park Master Plan February, 2022 J.A. Brennan, PLLC, BHC Consulting, and Sieger Consulting City of Tukwila 16 Pollutant Gravel Yard February 16, 2023 City of Tukwila City of Tukwila 17 Tukwila International Boulevard Slope Stability Evaluation March 11, 2022 Sean Gertz City of Tukwila 18 WSDOT CMP Segale Property April 22, 2020 WSDOT City of Tukwila Exhibit B Geodatabase Schema Otak Tukwila SWCP Geodatabase Schema - 05/09/2023 Feature Class Feature Class Feature Dataset Name Geometry Attributes: Known Issue Point Tukwila_ Known_I ssl,Ps Known_ Issue_ p point Field KI_ID FuliName Quality Quantity Erosion "Known_Issue_P" Alias Known Issue ID Full Name Water Quality Issue Flooding Issue Erosion Issue Format Short Int Text, 100 Short Int Short Int Short Int Represents known issues points. Associated lines and ppolygons have the same UNIQUEID value. Associated site visit points will be related by the "Site Visit ID" fields in both Known Issues Points and Site Visit Points feature classes. Content Unique ID for the known issue. All known issues are recorded as point features. Example "1001" Full name of the issue 1 for yes or 0 for no regarding water quality issue 1 for yes or 0 for no regarding water quantity issue 1 for yes or 0 for no regarding water erosion issue Field Habitat Maint InfoSource LongDesc Last Occur Yr Alias Habitat Issue Maintainability Issue Information Source Long description Last Year of Issue Occurance Format Short Int Short Int Text, 50 Text, 1500 Text, 4 Content 1 for yes or 0 for no regarding Habitat issue 1 for yes or 0 for no regarding maintenance issue Category of source (i.e. interview, previous study, existing data) A long description of the issue and the nature of the issue. A 4 digit text field for last year of known issue occurance. Field Frequency Issue_Sev Status Issue Owner Program Alias Issue Frequency Issue Severity Status Issue Ownership Program Format Text, 50 Text, 50 Text, 24 - Domain Text, 48 - Domain Text, 64 Content A text description of known issue frequency. A text description of known issue severity. Documents the status of the known issue, including such values as active, solved, solution in progress, unconfirmed, and inconsequential Documents whether known issue is the responsibility of the client (using value "public") or is the responsibility of a private party, another public agency, or unknown responsibility. Name of the Stormwater Program, if applicable Field ProgramlD PP ID CIP ID Site _Visit_ID FileLocationLink Alias Program ID Potential Project ID CIP ID Site Visit ID File Location Link Format Short Int Text, 32 Short Int Text, 10 Text, 120 Content Stormwater Program ID Number, if applicable (see below)Potential pp Unique alphanumeric ID for related Projectspoint (if applicable) pp ) Unique ID Number for related CIP Projects point (if applicable) Unique ID for the site visit. See "site visit" feature class to populate with the Site Visit ID. A hyperlink to the location of any corresponding files or resources Field Line Area CreatedUser CreatedDate LastEditedUser Alias Line Area Created User Created Date Last Edited User Format Short Int Short Int Text, 50 Date Text, 50 Content Indicates if there is a Known Issue Line association. 1 for yes or 0 for no Indicates if there is a Known Issue Area association. 1 for yes or 0 for no Person/Agency who created the point - automated XX/XX/XXXX - automated Person/Agency who updated the point - automated Field LastEditedDate Alias Last Edited Date Format Date Content xx/xx/xxxx - automated Page 1 Site Visit Point N/A Site_Visit_P point Field Site_Visit_ID Related_KI_ID Visit Date Access Team "Site Visit P" Alias Site Visit ID Related Known Issue ID Field Visit Date Site Visit Access Staff Initials Format Text, 10 Short Int Date Text, 120 Text, 12 Represents site visit data points. Photo attachments are enabled for field use. Content Unique ID for the site visit. This field will be related to the same field in Known Issues Points. Related Known Issue ID Date of the field visit Site access instructions or obvservations Initials of staff who visited Field Site_Descrip Study_Area Land Owner Site_Long_Descript CreatedUser Alias Site Description Study Area Land Ownership Site Long Description Created User Format Text, 255 Text, 50 Text, 70 Text, 5000 Text, 50 Content Describes the site and the primary problem to be addressed Name of the study area, if applicable. Documents whetherthe site visit is within the responsibility of a private party, public agency, or unknown responsibility. A longer description of the site and underlying issues in the site visit vicinity. Person/Agency who created the area - automated Field Prop_Solution Wider_Bene FileLocationLink CreatedDate LastEditedUser Alias Proposed Solution Wider Benefits File Location Link Created Date Last Edited User Format Text, 5000 Text, 5000 Text, 120 Date Text, 50 Content A description of a proposed solution to an issue found at the site visit. A description of possible wider benefits to the project area from proposed solutions. A hyperlink to the location of any additional site visit notes or additional photos XX/XX/XXXX - automated Person/Agency who updated the area - automated Field LastEditedDate PhotoAttach Alias Last Edited Date Photo Attachment Format Date Related Table Photo Content XX/XX/XXXX - automated Photo Attachment Existing CIPs N/A Existing_CIPs point Field Proj_ID Proj_Name Proj_Loc Parcel_Num Proj_Type "Existing_CIPs" Alias Project ID Project Name Project Location Parcel Number Project Type Format Text, 24 Text, 70 Text, 70 Text, 32 Domain Represents the City's exisitng Capital Improvement Projects in a point feature class. Content The jurisdiction's existing City project number. The jurisdiction's CIP project name Brief location of project. Parcel Number, if applicable. Default is "N/A" Type of Captal Improvement Project. Domain values include: Transportation, Parks, Sewer, Storm, and Other Field Owner Proj_Yr Design_Man File Path CreatedUser Alias Project Owner Project Year Design Manual CIP Source Document Created User Format Text, 10 Text, 20 Text, 32 Text, 50 Content CIP owner/administrator. Project year (of probable or planned construction). Text string allows date range. If known, documents the stormwater design engineering manual used for design Abbreviated title and year of source where CIP was documented Person/Agency who created the area - automated Field CreatedDate LastEditedUser LastEditedUser LastEditedDate Alias Created Date Last Edited User Last Edited User Last Edited Date Format Date Text, 50 Text, 50 Date Content XX/XX/XXXX - automated Person/Agency who updated the area automated Person/Agency who updated the area - automated XX/XX/XXXX - automated Page 2 Exhibit C Known Issues List Otak Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 1 KI-1 FullName Sediment/clogging issues along all of Southgate Creek including Normed Drainage Issue InfoSource 5_2013 Plan (ID25) & 4_Southgte Assssmnt (2010) LongD 2013 SWCP (table 7) proposes the following solutions for the Sediment/clogging issues (issue ID25, table 7, 2013 SWCP): Possible solution: Regrading of wetlands on private property by private property owner. Recommended solution: To be addressed by others and City Code Enforcement. The creek and culvert accumulates sediments and overtops during storm events to flood 44th Avenue South and the NorMed site (solution is in design now). Last_Occur_ Yr Unkn Frequency Periodically Issue Severit1L MapSymbol (Issue Type) Water Quality & Flooding . Unknown 2 KI-2 Gilliam Crk DO Issue 3_Gilliam Crk Water Qulty Assssent & Rprt (2019) 9 samples over 12 months (June 2018-May 2019) were collected from 2 locations in the open channel of Gilliam Crk. DO exceeded the threshold value (8 mg/L) during Aug 2018 in both locations. 2019 Periodically Unknown Water Quality 3 KI-3 Gilliam Crk Turbidity Issue 3_Gilliam Crk Water Qulty Assssent & Rprt (2019) 9 samples over 12 months (June 2018-May 2019) were collected from 2 locations (upstream and downstream) in the open channel of Gilliam Crk. Turbidity levels were above the threshold in the downstream sampling location. Upstream Turbidity levels were used as background. 2019 Periodically Unknown Water Quality 4 KI-4 Gilliam Crk pH Issue 3_Gilliam Crk Water Qulty Assssent & Rprt (2019) 9 samples over 12 months (June 2018-May 2019) were collected from 2 locations in the open channel of Gilliam Crk. PH levels were below the 6.5 threshold in both locations. 2019 Periodically Unknown Water Quality 5 KI-5 Gilliam Crk Sediment (PAHs) Issue 3_Gilliam Crk Water Qulty Assssent & Rprt (2019) 3 samples on June 14, 2018 were collected from 3 locations in the open channel of Gilliam Crk. Several PAHs exceeded the NOAA Screening Levels in one of the sampling locations. Note that there is debate about the criteria used to assess the samples. 2018 Unknown Low Water Quality 6 KI-6 RivertonCrk Sediment (Metal) Issue 7_Riverton Smping Rprt_Flapgate rmvl (2020) 3 samples on Aug 1, 2016 were collected from 3 locations in the open channel of Riverton Crk. Copper and Zinc samples exceeded the NOAA Screening Levels the samples. 2016 Unknown Low Water Quality Water Quality 7 KI-7 RivertonCrk DO Issue 7_Riverton Smping Rprt _Flapgate rmvl (2020) 12 samples over 12 months (Feb 2019 to Dec 2019) were collected from 2 locations in the open channel of Riverton Crk. DO exceeded the threshold value (8 mg/L) during April to September. 2019 Unknown Unknown 8 KI-8 Fort Dent Park 6PPD-quinone Issue 6_TIR for Starfire Fields at Fort Dent Park (2003) 6PPD-quinone concern due to tire material on field Unkn Unknown Unknown Water Quality 9 KI-9 Runoff Issue at 10349 Beacon Ave S 8_2022 Small Drainage Project List (2022) Resident at 10349 Beacon Ave S. has roadway runoff entering her property causing damage to her septic system. Surveyed in 2008. Priority Ranking for this issue is 2. City proposes the following solutions: 1- Obtain easements from private property owners to construct new drainage system to the west. 2- Construct a deep storm line to Ryan Way. The preferred method will need to be determined during design. Solution : remain in the Small Drainage program Unkn Unknown Unknown Flooding 10 KI-59 Flood Patrol, Storm Structures, DR00217 9_Flood Patrol Assets List Storm Structures, ID=DR00217, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 11 KI-57 Flood Patrol, Storm Structures, DR00218 9_Flood Patrol Assets List Storm Structures, ID=DR00218, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 12 KI-60 Flood Patrol, Storm Structures, DR00219 9_Flood Patrol Assets List Storm Structures, ID=DR00219, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 13 KI-58 Flood Patrol, Storm Structures, DR00220 9_Flood Patrol Assets List Storm Structures, ID=DR00220, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 14 KI-56 Flood Patrol, Storm Structures, DR00221 9_Flood Patrol Assets List Storm Structures, ID=DR00221, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 15 KI-62 Flood Patrol, Storm Structures, DR00598 9_Flood Patrol Assets List Storm Structures, ID=DR00598, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 16 KI-54 Flood Patrol, Storm Structures, DR00902 9_Flood Patrol Assets List Storm Structures, ID=DR00902, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 17 KI-55 Flood Patrol, Storm Structures, DR01190 9_Flood Patrol Assets List Storm Structures, ID=DR01190, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 1 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 18 KI-53 Flood Patrol, Storm Structures, DR01701 InfoSource 9_Flood Patrol Assets List ongDesc Storm Structures, ID=DR01701, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance Last_Occur_ Yr 2021 Frequency Annual Issue Severity Low MapSymbol (Issue Type) Flooding & Maintainability 19 KI-52 Flood Patrol, Storm Structures, DR01878 9_Flood Patrol Assets List Storm Structures, ID=DR01878, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 20 KI-61 Flood Patrol, Storm Structures, DR03532 9_Flood Patrol Assets List Storm Structures, ID=DR03532, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 21 KI-48 Flood Patrol, Storm Structures, DR04308 9_Flood Patrol Assets List Storm Structures, ID=DR04308, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 22 KI-49 Flood Patrol, Storm Structures, DR04309 9_Flood Patrol Assets List Storm Structures, ID=DR04309, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 23 KI-50 Flood Patrol, Storm Structures, DR04315 9_Flood Patrol Assets List Storm Structures, ID=DR04315, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 24 KI-51 Flood Patrol, Storm Structures, DR05540 9_Flood Patrol Assets List Storm Structures, ID=DR05540, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 25 KI-68 Flood Patrol, Storm Structures, DR35006 9_Flood Patrol Assets List Storm Structures, ID=DR35006, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 26 KI-24 Flood Patrol, Storm Outfalls, DR06865 9_Flood Patrol Assets List Storm Outfalls, ID=DR06865, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 27 KI-36 Flood Patrol, Storm Outfalls, DR06942 9_Flood Patrol Assets List Storm Outfalls, ID=DR06942, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 28 KI-35 Flood Patrol, Storm Outfalls, DR06945 9_Flood Patrol Assets List Storm Outfalls, ID=DR06945, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 29 KI-34 Flood Patrol, Storm Outfalls, DR06946 9_Flood Patrol Assets List Storm Outfalls, ID=DR06946, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 30 KI-46 Flood Patrol, Storm Outfalls, DR07256 9_Flood Patrol Assets List Storm Outfalls, ID=DR07256, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 31 KI-47 Flood Patrol, Storm Outfalls, DR07259 9_Flood Patrol Assets List Storm Outfalls, ID=DR07259, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 32 KI-65 Flood Patrol, Storm Outfalls, DR06618 9_Flood Patrol Assets List Storm Outfalls, ID=DR07355, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 33 KI-69 Flood Patrol, Storm Outfalls, DR07438 9_Flood Patrol Assets List Storm Outfalls, ID=DR07438, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 34 KI-20 Flood Patrol, Storm Outfalls, DR36071 9_Flood Patrol Assets List Storm Outfalls, ID=DR36071, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 35 KI-19 Flood Patrol, Storm Outfalls, DR36070 9_Flood Patrol Assets List Storm Outfalls, ID=DR36070, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 36 KI-21 Flood Patrol, Storm Outfalls, DR40017 9_Flood Patrol Assets List Storm Outfalls, ID=DR40017, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 37 KI-66 Flood Patrol, Storm Outfalls, DR36123 9_Flood Patrol Assets List Storm Outfalls, ID=DR36123, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 38 KI-67 Flood Patrol, Storm Outfalls, DR30689 9_Flood Patrol Assets List Storm Outfalls, ID=DR30689, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 39 KI-25 Flood Patrol, Storm Outfalls, DR30862 9_Flood Patrol Assets List Storm Outfalls, ID=DR30862, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 40 KI-26 Flood Patrol, Storm Outfalls, DR30863 9_Flood Patrol Assets List Storm Outfalls, ID=DR30863, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 41 KI-23 Flood Patrol, Storm Outfalls, DR31112 9_Flood Patrol Assets List Storm Outfalls, ID=DR31112, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 42 KI-22 Flood Patrol, Storm Outfalls, DR31117 9_Flood Patrol Assets List Storm Outfalls, ID=DR31117, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 2 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 43 KI-42 Flood Patrol, Storm Outfalls, DR06220 InfoSource 9_Flood Patrol Assets List ongDesc Storm Outfalls, ID=DR06220, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance Last_Occur_ Yr 2021 Frequency Annual Issue Severity Low MapSymbol (Issue Type) Flooding & Maintainability 44 KI-41 Flood Patrol, Storm Outfalls, DR06219 9_Flood Patrol Assets List Storm Outfalls, ID=DR06219, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 45 KI-40 Flood Patrol, Storm Outfalls, DR06218 9_Flood Patrol Assets List Storm Outfalls, ID=DR06218, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 46 KI-39 Flood Patrol, Storm Outfalls, DR06217 9_Flood Patrol Assets List Storm Outfalls, ID=DR06217, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 47 KI-44 Flood Patrol, Storm Outfalls, DR06224 9_Flood Patrol Assets List Storm Outfalls, ID=DR06224, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 48 KI-43 Flood Patrol, Storm Outfalls, DR06223 9_Flood Patrol Assets List Storm Outfalls, ID=DR06223, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 49 KI-38 Flood Patrol, Storm Outfalls, DR06412 9_Flood Patrol Assets List Storm Outfalls, ID=DR06412, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 50 KI-37 Flood Patrol, Storm Outfalls, DR06411 9_Flood Patrol Assets List Storm Outfalls, ID=DR06411, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 51 KI-45 Flood Patrol, Storm Outfalls, DR06469 9_Flood Patrol Assets List Storm Outfalls, ID=DR06469, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 52 KI-64 Flood Patrol, Storm Outfalls, DR06597 9_Flood Patrol Assets List Storm Outfalls, ID=DR06597, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 53 KI-65 Flood Patrol, Storm Outfalls, DR06618 9_Flood Patrol Assets List Storm Outfalls, ID=DR06618, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 54 KI-28 Flood Patrol, Storm Outfalls, DR06698 9_Flood Patrol Assets List Storm Outfalls, ID=DR06698, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 55 KI-29 Flood Patrol, Storm Outfalls, DR06697 9_Flood Patrol Assets List Storm Outfalls, ID=DR06697, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 56 KI-30 Flood Patrol, Storm Outfalls, DR06696 9_Flood Patrol Assets List Storm Outfalls, ID=DR06696, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 57 KI-31 Flood Patrol, Storm Outfalls, DR06695 9_Flood Patrol Assets List Storm Outfalls, ID=DR06695, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 58 KI-32 Flood Patrol, Storm Outfalls, DR06694 9_Flood Patrol Assets List Storm Outfalls, ID=DR06694, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 59 KI-33 Flood Patrol, Storm Outfalls, DR06693 9_Flood Patrol Assets List Storm Outfalls, ID=DR06693, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 60 KI-27 Flood Patrol, Storm Outfalls, DR06699 9_Flood Patrol Assets List Storm Outfalls, ID=DR06699, frequent/difficult maintenance spot City checks during all storms. Solution: operations/maintenance 2021 Annual Low Flooding & Maintainability 61 KI-10 Old culvert tile pipe at 34th & Military Road 8_2022 Small Drainage Project List (2022) On 34th & Military Road — Root plugged, old culvert tile pipe. Priority Ranking for this issue is 2. City proposes the following solution: Replace 18" pipe from Military Road to 34th at old gas station to corner of S. 144th Street. Solution : remain in the program Unkn Unknown Unknown Flooding & Maintainability Flooding 62 KI-11 Broken pipe from ditch on 45th to S. 137th 8_2022 Small Drainage Project List (2022) Old broken pipe from ditch on 45th to S. 137th — Mismatched pipe, junk system. Priority Ranking for this issue is 2. City proposes the following solution: Replace approximately 450 feet of 12" pipe and add (8) catch basins on east side of 45th. Unkn Unknown Unknown 63 KI-12 12" CMP/concrete culvert tile pipe running through yard to manhole under deck and then out to pond 8_2022 Small Drainage Project List (2022) At the NE corner of 33rd and S. 132nd, 3306 S. 132nd manufactured home has 12" CMP/concrete culvert tile pipe running through yard to manhole under deck and then out to pond in neighbor's yard then to 34th, live stream. Priority Ranking for this issue is 2. City proposes the following solution: Replace/re-route system, HPA needed. Unkn Unknown Unknown Flooding 64 KI-13 Runoff Issue at 38th Ave & S. 130th St to dead end 8_2022 Small Drainage Project List (2022) 38th Ave & S. 130th to dead end — Needs new drainage system. Old mismatched pipe, deep ditches, steep driveways. Water running into home on lower side of road. Priority Ranking for this issue is 2. City proposes the following solution: Install new 12" storm system with catch basins and thickened edges to get water to new catch basins. Solution : remain in the program. Unkn Unknown Unknown Flooding 3 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 65 KI-14 FullName Blocked 30" CMP pipe due to rocked and debries at S. 133rd & S. 134th Street 8_2022 Small Drainage Project List (2022) ongDesc S. 133rd & S. 134th — Clean rocks and other debris out of 30" CMP pipe on west branch of Southgate Creek. NPDES issue and private property issue. Priority Ranking for this issue is 3. Debris plugs low flow pipe, hard to keep clean. NPDES issue and private property issue. Solution : remain in the program ast_Occur_ Yr Unkn Frequency Unknown Issue . Severity Unknown MapSymbol (Issue Type) Flooding & Maintainability 66 KI-15 West Valley Hwy at the CAT Rental Store — Railroad tracks to the ditch 8_2022 Small Drainage Project List (2022) West Valley Hwy at the CAT Rental Store — Railroad tracks to the ditch. Priority Ranking for this issue is 3. City proposes the following solution: Replace 650 feet of 12" pipe and install (5) Type I catch basins. Crossing OK, need R-O-W survey.Solution : remain in the program Unkn Unknown Unknown Flooding & Maintainability 67 KI-16 Broken and old mismatched pipe on 37th Ave S 8_2022 Small Drainage Project List (2022) On 37th Ave South from S. 126th to S. 128th, then down S. 126th to creek — Old mismatched pipe is broken, junk system etc. Priority Ranking for this issue is 3. City proposes the following solution: Replace 750 feet of 12" pipe and install (12) catch basins. . Solution : remain in the program Unkn Unknown Unknown Maintainability 68 KI-17 Broken and old mismatched pipe on S. 130th Street 8_2022 Small Drainage Project List (2022) On S.130th at East Marginal Way on west side — Old mismatched pipe is broken, junk system etc. From East Marginal Way to 34th — Both sides of road, new system. Priority Ranking for this issue is 3. City proposes the following solution: Replace pipe from ditch on north side crossing with 950 feet of 12" pipe and (15) catch basins, including angle across street. Solution : remain in the program Unkn Unknown Unknown Maintainability 69 KI-18 Local crawl space flooding at S. 135th between 37th and 35th 8_2022 Small Drainage Project List (2022) Off S. 135th between 37th and 35th — Local crawl space flooding due to no drainage in private alley. Priority Ranking for this issue is 3. City proposes the following solution: Install drainage and hook up homes. Need petition from property owners. Solution : remain in the program Unkn Unknown Unknown Flooding 70 KI-70 Undersized inlet pipe to catch basin on S. 150th 8_2022 Small Drainage Project List (2022) S. 150th creek outfall to catch basin on S. 150th (off Macadam Road). Undersized inlet "debris plugs", south of Baptist church. Priority Ranking for this issue is 3. City proposes the following solution: Install new cone grate and Type II manhole. Solution : remain in the program Unkn Unknown Unknown Flooding & Maintainability 71 KI-71 Ditch problem on 56th Ave S & S. 141st to S. 139th 8_2022 Small Drainage Project List (2022) 56th Ave S & S. 141st to S. 139th problem area — Problem ditch. Long berms need new drainage system to prevent homes from being flooded. Priority Ranking for this issue is 3. City proposes the following solution: Install approx. 600 feet of 12" storm main and (4-6) catch basins from S. 141st to S. 139th. Fill ditch, both sides of 56th Ave South. Solution : remain in the program Unkn Unknown Unknown Flooding 72 KI-72 Vault at Gilliam Creek crossing on S. 154th 8_2022 Small Drainage Project List (2022) Large Contech pot style vault at Gilliam Creek crossing on S. 154th — vault needs better access for pot cleaning and replacement. Priority Ranking for this issue is 3. City proposes the following solution: Pull lid from vault and add 2-3 feet riser section asphalt area. Add fences and gates for vehicle access for cleaning . Solution : remain in the program Unkn Unknown Unknown Maintainability 73 KI-73 Abandoned pipe downstream of 10831 Tukwila International Blvd 8_2022 Small Drainage Project List (2022) 10831 Tukwila International Blvd — Downstream pipe was abandoned (no idea when) and is now slowing to north through pipes at reverse grade. Priority Ranking for this issue is unknown. City proposes the following solution: Replace 5 type-1 CBs and 330' of 12" storm pipe from DR00037 to DR00020. Solution : remain in the program Unkn Unknown Unknown Maintainability 74 KI-74 Fish mortality in Riverton Crk City's Staff Observation City's Staff witnessed fish mortality in Riverton Crk near the mouth Unkn Unknown Unkn Water Quality 75 KI-75 Lack of off -channel salmon habitat along lower Duwamish 5_2013 Plan Table 7 Issues and Solutions The issue is located at Duwamish River near light rail crossing. The 2013 SWCP (table 7 - issue ID 4) proposes the following solutions for the issue. Possible solution: Capital (channel physical habitat restoration). Recommended solution: Physical habitat restoration (capital project - Duwamish Gardens) Unkn Unknown Unkn Habitat 76 KI-76 Fish habitat accessibility issues in Riverton Creek culvert 5_2013 Plan - Table 7 - Issues and Solutions The issue is located at E Marginal Way south of SR599. The 2013 SWCP (table 22, Issue ID 4) proposes the following solutions for the issue. Possible solution: Capital (removal/replacement of fish -blocking culvert). Recommended solution: Conveyance system cleaning and inspection (capital project) Unkn Unknown Unknown Habitat 4 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 77 KI-77 Or Dumping_City wide issue City's Staff observation ongDesc The site is one example of several where the City is concerned about encampments of houseless people on the levees, in streams, and in stormwater facilities. The people may not be safe in those locations, and the infrastructure may also be damaged by human activities. Recommendation may be for City council to address houselessness more broadly. Last_Occur_ Yr 2022 Frequency Weekly Issue . Severity Unknown MapSymbol . (Issue Type) Water Quality 78 KI-78 Ponding in low spot, possible ponding on the east side of roa 5_2013 Plan - Table 7 - Issues and Solutions The issue is located at: 49th Ave S and S Hazel Street. The 2013 SWCP (table 7 -issue ID 2) proposes the following solutions for the issue. Possible solution: Capital (increase conveyance capacity,retention/detention) Recommended solution: Move onto 2012 Small Drainage Project List Unkn Unknown Unkn Flooding 79 KI-79 Tukwila stormwater line discharges to WSDOT pipe, no access due to 1-405 widening 5_2013 Plan - Table 7 - Issues and Solutions The issue is located at Andover Park W at Gilliam Creek. The 2013 SWCP (table 7 -issue ID 10) proposes the following solutions for the issue. Possible solution: Capital (re-route drainage system). Recommended solution: Re-route drainage system (capital project). Unkn Unknown Unknown Flooding 80 KI-80 Historical landslide 5_2013 Plan - Table 7 - Issues and Solutions The issue is located at S 137th St at 44th Ave S . The 2013 SWCP (table 7 -issue ID 10) proposes the following solutions for the issue. Possible solution: Capital (complete channel stabilization and riparian buffer restoration). Recommended solution: No capital project at this time; monitor status and review during next planning period. Unkn Unknown Unkn Water Quality & Flooding 81 KI-81 Runoff Issue at Allentown — 48th, 49th, S. 124th 8_2022 Small Drainage Project List (2022) Allentown — 48th, 49th, S. 124th — These streets have no formal drainage and have always had problems with runoff into yards and homes from right-of-way. Priority Ranking for this issue is 1. City proposes the following solution: Install new pipe one street at a time. Unkn Unknown Unknown Flooding 82 KI-82 Andover Park 48 inch stormwater pipe in poor condition, possibly damaged 5_2013 Plan Table 7 Issues and Solutions The issue is located at Andover Park W. The 2013 SWCP (table 7 -issue ID 11) proposes the following solutions for the issue. Possible solution: Capital (increase effective conveyance capacity). Recommended solution: No capital project at this time; address once collection system has been clean and inspected; had been CIP project #98641217 Unkn Unknown Unkn Flooding 84 KI-84 Water Quality in Tukwila Pond City Staff and Tukwila Pond Master Plan Pond has a poor WQ and high levels of phosphorus. Tukwila pond is the result of filling in and paving the areas around it. The pond is pretty shallow (5-6 feet); before surrounding development built up the surrounding are there were pastures here. During periods of high flow, it discharges to Green river, but under gravity flow conditions it outlets to Gilliam Creek. (Russell has some info regarding the discharges) Unkn Unknown Unknown Water Quality 85 KI-85 Cascade view/S 128th street Landslide Known Issue City Staff_Field Visit A parking lot owned by a non-profit entity is sloughing/cracking off at the top of a historic landslide. Further upslope, which is in City of Burien, a retirement facility has a pond which discharges near the top of the slope on the landslide. City staff spoke with City of Burien staff about the pond, but the pond design follows an applicable stormwater manual. There is a pipe that outfalls into Tukwila through property in Burien. There is occasional flooding in this area according to City staff. Unkn Unknown Unkn Water Quality 86 KI-86 Unauthorized encampment.in Parcel 3747 City's Staff The issue includes unauthorized encampment. The City owns the parcel. Could we use this vacant parcel to provide water quality treatment here? Unkn Unknown Unknown Water Quality 87 KI-87 Damaged/Rusted pipe at 13601 40th Ave S 8_2022 Small Drainage Project List (2022) 13601 40th Ave S. Old brick built CB2s and 18" CMP pipe are completely impacted with roots. Sections of the pipe have rusted away, and water is scouring the ground around the pipe depositing sediment into Southgate Creek. Priority Ranking for this issue is 1. City proposes the following solution: 90' of 18" CMP; 80' of 12" concrete; two CB2s and one CB1 need to be replaced. Unkn Unknown Unknown Flooding & Maintainability 5 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 88 KI-88 Pollution Generating Gravel Yard InfoSource —GE0000g20236.kmz/Polluting Gravel Yard ongDesc The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. Last_Occur_ Yr 2022 Frequency Annual Issue . Severity Low MapSymbol . (Issue Type) Water Quality 89 KI-89 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 90 KI-90 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 91 KI-91 Pollution Generating Gravel Yard -GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 92 KI-92 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 93 KI-93 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 94 KI-94 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 95 KI-95 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 96 KI-96 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 97 KI-97 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 6 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 98 KI-98 Pollution Generating Gravel Yard InfoSource —GE0000g20236.kmz/Polluting Gravel Yard ongDesc The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. Last_Occur_ Yr 2022 Frequency Annual Issue . Severity Low MapSymbol . (Issue Type) Water Quality 99 KI-99 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 100 KI-100 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 101 KI-101 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 102 KI-102 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 103 KI-103 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 104 KI-104 KI-105 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 105 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 106 KI-106 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 107 KI-107 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 7 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 108 KI-108 Pollution Generating Gravel Yard InfoSource —GE0000g20236.kmz/Polluting Gravel Yard ongDesc The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. Last_Occur_ Yr 2022 Frequency Annual Issue . Severity Low MapSymbol . (Issue Type) Water Quality 109 KI-109 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 110 KI-110 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 111 KI-111 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 112 KI-112 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 113 KI-113 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 114 KI-114 KI-115 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 115 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 116 KI-116 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 117 KI-117 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 8 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 118 KI-118 Pollution Generating Gravel Yard InfoSource —GE0000g20236.kmz/Polluting Gravel Yard ongDesc The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. Last_Occur_ Yr 2022 Frequency Annual Issue . Severity Low MapSymbol . (Issue Type) Water Quality 119 KI-119 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 120 KI-120 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 121 KI-121 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 122 KI-122 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 123 KI-123 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 124 KI-124 KI-125 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 125 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 126 KI-126 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 127 KI-127 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 9 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 128 KI-128 Pollution Generating Gravel Yard InfoSource —GE0000g20236.kmz/Polluting Gravel Yard ongDesc The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. Last_Occur_ Yr 2022 Frequency Annual Issue . Severity Low MapSymbol . (Issue Type) Water Quality 129 KI-129 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 130 KI-130 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 131 KI-131 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 132 KI-132 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 133 KI-133 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 134 KI-134 KI-135 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 135 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 136 KI-136 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 137 KI-137 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 10 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 138 KI-138 Pollution Generating Gravel Yard InfoSource —GE0000g20236.kmz/Polluting Gravel Yard ongDesc The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. Last_Occur_ Yr 2022 Frequency Annual Issue . Severity Low MapSymbol . (Issue Type) Water Quality 139 KI-139 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 140 KI-140 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 141 KI-141 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 142 KI-142 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 143 KI-143 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 144 KI-144 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 145 KI-145 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 146 KI-146 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 147 KI-147 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 11 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ ID 148 KI-148 Pollution Generating Gravel Yard InfoSource —GE0000g20236.kmz/Polluting Gravel Yard ongDesc The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. Last_Occur_ Yr 2022 Frequency Annual Issue . Severity Low MapSymbol . (Issue Type) Water Quality 149 KI-149 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 150 KI-150 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 151 KI-151 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 152 KI-152 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 153 KI-153 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 154 KI-154 KI-155 Pollution Generating Gravel Yard —GE0000g20236.kmz/Polluting Gravel Yard The Known Issue is one of many on a list of pollution generating gravel yards kept by the City. The City has permitted many temporary parking lots with gravel surfaces that were supposed to be paved within 3 years. Gravel parking lots with catch basins and connections to the municipal storm sewer may be discharging untreated runoff to the municipal storm sewer. 2022 Annual Low Water Quality 155 Springbrook Maintenance CityStaff_Meeting March 16, 2023 The issue is located in Springbrook basin between the two railroad lines. FEMA maps indicate this area ponds. This channel is rarely cleaned out, last likely around 2015. There might have been an beaver dam in the past. This area needs to be cleaned out again. Unkn Periodically Low Maintainability 157 KI-156 S Ryan Way Drainage Issues Meeting with City staff on March 29, 2023 There is poor pipe condition along S Ryan Way and there are associated drainage issues. Paving is needed. If brought down to the base of the road, stormwater standards will be triggered which includes the flow control threshold. Possible solution would be funded by the Transportation funds. Unkn Unknown Moderate Flooding & Maintainability 158 KI-157 Erosion at inlet of 108" diameter culvert carrying Gilliam Creek under 66th Ave S and the Green Rive Meeting with City staff on May 11, 2023 Erosion at inlet of 108" diameter culvert carrying Gilliam Creek under 66th Ave S and the Green River Trail. A debris rack was installed by the City to prevent large material from getting in the culvert, and if it's not maintained frequently, the flows in Gilliam Creek erode the slopes around the culvert. It happened in the winter of 2022-2023 with up to 12-20 feet of losses. The new angle of repose will intercept 66th Ave. South and undermine it if the slope is not stabilized. The City is currently working on a larger fish passage enhancement project at this location. 2022 Unknown High Erosion & Maintainability 12 Tukwila SWCP Known Issue Points - Export Date 5/11/2023 OBJ Last_Occur_ Issue MapSymbol ID KI_ID FullName 159 KI-158 Foster Heights erosion problem in Southgate Meeting with City staff on May 11, 2024 LongD The Foster Heights area of town was annexed from the county and shortly after a plat began construction before the 2008 downturn. Just north of S 137th Street, 43rd Avenue S is collapsing. The ROW has been vacated, and the roadway is now located on private property and is closed. Southgate Creek passes under 43rd Avenue S in the private tract. The collapsing roadway is contributing debris to the stream, which travels downstream and is deposited behind Evergreen Catering Equipment. The business has installed Ecology Blocks to prevent stream from eroding their property. Unkn Yr Frequency Severity (Issue Type) Unknown Moderate Water Quality & Erosion 13 Appendix E Surface Water Capital Projects and Studies Surface Water Capital Projects and Studies Appendix E contains a summary of the recommended surface water capital projects, the 2024 Annual Small Drainage Program list, and recommended studies. The information presented here is summarized in Section 5 and Section 6 of the 2024 Surface Water Comprehensive Plan. A major component of this Plan is the identification of surface water management issues and corresponding solutions to those issues. The Plan identifies both programmatic (non - structure) and structural solutions to those issues. Structural solutions are further categorized as capital projects, which are large complex projects generally requiring a design by a professional engineer and likely to be bid to a contractor for construction as an individual project, and small drainage projects, which are less complicated drainage system repairs and modifications that may not require an engineered design and that can sometimes be constructed by City Operations staff. The purpose of this appendix is to outline the capital projects, Annual Small Drainage Program projects, and studies recommended for implementation in the Plan. Attachment A to this Appendix contains the basis for the cost estimates for each of the capital projects recommended for inclusion in Tukwila's CIP. Attachment B to this Appendix contains the summary sheets for each of the capital projects that can be utilized as part of the budget planning process and CIP development. Attachment C to this Appendix contains the 2024 Annual Small Drainage Program list. Attachment D to this Appendix contains copies of the public involvement process used to help prioritize projects. The surface water needs, or known issues, were identified as part of SWCP development. Needs were categories as drainage, water quality, erosion, maintenance, or aquatic habitat needs. Once these needs were identified, one or more potential solutions were identified. These solutions were either programmatic or structural (capital) in nature. Otak and City staff screened the list of known issues into solution categories — programmatic and structural. Capital Projects Project Development Otak and City staff prioritized structural solutions and requested input from the public on capital project prioritization. Otak and City of Tukwila staff collaborated on the preferred solution for the highest priority projects. Otak developed preliminary design concepts and planning -level cost estimates for the highest priority capital projects. E -1 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Most of the capital projects presented in this memorandum are focused on rectifying discrete drainage, water quality, or aquatic habitat problems. Some of the known issues identified are not readily solved using discrete capital projects. For example, widespread water quality problems in urban runoff entering Riverton, Southgate, and Gilliam Creeks cannot be solved with individual capital improvements. It can be appropriate to address water quality problems with land use or stormwater management regulations (for example, requiring water quality treatment for redevelopment projects) or by bundling stormwater runoff retrofits into programmatic CIPs to address water quality. Studies are recommended when a solution to a problem cannot be identified because the causes or appropriate prioritization is not clear. Prioritization The planning process for the 2024 SWCP identified more issues that require a capital improvement than the City could afford to construct over the next ten years. As a result, the issues were screened to identify the most important ones to address first. For the most important issues, capital improvement projects were prioritized based on a variety of factors. In addition to selecting capital improvement projects based on individual characteristics, the process also ensured that the City's portfolio of surface water CIPs and studies in the 2024 SWCP would solve a comprehensive set of issue types and would address regional priorities and lead to multiple benefits. Tables E-1 describes the known issue screening factors, and Table E-2 describes project prioritization weighting. Table E-1 Known Issue Screening Factors Audience Issue Type City Regional Priority Public Input Intractable, severe, or widespread issue within City x x Localized drainage issues X x Degraded water quality from urban pollutants x x x Degraded water quality from erosion and landslides Flow control Degraded or lack of fish habitat Barriers to fish passage Poor condition and aging of storm sewer system x x x x x E -2 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Table E-2 Project Prioritization Weights Project Characteristics Relative Weight High Medium Low Multi -beneficial project which combines solutions to x multiple problems Multi -beneficial project which coordinates with efforts of x other Tukwila departments (e.g. Parks, Transportation) or other agency Project addresses a regional priority or anticipated x regulatory requirement Project is eligible for grant funding Project received favorable public input Previously identified project not yet implemented Standalone water quality project Standalone habitat / fish barrier removal project Standalone flooding / drainage project, high severity Standalone erosion / sedimentation project Tukwila Surface Water Program is not the lead agency and does not control timing of multi -benefit project Standalone maintainability or capital repair/replacement Standalone flooding / drainage project, low or medium severity x x x x x x x x x 'Change priority to "high" when another department of agency is ready to advance the project Capital Projects Recommended for Inclusion into the CIP Table E-3 presents the capital projects recommended for inclusion into Tukwila's Surface Water CIP. Projects with an eight -digit ID were previously recommended and assigned an ID number using Tukwila's CIP numbering system. Projects with an alphanumeric ID are new projects identified for this Plan, and they will be assigned an eight -digit ID when they are incorporated into the City's capital improvement program. Attachment A to this memorandum contains the basis for the project costs. Attachment B contains project summary sheets with project scopes, benefits, schematic sketches, and cost estimates for each project. E -3 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Table E-3 Recommended Capital Projects ID Project Name Project History Estimated Total Project Cost (2023 dollars) 98641222 S 143rd St storm drain system 98741202 Nelsen/Longacres — Phase II 99441202 Soil Reclamation Facility / Enhanced Maintenance Program and Decant Facility Design — Part 1 90341214 S 146th St pipe and 35th Ave S drainage 91241203 Tukwila Urban Center Conveyance Inspections CIP-1 Norfolk Outfall Trunkline Sewer Separation Preliminary Feasibility Study CIP-2 CIP-3 CIP-4 S Ryan Way Pipe Rehabilitation Fort Dent Park Water Quality Retrofit Tukwila Pkwy/Gilliam Cr Outfalls CIP-5 Tukwila Pond Water Quality Improvement CIP-6 Johnson Creek Fish Barrier Mitigation Alternatives Analysis 2003 and 2013 Plans 2013 Plan 2003 and 2013 Plans; City will study cost under Enhanced Maintenance Planning grant in 2024 2003 and 2013 Plans Gilliam Cr./P17 New New New 2013 Plan (ID 91241202); 2023 Tukwila CIP ID 91241205. CIP-4 is a redesign. New New $1,410,000 $1,000,000 $540,000 $1,290,000 $790,000 $155,000 Alt. 1: $840,000 Alt. 2: $680,000 Alt. 1: 90,000 Alt. 2: $1,745,000 $1,240,000 $940,000 $280,000 Attachment B contains project summary sheets with project scopes, benefits, schematic sketches, and cost estimates for each project. E -4 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Programmatic CIPs The City's objectives to improve water quality for salmon and human health, meet stormwater planning requirements of the NPDES Phase II Permit, and coordinate on regional priorities cannot be met with a single capital investment. In addition, the Annual Small Drainage Program programmatic CIP allows the City to dedicate funding annually to make consistent progress in addressing public complaints. Five programmatic capital improvement programs are recommended for inclusion in the City's CIP. The purpose of the Annual Small Drainage Program is to fix small public drainage issues that often start as customer service requests or issues discovered in the field. For greater efficiency, these projects are often batched together. Solutions typically entail installing catch basins, pipes, berms, and other small improvements within the public right-of-way. These projects proactively ensure public safety, reduce flooding, decrease maintenance demands, and protect critical infrastructure. Otak and City staff reviewed the 2022 Annual Small Drainage Program list to verify the status of the underlying surface water known issue. The 2024 Annual Small Drainage Program comprises the remaining active known issues from the 2022 Small Drainage Program list and a small number of newly identified surface water known issues. Attachment C to this Appendix contains the 2024 Annual Small Drainage Program list and information about the disposition of small projects on previous lists. The Stormwater Outfalls Water Quality Retrofit Program has been active since 2015 with the outfall retrofit at Interurban and 53rd Ave S. It focuses on treating roadway runoff close to outfalls into the Green/Duwamish. In 2021, the City evaluated eight sites and developed preliminary designs for four sites. The City has obtained a grant from Ecology to advance the design and construction of sites No. 5 and No. 8, while sites No. 4 No. 7 will be designed to 90% and put on hold. This programmatic CIP is city-wide and could be used to identify and implement opportunities for stormwater parks in the future. See Appendix F for the Stormwater Outfalls Design Report. The Stormwater Management Action Plan (SMAP) for Riverton Creek identifies four priority stormwater retrofits and a handful of lower priority stormwater retrofits with the goal of improving water quality in Riverton Creek. Riverton Creek has good quality fish habitat in several reaches, and the City and King County Metro each have been engaged in improving access to the habitat. Therefore, improvements to water quality in Riverton Creek are especially valuable. Implementation of the SMAP or equivalent water quality protection programs may be required in the next NPDES Phase II permit cycle, and projects in this programmatic CIP are eligible for grant funding from Ecology. See Appendix F for the SMAP document. E -5 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) The Green Infrastructure Program is envisioned as way to support regional priorities for water quality improvement of the Green/Duwamish Rivers, protection of Puget Sound, habitat improvements for fish, and providing a healthy environment for people. The Green Infrastructure Program would be partnership between Tukwila's Public Works, Parks and Recreation, and Department of Community Development departments. The program would help manage habitat restoration sites and identify, acquire, restore, and manage forested lands, wetlands, river side channels, and other lands that benefit surface water. The Green Infrastructure Program would expand on the City's existing Green Tukwila Program which is currently not on track to enroll all 138 acres in restoration and active maintenance within the 20-year time frame. The proposed program would increase collaboration between departments to achieve the Green Tukwila Program goal. The programmatic CIP is nascent, and the costs and implications have not been studied. The WSDOT Stormwater Retrofit and Maintenance programmatic CIP aims to retrofit limited -access state highways in Tukwila with water quality treatment BMPs. The program The City partners with State to fund stormwater retrofit projects and certain maintenance activities with surface water management fees collected from WSDOT. An annual retrofit plan and project status report must be submitted to and approved by the State in order to collect a surface water management fee from WSDOT. See Appendix F for the WSDOT Retrofit Project Opportunities Memorandum. Table E-4 Recommended Programmatic Capital Projects ID Project Name Project History 81241207 Annual Small Drainage Program Begin prior to 2013 Plan 91241202 Stormwater Outfalls Water Quality 2013 Plan (ID 91241201); some Retrofit Program projects in program have been completed. TBD TBD TBD SMAP Program CIP New Green Infrastructure Program New WSDOT Stormwater Retrofit and Ongoing Maintenance Program Appendix F contains three reports supporting the programmatic water quality retrofit CIPs. E -6 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) The Ecosystem Services Conservation Program is envisioned as way to support regional priorities for water quality improvement of the Green/Duwamish Rivers, protection of Puget Sound, habitat improvements for fish, and providing a healthy environment for people. The Ecosystem Services Conservation Program would be partnership between Tukwila's Public Works, Parks and Recreation, and Department of Community Development departments. The program would help manage habitat restoration sites and identify, acquire, restore, and manage forested lands, wetlands, river side channels, and other lands that benefit surface water. The GI Program would expand on the City's existing Green Tukwila Program which is currently not on track to enroll all 138 acres in restoration and active maintenance within the 20-year time frame. The proposed program would increase collaboration between departments to achieve the Green Tukwila Program goal. The programmatic CIP is nascent, and the costs and implications have not been studied. The WSDOT Stormwater Retrofit and Maintenance programmatic CIP aims to retrofit limited -access state highways in Tukwila with water quality treatment BMPs. The program The City partners with State to fund stormwater retrofit projects and certain maintenance activities with surface water management fees collected from WSDOT. An annual retrofit plan and project status report must be submitted to and approved by the State in order to collect a surface water management fee from WSDOT. See Appendix F for the WSDOT Retrofit Project Opportunities Memorandum. Table E-4 Recommended Programmatic Capital Projects ID Project Name Project History 81241207 Annual Small Drainage Program 91241202 Stormwater Outfalls Water Quality Retrofit Program TBD SMAP Program CIP TBD Ecosystem Services Conservation Program TBD WSDOT Stormwater Retrofit and Maintenance Program Begin prior to 2013 Plan 2013 Plan (ID 91241201); some projects in program have been completed. New New Ongoing Appendix F contains three reports supporting the programmatic water quality retrofit CIPs. E -6 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Capital Projects Recommended for Removal from the CIP Several capital projects developed in previous plans and appearing in previous CIPs are recommended for removal from the CIP for one or more of the following reasons: • Project has been completed. • Solution is in progress (that is, under design or construction). • Alternative solutions were developed under a different capital project included in the CIP. These projects are listed in Table E-5. Table E-5 Capital Projects Removed from the CIP ID Capital Project Name Reason 90330104 Nelsen Side Channel In progress 98941202 Christensen Rd. pipe replacement Complete 99341208 Gilliam Creek 42nd Ave S culvert Complete 90341206 Northwest Gilliam Storm Drainage System Partially complete; Add remainder to Annual Small Drainage 90341213 53rd Ave S storm drain system Complete 91041203 Storm Lift Station No. 15 Improvements Complete 91041204 E. Marginal Way S Stormwater Outfall Complete 91041204 E. Marginal Way Conveyance Inspection Complete 90630102 Duwamish Gardens Complete 99830103 Riverton Creek Flap Gate Removal Complete 99830105 Gilliam Creek Fish Barrier Removal In progress Capital Projects Added Since 2013 Plan The City has been active in identifying and pursuing surface water capital improvements since the 2013 Plan was published, including several which had not been previously listed. Table E-6 lists projects on the City's 2023-2028 Capital Improvement Program list for the Surface Water Fund which were not identified in the 2013 Surface Water Comprehensive Plan, and which are not yet completed. Some of the projects fall outside of the focus area of the 2024 SWCP, such as levee certification. E -7 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Table E-6 Current Capital Projects Identified After the 2013 Plan ID Capital Project Name Short Description 70041201 91641202 Regional Surface Water Partnerships Green the Green Program 91341203 Tukwila 205 Levee Certification (Program) 91641204 S 1315t PI Drainage Improvements 91441202 Chinook Winds Public Access 92341202 92241203 Chinook Winds Extension Duwamish Riverbank Stabilization at S 104th St 92241203 Duwamish Hill Preserve Phase III Ongoing inter -agency partnerships related to surface water Supports revegetation efforts along watercourses to provide habitat and reduce temperatures Reconstruct the Tukwila 205 Levee to provide 500-year level of flood protection and obtain levee certification Replace an existing 36" culvert under S. 131st P Develop public access and maintenance trail to Duwamish Gardens Develop connecting shoreline habitat and the 'missing trail link' between Duwamish Gardens and Chinook Wind within recently acquired City property Analyze site conditions and develop solutions to create a sustainable shoreline that can withstand hydraulic forces, reduce erosional risk to uplands and provide ecological value The park master plan calls for moving a portion of S 115th Street landward to improve shallow water habitat, water quality and enjoyment of the shoreline Studies The diagnosis of some of the more multifaceted surface water known issues is not readily apparent without further investigation into the causes. In other cases, the most beneficial order of solving a selected subset of known issues is best determined through additional study. Further solution development should not proceed until a diagnosis or prioritization has been completed. In these cases, a study is recommended. Table E-7 lists the recommended studies. E -8 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Table E-7 Recommended Studies Estimated Total Study Project Cost (2023 ID Study Name History dollars) CIP-101 Fish Passage Barrier Prioritization Study New $147,000 CIP-102 Middle Fork of Southgate Creek — Stream New $200,000 and Slope Stability Study CIP-103 P17 Pond and Southcenter Subarea New $300,000 Hydraulic Study Attachment B to this Appendix contains study summary sheets with a scope, benefit and cost estimate for each study. Surface Water Project Funding The City of Tukwila's Capital Improvement Program includes projects and program elements that are recommended for implementation in the Surface Water Comprehensive Plan. Projects implemented primarily for surface water management purposes are funded with Fund 412. Fund 412 is an enterprise account for utility operations which is self -supported through Surface Water rate charges. Grant and bond revenue is also deposited into Fund 412 when available. The City has made extensive use of grants from Department of Ecology and King County Flood Control District for surface water projects. The City has received approximately $3.2 million in grant funding for stormwater planning and stormwater retrofit CIPs from Department of Ecology between 2016 and 2023. The City has current agreements totaling $2.3 million in grant funding for the Enhanced Maintenance Program and Decant Facility Design (CIP 99341208) and the Stormwater Quality Retrofit Program Part 2. The City has received a landside grant from FEMA Cooperative Technical Partners (CTP) to study existing landslides. The findings from the study could produce findings that assist with Middle Fork Southgate Creek Stream Stability Study (CIP-102). The City has submitted an application to FEMA CTP for P17 Pond and Southcenter Subarea Hydraulic Study (CIP-103). The City may qualify for grant funding from the King County Flood Control District for projects that reduce the impact of flooding. The program categories are Flood Reduction, E -9 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) Urban Streams, Coastal Erosion/Coastal Flooding, and Culvert Replacement/Fish Passage Restoration. Projects that achieve multiple benefits are encouraged. Eligible project types that are applicable to the City proposed CIPs are: • Upgrading aging or undersized stormwater systems in urban or suburban areas. o CIP-2 S Ryan Way Pipe Rehabilitation o CIP 90341214 S 146th St Drainage o CIP 98641222 S 143rd St Drainage o CIP 98741202 Nelsen Place/Longacres Phase 2 • Replacing culverts that block fish passage and restrict flows and undermine streambanks. o CIP-6 Johnson Creek Fish Barrier Mitigation Alternatives Analysis Projects financed under the commercial streets, water, and sewer programs may have a stormwater element. Projects with surface water components may funded under the following City Programs, in addition to Fund 412: • Bridges and Arterial Streets (Fund 104) • Water Program (Fund 401) • Sewer Program (Fund 402) • Parks & Trails (Fund 301) • City Facilities (Fund 306) Public Involvement In order to ensure the public could participate in prioritizing capital projects, City staff and Otak attended an Open House at Showalter Middle School on September 20, 2023, and published an online survey that was open in September and October 2023. The Open House was a joint event with the City's Comprehensive Plan Update. Attachment D to this Appendix contains the public involvement materials and survey results. References CH2M HILL. 2013. City of Tukwila Surface Water Comprehensive Plan. Prepare for the City of Tukwila. February. E -10 APPENDIX E: SURFACE WATER CAPITAL PROJECTS (2024) CH2M HILL. 2003. City of Tukwila Comprehensive Surface Water Management Plan. Prepared for the City of Tukwila. November. City of Tukwila. Adopted 2010-2015 Financial Planning Model and Capital Improvement Program. December 7, 2009. City of Tukwila. Adopted 2023-2028 Financial Planning Model and Capital Improvement Program. November 28, 2022. E -11 ATTACHMENT E-1 Capital Project Cost Development Otak Memorandum To: Sherry Edquid (City of Tukwila) From: Trista Kobluskie, Shailee Jain, PE Copies: File Date: March 21, 2024 Subject: City of Tukwila SWCP Project Cost Opinion Methodology Project No.: 33383 For the City of Tukwila, Surface Water Comprehensive Plan (SWCP) Otak developed planning -level cost opinions for capital improvement projects (CIPs) and studies. Otak also updated the project cost estimates for projects identified in the 2003 and 2013 Surface Water Comprehensive Plans that have not been implemented and are still needed. This memorandum summarizes the assumptions made in formulating the cost opinions for newly identified CIPs in Sections 1 through 5, studies and Section 6, and updating costs of older projects in Section 7. 1. CIP Project Scope The SWCP recommends CIPs such as drainage projects, water quality projects, and pipe replacement projects; these CIPs include an estimate for construction. The cost opinions for CIPs that have a construction estimate are developed as described in Sections 1 through 5. Cost opinions are based on conceptual project scopes and engineering and are presented in 2023 dollars. Conceptual project scopes and designs are developed with limited detail about permit requirements, existing system attributes (e.g., invert elevations), utility conflicts, and external impacts. Conceptual engineering includes preliminary engineering calculations or uses information from recent similar work. All concepts and costs should be considered preliminary. It is assumed that projects will meet engineering requirements of the King County Surface Water Design Manual in effect when the project is permitted. Cost estimates are based on assumptions derived from current engineering standards. 2. CIP Design Design costs consist of permitting, engineering, survey, and project administration. 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com Ilotak.comlotaklproject1333001333831waterres\task 600 - swcplt-6401tukwila swcp cost estimating.docx City of Tukwila SWCP Project Cost Opinion Methodology Page 2 of 4 March 21, 2024 Type of Cost Includes How Applied How Calculated Basic Permitting* • Basic municipal permits Most projects, based on engineering judgement • $0, if local permits will not apply ■ $15,000, if local permits may apply Engineering • Engineering design ■ Preparation of SWPPP and erosion & sediment control plans ■ Geotechnical studies (if needed) ■ Archaeological survey (if needed) ■ Other special studies when described in fact sheet All projects Varied percentage of total construction cost based on engineering judgement as to type of project and complexity of design. Percentages ranges from 15% to 25%. Survey • Survey Most projects, based on probable needs of the design • 0% when survey not needed ■ 2% to 10% of total construction, based on engineering judgement as to complexity of survey Project Administration • City's staffing cost to manage the project and related grants if any All projects 5% of total construction * Basic Permitting cost is applied to most CIPs and represents cost of local permits. Based on desktop analysis, no CIPs will trigger federal or state environmental permits or environmental mitigation, which would entail additional cost. Therefore, no additional permitting is anticipated. 3. CIP Land (Right of Way) Land costs consists of permanent easements, if needed, which are calculated at $6 per square foot. 4. CIP Construction Management Construction management consists of either the City's staffing or a contractor to oversee construction and is calculated as 10% of total construction for all standalone projects. A standalone project is expected to be completed by the Public Works Surface Water Program independent of projects such as transportation or parks. CIP-2, S Ryan Way Pipe Rehabilitation, is not a standalone project because the pipe rehabilitation is expected to be coordinated with and completed as part of a transportation projects. Therefore, construction management for CIP-2 is $0 because we assume the transportation project will fund this cost. Ilotak.comlotaklproject1333001333831waterres\task 600 - swcplt-6401tukwila swcp cost estimating.docx City of Tukwila SWCP Project Cost Opinion Methodology Page 3 of 4 March 21, 2024 5. CIP Construction Construction consists of construction elements and required ancillary construction pay items. 5.1. Construction Elements Construction elements are the necessary significant pay items to construct the project. Items are usually presented as a package that includes labor and a variety of materials. For example, the unit cost for a right-of-way bioretention planter is a package based on a typical design and includes labor and materials such as Portland cement, pipe, bioretention soils, plants, and other needed materials. Otak civil engineers researched unit prices from recently completed local and regional construction projects to estimate project costs. Each project includes an engineer's assumption for preliminary unit quantities. 5.2. Required Ancillary Construction Items Required ancillary construction items include mobilization, temporary water management, erosion & sedimentation control, traffic control, and a planning level construction contingency. Each of these items are calculated based on a percentage of project costs as described in the table below. Type of Cost Includes How Applied How Calculated Mobilization • Contractor's mobilization All standalone projects 10% of construction elements subtotal Temporary Water Management • Contractor's temporary water management costs If needed based on desktop analysis of site conditions Percentage based on engineering judgement Erosion & Sedimentation Control • Contractor's erosion control costs All standalone projects 5% of construction elements subtotal Traffic Control • Contractor's traffic control costs If needed based on desktop analysis of site conditions Percentage based on engineering judgement Planning Level Construction Contingency • Expected costs that are not specified at the planning level All projects Percentage of total construction cost based on engineering judgement as to type of project and complexity of design. Percentages range from 15% to 30% 6. Costs of Alternatives Analyses and Studies The SWCP also recommends CIPs that must begin with a significant alternatives analysis process before design and construction may proceed as well as studies to diagnose more complex surface water issues before proceeding to solution development. The cost opinion of studies and CIPs that do not have a Ilotak.comlotaklproject1333001333831waterres\task 600 - swcplt-6401tukwila swcp cost estimating.docx City of Tukwila SWCP Project Cost Opinion Methodology Page 4 of 4 March 21, 2024 construction estimate are developed as follows. Otak's engineers and planners documented the significant tasks of the study or alternatives analysis process using experience performing similar work. The cost opinion for each significant task is based on recent experience and is presented rounded up to the nearest ten thousand dollars. 7. Updating Costs of Older Projects Not all projects from the 2003 and 2013 Surface Water Comprehensive Plans have been implemented. After working with City staff to determine which remaining projects are still needed, Otak updated the project costs to 2023 dollars. The project costs were updated by maintaining the structures of the estimates, which are divided into materials costs and other items, and without changing the scopes or concepts of the projects. Otak updated materials costs by applying a construction cost index published by Engineering News - Record. Materials costs were increased by 145.82% based on the Construction Cost Index value from March 2012 to December 2023. Other line items that are expressed as percentages of materials or construction costs, such as dewatering, mobilization, and construction management, were calculated based on the updated materials and construction costs. Sales tax was increased to the current local rate of 10.1%, 8. Escalation and Future Estimation Costs were estimated in 2023 dollars. Cost opinions in the SWCP do not include escalation. Otak recommends escalating a cost opinion using an established index when the City adds a project to its capital improvement program. After the project design phase is complete, the construction cost opinion should be replaced by the engineers' estimate. Ilotak.comlotaklproject1333001333831waterres\task 600 - swcplt-6401tukwila swcp cost estimating.docx ATTACHMENT E-2 Project and Study Summary Sheets CAPITAL PROJECTS PROJECT SUMMARY SHEET-9864122 Project Title: S. 143rd Street Storm Drain System PROJ. ID: (2013 Plan) 98641222 PROJ. ID: (2003 Plan) 86-DR22 Location: S 143rd Place and S 143rd St. Project History: The project was identified in the 2003 Tukwila Surface Water Management Comprehensive Plan. The project sketch on the following page is excerpted from the 2003 plan. The project cost was updated for the 2013 Surface Water Comprehensive Plan and has been escalated again for the 2024 SWCP using the construction cost index published by Engineering News -Record. The current sales tax rate has been used. Project Description: Design and construct closed pipe drainage system along S. 143rd Street and S. 143rd Place. Provide a WQ treatment manhole and a flap gate at the outlet of the drainage system. Convert existing drainage ditch, located on private property, to a bioswale. Provide asphalt overlay, curb and gutter, and sidewalks for S. 143rd Street. Provide asphalt overlay for S. 143rd Place. Justification: New conveyance system will reduce ROW and private property flooding. Bioswale will treat stormwater runoff before it's routed to the Duwamish River. Flap gate will help prevent flooding when the Duwamish River is at high stages. Comments: Assumes that parking adjacent to existing ditch will not be disturbed. Potential for LID/ND improvements are not included in estimated cost. Estimated Project Cost: $1,410,000 City of Tukwila Surface Water Comprehensive Plan January 2024 Project Sketch S. 143rd Street Storm Drain System Convert Ditch to Bioswale 178170.TS.01 W062003006SEA. 86-DH22 sum sht 07-31-03. 1;0 Provide Storm Drainage System, Asphalt Overlay, Curb and Gutter, and Sidewalk / Provide Storm Drainage System, Asphalt Overlay, " and Extruded Asphalt Curb Provide Flap Gate Provide WQ Manhole September 2003 PLANNING LEVEL PROJECT COST OPINION COSTS FROM 2013 TUKWILA SURFACE WATER COMPREHENSIVE PLAN UPDATED USING THE ENGINEERING NEWS -RECORD CONSTRUCTION COST INDEX LOCATION: S. 143rd Street Storm Drain System BY: SJ DATE: 2/7/2024 PROJ. ID: (2013 Plan) 98641222 2013 Cost: $1,096,000 COST INDEX: 145.82% PROJ. ID: (2003 Plan) 86-DR22 2003 Cost: $757,000 Drainge issues in ROW of S 143 PI and S 143 St. Reduce DESC. ponding and provide runoff treatment. Install asphalt overlay, curb, pipe conveyance, and runoff treatment. Include flapgate at river to prevent flooding. ITEM NO. ITEM QUANTITY UNIT PRICE I PRICE AMOUNT 1 REMOVE/ABANDON PIPE 85 LF $ 23.00 $ 34.00 $ 2,890 PAVEMENT OVERLAY, ASPHALT CONCRETE CL B (S 2 143RD ST ANDS 143RD PL) 1,305 TN $ 63.00 $ 92.00 $ 120,060 WASHED DRAIN ROCK/STRUCTURAL FILL/PIPE 3 BEDDING 420 TN $ 26.00 $ 38.00 $ 15,960 4 CURB AND GUTTER, CEMENT AND CONC. (S 143RD ST) 2,300 LF $ 22.00 $ 32.00 $ 73,600 CEMENT CONCRETE SIDEWALK OR DRIVEWAY (S 5 143RD ST) 1,533 SY $ 40.00 $ 58.00 $ 88,914 6 CURB RAMP, CEMENT CONCRETE (S 143RD ST) 12 EA $ 489.00 $ 713.00 $ 8,556 7 CATCH BASINS, TYPE 1 8 EA $ 1,532.00 $ 2,234.00 $ 17,872 8 CATCH BASINS, TYPE 2 48"-54" 2 EA $ 4,353.00 $ 6,348.00 $ 12,696 9 STORMCEPTOR WQ MANHOLE (STC 4800)A 1 EA $ 53,000.00 $ 77,285.00 $ 77,285 18"-24" DIA. SMOOTH INTERIOR WALL CORROGATED 10 POLYETHENE IN PAVED AREA 500 LF $ 141.00 $ 206.00 $ 103,000 8"-12" DIA. SMOOTH INTERIOR WALL CORROGATED 11 POLYETHENE IN PAVED AREA 1,100 LF $ 81.00 $ 118.00 $ 129,800 12 TRENCH SAFETY SYSTEMS 16,000 SF $ 0.92 $ 1.00 $ 16,000 13 REGRADE EXISTING DITCH 500 LF $ 5.76 $ 8.00 $ 4,000 14 BIOSWALE SEEDING 4,000 SF $ 1.73 $ 3.00 $ 12,000 15 18" - 24" DIAMETER FLAP GATE 1 EA $ 3,455.00 $ 5,038.00 $ 5,038 16 UTILITY RELOCATIONS 1 LS $ 11,516.00 $ 16,793.00 $ 16,793 17 TEMPORARY BYPASS 1 LS $ 5,758.00 $ 8,396.00 $ 8,396 Material Subtotal in March 2012 $ 491,699 Material Subtotal in December 2023 $ 712,860 Other Items (% of Material Subtotal in December 2023 Dollars) 18 DEWATERING 5% $ 35,600 19 OTHER ITEMS 0% $ - 20 EROSION & SEDIMENTATION CONTROL 2% $ 14,300 21 TRAFFIC CONTROL 5% $ 35,600 22 CONTINGENCY 15% $ 106,900 23 MOBILIZATION (GENERAL REQUIREMENTS) 10% $ 71,300 24 CONSTRUCTION MANAGEMENT 20% $ 142,600 25 SALES TAX 10.1% $ 72,000 26 ENGINEERING/LEGAL/ADMIN 25% $ 178,200 29 PERMITTING 5% $ 35,600 Subtotal Other Items $ 692,100 Total Project Cost $ 1,404,960 2023 Dollars Total Estimated Project Cost (Rounded) $ 1,410,000 Notes: 1. The above cost opinion was developed by applying a construction cost index of 145.82% to the materials line items to escalate cost of materials from March 2012 to December 2023. 2. These costs do not account for design and material changes associated with updating the 2003 design to meet current stormwater standards for water quality and conveyance infrastructure. A. This product has now been replaced by the CDS3020-6-C, which costs $35,000 delivered to site in 2023 construction dollars PROJECT SUMMARY SHEET-98741202 Project Title: Nelsen PI/Longacres Phase 2 — Interceptor Pipe PROJ. ID: (2013 Plan) 98741202 PROJ. ID: (2003 Plan) None Location: South of 1-405, under BNSF railroad tracks on City boundary with Renton Project History: Phase 1 of the project was identified in the 2003 Tukwila Surface Water Management Comprehensive Plan and was constructed in 2015. Phase 2 of the project was identified in the 2013 Surface Water Comprehensive Plan, and the cost has been escalated for the 2024 SWCP using the construction cost index published by Engineering News -Record. The current sales tax rate has been used. Project Description: The proposed solution is to install a 48-inch stormwater pipe crossing underneath the Burlington Northern railroad tracks connecting to a previously installed interceptor east of the tracks. This 48-inch stormwater pipe will be constructed using trenchless techniques to minimize the impact to the operation of the railroad. This new pipe will provide drainage from the existing drainage ditch west of the tracks to the P-1 interceptor. Ownership, easement, and maintenance responsibility will be determined and/or verified prior to moving forward with this project. Justification: Because of development and increased surface water runoff, flooding is occurring in the right-of-way and on private property. The design objectives are reduction of stormwater ponding and peak flow rate. The project is located within the Burlington Northern Santa Fe (BNSF) corridor. Estimated Project Cost: $1,000,000 City of Tukwila Surface Water Comprehensive Plan January 2024 Project Sketch Nelson Place/Longacres Interceptor Pipe Provide Storm Drainage Pipe to P-1 Interceptor 176170.75 01 y.1062003006SEA . 67-ORO2 sum se 0612.07 . Or Existing Storm Drainage System (PI Interceptor) September 2003 PLANNING LEVEL PROJECT COST OPINION COSTS FROM 2013 TUKWILA SURFACE WATER COMPREHENSIVE PLAN UPDATED USING THE ENGINEERING NEWS -RECORD CONSTRUCTION COST INDEX LOCATION: Nelsen/Longacres - Phase 2 BY: MJT DATE: 2/7/2024 PROJ. ID: (2013 Plan) 98741202 2013 Cost: $ 678,000 COST INDEX: 145.82% PROJ. ID: (2003 Plan) N/A 2003 Cost: N/A Flooding in ROW and on private property. Proposed solution is 48-in stormwater pipe from ditch west of tracks using DESC. trenchless technique underneath BN tracks connecting to existing P-1 interceptor east of the tracks. Previous project phase completed in 2015 WVH to Nelsen. 2012 UNIT 2023 UNIT ITEM NO. ITEM QUANTITY UNIT PRICE PRICE AMOUNT 1 CATCH BASIN, TYPE 2 - 84-IN DIAM 1 EA $ 14,108.00 $20,572.00 $ 20,572 2 TEMPORARY BYPASS 1 LS $ 5,758.00 $ 8,396.00 $ 8,396 3 RAILROAD INSPECTOR 24 HR $ 58.00 $ 85.00 $ 2,040 42" DIA. SMOOTH WALL INTERIOR CORROGATED 4 POLYETHENE, JACK & BORE CONSTRUCTION 225 LF $ 1,025.00 $ 1,495.00 $ 336,375 5 JACKING AND RECEIVING PIT 1 EA $ 40,883.00 $59,616.00 $ 59,616 6 UTILITY RELOCATION 1 LS $ 11,516.00 $16,793.00 $ 16,793 Material Subtotal $ 443,792 7 DEWATERING 5% $ 22,200 8 OTHER ITEMS $ - 9 EROSION & SEDIMENTATION CONTROL 2% $ 8,900 10 TRAFFIC CONTROL 5% $ 22,200 11 CONTINGENCY 15% $ 66,600 Subtotal $ 563,692 12 MOBILIZATION (GENERAL REQUIREMENTS) 10% $ 56,400 Construction Subtotal $ 620,092 13 CONSTRUCTION MANAGEMENT 20% $ 124,000 14 SALES TAX 10.1% $ 62,600 15 ENGINEERING/LEGAL/ADMIN/PERMIT 25% $ 155,000 16 PERMITTING 5% $ 31,000 Project Subtotal $ 992,692 17 CONTINGENCY 0% $ - Subtotal $ - Total Project Cost $ 992,692 2023 Dollars Total Estimated Project Cost (Rounded) $ 1,000,000 Notes: 1. The above cost opinion was developed by applying a construction cost index of 145.82 % to the materials line items to escalate cost of materials from March 2012 to December 2023. PROJECT SUMMARY SHEET-99341208 Project Title: Soil Reclamation (Decant) Facility PROJ. ID: (2013 Plan) 99441202 PROJ. ID: (2003 Plan) N/A Location: TBD Project History: The project was identified in the 2013 Tukwila Surface Water Comprehensive Plan. The City has received a grant from the Washington Department of Ecology to propose and Enhanced Maintenance Program for the City's stormwater operations. This study will assess the usefulness, feasibility, cost, and potential locations for a decant facility. Project Description: The proposed solution is to build a soil reclamation facility within the City. This capital project consists of property acquisition for this facility. Justification: The City maintenance crews collect sediments during typical stormwater system maintenance work tasks such as street sweeping and cleaning out stormwater inlets and pipes. The City is lacking a formal facility to efficiently dewater, treat and dispose of the waste materials. Currently crews drive to Renton to dispose of decant from catch basin cleaning, stormwater system cleaning, and street sweeping. Estimated Project Cost: TBD City of Tukwila Surface Water Comprehensive Plan January 2024 PROJECT SUMMARY SHEET-90341214 Project Title: S 1461h St Pipe and 35th Ave S Drainage System PROJ. ID: (2013 Plan) 90341214 PROJ. ID: (2003 Plan) 03-DRO4 Location: S 1461h Street, west of Tukwila International Boulevard Project History: The project was identified in the 2003 Tukwila Surface Water Management Comprehensive Plan. The project sketch on the following page is excerpted from the 2003 plan. The project cost was updated for the 2013 Surface Water Comprehensive Plan and has been escalated again for the 2024 SWCP using the construction cost index published by Engineering News -Record. The current sales tax rate has been used. Project Description: Replace existing storm drainage system on S. 146th Street. Provide new storm drainage system for 35th Avenue S. Provide asphalt overlay and extruded asphalt curb for both streets. Justification: Reduce ROW and private property flooding by increasing the hydraulic capacity of the storm drainage system. Comments: Potential for LID/ND improvements are not included in estimated cost. Estimated Project Cost: $1,290,000 City of Tukwila Surface Water Comprehensive Plan January 2024 Project Sketch S. 146th Street Pipe and 35th Avenue S. Drainage System Replace Exist ng Storm Drainage System. Provide Asphalt Overlay and Extruded Asphalt Curb 176170.TS.01_W0020030O6SEA. 03-DR04 Sum sM 07-31-03. gr Existing Storm Drainage Syslem PLANNING LEVEL PROJECT COST OPINION COSTS FROM 2013 TUKWILA SURFACE WATER COMPREHENSIVE PLAN UPDATED USING THE ENGINEERING NEWS -RECORD CONSTRUCTION COST INDEX LOCATION: S 146th St Pipe and 35th Ave S Drainage System BY: SJ MJT 2/7/2024 PROJ. ID: (2013 Plan) 90341214 2013 Cost: $ 882,000 COST INDEX: 145.82% PROJ. ID: (2003 Plan) 03-DRO4 2003 Cost: $ 550,000 Flooding in ROW and private property along S. 146th St west DESC. of Tukwila Internmational Blvd (TIB). Proposed solution: asphalt overlay, curb, replace pipes along S. 146th Street and a segment of 35th Avenue South. Connect to pipe in TIB. 2012 UNIT 2023 UNIT ITEM NO. ITEM QUANTITY UNIT PRICE PRICE AMOUNT 1 CATCH BASIN TYPE 2 48"-54" 5 EA $ 4,353.00 $ 6,348.00 $ 31,740 2 CURB, EXTRUDED (ASPHALT OR CEMENT CONCRETE) 2,700 LF $ 9.00 $ 13.00 $ 35,100 3 TRENCH SAFETY SYSTEM 9,660 SF $ 1.00 $ 1.00 $ 9,660 4 TEMPORARY BYPASS 1 LS $ 5,758.00 $ 8,396.00 $ 8,396 5 PAVEMENT, ASPHALT CONCRETE CL B (QTY> 500) 1,062 TN $ 63.00 $ 92.00 $ 97,704 CORRUGATED POLYETHYLENE STORM SEWER PIPE, 8 - 6 12 IN. DIAM. 560 LF $ 93.00 $ 136.00 $ 76,160 CORRUGATED POLYETHYLENE STORM SEWER PIPE, 18 - 7 24 IN. DIAM 1,050 LF $ 162.00 $ 236.00 $ 247,800 8 REMOVE/ABANDON PIPE 1,000 LF $ 23.00 $ 34.00 $ 34,000 9 REMOVE/ABANDON CATCH BASIN 5 EA $ 345.00 $ 503.00 $ 2,515 10 UTILITY RELOCATION 1 LS $ 11,516.00 $ 16,793.00 $ 16,793 Material Subtotal $ 559,868 11 DEWATERING 5% $ 28,000 12 EROSION & SEDIMENTATION CONTROL 5% $ 28,000 13 TRAFFIC CONTROL 5% $ 28,000 14 CONTINGENCY 15% $ 84,000 Subtotal $ 727,868 15 MOBILIZATION (GENERAL REQUIREMENTS) 10% $ 72,800 Construction Subtotal $ 800,668 16 CONSTRUCTION MANAGEMENT 20% $ 160,100 17 SALES TAX 10.1% $ 80,900 18 ENGINEERING/LEGAL/ADMIN 25% $ 200,200 19 PERMITTING 5% $ 40,000 Project Subtotal $ 1,281,868 20 CONTINGENCY 0% $ - Subtotal Total Project Cost $ 1,281,868 2023 Dollars Total Estimated Project Cost (Rounded) $ 1,290,000 Notes: 1. The above cost opinion was developed by applying a construction cost index of 145.82% to the materials line items to escalate cost of materials from March 2012 to December 2023. PROJECT SUMMARY SHEET-CIP-1 Project Title: Norfolk Outfall Trunkline Sewer Separation Preliminary Feasibility Study Location: S Norfolk Street and E Marginal Way S Issue and Benefit Summary: Issue Benefit Water Quality Study could result in a project to decrease City stormwater flows to combined sewer and improve water quality of discharges from pipe Other Study will assist in determining the extent of City of Tukwila's potential responsibility for combined sewer overflows (CSOs) through the Norfolk CSO trunkline, which outfalls to a Superfund site on the Duwamish River, and will develop alternatives for reducing or removing the City's responsibility. Issue Description: The City of Tukwila (City) inherited an 84-in diameter combined sewer overflow (CSO) trunkline and outfall from King County Wastewater Treatment division in 1995 following a 1989 annexation of the area generally known as East Marginal Way (City of Tukwila Resolution No. 1302). The pipe runs northwest southeast along E Marginal Way S and then turns west continuing under a Boeing parking lot before outfalling into the Duwamish River at the S Norfolk Outfall. A combination of City of Tukwila, Boeing, and City of Seattle convey stormwater flows to the outfall. City of Seattle uses the outfall for emergency overflow of combined sewage. King County uses the outfall for conveying treated CSOs from the Henderson (Sewer) Pump Station. The City installed a stormwater trunkline along E Marginal Way S in the 1990s for the purpose of separating stormwater flows from both the combined sewer system and the adjacent private stormwater system owned by Boeing. However, City staff has anecdotal information that the connections of City stormwater laterals into the E Marginal Way S stormwater trunkline were not completed as designed, likely due to utility conflicts encountered in the field. No construction drawings documenting the ultimate system configuration have been located. Therefore, the City is aware that its existing records of the storm system in this location, such as engineering drawings and GIS mapping, are incomplete or incorrect. The lack of accurate information about the City's connections to the combined sewer trunkline and the Boeing system leaves the City at risk of being held partially responsible for the effects of sewer overflows carried by the Norfolk trunkline or violations of Boeing's National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater Permit. See Figure 1 for the combined sewer system and stormwater drainage system drawn based on conversations with City staff. In 2001, the United States Environmental Protection Agency (EPA) designated the Lower Duwamish Waterway (LDW) as a Superfund site, and in -water cleanup actions commenced and are ongoing. A cleanup of contaminated river sediments associated with the Norfolk CSO outfall was an early action. City staff are aware of a later study (author and date not found) which indicated that the river sediments had become polluted again with PCBs in the vicinity of the Norfolk outfall. EPA has designated the Washington State Department of Ecology (Ecology) the lead agency for controlling upland sources of contamination entering the LDW through source control, which includes controlling CSOs. Ecology works with various public agencies and potentially responsible parties to conduct source control activities and enforcement in the drainage basin. Ecology has reportedly contacted the City about sharing responsibility City of Tukwila Surface Water Comprehensive Plan January 2024 Norfolk Trunkline Sewer Separation Preliminary Feasibility Study for the CSOs. City staff have reported that a later study found the City's contribution to the resuspension of PCBs in the Duwamish River to be insignificant; however the study has not been located. The City would like to avoid the risk of being found partially responsible for costs associated with Superfund site cleanup. Therefore, the City would like to separate its stormwater completely from combined sewer in this area and turn the S Norfolk CSO pipeline and outfall back over to King County or to City of Seattle, which use it to convey overflows of combined sewage. Project Description: The project is a preliminary feasibility study to document the City's and adjacent private property storm drainage systems within the right-of-way and the CSO system in the area within the City boundary, document any City storm drain connections to the CSO line, and evaluate risks and alternative solutions if connections of the City's storm drains to the CSO trunkline and private systems are discovered. A study of this area will include survey of the existing storm system inverts, connections, and potholes to locate existing utilities that may be impacted by a future project. Small scale smoke studies will also be used to identify connections to the sewer trunk line. The City will also need to review documentation and meet with Boeing and Ecology to identify portions of the private Boeing stormwater system that are both within in E Marginal Way S and regulated under Boeing's industrial stormwater permit. The study will include an alternatives analysis that compares the feasibility, implementation costs, and benefits of: Removing the City's stormwater connections to the sewer trunkline, if any are found, and installing a separate stormwater system, • Providing water quality treatment for the stormwater prior to connecting to the sewer overflow trunkline where separation is infeasible, and/or • Conveying stormwater from S Norfolk St to a parcel on the west side of E Marginal Way S to be treated and pumped over the sewer trunkline to connect to the separated storm system to the south. An important element of the alternatives analysis will include coordination with King County, City of Seattle, Boeing, Ecology, and the nearby business owners and utility agencies, at a minimum. Next Steps: 1. Collect and review as-builts and agreements from nearby industries regarding connections into the CSO trunkline. 2. Perform surveying and smoke testing of the existing system to determine which sections of storm pipe connect to the combined sewer and the elevations of the existing system. 3. Perform surveying and potholing of utilities in the area to determine type, size, location and elevations of utilities such as water, telecommunications, etc. 4. Conduct the alternatives analysis described above. Each alternative will include a concept layout and implementation cost. 5. Select preferred alternative through coordination with interested parties. Future Steps (not included in cost estimate below): 1. Hydrologic and hydraulic analyses, including capacity analysis, of the preferred solution. 2. Design, development, and implementation costs of the preferred solution. 3. Permitting costs related to preferred solution. 4. Coordination with interested parties relating to implementation of preferred solution. 5. Maintenance of existing trunklines if needed to implement solution. 6. Negotiation with jurisdictions to turn ownership of the CSO trunkline and the S Norfolk Outfall over from City of Tukwila to King County or City of Seattle. City of Tukwila Surface Water Comprehensive Plan January 2024 Norfolk Trunkline Sewer Separation Preliminary Feasibility Study Scope Items and Estimated Cost: Scope Desktop analysis of existing system, including records research $25,000 Survey existing system and smoke testing $50,000 Meetings with interested parties including Ecology and Boeing + Outreach for Smoke $40,000 Testing + Engagement to Select Preferred Alternative Alternatives analysis using elevation and topographic data + associated documentation $40,000 Estimated Project Cost: $155,000 Related Projects: None. References: Agreement for Use of Boeing -Owned Storm Water System by City of Tukwila, March 28, 1994 City of Tukwila, Washington, Resolution No. 1302, August 1, 1994 Fact Sheet for NPDES Permit WA0029181, West Point Wastewater Treatment Plan and Combined Sewer Overflows, Public Notice Draft dated April 5, 2023, by Washington Department of Ecology. Lower Duwamish Waterway Seattle, WA (Superfund Site) EPA home page, (https://cumulis.epa.gov/supercpad/cursites/csitinfo.cfm?id=1002020), accessed November 1, 2023 Lower Duwamish Waterway Seattle, WA (Superfund Site) Cleanup Activities web page, (https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=1002020), accessed November 1, 2023 Norfolk Regulator Station Overflow Sediment Remediation Project web page, (https://kingcounty.gov/en/dept/dnrp/waste-services/wastewater-treatment/programs/sediment- manaqement/plan-implementation/norfolk), accessed November 1, 2023 Seattle's Source Control Plan for the Lower Duwamish Waterway (2021-2026) December 2020 Update City of Tukwila Surface Water Comprehensive Plan January 2024 a U 0 0 U a 2 DESKTOP ANALYSIS TO EXTEND TO S 96TH PLACE ANTICIPATED SURVEY EXTENTS WITHIN ROW E MARGINAL WAYS TRUNKLINE BOEING PARKING PARCEL RECOMMENDED BY LOT - CITY FOR PUMPING NORFOLK STORMWATER AND TREATMENT ss E MARGINAL WAY S TRUNKLINE GOES OVER/THROUGH COMBINED SEWER PIPE SUPERFUND SITE DUWAMISH RIVER LEGEND SS . EWE S 102ND ST E MARGINAL WAY S TRUNKLINE DRAINS TO OUTFALL TO THE SOUTH NEAR TAVERN 2 FT CONTOURS TAXLOTS STREAM/CREEK EXISTING STORM PIPE EXISTING STORM STRUCTURE EXISTING COMBINED SEWER PIPE 60" NORFOLK SEWER PIPE PROLOGIS� 84" KING COUNTY CCOMBINED SEWER OVERFLOW PIPE 0 200 400 SCALE IN FEET Otak CIP 1 Tukwila Surface Water Comprehensive Plan Norfolk Trunkline Sewer Separation Preliminary Feasibility Study PROJECT SUMMARY SHEET-CIP-2 Project Title: S Ryan Way Pipe Rehabilitation Location: Along S Ryan Way, between the intersection of Beacon Avenue S and Martin Luther King Jr Way S Issue and Benefit Additional Summary: Issue Benefit Poor condition of existing Avoids failure of existing stormwater system and potential road stormwater system safety hazards along the steep street. Issue Description: S Ryan Way is an arterial providing access to 1-5. In Tukwila, the S Ryan Way roadway corridor is approximately 0.3 miles long between the intersections of Beacon Avenue S and Martin Luther King Jr Way S and has approximately 1,830 LF of 12-in diameter storm pipe, 1,300 LF of 18-in diameter storm pipe, and 28 catch basins, based on the City of Tukwila's GIS data. Field observation will need to be performed to confirm that all 28 catch basins are defined accurately by GIS. Based on field observation by the City, storm pipes within S Ryan Way are aging, in poor condition, and are at risk of failure. All existing storm pipes are corrugated metal pipe and are susceptible to corrosion and pipe breakage. It is a priority to replace the storm system within S Ryan Way before a failure occurs, to avoid potential road safety hazards along the steep arterial street. The existing pavement on S Ryan Way is reportedly in poor condition, and the roadway lacks bike lanes. The Public Works Department is considering implementing an asphalt overlay or a full roadway improvement, including reconstruction of roadway and sidewalks. Project Description: This project proposes to replace or repair all existing 12-in and 18-in diameter storm sewer pipes and catch basins within S Ryan Way in coordination with an eventual overlay or reconstruction. Phase 1 The Public Works Department has completed some CCTV inspection of the conveyance pipes to determine their condition. In the first phase of the project, the CCTV videos will be reviewed, and additional CCTV inspections may be completed if needed. If the damage to the pipe is extensive and there is breakage in the pipe, a full replacement will be necessary (see Alternative 1). If the existing storm pipe is deteriorating but is still whole, then the pipe can be repaired using cured -in -place -pipe (CIPP) lining technology (see Alternative 2). Phase 2 (Alternative 1) Alternative 1 is full replacement of pipes, performed in coordination with a roadway improvement project to overlay or reconstruct the roadway. All catch basins with 12-in diameter pipe connections are proposed to be replaced with Catch Basin, Type 1, and all catch basins with 18-in diameter pipe connections are proposed to be replaced with Catch Basin, Type 2. City of Tukwila Surface Water Comprehensive Plan January 2024 S Ryan Way Pipe Rehabilitation Phase 2 (Alternative 2) Alternative 2 includes cleaning all existing storm pipe in the roadway and then repairing deteriorated pipe using CIPP lining. All catch basins with 12-in diameter pipe connections are proposed to be replaced with Catch Basin, Type 1 and all catch basins with 18-in diameter pipe connections are proposed to be replaced with Catch Basin, Type 2. Assumptions • Roadway improvements (either full roadway improvements or asphalt overlay) would begin at the intersection of Beacon Avenue S and end at Martin Luther King Jr Way S. The same limits were assumed for the repair or replacement of the existing storm system. • Roadway improvements, including pavement restoration or repaving after trenching for pipe placement, will be part of a different City of Tukwila capital improvement project. Costs of roadway improvements are not estimated in this fact sheet. • The roadway improvements will not significantly change drainage patterns, therefore existing storm alignment and catch basin locations will remain. • There will only be one construction phase for the project. Conveyance Analysis The preliminary drainage basin (approximately 15.7 acres) along S Ryan Way was delineated based on the City's GIS storm system, contour data, and aerial imagery. Preliminary calculations confirm that the existing conveyance pipes have adequate capacity to convey flows from the contributing drainage basin. A more in-depth analysis of the pipe conveyance system in later design phases is recommended to confirm that pipes diameters do not need to be increased. Future Consideration: If the City decides to construct full roadway improvements along S Ryan Way, this may trigger stormwater requirements for flow control and runoff treatment. This project does not address flow control or runoff treatment for new or replaced surfaces. Estimated Project Cost: Alternative 1: $ 840,000 Alternative 2: $ 680,000 The project cost estimate assumes that the stormwater pipe replacement or rehabilitation is implemented as a part of the City's roadway improvement project on S Ryan Way. Therefore, costs such as permitting, construction management, mobilization, erosion & sedimentation control, traffic control, and pavement surface restoration or paving are assumed to be paid for by the roadway improvement project. Related Projects: None. References: City of Tukwila Ryan Hill Neighborhood Study, March 2018 City of Tukwila Surface Water Comprehensive Plan January 2024 S Ryan Way Pipe Rehabilitation Photographs: Typical roadway section of S Ryan Way, showing cracked roadway * Photo from Google Earth Street View City of Tukwila Surface Water Comprehensive Plan January 2024 PLANNING LEVEL PROJECT COST OPINION PROJECT: CIP-2, S Ryan Way Pipe Rehabilitation, Alternative 1 BY: FJS LOCATION: Along S Ryan Way, between the intersection of Beacon Avenue S and Martin Luther King Jr Way S DATE: 11/7/2023 DESC. Full replacement of stormwater pipes and catch basins along S Ryan Way, between the intersection of Beacon Avenue S and Martin Luther King Jr Way S ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 0% Of Total Construction $ - 2 ENGINEERING 15% Of Total Construction $ 102,900 3 SURVEY 2% Of Total Construction $ 13,800 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 34,300 Total Design $ 151,000 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 0% Of Total Construction $ - Total Construction Management $ - CONSTRUCTION Construction Elements 7 STORM PIPE, 12 IN. DIAM. 1,830 LF $ 120 $ 219,600 8 STORM PIPE, 18 IN. DIAM. 1,300 LF $ 150 $ 195,000 9 CATCH BASIN, TYPE 1 17 EA $ 3,200 $ 54,400 10 CATCH BASIN, TYPE 2 11 EA $ 5,000 $ 55,000 Subtotal Construction Elements $ 524,000 Required Ancillary Construction Items 11 MOBILIZATION 0% Of Construction Elements $ - 12 TEMPORARY WATER MANAGEMENT 15% Of Construction Elements $ 24,300 13 EROSION & SEDIMENTATION CONTROL 0% Of Construction Elements $ - 14 TRAFFIC CONTROL 0% Of Construction Elements $ - 15 PLANNING LEVEL CONSTRUCTION CONTINGENCY 20% Of Total Construction $ 137,100 Subtotal Ancillary Items $ 161,400 Total Construction $ 685,400 Total Project Cost $ 836,400 2023 Dollars Total Estimated Project Cost (Rounded) $ 840,000 Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. If escalation is required, we recommend including 3%/yr. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. 3. Property acquisition costs are not included in this estimate. 4. Permitting, Construction Management, Mobilization, Erosion & Sedimentation Control, and Traffic Control costs will be part of the roadway improvements, and are not included in this estimate. 5. Survey only includes the surveying of the existing stormwater system. 6. Storm pipe costs do not include asphalt because repaving is assumed to be part of the roadway improvements. PLANNING LEVEL PROJECT COST OPINION PROJECT: CIP-2, S Ryan Way Pipe Rehabilitation, Alternative 2 BY: FJS LOCATION: Along S Ryan Way, between the intersection of Beacon Avenue S and Martin Luther King Jr Way S DATE: 11/7/2023 DESC. CIPP lining of pipes and catch basin replacement along S Ryan Way, between the intersection of Beacon Avenue S and Martin Luther King Jr Way S ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 0% Of Total Construction $ - 2 ENGINEERING 15% Of Total Construction $ 81,800 3 SURVEY 3% Of Total Construction $ 16,400 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 27,300 Total Design $ 125,500 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 0% Of Total Construction $ - Total Construction Management $ - CONSTRUCTION Construction Elements 7 12" STORMPIPE REHABILITATON (CIPP) 1,830 LF $ 100 $ 183,000 8 18" STORMPIPE REHABILITATON (CIPP) 1,300 LF $ 120 $ 156,000 9 CATCH BASIN, TYPE 1 17 EA $ 3,200 $ 54,400 10 CATCH BASIN, TYPE 2 11 EA $ 5,000 $ 55,000 Subtotal Construction Elements $ 448,400 Required Ancillary Construction Items 11 MOBILIZATION 0% Of Construction Elements $ - 12 TEMPORARY WATER MANAGEMENT 15% Of Construction Elements $ 14,500 13 EROSION & SEDIMENTATION CONTROL 0% Of Construction Elements $ - 14 TRAFFIC CONTROL 0% Of Construction Elements $ - 15 PLANNING LEVEL CONSTRUCTION CONTINGENCY 15% Of Total Construction $ 81,800 Subtotal Ancillary Items $ 96,300 Total Construction $ 544,700 Total Project Cost $ 670,200 2023 Dollars Total Estimated Project Cost (Rounded) $ 680,000 Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. If escalation is required, we recommend including 3%/yr. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. 3. Property acquisition costs are not included in this estimate. 4. Permitting, Construction Management, Mobilization, Erosion & Sedimentation Control, and Traffic Control costs will be part of the roadway improvements, and are not included in this estimate. 5. Survey only includes the surveying of the existing stormwater system. 6. Costs for stormpipe rehabilitation (CIPP) assumes moderate cleaning of the pipe. Price can vary depending on the quality of the pipe, and how much cleaning is required. 7. Storm pipe costs do not include asphalt because repaving is assumed to be part of the roadway improvements. 0 a 3 3 0 PHASE 1: REVIEW EXISTING CCTV FOOTAGE AND • OBTAIN ADDITIONAL CCTV INSPECTION OF EXISTING 12" r►_ AND 18" STORM PIPES AS APPLICABLE. — - PHASE 2 (ALTERNATIVE 1): REPLACE ALL CATCH BASINS AND STORM PIPES. PHASE 2 (ALTERNATIVE 2): REPLACE ALL CATCH BASINS AND REHAB ALL STORM LINES USING CURED IN PLACE PIPE. D z r c H m z c-) D — CONNECT TO EXISTING 18" PIPE — PROPOSED CATCH BASIN, TYPE 2, TYP. (REPLACE EXISTING) PROPOSED 18" STORM PIPE, TYP. (REPLACE/REHAB � IN EXISTING) rib b ���� `""� SUB BASIN il j1 ` i1j ,-�j INFLOW AREA= tO � �� 1.8AC ' 0 41/11,40 ! -- rr ., v.'1 -1--- tij —< —m Ln SUB BASIN INFLOW AREA= 6.1 AC SUB BASIN INFLOW AREA= 2.2 AC LEGEND 2 FT CONTOURS TAXLOTS STREAM/CREEK EXISTING STORM PIPE EXISTING STORM STRUCTURE 11IMI/11111111 SUB BASIN INFLOW AREA= 0.9 AC 4 SUB BASIN INFLOW AREA= 4.0 AC PROPOSED 12" STORM PIPE, TYP. (REPLACE/REHAB EXISTING) SUB BASIN INFLOW AREA= 0.7 AC S 107TH ST is PROPOSED CATCH BASIN, TYPE 1, TYP. (REPLACE EXISTING) ii jI1 liii' 10 250 500 SCALE IN FEET • PROPOSED CATCH BASIN, TYPE 2 ■ D SD D SD (REPLACE EXISTING) PROPOSED CATCH BASIN, TYPE 1 (REPLACE EXISTING) PROPOSED 12" STORM PIPE (REPLACE/REHAB EXISTING PIPE) PROPOSED 18" STORM PIPE (REPLACE/REHAB EXISTING PIPE) Otak C I P-2 Tukwila Surface Water Comprehensive Plan S Ryan Way Pipe Rehabilitation PROJECT SUMMARY SHEET-CIP-3 Project Title: Fort Dent Park Water Quality Retrofit Location: Fort Dent Park/Starfire Sports Ballfields (parcel # 2323049001) Issue and Benefit Summary: Issue Water Quality Benefit Addresses 6PPD-q, an emerging stormwater contaminant of concern, and removes pollutants from untreated urban stormwater runoff. Issue Description: Under existing conditions stormwater from artificial turf fields in Fort Dent Park (Park) is collected and discharged into the Fort Dent pond. The Park is owned by the City, and the sports fields are leased by Starfire Sports. The Park is separated and protected from the Green River by a levee and the Burlington Northern railroad embankment. Due to the proximity of the Green River, and the flat topography of the area, the stormwater pond is at similar elevation to the river. Therefore, pumps are required to discharge outflow from the pond during high stages of the river. No water quality treatment was installed for development of four northern and four southern artificial turf fields (Essayons Consulting Engineers, Inc., 2003). The artificial turf fields are made up of ground rubber, which may leach 6PPD-q', an emerging stormwater contaminant of concern that is known to cause fish mortality. Project Description: This project looks at implementing two alternative solutions. Alternative 1 is a simple low-cost solution to begin addressing 6PPD-q based on recent research. Alternative 2 provides more robust long-term treatment using proprietary stormwater treatment vaults. Alternative 1 is the addition of Bioretention Urban Retrofits (BURitos) to the existing detention pond. BURitos are filtration devices that consist of a non-proprietary filter media wrapped in a high -density polyethylene sock. The media is composed of a compost and sand bioretention mix. Runoff is filtered as it flows horizontally through the device. BURitos were developed and tested by the City of Bellevue in concert with Cedar Grove VIS Systems® in 2019 (see photograph below). This solution has low capital costs, uses natural materials, and supports innovation. In Alternative 1, BURitos will be installed adjacent to the pump outlet in the southwest corner of the pond, and they will be keyed into the slope to hold them in place. The length and number of BURitos will be quantified during design based on survey of topography near the outlet. In the test installation, the polyethylene material used as the sock for the BURito began to break down over the span of a year due to UV degradation. Alternative materials or shading methods should be considered in the design. Alternative 2 is the installation of proprietary stormwater treatment vaults approved by Washington State Department of Ecology (Ecology). The contributing basins were delineated based on as -built drawings. The northern basin (containing Fields 9-12) has approximately 8.85 acres of impervious area, while the southern basin (containing Fields 1-4) has approximately 8.0 acres of impervious area. At this preliminary level of design, the peak 15-minute off-line water quality flow rates of 0.81 cubic feet per second (cfs) and 0.75 cfs were generated for the northern and southern basins, respectively, using the latest version of the 1 6 p-Phenylenediamine quinone City of Tukwila Surface Water Comprehensive Plan January 2024 Fort Dent Park Water Quality Retrofit Western Washington Hydrology Model (WWHM2012). A facility managing these flow rates would provide runoff treatment of the two basins equal to current standards. Contech Engineered Solutions' Modular Wetlands® (MWS) Linear Stormwater Treatment System was used to calculate the estimated facility sizes and project cost. One study has described the MWS technology as having a moderate potential to treat 6PPD-q based on its treatment mechanism (Ecology, 2022). The facility sizes were calculated using the basin size, peak flow rate, and other considerations such as available space. Based on the required flow rates, each basin will require two 8-ft x 16-ft vaults. The facilities are sized to provide enhanced treatment (removal of fine sediment and dissolved metals) in accordance with Ecology's General Use Level Designation (GULD) for the MWS. Other GULD approved technologies that provide enhanced treatment and which are considered likely to remove 6PPD-q may be considered during final design. The existing stormwater trunklines draining from the fields to the pond will be retrofitted with the MWS systems. In each basin, a flow splitter will divide flow equally between two MWS vaults working in parallel. Additional pipes and structures will be required direct flow to each vault and to return treated runoff back to the existing stormwater pipes. Pollutants Addressed: The project will remove sediment, dissolved metals, and 6PPD-q from stormwater runoff. Future Considerations: As an emerging pollutant of concern that is known to cause fish mortality, 6PPD-q is being studied closely in Washington State. Ecology has neither established standards for concentrations of 6PPD-q in surface waters nor approved any best management practices (BMPs) for removing it from runoff. Preliminary studies have shown that some biofiltration technologies are successful in removing 6PPD-q from runoff. Over the next several years, Ecology could establish a water quality standard, approve BMPs, issue design guidance, or incorporate requirements for removal of 6PPD-q from runoff into permits. Future development of this CIP will need to consider the state of the science and regulations on 6PPD-q in runoff at the time of implementation. Both City staff and stakeholders have hypothesized that the artificial turf fields in Fort Dent Park are a source of 6PPD-q, but the City has not confirmed the hypothesis. Before implementing this CIP, the City may want to consider monitoring runoff from the fields for 6PPD-q. Because of the intense local interest in studying the chemical, the City may have the opportunity to partner with a research institution to perform the initial study and any longer -term monitoring studies which may be advantageous based on initial results. Information obtained from a monitoring study could help the community understand the relationship between artificial turf and 6PPD-q and assist in evaluating BMPs to remove it. It is recommended that the City look for study partners before implementing either alternative because a study could demonstrate that 6PPD-q is not discharged from the fields, or study design may guide the choice of a solution. Otherwise, it is recommended that the City begin with Alternative 1 and consider Alternative 2 if the BURito fails or if new research reverses the findings that the BURito device filters 6PPD-q. Maintenance Considerations: BURitos may need to be replaced every 2-3 years based on the testing at the City of Bellevue facility. The City currently owns MWS systems and has experience in their operation and maintenance. Funding: A research study of the 6PPD-q concentrations at different flows, over a longer period, or in influent and effluent from BMPs at the site could qualify for funding from the United States Environmental Protection Agency (EPA), Puget Sound Partnership, Ecology, or conservation organizations. The City could contact potential research partners or funders through Ecology's Stormwater Action Monitoring City of Tukwila Surface Water Comprehensive Plan January 2024 Fort Dent Park Water Quality Retrofit (SAM) collective, Ecology's Stormwater Grants of Regional or Statewide Significance (GROSS), or a presumed future Environmental Justice and Puget Sound Ecosystem Recovery grant program funded by EPA's Puget Sound Recovery National Program Office. Design and construction of MWS or other Ecology -approved stormwater facilities for this project could qualify for funding under Ecology's Water Quality Combined Funding Program. The City could also explore partnering with private entities. Contech, the manufacturer of MWS, could be interested in piloting a demonstration site where 6PPD-q removal efficacy could be studied. Starfire Sports could be interested in a funding partner if it is found that the artificial turf I is a source of 6PPD-q in runoff. Estimated Project Cost, Alt 1: $90,000 Alternative 1 does not need complex engineering. To implement it, the City could include the project in its Annual Storm Drainage Program. This alternative might not be eligible for Ecology's Water Quality Combined Funding Program and may need to be financed through City funds, Ecology's SAM program, or other avenues discussed above. Estimated Project Cost, Alt 2: $1,745,000 The estimated cost for Alternative 2 includes design and construction of four proprietary stormwater treatment vaults. To distribute costs over several years, the project could be phased. To reduce overall costs, the City could install fewer or smaller MWS systems. Photographs: ti- - LOCATION OF KEYED -IN BIORETENTION URBAN RETROFIT APPROX LOCATION OF POND OUTLET Proposed location of BURito on photograph of Fort Dent Pond Outlet from site visit, October 2023. City of Tukwila Surface Water Comprehensive Plan January 2024 Fort Dent Park Water Quality Retrofit BURito application in Bellevue from "Roads to Ruin Will Water Quality Retrofits Save Salmon?" report authored by Jenifer McIntyre. Bibliography: Cedar Grove Composting. (accessed November 2023). Cedar Grove VIS Systems® web page. https://cedar-grove.com/cedar-grove-vis-stormwater-systems Essayons Consulting Engineers, Inc. (May 2003). Technical Information Report for Starfire Fields at Fort Dent Park. McIntyre, Jenifer. (July 2021). Roads to Ruin; Will Water Quality Retrofits Save Salmon? Report to King County WaterWorks Grant Program. Washington State University. https://www.wastormwatercenter.org/wp-content/uploads/BU Rito-Report-Final-July-2021.pdf Navickis-Brasch, Aimee S., et. al. (June 2022). Storm water Treatment of Contaminants Best Management Practices Effectiveness, Final Report. Washington State Department of Ecology. https://fortress.wa.gov/ecy/ershare/wq/Permits/Flare/2019SWMMWW/Content/Resources/DocsForpownl oad/2022 SWTreatmentOfTireContaminants-BMPEffectiveness.pdf Puget Sound Recovery National Program Office. (accessed December 2023). Funding Availability for Ensuring Environmental Justice, Human Wellbeing, and Ecosystem Recovery in Puget Sound web page. United States EPA. https://www.epa.gov/puqet-sound/funding-availability-ensurinq-environmental-'ustice- human-wellbeing-and-ecosystem City of Tukwila Surface Water Comprehensive Plan January 2024 PLANNING LEVEL PROJECT COST OPINION PROJECT: CIP-3, Fort Dent Park Water Quality Retrofit, Alternative 1 BY: CDD LOCATION: Fort Dent Park (parcel # 2323049001) DATE: 11/21/2023 DESC. Install Bioretention Urban Retrofits (BURitos) in pond for stormwater runoff treatment retrofit ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 1 LS $ - 2 ENGINEERING 25% Of Total Construction $ 14,300 3 SURVEY 10% Of Total Construction $ 5,700 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 2,900 Total Design $ 22,900 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 10% Of Total Construction $ 5,720 Total Construction Management $ 5,720 CONSTRUCTION Construction Elements 7 BIORETENTION URBAN RETROFIT LS 1 $ 25,000 $ 25,000 Subtotal Construction Elements $ 25,000 Required Ancillary Construction Items 8 MOBILIZATION 10% Of Construction Elements $ 2,500 9 TEMPORARY WATER MANAGEMENT 20% Of Construction Elements $ 5,000 10 EROSION & SEDIMENTATION CONTROL 20% Of Construction Elements $ 5,000 11 TRAFFIC CONTROL 10% Of Construction Elements $ 2,500 12 PLANNING LEVEL CONSTRUCTION CONTINGENCY 30% Of Total Construction $ 17,200 Subtotal Ancillary Items $ 32,200 Total Construction $ 57,200 Total Project Cost $ 85,820 2023 Dollars Total Estimated Project Cost (Rounded) $ 90,000 Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. PLANNING LEVEL PROJECT COST OPINION PROJECT: CIP-3, Fort Dent Park Water Quality Retrofit, Alternative 2 BY: CDD LOCATION: Fort Dent Park (parcel # 2323049001) DATE: 11/21/2023 DESC. Construct underground proprietary runoff treatment systems ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 1 LS $ 15,000 $ 15,000 2 ENGINEERING 15% Of Total Construction $ 196,100 3 SURVEY 2% Of Total Construction $ 26,200 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 65,400 Total Design $ 302,700 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 10% Of Total Construction $ 130,800 Total Construction Management $ 130,800 CONSTRUCTION Construction Elements 7 STORM SEWER PIPE, 12 IN. DIAM 340 LF $ 190 $ 64,600 8 MANHOLE 48 IN. DIAM. TYPE 1 8 EA $ 8,240 $ 65,920 9 MANHOLE 60 IN. DIAM. TYPE 3 W/ FLOW SPLITTER 2 EA $ 20,000 $ 40,000 10 PROPRIETARY UNDERGROUND STORMWATER VAULT* 4 EA $ 170,000 $ 680,000 Subtotal Construction Elements $ 850,520 Required Ancillary Construction Items 11 MOBILIZATION 10% Of Construction Elements $ 85,100 12 TEMPORARY WATER MANAGEMENT 5% Of Construction Elements $ 42,500 13 EROSION & SEDIMENTATION CONTROL 5% Of Construction Elements $ 42,500 14 TRAFFIC CONTROL 3% Of Construction Elements $ 25,500 15 PLANNING LEVEL CONSTRUCTION CONTINGENCY 20% Of Total Construction $ 261,500 Subtotal Ancillary Items $ 457,100 Total Construction $ 1,307,620 Total Project Cost $ 1,741,120 2023 Dollars Total Estimated Project Cost (Rounded) $ 1,745,000 * For estimating purposes, a Contech Modular Wetlands® 8'x16'x8' Linear Stormwater Bioretention Unit is assumed. Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. U 0 U F- U W 0 a 0 2 ALTERNATIVE 2: INSTALL FLOW SPLITTER AND 2 PROPRIETARY UNDERGROUND STORMWATER VAULTS EXISTING STORMWATER OUTLET PIPE EXISTING PUMP SYSTEM LEGEND t • • FIELD 12 — NORTHERN BASIN FIELD 11 FIELD 10 FIELD 9 ,-• EXISTING STORM FROM FIELD UNDERDRAINS DETENTI POND FIELD 4 FIELD 3 a EXISTING STORM1 FIELD 2 FROM FIELD UNDERDRAINS SOUTHERN BASIN TAXLOTS EXISTING STORM PIPE BASIN DIRECTION OF FLOW PROPOSED IMPROVEMENT FIELD 1 ALTERNATIVE 1: TRENCH IN BIORETENTION URBAN RETROFITS (BURITOS) NEAR POND OUTLET ALTERNATIVE 2: INSTALL FLOW SPLITTER AND 2 PROPRIETARY UNDERGROUND STORMWATER 0_,VAULTS 2 300 600 SCALE IN FEET Otak %A\ C I P-3 Tukwila Surface Water Comprehensive Plan Fort Dent Park Water Quality Retrofit PROJECT SUMMARY SHEET-CIP-4 Project Title: Tukwila Parkway / Gilliam Creek Outfalls Stormwater Improvements Location: Tukwila Parkway at Andover Park West Issue and Benefit Summary: Issue Benefit Water Quality Provides runoff treatment for untreated stormwater runoff from high traffic road and highly impervious area. Access to Inspect and Maintain City Storm System The addition of flapgates on the 48-in diameter and the 30-in diameter storm pipes will isolate the pipes from the downstream 108-in diameter Washington State Department of Transportation (WSDOT) culvert under the 1-405 freeway to allow the City of Tukwila to inspect and maintain the 48-in diameter and the 30-in diameter storm pipes. Issue Description: A 48-in diameter City stormwater pipe in Andover Park W and a 30-in diameter City stormwater pipe between the driveways of iFly Indoor Skydiving and Lowes both discharge to an existing 108-in diameter Washington State Department of Transportation (WSDOT) pipe that conveys Gilliam Creek in the 1-405 right-of-way. As -built drawings of the 48-in diameter pipe from 1980 show that it is about 10-ft deep. As- builts of the 30-in diameter pipe have not been located and the alignment, connection type, and ownership have been assumed. The flow line of the WSDOT pipe is approximately 1.6 ft above that of the City pipes. This results in backwater to Strander Blvd in high flows and prevents inspection of the City's pipes. In addition, flows conveyed by these stormwater pipes do not receive runoff treatment. Project Description: The project expands the scope of CIP 91241205 in the City's 2021-2026 Capital Improvement Program and updates the costs. The existing 48-in diameter manhole will be replaced with an 84-in diameter manhole in Andover Park W just south of the intersection with Tukwila Parkway. A flapgate will be installed on the outgoing pipe. A manhole will be constructed over the 30-in diameter pipe on the south side of Tukwila Parkway and a flapgate installed. As a part of this project, ownership of the pipe should be confirmed. If the pipe is currently privately owned, the ownership and maintenance should be transferred to the City. To move forward with design of these structures, additional information on the inverts of the pipes and CCTV inspections to determine pipe alignments and conditions will be required. The City has completed preliminary CCTV inspections, which will be reviewed during the design process. These structures are in the Southcenter subarea within the Gilliam basin, which has complicated hydraulics, and the flapgate design will need to analyze impacts of installation and develop flapgate settings. This analysis could be included with this project or as a part of the Surface Water Comprehensive Plan 2024 Update CIP-103, P17 Pond and Southcenter Regional Hydraulic Study, if it proceeds first. It is desirable to add runoff treatment in the basin draining to Gilliam Creek. Runoff treatment will be provided upstream by replacing the existing catch basins with treatment catch basins. Tukwila Parkway has an average daily traffic (ADT) count over 19,000 cars per 2010 data. According to the King County 2021 Surface Water Design Manual, a facility receiving more than 50% of its runoff from a road with an ADT over 2,000 is required to provide Enhanced Basic Water Quality treatment. Although retrofits do not City of Tukwila Surface Water Comprehensive Plan January 2024 Tukwila Parkway/Gilliam Creek Outfalls Stormwater Improvements have to achieve the same standards, the City would like to provide Enhanced Basic Water Quality treatment. Contech Engineered Solutions' Modular Wetlands® (MWS) Linear Stormwater Treatment System was used to calculate the estimated runoff treatment facility size and cost. This technology has received a General Use Level Designation (GULD) from Washington Department of Ecology (Ecology) for runoff treatment; other GULD approved technologies may be considered during final design. The City currently owns MWS facilities and has experience in their operation and maintenance. The existing grated inlets along Tukwila Parkway will be replaced with the grated MWS. The smallest grated MWS is 4-ft x 8-ft and has a maximum treatment flowrate of 0.115 cfs. Preliminary drainage basins were delineated based on City GIS storm system and contour data. The four contributing basins range between 0.5 acre to one acre of impervious area. At this preliminary level of design, the peak 15-minute off-line water quality flow rate generated by the largest basin as calculated using the latest version of the Western Washington Hydrology Model (WWHM2012) is 0.069 cfs. Additional pipe and structures will be required to meet the pipe configuration required for the MWS facilities. The curb ramp on the southeast side of the Tukwila Parkway and Andover Park W was repaired in the fall/winter of 2022. Requirement for pavement restoration will need to be considered since it was repaved within the last year. This storm system work could also be paired with ADA ramp improvements at the intersection. Work on the stormwater pipes should occur during the summer to limit the backup of Gilliam Creek into the work area. Pollutants Addressed: The project will remove sediment, dissolved metals, and 6PPD-q1 from stormwater runoff. Future Consideration: Survey will be required at the proposed facility installation locations to determine pipe invert elevations. Analysis of the P17 basin hydraulics will be required to determine the basin impacts and the flapgate settings. Estimated Project Cost: $1,240,000 (does not include hydraulic study) Related Projects: Addition of the flapgates should be included in the study of the P17 basin hydraulics since Tukwila Pond is allowed to overflow to the storm line in Andover Park W. See the fact sheet for CIP-103. 1 6 p-Phenylenediamine quinone City of Tukwila Surface Water Comprehensive Plan January 2024 Tukwila Parkway/Gilliam Creek Outfalls Stormwater Improvements Photographs: Catch basin to be replaced with treatment system Tukwla Parkway Gaagle Manhole to be replaced with 84" diameter manhole over 48" diameter pipe Intersection of Tukwila Parkway looking south on Andover Park West *Photo from Google Maps Streetview Catch basin to be replaced with treatment structure Google Catch basin to be replaced with treatment system Mexaq.e n.. mza a xrra G.41, Tukwila Parkway looking west at intersection with Andover Park West *Photo from Google Maps Streetview 84" diameter manhole to be constructed over 30" diameter pipe Google Tukwila Parkway looking west *Photo from Google Maps Streetview Catch basin to be replaced with treatment structure City of Tukwila Surface Water Comprehensive Plan January 2024 PLANNING LEVEL PROJECT COST OPINION PROJECT: CIP-4, Tukwila PkwyParkway/Gilliam Creek Outfalls Stormwater BY: RCH Improvements LOCATION: Tukwila Parkway at Andover Park West DATE: 10/30/2023 DESC. Flow, Maintenance and Water Quality Retrofit Improvements at Tukwila Pkwy and Andover Park West ITEM NO. I ITEM I QUANTITY I UNIT I UNIT PRICE I AMOUNT DESIGN 1 BASIC PERMITTING 1 LS $ 15,000 $ 15,000 2 ENGINEERING 20% Of Total Construction $ 178,000 3 SURVEY 2% Of Total Construction $ 17,800 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 44,500 Total Design $ 255,300 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 10% Of Total Construction $ 89,000 Total Construction Management $ 89,000 CONSTRUCTION Construction Elements 1 STORM PIPE, 12 IN. DIAM. 90 LF $ 140 $ 12,600 2 PROPRIETARY WATER QUALITY FACILITY 4 EA $ 80,000 $ 320,000 3 ROAD RESURFACING 440 LF $ 40 $ 17,600 4 PAINTED CROSSWALK LINE 80 SF $ 2 $ 160 5 FLAP GATE 2 EA $ 16,000 $ 32,000 6 MANHOLE 84 IN. DIAM. TYPE 1 2 EA $ 20,000 $ 40,000 7 MANHOLE 48 IN. DIAM. TYPE 1 3 EA $ 7,500 $ 22,500 Subtotal Construction Elements $ 444,860 Required Ancillary Items 8 MOBILIZATION 10% Of Construction Elements $ 44,500 9 STORMWATER BYPASS 5% Of Construction Elements $ 22,300 10 EROSION & SEDIMENTATION CONTROL 5% Of Construction Elements $ 22,300 11 TRAFFIC CONTROL 20% Of Construction Elements $ 89,000 12 PLANNING LEVEL CONTINGENCY 30% Of Total Construction $ 267,000 Subtotal Ancillary Items $ 445,100 Total Construction $ 889,960 Total Project Cost $ 1,234,260 2023 Dollars Total Estimated Project Cost (Rounded) $ 1,240,000 Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. 3. Increase percentage markup if work is in or immediately adjacent to flowing or standing water, steep slope, and/or other erosion -prone conditions. 4. Increase percentage markup if work is in or immediately adjacent to secondary, arterial, or other high -volume road or temporarily closes a roadway. C60" WATER LINE 48" PIPE CONNECTION TO 108" CULVERT 1-405 GILLIAM CREEK 108" CULVERT TREATMENT CB B 30" PIPE CONNECTION TO 108" CULVERT 4 u) W. TREATMENT CB A W W TUKWILA PARKWAY W W TREATMENT CB D REPLACE 48" MH WITH 84" MH AND INSTALL FLAPGATE ON OUTGOING PIPE TREATMENT CB C REPLACE -" CLEANOUT WITH 84" MH OVER 30" PIPE AND INSTALL FLAPGATE ON OUTGOING PIPE TREATMENT CB # DRAINAGE AREA (AC) A 0.65 B 1.02 C 0.48 D 0.50 LEGEND W SS SD 2 FT CONTOURS TAXLOTS STREAM/CREEK EXISTING WATER PIPE EXISTING SANITARY PIPE EXISTING STORM PIPE PROPOSED STORM PIPE 0 100 200 ® ® EXISTING STORM STRUCTURE OS EXISTING SANITARY MANHOLE • PROPOSED STORM MANHOLE PROPOSED PROPRIETARY MODULAR BIOFILTRATION (TREATMENT CB) REPLACE EXISTING TYPE-1 CB WITH TREATMENT CB 000a O SCALE IN FEET i i Otak %A\ CIP 4 Tukwila Surface Water Comprehensive Plan Tukwila Parkway/Gilliam Creek Outfalls Stomwater Improvements PROJECT SUMMARY SHEET-CIP-5 Project Title: Tukwila Pond Water Quality Improvement Location: Tukwila Pond Park located south of Westfield Southcenter Mall (Parcel #2623049062) Issue and Benefit Summary: Issue Water Quality Benefit Improve quality of stormwater runoff discharging to Tukwila Pond Project Description: The project aims to allow Tukwila's Public Works Department to support water quality treatment for surface water runoff draining to the Tukwila Pond, as part of the Tukwila Pond Park Master Plan (Master Plan) improvements. The Parks and Recreation Department will carry out the implementation of the Master Plan, including hiring and managing consultants for design, permitting and construction negotiations, and leading discussions with private property owners. The Public Works Department will contribute funds to support the design and construction of stormwater runoff treatment facilities described in this fact sheet. The recommended water quality improvements are planned for construction during Phases 1 B through 6 in the period spanning 2024 to 2038, as specified in the Master Plan. Below is a summary of the pertinent Master Plan narrative and improvements. Pond Drainage and Function The Tukwila Pond is within a depression in the Southcenter region. Its is approximately 19 acres in area and 2.5 feet in depth. The outflow from the pond is complicated; it changes direction based on the stage in Gilliam Creek, the stage in the Green River, the settings of a manually operated slidegate, and the functioning of three pump systems in the area. The hydraulics are described in the Master Plan. One of the key functions of the pond is to provide flood storage when Gilliam Creek and the Green River are high. The flood storage functionality of Tukwila Pond is critical and should not be reduced as a result of any Mater Plan -related improvements. Pond Water Quality Issues The Tukwila Pond has high phosphorus, turbidity, and high temperature under existing conditions. It is fed largely by groundwater during the summer and has additional input from precipitation and two nearby swales, which treat runoff from adjacent commercial properties. Groundwater and soils are likely contributing to nutrient loading of the pond, suggesting that even if water quality improves, it may remain high in nutrients. Additionally, there is limited treatment for surface runoff and piped stormwater entering the pond. The pond drains into the Green River either through Gilliam Creek or through pumped and piped conveyances. The Green River in this area is on the Washington State Department of Ecology's list of impaired waters (303(d) list) for temperature, dissolved oxygen, and fecal coliform. Water Quality Improvements Several methods of treatment to improve water quality in the pond were compared in the Master Plan. The methods address high nutrient content in the pond caused by groundwater and stagnation, high temperatures in the pond caused by limited tree cover, and pollutants in the urban stormwater runoff draining to the pond. Direct improvements to the pond to address nutrients and temperature are estimated to cost approximately $6 million in 2021 construction dollars while water quality improvements for treating surface runoff or piped runoff draining to the pond are estimated at $656,000. The Public City of Tukwila Surface Water Comprehensive Plan January 2024 Tukwila Pond Water Quality Improvement Works Department's Surface Water Program plans to provide funds for the latter - those elements of the Parks and Recreation project that will treat the surface runoff and piped runoff entering the pond. Within the Master Plan, these elements are grouped as "storm drainage improvements." Storm drainage improvements include improvements to an existing biofiltration-drainage swale system, installation of new stormwater runoff treatment facilities, and installation of associated stormwater conveyance systems. Several runoff treatment Best Management Practices (BMPs) could be used to treat surface runoff and piped stormwater. Options for treatment of surface runoff include bioswales, filter strips, or proprietary systems (such as Filterra® bioretention system from Contech Engineered Solutions or BioPodTM from Oldcastle Infrastructure). Options for treatment of piped stormwater include wet ponds, wet vaults, or proprietary systems (such as Modular Wetlands® Linear stormwater bioretention system by Contech Engineered Solutions). Some considerations for selecting facility type(s) during engineering design are listed below: • Area available to site facilities, which may be on private property; • Whether facilities will be located at the end -of -pipe or dispersed throughout the City's right-of-way and on private properties; • Hydraulic drop available; • Whether facilities will be placed above ground or underground; • Ability to treat the emerging pollutant of concern, 6-PPD-q1; • Providing a level of treatment that corresponds to the land use characteristics of the drainage basins and the water quality issues in the Green River; and • Constructability constraints such as utility conflicts. The Master Plan recommends further study to compare alternatives and determine the preferred option or combination of options for the water quality treatment described above. The Public Works Department's Surface Water Program plans to support the study, engineering design, and construction of the runoff treatment facilities, within the larger effort to be implemented by the Parks and Recreation Department. Scope Items and Estimated Cost in 2023 Dollars: Scope Cost Storm Drainage Improvements Construction (from Master Plan, Appendix A) $656,000 Alternatives Analysis and Engineering Design for Preferred Water Quality Treatment Alternative (30% of Construction Cost, rounded) $197,000 Total Project Cost in 2021 Dollars (Sum) $853,000 Project Cost in 2023 Dollars (5% annual escalation, rounded) $940,000 The Master Plan project cost estimates, which total more than $33 million of improvements for access, recreation, and environment, include necessary costs such as coordination of improvements with landowners, construction contingency, permitting fees, etc. It is assumed that those items will be covered under the larger project and are not included here. These projects providing stormwater retrofit treatment may be eligible for grant funding through Washington State Department of Ecology. 1 6 p-Phenylenediamine quinone City of Tukwila Surface Water Comprehensive Plan January 2024 Tukwila Pond Water Quality Improvement Future Considerations: Tukwila Pond has high temperature and high nutrients affecting its water quality. Stormwater management facilities alone will not address these issues. Some preliminary concepts were evaluated in the Master Plan and found to be high cost. If the Parks and Recreation Department develops solutions for temperature and nutrients in the pond, the Public Works Department could consider sharing cost of implementing those solutions as well. Cost of those projects have not been estimated in this fact sheet. Estimated Project Cost: $940,000 Related Projects: • Tukwila Pond Park Master Plan Improvements (City of Tukwila, 2022) • Gilliam Creek Fish Habitat Enhancement Project (City CIP 2023-2028, Project No. 99830105) • P17 Pond and Southcenter Regional Hydraulic Study (Surface Water Comprehensive Plan 2024 Update, CIP-103) City of Tukwila Surface Water Comprehensive Plan January 2024 PROJECT SUMMARY SHEET-CIP-6 Project Title: Johnson Creek Fish Barrier Mitigation Alternatives Analysis Location: S 204th Street and Frager Rd at confluence of Johnson Creek with the Green River Issue and Benefit Summary: Disconnection of Habitat Allow fish to access habitat in the Johnson Creek basin Issue: Johnson Creek is a low gradient left -bank tributary to the Green River in the river's floodplain. They confluence at river mile (RM) 17.3 through a 60-in diameter culvert with a debris rack at its inlet and a flapgate at its outlet. Tributaries in this section of the Green River are often used by out -migrating Chinook for rearing and flood refugia. The existing flapgate on Johnson Creek was considered fish - passable when it was installed in 2011, and it is not listed as a barrier by Washington State Department of Fish and Wildlife (WDFW) as of 2023. However, a recent study by King County documented that no fish were sampled in Johnson Creek. This was thought to be due to the low elevation of the flapgate, causing it to be submerged and closed during most winter and spring flows when fish would typically access the creek. The study also notes juvenile fish may be swept past the confluence and unable to enter Johnson Creek because the flapgate is located where the tributary enters the Green River such that there is no low velocity setback available. The debris rack on the upstream side of the culvert is also frequently clogged (King County, Dec 2019). Therefore, the City has determined that the flapgate and debris rack limit fish access to habitat in Johnson Creek. Existing Flapgate at the confluence of Johnson Creek with the Green River Johnson Creek Context: The Johnson Creek culvert connects to the Green River through a revetment along the west bank. The elevation of the revetment appears to match that of the levee to the north so that, although the revetment is not certified, it is providing flood protection along with the flapgate (King Co, Feb 2019). City of Tukwila Surface Water Comprehensive Plan January 2024 Johnson Creek Fish Barrier Mitigation The reach approximately 150 meters upstream from the confluence with the Green River is within the Johnson Creek mitigation area that is part of the Segale Properties LLC's Tukwila South Project. This segment of Johnson Creek was reconstructed and relocated in 2011 (Tukwila, 2013) under a Hydraulic Project Approval (HPA) issued in 2007. The 2007 HPA provisions included the following: The culvert facility and floodgate at Johnson Creek shall be maintained by the owner(s) per RWC 77.57.030 to ensure continued, unimpeded fish passage. If either structure becomes a hinderance to fish passage, the owner(s) shall be responsible for obtaining and HPA and providing prompt repair. (provision 28) In 2017 Drainage District #2 of King County, received an HPA to remove a beaver dam on Johnson Creek that caused damage to upstream agricultural lands. Land Ownership (see Figure): The Johnson Creek drainage basin includes portions of the City of Tukwila, City of Kent, City of SeaTac, and unincorporated King County. Within the City, the Johnson Creek basin is largely owned by Segale Properties LLC, which has a developer agreement with the City regarding land use and stormwater controls for the Tukwila South Project. Additionally, Drainage District #2 of King County manages stormwater in the majority of the Johnson Creek basin in Tukwila (King County, 2022). The parcel that contains the realigned Johnson Creek is owned by Drainage District #2 of King County. Three parcels in the City of Kent directly south of S 204th Street are owned by King County Water and Land Resources Division's River and Floodplain Section (King County River and Flood) and are classified as farmland preservation properties. Segale Property LLC also owns properties in the City of Kent that serve as wetland mitigation for the Tukwila South Project. Other Habitat Improvement Plans: The Water Resource Inventory Area (WRIA) 9 Salmon Habitat Plan 2021 Update includes project LG-34 sponsored by the City of Kent to improve the Jonhson Creek floodplain by acquiring properties, setting back the road and trail to reconnect the floodplain, and creating off -channel habitat. The parcels owned by King County River and Flood south of S 204th Street were purchased in September 2023 for levee repair and habitat restoration, and little documentation has been located about the project objectives or timeline. There may be an opportunity for the City's Johnson Creek Fish Barrier Mitigation project to be integrated with the King County project when more information becomes available. Project Description: The goal of the project will be to identify a preferred solution to improve fish access to Johnson Creek while maintaining flood protection. To meet this goal, the project will include the following steps: 1. Review agreement between Segale LLC, Drainage District #2 of King County and City regarding stormwater controls with the goal of determining whether a portion of their properties may be used for a levee setback. 2. Initiate discussion with impacted properties, and potential project partners. 3. Survey stream channel, adjacent roadway, critical elevations on adjacent properties, and culvert elevation. 4. Review basin hydrology to determine contributing flow to Johnson Creek. 5. Complete statistical analysis of the stages on the Green River to determine an optimum vertical location for a flapgate and evaluate risk of removal of flapgate on flooding of upstream properties depending on their relative elevations. If flapgate removal is not feasible, evaluate feasibility of culvert and flapgate retrofit or replacement. City of Tukwila Surface Water Comprehensive Plan January 2024 Johnson Creek Fish Barrier Mitigation 6. Complete a critical areas study, prepare a stream assessment, and determine bankfull widths to determine a reasonable size of a structure for alternatives that include replacing the existing structure. 7. Complete a preliminary geotechnical analysis that identifies constraints and supports a preliminary design of a replacement structure, if determined that structured needs to be replaced. 8. Complete a hydraulic analysis that will: a. Simulate flooding under existing conditions and evaluate the risks associated with removal of the flapgate as well as replacement by a side -hinge flapgate. b. Evaluate potential locations along Johnson Creek for the flapgate to be setback from the Green River channel to provide low velocity habitat for juvenile salmonids. This will be done in coordination with item #1. c. Evaluate options for replacement debris racks and maintenance intervals. 9. Develop feasible solution concepts and implementation costs with the goal of balancing flood protection while improving fish access to habitat in Johnson Creek. Develop a permitting strategy related to each solution concept. 10. Compare solutions using factors such as habitat uplift, constructability constraints, costs and funding opportunities, implementation timelines, compatibility with future projects etc. 11. Identify a preferred solution in coordination with interested parties. At this stage it is anticipated that interested parties will include Segale Properties LLC, Drainage District #2 of King County, King County, King County River and Flood, King County Flood Control District, the Muckleshoot Indian Tribe, other tribal organizations, WDFW, and Water Resource Inventory Area (WRIA) 9. Constraints for engineering design: • The 60-in diameter culvert connecting Johnson Creek with the Green River passes under a cul-de- sac that provides turn -around for roadways connecting properties in the City of Kent. Any setback along this section of the Green River would require realignment of these roadways. • The low gradient of Johnson Creek limits opportunity to raise the elevation of the connection with the Green River. • King County identifies much of this land as a seismic hazard area. • The fine grain silt loams along the Green River and Johnson Creek may have low bearing capacity that would impact structure type and construction methods. Scope Items and Estimated Cost in 2023 Dollars: Scope Desktop analysis of existing system and agreements Cost $10,000 Meetings with interested parties including major project partners, permitting organizations, property owners, and King County regarding feasibility of setting back levee and impacting the properties* $20,000 Survey for stream channel, culvert, and adjacent topography $20,000 Critical Area Study and Stream Assessment $30,000 Preliminary Geotechnical Analysis $30,000 Hydraulic analysis of existing conditions $30,000 Hydraulic analysis of proposed conditions (see alternatives described above) $40,000 Peer review and technical reporting of hydraulic analysis $20,000 City of Tukwila Surface Water Comprehensive Plan January 2024 Johnson Creek Fish Barrier Mitigation Scope Cost Development of alternative solution concepts and costs and comparison of alternatives** $40,000 Selecting preferred solution concept through engagement with interested parties $40,000 * Cost does not include negotiation costs if ownership transfer is needed. It is anticipated that those negotiation costs will be included in the implementation costs for the preferred alternative. ** Cost does not include other coordinating potential projects mentioned in this fact sheet, including channel realignment through City of Kent, WRIA 9 LG-34 project, and King County River and Flood levee setback and habitat restoration project. Estimated Project Cost: $280,000 References: King County, Dec 2019. Juvenile Chinook Use of Non -natal Tributaries in the Lower Green River, King County, December 2019. King County, Feb 2019. System -Wide Improvement Framework Lower Green River King County, Washington, February 2019. King County, 2022. Signature Report Motion 16184 passed by Metropolitan King County Council on August 16, 2022. Tukwila, 2005. Tukwila South Project Final EIS, by Raedeke Associates, Inc, Cedarock Consultants, Inc, and A.C. Kindig &Co., June 29, 2005. Tukwila, 2013. 2013 Surface Water Comprehensive Plan, prepared by CH2MHill, February 2013. WDFW, 2007. Hydraulic Project Approval for Tukwila South Project, issued by Washington Department of Fish and Wildlife on March 1, 2007. WDFW, 2017. Hydraulic Project Approval for Drainage District No. 2 Beaver Dam Modification Project, issued by Washington Department of Fish and Wildlife on July 20, 2017. City of Tukwila Surface Water Comprehensive Plan January 2024 CITJt OF SEATAC Current Johnson Creek Alignment Seagale Properties LLC CIP-6 JOHNSON CREEK FISH BARRIER MITIGATION TUKWILA SURFACE WATER COMP PLAN TUKWILA, WA Dais Scum.. Keg County !Wm FealuIee: LenaasJ. Cap or TuExiu. Goagle rnaJa Ioase?,PJ Dma. 12.•2a20n ❑ .PRDJECP333001a3383tCADD GISUPRos 2a329 TSwii. Base Data SX.apx CITY OF TUKWILA Seagale Properties LLC Tukwila South Detention Ponds Seagale Properties LLC .IDtitSON CREEK S 20- h.St Drainage District # 2 King County River and Flood CITY OF KENT WRIA 9 Project LG-34 Legend r 1 City Boundary • Private Outfall Levee Parcels — Closed Pipe = Revetment Stream EMI Culvert Dlseaoo., Thn mbi�not:os .. emirwy Outfall — Ditch �meammrpa ^npv ec cnly Johnson Creek Outfall 60" Flapgate 0 ft 800 Otak STUDIES STUDY SUMMARY SHEET-CIP-101 Study Title: Fish Passage Barrier Prioritization Study Study Extents: Citywide Issue and Benefit Summary: Issue Description Habitat The City values removing fish passage barriers and wishes to prioritize barrier removal projects prudently. The fish passage inventory in the 2024 SWCP has not been prioritized. The study will prioritize barrier removal opportunities. Issue: The presence of fish passage barriers in creeks and streams is a critical risk to salmonids. Fish passage barriers that can be corrected are human -made instream features that impede upstream fish passage, such as culverts, dams, and diversions. The Northwest Indian Fisheries Commission's online map of Statewide Integrated Fish Distribution identifies the presence of multiple fish species, including salmonids, in all Tukwila streams with the exception of Nelsen. The City of Tukwila (City) supports removal of human -made barriers to open valuable habitat to native fish. Fish passage barriers have been documented in several stream systems in Tukwila: Riverton Creek, Southgate Creek, Gilliam Creek and its tributary Cottage Creek, tributaries to Green River in the P17 Basin, Johnson Creek, and the Duwamish River. Currently, 58 uncorrected fish passage barriers are identified in Table 2 of Appendix B, not including barriers owned by Washington State Department of Transportation (WSDOT). It is assumed that up to 10 additional uncorrected fish passage barriers may exist in Tukwila on private properties not accessible from public roadways. In order to invest prudently in restoring access to fish habitat, the City would like to prioritize the large number of documented barriers. See Appendix B of the 2024 SWCP for more information about the barrier inventory. Study Description: The City would like to prioritize potential barrier removal projects. The study will prioritize barrier removals based on feasibility, potential habitat gain, importance of the stream system for fish use, and coordination with other barrier removal efforts and water quality improvement efforts in the stream system. Because the WDFW fish passage barrier database has been recently updated (2023-2024) with field - verified information about crossings and barriers in the Riverton Creek system and the Southgate Creek system, including barriers on private properties, it is thought that the inventory of barriers is complete enough to conduct the prioritization without conducting additional fieldwork to discover new barriers. The available information in the recently updated records includes potential habitat gain. The prioritization process will include: 1. Development and implementation of a Fish Passage Barrier Correction Prioritization process to identify fish barrier removal opportunities. Resources such as the WDFW 2019 Manual or King County's Fish Passage Restoration Program' s Fish Passage Barrier Prioritization formula (King County, 2022) could be used to develop prioritization factors. Examples of factors include: a. Stream habitat quantity and quality b. Watershed habitat quality City of Tukwila Surface Water Comprehensive Plan March 2024 Fish Passage Barrier Prioritization Study c. Connectivity d. Presence of priority salmon species 2. Identifying downstream barriers owned/operated by other entities and documenting the planned date for removing those barriers, if any. 3. Categorizing and grouping fish barrier removal opportunities into programs or capital projects depending on cost, geographic proximity, coordination with other projects or planning efforts, or complexity of solution. Prioritization will be presented by creek basin. Note: Private property owners may need significant inducement to voluntarily participate, such as offering eligibility for future cost -share or funding opportunities or limiting reporting on on -property compliance issues unrelated to fish passage barriers. The study will include concept design and planning level cost for the ten priority barrier removal opportunities. Estimated Study Cost: $147,000 Funding: This study and the prioritized projects that result from this study may be eligible for watershed restoration, fish passage barrier, or habitat grant funding or federal appropriations. Examples of these funding opportunities include: • Washington Department of Ecology: Water Resources Program Streamflow Restoration Competitive Grants. • Washington Department of Fish and Wildlife and the Recreation Conservation Office: Brian Abbot Fish Barrier Removal Board Grant Program. • Washington Department of Ecology: Water Quality Combined Funding Program. • Federal Highway Administration: National Culvert Removal, Replacement and Restoration — Culvert Aquatic Organism Passage Program. • U.S. Fish and Wildlife Services National Fish Passage Program. • National Oceanic and Atmospheric Administration, National Marine Fisheries Service: Restoring Fish Passage through Barrier Removal. Related Issues: The Washington Department of Transportation (WSDOT) has been working to remove fish passage barriers since 2013 due to a federal culvert injunction. The U.S District Court agreed with twenty-one northwest Washington tribes that the State of Washington has a duty to preserve fish runs. As a result, the State must repair or replace culverts that impede salmon migration under state -maintained roads. WSDOT developed its Fish Passage Inventory to document fish passage barriers under state roads. WSDOT has removed 114 fish passage barriers under the federal court injunction. As of 2024 at least seven WSDOT fish passage barriers identified for correction under the injunction remain in the City of Tukwila. WSDOT will continue to focus on barrier removal, however, WSDOT does not have plans to correct any fish passage barriers in Tukwila under the injunction by 2030. Following 2030 the City expects WSDOT to address fish passage barriers at the 1-5/1-405 interchange which is currently in the preliminary design phase. City of Tukwila Surface Water Comprehensive Plan March 2024 PLANNING LEVEL PROJECT COST OPINION CIP-101, Fish Passage Barrier Inventory Update and PROJECT: Prioritization Study BY: TMK LOCATION: Citywide DATE: 3/19/2024 Programmatic prioritization of barrier removal opportunities DESC. by creek basin. ITEM NO. ITEM UNIT QUANTITY HOW CALCULATED HOURS Locations / Prooerties a Known barrier locations (uncorrected) each 58 WDFW and 2024 SWCP; does not include state-owned barriers or barriers with revised status of "not a barrier," "passable," "none," or "N/A" b Estimated unknown barrier locations each 10 c Number of creek basins with barriers each 6 via Appendix B Prioritization d Document and compare potential habitat gain hrs 68 (a+b)*1 68 e Develop prioritization criteria, inc'I outreach to stakeholders hrs 60 60 f Evaluation and Prioritization by Basin hrs 60 c*60 360 Concept Design g Project Development for 10 Barrier Removals hrs 40 10*40 400 Average Staff Cost h 'Average Labor Cost 1$/hr I 150 Total Labor Hours 888 Labor Cost (Total Labor Hours * h) 133,200 Contingency 10% Estimated Cost $ 146,520 2023 Dollars (Total Estimated Project Cost (Rounded) $ 147,000 Notes: 1. The above cost opinion is in 2023 dollars and does not include acquiring rights of entry, public engagement and communication with property owners, future escalation, financing, or O&M costs. If escalation is required, we recommend including 3% per year. STUDY SUMMARY SHEET-CIP-102 Study Title: Middle Fork of Southgate Creek — Stream and Slope Stability Study Study Extents: Middle Fork of Southgate Creek from headwaters near 44th Avenue S to discharge into a stormwater system at the intersection of S 134th PI and S 133rd St Issue Description: Issue Description Flooding, Erosion, Landslide Alteration of stream by development coupled with natural degradation processes in the steep upper reaches is transporting sediment downstream and causing erosion and flooding on a commercial development on the east side of Macadam Rd S Habitat Two Fish Passage Barriers: WDFW Site ID 922644 and Site ID 922641 Middle Fork of Southgate Creek: The Middle Fork of Southgate Creek (Middle Fork) has its headwaters in the Foster Heights neighborhood in Tukwila where it is fed by piped stormwater runoff and precipitation. It flows in a northerly direction to the Duwamish River, passing through City rights -of -way, state rights -of -way, and a substantial amount of private property. From its headwaters, it has a steep gradient as it flows through a ravine and crosses Macadam Rd S in a 48-in wide concrete box culvert where the flow splits in two directions — one continuing along Macadam Rd S and the other east through a business park. The first channel alignment is along Macadam Rd S; the stream continues north and then takes a 90-degree bend and travels through ditches along S 133rd St. The second channel alignment is through the business park east of Macadam Rd S. Based on comparing aerial imagery between 2007 and 2009, the stream may have been altered when development occurred around 2008, and it is probable that flows were directed through a pipe which drains into the ditches along S 134th PI. The two alignments confluence at the intersection of S 133rd St and S 134th PI before being piped across the SR 599 highway in a 72-in diameter pipe along Interurban Avenue South. Then the Middle Fork confluences with the main stem of Southgate Creek downstream of a 66-in diameter Washington State Department of Transportation (WSDOT) culvert before discharging into the Duwamish River. The Middle Fork is classified by Washington State Department of Fish and Wildlife (WDFW) as a fish -bearing stream. Known Issues: Lack of accurate information on the stream's alignment is a known issue. Available information about the alignment of the Middle Fork is inconsistent. The above description is based on institutional knowledge of City staff. Other land managers and agencies document different alignments. Another key issue is whether the Middle Fork should be classified as a salmon bearing stream; it is piped for a long stretch downstream of the intersection of S 133rd St and S 134th PI. In recent years, the City has received numerous reports of flooding and erosion in the business park. Near 44th Avenue S a landslide was first documented in 1982 by King County. The landslide was also discussed in the 2013 Tukwila Surface Water Comprehensive Plan (table 7 -issue ID 10) with a recommendation to monitor the issue and review during the next planning period. Based on comparing aerial imagery from 1998 and 2005 a short plat was developed near the slide in the early 2000s. More recently, the City vacated the right-of-way on 43rd Avenue S, which is now closed to public traffic and located on private property. Since then, City staff have observed the former 43rd Avenue S collapsing just north of S 137th St, which may be caused by recurrence or reactivation of the landslide. The collapsing City of Tukwila Surface Water Comprehensive Plan January 2024 Middle Fork of Southgate Creek — Stream and Slope Stability Study roadway appears to be contributing debris to the stream, which travels downstream and is deposited behind the business park east of Macadam Rd S. A tenant of the business park has installed ecology blocks to prevent the stream from eroding and flooding onto their property. WDFW assumes a different stream alignment, in which the Middle Fork confluences with the mainstem of Southgate Creek at the intersection of S 133rd St and S 134th PI and flows into WSDOT's culvert. The WDFW Fish Passage and Diversion Screening Inventory Database documents two barriers to fish passage on the Middle Fork. Table 1 Fish Passage Barriers, WDFW Fish Passage and Diversion Screening Inventory Database Site ID Existing Structure Barrier Description 922644 36-in Diameter Concrete Pipe @ 6.4% Slope Slope Barrier, 0% Passable 922641 48-in Wide Concrete Box Culvert @ 7.2% Slope Slope Barrier, 0% Passable Based on a desktop assessment of the topography, reviewing aerial imagery, and gathering anecdotal evidence, it appears that the Middle Fork channel may be eroding in the reaches upstream of Macadam Rd S. There may also be slope stability issues contributing to the landslide which has caused the roadway to collapse. Both the erosion and the landslide may be contributing debris to the Middle Fork, which transports the sediment downstream. It is unknown how the channel cross section changes going from upstream to downstream and whether sediment is deposited in locations where slopes are gentler. The flow split at Macadam Rd S is not well documented, and capacity of the eastern alignment through the business park has not been evaluated by the City. The causes of the reported flooding and stream channel erosion at the business park are unknown but could be related to channel size, channel configuration, sediment deposition, or insufficient capacity in the eastern alignment. Project Description: A preliminary study is proposed to identify the causes of the known issues and assess solutions. The City's Department of Community Development (DCD) is working on stream classifications, and DCD's findings, if available, can be used for this project. The proposed stream and slope stability study will include the following elements: 1. Obtaining right of entry from private properties. 2. Field reconnaissance for a preliminary geomorphic, geotechnical, and environmental investigation. The geomorphic investigation will document existing conditions of the stream, changes in stream slope, and changes in channel cross sections observed by walking the stream channel. It will identify stream channel instability issue locations and causes. The geotechnical investigation will document any observations of slope stability and causes under existing conditions. The environmental investigation will assess stream typing in coordination with DCD's stream classification project and document existing conditions of regulated critical areas such as wetlands. The environmental reporting will form the baseline for calculating environmental impacts caused by solutions and identifying mitigation needs for the solutions. 3. Confirmation through discussion with WDFW and Muckleshoot Indian Tribe whether the Middle Fork should be classified a fish bearing stream. This determination is key to understanding what type of solution options are feasible and permittable for addressing the landslide, erosion, flooding, and fish barrier issues. 4. Performing geotechnical borings to determine the vertical profile of the soil, if needed, as determined by the geotechnical investigation in item #2. 5. Developing up to four concept solutions to address the causes of the issues identified under items #2 and #3. It is anticipated that solutions will focus on (a) controlling sources of sediment City of Tukwila Surface Water Comprehensive Plan January 2024 Middle Fork of Southgate Creek — Stream and Slope Stability Study and (b) maintaining ditches where deposition may be occurring if permissible and (c) fish passage improvements if determined the stream has fish use. Source control options include stream and bank stabilization of the upper reaches with elements such as large woody debris and wattles. Depending on the findings of the geotechnical reconnaissance, slope stabilization solutions may also be evaluated. If fish passage structures are needed, an important consideration will be length of stream regrading needed through private property. For all solutions, a qualitative assessment of downstream impacts will be completed. Any additional studies needed to design the solution will be noted. Also, a preliminary assessment of order of magnitude environmental impacts, anticipated mitigation needs and permitting strategy will be documented for each solution. 6. Develop planning level implementation costs for solutions determined under item #5. 7. Compile a planning document that will support the City in obtaining funds to address the issues. Scope Items and Estimated Cost in 2023 Dollars: Scope Cost Preliminary Geomorphic Study $30,000 Preliminary Geotechnical Study $50,000 Preliminary Environmental Study $20,000 Coordinating with private property owners, WDFW, and Muckleshoot Indian Tribe $20,000 Preparing three concept solutions and planning level cost estimates (assumes two fish passage structures with habitat uplift and two additional concepts) $50,000 Report $30,000 The estimate does not include enaineerina desian or site specific studies for the preferred alternative. Estimated Study Cost: $200,000 Future Considerations: Much of the Middle Fork is on private property, and the preferred alternative selected in the study may require right-of-way acquisition and/or permanent and temporary construction easements. Therefore, successful negotiations with private property owners could determine the feasibility of implementing many solutions assessed during the study. In the next phase, alternatives will be hydraulically modeled to assess sediment and habitat impacts of the solutions and a preferred alternative will be chosen. The preferred alternative may be one or a combination of alternatives evaluated. Related Projects: The City currently has a contract with a consultant to study the main stem of Southgate Creek and address sediment transport and flooding along S 131 St St. The City's Department of Community Development (DCD) is working on a project to classify streams in the City. City of Tukwila Surface Water Comprehensive Plan January 2024 Middle Fork of Southgate Creek — Stream and Slope Stability Study Photographs: Photo taken at the location of the landslide by the City in 2022— shows the undercut banks of Middle Fork Southgate Creek Former 43rd Avenue S Photo taken at the location of the landslide by the City in 2022— shows the collapsing former 43rd Avenue S City of Tukwila Surface Water Comprehensive Plan January 2024 48" Concrete Box Culvert, Listed as 0% Passable Slope Barrier - Site ID 922641 MIDDLE FORK SOUTHGATE CREEK STUDY GEOTECHNICAL AND GEOMORPHIC ASSESSMENT TUKWILA SURFACE WATER COMP PLAN TUKWILA, WA On saw Dole: 112112022 Drub...roar This &In is nol to syrupy accuracy and 6 IRONIC for pinnrvno pa lmspa or* O.way.rten3s3omaasa3C6DDrGISl Rxslaa3aa hew16e Bose Dma elc.am Legend City Boundary p Basins Stream Middle Fork Southgate Creek alignment per discussion with City Flow split occurs here per discussion with City. May have been piped with development around 2008 Complaints of erosion and flooding from business park tenant in this area Landslide recorded by King County in 1982 that has continued to worsen 36" Concrete Circular Pipe, Listed as 0% Passable Slope Barrier - Site ID 922644 Q Outfall • Private Duffel! — Closed Pipe I Stormwater Detention IWO Culvert Fish Passage Barrier • Yes ft — Ditch 0 600 Anecdotal Stream Alignment Dtak PROJECT SUMMARY SHEET-CIP-103 Project Title: P17 Pond and Southcenter Subarea Hydraulic Study Location: The vicinity of Southcenter Mall, between 1-5 and the Green River, and from 1-405 to approximately S 200th St Issue and Benefit Summary: Issue Drainage Other Benefit Ensure adequate capacity of the S 180th St Stormwater Pump Station. The City would like to discontinue use of its Minkler Public Works Maintenance Facility and relocate the P17 Pond (see figure), which currently occupies the property, in order to support a King County Flood Control District project to set back a portion of a levee on the Green River to provide salmon habitat. Issues: The Southcenter subarea of City of Tukwila (City) is served by a complex drainage system. One element of the Southcenter subarea's drainage system is the P17 Pond on Minkler Blvd near the Green River at river mile 13.75. The pond is on the City's Minkler Public Works Maintenance Facility property and is utilized for stormwater storage capacity before the King County Flood Control District P17 Pump Station, which pumps stormwater over the Tukwila 205 Levee into the Green River. The City is studying the feasibility of discontinuing use of the maintenance facility and selling the property. The King County Flood Control District may express an interest in purchasing the property and setting back the levee, consistent with project LG-35 identified in the WRIA 9 Salmon Recovery Plan approved on February 11, 2021. LG-35 would be a future project and is not currently in King County's Capital Improvement Program. The Southcenter subarea's drainage system includes three stormwater pump stations. Two failed pumps at the S 180th St pump station (also referred to as the Lift Station No. 15) have not been replaced, and City staff have recently observed ponding of the drainage system in the vicinity. Existing Conditions near (Minkler) Public Works Maintenance Facility, from WRIA 9 Salmon Recovery Plan Project Description: Before confirming feasibility of decommissioning the P17 Pond and the P17 Pump Station to support a setback of the levee for habitat uplift, the City must ensure that the detention and conveyance capacity they provide can be provided elsewhere in the Southcenter subarea. The City will study hydraulics in the Southcenter subarea, including most of the P17 Basin and the interrelated portions of the Gilliam Creek basin, Green/Duwamish basin, and Johnson Creek basin to determine alternatives for providing the needed detention storage and discharge of stormwater runoff to the Green River. City of Tukwila Surface Water Comprehensive Plan January 2024 P17 Pond and Southcenter Regional Hydraulic Study The study area encompasses approximately 1,150 acres from 1-5 on the west to the Green River on the east and from 1-405 on the north to about 1,500 feet north of S 200th St on the south. The study limits include Tukwila Pond, P17 Pond, closed pipes, open channels, slide gates, flap gates, three publicly operated stormwater pump stations, and outfalls to both the Green River and Gilliam Creek. The limits of the study are indicated on the map (page 5). These limits are based on the modeling work completed by Northwest Hydraulic Consultants (NHC) described further below. It is anticipated that the limits may need to be refined during the study. The study goals include: • Evaluating the Southcenter subarea stormwater system capacity, including excess or constraints on the three pump stations, under existing conditions. • Evaluating stormwater system capacity, including excess or constraints of two pump stations, under a future conditions scenario after removal of the P17 Pond and P17 Pump Station. • Evaluating need to replace two currently failed pumps in the S 180th St Pump Station. • Identifying alternatives for relocating detention storage and pumping functions in the Southcenter subarea. • Assessing costs for replacing conveyance and detention capacity in the Southcenter subarea. The proposed study will require development of a hydraulic model or models capable of evaluating the complex hydraulics of the stormwater system within the Southcenter subarea. The system consists primarily of closed conduits which are connected to various open channels, storage ponds, pump stations, and flap gates. The system also includes manual controls such as a slide gate to divert flow to different zones within the system depending on flow conditions. The flap gate for flood protection at the confluence of Gilliam Creek and the Green River is a 9-foot diameter top -hinge gate that closes when river stage is high and prevents backup of river flow into Gilliam Creek. If the gate closes during a storm event, the stage within Gilliam Creek also rises, which in turn impacts conveyance in the Southcenter subarea. For example, the discharge from Tukwila Pond flows through different basins depending on the stage in Gilliam Creek, which is impacted by the river stage and flap gate at the confluence, pump station operations, and slide gate settings. The hydraulic model(s) will need to be calibrated to reflect the operation of the pumps and flap gates and will need to include storage nodes and slide gate controls. Further, the Green River is both tidally influenced in this area and impacted by the operation of the Howard A Hanson Dam upstream. The study will need to be capable of assessing an unsteady state flow regime because operation of the system is heavily influenced by the coincidence of the stage of the Green River and the stage in Gilliam Creek. The hydraulic model(s) developed for the study will need to be compatible with the HEC RAS 1 D effective Federal Emergency Management Agency (FEMA) model which is being used to certify the levee. NHC prepared an unsteady HEC RAS hydraulic model of the proposed study area in 2015 for the first phase of the levee accreditation process. As part of a separate fish passage and habitat enhancement project that proposes to modify the flood protection flap gate at Gilliam Creek and the Green River, Otak conducted a preliminary review of the model for evaluation of changes to flooding with proposed improvements. Due to the complexity of the Southcenter subarea stormwater system, Otak determined that the existing NHC model may not be appropriate to use directly as the basis of the proposed P17 Pond and Southcenter Subarea Hydraulic Study. Next Steps: Conduct desktop analysis of hydrologic and hydraulic information available in the NHC model, City GIS, and system operation manuals to identify re -usable information and data needs. An existing conditions hydraulic model will be developed and calibrated. Confirm or acquire crucial invert elevations with a survey and document the triggers for changing slide gate settings and activation of the pump systems by City of Tukwila Surface Water Comprehensive Plan January 2024 P17 Pond and Southcenter Regional Hydraulic Study interviewing City staff. Potential locations for a replacement of the P17 Pond and P17 Pump Station will be identified. Hydraulic analysis will evaluate the feasibility and compare the following solution elements: • Relocating the P17 Pond to another location or multiple locations within the basin. • Increasing pump capacity to decrease reliance on a pond for storage. • Adjusting system hydraulics to utilize other pump stations with the Southcenter subarea. It is likely that a combination of the solution elements will become the preferred alternative needed to address the issue. Up to three alternative configurations will be developed to a concept level including preliminary cost estimates. If the King County Flood Control District proceeds with the LG-35 levee setback project, the FEMA HEC RAS model will need to be updated. An update of the FEMA HEC RAS model is not included in this project. Opportunities and Challenges: • It is possible there is some redundancy and excess capacity in the Southcenter subarea conveyance system, including within the pump stations, which could be utilized to compensate for removal of the P17 Pump Station and P17 Pond. • The City strongly supports the fish habitat enhancements that would result from the LG-35 project identified in the WRIA 9 Salmon Recovery Plan. • The City is currently working on the replacement of the flap gate at the confluence of Gilliam Creek and the Green River. The project is currently in the preliminary alternatives analysis phase. If that project is completed first, there may be cost savings for this study as the Gilliam Creek project will model impacts from the improvements on hydraulics in the Southcenter subarea. • It is assumed that hydrology data from past modeling is available and is still applicable, since the study area is fully developed. • The Southcenter subarea is highly developed, and identifying feasible locations to site the P17 Pond replacement may be challenging. Coordination with property owners and a siting analysis including property valuations will be needed. • The City is aware that the GIS map of the storm sewer system has inaccuracies. For example, outfalls from the Southcenter subarea to the Green River are not accurately documented in the GIS data set currently in use by City staff. The study lead will need to use care in representing the existing conveyance system in the hydraulic model(s). • There may be a limited number of consulting firms with the capability of developing an effective hydraulic model to represent the complex hydraulics of the Southcenter subarea and the relationship to the flow regimes of the Green River and Gilliam Creek. City of Tukwila Surface Water Comprehensive Plan January 2024 P17 Pond and Southcenter Regional Hydraulic Study Scope Items and Estimated Cost in 2023 Dollars: Scope Cost Desktop analysis of existing system and survey of critical inverts $40,000 Meetings with interested parties including major project partners, property owners, and King County $20,000 Review alternative pond locations and property valuation $40,000 Hydraulic analysis of existing conditions $50,000 Hydraulic analysis of proposed conditions (see alternatives described above) $80,000 Peer review and technical reporting of hydraulic analysis $40,000 Preparing three solution concepts and cost estimates $30,000 The estimate does not include engineering design of the preferred alternative. Estimated Project Cost: $300,000 City of Tukwila Surface Water Comprehensive Plan January 2024 S 180th Pump Station Johnson is •. Southern Terminus of Tukwila 205 Levee (beyond map extents) P17 POND & SOUTHCENTER REGIONAL HYDRAULIC STUDY TUKWILA SURFACE WATER COMP PLAN TUKWILA, WA Dale Scums ❑01. 11 0702,3 Olula.ier hlstlele is nb1 u survey saure, aid is •rrars for yznrais wrpfl4an1Y. H1PmJedk73$DfA$93p3{CADOIGISM1Yas'S936j Tukylln%na q nsaes Dena oprx Legend r J City Limits Q Drainage Basins _ Public Parcels Stream c U Minkle�'Blvd `mml Study Area — Closed Pipe Culvert - Ditch Storm Pump Station 0 ft 2,000 Otak P17 Pond and Southcenter Regional Hydraulic Study References and annotations: City of Tukwila P-17 Basin Study, prepared by KCM, 1989 ■ Not reviewed for preparation of this fact sheet. Recommend study lead review this document and its references. Development Agreement by and between the City of Tukwila and La Pianta LLC, for the Tukwila South development (Ordinance 2233), 2009 and First Amendment to Development Agreement by and between the City of Tukwila and Segale LLC, for the Tukwila South development (Ordinance 2289), 2010 ■ An agreement was made between the City and Segale LLC (earlier La Pianta LLC) to master plan and construct the Tukwila South Project, which comprises 512 acres located between the boundaries of South 178th Street/South 180th Street on the north; South 204th Street on the south; Orillia Road and 1-5 to the on the west; and the Green River on the east. Part of the development includes realigning of roadway corridors as well as stormwater management through detention ponds and water quality facilities. Two detention ponds/water quality facilities were to be constructed: the North Facility which would drain to the S 180th St pump Station, which would route the water to either the Green River or into the P-17 drainage basin; the South Facility which would outflow into the Green River or overflow into the Johnson Creek basin. It is unknown to what extent the development and associated stormwater facilities were implemented. The terms of this agreement, code modifications etc. proposed are valid to December 31st, 2024. P17 Pumping Plan Plans, prepared by USDA SCS, 1973 ■ Reviewed detail drawings of construction of the pump station. P17 Pump Station Pump Operation Plan (POP) and O&M Manual, 1974 • Purpose of pump is to remove stormwater from 1.13 square miles drainage area behind the dike. P17 plant includes 4 pumps that provide capacity ranging from 10 cfs to 110 cfs. • Storage capacity of the forebay impacts the degree of protection of the pump plant. At elevation 20-ft the designed forebay area is 8.79 acres and volume if 54.2 ac-ft. Maximum 1% water surface is elevation 19.6-ft. Storm Lift Station No. 15 Improvements Drainage Study • This study evaluates impacts to the S 180th St pump station due to the additional flows (29.1 cfs being the 100-year flow) from the Tukwila South project in the event of pump failures caused by a power outage, equipment failure or other factors. The study notes that the hydraulic modeling associated with the pump station was completed by David Evans and Associates Inc. in 2010 as part of the Hydraulic Review and Assessment of the Southcenter Parkway Extension Project. • It is unknown whether the Southcenter Parkway Extension Project was implemented, and analysis associated with the project was not reviewed. Recommend study lead review this document and its references. • Lift Station No. 15 is a 27-foot diameter vault, 18-feet deep with a wetwell volume of approximately 5,430 cf and consists of four pumps: one 6.2 cfs pump and three 12.5 cfs pumps. Stormwater runoff is conveyed to the lift station through a 36-inch concrete pipe. The lift station pumps flow into a 30-inch pipe that further discharges into a 66-inch pressure pipe that conveys flows from surrounding areas and 1-5 into the Green River. Pumped flows are allowed only when the Green River flow is less than 12,000 cfs at the Auburn gage. • The study recommends sealing the pump station and installing a standby generator. It is unknown whether the recommended alternatives were implemented. City of Tukwila Surface Water Comprehensive Plan January 2024 P17 Pond and Southcenter Regional Hydraulic Study Tukwila Levee Accreditation Phase 1 — Engineering Analyses and Improvement Identification, prepared by Northwest Hydraulic Consultants, 2015 • The study was an internal drainage analysis to evaluate existing conditions landward of the Tukwila 205 levee in order to meet FEMA requirements for levee accreditation. • This study models the capabilities of the pump stations in the Southcenter subarea. Tukwila Pond Park Master Plan, prepared by J.B. Brennan, February 2022 ■ Contains a description and figure of the hydraulics related to Tukwila Pond, reproduced below. m: I.: A7W Qra:nage Pipe drains north to G'I Ham y ml Creek �rrar Fl0W4haCdS &m high rlvee uentsthatprei,fl7iam 1rTrom M.;i !_�. a elning. LK. << :- a...• � �.f.. a IP R • I- ManLauy Qper . Slide bare -...__ left Op a. —- 'r rarvi Bioswaie Za 1 e I u 30' Primary Pond Overflow to Gilliam I Creek. Water can back Me pond rrom mik • }his pipe when Grlliam Leek is high duc !, to high rluereuents preuenting rlow ro he river. ■ - 38'Secondary Pond ' Eho)Wale Qverfl•wIe P-1r •f IAequWPS higher Pond "'",A, elgyaiiam] ` H ■ 1,1 Diagram provided by City of Tukwila Public Works staff; Ryon f_arson,2021 Figure 8 Drainage Map :lia.1,10 -i 5vande' Pu'.li" _ .. when she. Stannwarer areal. war Cl rhN Sul... ROA KO DICOea h,kw,I,I — calked,:rulues- Scum Para S1eran — .hnod Pipe Stara vault Lid Culrerr — Stream OreM Cad, gds. fin§ ■ call olhe,yah,es• -ram Miser„alues. c e t,pa 1 krarr, Ca .um,r n ltikh a4mnr Furor a a.r Much Pm., ran Drainage Routing Associated with Tukwila Pond, from Tukwila Pond Park Master Plan Tukwila Surface Water Management Comprehensive Plan, September 2003 • Identified Project No 03-DRO9 to provide storm drain route on Strander Blvd to route Gilliam Creek outflow to Christensen Road Storm Drain Pump when Gilliam Creek outlet flap gates are closed. • Conversations with the City indicate that this was complete in 2005 with a pump station upgrade. City of Tukwila Surface Water Comprehensive Plan January 2024 ATTACHMENT E-3 2024 Annual Small Drainage Program Otak Memorandum To: Sherry Edquid; Josh Hopkins From: Trista Kobluskie Copies: File Date: February 12, 2024 Subject: Tukwila 2024 Annual Small Drainage Project List Project No. : 33383 Otak compiled a 2024 Annual Small Drainage (ASD) project list as part of the Surface Water Comprehensive Plan (SWCP) update. The majority of the ASD project list comprises small projects from the 2022 Small Drainage Project List which have not yet been completed. Project priority has been established using the following criteria: Priority 1 Priority 2 Priority 3 • Incomplete projects from the 2022 Small Drainage Project List with a priority of 2, unless otherwise mentioned. • Incomplete projects from the 2022 Small Drainage Project List with a priority of 3, unless otherwise mentioned. • Incomplete projects from the 2022 Small Drainage Project List with any priority that appear to be primarily private property issues or issues not directly associated with the storm sewer; or • Projects that are new to the ASD list. 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage Project List 2024 Annual Small Drainage Project List' Page 2 of 10 February 12, 2024 Priori Project Description Co WCP nown ssue No. Problem Statement 1 Resident at 10349 Beacon Ave S. has roadway runoff entering her property causing damage to her septic system. Surveyed in 2008. There are two possible solutions to resolve this issue; either obtain easements from private property owners to construct new drainage system to the west or construct a deep storm line to Ryan Way. The preferred method will need to be determined during design. Construction $ 80,000 Eng/Cont 15% $ 16,000 Total $ 96,000 KI-9 1 On 34th & Military Road — Root plugged, old culvert tile pipe. Replace 18" pipe from Military Road to 34th at old gas station to corner of S. 144th Street. TBD KI-10 1 Old broken pipe from ditch on 45th to S. 137th — Mismatched pipe, junk system. Replace approximately 450' of 12" pipe and add (8) catch basins on east side of 45th. Total $ 70,000 KI-11 (Also PP-9) 1 At the NE corner of 33rd and S. 132nd, 3306 S. 132nd manufactured home has 12" CMP/concrete culvert tile pipe running through yard to manhole under deck and then out to pond in neighbor's yard then to 34th, live stream. Replace/re-route system, HPA needed. TBD KI-12 1 38th Ave & S. 130th to dead end — Needs new drainage system. Old mismatched pipe, deep ditches, steep driveways. Water running into home on lower side of road. Install new 12" storm system with catch basins and thickened edges to get water to new catch basins. TBD KI-13 1 Otak Recommendation Only — Not Approved by City Administration or Council — Subject to Change 2 When costs are provided, they are from the 2022 Small Drainage Projects List. Costs were not developed for additional projects, nor updated from 2022. o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List Page 3 of 10 February 12, 2024 Priority Problem Statement Project Description Cost2 SWCP Known ssue No. 2 S. 150th creek outfall to catch basin on S. 150th (off Macadam Road). Undersized inlet "debris plugs", south of Baptist church. Install new cone grate and Type II manhole. Construction $ 15,000 Eng/Cont 15% $ 6,000 Total $ 21,000 *Design completed in 2016 KI-70 2 56th Ave S & S. 141St to S. 139th problem area — Problem ditch. Long berms need new drainage system to prevent homes from being flooded. Install approx. 600' of 12" storm main and (4- 6) catch basins from S. 141st to S. 139th. Fill ditch, both sides of 56th Ave South. Total $100,000 KI-71 2 West Valley Hwy at the CAT Rental Store — Railroad tracks to the ditch. Replace 650' of 12" pipe and install (5) Type I catch basins. Crossing OK, need R-O-W survey. Construction $100,000 Eng/Cont 15% $ 15,000 Total $115,000 KI-15 2 On S. 130th at East Marginal Way on west side — Old mismatched pipe is broken, junk system etc. From East Marginal Way to 34th — Both sides of road, new system. Replace pipe from ditch on north side crossing with 950' of 12" pipe and (15) catch basins, including angle across street. TBD KI-17 (Also PP-10) 2 Large Contech pot style vault at Gilliam Creek crossing on S. 154th — vault needs better access for pot cleaning and replacement. Pull lid from vault and add 2-3 foot riser section asphalt area. Add fences and gates for vehicle access for cleaning. TBD KI-72 2 10831 TIB — Downstream pipe was abandoned (no idea when) and is now slowing to north through pipes at reverse grade. Replace 5 type-1 CBs and 330' of 12" storm pipe from DR00037 to DR00020 TBD KI-73 (Also PP-5) o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List Page 4 of 10 February 12, 2024 Priority Problem Statement Project Descripti • Cost2 SWCP Known Issue No. 3 13601 40th Ave S. Old brick built CB2s and 18" CMP pipe are completely impacted with roots. Sections of the pipe have rusted away, and water is scouring the ground around the pipe depositing sediment into Southgate Creek 90' of 18" CMP; 80' of 12" concrete; two CB2s and one CBI need to be replaced. Recommend waiting until the ongoing study of Southgate Creek has been completed to see if proposed solutions will address this problem. Existing design may need to be changed. TBD KI-87 3 S. 133rd & S. 134th — Clean rocks and other debris out of 30" CMP pipe on west branch of Southgate Creek. Debris plugs low flow pipe, hard to keep clean. NPDES issue and private property issue. Recommend assessing again after Middle Fork Southgate Stream and Slope Stability Study has been completed. TBD KI-14 3 Off S. 135th between 37th and 35th — Local crawl space flooding due to no drainage in private alley. Install drainage and hook up homes. Need petition from property owners. TBD KI-18 3 42nd Avenue Detention Pond, storm structure ID=DR01878, frequent or difficult maintenance; City checks during all storms. City would also like to consider adding shade and making the facility available for public access. Detention pond outfalls to Category IV wetland. Structure ID=DR01878 is a catch basin within wetland. Update inlet of ID=DR01878 to reduce clogging. Evaluate placing trash rack or pipe screen on structure ID=DR06845, an approximately 12-in diameter pipe flowing out of detention pond. Evaluate northwest corner of parcel 0042000355 for suitability to plant a shade tree. TBD KI-52 o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List 2022 & Prior Annual Small Drainage Projects, Disposition Table Page 5 of 10 February 12, 2024 - - - description Disposition Priority Ranking 1 14811 42nd Ave South — Inlet to pipe on this property frequently plugs up with leaves and sticks, then overflows onto 42nd Ave South, creating localized flooding. The preacher's house. Two options for repair: 1) Reroute the flow from the outfall on S. 148th Street by connecting storm pipes DR13199 and DR13246 to a new type 2 CB, then 90' of new storm main from CB to the east to a new type 2 installed on the 18" main that flows south through the intersection of S. 148th & 42nd Ave South. 2) Install a type 2 CB on storm pipe DR13258 (the inlet pipe for the flow running across this property) with a beehive rack on top and trash rack on the inlet pipe to the new structure. Completed 2021 1 Klickitat Ave at 53rd Ave S. 18" CMP is rusting out and a sink hole is forming in the shoulder above it. Replace 180' of CMP pipe between structures DR06858 and DR02254 Completed 2021 1 13601 40th Ave S. Old brick built CB2s and 18" CMP pipe are completely impacted with roots. Sections of the pipe have rusted away, and water is scouring the ground around the pipe depositing sediment into Southgate Creek 90' of 18" CMP; 80' of 12" concrete; two CB2s and one CB1 need to be replaced. SWCP KI-87; 2024 ASD, Priority 3 1 S 124th St from 42nd Ave to 45th Ave — Allentown There is no drainage on the north side of S. 124th so the stormwater is running off the road into residents' yards and driveways. Install asphalt berms and catch basins along the north side of S 124th St. New drains will either be connected to the existing main on the south side of S 124t'' St or to existing drains on 43rd, 44th & 45th. Possible utility conflict on S 124th Completed 2021 1 57th Ave South off Interurban Ave behind the Golden Nugget. Bring Type II manhole up to grade by removing 8' of 24" riser rings. Add 48" riser sections and new manhole ring & cover Completed 2021 1 53rd Ave S from 166th Lane in SeaTac Install new Type 1 CB behind 16625 53rd Ave S, repair and line approx. 345' of 12" conc. storm line. All work in easement on private property. Completed 2021 o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List Page 6 of 10 February 12, 2024 2022 Priority Rankin • Problem Sta Project Description Dispositi • 1 Allentown — 48th 49th, S. 124th — These streets have no formal drainage and have always had problems with runoff into yards and homes from right-of-way Install new pipe one street at a time. Completed 2022 2 Rip rap has been washed out from the end of outfalls at flapgates #27, #28 and #29 in Gateway Park. Add root wads Replace rip rap, add root wads, HPA needed. Unknown 2 Resident at 10349 Beacon Ave S. has roadway runoff entering her property causing damage to her septic system. Surveyed in 2008. There are two possible solutions to resolve this issue; either obtain easements from private property owners to construct new drainage system to the west or construct a deep storm line to Ryan Way. The preferred method will need to be determined during design. SWCP KI-9; 2024 ASD, Priority 1 2 Trail #14 at S. 168th & 53rd — Install storm system under sidewalk to get rid of deep ditch to residence there. From dead end of S. 168th to storm line on 53rd. Install (2) Type I catch basins and 400' of 12" pipe. Remove deep ditch on north side of home's property. Problem solved. Property at 16665 built; no longer an issue. 2 On 34th & Military Road — Root plugged, old culvert tile pipe. Replace 18" pipe from Military Road to 34th at old gas station to corner of S. 144th Street. SWCP KI-10; 2024 ASD, Priority 1 o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List Page 7 of 10 February 12, 2024 2022 Priority Ranking escription Disposition 2 Old broken pipe from ditch on 451h to S. 1371h — Mismatched pipe, junk system. Replace approximately 450' of 12" pipe and add (8) catch basins on east side of 45th. SWCP KI-11; 2024 ASD, Priority 1 2 At the NE corner of 33rd and S. 132nd, 3306 S. 132nd manufactured home has 12" CMP/concrete culvert tile pipe running through yard to manhole under deck and then out to pond in neighbor's yard then to 34th, live stream Replace/re-route system, HPA needed. SWCP KI-12; 2024 ASD, Priority 1 2 38th Ave & S. 130thto dead end — Needs new drainage system. Old mismatched pipe, deep ditches, steep driveways. Water running into home on lower side of road. Install new 12" storm system with catch basins and thickened edges to get water to new catch basins. SWCP KI-13; 2024 ASD, Priority 1 3 S. 150th creek outfall to catch basin on S. 150th (off Macadam Road). Undersized inlet "debris plugs" south of Baptist church. Install new cone grate and Type II manhole. SWCP KI-70; 2024 ASD, Priority 2 3 56th Ave S & S. 141st to S. 139th problem area — Problem ditch. Long berms need new drainage system to prevent homes from being flooded. Install approx. 600' of 12" storm main and (4-6) catch basins from S. 141st to S. 139th. Fill ditch, both sides of 56th Ave South. SWCP KI-71; 2024 ASD, Priority 2 3 S. 133rd & S. 134th — Clean rocks and other debris out of 30" CMP pipe on west branch of Southgate Creek. Debris plugs low flow pipe, hard to keep clean. NPDES issue and private property issue. SWCP KI-14; 2024 ASD, Priority 3 3 West Valley Hwy at the CAT Rental Store — Railroad tracks to the ditch. Replace 650' of 12" pipe and install (5) Type I catch basins. Crossing OK, need R-O-W survey. SWCP KI-15; 2024 ASD, Priority 2 o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List Page 8 of 10 February 12, 2024 2022 Priority Ranking - J escription Disposition 3 On 37th Ave South from S. 1261h to S. 128th, then down S. 126th to creek — Old mismatched pipe is broken, junk system etc. Replace 750' of 12" pipe and install (12) catch basins. SWCP KI-16; Solved, per City staff interviews for SWCP 3 On S. 130th at East Marginal Way on west side — Old mismatched pipe is broken, junk system etc. From East Marginal Way to 34th — Both sides of road, new system. Replace pipe from ditch on north side crossing with 950' of 12" pipe and (15) catch basins, including angle across street. SWCP KI-17; 2024 ASD, Priority 2 3 Off S. 135th between 37th and 35th — Local crawl space flooding due to no drainage in private alley. Install drainage and hook up homes. Need petition from property owners. SWCP KI-18; 2024 ASD, Priority 3 3 Large Contech pot style vault at Gilliam Creek crossing on S. 154th — vault needs better access for pot cleaning and replacement. Pull lid from vault and add 2-3 foot riser section asphalt area. Add fences and gates for vehicle access for cleaning. SWCP KI-72; 2024 ASD, Priority 2 None 10831 TIB — Downstream pipe was abandoned (no idea when) and is now slowing to north through pipes at reverse grade. Replace 5 type-1 CBs and 330' of 12" storm pipe from DR00037 to DR00020 SWCP KI-73; 2024 ASD, Priority 2 N/A Trail #11 at S. 162nd & 48th — Need new storm system for 47th from the trail to S. 160th Street. East side of road, homes gets lots of run off. Install (8-10) Type I catch basins and 1,000 feet of 12" pipe to replace old broken mismatched junk pipe. Add thickened edge whole eastside with catch basins crossing to main line on west side. Completed 2017 N/A 14423 to 14455 58th Ave S. between S. 144th and S. 147th — Plugged under drains and rotten pipe. Sub -standard catch basins creating icing and washing problems. Broken sunken sidewalks. Remove 200' of sidewalk and curb. Replace under drains and install new drainage system. Replace concrete driveway aprons, sidewalks and curbs hook up all yard drains to system. Install Type 3 catch basin and pipe to collect water. Completed 2017 o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List Page 9 of 10 February 12, 2024 2022 Priorit Rankin ' roblem Sta Project Description Dispositi • N/A Sidewalk at the Target Store — north end of building along Strander Blvd has no drainage. This leads to large puddles affecting customers. Install drainage pipe and catch basins to get water in low spot to drainage system in Strander Blvd. Completed 2017 N/A Outfall headwall at the 109" Gilliam Outfall — Needs railing, catwalk, and ladder to access pad for inspection. Also, RDF has an unsafe access issue from the parking pad to inflow pipe. Install railing, stairs, catwalk, and ladder to bottom pad at structure for safer access. HPA? Install a platform and stairs from parking pad to bottom. Build on the south side of structure. Completed 2018 N/A Rotten CMP pipe and manhole in levee at Overmeyer Drive, CBD — Storm out fall system, block south of Strander Blvd. Lined 100' with CIPP Completed 2018 N/A Abandon storm manhole in front of Sabey Server farm. Manhole next to power pole out front of gen sets. Add (1) Type I catch basin and pipe to downstream system. Grout pipe under highway. Completed 2018 N/A Gilliam Creek & S. 154th — Replace and improve drainage structure DR05540, "the cone". This is the structure at the inlet to the culvert that carries Gilliam Creek under Southcenter Blvd. Rebuild needs to have something similar to the rack on the Gilliam Creek inlet that goes to the river and also improve access to this structure so the crew can maintain it. There might have been some design work started already. Completed 2019 N/A Stairs at the Gilliam Creek Control Structure — Install new stairs for access to the debris grate Possibly designed in 2016 but the Crystal Springs project prevented it from being done. Completed 2019 o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx Tukwila 2024 Annual Small Drainage List CIPP Lining Projects, Disposition Page 10 of 10 February 12, 2024 Problem Statement ' roject Description Disposition ih Southcenter Blvd @ 61st Ave South — Storm main needs to be lined between DR04298 and DR04276 to prevent root intrusion. Approximately 110' of 18" pipe. There is also a repair that needs to be made 20' from the south end of this pipe where a guardrail post punctured the top of the pipe. Completed 2019 S. 140'h Street @ 38'h Ave South — Storm main needs to be lined between DR04742 and DR04743 and DR04744 to prevent root intrusion. Approximately 200' of 12" pipe. Completed 2019 S. 152hd Street @ 42hd Ave South — Storm main needs to be lined between DR02222 and DR02223 and DR01867 to prevent root intrusion Approximately 170' of 12" pipe. Completed 2019 S. 130'h Street @ 33rd Place South — Storm main needs to be lined between DR04373 and DR04372 and DR04371 and DR04370 to prevent root intrusion. Approximately 120' of 12" pipe. Completed 2019 40'h Ave South @ Southcenter Blvd — Storm main needs to be lined between DR01533 and DR01532 to prevent root intrusion. Approximately 45' of 8" pipe. Completed 2019 Behind Thorndyke Elementary School —Storm main needs to be lined from DR0174 to DR0175 to DR05784 Approximately 285' of 24" pipe Completed 2021 53rd Ave S from 166th Lane in SeaTac (listed above for repairs) Approximately 345' of 12" conc. pipe Completed 2021 o:Iproject1333001333831waterres\task 600 - swcplt-6401annual small drainage12024 annual small drainage projects list.docx ATTACHMENT E-4 Public Involvement Materials CITY OF TUKWILA • Surface Water Comprehensive Plan Update The City of Tukwila is updating its Surface Water Comprehensive Plan for the next 10 years. We are working on fixing stormwater drainage issues and improving stormwater quality and fish habitat. Projects are funded by the Surface Water utility Fees paid by property owners in • Tukwila along with grants or partnerships. We need your help to identify which projects and studies are the most important to you. What is your priority for managing stormwater runoff? -.40411111.1011111 10.61P!issoi'w-- . . __ _ . -.:_ [■] �] Your opinion matters! We will use feedback from the community to help select which projects and studies to implement first. r. ti ., /14. ■ � f TUKWILA SURFACE ��/ WATER Tukwila Surface Water Comprehensive Plan Update Project Prioritization Septem TUKWILA SURFACE WATER • er 20, 2 • Introduction & History • Public Works Department — Surface Water Program • Updating the Surface Water Comprehensive Plan • Strategic framework for managing surface water — Conserve and enhance streams, ponds, rivers — Protect public health and safety — Protect private property and public infrastructure — Maintain compliance with regulations • First plan in 2003 • Second plan in 2013 Duwamish River in Tukwila . What are we doing? • The plan will work to fix stormwater drainage issues and improve stormwater quality and fish habitat • We need your help to identify which projects and studies are the most important to you! • The online survey has four types of projects: • Drainage • Water Quality • Fish Barrier Removal • Studies Stormwater Manhole Lid Drainage Projects Flooding in Tukwila New catch basin in Tukwila Water Quality Projects Tukwila Pond Bioretention cell in Tukwila Fish Barrier Removal Projects Gilliam Creek fish barrier in Tukwila Riverton Creek fish barrier removal project in Tukwila Studies Minkler Public Works Maintenance Facility in Tukwila Minkler Pond in Tukwila •■• ■ ■ •Oa ■ ■■■■ ■I■■ S r ■••a • 1:::I ■ ern ■ • • • MS ■ ■■ ■ r • a • Ea•. r • • am ■• as ■■ r 1:::1 • l • • • A ■ A ■ • A •E• ■ O■ MOM ■ • a■ ■ m • ■ • A MOO ■ MS ■ MESA MOM m ■■ • • ■■ I •DI■■ Id■S e ■O■ ■ a ■ ■ ■ • • ■ ■ ■r ■EU•A • • • ■O• ■■ • • n ■E■ ae a ■ Sind ■ • r n.■•■ 05E0 ■ a ■ •S ■ a • O •l l ■ ■ • ■ ■ ■ ■S ■O■ • •■ ■a• a ■ •E A • ■ ■■ ■ • • ■ ■■ r■■ ••■■ ■O ■ • S• ■ ■■ a•■ • I • ■■ s ■M ■ ■ ■•■ •■l•DA ■ • ••m•l A l l a ■A ■■ ■ ■ • • ■ • •■ • WOO ass dee n ■ • • MAMMA ■ ON ■D O ■ ■ ■■ di r ■■ • ■ O■ Eakin a m ■ M■ MO MOO • • ■■r r • ■ ■ ■■ ■ ■ a ■■ ■ A • ■ ■E ■ ■■ ■ ■• ■ n • • ■■ ■••A ■•• A •••■ r • ■■ ■■■ w ■ E. w. ■ • UUUUUU • • nOWCOo, ■■ ■ ■■ ■ Imes ■■ l • a l Da•■ PWYACY.ROWCODE.COM ODDS ■e ■ What is your priority for managing stormwater runoff? The survey is open until October 11th! Recipients From: Sent: To: Subject: City of Tukwila <scott.kirby@tukwilawa.gov> Monday, September 25, 2023 4:59 PM Recipients City of Tukwila E-Hazelnut Newsletter for September 2023 City of Tukwila E-Hazelnut Newsletter - September 2023 Quick Links • City of Tukwila Website • City Employment Opportunities • Experience Tukwila • TukTV Tukwila Elected Officials Hear from your Tukwila candidates! City of Tukwila 2023 Election Video Voters' Guide To help Tukwila residents get to know the candidates for the Mayor and Council positions in the upcoming election, the City of Tukwila offers a 2023 Video Voters' Guide as a resource for Which stormwater projects and studies are important to you in Tukwila? TUKWILA SURFACE WATER Rain is inevitable. Stormwater pollution is not. What is your priority for managing stormwater runoff? The City of Tukwila is updating its Surface Water Comprehensive Plan for the next 10 years. We are working on fixing stormwater drainage issues and improving stormwater quality and fish habitat. Projects are funded by the Surface Water Utility Fees paid by property owners in Tukwila along with grants or partnerships. We need your help to identify which projects and studies are the most important to you! We will use feedback from the community to help select which projects and studies to implement first. Use our online survey to submit your priority projects by October 11, 2023! • View the Online Survey City of Tukwila 16200 Southcenter Blvd, Tukwila WA 98188 1206 433-1800 City of Tukwila 16200 Southcenter Blvd, Tukwila, WA 98188 Unsubscribe trista.kobluskie@otak.com Update Profile I Constant Contact Data Notice Sent by scott.kirby@tukwilawa.gov powered by `1 Constant / Contact Try email marketing for free today! Tukwila SWC Public Engagement Survey Site Tukwila Surface Water Comp Plan Project Prioritization Survey Welcome! Please help the City of Tukwila prioritize projects and studies to address stormwater drainage, improve quality of runoff, and restore fish habitat. The storm sewer system is designed to gather stormwater runoff and discharge it to local streams and the Green/Duwamish River. How we manage runoff and design stream and river crossings such as culverts can affect ponding on streets and properties, water quality in streams, rivers, and the Puget Sound, and availability of habitat for fish. The City has identified 17 surface water capital projects to fix lack of stormwater infrastructure, aging infrastructure, or older designs that may be contributing to ponding, poor water quality, or degraded fish habitat. See the reference map below for project locations. The City has also identified four studies where we need to learn more about the problems before deciding on solutions. To help us prioritize future projects, please tell us about your preferences in the survey below the map. The projects we are asking you about today are for the future. If you would like to see our recent and ongoing construction projects, see the completed projects and the surface water projects lists on our City Construction Projects and Transportation Impacts web page. The survey will be open until October 11, 2023 Optional: Open Map in New Tab Optional: Open Survey in New Tab https://experience.arcgis.com/experience/0914f76 ad65498f8db82e5384d20ffb/page/City-of-Tukwila-SWCP-Survey/?draft=true&org=Otak Tukwila SWCP Proposed Projects Map I Tukwila SWCP Public Engagement Survey Site and Park ■ w-1 ouwamisn ■ W-5 Tukwila SWCP Proposed Projects *D-2 11515,5.11 Sterile Allentown ■ W-7 '1 W19 e'"�sn u,,.e He 1Rl1' . non U®6x ■ w-+o ■W-8 *D-3 5 1461^S1 s ,Btn Sr '.111 1 i[ ken ei9 is Foster Se a tan Lr i 2rg16 Sr LEGEND * Proposed Drainage Projects • Proposed Water Quality Projects • Proposed Fish Barrier Removal Projects forcer Guar o H-1 Skynay OW-6 r *D-4 fmi Pa. itDr�wla neitheld Setnixoncor ■W-3 r 1414 SW https://experience.arcgis.com/experience/0914f760ad65498f8db82e5384d20ffb/page/Tukwila-SWOP-Proposed-Projects-M ap/?draft=true&org=0tak Cara Tukwila SWCP Project Preference Survey Survey Page 1 Which are your preferred drainage projects? Drainage projects address ponding on streets from stormwater runoff, repair or replacement of aging stormwater pipes, or re-routing stormwater pipes when safety or water quality are a concern. Please select up to two options below. Drainage projects are shown on the map above as blue stars. n D-1: Tukwila Parkway Drainage and Water Quality Improvement Issue : The 48-inch diameter stormwater pipe on Andover Park W connects to a state stormwater pipe under 1-405 without maintenance access. Runoff from busy roads discharging at three outfalls does not receive treatment. Project: Re-route the stormwater pipe on Andover Park W. Ensure both maintenance access to new pipe and positive drainage to the downstream system. Add a runoff treatment facility to remove pollutants from runoff which currently connects to a stormwater pipe under 1-405 without maintenance access. Ensure both maintenance access to new pipe and positive drainage to the downstream system. Add runoff treatment facilities to remove pollutants from runoff. Benefits: Improves maintainability, ensures drainage, removes pollutants from urban runoff, and completes a project that was identified in the 2013 Surface Water Comprehensive Plan. D-2: S. Ryan Way Pipe Rehabilitation Issue: Stormwater pipes in S Ryan Way are aging, in poor condition, and are at risk of failure. Project: Replace aging stormwater pipes and improve runoff collection. Coordinate efforts with potential pedestrian safety or re -paving projects in same location. Benefits: Avoids potential road safety hazards from sheet flow on a steep street if aging stormwater pipes were to fail. ElD-3: S 146th St and 35th Ave S Drainage Improvement Issue: Stormwater runoff ponds along S 146th Street and a portion of 35th Ave S and adjacent private property. Project: Install curbs and replace stormwater pipes along S 146th Street and a Cara Benefits: Reduces ponding on streets and property and completes a project that was identified in the 2013 Surface Water Comprehensive Plan. D-4: S 143rd St Drainage and Water Quality Improvement Issue: Stormwater runoff ponds along S 143rd Place and S 143rd Street and adjacent private properties. River water may back up into stormwater pipes when the river is high. Stormwater runoff is untreated. Project: Install curbs and replace stormwater pipes along S 143rd Place and S 143rd Street. Convert an existing ditch to a bioswale and construct a runoff treatment facility to remove pollutants from runoff. Install a flapgate at the river. Benefits: Reduces ponding on streets and property and removes pollutants from runoff and completes a project that was identified in the 2013 Surface Water Comprehensive Plan. ❑ D-5: Nelsen/Longacres Drainage Improvement Phase II Issue: Stormwater runoff ponds on Longacres Way and adjacent properties. The 24-inch diameter stormwater pipe draining east under the Burlington Northern Santa Fe railroad tracks is too small. A previous project phase to install stormwater pipe from West Valley Highway was finished in 2015. Project: Install a 48-in stormwater pipe from ditch west of railroad tracks using trenchless technique underneath tracks connecting to existing P-1 interceptor pipe to the east. The project addresses ponding in the road and adjacent properties. The previous project phase to install stormwater pipe from West Valley Highway to Nelsen was finished in 2015. Benefits: Reduces ponding on streets and property and completes a drainage project first identified in 1993 Surface Water Management Comprehensive Plan. D-6: Tukwila Urban Center Conveyance Inspections Issue: The stormwater pipe system in the Tukwila Urban Center is relatively flat and may tend to fill with sediment. The system is aging, and the repair, rehabilitation, and assessment needs are unknown. Project: Clean and inspect stormwater pipes in Tukwila Urban Center to assess condition and identify next steps. Benefits: Proactively manages drainage and pipe condition in busy area before serious problems arise. ❑ None: I do not support drainage projects Please write in a drainage issue and location. Cara 1000 4 Next Powered by ArcGIS Survey123 Page 2 of 5 Cara Tukwila SWCP Project Preference Survey Survey Page 2 Which are your preferred water quality projects? Water quality projects remove pollutants from stormwater before discharging runoff to streams or the Green/Duwamish River. Please select up to two options below. Water quality projects are shown on the map above as blue squares. W-1: Norfolk Trunkline Sewer Separation Issue: The City inherited a 84-inch diameter sewer trunkline from King County Wastewater division in 1994. Some of City's stormwater, Boeing stormwater, and City of Seattle stormwater is flowing into the trunkline. Project: Disconnect City -owned stormwater pipes from sanitary sewer trunkline in 27th Ave S. Install new stormwater pipes and construct a new stormwater outfall to the Duwamish River. Assess system hydraulics and pipe alignments in a pre - design alternatives analysis. Benefits: Reduces risk of City involvement in a sanitary sewer outfall combined sewer overflow (CSO) from stormwater overflow in a big storm. n W-2: Fort Dent Park/Starfire Water Quality Retrofit Issue: Developed areas of the park, including sports fields, discharge urban runoff to the Duwamish River and may discharge an emerging pollutant of concern from tire particles that is known to kill coho salmon. Project: Construct a new runoff treatment facility to remove pollutants from developed areas of the park. Benefits: Removes pollutants from urban runoff. W-3: Tukwila Pond Enhancement and Water Quality Retrofit Issue: Tukwila Pond suffers from high levels of nutrients such as phosphorus, low oxygen, and high temperature in summer. Project: No specific project has yet been identified. The Surface Water Program could participate with the Parks & Recreation Department to improve the ecosystem and water quality in Tukwila Pond. The Parks & Recreation Department may study and select a water quality improvement intervention with a future implementation phase of the 2021 Tukwila Pond Park Master Plan, and the Surface Water Program will support a resulting water quality improvement project. dense urban area. 1 Cara ❑ ❑ W-4: City Gateway at Grady Way Stormwater Facility Rehabilitation and Water Quality Improvement Issue: A 1970's era transfer of ownership of a stormwater facility from the state department of transportation to the City of Tukwila is incomplete, and the older stormwater swale may not remove to the most toxic pollutants from urban road runoff. Project: Complete the paperwork to transfer ownership of the facility. Expand and improve the facility to remove more pollutants from urban runoff. Install landscaping and City gateway signage on the site. Benefits: Clarify ownership, improve pollutant removal, and support placemaking. W-5: Tukwila International Blvd Water Quality Improvement with Underground Structures Issue:Urban runoff from 2.2 acres of Tukwila International Blvd near SR-599 is untreated. Project: Install underground runoff treatment structures to remove pollutants from runoff from Tukwila International Blvd. The location is Treatment Site #8 from the City's 2021 study of stormwater retrofit sites. Benefits: Remove pollutants from urban stormwater runoff. W-6: Interurban Avenue South Water Quality Improvement with Underground Structures Issue: Urban runoff from 1.5 acres of Interurban Ave S near S 143rd St is untreated. Project: Install an underground runoff treatment structure to remove pollutants from stormwater. The location is Treatment Site #5 from the City's 2021 study of stormwater retrofit sites. Benefits: Remove pollutants from urban stormwater runoff. W-7: Tukwila International Blvd Bus Stop 30983 Water Quality Improvement with Underground Structures Issue: Urban runoff from 0.6 acres of runoff from Tukwila International Blvd is untreated. Project: Install an underground runoff treatment structure to remove pollutants from stormwater. The location is one of four sites prioritized in the City's 2023 Stormwater Management Action Plan (SMAP) for Riverton Creek Basin. Benefits: Remove pollutants from urban stormwater runoff. Cara W-7: Tukwila International Blvd Bus Stop 30983 Water Quality Improvement with Underground Structures Issue: Urban runoff from 0.6 acres of Tukwila International Blvd is untreated. Project: Install an underground runoff treatment structure to remove pollutants from stormwater. The location is one of four sites prioritized in the City's 2023 Stormwater Management Action Plan (SMAP) for Riverton Creek Basin. Benefits:Remove pollutants from urban stormwater runoff. W-8: S 130th St Right -of -Way Water Quality Improvement with Stormwater Planters (Bioretention) Issue: Urban runoff from 1.8 acres of S 130th Street and nearby streets is untreated. Project: Install above -ground vegetated bioretention planters to remove pollutants from runoff. The location is one of four sites prioritized in the City's 2023 Stormwater Management Action Plan (SMAP) for Riverton Creek Basin. Benefits: Remove pollutants from stormwater runoff. W-9: E Marginal Way S Water Quality Improvement with Distributed Underground Structures Issue: Urban runoff from 3.5 acres of E Marginal Way S is untreated. Project: Replace 22 catch basins with runoff treatment catch basins to remove pollutants from runoff. The location is one of four sites prioritized in the City's 2023 Stormwater Management Action Plan (SMAP) for Riverton Creek Basin. Benefits: Remove pollutants from stormwater runoff. W-10: Tukwila School District Stormwater Pond Retrofit and Sanitary Sewer Connection Issue: Tukwila School District previously washed school buses at the bus barn. Wash water from the school buses likely contains pollutants, and the school district stopped washing activity at the site until wash water can be directed away from the stormwater system. Stormwater runoff from the 1.2-acre property is collected and sent to the School District's stormwater pond, which provides treatment and flow control to older standards that could be improved. Project: Replace existing stormwater pond with a more effective vegetated bioretention pond and upgrade the flow control structure. Install a diversion valve and oil/water separator to protect stormwater facilities from wash water. The location is one of four sites prioritized in the City's 2023 Stormwater Management Action Plan (SMAP) for Riverton Creek Basin. Tukwila School District. Cara U None: I do not support water quality projects Other: Please write in a water quality issue and location 1000 Back Next Powered by ArcGIS Survey123 Page 3 of 5 Cara Tukwila SWCP Project Preference Survey Survey Page 3 Which is your preferred fish barrier removal project? Fish passage barrier removal projects increase access to good stream habitat for fish, especially salmon. Please select one option below. Fish passage barrier removal projects are shown on the map above as blue circles. H-1: Johnson Creek Fish Barrier Mitigation Issue: As salmon migrate through the Green River to and from the Puget Sound, a flapgate and debris rack prevent them from entering Johnson Creek, which provides important stream habitat for rearing and flood refuge. Project: Replace or update the flapgate and debris rack to allow salmon to access stream habitat for rearing and flood refuge. Coordinate with private property owner. Benefits: Improves fish access to difficult to find salmon rearing habitat, especially in spring. ❑ None: I do not support fish barrier removal projects Other: Please write in a fish barrier issue or habitat restoration project location. You may refer to the Water Resource Inventory Area (WRIA) 9 2021 Salmon Habitat Plan if you wish. 1000 Next Page 4 of 5 Cara Tukwila SWCP Project Preference Survey Survey Page 4 Which are your preferred studies? Studies allow the City to learn more about a drainage, water quality, or fish habitat problem before deciding on solutions. Please select up to two options below. Citywide Fish Passage Barrier Inventory Update and Prioritization Study Issue: The presence of fish passage barriers in creeks and streams is a critical risk to salmonids. Several types of barriers that result from human -made modifications such as dams and culverts can be corrected. Study proposal: The existing fish passage barrier inventory appears to be incomplete and needs to be updated. The study would inventory barriers throughout the City and would develop a process for prioritizing fish passage barrier removal projects, in coordination with the Duwamish Tribe. Southgate Stream Restoration Study Issue: Southgate Creek suffers from sedimentation throughout its lower reaches and erosion of streambanks that threaten properties. Study proposal: This study would perform a geomorphic assessment and geotechnical analysis of the stream and slope conditions in Southgate Creek basin to discover causes. From the study, the City would develop and prioritize solution concepts such as stream restoration, installation of a stormwater park, and others solutions. Pump Station #15 at S 180th St Capacity Study Issue: Five stormwater pumps at this station caught fire, and only two are now operating. Study proposal: This study would assess capacity of this station and system to determine if replacement pumps or upgrades are needed. Minkler Facility, P17 Basin, and Levee Setback Study Issue: The City is planning to discontinue use of the Minkler Public Works maintenance facility and sell the property. The King County Flood Control District has expressed interest in purchasing the property and setting back the adjacent levee, consistent with a project identified in the Water Resource Inventory Area Cara Pond and associated stormwater pump station operated by King County. Study proposal: This study would assess the conveyance and detention needs in the P17 basin, including identifying potential locations for replacing the P17 Pond and providing cost estimates. 0 None Other Please write in a study description Submit (please submit one survey per person) Powered byArcGIS Survey123 1000 Page 5 of 5 Tukwila SWCP Project Preference Survey Results The survey was open from September through October 2023. The survey included projects under consideration for the SWCP as well as water quality projects that had been identified in previous studies. For the purposes of the survey, projects were given alphanumeric IDs corresponding to their type - "D" for drainage, "W" for water quality, and "H" for habitat. Studies were listed in the survey with no ID. Drainage Projects ID Name Votes Other ID Notes D-1 Tukwila Parkway Drainage and Water Quality Improvement 4 CIP-4 Remains in CIP from prior Plan, with new concept D-2 S Ryan Way Pipe Rehabilitation 1 CIP-2 New CIP D-3 S 146th St and 35th Ave S Drainage Improvement 2 90341214 Remains in CIP from prior plan D-4 S 143rd St Drainage and Water Quality Improvement 2 98641222 Remains in CIP from prior plan. Final project concept does not include water quality portion. D-5 Nelsen/Longacres Drainage Improvement Phase II 0 98741202 Remains in CIP from prior Plan D-6 Tukwila Urban Center Conveyance Inspections 0 91241203 Remains in CIP from prior Plan None I do not support drainage projects 0 Other Write ins 0 Water Quality Projects ID Name Votes Other ID Notes W-1 Norfolk Trunkline Sewer Separation 2 CIP-1 New CIP W-2 Fort Dent Park/Starfire Water Quality Retrofit 0 CIP-3 New CIP W-3 Tukwila Pond Enhancement and Water Quality Retrofit 2 CIP-5 New CIP W-4 City Gateway at Grady Way Stormwater Facility Rehabilitation and Water Quality Improvement 0 N/A Later removed from list because of low feasibility W-5 Tukwila International Blvd. Water Quality Improvement with Underground Structures 4 Site 8 Treatment Site from Stormwater Outfall Water Quality Retrofit Project, Design Report, Revised 2021 W-6 Interurban Avenue South Water Quality Improvement with Underground Structures 0 Site 5 Treatment Site from Stormwater Outfall Water Quality Retrofit Project, Design Report, Revised 2021 W-7 Tukwila International Blvd. Bus Stop 60983 Water Quality Improvement with Underground Structures 0 SMAP-4 One of four sites prioritized in Riverton Creek Basin from 2023 SMAP. W-8 S 130th St Right -of -Way Water Quality Improvement 1 SMAP-5 One of four sites prioritized in W-9 E Marginal Way S Water Quality Improvement with Distributed Underground Structures 1 SMAP-12 One of four sites prioritized in Riverton Creek Basin from 2023 SMAP. W-10 Tukwila School District Stormwater Pond Retrofit and Sanitary Sewer Connection 0 SMAP-14 One of four sites prioritized in Riverton Creek Basin from 2023 SMAP. None I do not support water quality projects 0 Other Write ins 0 Page 1 of 2 Tukwila SWCP Project Preference Survey Results Habitat Improvement Projects ID Name Votes Other ID Notes H-1 Johnson Creek Fish Barrier Mitigation 1 CIP-6 Other Write ins 0 Studies ID Name Votes Other ID Notes 1 City-wide Fish Passage Barrier Inventory Update and Prioritization Study 5 CIP-101 New Study 2 Southgate Stream Restoration Study 1 CIP-102 New Study 3 Pump Station #15 at S 180th St Capacity Study 1 N/A Combined with CIP-103 4 Minkler Facility, P17 Basin, and Levee Setback Study 2 CIP-103 New Study None None Other Write ins Page 2 of 2 Appendix F Supporting Studies for Programmatic CIPs City of Tukwila Stormwater Management Action Plan Revised Final Submitted to: Prepared by: City of Tukwila 6200 Southcenter Blvd Tukwila, WA 98188 Otak, Inc. 11241 Willows Road NE, Suite 200 Redmond, WA 98052 January 15, 2024 Project No. 33383 Project Manager: Project Sponsor: Team Role: Team Role: Team Role: Team Role: Team Role: Team Role: Team Role: Team Role: Submitted to Sherry Edquid, Project Manager Mike Perfetti, Surface Water Senior Program Manager Project Development Team (Otak, Inc.) Trista Kobluskie, Project Manager and Senior Stormwater Planner Nate Robinson, P.E., Senior Project Engineer Brandon Teetsel, P.E. Project Engineer Madeline Pommier, Water Resources Designer Cara Donovan, Stormwater Planner John Rogers, Senior GIS Specialist Project Development Team (Aspect Consulting, LLC) Emelie Crumbaker, GIS Analyst Bryan Berkompas, Hydrologist Aspect (CONSULTING Funded by This project is funded in part by the Washington State Department of Ecology. NM DEPARTMENT OF arm ECOLOGY State of Washington TABLE OF CONTENTS Page Section 1. Introduction 1 Purpose 1 Document Organization 2 Section 2. Summary of Receiving Waters Assessment 3 Step 1-Delineate Drainage Basins 3 Step 2-Determine Designated Uses 5 Step 3-Assess the Overall Receiving Water Condition 5 Step 4-Assess the Stormwater Management Influence (SMI) Potential 6 Section 3. Summary of Basin Prioritization 10 Section 4. Retrofit Plan 12 Riverton Creek Basin 12 Methodology 15 Stormwater Management Action Development 15 Stakeholder Outreach 15 Stormwater Management Action Ranking 18 Recommended Stormwater Management Actions 22 Stormwater Facility Retrofit Projects 23 Land Management and/or Development Strategies 27 Customized Stormwater Management Actions 27 Instream Strategies 28 Section 5. Implementation Schedule 28 Short -Term Actions 29 Long -Term Actions 29 Section 6. Budget Sources 30 Section 7. Adaptive Management 32 Section 8. Conclusion 33 Section 9. References 33 TABLES Table 1 Tukwila Drainage Basins 3 Table 2 Basin Conditions 5 Table 3 Stormwater Management Influence Assessment 8 Table 4 Receiving Water Prioritization Rating Summary 11 Table 5 Record of Stormwater Management Action Concept Information Presented for Stakeholder Outreach 16 Table 6 Stormwater Management Actions Considered During Project Ranking 20 Table 7 Short -Term Retrofit Projects in the Riverton Creek Basin 23 Table 8 External Revenue Sources 30 FIGURES Figure 1 Tukwila Drainage Basins 4 Figure 2 Riverton Creek Basin Map 14 Figure 3 Stormwater Management Action Survey Results for Question 1* 18 City of Tukwila Stormwater Management Action Plan Otak Figure 4 Stormwater Management Action Survey Results for Question 2 18 Figure 5 Retrofit Projects 25 Figure 6 Short -Term Retrofit Project Catchments 26 Figure 7 Proposed Implementation Schedule 29 APPENDICES Appendix A Appendix B Appendix C Appendix D Receiving Waters Assessment Basin Prioritization — Memo and Outreach Summary Stormwater Management Action Outreach Material Short -Term Retrofit Project Fact Sheets and Cost Opinion Memorandum City of Tukwila ii Stormwater Management Action Plan Otak Section 1. Introduction The City of Tukwila (the City) is located in the Duwamish River Valley at the intersection of two interstate highways, 1-5 and 1-405. The Lower Green River, Duwamish River, and their tributaries which flow through the City are highly important for salmon migration. The population of salmon, including Chinook, coho, chum, and steelhead, has declined since the late 1800s. Chinook, coho, chum, and steelhead have been listed as threatened under the Endangered Species Act. There are many reasons for the decline, among them are the land use and land cover changes associated with the City's population growth. Historically, forests and wetlands infiltrated rain where it fell. As Tukwila developed the City became more impervious and land uses became more industrial and commercial. Now when it rains, the chemicals and particles from vehicle tires, roofs, lawns, and outdoor storage areas, some of which are harmful to fish populations, get swept quickly into the nearest stream by stormwater runoff. Urban stormwater runoff is rain and snowmelt that does not infiltrate due to impervious surfaces, such as paved streets, parking lots, and buildings. The City is authorized to discharge stormwater runoff to surface water by the State of Washington Department of Ecology (Ecology) under the National Pollutant Discharge Elimination System (NPDES) Western Washington Phase II Municipal Stormwater Permit (Permit). Ecology reissued the Permit, effective August 1, 2019 through July 31, 2024. Purpose The purpose of the Stormwater Management Action Plan (SMAP) is to further the City's goals of protecting shorelines, streams, and natural amenities (City of Tukwila, 2015). The City has implemented several important water quality retrofits and fish passage improvements over the past several years, and the SMAP expands upon that valuable work. This SMAP is intended to direct the City on the most effective and efficient plan to take action for the greatest benefit to one stream system. It also meets a Permit requirement and aligns with regional goals. Stormwater Management Action Planning is a new requirement under the current Permit. SMAP intends to help cities prioritize, invest, and plan stormwater retrofits along with targeted planning actions that accommodate future growth while minimizing impacts to receiving waters. Ecology uses SMAP as both a verb for the planning process and as a noun for the resulting plan. This document complies with Permit condition S5.C.1.d, by following, in large part, Ecology's 2019 Stormwater Management Action Planning Guidance (SMAP Guidance). This document also serves to meet the goals of the City's 2023 grant to prepare a basin plan, funded by Ecology through the Water Quality Combined Financial Assistance program. This document may also be used to partner with basin -protection stakeholders and to secure funding from Ecology to implement elements of the SMAP. The SMAP is also aligned with VISION 2050, the region's growth strategy led by the Puget Sound Regional Council (PSRC) (Puget Sound Regional Council, 2020). VISION 2050 was adopted in 2020 and establishes the following regional vision, "The central Puget Sound region provides an exceptional quality of life and opportunity for all, connected communities, a spectacular natural environment, and an innovative, thriving economy." Vision 2050 imagines that by 2050 the region's natural environment, including the City of Tukwila, will be restored, protected, and sustained by preserving and enhancing natural functions and wildlife habitats. VISION 2050 also supports the work that Puget Sound Partnership does to promote a coordinated approach to watershed planning and restoring the health of Puget Sound (Puget Sound Regional Council, 2020). City of Tukwila Stormwater Management Action Plan 1 Otak SMAP is focused on addressing effects of cumulative development on a watershed both under existing and future conditions. A successful SMAP strategically identifies approaches to alleviate existing stormwater problems and to protect and improve receiving water conditions while meeting future population and density targets. This SMAP identifies stormwater retrofits, land management and development strategies, customized stormwater management actions, and instream improvements to protect and restore water quality in the selected high -priority receiving water, Riverton Creek. The basin and stormwater management action selection processes both included stakeholder outreach. Feedback from both stakeholder outreach efforts was used to develop this SMAP. Document Organization The SMAP requirements are established in the Permit and described in more detail in the SMAP Guidance. The SMAP process consists of three major phases: • Phase 1 — Receiving Water Assessment (Section S5.C.1.d.i). • Phase 2 — Receiving Water Prioritization (Section S5.C.1.d.ii). • Phase 3 — SMAP (Section S5.C.1.d.iii). Each phase includes several steps which are outlined in this document. Section 2 and Section 3 describe how the requirements of the Receiving Water Assessment and Receiving Water Prioritization are respectively fulfilled. Section 4 details the retrofit plan for the prioritized receiving water, Riverton Creek. The implementation schedule, budget sources, and adaptive management approach to SMAP are described in Section 5, Section 6, and Section 7 respectively. City of Tukwila Stormwater Management Action Plan 2 Otak Section 2. Summary of Receiving Waters Assessment The receiving waters assessment followed the steps outlined in Ecology's SMAP Guidance and included input from the Building Cities in the Rain guidance (State of Washington Department of Commerce, 2016). The City completed a preliminary assessment of the receiving waters (Otak, 2021) that compiled much of the data used in the final assessment. Aspect and Otak, consultants, worked with City staff to gather additional data to complete the final receiving waters assessment in 2022. The Receiving Waters Assessment is available as Appendix A. The receiving waters assessment was completed in four steps: Step 1-Delineate Drainage Basins Aspect reviewed and confirmed the nine drainage basins previously delineated by the City (Figure 1). Per Ecology's SMAP Guidance, the total drainage areas and drainage areas within the city limits, herein called basins, were determined. The receiving waters for each basin were also determined and documented. The results are shown in Table 1. Table 1 Tukwila Drainage Basins Basin Name Receiving Waters within Basin Basin Area S • . Mi. =asin A in Tukwi S • . Mi. ercent asin in ukwila Direct Discharge to Puget Sound Gilliam Creek Green River, Gilliam Creek, Cottage Creek 2.9 2.1 70.8 No Green/ Duwamish River Green/ Duwamish Rivers, Duwamish Waterway, Ryan Hill Creek 465.0 4.0 0.9 Yes Johnson Creek Green River, Johnson Creek, Ditches J2 (probable), and Ditch C (probable) 2.7 0.5 16.5 No Mill Creek Green River 8.0 0.1 1.7 No Nelsen* I Springbrook Creek, Green River** 0.2 0.2 98.7 No P17 Green River, Stream E, El, E2 2.4 1.3 53.3 No Riverton Creek Duwamish River, Riverton Creek 0.8 0.6 78.3 No Southgate Creek Duwamish River, Southgate Creek 0.8 0.8 99.6 No Springbrook Creek Green River, Black River, Springbrook Creek 3.6 0.1 2.0 No * The value in this cell has changed since completion of the Receiving Water Assessment and Prioritization memoranda, which referred to this basin as "Nelson." The basin name has been changed to "Nelsen" in this document to reflect City staff's knowledge of the basin. ** The value in this table differs from the information given in Appendix A, Receiving Waters Assessment, Table 1, which states that Green River is the only receiving water in the Nelsen basin. City of Tukwila Stormwater Management Action Plan 3 Otak ighland Park Normandy Park c Gilliam Green/Duwamish c2Riverton c2 Southgate SEATTLE-TACOMA\ INTERNATIONAL, AIRPORT Other Basins 2. Streams City of Tukwila —* Flow Direction * 2,000 4,000 Feet inierC Beach La; eridge S k\yway BLACK RIVER' FOREST, Mill Creek ennydale Receiving Water Assessment Basins City of Tukwila SMAP Tukwila, Washington * There is interflow between the Gilliam, P17, and Johnson Creek basins, which is complex and has not been depicted with flow arrows. Aspect CONSULTING JAN-2023 BY.: EAC / BB PROJECT NO. 210379 REVISED BY: NCP/ BB FIGURE NO. 1 Data source credits: None II Basemap Spruce Layer Credits: CO of Seaiac, King County, WA State Parks GIS, Esri, HERE, Garmin, SafeGraph, Georechnologies, I c, METI/NASA, USGS, Bureau of Land Management, EPA NPS, USDA, City of Searac, Hing Court MET%NASA, USGS, Bureau of Land Management, EPA, NPS A State Parks GIS, Eari, HERE, Gamin, SafeGraph, FAO, Step 2-Determine Designated Uses The designated uses for aquatic life and recreation were determined for each basin following Washington Administrative Code (WAC) 173-201A. All basins are designated for "Salmonid Spawning, Rearing, and Migration" and for "Primary Contact." Portions of the Green/Duwamish basin are designated for "Salmonid Rearing and Migration Only" and for "Shellfish Harvesting." The water quality standards that are associated with these designated uses are shown in Appendix A. Step 3-Assess the Overall Receiving Water Condition Data to assess overall receiving water conditions came from many sources, including the Washington Department of Fish and Wildlife, Ecology, King County, the Washington State Department of Health, and the City. These data sets were used to assess the overall conditions of the receiving waters based on the following categories: • Extent to which desired conditions are being met. This category looked at habitat and known water quality impairments. Habitat was assessed using known fish presence data and the percentage of the basin with 100-foot to 300-foot vegetative buffers. Water quality was assessed using Benthic Index of Biotic Integrity (B-IBI) data, 303d (impaired waterbodies) and 305b listings, Total Maximum Daily Load (TMDL) Plans (water quality improvement projects), and City data. • Landscape Areas. This category assessed landscape -scale data using geographic information systems (GIS) to determine impervious area, vegetative cover, land use (industrial, commercial, and residential), high average daily traffic (ADT) roads, road areas adjacent to the stream, fish barriers, and culverts. • Development Pressures within the basin. This category examined hazardous areas (landslide, seismic, etc.), the number of planned developments or redevelopments, and the amount of environmental protection already in place due to zoning and critical area designations. • Discharge to basins with impaired waters. This category looked at the types of impairments within each basin, including known contaminated sites, areas already being treated or covered under other permits (such as the Industrial Stormwater General Permit (ISGP)), sources of contamination based on land use, the extent and location of impairments in the basin, and opportunities or availability to treat impairments. • Overburdened communities. This category assessed the burden on communities within each basin by documenting the percentage of residents of color, those living in poverty, English language learner households, free and reduced school lunch usage, and the proximity of residential areas near high ADT roads. These categories were used to develop a qualitative overall assessment of the condition of each delineated basin. The summary results are presented in Table 2. The full analysis can be found in Appendix A. Table 2 Basin Conditions Basin Receiving Water Condition Summary Gilliam Creek • One 303(d) listing • Relatively large Washington State Department of Transportation (WSDOT) influence (251.4 acres, 19% of basin) • Relatively high percentage of pollution -generating surface (PGS) area • More than 70% of the basin is in Tukwila • City data from lower reach in 2018-2020 indicate concerns with pH, turbidity, and total suspended solids City of Tukwila Stormwater Management Action Plan 5 Otak Basin Receiving Water Condition Summary Green/Duwamish • Multiple 303(d) listing and current TMDLs River ■ Less than 1% of the basin is in Tukwila ■ Relatively high percentage of PGS area in basin Johnson Creek • Within city limits, largely owned by one landowner which has a developer agreement with the City regulating stormwater control. Additionally, Agricultural Drainage District # 2 manages stormwater in the majority of Johnson Creek basin in Tukwila (King County, 2022). ■ One 303(d) listing in the headwaters in the City of SeaTac, not in Tukwila ■ Less than 20% of the basin is in Tukwila Mill Creek • Basin has multiple 303(d) listings but none in Tukwila ■ Less than 2% of the total basin is in Tukwila Nelsen • No surface waters* ■ Discharges to Springbrook Creek and Green River** P17 • The area of the basin that is in Tukwila may redevelop under current stormwater regulations ■ Almost 50% of the basin is in the City of SeaTac Riverton Creek • Noted fish presence ■ One 303(d) listing ■ Improving water quality would align with other projects in the basin ■ City data from 2019 indicates concerns with dissolved oxygen but temperature and pH levels meet standards Southgate Creek • Relatively small PGS area ■ Noted sediment issues in the basin due to steep slopes ■ City data from 1994-1995 indicate moderate concerns with dissolved oxygen and pH Springbrook Creek • Area in Tukwila already likely being addressed by ISGP ■ Very small percentage of the basin is in Tukwila (2%) • Several 303(d) listings * There is an old stream channel in the basin, however, surface water and stormwater are piped and there are currently no open channels except for a ditch parallel to the BNSF rail tracks north of Longacres Way. ** The value in this table differs from the information given in Appendix A, Receiving Waters Assessment, Table 1, which states that Green River is the only receiving water in the Nelsen basin. Step 4-Assess the Stormwater Management Influence (SMI) Potential The Stormwater Management Influence (SMI) assessment focused on the ability of the City to improve the receiving water conditions in each delineated basin. The SMI potential for each basin was assessed for both flow and water quality and divided into three categories: ■ Hydrologic Stormwater Management Influence. The hydrologic SMI was based on the percentage of the drainage basin within the city limits and the position of the City within the basin. Basins with a greater percentage of area within the city limits and basins where the city limits extended higher in the City of Tukwila Stormwater Management Action Plan 6 Otak watershed have greater potential SMI. SMI was not considered for flow in flow -exempt receiving waters. ■ Pollutant Stormwater Management Influence. Pollutant SMI was determined using the percentage of impervious area, areas already being treated by stormwater facilities, areas already being addressed under other regulations like the ISGP, high ADT roads, and the density of stormwater outfalls per 1,000 feet of stream. Basins with greater pollution -generating area that directly connect to streams and with lower percent areas already under treatment were deemed to have greater potential SMI. ■ Effects of Future Growth. Basins with more publicly owned land area were considered to have a greater SMI potential due to greater land available for retrofits. Basins with less publicly owned land area would likely require purchasing land for retrofits. These categories were used to develop a qualitative assessment of the SMI for each basin. Results are shown in Table 3. To see the full analysis, see Appendix A. City of Tukwila Stormwater Management Action Plan 7 Otak Table 3 Stormwater Management Influence Assessment _ . • ro ogic ' Reason for I-Idrologi Impact Rating Pollutant Loading Impact Pollutant SMI eason for Pollutant Loading Rating Expected Pollutant Loading Change with Future Land Use Effects of Future Growth . • • • . Impact Gilliam Creek Medium -Low Almost half of the basin is impervious but the entire basin east of 1-5 is flow control exempt. 70% of the basin is in Tukwila but many jurisdictions involved within city limits. Medium Highest percentage of high ADT roads. Large percentage of commercial and high - density residential land use (10.4 %). 70% of the basin is in Tukwila but many jurisdictions involved within city limits. Likely little change Moderate/high growth planned** Green/ Duwamish River Low Flow control exempt Low Percentage of basin in Tukwila is less than 1 %. Likely little change Minimal growth planned Johnson Creek Low Only 16% of the basin is in Tukwila. Only 16% of the area in Tukwila is impervious. Area within Tukwila already under development agreement (set to expire in 2024). Low Largely undeveloped or low density residential. Only 16% of basin in Tukwila and mostly already under development agreement. Runoff durations may increase because a development agreement locks in older flow control standards; however, this has not been confirmed though modeling. Significant development expected, and development standards locked in under older agreement. Future growth may impact conditions. Mill Creek Low Basin almost entirely impervious but less than 2% of the basin is in Tukwila. Low Relatively large portion is commercial/ light industrial but only 2% of basin is in Tukwila. Likely little change Minimal growth planned Nelsen Low Discharge to flow control exempt water body. High Relatively large percentage of high ADT roads. Large percentage of commercial and industrial land use (54.1%). Likely little change Minimal growth planned City of Tukwila Stormwater Management Action Plan 8 Otak Basin • Hydrologic SMI Reason for Hydrolog Impact Rating ollutan oading Impac u Pollutant SMI Effects of uture Growth ydrologic Impact Reason for Pollutant Loading Rating Expected Polluta Loading Change w Future Land Use P17 Low Almost the entire portion of the basin within Tukwila has a modified flow control requirement based on the 40/20 criterion.* Relatively high impervious area (62.4%). Medium Relatively large percentage of high ADT roads (17.7%). Commercial and industrial. Tukwila is only half of basin and the lower half. Pollutant loads may decrease when planned redevelopment meets newer stormwater standards. If redevelopment meets treatment requirements. Riverton Creek High Large portion of the basin is impervious (47.5%). More than 78% of the basin is in Tukwila. High Upper basin largely low- density residential, lower basin largely commercial/ light industrial. More than 78% of basin in Tukwila. Likely little change Minimal growth planned Southgate Creek Medium/ High Basin almost entirely within Tukwila (99.6%). Less impervious area than other basins. Medium/ High Basin almost entirely within City (99.6%). Less PGS area than other basins. Pollutant loads may decrease when planned redevelopment meets newer stormwater standards. Minimal growth planned Springbrook Creek Low Tukwila only makes up 2% of the basin and much of that is a forested median between railroad tracks. Low City only makes up 2% of basin even if largely PGS. Likely little change Minimal growth planned *Flow control facilities designed to the "40/20 criterion" only have to m'tigate for the added impervious surface. The 40/20 criterion can be applied to areas that had at least 40% total impervious surface area for the 20 years preceding Ecology's adoption of the 2005 Storm water Management Manual for Western Washington. **The value in this cell has changed since completion of the Receiving Waters Assessment and Prioritization memoranda, which indicated minimal growth planned in the Gilliam Creek basin. The majority of the City's growth is expected in the Southcenter area. Redevelopment in the Southcenter subarea is expected to increase building heights in the southeast corner of the Gilliam Creek basin (City of Tukwila, 2014) over the next 20 years. Tukwila's Comprehensive Plan is under development and may change the growth expected in the Gilliam Creek basin. The change did not change the selection of Riverton Creek basin for the SMAP. City of Tukwila Stormwater Management Action Plan 9 Otak Section 3. Summary of Basin Prioritization Four basins which could benefit from a SMAP were selected to continue into the prioritization phase: Gilliam Creek, Southgate Creek, Riverton Creek, and the Green/Duwamish River. Prioritization criteria were developed to compare the four candidate basins (Appendix B). The criteria considered were as follows: • Receiving water conditions (water quality impairments, aquatic life, fish barriers). • SMI (hydrologic condition, pollutants, potential partnerships, basin management strategy). • Community factors (public and stakeholder feedback, overburdened communities). Each basin was given an overall qualitative rating for each category and an overall rating based on the combination of the results (Table 4). See Appendix B for more information. City of Tukwila 10 Stormwater Management Action Plan Otak Table 4 Receiving Water Prioritization Rating Summary IMO a vera ' eceiving "a er Conditions Rating •'era ` ' a mg verall Community Rating Overall Rating Gilliam Creek Low/Medium Medium Medium/High Medium* • Water quality concerns • Portions flow control exempt • One public vote • High ADT roads • Highest percentage of high ADT roads • Likely most overburdened • Fish barriers above lower basin • Would score higher with more partnership with WSDOT and SeaTac community Green/Duwamish Medium Low Medium Medium/Low River • High aquatic life rating • Mostly flow control exempt • Most public votes • Low Water Quality rating • • Very small percentage of basin in Tukwila TMDL and other plans already in place • Relatively low overburdened community • Could rate higher with larger basin partnerships Southgate Creek Medium/Low Medium/High Medium Medium • Water quality concerns • Almost all basin is in Tukwila • No public votes • Sediment concerns • Less impervious/PGS than other basins • Relatively high overburdened • Fish barriers above lower basin • Much of lower basin is piped • community Fewer residents than Gilliam Creek basin Riverton Creek Medium/Low High/Medium Low/Medium Medium/ • Water quality concerns • Large portion of basin in Tukwila • No public votes High • • Sediment concerns** Fish barriers above lower • Higher PGS/impervious than Southgate Creek • Likely third highest overburdened community basin • More potentially available public right-of-way • Fewest residents of the four • Observed urban runoff mortality • Some large fish barriers in lower basin basins * The value in this cell has changed since completion of the Receiving Waters Assessment and Prioritization memoranda, which classified Gilliam Creek basin as medium/low. Gilliam Creek basin was later recategorized to have a medium overall rating. The change did not change the selection of Riverton Creek basin for the SMAP. ** Following discussion with City staff and further review of the City of Tukwila 2013 Surface Water Comprehensive Plan (CH2MHill, 2013), sediment concerns for Riverton Creek have been added since the completion of the Receiving Waters Assessment and Prioritization memoranda. City of Tukwila Stormwater Management Action Plan 11 Otak The Riverton Creek basin was selected to move forward for the development of a SMAP. Riverton Creek basin was rated "Medium/Low" for receiving water conditions based on concerns for water quality, observations of fish mortality, and fish barriers in the lower basin. It was rated "High/Medium" for SMI because a large portion of the basin is within the city limits, it has more pollution -generating and impervious surfaces than other basins, and it has more potential available area in the public right-of-way for retrofits. Riverton Creek basin was rated "Low/Medium" for community factors as it received no public feedback and has a smaller population than other basins, but it has the highest percent rate of poverty and support from stakeholders like Water Resource Inventory Area (WRIA) 9 for fish habitat. These led to an overall rating of "Medium/High" for Riverton Creek basin, which was the highest rating of the four basins. The SMAP for Riverton Creek basin seeks to reduce the pollutant -loading impacts caused by the relatively large pollution -generation areas. The relatively large available area for retrofits and low percentage of current stormwater treatment facilities should provide opportunities for both water quality and hydrologic improvements within the Riverton Creek basin. Section 4. Retrofit Plan This section describes a 20-year retrofit plan to improve conditions in the Riverton Creek basin. The implementation plan is divided into two stages where short-term actions will be implemented in the first six years and long-term actions will be implemented in years 7 to 20. Riverton Creek Basin Riverton Creek is located in northwest Tukwila and has two forks (Figure 2). The western fork originates at wetlands along the western city limits, passes under Tukwila International Blvd, and flows north before draining into the Duwamish River. The wetlands in the northwest portion basin between the SR 99 entrance ramp and Tukwila International Blvd drains to the western fork following heavy precipitation events. The eastern fork originates at the same wetlands as the western fork. The eastern fork also crosses Tukwila International Blvd and is largely piped until it meets the western fork just south of SR- 599. Riverton Creek then passes beneath SR-599 and flows a short distance before joining the Duwamish River. Riverton Creek is designated for salmonid spawning, rearing, and migration and is classified as a fish bearing stream. Approximately 78% of the 514-acre basin is located in Tukwila while the rest of the basin is in the City of Burien. Land use in the upper portion of Riverton basin is largely low -density residential while the lower portion is largely commercial and industrial land uses. Half of the basin is made up of pollution generating surfaces and 48% of the basin is impervious. The Puget Sound Watershed Characterization project has assigned the Riverton Creek basin the "restoration with development" basin management strategy for overall water flow (Puget Sound Partnership, 2016). This management strategy indicates degradation has already occurred in the Riverton Creek basin. The following fish are present in Riverton Creek: coho, fall Chinook, fall chum, resident coastal cutthroat, and winter steelhead. City staff have witnessed urban runoff mortality at least once in Riverton Creek following the removal of a flap gate at the mouth. This indicates conditions may not be favorable for fish in some circumstances. Riverton Creek has a Category 5 listing for bioassessment, and data collected in 2019 indicates dissolved oxygen in the stream are at concerning levels. There are also sedimentation concerns throughout the basin (CH2MHill, 2013). There are landslide concerns in the upper basin and accumulated sediment in City of Tukwila 12 Stormwater Management Action Plan Otak the lower basin that needs to be removed annually (City of Tukwila, 2022). Finally, there are seven total fish barriers on Riverton Creek and two partial barriers. There are also 80 culverts, manmade waterfalls (on private property just north of S 126th Street), and an abandoned dam upstream of the waterfalls (on private property just south of S 126th Street). The City and other organizations have invested in improving conditions in Riverton Creek. The City recently removed a flap gate at the mouth of the stream, a private business has daylit a portion of the western fork of the stream and operates a small salmon hatchery (Sabey Corporation, 2022), and King County Metro is planning to daylight a portion of the eastern fork of the stream. City of Tukwila 13 Stormwater Management Action Plan Otak FIGURE 2 RIVERTON CREEK BASIN TUKWILA SMAP 133383 TUKWILA, WASHINGTON old 40. S'13?th St ` Cascade Vice t_if111CI]iai'__ 'Sl:Ill](]I r j Tukwila City Limits Riverton Creek Basin ■ Total Fish Passage Blockage A Partial Fish Passage Blockage — Stream / Watercourse Streets Dols boom. Contours Pollution Generating Land Use Manufacturing Industrial Center/Heavy =I Manufacturing Industrial Center/Light Commercial Light Industrial L I Neighborhood Commercial Center Office — High ADT Roads Wetlands Category II Category Ill Category IV Outfalls 0 Outfall • Private Outfall Otak ❑am 1, 1/f= 9. Llisdamer. 1I sdais isrd to survey ecwracy end is meant for penn.] purposes ono KYYOIecR3330033.363CRDDIGISMXDsl33383 Tukolle Knc m Issues Dela aprx Methodology Ecology's SMAP Guidance indicates that different stormwater management actions (SMAs) should be implemented depending on the conditions in the receiving water (Ecology, 2019). Based on the basin management strategy for Riverton Creek, the receiving water needs improvement, as opposed to protection. SMAs in basins that are degraded, such as Riverton Creek, should focus on reducing pollutant loads, tailoring maintenance activities, and reducing stormwater flows to allow stream habitat conditions to improve. Stormwater Management Action Development The first step in developing SMAs for Riverton Creek basin was a review of the water quality, flow, and habitat concerns outlined in the previous sections. These concerns were discussed with City staff. A desktop review of Riverton Creek basin was conducted using aerial imagery and the City's GIS data to determine potential site locations. While Riverton Creek basin has a significant amount of public right-of- way, through the desktop review and discussions with City staff, Otak found much of the public right-of- way cannot accommodate retrofit projects due to topography and existing infrastructure. On October 17, 2022, the multidisciplinary SMAP team conducted a site visit in Riverton Creek basin to review stormwater management needs and assess potential project sites. After the site visit, several sites were eliminated from further consideration due to existing utility infrastructure and other considerations. After the desktop analysis and site visit, the team developed ten SMA concepts consisting of eight retrofit concepts and two program concepts. Stakeholder Outreach The project concepts were brought to stakeholders for review and input. The goal of stakeholder engagement for this phase of the SMAP was to determine which SMA concepts stakeholders would like to see in the Riverton Creek basin. This stakeholder engagement effort built on the process used in the previous engagement efforts during the receiving water assessment and receiving water prioritization phases of SMAP. The City's SMAP storymap was updated to reflect this phase of the project, and a survey was developed. For this phase, input was requested from the general public, tribal agencies, and internal stakeholders (representatives from the City's Administrative, Maintenance, Engineering, and Surface Water Program Divisions of the Department of Public Works, the Urban Forestry and Long -Range Planning Divisions of the Department of Community Development, and the Parks and Recreation Department). Stakeholders were asked to select their top three retrofit concepts in question one and their top program concept in question two of the survey. The information presented to stakeholders, other than example photos, is presented in Table 5. The survey and a printout of the storymap can be seen in Appendix C. The general public was informed through an e-Hazelnut notice and a news release on the City's website. The survey was open between November 3, 2022 to November 11, 2022. City of Tukwila 15 Stormwater Management Action Plan Otak Table 5 Record of Stormwater Management Action Concept Information Presented for Stakeholder Outreach • u . or • • , • men . Goals Addressed - e a Initial Cost ' e ative aintenance Re • uired Other Considerations Management Action Conce • t 1 Proprietary large underground stormwater treatment facility (such as a Contech StormFilter® Vault) Cartridges in an underground storage vault that treat stormwater runoff. Water quality Low Moderate 2 Proprietary small underground stormwater treatment facility (such as a Contech StormFilter® Catch Basin) Underground cartridges installed in existing catch basins in the public right-of-way to treat stormwater runoff from highly -traveled roads and capture large debris before it reaches the stormwater system. Water quality Moderate Moderate/High 3 Proprietary modular biofiltration (such as a Contech Modular Wetland®) In -ground planted facility that manages stormwater from highly- traveled roads belowground in the public right-of-way. Water quality High Moderate/High 4 Stormwater Planter (bioretention/rain garden) In -ground planters that manage stormwater in the public right -of- way. Water quality and flow control Moderate High Note: Possible for public to assist upkeep Vegetated facility 5 Large underground detention facility Underground chamber that temporarily stores stormwater to reduce harmful effects such as erosion and flooding. Flow control High Low 6 Upgrade existing stormwater management facility Rehabilitation of an existing detention facility to provide water quality treatment for runoff from highly -traveled roads and retrofit to prevent vehicle washing runoff from entering stormwater system. Water quality and flow control Moderate Moderate Project would include partnership with another government agency. City of Tukwila Stormwater Management Action Plan 16 Otak Solution 7 Stormwater Management Action Description Environmental Goals .. - - . Flow control Relati Initial Cost High Relative aintenance . ' Other onsideration • Permeable Pavement Alternative pavement that infiltrates stormwater in the public -right -of way (sidewalks, bike lanes, parking spaces). This program would be a consideration when transportation and/or parks improvement projects have construction projects that could utilize permeable pavement. Moderate This program would require purchase of special maintenance equipment or a maintenance contract. 8 Coordination with potential future park to install stormwater facilities The 2020 City of Tukwila Parks, Recreation and Open Space Plan identifies the Cascade Neighborhood Search Area as a possible location for a new park, part of which is within Riverton Creek basin. If the City identifies a site within Riverton Creek basin to develop a new park, then stormwater facilities could be sited on the property, likely underground to maximize useable space. Water quality and flow control 9 Targeted Source Control Program Program focused in a particular area to reduce sediment and pollution in stormwater runoff from City owned and operated areas including the public right-of-way. Water quality Moderate Moderate/High This will include an enhanced outreach element which will highlight Riverton to businesses/residents (multi-lingual). 10 Community Rain Garden Stewardship Program Program for volunteers to help maintain rain gardens, ditches, and/or streams in their neighborhood. Water quality Low Low Considerations include access and safety. City of Tukwila Stormwater Management Action Plan 17 Otak The City received five responses for the first question of the survey and four responses for the second question from external stakeholders. Only one of the ten SMA concepts received zero votes. Results can be seen in Figure 3 and Figure 4 below. Figure 3 Stormwater Management Action Survey Results for Question 1* Retrofit Concept Preferences Proprietary large underground treatment (e.g. Contech StormPllter Vault) Proprietary small underground treatment (e.g Contech StormFilter Catch Basin) Proprietrary modular biofiltration treatment (e.g. Contech Modular Wetland) Stormwater Planter (bioretention/rain garden) Large underground detention facility Upgrade existing storrwater management facility Permeable Pavement Coordination with potential future park to Install stormwater facilities I do not prefer any of these options Responses 0 I 1 0 *Values are based on respondents selecting up to three options Figure 4 Stormwater Management Action Survey Results for Question 2 Program Concept Preferences 0 I do not prefer any of these options. Community Rain Garden Stewardship Program Targeted Source Control Inspection Program i Responses Stormwater Management Action Ranking After gaining input from the public on the generic SMA concepts, the team proposed SMAs at specific locations using Ecology's SMAP Guidance, information obtained during the site visit, and engineering judgment. Nine retrofit projects were proposed where space is available. These retrofit projects and three programs were considered during the SMA ranking process. While only two programs were considered during the stakeholder outreach process, an additional program for installing permeable pavement sidewalks was added during the ranking process. Descriptions of each of the SMAs considered during the ranking process can be seen in Table 6. SMA ranking relied on qualitative assessments. Ranking factors included stakeholder feedback, planning level technical feasibility, impact, partnerships, and potential funding opportunities. Factors associated with technical feasibility included compatibility with existing infrastructure, area readily available for siting a facility, and long-term maintenance requirements. Impact was based on the area that could be treated, the type of pollutants that could be treated, the land use that could be treated, location of the project in the basin, and whether water quality treatment, flow control, or both could be provided. The main consideration associated with partnerships was whether a SMA could include a partnership opportunity for implementation. Potential funding opportunities included the grant worthiness of the SMA. The consultant team and Public Works staff determined the SMA ranking criteria for the SMAs during a meeting on November 21, 2022. SMAs in the lower basin, SMAs that would treat large areas, and SMAs that would treat PGS areas were ranked high due to their impact. Given the stakeholder support for bioretention facilities these projects were highly ranked. Finally, SMAs that had a high potential for City of Tukwila 18 Stormwater Management Action Plan Otak partnership and grant funding were ranked high. Flow control facilities and a flow control requirement were ranked lower because the relative cost to benefit in the Riverton Creek basin is lower than runoff treatment facilities. SMAs in the upper basin, SMAs that would treat small areas, and SMAs that do not treat PGS areas were ranked low due to the relative impact they would have on water quality. City of Tukwila 19 Stormwater Management Action Plan Otak Table 6 Stormwater Management Actions Considered During Project Ranking scrip i Environmental Goals Addressed Total Drainage Basin Area (Ac) or Area Served Contribu ing Impervious Area (Ac) enance Effort Benefit Provided Relative Capital Cost Public Input on Solution Type SMAP-2 S 13Oth St & 34th Ave S Water Quality Vaults Media filter units in S 13Oth St & 34th Ave S intersection at existing catch basin locations. Install up to 68 cartridges in water quality treatment vaults. Potentially paired with flow control (SMAP-3). Water Quality 22.5 8.6 Moderate Basic Runoff Treatment' Low Three votes for "proprietary large underground treatment" SMAP-3 S 130th & 34th Detention Pipes Underground stormwater detention in S 130th St & 34th Ave S intersection. Potentially paired with water quality treatment (SMAP-2). Flow Control 22.5 8.6 Low Flow Control Moderate No votes for "large underground detention" SMAP-4 Tukwila Intl Blvd: Bus Stop 60983 Underground proprietary runoff treatment system adjacent to the bus stop in front of 12500 Tukwila International Blvd (Stop ID 60983). Water Quality 0.6 0.6 Moderate Enhanced Runoff Treatment2 Moderate Three votes for "proprietary modular biofiltration" Flow Control 0.6 0.6 Low Flow Control Moderate No votes for "large underground detention" SMAP- 4.1 USCIS ASC Roundabout Public/Private Partnership Alternate location to SMAP-4 on private property. Water Quality 2.1 2.1 Moderate Enhanced Moderate Three votes for "proprietary modular biofiltration" Flow Control 2.1 2.1 Low Flow Control Moderate No votes for "large underground detention" SMAP-5 S 13Oth Right -of -Way Planters Install right-of-way bioretention planters in existing conveyance ditch locations along S 13Oth St. Water Quality and Flow Control 4.8 4.8 High Enhanced and 6PPD- q3 High Five votes for "stormwater planters" SMAP-12 E Marginal Way Distributed Water Quality Treatment Install media filter units along E Marginal Way, locations determined based on existing stormwater infrastructure. Install up to 43 cartridges in water quality treatment vaults. Water Quality 3.5 3.5 Moderate Basic Runoff Treatment Low Two votes for "proprietary small underground treatment at existing catch basins" SMAP-13 Cascade Elementary School Area Right -of- Way Planters Install right-of-way bioretention planters in neighborhoods surrounding Cascade View Elementary School. Consider partnering with School District to use planter maintenance as an educational opportunity. Water Quality and Flow Control 0.5-16.8 0.5-16.8 High Enhanced and 6PPD- q3 Moderate Five votes for "stormwater planters" SMAP-14 School Bus Depot Rehab Partnership with Tukwila School District. Rehabilitate existing detention facility to provide water quality treatment and install a sanitary sewer bypass valve to prevent washing runoff from entering stormwater system. Water Quality and Flow Control 1.2 1.2 Moderate Basic Runoff Treatment Low Two votes for "upgrade existing facilities" SMAP-16 Co -Located Regional Stormwater Control in New Park Stormwater retrofit associated with planned park located in southern area of Riverton Creek basin. Stormwater features consist of cartridges in water quality treatment vaults and underground stormwater detention. Flow Control 20 7.6 Low Flow Control Moderate No votes for "large underground detention" Water Quality 20 7.6 Moderate Basic Runoff Treatment Low Three votes for "proprietary large underground treatment" City of Tukwila Stormwater Management Action Plan 20 Otak SMA-ID SMAP-17 SMA Name Co -Located Cascade View Elementary Stormwater Facility Description Cascade View Elementary School was constructed in 1958 and modernized in 1996. It will be eligible for State -assisted funding for additional modernization/expansion in 2026 (2015 Bond Committee Report, p. 12). The School District is in the midst of bond -funded upgrades to the school now, which appear to be interior and equipment improvements. There were no stormwater treatment or detention requirements when Cascade View Elementary School was constructed in 1958. The City proposed to partner with Tukwila School District to install runoff treatment and, if warranted, flow control facilities on the school site. Environmental Goals Addressed Water Quality and Flow Control Total Drainage Basin Area (Ac) or Area Served Contributing Impervious Area (Ac) Maintenance Effort To be determined Benefit Provided To be determined elative Capital Cost To be determined Public Input on Solution Type This option was not presented to the public. 9 3 SMAP-18 Permeable Pavement Sidewalk Program Permeable pavement is an alternative to traditional asphalt and concrete which allows water to percolate through to the ground. The proposal is for the City to consider permeable pavement in the public right -of way for sidewalks, bike lanes, and parking spaces whenever a transportation project or park improvement project is developed in Riverton Creek basin. Water Quality and Flow Control Permeable pavement on sidewalks, bike lanes, parking, and parks could be distributed anywhere within the basin but may be most feasible in residential areas and where grades are less than 6%. To be determined with each project, each project is likely to have a small area served by permeable pavement. Moderate Incremental reduction in stormwater flows in basin as projects are constructed. N/A One vote for "permeable pavement" SMAP-19 Targeted Source Control Program The Riverton Creek basin is home to numerous large industrial and commercial parcels where materials are stored and handled that may potentially contaminate stormwater runoff. Many of these sites do not have stormwater treatment best management practices on site. The targeted source control program would focus required source control inspections the City is already required to perform across the City in the Riverton Creek basin, helping to minimize pollutants in stormwater runoff from private business through regulation and enforcement. Water Quality The industrial area is concentrated in the lower basin over roughly 100 acres. 90 High Prevents pollutants from coming in contact with stormwater runoff, which is more effective than removing pollutants from runoff using treatment devices. N/A Three votes for "targeted source control" SMAP-20 Community Rain Garden Stewardship Program Program for volunteers to help maintain rain gardens, ditches, and/or streams in their neighborhood. Water Quality The community rain garden stewardship could work in residential areas, the school zone, or along high visibility roads where businesses may be enticed to adopt a rain garden. To be determined with each project, each project is likely to improve a small area. Low Maintenance of existing function. N/A One vote for "community rain garden stewardship" Notes: 1. Basic runoff treatment facilities remove total suspended solids (TSS). 2. Enhanced runoff treatment facilities remove TSS and dissolved metals. 3. 6PPD-Quinone is an emerging pollutant of concern, causing fish mortality. The pollutant is deposited in the environment primarily via tire wear particles, and early studies show that bioretention effectively captures the pollutant. City of Tukwila Stormwater Management Action Plan 21 Otak The following retrofit projects were prioritized and selected to be developed further in this plan: SMAP-4, SMAP-5, SMAP-12, and SMAP-14. SMAP-4 was favored by the City because it would treat a highly traveled road and it would provide enhanced treatment. SMAP-5 was selected as it would treat a neighborhood collector road, provide enhanced treatment, and treat 6PPD-q. Survey results also indicate stakeholders support stormwater planters, and City staff would like to have a bioretention demonstration project. Finally, installing stormwater planters may present an opportunity to implement SMAP-20, the Community Rain Garden Stewardship Program. SMAP-12 was also selected because it would treat a highly traveled road. Additionally, King County Metro will be daylighting Riverton Creek slightly downstream, and the newly opened fish habitat could benefit from cleaner water. SMAP-14 was selected as it would be an opportunity to develop a relationship with the Tukwila School District which could be a valuable project partner in the future. More information on these retrofit projects can be found in the next section and Appendix D. The City determined that the programs, SMAP-18, 19, and 20, could be implemented as City-wide programs which would benefit Riverton Creek if implemented. The programs are briefly described in the next section. In addition to the SMAs in Table 6, instream SMAs were also discussed during the meeting on November 21, 2022. Habitat conditions are documented to be poor, and projects that improve conditions for aquatic life are supported by this SMAP. Information on these SMAs can be found in the next section. Recommended Stormwater Management Actions Ecology's SMAP Guidance recommends that the City categorize SMAs as follows: stormwater facility retrofits, land management and/or development strategies, and targeted or customized stormwater actions. Ecology states that stormwater facility retrofits are projects that either retrofit (add new service to) existing treatment or flow control facilities or construct new treatment or flow control facilities to address impacts from existing development. Retrofit runoff treatment facilities should be designed to filter pollutants such as TSS, metals, and hydrocarbons from unmitigated existing development before discharging runoff into a receiving water. Retrofit flow control facilities should be designed to reduce the volume and duration of erosive flow discharges, which could help reduce channel and streambank erosion resulting from unmitigated or inadequately mitigated existing development. Land management and/or development strategies entail identification of land that should be conserved or protected and the strategies to achieve this. For example, a watershed may benefit if the City protects several undeveloped parcels from impervious surface conversion, and the strategy to protect these parcels may be land use policy changes. Ecology's SMAP Guidance notes these strategies are most beneficial to undeveloped catchments which drain to a small stream or lake with good water quality and habitat conditions. The guidance notes that for developed catchments, like the Riverton Creek basin, an increase in canopy cover may be beneficial. Targeted or customized stormwater actions are related to the stormwater management program (SWMP), S5.0 in the 2019-2024 Permit. Ecology's SMAP Guidance specifies the following S5.0 programs may be included in the SMAP: ■ Focused or more frequent illicit discharge detection and elimination (IDDE) field screening. ■ Prioritization of source control inspections. • Operations and maintenance (O&M) inspections or enhanced maintenance of facilities the City owns or operates. ■ Maintenance that requires capital construction of more than $25,000. City of Tukwila 22 Stormwater Management Action Plan Otak • Public Education and Outreach behavior change programs to support SMAP actions for the receiving water overall, or for the catchment area in particular Instream strategies are not outlined by Ecology's SMAP Guidance. However, the City supports improving conditions for aquatic life by removing fish passage barriers and daylighting Riverton Creek. Stormwater Facility Retrofit Projects Four stormwater facility retrofit projects were prioritized and developed into short-term retrofit projects. Table 7 briefly describes these short-term retrofit projects, and their locations can be seen in Figure 5. The solution fact sheets for the short-term retrofit projects include a conceptual design and planning level cost opinion and are attached in Appendix D. Figure 6 depicts the approximate catchment of each short- term retrofit project. Table 7 Short -Term Retrofit Projects in the Riverton Creek Basin ID Project Name Project Description Issues Addressed Cost Opinion' SMAP-4 Tukwila Intl Blvd: Bus Stop 60983 Water Quality Retrofit. Modular Wetlands® would treat stormwater collected from Tukwila International Blvd. The project is only the treatment portion of the SMA, which also includes a detention portion. Sediment and dissolved metals. $440,000 SMAP-5 South 130th St Right -Of -Way Bioretention Planters. Bioretention planters would replace existing storm ditches along S 130th St, 37th Ave S, and 38th Ave S to treat stormwater runoff. Sediment, dissolved metals, and 6PPD-q2 $1,340,000 SMAP-12 E Marginal Way S Distributed Water Quality Treatment. 22 existing catch basins would be replaced with catch basins that contain Contech StormFilter® Cartridges to treat stormwater runoff from E Marginal Way S. Sediment $1,420,000 SMAP-14 Tukwila School District Stormwater Pond Retrofit and Sanitary Sewer Connection. A bioretention facility would replace the existing stormwater pond to treat stormwater runoff and provide flow control; An oil/water separator and diversion valve would be installed to redirect wash water from school buses to the sewer system. Sediment, dissolved metals, oil, illicit discharge from washing operations, and flow control. $440,0003 Total $3,640,000 Notes: 1. Appendix D includes a memorandum that describes the methodology used to develop these cost opinions. 2. 6PPD-Quinone is an emerging pollutant of concern, causing fish mortality. The pollutant is deposited in the environment primarily via tire wear particles, and early studies show that bioretention effectively captures the pollutant. 3. Project cost would be shared between the City of Tukwila and the Tukwila School District. The City would be expected to pay 54% of the total project cost ($236,000) and the School District would be expected to pay 46% of the total project cost ($204,000). City of Tukwila Stormwater Management Action Plan 23 Otak The City may choose to reconsider implementing any of the remaining six proposed long-term retrofit projects after completing the short-term retrofit projects. The following long-term retrofit project locations can be seen in Figure 5. ■ SMAP-2 ■ SMAP-3 ■ SMAP-4 (underground detention portion) (shown as a short-term retrofit project on Figure 5) ■ SMAP-13 ■ SMAP-16 ■ SMAP-17 City of Tukwila 24 Stormwater Management Action Plan Otak FIGURE 5 RETROFIT PROJECTS TUKWILA SMAP 133383 TUKWILA, WASHINGTON Dana Spaces one 17,39+2173 Dt demel: alas dais is lal to survey accuracy and is MOM For Ciennnd purposesorly KIPROJtC1L33300a3.,S3P.CADDIGI51Mlhos' „n, ilxmle IU,van ISSUES Dateasp .IlII S 137th:St Cascade View EIcmcotJry r J Tukwila City Limits Q Riverton Creek Basin Parcels * Short -Term Retrofit Projects Q Long -Term Retrofit Projects — Stream 1 Watercourse Streets Otak FIGURE 6 SHORT-TERM RETROFIT PROJECT CATCHMENTS TUKWILA SMAP 133383 TUKWILA, WASHINGTON rT �,a S120thPI `5 Js 7 • the S 126th St Riverton Creek Basin Catchment Boundaries r J Tukwila City Limits — Stream / Watercourse SMAP-12 iSMA P=14 City of 1 izkwila Oa1a Snurce'. KMCounty,CT o1 Iutynle Gooplef lees Ono 12r2212073 [hsdamer. TINS dale is nd to surrey accuracy mil IsmesM for lAnnng purposes K WROJtCi1333(11:s33.3B]ICMCVG15V.1)a5L,,.a %Minis KnO Il Issues Oaleaprx Parcels * Short-term Retrofit Projects Otak Land Management and/or Development Strategies Only one land management/development strategy was considered for this SMAP: the Permeable Pavement Sidewalk Program (SMAP-18). The Permeable Pavement Sidewalk Program could be implemented City-wide in partnership with transportation, park, school, Public Works, and other municipal projects. Permeable pavement allows stormwater to infiltrate as opposed to traditional, impervious asphalt or concrete. The program would result in an incremental reduction in stormwater flows in the Riverton Creek basin as projects are constructed. This SMAP recommends installing permeable pavement in the Riverton Creek basin in areas that are considered low-grade (6% or less) and low -traffic locations such as sidewalks, bike lanes, angled parking stalls, and parks. Low traffic locations have a lower presence of fine sediments and other materials that would decrease the amount to infiltration through the permeable pavement. There is also a lower likelihood of a spill occurring or frequent tire rotation in low -traffic locations. Therefore, permeable pavement in low traffic locations, as opposed to high traffic areas, is likely to decrease the amount of maintenance required and increase the longevity of the permeable pavement. The City does not currently have the equipment to maintain permeable pavement, therefore, this project would be implemented over the long-term. The City considered a targeted version of the Permeable Pavement Sidewalk Program when developing SMAs for this SMAP. Due to the slow pace of transportation and other pertinent improvement projects in Tukwila, the City determined it would better to implement the program City-wide, including in the Riverton Creek basin. It is expected that if implemented this program would benefit Riverton Creek. Customized Stormwater Management Actions Under the NPDES Permit, the City implements a required Stormwater Management Program (SWMP) throughout the city limits. For SMAP, the City has examined whether it could customize the implementation of its SWMP within Riverton Creek basin to improve water quality in Riverton Creek. Ecology's SMAP Guidance notes that the following aspects of the SWMP could be customized in the priority basin: • IDDE field screening. • Source control inspections. • O&M inspections or enhanced maintenance of City owned or operated facilities. • Maintenance that requires capital construction of more than $25,000. • Public Education and Outreach behavior change programs. After considering several options for customizing the SWMP in Riverton Creek basin, the team determined that the SMAP does not need to specifically recommend these actions. The City expects that focus on Riverton Creek will increase organically due to the new Source Control Inspection permit requirement and as more City -owned facilities are installed, including those recommended by this SMAP. A review of the SMAs that were considered is provided below. One customized SMA considered for this SMAP was a Targeted Source Control Inspection Program (SMAP-19). The City is already increasing source control inspections by adding staff to this effort due to the flap gate removal, the Sabey fish hatchery, a landslide concern in the upper basin, illicit discharge complaints, routine IDDE inspection, and private facility inspections. Source control inspections in Riverton Creek basin will help to minimize pollutants in stormwater runoff from private business in the industrial and commercial areas through regulation and enforcement. The Riverton Creek basin is home to numerous large industrial and commercial parcels where materials are stored and handled that may potentially contaminate stormwater runoff. Many of these sites do not have runoff treatment best City of Tukwila 27 Stormwater Management Action Plan Otak management practices on site. The City could also take steps to reduce sediment in stormwater runoff from City owned and managed properties. The City also considered developing a targeted Community Rain Garden Stewardship Program (SMAP- 20) which would be considered a Public Education and Outreach program. After consideration, the City determined it would be better to implement the program City-wide, including in the Riverton Creek basin. It is expected that if implemented this program would benefit Riverton Creek. Volunteers would help the City maintain rain gardens, ditches, and/or streams to ensure they are functioning properly. This program would help protect aquatic habitat and beautify neighborhoods. The program could operate City-wide in residential areas, school zones, and along high visibility roads where businesses may be enticed to adopt a rain garden. Volunteers would be organized by the Public Works department and would receive an initial orientation which would include safety information. Instream Strategies Riverton Creek is designated for salmonid spawning, rearing, and migration and is classified as a fish - bearing stream. There have been several efforts to improve habitat conditions in Riverton Creek basin including removal of a flap gate at the mouth of Riverton Creek and daylighting portions of the stream. Large portions of the stream remain piped, and 80 culverts remain on Riverton Creek. Upper sections of Riverton Creek are likely too steep for fish migration (CH2MHill, 2013). There are also several remaining fish passage barriers: seven full barriers, two partial barriers, manmade waterfalls (on private property north of S 126th Street), and an abandoned dam (on private property south of S 126th Street). This SMAP recommends removing fish passage barriers along both the east and west forks of Riverton Creek. On the west fork, only barriers up to S 126th Street need to be considered because "fish would likely not be able to pass upstream of S 126th Street because of the steep gradient" (CH2MHill, 2013). This SMAP also recommends daylighting the stream as much as possible. Riverton Creek flows through private property, so the City would need to work with property owners to remove barriers or to daylight the stream. The City will consider fish barrier removal projects in the update to the Surface Water Comprehensive Plan, expected to be completed later in 2023. Section 5. Implementation Schedule Implementation of this SMAP will take place over a 20-year period which is divided into two stages. The schedule depicted in Figure 7 is intended to depict the relative timing of project phases and of recommended implementation of SMAs with respect to one another. This schedule depicts a best -case scenario for implementation. Implementation will cover both capital projects and programmatic initiatives in the Riverton Creek basin. It is important to note that staff availability, availability of funding, and the involvement of the public, partner jurisdictions, Tribes, agencies, and non -governmental organizations (NGOs) will be integral to successfully implement this SMAP on the proposed schedule. Stormwater retrofit projects are anticipated to span four years each from grant application to completion of construction. Plant establishment in vegetated facilities may continue for another one to two years. City of Tukwila 28 Stormwater Management Action Plan Otak Phase Year Projects Short -Term Long -Term 111301113131110C1 10 mmmmmmmmm 20 Improve Asset Data of Stormwater infrastructure Adaptive Management SMAP-4 SMAP-5 SMAP-12 Permeable Pavement Sidewalk Program Community Rain Garden Stewardship Program SMAP-14 Coordinate with Capita! Improvement Program, Comprehensive Plan, and Surface Water Comprehensive Plat, I Assess and Reprioritize Long -Term Capital SMAs Coordinate with Capital Improvement Program Coordinate with other City departments, adjacent cities, King County, WRIA 9, WSDOT, stewardship groups, property owners, and other organizations about opportunities to collaborate Figure 7 Proposed Implementation Schedule 10. Short -Term Actions Short-term actions will take place in years one through six of implementation during the initiation and early action stage. The four short-term stormwater facility retrofit projects are intended to be implemented during this phase: SMAP-4, SMAP-5, SMAP-12, and SMAP-14. To help with siting of future stormwater retrofits it is recommended that the City begin to collect data about stormwater facility age and service areas. Both the City's Comprehensive Plan and the Surface Water Comprehensive Plan are scheduled to be completed in 2024. Both documents should integrate SMAP recommendations where feasible. As the short-term retrofit projects are constructed in Riverton Creek basin and as the required Source Control Inspection Program ramps up, the City will organically focus more maintenance work and pollution prevention activities in the basin. Long -Term Actions Implementation of long-term actions will occur in years 7 through 20. Short-term actions that were not implemented during the first six years of SMAP implementation should be completed in years 7 to 20. Listed below are additional recommended long-term actions listed in order of priority: • Permeable Pavement Sidewalk Program. • Community Rain Garden Stewardship Program. • Long-term stormwater facility retrofit projects. • Stormwater facility retrofit projects identified through adaptive management or coordination with other City departments and property owners. • Improved asset data on stormwater infrastructure facility age and service areas in GIS and Lucity Asset Management. • Discussions with adjacent cities, King County, WRIA 9, WSDOT, stewardship groups, and other organizations about opportunities to collaborate. City of Tukwila 29 Stormwater Management Action Plan Otak Section 6. Budget Sources The ability to fully implement SMAs identified in the SMAP is contingent upon obtaining funding. Major sources of funding for the City's surface water management projects and programs include revenues from the Storm and Surface Water Utility Fund and grant revenues from external sources (Table 8). The City anticipates the need to work in partnership with federal, regional, other local government agencies, and other organizations to implement SMAP recommendations. Due to the cost and scale of short-term retrofit projects and programs outlined in this SMAP, the availability and timing of grants and other outside funding will largely determine the actual timeframe for implementation. Each short-term retrofit project was developed to be eligible for at least one grant program, and this SMAP recommends the City apply for up to one grant per year. The City should investigate and evaluate potential funding sources and collaborative options further in the short-term stage of the SMAP. Ecology has been a significant source of funding in the past for Tukwila stormwater projects and should be considered for SMAP implementation. Ecology's Water Quality Combined Funding Program is considered the most likely source of funding for the stormwater retrofit projects. WRIA 9's Salmon Habitat Plan also provides funding sources for projects and programs suggested. The three funding sources include the Salmon Recovery Funding Board, the Puget Sound Acquisition and Restoration Fund, and the King County Flood Control District Cooperative Watershed Management grants (WRIA 9, 2021). WRIA 9 may also support the City in seeking funding for other local, state, and federal sources. Table 8 External Revenue Sources IRevenue Source Description Real Estate Excise Tax (REET) Washington State authorizes cities to levy two taxes on the sales of real estate, providing guidance on the specific uses for each. REET 1 funds may be used for any purpose identified in a Capital Improvement Plan. REET 2 funds are primarily used for transportation improvements but may also be utilized for sidewalks, traffic signals, and some utility projects. King County Flood Control District, Opportunity Fund Funds projects or activities for flood control and stormwater improvements and may fund watershed management activities such as habitat conservation if such projects are linked to flood control or stormwater activities. King County Flood Control District, Flood Reduction Grants Funds small to medium local flood reduction projects, including stormwater retrofit, slope stabilization, drainage improvements, urban flood risk reduction, and culvert replacement / fish passage restoration. King County Flood Control District, Cooperative Watershed Grants Implementation of Water Resource Inventory Area (WRIA) Forum priorities - WRIA 9: Green/Duwamish and Central Puget Sound Watershed Ecosystem Forum. City of Tukwila Stormwater Management Action Plan 30 Otak Revenue Source Description Puget Sound Partnership and Recreation and Conservation Office, Puget Sound Recovery and Acquisition Fund Grant The Puget Sound Acquisition and Restoration (PSAR) fund supports projects that recover salmon and protect and recover salmon habitat in Puget Sound. PSAR is co -managed by the Puget Sound Partnership and the Recreation and Conservation Office. Local entities identify and propose projects, and the Salmon Recovery Funding Board prioritizes projects for funding. Washington State Department of Ecology, Water Quality Combined Funding Program Provides grants and loans on a competitive basis for high priority water quality projects throughout Washington State. The City has obtained several grants through this program and will plan to seek funding for SMAP-recommended retrofit projects. Washington State Department of Ecology, Watershed Plan Implementation & Flow Achievement Planning Grants For improving instream and riparian zone conditions, reorganizing or concentrating existing points of diversion, studying surface or groundwater storage feasibility. Washington State Department of Ecology, Flood Control Assistance Account Program Funds comprehensive flood hazard management planning and implementing actions to control flooding. Washington State Department of Ecology, Streamflow Restoration Competitive Grants Funds to implement local plans and projects to improve stream flows to levels necessary to support robust, healthy, and sustainable salmon populations. Washington State Recreation and Conservation Office, Salmon Recovery Grant - Urban Wildlife Habitat Category Grant Conservation of habitat in cities via land acquisition, development, and restoration. Washington State Fish and Wildlife, Brian Abbott Fish Barrier Removal Board Grant Design and construction to correct fish passage barriers that impact salmonids and are in coordination with other fish passage investments. Washington Public Work Board, Construction Loan Program Grant Low -interest loans for local governments to finance public infrastructure construction and rehabilitation. Eligible projects must improve public health and safety, respond to environmental issues, promote economic development, or upgrade system performance. Washington State Department of Ecology et. al., Floodplains by Design Grant Studies, design, construction, and monitoring to address flood hazards and improve natural floodplain conditions. City of Tukwila Stormwater Management Action Plan 31 Otak Revenue Source Description Federal Emergency Management Agency, Flood Mitigation Assistance Grant Program Grant Design and construction of projects that reduce or eliminate long-term risk of flood damage to structures insured under the National Flood Insurance Program. United States Department of Transportation, Rebuilding America Infrastructure with Sustainability and Equity Grant Program RAISE (Rebuilding America Infrastructure with Sustainability and Equity) discretionary grants help project sponsors complete critical freight and passenger transportation infrastructure projects. Stormwater or culvert projects which alleviate flooding of primary transportation routes may be eligible for this program. Section 7. Adaptive Management The City plans to adaptively manage the SMAP. Adaptive management will allow goals and methods to change in response to new information, feedback on progress, changing technologies, and new or updated regulatory and community goals. In short, adaptive management will allow for a more nimble response to new information, and lead to a more efficient use of resources in the long-term. Therefore, adaptive management will help in refining long-term strategies for the Riverton Creek basin. The City will track implementation by maintaining a spreadsheet and/or map of the planned projects and programs that have taken place, and how much of the basin area has been managed for runoff treatment or for flow control. The City has published a Tukwila SMAP Public Engagement web site to track the ongoing implementation of the SMAP; see the Implementation Tracking tab at https://arcg.is/WubnS. Improved GIS data on stormwater infrastructure facility age and service areas would assist in tracking. The City will document progress toward meeting SMAP goals and report progress to the funders, the public, and Ecology. As SMAP is implemented, the City expects to adapt its approach to SMAP over time as lessons are learned from implementation of various strategies. Typical adaptations may include choosing different BMPs for runoff treatment as the City operations staff gains experience handling a growing inventory of public facilities or changing the sequence of project implementation if an opportunity arises that makes one of the lower priority options more cost effective. Adaptive management has been incorporated into WRIA 9's Salmon Habitat Plan with which the City intends to coordinate. The Salmon Habitat Plan states that adaptive management ensures prioritization and sequencing of investments that reflect the best available science and maximizing benefits for Chinook salmon. A key component to the WRIA 9's adaptive management approach is monitoring. If monitoring or anecdotal information about culvert sedimentation occurrences indicate that sediment is still a water quality concern following implementation of the short-term actions, the City could consider conducting a sediment study in Riverton basin. Although Riverton Creek is known to have sediment issues (CH2MHill, 2013), the reasons have not been closely studied. It is not well understood whether additional flow control in the basin would reduce sediment in Riverton Creek. A sediment study could indicate if existing conditions are a natural state of Riverton Creek, if development has altered the City of Tukwila 32 Stormwater Management Action Plan Otak condition of the stream, and if landslides in the upper basin are contributing to degraded water quality. The results of a sediment study would assist the City in determining whether flow control retrofits would be useful in improving conditions for fish in Riverton Creek or if non-stormwater management actions, such as landslide control or remediation, would be necessary to improve sediment conditions. Proposed flow control retrofits could be removed from the list of SMAs if other strategies are found to be more effective or if sediment in Riverton Creek is found to be a natural condition. Because flow control facilities tend to have a high initial capital cost, this study could assist the City in focusing resources on the most effective solutions. Finally, this SMAP recommends the City monitor research on 6PPD-q. Numerous studies are expected in the near future, and study findings could impact the approach the City will take to improving Riverton Creek, including selecting stormwater facility types that remove 6PPD-q from runoff. The City may choose to monitor 6PPD-q in Riverton Creek, implement SMAs that reduce 6PPD-q in stormwater runoff, or make other changes to the urban landscape. SMAP implementation may be assessed annually with the City's NPDES Annual Report. In addition, the City may consider incorporating retrofit projects from this plan into the Water Quality Retrofit Capital Improvement Program if funding is available. Section 8. Conclusion The City of Tukwila has identified Riverton Creek basin to strategically invest in making stormwater improvements which will improve water quality while allowing for future population growth. The City is committed to providing a safe and livable community and being a good steward of the environment. The City is actively making steps to improve water quality in the City's receiving waters and will include the community as the SMAP is implemented. During the SMAP process, the City built relationships with stakeholders and the public. As retrofit projects and programs move closer to implementation the City will continue to have ongoing conversations with the community. This SMAP will also be an appendix of the City's Surface Water Comprehensive Plan update which is currently being developed. The short-term retrofit projects developed for this SMAP will be implemented through either the existing Water Quality Retrofit Capital Improvement Program or the small drainage program, so projects will be reviewed annually to determine which projects will be implemented in the coming year. Additionally, the recommendations in this SMAP were designed to be eligible for grants. Thus, it would be beneficial for the City of Tukwila to take steps to implement the short-term recommendations. The first step in implementing this SMAP will include applying for retrofit project funding. Next, the City will explore the feasibility of the recommended land management strategy and, as feasible, implement the suggested customized SWMP, the Targeted Source Control Program, and Community Rain Garden Stewardship Program. Riverton Creek is an important water resource for the City of Tukwila. Poor water quality inflicts harm on endangered species, including Chinook, Coho, chum, and steelhead, which define the character of the City and region. As recommendations are implemented, this SMAP will guide the City's continuing work to restore Riverton Creek. Section 9. References CH2MHill. (2013). City of Tukwila 2013 Surface Water Comprehensive Plan. Retrieved from https://www.tukwilawa.gov/wp-content/uploads/PW-Surface-Water-Comprehensive-Plan.pdf. City of Tukwila 33 Stormwater Management Action Plan Otak City of Tukwila. (June 2, 2014). Southcenter Subarea Plan. Retrieved from https://www.tukwilawa.gov/wp- content/uploads/DCD-Planning-Southcenter-Subarea-Plan.pdf. City of Tukwila. (2015). City of Tukwila Comprehensive Plan. Retrieved from https://www.tukwilawa.gov/wp-content/uploads/DCD-Comprehensive-Plan.pdf. City of Tukwila. (October 2022). Personal Communication from R. Betteridge. King County. (December 2021). Ordinance 19384. King County. (August 2022). King County Signature Report Motion 16184. Otak. (2021). Preliminary Receiving Waters Assessment and Stormwater Management Influence Memorandum. Puget Sound Partnership. (2016). Puget Sound Characterization. Volume 1: The Water Resources Assessments: Water Flow and Water Quality. Publication No. 11-06-016. Retrieved from https://apps.ecology.wa.gov/publications/summarypages/1106016.html. Puget Sound Regional Council. (October 2020). Vision 2050: A Plan for the Central Puget Sound Region. Sabey Corporation. (March 16, 2022). SabeyStories: Return of the Salmon. Retrieved from https://sabey.com/sabeystories-return-of-the-salmon/. State of Washington Department of Commerce. (2016). Building Cities in the Rain. State of Washington Department of Commerce. (2022). Periodic Update Checklist for Fully -Planning Cities. Washington Department of Ecology (Ecology). (2010). Frequently Asked Questions Water Quality Program: Implementing the Flow Control Standard in Ecology's Western Washington Municipal Storm water Permits. Retrieved from https://apps.ecology.wa.gov/publications/documents/1010024.pdf. Washington Department of Ecology (Ecology). (2019). Stormwater Management Action Planning Guidance. Retrieved from https://fortress.wa.gov/ecy/ershare/wq/permits/StormwaterMgmtActionPlanning.pdf. Washington Department of Ecology (Ecology). (October 2022). 6PPD in Road Runoff. Assessment and Mitigation Strategies. Publication 22-03-020. Retrieved from https://app.leg.wa.gov/ReportsToTheLegislature/Home/GetPDF?fileName=ECY%206PPD%20in 20Road%20Runoff%20Report_32dc8c92-b98a-4023-97f2-d6d2ec19b390.pdf. Water Resource Inventory Area 9 (WRIA 9). (February 11, 2021). Salmon Habitat Plan 2021 Update. Available at: https://www.govlink.org/watersheds/9/pdf/2021_PlanUpdate.pdf. City of Tukwila 34 Stormwater Management Action Plan Otak Appendix A Part Receiving Waters Assessment April 2022 Find the archived Tukwila Watershed Inventory interactive web page at: tukwilawa.gov/SMAPWatershed Inventory Otak 4/7/22, 1:04 PM City of Tukwila - SMAP City of Tukwila - SMAP Appendix to Watershed Inventory Table DEPARTMENT OF ECOLOGY State of Washington Stormwater Management Action Planning Guidance Phase I and Western Washington Phase II Municipal Storm water Permits This set of webmaps is an Appendix to the Receiving Water Inventory (Table) required by the Western Washington Phase II Municipal Stormwater Permit. Steps in the Stormwater Management Action Planning Guidance require a Watershed Inventory Table to be submitted to Washington State Department of Ecology by March 31, 2022. The following webmaps capture GIS information to be submitted by the City of Tukwila. https://storymaps.arcgis.com/stories/f15ab871 c5cf44a 1 a51 b030d 11 ef675b 1/14 4/7/22, 1:04 PM City of Tukwila - SMAP (ighland Park Mt View Priglesea p rart ook City of SeaTac, King County, WA State Parks GIS, Esri Canada, Esri, HERE, Garmin, SafeGraph, GeoTechnologi... Step 1: Delineate Basins and Identify Receiving Waters Aspect reviewed the existing basin delineation from the 2013 Surface Water Comprehensive Plan which was based on field visits, the City Geographic Information System (GIS), and previously developed basin plans. Aspect also compared Ecology's Assessment Units (AUs), LiDAR-derived basins, and the City stormwater data. Using this information, Aspect updated basin boundaries as shown on the webmap here. Link to Step 1 Table. Powered by Esri 2/14 4/7/22, 1:04 PM City of Tukwila - SMAP Step 2: Assess Receiving Water Conditions Data from the next six sections, as outlined in the SMAP guidance, was used to assess receiving water conditions within the City of Tukwila. Receiving Water Conditions Assessment_Step ... Step 2 Table 3/14 4/7/22, 1:04 PM City of Tukwila - SMAP a) Identify designated uses and desired WQ conditions to support uses Link to Step 2 Table. ® Step 2. Receiving Water Assessi X + v ❑ X e Q i aspectconsulting.maps.arcgis.com/apps/webappviewer/index.html?id=dBb2d328de0a4fc4a... E. A* 0 S 43) Step 2. Receiving Water Assessment - Extent Desired Conditions Met _ •-1222056].524 Depeiet Cenni—ydaie. _a ry wire wage basin(Aspect, tut it -Q City ofTukwila OuttelEs(2022) ▪ Discharge Point [1r Dutfall A❑ Private Storm water As. t (Tu kwil a, 2022) • A❑ Private Stormwater Conveyance (Tukwila, 2022] .rs _O City of Tukwila Catch Basins (2022) • A❑ City of Tukwila Pipes (2022) B-IBfSims -el Fish Distribution (SWIFD) -Q TMDL Boundary(Ecology) Duwamish Watenray Am mania-NTMDL Femriek EakeTotal Ph D2phorus TAM_ „-een River Temperature Watershed TMDL Lake Sawyer Total Phosphorus TMDL Newaukum Creek Temperature TMDL Sons Creek Subbasin Bacteria TMDL Saes Creek Subbasin Muluparameter TM DL 10 RNers(King County) I❑ Aerial boa gery(King County, 2019) b) determine available information and assess extent desired conditions are being met Link to Step 3 Table. 4/14 4/7/22, 1:04 PM City of Tukwila - SMAP Layers wEa wEa w� Drainage Basins (Asper. 2021) City of Tukwila Streets with Average Daly Trafis Counts Less than 7,544 cs City ?arks Fok, rila) gg Wetland {Tuks la) I-1 Irnper.o US: Area (City/Aspect} WSDOT Right -of -Way (IKrng County/Aspects To best view information in the webmaps open in a new browser tab by clicking on the icon above. Having trouble seeing the basemap? Use the Basemap Gallery button to choose a specific basemap, for example Human Geography or Firefly Imagery, and keep working within the StoryMap. Alternatively, you can open the map in a separate browser tab as shown above. 5/14 4/7/22, 1:04 PM City of Tukwila - SMAP — • -. Charted Te-ritcry Map rw rA61.2 Geography Map Imagery Hybrid Colored Pencl� Map Dark Gray Canvas Human Geography Dark Li o L. Grey Canvas Click on the basins to pop up summary information. 6/14 4/7/22, 1:04 PM City of Tukwila - SMAP Step 2. Receiving Water Assessrr X + V — II X 0 0 (i aspectconsulting.maps.arcgis.com/apps/webappviewer/index.html?id=eSe84de7bba443a287... L*, 4- El S Step 2. Receiving Water Assessment - Evaluate Landscape Scale Data ATRE-TACOMA ITER NATIONAL AIRPORT Lakeridge • RENTI MUNIC ARK MAGIC RIVER FOREST Layers k is Drainage Basins (Aspect, 2021) 0 City of Tukwila Culvert (Tukwila) P. Total Fish Passage Blockage r• Partial Fish Passage Blockage c Streets with Average Daily Traffic Counts More .r. than 7,500 City Parks (Tukwila) 0 Wetland (Tukwila) I. ❑ Impervious Areas (City/Aspect) M ❑ WSDDT Right -of -Way (King County/Aspect) Known Right -of -Way (King County) I. Land Use (King County, 2021) Rivers (King County) 1.E Aerial Imagery (King County, 2019) c) Gather and evaluate landscape -scale data that help explain and predict receiving water conditions. Click on the basins to pop up summary information. 7/14 4/7/22, 1:04 PM City of Tukwila - SMAP Step 2. Receiving Water Assessrr X L] x O ■ G fl i aspectconsulting,maps.dregis.com/aPes/webappviewer/index.html?id=b58a7d4c9c014db297c5deb4a2e9572b Step 2. Receiving Water Assessment - Assess Development Pressure FTT. 8rL1 H:i -_! piacc Haight:. ti Fester Southgate, MCMlcken bloightn CIAL SPRINGS FMK SlER LINKS Wen NI NGec wxrS Tukwila Urban Center Corridor Types — Commercial Corridor — Future Commercial Corridor — Freeway Frontage Corridor ^�— Neighborhood Corridor — — Future Neighborhood Corridor - Tukwila Pond Esplanade — Urban Corridor — — Future Urban Corridor — Walkable Corridor — — Future Walkable Corridor - Workplace Corridor — — Fatbre Workplace Corridor Recently Developed Par. *S (Tukwila/ASPent( b Wetland (Gty of Tukwila) Cmeg ory II ' Category III Category IV Gre Grewth-Focused Zones Mixed Use - Office hiMixed Use -Regional Co mmerda. ' Tukwila Urban Center- Co mmercia Corridor Tukwila Urban Center- Pond ' Tukwila Urban Center -Regional Center OCounty,'J.'A Ste.e Parks GIS, Esr, HERE. Garmin,SefeG Tukwila urban Cen,ter-Transhoriented d) assess development pressure in the basin 1. How much growth is being directed toward this area? 2. How is transportation planning likely to affect this basin? 3. In addition to watershed -scale implementation of Low Impact Development techniques, are headwaters, riparian areas, and other sensitive portions of the basin likely to be protected under current zoning and plans? Urban Growth Capacity Report (King County, 2021) (see Exhibit 13, page 32) Tukwila's Comprehensive Plan lays out focus areas for growth. All of these elements, goals and policies contribute to the implementation of the Plan's following four major objectives, which are listed in priority order: 8/14 4/7/22, 1:04 PM City of Tukwila - SMAP 1. To improve and sustain residential neighborhood quality and livability. 2. To redevelop and reinvigorate the Tukwila International Boulevard District both economically and residentially. 3. To redevelop and reinvigorate the industrial uses in the Manufacturing/Industrial Center along East Marginal Way. 4. To further develop a thriving Urban Center as a true regional concentration of employment, housing, shopping and recreational opportunities. The plan also states that with little available vacant land other than the Tukwila South subarea, much of Tukwila's future residential population growth will occur in mixed use commercial areas. Click on the basins to pop up summary information. 9/14 4/7/22, 1:04 PM City of Tukwila - SMAP ge perk 0 Center Step 2. Receiving Water Assessn. X + {" 17 4 aspectconsulting,maps.arcgis.cam/apes/webappviewer/index.html?id=0c81527808274... Step 2. Receiving Water Assessment - Assess Discharge to Impaired Waters Q urteo WAL Mcklicken Heights Dunlap Skyway Nelson Ken II Green/Du J - y Springbrook a.:rty. WA State Parks GIS, Eri, HERE. 1±,41 i7 0 L Layers kQ City of Tukwila kDrainage Basin (Aspect. 2021) Q e Enritonmental Site Location (Ecology) • kis City of Tukwila (Leask {2022) kel Private Stormwater Psse. (kw'i I a. 2022) k� Private Stormwater Conveyance )Tukw'iIa, 2022) kIN City of Tukwila Catch Basins {2022) kQ City of Tukwila Plpes(2922) k © Rivers (King Country) k Aerial Imagery {King County, 2019) e) assess basins that discharge to impaired waters 1. What sources/activities are the main contributors to the pollutant load targeted for reduction (e.g., polluting activities associated with particular land use or land cover types)? 2. When does the impairment occur? Is it seasonal, or flow - dependent? 3. Can these sources be addressed (or are they already being addressed) through BMPs found in the SWMMWW and applied through your SWMP? 4. Will enhanced municipal stormwater management actions result in meeting loading targets? 5. Are substantial non-stormwater management actions needed to address the impairment? 6. What combination of additional stormwater management actions will most effectively reduce current and future loadings? 10/14 4/7/22, 1:04 PM City of Tukwila - SMAP Click on the basins to pop up summary information. Step 2. Receiving Water Assess; X + 0 Q i aspedconsulting maps.arcgis.tom/apps/webappviewer/indexhtml?id=3c1b7d79bb8b48b5b... al Step 2. Receiving Water Assessment - Overburdened Communities os Builvn ndy Perk ❑unlap ;iiertan Sodthgate Skyway 1, Tuitwils Lake n dge eu[a srrer 1\ .top If Mar Wass ft Kennydale Be neon Heights G een/Duwamish lP17 Springbro ak Mil! Creek (\J SeaTar aunty, 'JJA Stare Parks GIS, Esri, HERE, Gar — ❑ x Q Q * El Layers P el Drainage Basin (Aspen, 2021). Gel City eFT Livila �Q Population Living on Poverty Percent of Population Living in Poverty ' 45% ▪ 25-45% c 25% '❑ Population Living Near Flea,/ Traffic Percent of Population Living Near Heavy Traffic ' ,45% ® 15-45% < 15% -❑ People of Color Percent >70% ' 60 - 70% c60% k� Rovers (King County} 1❑ Acne; lmagery(King County, 2014) Overburdened Communities Lastly, evaluate information related to overburdened communities within the contributing areas to help determine where overlap may exist with improving receiving water conditions for water quality and human health. Sources of information for overburdened communities include, but are not limited to: USEPA's EJ Screen and the Washington State Department of Health Washington State's Health Disparity Map. Click on the basins to pop up summary information that includes free and reduced lunches and ELL. 11/14 4/7/22, 1:04 PM City of Tukwila - SMAP ® Step 3. Storm water Managemen X + C Q i aspectconsulting,maps.arcgis.com/apps/webappviewer/index.html?id=2e5c40edd80a4123a.., ID Step 3. Stormwater Management Influence Flndanldr� Park 0 h Ito Center Mt View edearerdereiRL AIRPORT eddy Park • .122]E9 47.535 Depessi' MCMicken Heights Ittada kr_ mr • %reeik — ❑ X Q L� * a' I.__l r❑ WSDOT Ditch Kennyd ,----J _;? L❑ Stormwater Detention (Water quality Structure)... Average Daily Traffic Counts(rukwila) Streets W.Vh Average Daily Traff Cournr, Gr .esr*Ijn 1.500 I❑ City Parka (II kwlla) ❑ Impervious Areas [Tukwila). 'Q Rig ht-f-Way(KIng County) I❑ Pervious Right -of -Way (King County/Asps¢) I❑ WSDOT Rrght-of-Way (Keg County/Aspect) I❑ Industrial land Use {King Co unty, 2022) Rnntn Polluti2022)on-Generating Land Use (King County, /een/DuwI Springbrook �. _.a.e'arks GlS.Esn, HERE, Ge High Density Residential Medium Density Residential ▪ Commerdal Commercial Light Industrial ▪ Office Indc atrial{Heavy) Industrial{Light) Park/Open Space ▪ Vacant r Q Rivers (King County) I ❑ Aerial Imagery (King County, 2019) Step 3: Assess Stormwater Management Influence Link to Step 4 Table. A basin with relatively low expected Stormwater Management Influence for SMAP is defined as having both "low expected hydrologic impacts" and "low expected pollutant loadings". Low expected hydrologic impacts are from MS4s that drain directly to: • Flow -control exempt receiving waters as defined in the 2019 SWMMWW, or • Ephemeral streams (generally, streams having less than one square mile of contributing watershed area), or 12/14 4/7/22, 1:04 PM City of Tukwila - SMAP • Receiving waters primarily influenced by groundwater flows. Low expected pollutant loadings are from MS4s receiving runoff from only: • Non -pollutant generating surfaces as defined in the 2019 SWMMWW; and/or • Low density residential land uses; and/or • Parking areas with up to 100 total trip ends or for up to 300 employees; and/or • Roads with ADT up to 7,500, fully and partially controlled limited access highways with ADT up to 15,000; and/or • Roads with ADT up to 7,500, fully and partially controlled limited access highways with ADT up to 15,000; and/or • Other land uses where runoff is already being treated using stormwater BMPs designed in accordance with the SWMMWW (or equivalent), and in particular, roads with higher ADT, parking areas for buildings with more total trip ends, and on -street parking areas of municipal streets in commercial and industrial areas (see the 2019 SWMMWW). For each basin, document your answers to the following questions: 1. What are the major pollutants and/or flow impacts associated with individual point sources versus non -point sources? Will the loadings and/or runoff volumes increase under expected future land use conditions? 2. Can these sources be addressed through other land management strategies, including policies, code, or development standards? 3. Can future growth be managed to minimize adverse stormwater impacts? Flow Control Standards From Tukwila's Infrastructure and Design Guidance 13/14 4/7/22, 1:04 PM City of Tukwila - SMAP Click on the basins to pop up summary information. Table 1 Table 2 Table 3 Table 4 Draft Watershed Inventory Table - Appendix City of Tukwila 14/14 Basins and Receiving Waters - City of Tukwila Basin Name Receiving Waters within Basin Basin Area (Acres) Basin Area inside Tukwila (Acres) Basin Area (Sq. Miles) Basin Area inside Tukwila (Sq. Miles) % of Basin in Tukwila Direct Discharge to Puget Sound? (refer to SMAP) Gilliam Green River, Gilliam Creek, Cottage Creek 1,858 1,315 2.9 2.1 70.8 No Green/ Duwamish Green/Duwamish Rivers, Duwamish Waterway, Ryan Hill Creek 297,608 2,589 465.0 4.0 0.9 Yes Johnson Green River, Johnson Creek, Ditches J2 (probable), and Ditch C (probable) 1,753 289 2.7 0.5 16.5 No Mill Creek Green River 5,122 86 8.0 0.1 1.7 No Nelson Green River 112 110 0.2 0.2 98.7 No P17 Green River, Stream E, El, E2 1,516 808 2.4 1.3 53.3 No Riverton Duwamish River, Riverton Creek 514 402 0.8 0.6 78.3 No Southgate Duwamish River, Southgate Creek 506 504 0.8 0.8 99.6 No Springbrook Green River, Black River, Springbrook Creek 2,311 47 3.6 0.1 2.0 No %Aspect Otak •_ON5iJLT1240 3/22/2022 Designated Uses - City of Tukwila 3/22/2022 Receiving Water Name Designated Uses Use Category Parameter Water Quality Standard (WAC 173-201A) Gilliam Creek Johnson Creek Mill Creek" P17 Riverton Creek Southgate Creek S rin brook Creek P g Aquatic Life Salmonid Spawning, Rearing, and Migration Temperature Highest 7-DADMaxl: 17.5°C (63.5°F) DO Lowest 1-Day Minimum: 8.0 mg/L pH 6.5 - 8.5 pH units, with a human -caused variation within the range of less than 0.5 units Turbidity < 5 NTU2 over background3 when the background is 50 NTU or less; or A 10 percent increase in the turbidity when the background turbidity is more than 50 NTU Recreation (Primary Contact) Bacteria Fecal coliform4 organism levels within an averaging periods must not exceed a geometric mean value of 100 CFU6 or MPN6 per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within an averaging period exceeding 200 CFU or MPN per 100 mL E. coli organism levels within an averaging period must not exceed a geometric mean value of 100 CFU or MPN per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within the averaging period exceeding 320 CFU or MPN per 100 mL Aquatic Life Salmonid Spawning, Rearing, and Migration Temperature Highest 7-DADMax1: 17.5°C (63.5°F) DO Lowest 1-Day Minimum: 8.0 mg/L pH 6.5 - 8.5 pH units, with a human -caused variation within the range of less than 0.5 units Turbidity < 5 NTU2 over background3 when the background is 50 NTU or less; or A 10 percent increase in the turbidity when the background turbidity is more than 50 NTU Aquatic Life Salmonid Rearing, and Migration Only Temperature Same as above DO Lowest 1-Day Minimum: 6.5 mg/L pH Same as above Turbidity < 10 NTU over background when the background is 50 NTU or less; or A 20 percent increase in the turbidity when the background turbidity V is more than 50 NTU Recreation (Primary Contact) Bacteria Fecal coliform4 organism levels within an averaging periods must not exceed a geometric mean value of 100 CFU6 or MPN6 per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within an averaging period exceeding 200 CFU or MPN per 100 mL E. coli organism levels within an averaging period must not exceed a geometric mean value of 100 CFU or MPN per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within the averaging period exceeding 320 CFU or MPN per 100 mL Other (Shellfish Harvesting) Bacteria Fecal coliform must not exceed a geometric mean value of 14 CFU or MPN per 100 mL, and not have more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained for calculating the geometric mean value exceeding 43 CFU or MPN per 100mL Nelson N/A - Nelson basin has no identified surface water, City MS4 system discharges to Green River " Mill Creek basin has no identified surface water within City of Tukwila, City MS4 discharges into Mill Creek which is designated as Salmonid Spawning, Rearing, and Migration and for Primary Contact Recreation 17-DADMax: the 7-day average of the daily maximum temperatures 2 NTU—unit of measurement for turbidity; Nephelometric Turbidity Units 'Background means turbidity level of a waterbody which is outside the area of influence of the discharge under consideration. Fecal Coliform standard was expired on 12/31/2020. 6The averaging period of bacteria sample data shall be ninety days or less 6 CFU and MPN—units of measurement for number of bacteria; Colony Forming Unit and Most Probable Number, respectively Otak %Aspect Page 1 of 1 Watershed Inventory - City of Tukwila 3/29/2022 1. Designated Uses and Desired WQ 2. Extent to which desired conditions are being met Fish Presence and Habitat Conditions Known WQ Impairment Summary of Extent Conditions are Being Met Basin/Receiving Water Name of Basin in Tukwila Designated Uses and Desired WQ Conditions to Support (WAC 173-201A) Fish Presence (SWIFD) Percent Vegetated 100' Buffer of Stream with Fish Presence Percent Vegetated 300' Buffer of Stream with Fish Presence B-IBI (Score out of 100) Waterway (303d- or 305b-Listing)* (ECY) TMDLs* Local Knowledge of Receiving Water Conditions Give higher priority to RW with low to moderate levels of impairment. Gilliam 70.8 (See Step 2. Designated Uses) Coho (P); Resident Coastal Cutthroat (P) 54.9 40.7 09LOW0325: Very Poor (9.1) Unnamed Creek - Tributary to Green River - Other: (CATS - bioassessment) Green River Temperature Watershed TMDL City data from lower reach in 2018-2020 indicate concerns with pH, turbidity and total suspended solids. Metals, DO and temperature met standards. Creek runs along mall parking lot and under I 405/1-5 intersection and overpass. Green/Duwamish 0.9 (See Step 2. Designated Uses) Coho(P)(R); Dolly Varden/Bull Trout (P); Fall Chinook (P)(R); Fall Chum (P)(R); Pink Odd Year (P); Resident Coastal Cutthroat (P); Sockeye (P); Summer Steelhead (R); Winter Steelhead (P) 94.9 61.5 -- Duwamish River - Water: (CATS - Temperature, CATS - Alpha-BHC, CATS - pH) Duwamish River - Tissue: (CATS - PCBs, CATS - 4,4'-DDE, CATS - 4,4'-DDT, CATS - 4/4'- DDD) Green River - Water: (CATS - DO, CAT4A - Temperature) Green River Temperature Watershed TMDL and Duwamish Waterway Ammonia-N TMDL Homeless encampments along river bank are prone to winter flooding and could contribute unknown debris and contaminants, Synthetic turf fields at Ft. Dent might be possible one, source of 6-PPD- needed further research needed Multiple TMDL's already in place Johnson 16.5 (See Step 2. Designated Uses) Coho (P); Fall Chinook (P); Fall Chum (P); Resident Coastal Cutthroat (P); Winter Steelhead (P) 89.8 82.3 Angle Lake - Water: (CATS - Bacteria) Green River Temperature Watershed TMDL Fecal Coliform from Agriculture in Kent. King County flap gate does not work and fish are not present. Basin within City already under development agreements Mill Creek 1.7 (See Step 2. Designated Uses) Coho (P)(S)(R); Fall Chinook (P); Fall Chum (P); Resident Coastal Cutthroat (P); Winter Steelhead (P) 69.8 22.1 These stations are outside of the City boundary. 09BLA0675: Poor (20.2) 09BLA0716: Poor (30.5) 09BLA0756: Very Poor (14.5) Springbrook (Mill) Creek - Water: (CATS - Bacteria, CATS - Zinc, CATS - DO, CAT4A - Temperature) Springbrook (Mill) Creek -Other: (CATS - Bioassessment) Green River Temperature Watershed TMDL The reaches with 303d/305b-listed waters and the B-IBI stations are outside City boundary. The percentage of basin in Tukwila is <2% Nelson 98.7 (See Step 2. Designated Uses) 97.3 62.6 Green River Temperature Watershed TMDL No identified surface waters P17 53.3 (See Step 2. Designated Uses) Coho (P); Fall Chinook (P); Fall Chum (P); Resident Coastal Cutthroat (P); Winter Steelhead (P) 61.4 40.4 -- -- Green River Temperature Watershed TMDL PSWCP indicates high concern for Metals, nutrients and bacteria Aspect Otak Page 1 of 8 Watershed Inventory - City of Tukwila 3/29/2022 1. Designated Uses and Desired WQ 2. Extent to which desired conditions are being met Fish Presence and Habitat Conditions Known WQ Impairment Summary of Extent Conditions are Being Met Basin/Receiving Water Name of Basin in Tukwila Designated Uses and Desired WQ Conditions to Support (WAC 173-201A) Fish Presence (SWIFD) Percent Vegetated 100' Buffer of Stream with Fish Presence Percent Vegetated 300' Buffer of Stream with Fish Presence B-IBI (Score out of 100) Waterway (303d- or 305b-Listing)* (ECY) TMDLs* Local Knowledge of Receiving Water Conditions Give higher priority to RW with low to moderate levels of impairment. Riverton 78.3 (See Step 2. Designated Uses) Coho (P); Fall Chinook (P); Fall Chum (P); Resident Coastal Cutthroat (P); Winter Steelhead (P) 68.1 52.4 09DUW0277: Poor (28.9) Unnamed Creek (Trib to Duwamish River) - Other: (CATS - Bioassessment) Duwamish Waterway Ammonia-N TMDL Highly developed area with fish present - opportunity for significant impact. Urban runoff mortality has been observed. Data from 2019 indicates concerns with DO but Temp and pH are ok Concerns with DO and bioassessment scores. Observed pre -spawn mortality but creek is also largely accessible to fish Southgate 99 6 (See Step 2. Designated Uses) Coho (P); Fall Chinook (P); Fall Chum (P); Resident Coastal Cutthroat (P); Winter Steelhead (P) 82.0 69.6 -- -- Duwamish Waterway Ammonia-N TMDL Sediment issues. Bank stabilization and dredging maintenance often required. City data from 1994-1995 indicate moderate concern with DO and pH Concerns with sediment, DO and pH and much of creek is piped Springbrook 2.0 (See Step 2. Designated Uses) Coho (P)(R); Fall Chinook (P); Fall Chum (P); Resident Coastal Cutthroat (P); Winter Steelhead (P) -- -- -- Springbrook (Mill) Creek - Other: (CATS - Bioassessment, Green River Temperature Watershed TMDL The reaches with 303d/305b-listed waters are outside City boundary. *TMDLs, 303d, and 305b were considered as part of water quality assessment but no stormwater-related listings are included in Appendix 2 of the NPDES municipal stormwater permit for Tukwila. (P) indicates presence of salmonid species (S) indicates spawning of salmonid species (R) indicates rearing of salmonid species Aspect Otak Page 2 of 8 Watershed Inventory - City of Tukwila 3/29/2022 3. Evaluate landscape -scale data Information on Existing Land Cover in Tukwila Basin/Receiving Water Name Basin Area inside Tukwila (Acres) Impervious Surface (Acres) Impervious Surface (%) Wetland or Park (%) Other Vegetated/ Forested (%) Road Density (% Impervious Trans- portation) High Vehicle Traffic Areas (AADT >7,500) (%) Approximate Industrial Land use (Regrouped from King County Parcels, 2022) (%) Approximate Commercial Land use (Regrouped from King County Parcels, 2022) (%) Approximate Single- Family Land use (Regrouped from King County Parcels, 2022) (%) Approximate Multi - Family Land use (Regrouped from King County Parcels, 2022) (%) Percentage Road Surface within 100' of Stream Percentage High Traffic Road Surface within 100'of Stream Culverts (Quantity) Fish Passage Barriers (Total Block) Fish Passage Barriers (Partial Block) Gilliam 1315 616.7 46.9 4.4 48.7 14.4 16.7 0.7 17.6 32.9 9.7 84.2 25.4 68 13 5 Green/Duwamish 2589 1227.9 47.4 8.0 44.6 12.0 47.1 24.6 16.4 19.0 1.2 54.7 14.9 130 2 0 Johnson 289 45.9 15.9 9.1 75.0 7.5 6.7 0.0 0.0 0.2 0.0 30.6 11.6 7 0 0 Mill Creek 86 69.6 80.6 0.0 19.4 10.8 3.3 5.3 78.3 0.0 0.0 35.1 89.2 1 0 0 Nelson 110 49.0 44.5 1.2 54.3 14.0 4.5 19.4 34.7 2.7 0.0 93.7 81.2 2 0 0 P17 808 504.8 62.4 4.1 33.5 8.8 17.7 4.1 55.0 5.8 0.5 52.1 20.6 16 0 0 Aspect Otak ■ Page 3 of 8 Watershed Inventory - City of Tukwila 3/29/2022 3. Evaluate landscape -scale data Information on Existing Land Cover in Tukwila Basin/Receiving Water Name Basin Area inside Tukwila (Acres) Impervious Surface (Acres) Impervious Surface (%) Wetland or Park (%) Other Vegetated/ Forested (%) Road Density (% Impervious Trans- portation) High Vehicle Traffic Areas (AADT >7,500) (%) Approximate Industrial Land use (Regrouped from King County Parcels, 2022) (%) Approximate Commercial Land use (Regrouped from King County Parcels, 2022) (%) Approximate Single- Family Land use (Regrouped from King County Parcels, 2022) (%) Approximate Multi - Family Land use (Regrouped from King County Parcels, 2022) (%) Percentage Road Surface within 100' of Stream Percentage High Traffic Road Surface within 100' of Stream Culverts (Quantity) Fish Passage Barriers (Total Block) Fish Passage Barriers (Partial Block) Riverton 402 191.0 47.5 3.5 49.0 10.0 4.7 2.1 36.8 26.4 0.3 46.1 8.7 80 4 1 Southgate 504 212.1 42.1 5.7 52.3 11.8 -- 0.3 11.0 49.5 7.0 60.8 0.0 83 0 0 Springbrook 47 3.8 8.1 49.6 42.3 1.8 -- 79.9 3.7 0.0 0.1 30.6 0.0 0 0 0 *TMDLs, 303d, and 305b were considered as part of water quality assessment but no stormwater-related listings are included in Appendix 2 of the NPDES municipal stormwater permit for Tukwila. (P) indicates presence of salmonid species (S) indicates spawning of salmonid species (R) indicates rearing of salmonid species Aspect Otak Page 4 of 8 Watershed Inventory - City of Tukwila 3/29/2022 4. Assess Development Pressure in the Basin 5. Information on Basins that Discharge to Impaired Waters Information on Development Pressure Summary of Development Pressure in the Basin Pollution Sources and Stormwater Management Summary of Impairment to Water Basin/Receiving Water Name Mapped Landslides (King County) Very High Landslide Hazard Area (City) (%) High Landslide Hazard Area (City) (%) Mine Hazard Areas (City) (%) Seismic Hazard Area (City) (%) Mapped Erosion Areas (King County) (%) Major Redevelopment Projects (list of projects from City) How much growth is being directed toward this area? In addition to watershed -scale implementation of LID techniques, are headwaters, riparian areas, and other sensitive portions of the basin likely to be protected under current zoning and plans? Number of Environmental Sites (Ecology) Number of Outfalls per 1000 linear feet of River Known issues (flooding, erosion, etc.) (King County) Approximate Treated Area (%) (See Step 4. SMI) What sources and activities contribute to pollution? Where does impairment occur? Can/are sources addressed through BMPs? Gilliam -- 3.2 6.7 -- -- -- 16 McMicken neighborhood expecting redevelopment because of recent sewer upgrades. Redevelopment is around south center mall in Gilliam and P17. Communityon plan in that area and expecting redevelopment. Portion of Gilliam along 518 and Southcenter boulevard West of 1-5 are not designated as watercourse Critical Areas maps. Much of this might be in WSDOT RoW 24 2.30 w4 issues reported. Low -only 9 of 500 acres likely treated under ISGP and only a few City and private facilities shown in the data High ADT roads, commercial land use, high -density residential Throughout basin Potentially Green/Duwamish -- 0.4 7.0 One 16 acre mine hazard area near Foster Golf Links. 8.0 -- 21 New Amazon warehouse on west side of Duwamish in far north Tukwila Entire shoreline covered but Shoreline Jurisdiction under Shoreline Master Program 118 2.03 WQ/FC issues reported. Med-maybe 40% of PGS treated under ISGP, City data shows only 3 City treatment facilities Commercial land use, roads, agriculture, industrial throughout basin Upstream area likely too large for City to have impact Johnson -- -- 0.7 -- 61.5 9.4 Segale development Tukwila South just adopted some multi -family design guidelines, and mixed use employment is expected north of 200th Wetlands and watercourses appear to be identified and buffers are in place under Critical Areas Ordinance 1 0.23 Low, all PGS assumed untreated, City data show no treatment facilities Agriculture. Throughout lower basin Already locked -in under development agreement Mill Creek -- -- 0.0 -- -- -- 1 No surface waters identified. 0 0.00 Low -small percentage under ISGP, City data shows no treatment facilities Commercial/light industrial Entire basin within City Potentially Nelson -- -- 2.2 -- -- -- -- Wetlands and watercourses appear to be identified and buffers are in place under Critical Areas Ordinance 3 0.00 Med-maybe 25% of PGS treated under ISGP, City data shows no treatment facilities Commercial/light industrial Entire basin within City Potentially P17 -- 0.4 6.8 -- 1.2 2.0 14 Redevelopment is around south center mall in Gilliam and P17. Community plan in that area and expecting redevelopment. Wetland between Minkler BLVD and Green River not shown in CAO data. Most other drainages are piped or have appropriate designated buffer 38 0.09 Low -small percentage under ISGP, City data shows 1 treatment facility and there are indications of a couple private detention facilities Commercial/ light industrial/High ADT roads Lower portion of basin Potentially Aspect Otak Page 5 of 8 Watershed Inventory - City of Tukwila 3/29/2022 4. Assess Development Pressure in the Basin 5. Information on Basins that Discharge to Impaired Waters Information on Development Pressure Summary of Development Pressure in the Basin Pollution Sources and Stormwater Management Summary of Impairment to Water Basin/Receiving Water Name Mapped Landslides (King County) Very High Landslide Hazard Area (City) (%) High Landslide Hazard Area (City) (%) Mine Hazard Areas (City) (%) Seismic Hazard Area (City) (%) Mapped Erosion Areas (King County) (%) Major Redevelopment Projects (list of projects from City) How much growth is being directed toward this area? In addition to watershed -scale implementation of LID techniques, are headwaters, riparian areas, and other sensitive portions of the basin likely to be protected under current zoning and plans? Number of Environmental Sites (Ecology) Number of Outfalls per 1000 linear feet of River Known issues (flooding, erosion, etc.) (King County) Approximate Treated Area (%) (See Step 4. SMI) What sources and activities contribute to pollution? Where does impairment occur? Can/are sources addressed through BMPs? Riverton -- 0.3 6.0 -- 4.5 -- 11 Wetlands and watercourses appear to be identified and buffers are in place under Critical Areas Ordinance 27 1.18 WQ issues reported. Highly developed fish present and WQ upgrades could make a positive impact. Low-med-small percentage under ISGP, City data shows 4 treatment facilities (low in basin) and several small private facilities within basin Commercial/light industrial/High ADT roads Lower portion of basin Potentially Southgate -- -- 3.8 -- -- -- 6 Development near Tukwila Village on Tukwila Intl Blvd ( Urban Renewal Zone) and also South of 144th on Tukwila Intl Blvd. Wetlands and watercourses appear to be identified and buffers are in place under Critical Areas Ordinance 3 1.45 WQ issues reported. Sediment issues require frequent dredging and bank stabilization. Flooding. Low -small percentage under ISGP, City data shows several vaults in upper portions of basin Commercial, high density residential, Commercial in lower basin, high - density residential in upper basin Potentially Springbrook -- -- 0.0 -- -- -- 1 Wetlands appear to be identified and buffers are in place under Critical Areas Ordinance 0 0.00 Low -almost entire basin is vegetated rail corridor within City, KC data classifies as industrial Industrial/ heavy industrial Entire basin within City Potentially *TMDLs, 303d, and 305b were considered as part of water quality assessment but no stormwater-related listings are included in Appendix 2 of the NPDES municipal stormwater permit for Tukwila. (P) indicates presence of salmonid species (S) indicates spawning of salmonid species (R) indicates rearing of salmonid species Aspect Otak Page 6 of 8 Watershed Inventory - City of Tukwila 3/29/2022 6. Overburdened Communities Overall Assessment Evaluate information related to overburdened communities within contributing areas to determine where overlap may exist with improving RW Conditions for WQ and human health. Summary of Overburdened Communities Basin Condition summary Basin/Receiving Water Name Approximate % of Parcels with Free or Reduced School Lunch (City WiFi Project, 2021) Approximate % of Parcels with Public School Student Homes Speaking ELL (City WiFi Project, 2021) Approximate Percentage of Population Living in Poverty (DOH) Approximate Percentage of Populations near Heavy Traffic Roadways (DOH) Approximate Percentage of People of color (DOH) Gilliam 10.8 10.4 34.0 42.3 66.3 Gilliam is likely the most overburdened basin. Essentially the same percentages for poverty, ELL, free and reduced lunch, and People of Color as Southgate. Gilliam likely has more people than Southgate. -one 303(d) listing -relatively large WSDOT influence -Relatively high % of pollution generating area -more than 70% of basin in Tukwila -City data from lower reach in 2018-2020 indicate concerns with pH, turbidity and total suspended solids Green/Duwamish 1.6 1.6 21.6 33.8 66.0 DOH data shows lower poverty, ELL, and Free and Reduced lunch relative to other basins with residential areas -Multiple 303(d) or current TMDL -Less than 1% of basin in Tukwila -Relatively high % of pollution generating surface in basin Johnson 0.0 0.0 19.2 22.4 56.8 King County data shows no residential area within city limits. Likely very few residents relative to other basins -Largely locked off by Segale development -303(d)for bacteria in headwaters in Seatac less than 20% of basin in Tukwila Mill Creek 0.0 0.0 20.1 22.9 57.0 King County data shows no residential area within city limits. Likely very few residents relative to other basins -Basin has multiple 303(d) listings but none in Tukwila -Less than 2% of total basin in Tukwila Nelson 0.0 0.0 21.5 40.1 62.1 Basin has almost no residential area within city limits. Likely very few residents relative to other basins -No surface waters -Discharges to Green River P17 0.0 0.0 20.7 33.8 60.2 King County data shows only a single residential area within city limits. Likely very few residents relative to other basins -Area in Tukwila potentially redeveloping -almost 50% of basin is in SeaTac Aspect Otak Page 7 of 8 Watershed Inventory - City of Tukwila 3/29/2022 6. Overburdened Communities Overall Assessment Evaluate information related to overburdened communities within contributing areas to determine where over ap may exist with improving RW Conditions for WQ and human health. Summary of Overburdened Communities Basin Condition summary Basin/Receiving Water Name Approximate % of Parcels with Free or Reduced School Lunch (City WiFi Project, 2021) Approximate % of Parcels with Public School Student Homes Speaking ELL (City WiFi Project, 2021) Approximate Percentage of Population Living in Poverty (DOH) Approximate Percentage of Populations near Heavy Traffic Roadways (DOH) Approximate Percentage of People of color (DOH) Riverton 2.1 2.0 39.9 14.7 64.5 Riverton is likely the 3rd most overburdened basin. It has the highest poverty but relatively low ELL and free and reduced lunch and lower population than Gilliam or Southgate. -Noted fish presence -303(d) listing for bioassessment -Improving wq would align with other projects in basin -City data from 2019 indicates concerns with DO but temp and pH are ok Southgate 10.2 9.2 39.3 14.0 65.0 Southgate is likely the 2nd most overburdened basin. Essentially the same percentages for poverty, ELL, free and reduced lunch, and People of Color as Gilliam. Gilliam likely has more people than Southgate. -Relatively small pollution generating area -Noted sediment issues in basin due to steep slopes City data from 1994- 1995 indicate moderate concern with DO and pH Springbrook 0.0 0.0 21.7 40.1 62.1 Basin has almost no residential area within city limits. Likely very few residents relative to other basins -Area in Tukwila all likely under ISGP -Very small % of basin in Tukwila Springbrook has several 303(d) listings *TMDLs, 303d, and 305b were considered as part of water quality assessment but no stormwater-related listings are included in Appendix 2 of the NPDES municipal stormwater permit for Tukwila. (P) indicates presence of salmonid species (S) indicates spawning of salmonid species (R) indicates rearing of salmonid species Aspect Otak Page 8 of 8 Stormwater Management Influence - City of Tukwila 3/23/2022 Step 3 - Assess Stormwater Management Influence Basin Characteristics Pollution -Generating Land Use Basin/ Receiving Water Name Basin Area inside Tukwila (Acres) Flow Control Exempt Receiving Water Location in the Basin % of Basin in Tukwila Approx. Area with Pollution- Generating Surface (Acres) Approx. Percentage of Area with Pollution- Generating Surface (") Number of CBs inside Pollution- Generating Surface/ Acre Approx. Area of Industrial Area (Indicates treatment exists per permitted activities) (Acres) Acres) Approx. Percentage of Industrial Land Use (Indicates treatment exists per permitted activities) Number of CBs inside Industrial Surface/ Acre* Impervious Surface (%) % Pollution- generating Land Use Treated by Existing SW Facility ( Hi h/ Med/ Low g ) High Vehicle Traffic Areas (AADT >7,500) (Acres) Outfall Density (Number of Outfalls per 1,000 linear feet of River) Gilliam 1315 Basin east of 1-5 falls under 40/20 rule for flow control due to 40% impervious since 1985 Lower 70% of basin in City. Upper 30% is mix of WSDOT, Seattle -Tacoma International Airport and SeaTac. WSDOT ROW around I-5, 1405, 518 are moderate portion of basin within City 70.8 500.1 38.0 0.42 9.16 0.70 UNK 46.9 Low -only 9 of 500 acres likely treated under ISGP and only a few City and private facilities shown in the data 16.7 2.30 Green/ Duwamish 2589 Yes Lower end, almost entire basin is upstream of City 0.9 1400.3 54.1 0.37 637.72 24.63 0.50 47.4 Med-maybe 40% of PGS treated under ISGP, City data shows only 3 City treatment facilities 47.1 2.03 Johnson 289 No Only the lowest portion of basin within City. Upper portions in Kent and SeaTac 16.5 202.9 70.1 0.11 0.00 0.00 0.00 15.9 low, all PGS assumed untreated, City data show no treatment facilities 6.7 0.23 Mill Creek 86 No The part of Mill Creek inside Tukwila is 0.13 sq. mi. and 1.7% of the total basin area. It is the confluence area and the opportunity for impact here is limited. 1.7 73.8 85.6 0.07 4.54 5.26 0.00 80.6 Low -small percentage under ISGP, City data shows no treatment facilities 3.3 0 Nelson 110 Yes Almost entire basin in City 98.7 82.7 75.0 0.56 21.44 19.45 0.84 44.5 Med-maybe 25% of PGS treated under ISGP, City data shows no treatment facilities 4.5 0 P17 808 Large portions of the basin fall under 40/20 rule for flow control due to 40% impervious since 1985 Lower half in Tukwila, upper half and on opt of bluff all within SeaTac 53.3 594.0 73.5 0.60 33.36 4.13 0.51 62.4 Low -small percentage under ISGP, City data shows 1 treatment facility and there are indications of a couple private detention facilities 17.7 0.09 %Aspect Otak { Q''S L':TI Page 1 of 4 Stormwater Management Influence - City of Tukwila 3/23/2022 Step 3 - Assess Stormwater Management Influence Basin Characteristics Pollution -Generating Land Use Basin/ Receiving Water Name Basin Area inside Tukwila (Acres) Flow Control Exempt Receiving Water Location in the Basin % of Basin in Tukwila Approx. Area with Pollution- Generating Surface (Acres) Approx. Percentage of Area with Pollution- Generating Surface (") Number of CBs inside Pollution- Generating Surface/ Acre Approx. Area of Industrial Area (Indicates treatment exists per permitted activities) (Acres) Acres) Approx. Percentage of Industrial Land Use (Indicates treatment exists per permitted activities) Number of CBs inside Industrial Surface/ Acre* Impervious Surface (%) % Pollution- generating Land Use Treated by Existing SW Facility ( Hi h/ Med/ Low g ) High Vehicle Traffic Areas (AADT >7,500) (Acres) Outfall Density (Number of Outfalls per 1,000 linear feet of River) Riverton 402 No All identified surface waters within City, upper northwest corner of basin (22%) within Burien is mixed high and low density residential 78.3 197.3 49.0 0.26 8.50 2.11 0.12 47.5 Low-med-small percentage under ISGP, City data shows 4 treatment facilities (low in basin) and several small private facilities within basin 4.7 1.18 Southgate 504 No Almost entire Basin within City 99.6 142.1 28.2 0.32 1.37 0.27 0.00 42.1 Low -small percentage under ISGP, City data shows several vaults in upper portions of basin -- 1.45 Springbrook 47 No The part of Springbrook Creek inside Tukwila is less than 0.07 sq. mi. and 2.0% of the total basin area. It is the confluence area and the opportunity for impact here is limited. 2.0 46.0 98.3 0.09 37.44 79.92 0.11 8.1 Low -almost entire basin is vegetated rail corridor within City, KC data classifies as industrial -- 0 * Catch basin information inside industrial areas is sparce. Summary calculations may not be reliable. %Aspect Otak { Q''S L':TI Lack of info on private facilities for commercial land use limits assessment Page 2 of 4 Stormwater Management Influence - City of Tukwila 3/23/2022 Step 3 - Assess Stormwater Management Influence Available Area for Retrofit Documented Answers to Stormwater Management Influence Questions Basin/ Receiving Water Name ROW (Acres) Pervious ROW (Acres) ROW Area as Percent of Total Area (%) Percent of ROW that is Pervious (%) WSDOT ROW Area (Acres) Approximate Number of City/Public Owned Parcels* Park (Tukwila) (Acres) Hydrologic Impact? (Low, Medium, High Reason for Hydrologic Impact Rating? Pollutant Loading Impact? Reason for expected pollutant loading rating? Will the loadings and/or runoff volumes increase under expected future land use conditions? Can future growth be managed to minimize adverse stormwater impacts? Gilliam 383.4 178.4 29.2 46.51 251.36 30 Parcels -several are large parks in SW and N portions of basin. -Large areas of WSDOT ROW along interstates 38.10 Medium -Low -Almost half of basin is impervious but the entire basin east of I-5 is flow exempt, -70% of basin in Tukwila but many jurisdictions involved Medium Highest percentage of high ADT roads, large percentage of commercial or high- density residential- 70% of basin in Tukwila but many jurisdictions involved Likely little change Minimal growth planned Green/ Duwamish 448.9 195.4 17.3 43.54 217.81 80 Parcels -Several large parks but much of public land is KC airport and other County facilities in lower basin that are already built out 179.02 Low Flow -exempt Low Percentage of basin in Tukwila isti�ess than Likely little change Minimal growth planned Johnson 33.7 12.2 11.7 36.31 2.72 0 0.00 Low -Only 16% of basin in City -Only 16% of the area in City is impervious -Area within City already under development agreement Low Largely undeveloped or low density residential -only 16% of basin in City and mostly already under development agreement Runoff durations may increase because a development agreement locks in older flow control standards; however this has not been confirmed though modeling. Significant development expected, and development standards locked in under older agreement. Future growth may impact conditions. Mill Creek 12.0 2.0 13.9 17.02 0.00 0 0.00 Low Basin almost entirely impervious but less than 2% of basin in Tukwila Low Relatively large portion is commercial/light industrial but only 2% of basin is in Tukwila Likely little change Minimal growth planned Nelson 24.0 7.5 21.8 31.18 17.60 1 0.00 Low Discharge to Flow- Exempt water body High Relatively large percentage of high ADT roads, commercial and industrial Likely little change Minimal growth planned P17 93.5 34.8 11.6 37.24 36.38 13 Parcels -2 are ponds -1 is KC flood control area 28.38 Low -Almost entire portion within City is Flow exempt based on 40/20 rule Relatively high impervious area Medium Relatively large percentage of high ADT roads, commercial and industrial but Tukwila is only half of basin and the lower half Potential change if redevelopment meets treatment thresholds If redevelopment meets treatment requirements %Aspect Otak { Q''S L':Ti Page 3 of 4 Stormwater Management Influence - City of Tukwila 3/23/2022 Step 3 - Assess Stormwater Management Influence Available Area for Retrofit Documented Answers to Stormwater Management Influence Questions Basin/ Receiving Water Name ROW (Acres) Pervious ROW (Acres) ROW Area as Percent of Total Area (%) Percent of ROW that is Pervious (%) WSDOT ROW Area (Acres) Approximate Number of City/Public Owned Parcels* Park (Tukwila) (Acres) Hydrologic Impact? (Low, Medium, High Reason for Hydrologic Impact Rating? Pollutant Loading Impact? Reason for expected pollutant loading rating? Will the loadings and/or runoff volumes increase under expected future land use conditions? Can future growth be managed to minimize adverse stormwater impacts? Riverton 99.8 54.0 24.8 54.12 28.72 5 Parcels -Most are County or Metro facilities 0.00 High Large portion of basin is impervious and more than 78% of basin in Tukwila High Upper basin largely low -density residential, lower basin largely commercial/light industrial, more than 78% of basin in Tukwila Likely little change Minimal growth planned Southgate 107.0 39.7 21.2 37.09 19.67 22 Parcels Mix of Tukwila Schools, Parks and Playfields mostly in lower basin 19.54 Medium/ High Basin almost entirely within City, less impervious area than other basins Medium/ High Basin almost entirely within City, less likely PGS area than other basins Potential change from urban renewal development Minimal growth planned Springbrook 0.8 0.3 1.7 34.13 0.00 1 Parcel -pond between railroad tracks 0.00 Low City only makes up 2% of basin and much of that is forested median between railroad tracks Low City only makes up 2% of basin even if largely PGS Likely little change Minimal growth planned *Data is based on King County and City of Tukwila Public Parks and Parcel datasets. %Aspect Otak { Q''S L':TI Page 4 of 4 Appendix A Part II Preliminary Receiving Waters Assessment and Stormwater Management Influence June 2021 Otak Otak Memorandum To: Greg Villanueva From: Sara Mardani and Trista Kobluskie Copies: Ryan Larson, Ryan Makie, File Date: February 24, 2021; Appendix A revised June 29, 2021 Subject: Preliminary Receiving Waters Assessment and Stormwater Management Influence Project No.: 33296 Introduction City of Tukwila (City) is authorized to discharge stormwater runoff to surface waters of the State by the Washington Department of Ecology (Ecology) under the Western Washington Phase II municipal stormwater permit. Ecology has reissued the permit, effective August 1, 2019 through July 31, 2024. The City has requested Otak's assistance in complying with two sections of the permit: S5.C.4, MS4 Mapping and Documentation, and elements of S5.C.1., Stormwater Planning in compliance with Ecology's Storm water Management Action Planning Guidance (SMAP Guidance). This memorandum is a preliminary assessment of existing conditions of the City's receiving waters. Detailed analysis of each basin, prioritization of the basins, and selection of a high priority watershed are not included in this memorandum. This memorandum lists all receiving waters in the City, describes the methods of analysis, and finally, presents the preliminary analysis of each basin. Basins and Receiving Waters Analyzed The City's Surface Water Comprehensive Plan (SWCP), which was completed in 2013, delineated the nine basins that were used for the analysis in this memorandum. Table 1 lists each basin with its receiving waters, total area, area within the City, and percentage of the basin falling within the City. Figure 1, Appendix A, shows the full basin boundaries. Four basins were selected for further analysis: Green/Duwamish River Mainstem, Gilliam Creek, P17, and Johnson Creek. Each was selected because its total drainage area is between one and 20 square miles, which is the size suggested for study in the SMAP Guidance. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx 11241 Willows Road NE, Suite 200 Redmond, WA 98052 • Phone (425)822-4446 Fax (425)827-9577 otak.com Preliminary Receiving Waters Assessment and Storm water Management Influence Table 1: Tukwila Drainage Basin Areas Page 2 February 24, 2021 eceiving Water Total Drainage Area (acres' [square miles]) 4,250 [6.64] Area of Basin in City of Tukwila (acres)1 2,613 Percent of Basin in City of Tukwila (%)' 61 Green/Duwamish River Mainstem Green/Duwamish Rivers, Duwamish Waterway, & Ryan Hill Creek Gilliam Creek Green River, Gilliam Creek, Cottage Creek 1,774 [2.77] 1,314 74 Nelson Place / Long Acres Green River 93 [0.15] 94 100 P17 Green River, Stream E, El, E2 1,348 [2.11] 777 58 Riverton Creek Duwamish River 452 [0.71] 393 87 Springbrook Creek Green River 23 [0.04] 23 100 Southgate Creek Duwamish River 546 [0.85] 484 89 Johnson Creek Green River, Johnson Creek, Ditches J2 (probable) and Ditch C (probable) 1,833 [2.86] 309 17 Mill Creek Green River 87 [0.14] 87 100 'From Table 1 of the 2013 SWCP Methodology The analysis methodology is based on the first two steps in the Receiving Water Conditions Assessment section of the SMAP Guidance. A simplified and preliminary version of each step has been taken. The goals are to document the desired water quality conditions in each basin based on regulatory objectives and to make a preliminary assessment as to how well such goals have been attained. The primary focus is on receiving water conditions that are influenced by stormwater runoff and may be influenced by stormwater management, although the presence of other pollutants has been noted. Preliminary Assessment of Receiving Waters The following analysis steps were completed for each basin. Step 1 - Delineate Basins and Identify Receiving Waters Basin boundaries were provided by the City from the 2013 SWCP. Receiving waters were defined as surface waters to which Tukwila's storm sewer system discharges directly. This step resulted in a list of receiving waters (Table 1) and a map of the basins (Figure 1, Appendix A). The remaining steps of this process were applied to the four selected basins. Step 2 - Assess Receiving Water Conditions Step 2.1 Designated Uses and Desired Water Quality Conditions The designated uses and desired water quality conditions of each receiving water were documented using Chapter 173-201A of the Washington Administrative Code (WAC), Water Quality Standards for Surface Waters of the State of Washington. After determining the desired water quality conditions, the memorandum documents how well each water has achieved these conditions. Step 2.2 Assessment We compiled and reviewed available information to understand the likely condition of each receiving water. The following references listed below were consulted. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum.docx Preliminary Receiving Waters Assessment and Page 3 Storm water Management Influence February 24, 2021 1. Ecology's Water Quality Assessment and 303(d) List: this source lists water bodies that do not meet water quality standards. Segments of waters assigned Category 5 are considered impaired by the State and were identified in this memo. 2. Ecology's Water Quality Atlas Map: this source provides information regarding any Total Maximum Daily Loads (TMDLs) or Water Quality Improvement (WQI) project plans in the basin. Where available, TMDLs and WQI projects were documented in this assessment. 3. Puget Sound Stream Benthos-Benthic Index of Biotic Integrity (B-IBI): this source provides B-IBI scores for some streams. A higher B-IBI score indicates better stream ecological health. B-IBI sample locations and scores were documented where available and used to represent ecological health of streams in this assessment. 4. Ecology's Puget Sound Watershed Characterization Project (PSWCP): a. Ecology's PSWCP, Assessment Units (AUs): this source provides the relative value of small watersheds, referred to as "Assessment Units" (AU's), throughout the Puget Sound basin. For this assessment, all AUs comprising each basin within the city limits were identified, but if there were more than one AU representing the basin within the city limits, only the largest AU (dominant) was chosen and documented in this assessment. The largest AU is identified as the dominant AU in this memorandum. This information was used to collect other data from PSWCP. b. Ecology's PSWCP, Degradation of Water Quality Parameters: this source provides a map indicating the relative degradation of AUs for sediments, phosphorus, metals, nitrogen, and pathogens. The levels of degradations are categorized as High (H), Moderate High (MH), Moderate (M), and Low (L). This data was collected and documented for the dominant AU in each basin for all the pollutants because they, in excess quantities, negatively affect the designated uses of the State's aquatic ecosystems (PSWCP, 2016). c. Ecology's PSWCP, Water Flow Overall Degradation: This source provides a map indicating the relative overall degradation of AUs for water flow processes. The levels of degradations are categorized as High (H), Moderate High (MH), Moderate (M), and Low (L). Since the PSWCP does not directly analyze degradation associated with bioassessment, water flow overall degradation data for the dominant AU in each basin was collected and documented to be used as a degradation indicator for bioassessment. d. Ecology's PSWCP, Local Salmonid Habitat Index: this source provides a map indicating the local Salmonid habitat index. The main components of this index are the density of wetlands and undeveloped floodplains, local salmonid habitats, and accumulative downstream habitats, and it is ranked from 0 with "no freshwater lotic Salmonid habitat" to 10 with "highest value of Salmonid habitats." Since the PSWCP does not directly analyze degradation associated with water quality impairments such as temperature and dissolved oxygen (DO), this Index was collected and documented as a degradation indicator of these parameters for the dominant AU in each basin. The degradation was assumed as high or low based on whether the index is less than or equal to five or more than five, respectively. 5. Water Quality Monitoring Data a. Ecology's Environmental Information Management (EIM) Database: this source provides water and sediment quality data from studies conducted across the State by various entities. Where available, study data were reviewed for this assessment. b. King County Water Quality Monitoring (WQM) Database: this source documents water quality monitoring data. Where available, study data were evaluated for this assessment. c. United States Geological Survey (USGS) Database/Studies: this source provides water quality and quantity data. Where available, study water quality data were evaluated for this assessment. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Page 4 Storm water Management Influence February 24, 2021 6. 2013 SWCP Report: this source contains a variety of information on each basin. If water quality information which was not included in the above data search was available from this source, then it was extracted and summarized in this assessment. Select Indicator Pollutants All the studies and data collected in the previous step were summarized and tabulated in a Table. This Table was used to understand the likely condition of receiving waters in each basin, and select two appropriate indicators of water quality conditions for each basin. Indicator pollutants were modeled to estimate the pollutant loads that are generated within the City under the existing conditions. In future phases of SMAP, the City may choose to model future conditions. Model Existing Conditions Indicator pollutants were modeled to understand the influence of urban land uses within the City. The Long -Term Hydrologic Impact Analysis (L-THIA) spreadsheet model was used to provide a planning level analysis of expected pollutant loadings for indicators based on existing land uses. The L-THIA spreadsheet model is a quick and straightforward analysis tool to estimate runoff, recharge, and nonpoint source pollution resulting from past or proposed land use changes. It produces long-term average annual runoff, and associated nitrogen, phosphorus, suspended sediment, bacteria, metal, biological oxygen demand (BOD), chemical oxygen demand (COD), and oil and grease loads for a given land use configuration based on long-term climate data for that area (Engel, 2003). Model inputs include: • location data; • land use data; • hydrologic soil groups; and • land area. Land use options that are selectable within the model include: • commercial; • industrial; • high density residential; • low density residential; • water/wetlands; • grass/pasture; • agricultural; and • forest. To get the input data, land use information from the City's GIS layer was classified. Hydrologic soil groups were collected from the Soil Survey Geographic Database (SSURGO). Green/Duwamish River Mainstem Basin Receiving Waters Assessment The majority of the Green/Duwamish River Mainstem basin (61 %) is located inside the City of Tukwila. This basin is almost entirely developed. The Green/Duwamish River Mainstem basin map is presented in Figure 2, Appendix A. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Page 5 Storm water Management Influence February 24, 2021 Step 1 - Identify Receiving Waters The receiving waters in this basin are Green/Duwamish River, Duwamish Waterway, and Ryan Hill Creek. Ryan Hill Creek is a perennial stream flowing east approximately 0.5 miles along the South Boeing Road and then flowing north along I-5. The Green/Duwamish River meanders from the southeast to northwest through the City and is significantly changed from its natural condition along most reaches in the City (SWCP, 2013). The Green/Duwamish River is named the Duwamish below the confluence with the Black River and is named the Green River upstream of that point (SWCP, 2013). The industrialized estuary of Duwamish River is known as the Duwamish Waterway and is located in the northern -most portion of the City of Tukwila. This part of the City lies within the lower Duwamish Waterway superfund site, designated by the 2001 United States Environmental Protection Agency (USEPA) due to high levels of chemicals in the river sediments, water, and fish (SWCP, 2013). (Note that we did not review any study/data related to the superfund site inside the City because stormwater management is not a primary tool for clean-up of the site.) Step 2 - Assess Receiving Water Conditions Step 2.1 Designated Uses and Desired Water Quality Conditions The receiving waters are protected for aquatic life uses, recreational uses, and other uses which include shellfish harvesting (exists only for Duwamish Waterway), water supply uses (i.e., domestic, industrial, agricultural, and stock), and miscellaneous uses (i.e., wildlife habitat, harvesting, commerce/navigation, boating, and aesthetics). Note that Duwamish River and Duwamish Waterway are classified for all water supply uses except domestic water. State water quality criteria that are designed to protect aquatic life, recreational, and other uses in the Green/Duwamish River Mainstem basin are shown in Table 2. Table 2: Green/Duwamish River Mainstem Basin — Water Quality Standards Designated Use Use Category Parameter Highest 7-DADMax': 17.5°C (63.5°F) Aquatic Life Salmonid Spawning, Rearing, and Migration Temperature DO Lowest 1-Day Minimum: 8.0 mg/L pH 6.5 - 8.5 pH units, with a human -caused variation within the range of less than 0.5 units Turbidity < 5 NTU2 over background3 when the background is 50 NTU or less; or A 10 percent increase in the turbidity when the background turbidity is more than 50 NTU Salmonid Rearing and Migration Only Temperature Same as above DO Lowest 1-Day Minimum: 6.5 mg/L pH Same as above Turbidity < 10 NTU over background when the background is 50 NTU or less; or A 20 percent increase in the turbidity when the background turbidity is more than 50 NTU Recreation Primary Contact Recreation Bacteria Fecal coliform4 organism levels within an averaging periods must not exceed a geometric mean value of 100 CFU6 or MPN6 per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within an averaging period exceeding 200 CFU or MPN per 100 mL E. coli organism levels within an averaging period must not exceed a geometric mean value of 100 CFU or MPN per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within the averaging period exceeding 320 CFU or MPN per 100 mL K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Other Shellfish Harvesting Bacteria Page 6 February 24, 2021 Water Quality Standard (WAC 173-201A) Fecal coliform must not exceed a geometric mean value of 14 CFU or MPN per 100 mL, and not have more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained for calculating the geometric mean value exceeding 43 CFU or MPN per 100mL 17-DADMax: the 7-day average of the daily maximum temperatures 2NTU—unit of measurement for turbidity; Nephelometric Turbidity Units 3Background means turbidity level of a waterbody which is outside the area of influence of the discharge under consideration. 'Fecal Coliform standard expired on 12/31/2020. 6The averaging period of bacteria sample data shall be ninety days or less 6CFU and MPN—units of measurement for number of bacteria; Colony Forming Unit and Most Probable Number, respectively The Duwamish Waterway is unique among Tukwila's receiving waters because it is listed in the State Water Quality Standards for brackish waters. For the brackish portions of freshwaters, the marine criteria associated with the freshwater use category is applied (Ecology, 2015). Table 3 shows the marine criteria associated with the freshwater use category in Duwamish Waterway and State water quality criteria that are designed to protect marine water and recreational uses. Table 3: Green/Duwamish River Mainstem Basin — Water Quality Standards for Brackish Waters Designated Use Fresh- water Use Category Equivalent Marine Use Category= Parameter Water Quality Standard (WAC 173-201A) Aquatic Life Salmonid Rearing and Good Migration Quality Only Temperature Highest 1-DADMax1:19°C (66.2°F) DO Lowest 1-Day Minimum: 5.0 mg/L pH pH must be within the range of 7.0 to 8.5 with a human -caused variation within the above range of less than 0.5 units Turbidity < 10 NTU2 over background3 when the background is 50 NTU or less; or A 20 percent increase in the turbidity when the background turbidity is more than 50 NTU Recreation Primary Primary Contact Contact Recreation Recreation Bacteria Fecal coliform4 organism levels within an averaging periods must not exceed a geometric mean value of 14 CFU6 or MPN6 per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within an averaging period exceeding 43 CFU or MPN per 100 mL Enterococci organism levels within an averaging period must not exceed a geometric mean value of 30 CFU or MPN per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample values exist) obtained within the averaging period exceeding 110 CFU or MPN per 100 mL 11-DADMax: the daily maximum temperatures ZNTU—unit of measurement for turbidity; Nephelometric Turbidity Units 3Background means turbidity level of a waterbody which is outside the area of influence of the discharge under consideration. 4Fecal Coliform standard expired on12/31/2020. 6The averaging period of bacteria sample data shall be ninety days or less 6CFU and MPN—units of measurement for number of bacteria; Colony Forming Unit and Most Probable Number, respectively Since there are no State criteria for total suspended solids (TSS), and the State criteria for turbidity requires background data, criteria based on a high level of protection for salmonids were selected and used in this assessment (Lloyd, 1987; Lloyd et al. 1987). They are <7 NTU for turbidity and <25mg/L for TSS. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Page 7 Storm water Management Influence February 24, 2021 Step 2.2 Assessment Ecology's Water Quality Assessment and 303(d) List Receiving waters do not meet surface water quality standards for a variety of physical and chemical parameters; however, the focus of this assessment is mainly on conventional and biological parameters and includes the physical water characteristics for the support of aquatic organisms such as fish. Duwamish Waterway is on Ecology's 303(d) list for DO, temperature, sediment bioassay, and bacteria. Duwamish River is on Ecology's 303(d) list for pH and temperature. Duwamish River and Duwamish Waterway are also on Ecology's 303(d) list for several chemical substances (such as Polychlorinated Biphenyls (PCBs), Benzo(a)pyrene etc.). Green River is on Ecology's 303(d) list only for DO. Black River is not among the receiving waters in the Green/Duwamish River Mainstem basin; however, a small part of this river is located within the basin and is on Ecology's 303(d) list for bacteria, DO, and bioassessment. TMDL/WQI Projects There are two approved TMDLs, called the Duwamish Waterway Ammonia-N TMDL and the Green River Temperature Watershed TMDL. There is one WQI project which is under development, called the Puget Sound Nutrient Source Reduction Project. Puget Sound Stream Benthos: B-IBI Scores No B-IBI sample locations were found inside the Green/Duwamish River Mainstem Basin. However, there are a few sample locations with very poor scores located just outside the city limits on streams that confluence with the Duwamish River. Ecology's PSWCP Data Out of five AUs that include the basin, the dominant AU (9068) was chosen for this assessment. The level of degradation was high for sediment and moderate high for phosphorus, metals, nitrogen, and pathogens. The local salmonid habitat index was "5," indicating high degradation related to temperature and DO. Degradation of overall water flow processes was high, indicating high degradation related to bioassessment. Water Quality Monitoring Data a. Ecology's EIM Database One monitoring station is located in the basin. The freshwater quality index of this station for the Water Years (WYs) between 1997 and 2019 indicates that water quality is good for pH, DO, and temperature, meeting standards to protect aquatic life. However, it is moderate for fecal coliform, suspended solids, turbidity, total phosphorus, and total nitrogen, as water quality does not meet expectations in some of the WYs. b. King County WQM Database Three monitoring stations were/are located in the basin. Table 4 summarizes the exceedances of the water quality standards at each King County WQM station and calculates percentage of samples exceeding the standard. All stations met water quality standards for DO and pH nearly all the time. Temperature and bacteria criteria were exceeded in all stations. Temperature is of moderate concern at the station that was located on Duwamish River. Since no background data was available to compare turbidity data, and there is no State criteria for TSS, a criterion based on a high level of protection for salmonids were used in this evaluation. Based on the turbidity criterion, turbidity is of moderate concern at all sampling stations. c. USGS Database/Studies Three monitoring stations were/are located in the basin. Table 4 summarizes the exceedances of the water quality standards at each USGS station and calculates percentage of samples exceeding the standard. The stations located on Duwamish River exceeded water quality criteria for temperature and turbidity. Temperature is of moderate concern at these stations. The station located on Green River K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Page 8 February 24, 2021 exceeded water quality criteria for suspended solids. Turbidity and suspended solid levels are of high concern at all the USGS stations. The USGS conducted a study and collected representative samples of water and suspended sediment at USGS stream gauge 12113390 during 13 periods of differing flow conditions from August 2016 to March 2017 (USGS, 2018). The sampling data provided in this study indicates that the water quality standards were met for pH, DO, and temperature all the times; however, turbidity and suspended sediment concentrations exceeded the criteria for a high level of protection for salmonids. Table 4: Green/Duwamish River Mainstem Basin, Summary of Exceedances urn ' - r Qual Type of Flow -Data DO 1/1322 (1%) • mperature 20/1342 (15%) e olif• 11/135 (8%) 2/132 (2%) Total • uspended Solids (TSS)3 8/141 (6%) Turbidity' 20/134 (15%) King County WQM 0309 (on Duwamish River) Mostly Baseflow— Monthly 1998-2008 King County WQM 3106 (on Green River) Baseflow and Stormflow — Monthly 1998-2020 1/3142 (0.3%) 36/3182 (11%) 37/316 (12%) 5/316 (2%) 28/335 (8%) 64/273 (23%) King County WQM 0311 (on Green River) Baseflow and Stormflow — Monthly 1998-2008 & 2014-2020 0/2052 (0%) 27/2062 (12%) 16/204 (8%) 1/204 (0.5%) 10/204 (0.5%) 34/205 (17%) USGS 12113390 (on Duwamish River) Baseflow and Stormflow — Daily 2014-2020 408/2064 (19%) - 877/2064 41 (42%) USGS 12113415 (on Duwamish River) Baseflow and Stormflow — Daily 2015-2019 386/1515 (25%) - - - 33/7504 1%) USGS 12113350 (on Green River) Baseflow and- Stormflow — Daily 1963-1966 - - Color coding: Green 0-15% (low concern); Yellow 15%-35% (moderate concern); Red >_35% (high concern) of time the standard was not met. The color coding is based on the color coding used in the exceedance table of the 2011 State of Our waters document (Issaquah, 2011). The water quality standards that we used for this table are either based on State freshwater quality criteria or a high level of protection for salmonids. 2Because instantaneous grab samplings were used in collecting samples, and they were not suitable for direct comparison to the State criteria, the applied standard is based on 1-day Maximum for temperature and 1-day Minimum for DO. 3Since no background data was available to compare turbidity data to and there is no State water quality standard for TSS, criteria based on a high level of protection for salmonids were used in this evaluation, for turbidity (< 7NTU) and for TSS (<25 mg/L). 'There were some missing turbidity data between 2015-2019. 2013 SWCP Report This source provides a review of King County WQM data located at Duwamish River and Green River for the period of 2003 through 2008. During the six -year study period, water quality standards were met for pH and fecal coliform in both stations; however, the temperature standard was exceeded mostly during the months of July and August. In addition, DO from the Green River station failed to meet the standard. Relatively clear water conditions were reported for both stations nearly all the time. Data Summary and Indicator Pollutants Table 5 summarizes all studies and data described above. These sources indicate that the water quality is poor in the Green/Duwamish River Mainstem basin. Impairments include the following parameters that can be impacted by stormwater management: bacteria, metals, and sediment. Sediment and metals were selected as indicators of pollutants to be used for modeling. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Table 5: Green/Duwamish River Mainstem, Summary of Data Page 9 February 24, 2021 =-*1 ' Ilutant = ac erua & Data - - emperature ediment/Turbidity/ Chemical TSS Metals Nutrients' Substances' - • urce . ssessmen 303(d) List Ecology's Water Quality 303(d) List Yes Yes Yes Yes Yes Yes -Only Sediment - - Yes EIM Database - Moderate Good Good Good Moderate - Moderate King County Data King County Database _ Low concern Low concern Moderate concern Low concern Moderate concern for Turbidity3 USGS Data/Studies Review of data represented in the 2018 USGS Report - Met the standard Met the standard Met the standard Did not meet the standard for Turbidity and TSS3 - - - USGS Database Moderate concern- High Concern for Turbidity and suspended solids3 - - 2013 SWCP Report Review of King County WQM Data between 2003-2008 - Met the standard Did not meet the standard Did not meet the standard Met the standard Relatively clear water conditions - - Ecology's PSWCP Data Local Salmonid Habitats Index Value (AU 9068) - - High High - - - - - Water Flow Overall Degradation (AU 9068) High - - - - - - - Degradation of Water Quality Parameters (AU 9068) - Moderate High High Moderate High Moderate High Puget Sound Stream Benthos B-IBI Condition Not data - - - - - - ' Nutrients including phosphorus and nitrogen 2Chemical Substances including PCBs, Arsenic (inorganic), Bis(2-Ethylhexyl)phthalate, Benzo(a)pyrene, Benzo(b)fluoranthene, Benzo(k)fluoranthene, Chrysene, Dibenzo(a,h)anthracene, Indeno(1,2,3-c,d)pyrene, Alpha-BHC, 4, 4'-DDE, 4, 4'-DDT, and 4, 4'-DDD 3Criteria based on a high level of protection for salmonids were used for turbidity and TSS in this evaluation Model Existing Conditions L-THIA was used to model sediment and metal loads for the existing conditions of urban land uses. Table 6 contains the data input to the L-THIA model. Table 6: Green/Duwamish Mainstem Basin, Model Inputs Hydrologic Soil Type Land use Areas (Acres) A B C Commercial' 63.74 D4 326.74 Industrial2 2.40 0.80 947.37 High Density Residential3 Low Density Residential 23.90 40.08 529.02 ' Commercial areas include Commercial Light Industrial, Regional Commercial Mixed Use, Transit Oriented Development, Office, Regional Center, Residential Commercial Center, and Workplace areas 2lndustrial areas include Heavy Industrial, Light Industrial, Manufacturing Industrial Center/Heavy, and Manufacturing Industrial Center/Light areas 3High Density Residential areas include High Density Residential and Medium Density Residential areas 'The areas with a dual hydrologic soil group of C/D were considered as the areas with D soil group. For the areas with no identified hydrologic soil types, we assumed these areas are all impervious or mostly impervious with D soil characteristics. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Page 10 February 24, 2021 The estimated annual sediment and metal loads in the Green/Duwamish River Mainstem basin within the City were 395,265 lbs. and 1712.9 lbs., respectively (Table 7). Industrial and commercial areas generate higher pollutant loads compared to other land uses in the basin. The results indicate high influence of urban land uses within the City on the selected pollutants. Table 7: Green/Duwamish Mainstem Basin, Model Results uspend olids lb Commercial 102795.0 23.0 26.0 332.0 1.2 17.0 21.0 Industrial 238998.0 59.1 59.1 967.5 7.0 27.0 32.1 High Density Residential 6510.0 1.0 1.0 12.0 0.1 0.3 1.0 Low Density Residential 46962.0 10.0 10.0 91.4 0.9 2.0 11.1 Total 395265.0 93.1 96.1 1402.9 9.2 i 46.4 65.1 Gilliam Creek Basin Receiving Waters Assessment The majority of the Gilliam Creek basin (74%) is located within the central region of the City of Tukwila and the remainder is located in the City of SeaTac. This basin is almost fully developed except for the steep slopes above the 1-5 Corridor (SWCP, 2013). This basin has a single outlet to the Green River via an outfall and flap gate located to the south of 1-405 (SWCP, 2013). The Gilliam Creek basin map is presented in Figure 3, Appendix A. Step - 1 Identify Receiving Waters The receiving waters in this basin are Green River, Gilliam Creek, and Cottage Creek. Gilliam Creek is a perennial stream that enters the Green River upstream of the confluence with the Black River. Cottage Creek (not shown on Figure 3) is a tributary of the Gilliam Creek that flows south from a hillside above Southcenter Boulevard east of 1-5 and north of 1-405; Gilliam Creek is mostly piped and discharges to Gilliam Creek south of I- 405. Gilliam Creek flows into a section of the Green River that is on Ecology's 303(d) list for DO. Step 2 - Assess Receiving Water Conditions Step 2.1 Designated Uses and Desired Water Quality Conditions The receiving waters are protected for aquatic life uses, recreational uses, and other uses which include water supply uses (i.e., domestic, industrial, agricultural, and stock) and miscellaneous uses (i.e., wildlife habitat, harvesting, commerce/navigation, boating, and aesthetics). State water quality criteria that are designed to protect freshwater aquatic life and recreational uses in the Gilliam Creek basin are shown in Table 8. Table 8: Gilliam Creek Basin, Water Quality Standards Designated Use Freshwater Use Parameter Water Quality Standard WAC 173-201A) Category Aquatic Life Salmonid Spawning, Rearing, and Migration Temperature Highest 7-DADMax': 17.5°C (63.5°F) DO Lowest 1-Day Minimum: 8.0 mg/L pH 6.5 - 8.5 pH units, with a human -caused variation within the range of less than 0.5 units Turbidity < 5 NTU2 over background3 when the background is 50 NTU or less; or A 10 percent increase in the turbidity when the background turbidity is more than 50 NTU K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Page 11 February 24, 2021 Designated Freshwater Use Use Parameter Water Quality Standard (WAC 173-201A) Category Recreation Primary Contact Recreation Bacteria Fecal coliform4 organism levels within an averaging periods must not exceed a geometric mean value of 100 CFU6 or MPN6 per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within an averaging period exceeding 200 CFU or MPN per 100 mL E. coli organism levels within an averaging period must not exceed a geometric mean value of 100 CFU or MPN per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within the averaging period exceeding 320 CFU or MPN per 100 mL 17-DADMax: the 7-day average of the daily maximum temperatures 2NTU—unit of measurement for turbidity; Nephelometric Turbidity Units 3Background means turbidity level of a waterbody which is outside the area of influence of the discharge under consideration. 4 Fecal Coliform standard was expired on 12/31/2020. 6The averaging period of bacteria sample data shall be ninety days or less 6 CFU and MPN—units of measurement for number of bacteria; Colony Forming Unit and Most Probable Number, respectively Step 2.2 Assessment Ecology's Water Quality Assessment and 303(d) List Receiving waters do not meet surface water quality standards for DO (in Green River) or for bioassessment (in Gilliam Creek). TMDL/WQI Projects There is one approved TMDL, called the Green River Temperature Watershed TMDL. No WQI project was located. Puget Sound Stream Benthos: B-IBI Scores One B-IBI sample location located at Gilliam Creek (called lower Green River tributary) with a very poor score (7.2 out of 100) was found inside the Gilliam Creek Basin. Ecology's PSWCP Data Out of two AUs that include the basin, the dominant AU (9039) was chosen for this assessment. The level of degradation was high for sediment, phosphorus, metals, nitrogen, and pathogens. The local salmonid habitat index was "1," indicating high degradation related to temperature and DO. Degradation of overall water flow processes was also high, indicating high degradation related to bioassessment. Water Quality Monitoring Data a. Ecology's EIM Database: No water quality data/study was located for this basin. b. King County WQM Database: No data/study was located for this basin. c. USGS Database/Studies: No data/study was located for this basin. 2013 SWCP Report This source provides information about a study that had been conducted in 1997 where several samples were collected from the Gilliam Creek during summer baseflow conditions. The results of that study indicated that during June and September, the samples did not meet the State DO standard. The samples also fell slightly below the pH and temperature standards. This report also summarized the water quality data from a stormwater management plan prepared for Gilliam Creek in 2001 (Herrera, 2001). Gilliam Creek was sampled at eight locations during three different storm runoff K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Page 12 February 24, 2021 events in the fall of 1999. The results were that temperature, DO, and pH almost met State water quality standards all the times. Turbidity and suspended solids were somewhat elevated. Dissolved lead almost met applicable water quality criteria all of the time. However, about half of the samples failed to meet the dissolved copper criteria. Finally, nearly all the fecal coliform samples exceeded the State water quality standards. Data Summary and Indicator Pollutants Table 9 summarizes all studies and data described above. These sources indicate that the water quality is poor in the Gilliam Creek basin. Impairments include the following parameters that can be impacted by stormwater management: bacteria, metals, and sediment. Bacteria and metals were selected as indicators to be used for modeling. Table 9: Gilliam Creek Basin, Summary of Data Parameter / P Sources Bioassessment Bacteria DO Temperature Sediment/ Turbidity/TSS Metals Nutrients' Ecology's Water Quality 303(d) List & Data 303(d) List Yes Yes - - - - - EIM Database King County Data King County Database - I - _ _ I _ _ _ USGS Data/Studies USGS Data/Studies - - - - - - - - 2013 SWCP Report Referred Data to the Stormwater Management Plan (2001) - Elevated Almost met the standard Almost met the standard Almost met the standard Elevated for Turbidity and TSS Almost met the standard for lead, but elevated for Copper Referred to a study that had been conducted in 1997 - - Did not meet the standard during Summer Fell slightly below the standard Fell slightly below the standard - - - Ecology's PSWCP Data Local Salmonid Habitats Index Value (AU 9039) - - High High - - - - Water Flow Overall Degradation (AU 9039) High - - - - - - - K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Page 13 February 24, 2021 ediment/ urbidity/TS ' e a s u rien s' Degradation of Water Quality Parameters (AU 9039) - High - - - High High High Puget Sound Stream Benthos B-IBI Condition Very poor condition 'Nutrients including phosphorus and nitrogen Model Existing Conditions L-THIA was used to model bacteria and metal loads for the existing conditions of urban land uses. Table 10 contains the data input to the L-THIA model. Table 10: Gilliam Creek Basin, Model Inputs Land use Areas (Acres) Commercial' High Density Residential2 Low Density Residential Hydrologic Soil Type A B C 0.32 D3 294.58 137.83 48.31 459.60 ' Commercial areas include Commercial Corridor, Neighborhood Commercial Center, Pond, Office, Regional Center, Residential Commercial Center, Regional Commercial Mixed Use, Residential Commercial Center, and Transit Oriented Development areas 2High Density Residential areas include High Density Residential and Medium Density Residential areas 3The areas with a dual hydrologic soil group of C/D were considered as the areas with D soil group. For the areas with no identified hydrologic soil types, we assumed these areas are all impervious or mostly impervious with D soil characteristics. The estimated annual fecal coliform and metal loads in the Gilliam Creek basin within the City were 193,816 millions of colony forming units (CFU) and 515.8 lbs., respectively (Table 11). The highest bacteria and metal loads are generated from low density residential and commercial areas in the basin, respectively. The results indicate high influence of urban land uses within the City on the selected pollutants. Table 11: Gilliam Creek Basin, Model Results Commercial High Density Residential Low Density Residential Bacteria millions of CFU ecal Coliform 47133.0 49644.0 97039.0 193816.0 122959.0 139005.0 271708.0 533672.0 4.0 8.7 31.7 Copper 4.0 8.7 33.7 Metals (lbs) Cadmium Chromium P17 Basin Receiving Waters Assessment The majority of the P17 basin (58%) is located within the City of Tukwila with the remainder located in the City of SeaTac. This basin is almost fully developed except for the steep slopes above the 1-5 Corridor (SWCP, 2013). The P17 basin map is presented in Figure 4, Appendix A. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Page 14 Storm water Management Influence February 24, 2021 Step 1 - Identify Receiving Waters The receiving waters in this basin are Green River and streams (not shown on Figure 4) E, El, and E2. Streams El and E2 are intermittent streams flowing east and entering Stream E. Stream E is a perennial stream that first flows northeast and then east, finally entering the Green River through the outlets. Step 2 - Assess Receiving Water Conditions Step 2.1 Designated Uses and Desired Water Quality Conditions The receiving waters are protected for aquatic life uses, recreational uses, and other uses which include water supply uses (i.e., domestic, industrial, agricultural, and stock) and miscellaneous uses (i.e., wildlife habitat, harvesting, commerce/navigation, boating, and aesthetics). State water quality criteria that are designed to protect freshwater aquatic life and recreational uses in the P17 basin are shown in Table 12. Table 12: P17 Basin, Water Quality Standards Designated Use Freshwater Use Category Parameter Water Quality Standard (WAC 173-201A) Aquatic Life Salmonid Spawning, Rearing, and Migration Temperature Highest 7-DADMax': 17.5°C (63.5°F) DO Lowest 1-Day Minimum: 8.0 mg/L pH 6.5 - 8.5 pH units, with a human -caused variation within the range of less than 0.5 units Turbidity < 5 NTU2 over background3 when the background is 50 NTU or less; or A 10 percent increase in the turbidity when the background turbidity is more than 50 NTU Recreation Primary Contact Recreation Bacteria Fecal coliform4 organism levels within an averaging periods must not exceed a geometric mean value of 100 CFU6 or MPN6 per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within an averaging period exceeding 200 CFU or MPN per 100 mL E. coli organism levels within an averaging period must not exceed a geometric mean value of 100 CFU or MPN per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within the averaging period exceeding 320 CFU or MPN per 100 mL ' 7-DADMax: the 7 day average of the daily maximum temperatures 2NTU—unit of measurement for turbidity; Nephelometric Turbidity Units 3Background means turbidity level of a waterbody which is outside the area of influence of the discharge under consideration. 4 Fecal Coliform standard was expired on 12/31/2020. 6The averaging period of bacteria sample data shall be ninety days or less 6 CFU and MPN—units of measurement for number of bacteria; Colony Forming Unit and Most Probable Number, respectively Step 2.2 Assessment Ecology's Water Quality Assessment and 303(d) List Receiving waters do not meet surface water quality standards for DO (in Green River). TMDL/WQI Projects There is one TMDL, called the Green River Temperature Watershed TMDL. No WQI project was located. Puget Sound Stream Benthos: B-IBI Scores No B-IBI sample locations were found inside the P17 basin. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Page 15 Storm water Management Influence February 24, 2021 Ecology's PSWCP Data The P17 basin consists of one AU (9042). The level of degradation was moderate high for sediment and high for other constituents (i.e., phosphorus, metals, nitrogen, and pathogens). The local salmonid habitat index was "4," indicating high degradation related to temperature and DO. Degradation of overall water flow processes was also high, indicating high degradation related to bioassessment. Water Quality Monitoring Data a. Ecology's EIM Database: no water quality data/study was located for this basin. b. King County WQM Database: no data/study was located for this basin. c. USGS database/Studies: no data/study was located for this basin. 2013 SWCP Report No water quality data/study was reported for this basin. Data Summary and Indicator Pollutants Little information is available for the P17 basin. Table 13 summarizes all studies and data described above. These sources indicate that the water quality is poor in the P17 basin. Impairments include some parameters that can be impacted by stormwater management, including bacteria, metals, and sediment. DO and metals were selected as indicators of pollutants to be used for modeling. Table 13: P17 Basin, Summary of Data Sourc- buliarameteMplikant = ioassessment Bacteria DQP'Femperature! pH Sediment Metals Data Nutrients' Ecology's Water Quality 303(d) List & 303(d) List - I - Yes - - - - EIM Database - - - - - - - King County Data King County Database USGS Data/Studies USGS Data/Studies - 2013 SWCP Report Referred to Any Data/Studies Ecology's PSWCP Data Local Salmonid Habitats Index Value (AU 9042) - - High High - - - Water Flow Overall Degradation (AU 9042j_ High Degradation of Water Quality Parameters (AU 9042) - High - - - Moderate High High High Puget Sound Stream Benthos B-IBI Condition No data - - - - - - Nutrients including phosphorus and nitrogen K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Page 16 February 24, 2021 Model Existing Conditions L-THIA was used to model Biological Oxygen Demand (BOD) and metal loads for the existing conditions of urban land uses. BOD was selected as a proxy for DO because L-THIA does not model DO and because BOD directly affects the amount of DO in rivers and streams. Table 14 contains the data input to the L-THIA model. Table 14: P17 Basin, Model Inputs Hydrologic Soil Type Land use Areas (Acres) A B C Commercial' 15.09 4.78 D4 417.61 Industrial2 0.02 25.31 83.52 Grass/Pasture3 2.95 12.67 32.44 Low Density Residential 46.45 11.52 14.74 'Commercial areas include Commercial Corridor, Mixed Use Office, Pond, Regional Center, Workplace, and Transit Oriented Development areas 2Industrial areas include Heavy Industrial areas 3Grass/Pasture areas include Tukwila Valley South areas 'The areas with a dual hydrologic soil group of C/D were considered as the areas with D soil group. For the areas with no identified hydrologic soil types, we assumed these areas are all impervious or mostly impervious with D soil characteristics. The estimated annual BOD and metal loads in the P17 basin within the City were 58,760.5 lbs. and 633 lbs., respectively (Table 15). The highest BOD and metal loads are generated from commercial areas in the basin. This indicates that commercial areas have the highest impacts on DO degradation and metal loads in the basin. The results indicate high influence of urban land uses within the City on the selected pollutants. Table 15: P17 Basin, Model Results Loads D (Ibs) Metals (Ibs) Lead Copper Zinc Cadmium Chromium Nickel Commercial 50656.0 28.0 31.1 395.0 2.1 21.7 25.9 Industrial 5868.5 6.0 6.0 102.0 0.8 2.5 2.6 Grass/Pasture 27.1 0.3 0.6 0.3 0.1 0.4 0.0 Low Density Residential 2209.0 0.8 0.8 5.0 0.1 0.2 0.9 Total 58760.5 35.0 38.4 502.3 3.0 24.8 29.3 Johnson Creek Basin Receiving Waters Assessment The majority of the Johnson Creek basin (83%) is located in the Cities of Kent and SeaTac, and only 17% of this basin is located in the City of Tukwila. Around 50% of the Tukwila South commercial development site is located in this basin (SWCP, 2013). The Johnson Creek basin map is presented in Figure 5, Appendix A. Step 1 - Identify Receiving Waters The receiving waters in this basin are Green River, Johnson Creek, and (not shown on Figure 5) Ditches C (probable) and J2 (probable). Ditches C and J2 are tributaries of the Johnson Creek that both flows south. Johnson Creek is an intermittent stream that flows east and discharges to the Green River. Johnson Creek flows into a section of the Green River that is on Ecology's 303(d) list for DO. Step 2 - Assess Receiving Water Conditions Step 2.1 Designated Uses and Desired Water Quality Conditions The receiving waters are protected for aquatic life uses, recreational uses, and other uses which include water supply uses (i.e., domestic, industrial, agricultural, and stock) and miscellaneous uses (i.e., wildlife habitat, K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Page 17 February 24, 2021 harvesting, commerce/navigation, boating, and aesthetics). State water quality criteria that are designed to protect freshwater aquatic life and recreational uses in the Gilliam Creek basin are shown in Table 16. Table 16: Johnson Creek Basin, Water Quality Standards Designated Use Freshwater Use Category Parameter Water Quality Standard (WAC 173-201A) Aquatic Life Salmonid Spawning, Rearing, and Migration Temperature Highest 7-DADMax': 17.5°C (63.5°F) DO Lowest 1-Day Minimum: 8.0 mg/L pH 6.5 — 8.5 pH units, with a human -caused variation within the range of less than 0.5 units Turbidity < 5 NTU2 over background3 when the background is 50 NTU or less; or A 10 percent increase in the turbidity when the background turbidity is more than 50 NTU Recreation Primary Contact Recreation Bacteria Fecal coliform4 organism levels within an averaging periods must not exceed a geometric mean value of 100 CFU6 or MPN6 per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within an averaging period exceeding 200 CFU or MPN per 100 mL E. coil organism levels within an averaging period must not exceed a geometric mean value of 100 CFU or MPN per 100 mL, with not more than 10 percent of all samples (or any single sample when less than ten sample points exist) obtained within the averaging period exceeding 320 CFU or MPN per 100 mL 17-DADMax: the 7 day average of the daily maximum temperatures 2NTU—unit of measurement for turbidity; Nephelometric Turbidity Units 3Background means turbidity level of a waterbody which is outside the area of influence of the discharge under consideration. 4 Fecal Coliform standard was expired on 12/31/2020. 5The averaging period of bacteria sample data shall be ninety days or less 6 CFU and MPN—units of measurement for number of bacteria; Colony Forming Unit and Most Probable Number, respectively Step 2.2 Assessment Ecology's Water Quality Assessment and 303(d) List Receiving waters do not meet surface water quality standards for DO (in Green River). TMDL/WQI Projects There is one TMDL, called the Green River Temperature Watershed TMDL. No WQI project was located. Puget Sound Stream Benthos: B-IBI Scores No B-IBI sample location was found inside the Johnson Creek basin. Ecology's PSWCP Data Out of three AUs that include the basin, the most dominant AU (9042) was chosen for this assessment. The level of degradation was moderate high for sediment and high for other constituents (i.e., phosphorus, metals, nitrogen, and pathogens). The local salmonid habitat index was "4," indicating high degradation related to temperature and DO. Degradation of overall water flow processes was also high, indicating high degradation related to bioassessment. Water Quality Monitoring Data a. Ecology's EIM database: no EIM water quality data/study was located for this basin. b. King County WQM database: no data/study was located for this basin. c. USGS database: no data/study was located for this basin. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence 2013 SWCP Report No water quality data/study was reported for this basin. Page 18 February 24, 2021 Data Summary and Indicator Pollutants Table 17 summarizes all studies and data described above. These sources indicate that the water quality is poor in the Johnson Creek basin. Impairments include some parameters that can be impacted by stormwater management, including bacteria, metals, and sediment. DO and metals were selected as indicators of pollutants to be used for modeling. Table 17: Johnson Creek Basin, Summary of Data • arame e Temp- -ediment M utrients' il Bioassessment I Bact- ' & Data Ecology's Water Quality 303(d) List 303(d) List - - Yes - I - I - - I - EIM Database - - - - - - - King County Data King County Database USGS Data/Studies USGS Data/Studies 2013 SWCP Report Referred to Any Data/Studies Ecology's PSWCP Data Local Salmonid Habitats Index Value (AU 9042) - -- High High - - - Water Flow Overall Degradation (AU 9042) High - Degradation of Water Quality Parameters (AU 9042) - High Moderate High High High Puget Sound Stream Benthos B-IBI Condition Not data - - - - - - - 'Nutrients including phosphorus and nitrogen. Model Existing Conditions L-THIA was used to model Biological Oxygen Demand (BOD) and metal loads for the existing conditions of urban land uses. BOD was selected as a proxy for DO because L-THIA does not model DO and because BOD directly affects the amount of DO in rivers and streams. Table 18 contains the data input to the L-THIA model. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Storm water Management Influence Table 18: Johnson Creek Basin, Model Inputs Page 19 February 24, 2021 ydrologic - i s e Areas (Acres) - Commercial' - 6.60 5.66 6.5 Grass/Pasture2 77.15 111.76 5.68 14.56 Low Density Residential 6.33 16.66 8.25 - 'Commercial areas include Mixed Use Offce areas. 2Grass/Pasture areas include Tukwila Valley South areas. 3The areas with a dual hydrologic soil group of C/D were considered as the areas with D soil group. For the areas with no identified hydrologic soil types, we assumed these areas are all impervious or mostly impervious with D soil characteristics. The estimated annual BOD and metal loads in the Johnson Creek basin within the City were 2,729 lbs. and 22.6 lbs., respectively (Table 19). The highest BOD and metal loads are generated from commercial areas in the basin. This indicates that commercial areas have the highest impacts on DO degradation and metal loads in the basin. The results indicate high influence of urban land uses within the City on the selected pollutants. Table 19: Johnson Creek Basin, Model Results oad BOD lbs Metal - C . i rdilnn Nickel Commercial 1988.0 1.1 1.3 13.0 0.1 0.9 1.0 Grass/Pasture 38.0 0.4 0.8 0.5 0.1 0.6 0.0 Low Density Residential 703.0 0.2 0.2 2.1 0.0 0.1 0.3 Total 2729.0 1.8 2.3 15.6 0.2 1.5 1.3 Results Summary This assessment indicates that the water quality is poor in the City of Tukwila. The receiving waters are on Ecology's 303(d) list for a variety of parameters including sediment, pH, temperature, dissolved oxygen, bacteria, and bioassessment. Impairments include some parameters that can be impacted by stormwater management, including bacteria, metals, and sediment. Modeling results indicate high influence of urban land uses within the City. Green Duwamish/Green River Mainstem basin generates the highest metal loads in the City. Next Steps The next step is a more detailed study of the influence of the basins on the receiving waters following all of the steps in the SMAP Guidance, including procuring stakeholder feedback on this analysis, collecting known water quality issues directly from the City, and evaluating information related to overburdened communities within the contributing areas. Figures 6 through 9 in Appendix A are maps of Green/Duwamish River, Gilliam Creek, P17, and Johnson Creek, respectively, presenting the primary factors contributing to the City's MS4's influence on receiving water conditions. These maps will be useful in assessing relative stormwater management influence. Finally, a ranking system will be established to prioritize the basins, and one or more basins will be chosen for a detailed analysis to meet the SMAP requirement. K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Page 20 Storm water Management Influence February 24, 2021 References City of Tukwila. Surface Water Comprehensive Plan (SWCP). 2013. City of Issaquah Public Works Engineering Department and Resource Conservation Office. 2011. State of Our Waters. Available at: https://www.issaquahwa.gov/DocumentCenter/View/925/State-of-Our-Waters-Fourth- Report-2011-Stream-Monitoring?bidld= Engel, B. 2003. Long-term hydrologic impacts assessment and non -point source pollutant model. Version-2.3 Manual, 7. Herrera Environmental Consultants, Inc. 2001. Gilliam Creek Basin: Stormwater Management Plan. Prepared for the City of Tukwila. King County. 2015. Strategies for Protecting and Restoring Puget Sound B-IBI Basins. Available at: https://benthos.kingcounty.gov/Projects/Restoration Priorities 2014/documents/ProtectRestorePS BIBI Basins. PDF King County Website. 2016. Stream Report. King County Water Quality Monitoring. Last updated on November 2016. Available at: https://green2.kingcounty.gov/streamsdata/watershedinfo.aspx?Locator=X438. Lloyd, D.S. 1987. Turbidity as a water quality standard for salmonid habitats in Alaska. North American Journal of Fisheries Management 7:34-45. Lloyd, D. S., Koenings, J. P., & Laperriere, J. D. 1987. Effects of turbidity in fresh waters of Alaska. North American Journal of Fisheries Management, 7(1), 18-33 Puget Sound Stream Benthos. Available at: https://pugetsoundstreambenthos.orq/ United States Geological Survey (USGS) database. Available at: https://waterdata.usqs.qov/nwis/qw United States Geological Survey (USGS). 2018. Chemical Concentrations in Water and Suspended Sediment, Green River to Lower Duwamish Waterway near Seattle, Washington, 2016-2017. Washington State Department of Ecology. 2019. Stormwater Management Action Planning Guidance. Publication 19-10-010. August 2019. Available at: https://fortress.wa.gov/ecy/publications/summarypages/1910010.html Washington State Department of Ecology. 2015. Application of Water Quality Criteria in Brackish Waters. Available at: https://ecology.wa.ciov/DOE/files/44/443c3b9d-ddc7-44ba-9980-5b2588d9a9ba.pdf Washington State Department of Ecology's EIM database. Available at: https://apps.ecology.wa.gov/eim/search/default.aspx Washington State Department of Ecology's Puget Sound Watershed Characterization Project. Available at: https://apps.ecoloqv.wa.qov/coastalatlas/wc/landinqpaqe.html Washington State Department of Ecology's Water Quality Assessment and 303(d) List. Available at: https://apps.ecology.wa.gov/waterqualityatlas/wqa/map K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Preliminary Receiving Waters Assessment and Page 21 Storm water Management Influence February 24, 2021 Washington State Department of Ecology's Water Quality Atlas Map. Available at: https://apps.ecology.wa.gov/waterqualityatlas/wqa/map Washington State Department of Ecology's Puget Sound Watershed Characterization Project. https://ecology.wa.gov/Water-Shorelines/Puget-Sound/Watershed-characterization-project Washington State Department of Ecology's Puget Sound Watershed Characterization Project (PSWCP). 2016. Appendix C: Assessing Water Quality Processes in Puget Sound and Western Washington. Available at: https://apps.ecology.wa.gov/publications/parts/1106016part4. pdf K:IProject1332001332961ProjectDocs\Reports\Preliminary Receiving Waters Assessment and Stormwater Management Memorandum FINAL.docx Appendix A Maps Otak 35th Ave SW Otoracd S\ SW Holden St SW Thistle St N Co N m SW Trenton St FaUht/ero y CreE Co s a, SW 100th St In Puget Sound SW 106th St Barton St 26th Ave SW SW Holden St Co a Q 0) N Co r z, SW Roxbury St SW 107th St eek G� 53\‘ 2nd Ave SW SW 108th St Hicklin Lake co > N N Co s m Co a S 112th St SW 116th St S 116th St Co s /901 S 96th St Co SW 128th St t 3 SN 1.0? Lake Burien ,e5AA 5� N sae\ 02"\ae� SW 160th St Co SW 170th St .1, /,2DO St SW 136th St v 3 Burien SW 146th St SW 148th St SW 150th St SW 152nd St N 01,100' Andsi\d Co ¢> Co n S 146th St CO S 152nd St S 156th St S 160th St co Normandy Park t Arrow Lake SW 200th St OP S 192nd St 0, � �Os ai S 208th St i S 116th St S 120th St S 128th St Co S 136th St • S 142nd St S 156th Way C'r co* e St S Webs r St S Othello St Seattle S Cloverdale St rw... I Green/Duwamish — 991 cc, \i S, - t St Co a, Southgate I > S 154th St / o i - S 164 St S 160th St Gilliam I S 164th St Co Sea Tac S 200th St Co Des Moines S 216th St Bow Lake S 188th St Co Co 509 Co a' es Creek m 1991 Co S S Cre ek Oiy m S Bangor St 4th St \ S Langst S 133rd St 1 th St N m Creek uth° SE 72nd St Mercer Island tsa\GN\ °e2 dy Lake Washington x a N 30th St d N Bellevue 116th Ave SE SE 88th St NE 27th St N '''0,,,,,, J. r 5 �De • ¢ S 1 G N o a_ 2 a ¢4, L a co a m ¢> a, zN 8th St 0 ro ¢ z Co c d z o -J Y m 2 a S 130th St N N 3rd St S 132nd St-� Co �d�, B. .i �900� SwCaogsfOoRq m S 3rd St per .5. co S 4th St slack River a SW 7th St a`\ Baker BI d Strander ' vd a N- S 196th St a) ¢ a U 181 Rd SW GtadY \" SW 16th St Nelson SW 27th St �405- Springbrook SW 34th St c, a a' m a • SW41stSt m - W m SW 43rd St O Mill Creek U�0 S 212th St m a ¢ - r` S21stSt Pa CP Co Sprig ro b67; P 111 z Z -o E Newcastle Way Newcastle GOtf Club Rd Lake Boren Newcastle SF 897hA ay Ct eek NE-37stSt NE 12th St NE/ofhst NE 7th St w NE 4th St NE 3\d St Renton n k `SoCreel ( Kent co fo1(K Co ¢> Monroe Ave NE Cedar River 116th Ave SE SE 168th St Co 11/ Panther Lake SE 208th St 116th Ave SE Union Ave NE Union Ave SE SE 192nd St 132nd Ave SE NE 4th St 144th Ave SE 148th Ave SE Nile Ave NE SE 141st St Lake Youngs FIGURE 1 TUKWILA BASIN BOUNDARIES PRELIM STORMWATER PLAN TUKWILA, WA — River/Stream Waterbody Tukwila City Limits Other City Limits Drainage Basin II Gilliam II Green/Duwamish II Johnson II Mill Creek Nelson II P17 II Riverton II Southgate II Springbrook 0 1 2 mi DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE: DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:\PROJECT\33300\33335\CADD\GIS\MXDS\33296 FIG1 BASINBOUNDARIES TMK.MXD DATE: 2/21/2021 U) a cc N a SW Holden St Puget Sound SW Holden St SW Holden St a U) 07th St m SW 108th St Hicklin Lake SW 116th St a U) Greek O� a�� 5 ack RjVerMonster Rd SW KCM -3106 9\0 .\55'5' tsur:en SW 128th St 4 U> m > N� co S Sullivan St S Trenton St S 96th St -5099 S 108th St D S 112th St S 116th St S 116th St w d'S 120th St Arbor Lake co Q F /� � c 4o a m co o SW 136th St S 136th St MS PAW wnegwv SW 146th St SW 148th St SW 150th St SW 152nd St a SW 160th St m a' co A bcf e5 cot 5 e* -e SW 171st St rP� leer v �G e co Jia�� S 146th St S 152nd St SW 156th St S 156th St S 160th St U) Q co S 128th St ?7. Tub Lake c.,S 144th St Lake Reba Lora Lakes 15sth Way �509� to d a' N S Webster St 0 a a N S Boeing Access Rd S 112th St KCM-0309 I-1 S 130th St 1 St133rd St ¢' 1 0 a \w �'13- m a \N c S 160t/St_ 99 Bow Lake S 133rd S 144th St S 160th St U) a' U) a a' 0 t, S Cloverdale St S co °1 a S Henderson St leek co ei y IcQ it12- a S Roxbury St % r m a B 9�e s co ro 0 e�o' a 9L- a a, v ,- es 2 a' N t CO (0 ro S antl Ted PJCMaS S Bangor St a a U) a B a' y a u V1 eed co fQs. s S 164th St co S 170th St S 176th St U) a a a `eS Lake Washington S 129th St o4thoe /a„ or Creek nt%a k/ickitat Dr Strander Blvd T a 3 1 a d m ~ I o r o a U) Syy, C?8th s r N S 180th St I A 1 I e or co coU Q > Z N 8th St a > Z o 5, a z c) _ >a .a"1 Cree* z a a (405� N 30th St B z 2 S Langston Rd S 133rd St a v N U) a c U co S 130th St S 132nd St sleek River 1C 900 Taylor Ave NW Swc ai,9ston SW 7th St SW Grady \Nal a rn SW 16th St m U) a 0- -3 N a z 0 > N 4th St ¢ G �.� N 3rd St ce Cedar River S 2nd St S 3rd St ¢'o S 4th St U � N cn U) a' a S Grady stay a F /4051 167 S 21st St -o T SW 27th St W a) V O SW 34th St 4,0 al it, a4 t0 ��� 6JQ� SW 41st St U) 0 i a N Puget Dr S SW 43rd St �3 co co 0 a .• w - m 0 0 w U) a 0 FIGURE 2 GREEN/DUWAMISH USES + IMPAIRMENTS PRELIM STORMWATER PLAN TUKWILA, WA — River/Stream Waterbody Tukwila City Limits II Green/Duwamish Basin ■ Water Quality Monitoring Station Receiving Water Impairment Bacteria Dissolved Oxygen pH - Temperature ri Sediment Bioassay * Not shown: USGS Gages O 0 ft 4,000 8,000 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE: DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:\PROJECT\33200\33296\CADD\GIS\MXDS\TASK 300\33296 FIG3 USESANDIMPAIRMENTS GREENDUWAMISH TMKA.MXD DATE: 2/21/2021 518 S 154th St 518 S 1 2nd St S 160th St 6- a C v i S 170th St C 1fAfl S 160th St S 164th St cP a r co S 141st Pt So4thcenterejfrd DUWaiiiish 41/2 �i rn a) a S151stSt • fri��/� ere-4 Tukwila pkwy South Strander Blvd ojr tP K (.diver Blau M ohster R aSw teen G cp v S N GCa61 a1 o U w a. Baker Baker Blvd FIGURE 3 GILLIAM BASIN IMPAIRMENTS PRELIM STORMWATER PLAN TUKWILA, WA River/Stream Waterbody Tukwila City Limits Q Gilliam Basin Receiving Water Impairment MEI Bioassessment 0 ft 1,100 2,200 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:\PROJECT1332001332961CADD\GIS\MXDS133296 FIG2 GILLIAM.MXD DATE: 12/30/2020 co > al c vI S 170th St S 188th St Angle Lake Klickitat Dr Strander Blvd a) SW 27th St Greek p/ooK SW 43rd St FIGURE 4 P17 BASIN IMPAIRMENTS PRELIM STORMWATER PLAN UKWILA, WA River/Stream Waterbody Tukwila City Limits II Johnson Creek Basin Receiving Water Impairment - Dissolved Oxygen 0 ft 1,000 2,000 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:\PROJECT\332001332961CADD\GISIMXDS133296FIGS P17.MXD DATE: 12/30/2020 FIGURE 5 JOHNSON CREEK IMPAIRMENTS PRELIM STORMWATER PLAN TUKWILA, WA River/Stream Waterbody Tukwila City Limits Q Johnson Creek Basin Receiving Water Impairment Dissolved Oxygen 0 ft 700 1,400 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:IPROJECT\332001332961CADD\GISIMXDS133296 FIG4 JOHNSONCREEK.MXD DATE: 12/30/2020 SW Orchard St co SW Holden St M SW Thistle St SW Trenton St SW Barton St SW 100th St co SW 106th St Q m Puget Sound 26th Ave SW Delridge Way SW ¢ Lake Burien co co SW Roxbury St SW 107th St 1Qg1X'sP S`N S SW 170th S,t yS1 W 172nd St tire e� ,,,it, Col m 7 uet tia' 8th Ave SW a, co SW 108th St S 108th St Hicklin Lake SW 116th St MS PM9 wnegwv a, m SW 128th St SW 136th St SW 146th St SW 148th St SW 150th St SW 152nd St SW 160th Sty a' 5 aco a, L del ey 5 a S 96th St rr ° S 112th St > S 116th St ¢ Arbor Lake 5) ro S 136th St S 146th St • • ICI • S 116th St N S 120th St co S 128th St ? Tub Lake oS 144th St NCO Lake Reba S 152nd St Lora Lake S 156th Way SW 156th St S 156th St S 160th St SW 171st St cc co 509 s S Myrtle St,s M�'rtte Green/Duwamish River below River Mileo 1e(§. Boeing Access Road) is SWebster among major receiving watres and exempt from tlib flow control facility •cast requirement. m S S Cloverdale St o S Boeing Access R S 112th KCM-0309 S 130th St 1 6.4 5132 S 133rd 0 ¢> 0 N S Henderson St leek S• G .S 124th St a \? a \pa S 144th St \N a S 154th St / / / S 16021St 4'_- fd aft S 164th St co A I S 170th St S 176th St Bow Lake rn S 188th St S Roxbury St d* 4"Ps S Bangor St a L 3 0) So . I LI S 178th Sr' S 0) ¢> U) > C0 ¢ a L S 129th St S 15 //a 4thoenter@/�a `1/ Cre ek S 160th St w v. Cornell Ave S cc co S Langston Rd S 133rd St Southcenter Pkwy Strander Blvd a a w SE 72nd St CO 132nd St Nglack River KC; 3106 m S 180th St ve / a a 181 T 900 SE 68th St N 0 Lake Washington e pr co > S 130th St "vc„9ston Ra co cc N 30th St z Airport Way C0 ad S 2nd St er Cedar River ,, S 3rd St co S 4th St SE Newcastle Way 116th Ave SE SE 88th St P•\"` May Creek NE 27th St Aberdeen Ave NE -56 � a SW 7th St m in (0 Ntay SW Grady WaY SW 16th St > J SW 27th St 0 `k 0 SW 34th St 0 01 i O �C �pl SW 41st St SW 43rd St co ¢> S GceM 405 167 a cr 0 IS N 8th St z¢ as a0 = N 3rd St m ye S 21st St N Puget Dr S 108th Ave SE Carr Rd Cl 0 SE 176th St Edmonds Ave NE a rn NE 12th St Monroe Ave NE NE 4th St NE 4th St NE3tdgt �169� 5) ¢ SE 168th St e • SE Petrovitsky Rd /9 SOO - ▪ 0 FIGURE 6 GREEN/DUWAMISH STORMWATER MANAGEMENT INFLUENCE PRELIM STORMWATER PLAN TUKWILA, WA - River/Stream Waterbody Tukwila City Limits Q Green/Duwamish Basin Outfall (Public) * Water Quality Sampling Location ❑ Flow Control Facility Water Quality Facility - Stormwater Mains (>=16") - ADT* (>7,500) Receiving Water Impairment Bacteria -Sediment Bioassay Pollution -Generating Zoning Commercial High Density Residential Industrial O *ADT = Average Daily Traffic Count 0 ft 4,000 8,000 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:\PROJECT1332001332961CADD\GIS\MXDS\TASK 300\33296 FIG SMI GREENDUWAMISH.MXD DATE: 4/22/2021 FIGURE 7 GILLIAM BASIN STORMWATER MANAGEMENT INFLUENCE PRELIM STORMWATER PLAN TUKWILA, WA - River/Stream Waterbody j __; Tukwila City Limits II Gilliam Basin c Outfall (Public) Flow Control Facility • Water Quality Facility - Stormwater Mains (>=16") - ADT* (>7,500) Receiving Water Impairment Bioassessment Pollution -Generating Zoning Commercial High Density Residential 0 *ADT = Average Daily Traffic Count 0 ft 1,100 2,200 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:IPROJECT 1332001332961CADD\GISIMXDSITASK 300133296 FIG SMI GILLIAM.MXD DATE: 4/22/2021 Klickitat Dr vI S 170th St S 188th St Angle Lake Strander Blvd SW 27th St creek ptooK i` SW 43rd St COg FIGURE 8 P17 BASIN STORMWATER MANAGEMENT INFLUENCE PRELIM STORMWATER PLAN TUKWILA, WA - River/Stream Waterbody Tukwila City Limits II Johnson Creek Basin Outfall (Public) Flow Control Facility - Stormwater Mains (>=16") Pollution -Generating Zoning Commercial Industrial O 0 ft 1,000 2,000 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:IPROJECT1332001332961CADD\GISIMXDSITASK 300133296 FIG SMI P17.MXD DATE: 4/22/2021 FIGURE 9 JOHNSON CREEK STORMWATER MANAGEMENT INFLUENCE PRELIM STORMWATER PLAN TUKWILA, WA River/Stream Waterbody j __; Tukwila City Limits Q Johnson Creek Basin Outfall (Public) Stormwater Mains (>=16") Pollution -Generating Zoning Commercial 0 ft 700 1,400 DISCLAIMER: THE INFORMATION IN THIS MAP IS ASSEMBLED GIS DATA CREATED AND ACQUIRED BY OTAK INC.THIS DATA IS NOT TO SURVEY ACCURACY AND IS MEANT FOR PLANNING PURPOSES ONLY. NOTE DATA IS PROVIDED BY ESRI, CITY OF TUKWILA, KING COUNTY, AND WA DEPARTMENT OF ECOLOGY. Otak K:\PROJECT\33200\33296\CADD\GIS\MXDS\TASK 300\33296 FIG SMI JOHNSONCREEK.MXD DATE: 4/22/2021 Appendix B Basin Prioritization — Memorandum and Outreach Summary Otak Otak As ec t /I , wCONSULTING Memorandum To: Sherry Edquid (City of Tukwila) From: Trista Kobluskie, Cara Donovan (Otak, Inc.) Bryan Berkompas, Emelie Crumbaker (Aspect, Inc.) Date: June 30, 2022 Subject: City of Tukwila SMAP Receiving Water Prioritization and Catchment Selection Project No.: 33383 1. Introduction The goal of the Receiving Water Prioritization and Catchment Selection is to select a receiving water and catchment within the priority receiving water's basin where stormwater management action planning (SMAP) will be applied. The four candidate receiving waters in Tukwila were Gilliam Creek, the Green/Duwamish River, Riverton Creek, and Southgate Creek (Table 1). Table 1 Candidate Receiving Waters for SMAP Prioritization Receiving Wate Total Basin Are. (Acres) asin Area Inside Tukwila (Acres) Percent of Basin in Tukwila (%) Gilliam Creek 1,858 1,315 70.8 Green/Duwamish River 297,608 2,589 0.9 Riverton Creek 514 402 78.3 Southgate Creek 506 504 99.6 2. Receiving Water Prioritization and Catchment Selection Methodology The goal of selecting a receiving water and catchment where SMAP will be applied is to focus the City's resources for stormwater improvements in an area where it can make a difference. Prioritization criteria were selected from among numerous factors assessed for each basin in the receiving waters assessment phase of SMAP. Attachment A shows the selected prioritization criteria and rating concepts. Stakeholder feedback was considered during the prioritization. An online storymap and survey were available to inform and solicit input from tribal agencies, WRIA 9, and the general public. The survey asked which receiving water the City should prioritize for the SMAP. The survey was open between May 30, 2022, and June 13, 2022. The general public was informed about the webpage and survey through an article in the eHazelnut, a Facebook post, a Twitter post, the City's NPDES webpage, and the City's news webpage. City staff shared the storymap and survey at the City's monthly Allentown meeting, which is focused on the Truck Reroute Environmental Impact Statement (EIS) and the 42nd Avenue South Bridge 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com City of Tukwila SMAP Receiving Water Prioritization and Catchment Selection Page 2 of 3 June 30, 2022 Replacement. City staff invited stakeholders from WRIA 9, the Muckleshoot Indian Tribe, and the Duwamish Indian Tribe to participate by email. The general public and external stakeholders were not asked to prioritize a catchment because the scale of all the analyses in the receiving water assessments was at the basin level. Instead, only internal stakeholders were consulted for catchment prioritization based on their knowledge of planned development and projects in these areas. 3. Receiving Water Prioritization and Catchment Selection The City received seven responses from the general public and one responses from invited stakeholders. Results of the public and invited stakeholder feedback are presented in Attachment B. The project's consultants and City staff from the Departments of Public Works and Community Development held an internal stakeholder meeting on June 16, 2022, to discuss the candidate basins, the prioritization assessment, and external feedback. Riverton Creek was selected for the SMAP as a result of this discussion. City staff agreed with external stakeholders that the Green/Duwamish River is a high priority receiving water. However, based on the other prioritization factors, particularly the City's influence on the receiving water, the City first removed the Green/Duwamish from consideration. City staff noted that by selecting any of the other three candidate basins the Green/Duwamish River will benefit as the downstream receiving water. Gilliam Creek was eliminated due to a lower score in the prioritization analysis than the other two remaining candidate receiving waters. Riverton Creek and Southgate Creek have similar traits which were discussed by City staff. The City has a similar hydrologic impact on the Riverton and Southgate basins, and both basins have similar watershed management strategies. There are also several differences between Riverton Creek and Southgate Creek basins. A fish passage barrier was recently removed near the outlet of Riverton Creek at the Duwamish River, and there is a fish passage barrier remaining in the lower portion of Southgate Creek with no plans for removal. Riverton basin has nearly double the percentage of pollution -generating surface as Southgate basin, which indicates there is more opportunity to improve water quality in the Riverton basin. Finally, there is an upcoming sediment and hydraulic study for Southgate Creek that will give the City a better idea of projects that will have a benefit to the conditions in the basin. The City recognizes that investment in Southgate Creek would be more effective once this study is completed. Riverton Creek was selected by City staff as the priority receiving water. Once Riverton Creek was selected, City staff discussed a catchment for the SMAP. SMAP guidance states that the prioritized catchment should be between 400 and 600 acres, or a catchment scale that is appropriate for the jurisdiction. In the case of Riverton Creek, the total basin area is 514 acres and the City controls 402 acres of this basin. The City intends to focus efforts on the lower basin where there is a high concentration of industrial land use for short-term stormwater management actions and include the upper basin where there is a high concentration of residential land use for long-term actions. Attachment C shows the results of the prioritization rating applied to the four candidate basins. City of Tukwila SMAP Receiving Water Prioritization and Catchment Selection Page 3 of 3 June 30, 2022 3.1. Conclusion The receiving water prioritization and catchment selection process resulted in prioritization of Riverton Creek. Investments in the Riverton Creek basin will have a positive downstream effect on the Green/Duwamish River, which the general public indicated is an important waterbody. This process will be explained in further detail in the SMAP document. Attachments to this memorandum include: A. Prioritization Criteria B. Outreach Results C. Prioritization Analysis D. Map of Riverton Basin Attachment A Prioritization Criteria Otak Tukwila Basin Prioritization Criteria Consideratio Receving Water Conditions Reasoning Influence / Score Data Source Notes i Water quality impairment Aquatic Life Included in SMAP guidance and Building Cities in the Rain Low/Moderate impairment = high score Aspect RWA Table 3 BCiTR emphasizes existing species/habitat salmonid presence=high score Aspect RWA Table 3 Considers water quality data, B-IBI, habitat surveys Fish passage barriers Building Cities in the Rain Downstream barriers (with no removal 'Ian = low score Aspect RWA Table 3 and local knowled• e of barrier removals Ability to Influence (SMI) Hydrologic Impact Pollutant loading impact Heavily impacted basins should have stormwater mitigation Medium/High impact = high score Aspect RWA Table 4 High pollutant loading should be Medium/High impact = high mitigated score Regional and local rehabilitation and restoration efforts Aspect RWA Table 4 Considers impervious surfaces, flow control exemption, portion/location of the basin in the City, existing treatment, and —forested area Assessment follows the SMI categories and weighting agreed upon by City and Consultant Team Considers polluting land uses, high ADT roads, portion/location of the basin in the City, existing development agreements, available area for treatment, and existing treatment/opportunities for retrofit. Assessment follows the SMI categories and weighting agreed upon by City and Consultant Team Included in SMAP guidance and Presence of existing Building Cities in the Rain rehabilitation effort = high score WRIA plans, salmon recovery plans, MTCA/Superfund cleanups, ESA listings, critical habitat designations , local efforts Watershed management strategy Building Cities in the Rain Restoration/Protection = high score Puget Sound Watershed Characterization Community Factors ■ Stakeholder feedback Stakeholder support for basin High support = high score Stakeholder feedback Overburdened communities overlap with water quality issues Human health impacts that can Included in SMAP guidance and be addressed through Building Cities in the Rain stormwater management improvements = high score EJScreen Use as a tiebreaker between similar receiving waters Attachment B Outreach Results Otak Tukwila Outreach Results Basin Focus Comment Resid_Emp Green Duwamish It looks like the largest watershed and borders many other neighboring watersheds Stormwater Resident Green Duwamish Fish habitat restoration. Habitat Resident Green Duwamish It is the sink for the other basins and their pollutants. Being the last line of defense before entering the Puget Sound, the Duwamish/Green basin should get improved methods of capturing contaminants for future cleanup before entering the sound. There also appears to be a lot single family homes in the basin that would likely counter construction proposals. Stormwater Reach out to me for any stormwater related positions the city will have open in the future. Resident Green Duwamish The proximity to the Duwamish river Stormwater Current storm drains aren't getting the water, and in turn a lot of runoff goes straight into the river. Being so close to the river in the Allentown neighborhood the whole of the riverbank needs to be preserved to protect and restore the habitat for salmon and other wildlife Resident Gilliam Plants and Soil Incentivize Perhaps the City can offer local perennial plant seeds or starts to residents to plant on their property. Resident Green Duwamish The Duwamish River runs directly thru this neighborhood and the debris on the shore is heartbreaking. All the options listed would serve the river. Resident Green Duwamish Critical Salmon habitat Habitat Start to implement phase 3 changes at the Duwamish Hill Preseve, shoreline enhancemtent and restoration. Resident Riverton or Gilliam From a fish habitat perspective the Green/Duwamish subwatershed would be the highest priority basin; however, I also understand that the ability to drive measurable stormwater benefit is limited by the extent of Tukwila jurisdiction. I think both Riverton and Gilliam would provide good opportunities to improve water quality associated with recently completed/planned habitat projects near the stream mouths. However, opportunities for synergies with habitat enhancement may be more limited. Either way, all these basin drain in to the Green/Duwamish and focus should be made based on magnitude of potential on reducing priority pollutants. Habitat This is not my area of expertise, but it would be great to expand integration of green infrastructure investments with restoring riparian habitats. Given the growing evidence of impact of 6PPD-Q, it would be great to ensure integration of roadway runoff treatment options into stormwater goals. Also, the Habitat Plan identified the T17 Stormwater Pond as a potential opportunity to integrate stormwater retrofits with salmon habitat restoration. If the right project was identified that integrated stormwater and salmon recovery (e.g., T17 Pond), there is the potential to look at funding support via the WRIA. Given Gilliam Creek restoration project will be in design process, there could be a potential to integrate stormwater and salmon investments. WRIA 9 Attachment C Prioritization Analysis Otak Receiving Water Prioritization — City of Tukwila 6/30/2022 Basin Receiving Water Conditions Ability to Influence (SMI) Community Factors Overall Rating Water Quality Impairment' WO Rating Aquatic Life Aquatic Life Rating Fish Passage Barriers Fish Passage Rating Overall WQ Rating Hydrologic Impact' Pollutant Loading Impact' Available Area for Retrofit° Regional &Local RehabiliMbon & Restoration Effortse Watershed Management Strategy Overall SMI Rating Stakehader Feedback Overburdened Communities Overlap wRM1 Water Quality Issues' Overall Community Rating Gillum Creek Poor B-IBI, WO concems forpH, Mrbidiry, TSS. DO Temp. and metals ok Low/ Medium -Multiple WO contents -High ADT roads throughout Coho(P); Resident Coastal Cutthroat (P) 55%with 100 ft buffer Medium/ Low -Limhed fish use -14 total barriers,5partial,fiB culverts -Multiple blocking culverts under portions of I-5 and 1-405 interchange Low/ Medium -Plans toopenc lower basin Low/Medium -Water quality oncems, -High ADT roads -Fish barriers above lower basin Medium/Low - Almost half of basin is impervious(46.9%) -Entire basin east of l-5 is flow exempt -70%of basin in Tukwila but many juristlictions involved Medium -Highest percentage of high ADT roadsi. -Large percentage of CO mm ercial or higM1-0de r esitlential - ]0%of basin in Tukwila but SeaTac (headwaters) and WSDOT (lower basin) involved 38%estimated PGS - 29% or 383.4 acres of ROW -19%or ROW acres of WSDOT ROW -30 parcels owned by City or WSDOT -46.51%of ROW is pervious -Several parks in N and SW portion of basin -WSDOTwourrdero flx4wlverts untler l- 405 -City working to open 1/4 mile of lower stream mfish PSWC rating -Flow=Devalopl Restoration - WO=Restoration of sources except for sediment= restoration of sinks Medium -Portions flow exempt -Highest percentage of high ADT roads -Would score higher with more partnership with WSDOT and SeaTac - One public comment in support Comment related to plants end soil -Support from WRIA9 because of synergies with upcoming habitat project at mouth Gilliam is likely the most overburdened basin, Essentially the same percentages for poverty, ELL, free and reduced lunch, and People of Color as Southgate. Gilliam likely has more people than Southgate. MetliumlHigh -1 public vote -Likey most overburdened m m muniry Medium/Low -LowlMetlium WC/ rating -Metlium SMlreting MediumMgh Community rating+K3:T3 GreenlDuwamish River Duwamish River- Water. (CATS - Temperature, CATS - Alpha-BHC, CATS- pH)ue:(CAS River- Tissue: (CATS - PCBs, CAT5-4,4'-DDE, CATS- 4.4'-DDT, CATS-4/4'- ODD) Green River - Water: (CATS -DO, CAT4A- Temperature)-43%of TMDL's for temp and Ammonia-N Law -Multiple TMDL's Coho(P)(R); Dolly Varden/Bull Trout (P); Fall Ch'inook(P)(R); Fall Chum (P.M: Pink Odd Year (P); Resident Coastal Cutthroat (P). Sockeye (P). Summer Stoelheatl (R); Winter Steelhead (P) 95%with 100 fl buffer High -Mainstom used for re wring - 4 total barders(in side channels?) -0 partial Barters -130 culverts High - Lower basin largely open -Small unnamed tributaries have barters Medium -High aquatic life rating -Low WO rating Low - Small percentage of basin in City (<1%) - Flow exempt in this mum Low -Small percentage of basin in City(<1%) -17%or 448.9 acres of ROW -8%or217.8 acres of WSDOT ROW -80 goy. parcels but much is KC airood or County facilities in lower basin and bulk out ROW is pervious -TMDL In place -City planning for local retrofits PSWC rating -Flow= Restoration -WO=restoration of sources except for N end pathogens= restoration of sinks Low -Mostly flow exempt - Very small percentage of basin in Tukwila -TMDL and other plans already In place - Could rate higher wfth Mrger basin partnerships - Seven public comments in support. comments related to size of watershed, essential for habitat opportunity to integrate (from King County), local drainage and pollution concerns-RelativeMMw -Support from WRIA9 because of Me importance of river for fish habitat but awareness that Citys ability to directly impact is low DOH data shmvs lower poverty, ELL, and free and reduced lunch relative to other basins with residential areas medium -Mos[public votes overburdened community Medium/Low -Low/Medium WQ rating - Medium SMI rating -Medium/Hgh Community rating Riverton Creek Unnamed Creek (Trib to Duwamish River) - Other (CATS -Bioassessment) HghM developed area with fish present - opportunity for significant Impact. Urban runoff mortally has been observed. Data from 2019 indicates cos with DO but Temp and pH are ok Medlum/Low -&IBI and DO co items Coho(P); Fall Chinook (P); Fall Chum (P); Resident Coastal Caohroat(P); Winter Steelheatl (P) 68%with tool buffer Medium -Somefish use - ] total barters -2 partial barriers -80 culverts - Manmade waterfalls largely separate lower commercialfrom upper low residential and undo wetlands - Abandoned dam just upstream of waterfalls Low/ Medium - Plans to- address lowest fish barriers MediamlLow -Water quality concems, -Observed urban runoff mortality -Fish barriers above lower basin High - Large portion of basin is impervious (4].5%) -More than]8%of basin in Tukwila High - Upper basin largely tow- density residential Lower basin largely commercial/light industrial -More than 78%of basin in Tukwila _49%estimatetl PGS -25%or 99.8 acres of ROW - ]%or 28.]ecres of WSDOT ROW - 5 parcels County or Metro facilities - 54%IN ROW b pervious -King County co nsidedng fish passage as part of metro base uptlate but timeline uncertain PSWC rating - Flow=Develop/ Restoration -WO=restoration of sources except for satliment= restoration of sinks High/Medium - Large potion of basin in City -Higher PGS/Impervlous than Southgate -More potentially available ROW -Some large fish barriers lower down - Support from WRIA 9 because of synergies with recent flapgate removal Riverton is likely the 3rd most overburdened basin. It has the highest poverty but tel low ELL and free and reduced lunch and lower than population Gilliam or Southgate. Low/Medlum - No public votes -Fewer residents than other basins but higher poveM rates Medium/High -MediumlLow WO rating -HighMledium SMI rating -Low/Medium Community rating SouthgateCreek Sediment issues. Bank stabilization and dredging maintenance often required. City data from 1994-1995 indicate moderate concern with DO and pH Medium/ Low -satliment and DO contents Coho (P); Fall Chinook (P); Fell Chum (P); Resident Coastal Cutthroat (P); Winter Steelheatl (P) 82%w8h 100flbuffer Medium -Somefish use -8 total barriers -1 partial barrier -83 culverts -lowes[blockage at5131st PI -City anecdotal info that flapgate at mouth is total barter with no plans to remove -CSWP mentions low flow fish barrier at SR599 culvert near base and frequent sediment constriction in culverts Low/ Medium -City anecdotal info there are no plans to ov remove flapgate at mouth -Plans to address some fish barters - Sedimenta concem Medium/Low -Water quality oncems -satliment wncems -FisM1 barriers above lower basin MedlumlHlgh - Basin almost entirely within Ciry(99.8%) -Slghty less IMParvkms area than other basins (42.1%) MediaMHigh - Basin almost entirely within QM - Less likely PGS (28%)area than other basins -21%or 107 acres of ROW -4%or 19.]acres of WSDOT ROW -22 parcels, school, parks, playflelds, mostly in lower basin -3]%or ROWu pervious -City redoing 5131st Street culvert PSWC rating -Flow = Restoration/ Develop -WO=restoration of sources except for sediment= restoration of sinks Medium/High -Almost all basin is in city -Less impervious/PGS than other basins of lower basin is -; ,r piped Nona Southgate islikey the 2ntl most overburdened basin. Essentially the same percentages for poveM, ELL, free antl 'dace' lunch, and People of Color Gilliam. as Gilliam likely has more people than Southgate, Mealum -No public votes - Relativelyhigh overburdened community - Fewer residents than Gilliam Medium -MetliuMLow WQ rating -MetliumMigh SMI rating -Medium Community Rating Reasoning Included in SMAP guidance and Building Cities in Me Rein BUR emphasizes existing species4nebltet Building Cities in the Rain Heavily I aP... basins sit should have atermwatw mitigation High pollutant loading should be mitigatetl Ciry owned pmpeM more co st effective for retrofitting Incta.c cIn SMAP guidance and Buflding Cities in the Rain Building Cities in. Rein Stakeholder auppartfor basin Included in SMAP guidance and Building Cities In Me Rein IMluencel3mre Low/Moderate Impairment= high score Salon on. presenceMigh score am banters (wkh no rem removal plan). law score Me umlHigh Impact= tll high score MetlmumlHigM1 impaG=high score More ROW=higher score existing ion mneffort= reeetilut of ha high score Restoration/Human Protectbn=high score High support score health acts that an be addressed through tormwaler management improvements = high score Data Source Aspect RWA Table 3 Aspect RA Table Aspect RWATable 3 a.local knowledge of barrier removals Aspect RWA Table 4 Aspect RWA Table 4 WRIA plans, salmon recovery plans, MTCPJ6upertuntl cIamps, ESA listings, critical habkat designations, local efforts Puget Sound Watershed Characterization Stakeholder feedback EJScreen (Recommend combining) ote: 1. considers water quality dam,B-181, babltat surveys 2. Considers Impervious s daces, flow control exemption, portion/location of the basin in the City, existing heatrnen4 and -forested areaAssessmem follows the SMI calefodes and weighting agreed up n by Coy and Consultant T am 3. Considers polluting lantl uses, high ADT roads, portiondocalion of the basin In the City, existing development agreements, available area for treatment, and existing treatmentropportunities for retrofit Assessment follows the SMI caMgones and weighting agreed upon by City and Consultant Team 4. SMI 5. Amost all MTCA sites Identified are dean or in process in all basins, ESA is for Puget sound affects all, critical hob migrating a occurrenco of Coho in Riverton end Southgate, coastal cutthroat in Gilliam, many in green local efforts? 6. This information has not been collect. yet ]. Use as a tiebreaker between similar receiving waters CO %Asnett Otak Acronym List: B-IBI = Benthic Index of Blot Integrity WO =Water Quality TSS = Total Suspended Solids DO= Dissolved Oxygen TMDL=Total Maximum Dail Load RWA=Receiving Water Assessment AD. Average Daily Traffic BCITR = Building Cites in IM1e Rain (Ecology guidance) CSWP = Comprehensive Stormwater Plan PGS = PollulaMGenemling Surface SMI= Stormwater Management Influence ROW = Right -Of -Way WSDOT= WA Department of Transportation ESA= Environmentally Sensitive Area PSWC = Puget Sound Watershed Characterization EJ = Equky and Justice DOH = Depa.ent of Health ELL = English Language Learner. Attachment D Map of Riverton Basin Otak 128t -St Riverton Burien 00l IVY Stream City of Tukwila Q Outfall ❑ Private Stormwater Assets (Tukwila, 2022) — Private Stormwater Conveyance (Tukwila, 2022) • City of Tukwila Catch Basins (2022) City of Tukwila Pipes (2022) Riverton Basin QRiverton Subbasins Basin (Aspect, 2021) 1,000 2,000 Feet N3Uppen Rive,�r-to:n1 Basin DUWAMISH HILL PRESERVE DUWAMISH PARK I-r TUKWILA S-13.0.th_St RIVERTON PARK OUTHGATE PARK Southgate Selected Catchment City of Tukwila SMAP Receiving Water Prioritization and Catchment Selection Tukwila, Washington \Aspect CONSULTING JUN-2022 EAC/ BB PROJECT NO. 210379 REVISED Ski / FIGURE NO. 1 Data source credits: None II Baseman Service Layer Credits: City of SeaTac, King County, WA State Parks GIS, Esd, HERE, Rennin, SafeGraph, FAO Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Censu Bureau, USDA ETI/NASA, USGS, Bureau of land Management, EPA, NPS, Esri Community Maps Contributors CI ty of Burien, WA, City of SeaTac, KingC unty, WA State Parks GIS, Esri, HERE, Appendix C Stormwater Management Action Outreach Material Find the regularly updated Tukwila SMAP Public Engagement Interactive web site here: https://arcg.is/WubnS Find the archived Watershed Prioritization web page here: tukwilawa.gov/SMAPStormwaterPlanning Otak 2/9/23, 2:08 PM Tukwila Stormwater Management Solutions for Riverton Creek Basin Survey Tukwila Stormwater Management Solutions for Riverton Creek Basin Question 1. Which types of stormwater retrofit solutions do you prefer? Please select your three favorite solutions from the eight options listed below. To help you decide, we have listed some key details for each option. 1) Proprietary large underground stormwater management facility (such as a Contech StormFilter Vault) Description: Cartridges in an underground vault that remove pollutants from stormwater runoff coming from large areas, including runoff from highly -traveled roads and commercial areas Environmental Goals Addressed: Water quality Relative Initial Cost: Low Relative Maintenance Required: Moderate Other Considerations: No above -ground components rpft004iigl 15171:4op,ww1 bi Coma, Eiquoem.'ioum.' n2) Proprietary small underground stormwater management facility (such as a Contech StormFilter Catch Basin) Description: Cartridges installed in existing catch basins in highly -traveled City streets that remove pollutants from stormwater runoff coming from small areas Environmental Goals Addressed: Water quality Relative Initial Cost: Moderate 1/5 2/9/23, 2:08 PM Tukwila Stormwater Management Solutions for Riverton Creek Basin Survey Relative Maintenance Required: Moderate/High Other Considerations: No above -ground components, uses existing catch basin locations to add water quality in locations where larger facilities are difficult to fit in Photo sourced Fen the CA,/ of Seethe PuIhc Ulibes 3) Proprietrary modular biofiltration (such as a Contech Modular Wetland) Description: In -ground planted facility that removes pollutants from stormwater runoff coming from small, medium, or large areas, including from highly -traveled roads and commercial areas Environmental Goals Addressed: Water quality Relative Initial Cost: High Relative Maintenance Required: Moderate/High Other considerations: Planted for aesthetics, but treatment is provided underground, can sometimes be sited where other proprietary devices do not fit, can provide neighborhood beautification 4) Stormwater Planter (bioretention/rain garden) Description: In -ground planter with native plants that removes pollutants and infiltrates or temporarily stores stormwater runoff from public streets to reduce harmful effects such as erosion and flooding Environmental Goals Addressed: Water quality and flow control Relative Initial Cost: Moderate Relative Maintenance Required: High Other Considerations: Vegetated facility; facilities can collect trash if not maintained; can 2/5 2/9/23, 2:08 PM Tukwila Stormwater Management Solutions for Riverton Creek Basin Survey provide neighborhood beautification Photo sourced from Statewide LID Training Program, Inspection and Maintenance Staff (Ecology, 2021) 5) Large underground detention facility Description: Underground chamber that temporarily stores stormwater to reduce harmful effects such as erosion and flooding Environmental Goals Addressed: Flow control Relative Initial Cost: High Relative Maintenance Required: Low Photo prowled by Contact Engineeran SA lbons n6) Upgrade existing stormwater management facility Description: Rehabilitate and upgrade existing detention pond to remove pollutants from runoff from heavy vehicle storage area Environmental Goals Addressed: Water quality and flow control Relative Initial Cost: Moderate Relative Maintenance Required: Moderate Other Considerations: Project would include partnership with another government agency 3/5 2/9/23, 2:08 PM Tukwila Stormwater Management Solutions for Riverton Creek Basin Survey and additional water quality elements provided by the agency Pholo sourced from City of Redmond n7) Permeable Pavement Description: Alternative pavement that infiltrates stormwater in the public -right -of way (sidewalks, bike lanes, parking spaces); this program would be a consideration when transportation and/or park improvement projects have construction projects that could utilize permeable pavement Environmental Goals Addressed: Flow control Relative Initial Cost: High Relative Maintenance Required: Moderate Other Considerations: This program would require purchase of special maintenance equipment or a maintenance contract Photo sourced from the City of Columbus 8) Coordination with potential future park to install stormwater facilities Description: The 2020 City of Tukwila Parks, Recreation and Open Space Plan identifies the Cascade Neighborhood Search Area as a possible location for a new park, part of which is within Riverton Basin. If the City identifies a site within Riverton Basin to develop a new park then stormwater facilities could be sited on the property, likely underground to maximize useable space. Environmental Goals Addressed: Water quality and flow control Relative Initial Cost: Moderate 4/5 2/9/23, 2:08 PM Tukwila Stormwater Management Solutions for Riverton Creek Basin Survey Relative Maintenance Required: Moderate I do not prefer any of these options. Next 5/5 2/9/23, 2:09 PM Tukwila Stormwater Management Solutions for Riverton Creek Basin Survey Tukwila Stormwater Management Solutions for Riverton Creek Basin Question 2. Which type of operational or policy solution do you prefer? Please select one preferred stormwater program from the two options listed below. To help you decide, we have listed some key details for each option. 1) Targeted Source Control Inspection Program Description: The City would inspect businesses in the Riverton Creek basin to help them manage their outdoor storage areas in ways that would prevent spills and polluted runoff from reach the storm system or the stream Environmental Goals Addressed: Water quality Relative Cost: Low Other Considerations: The City is required to perform these inspections on a portion of businesses. This concept would focus on inspecting business that drain to Riverton Creek Contain Contain stored fluids capture leaks n2) Community Rain Garden Stewardship Program Description: Program for volunteers to help maintain rain gardens, ditches, and/or streams in 1/2 2/9/23, 2:09 PM Tukwila Stormwater Management Solutions for Riverton Creek Basin Survey their neighborhood Environmental Goals Addressed: Water quality Relative Cost: Low I do not prefer any of these options. Thank you for taking time to respond to this survey. Please press the "Next" button below for your answers to be recorded. If you have additional comments about stormwater solutions in Riverton Basin, please email Sherry Edquid at sherry.edquid@tukwila.wa.gov. Prey Next 2/2 Introduction Need for SMAP Completed Steps Step 3: Solutions Next Steps Otak City of Tukwila SMAP Tukwila is growing and lies at the intersection of two major freeways. As more people come to call our City home and work here, the river and streams that we enjoy face new pressures. The City is developing a stormwater management action plan (SMAP) to improve water conditions. We need your input to prioritize targeted stormwater actions to reduce pollution and improve overall water quality. To go directly to the survey see the "Step 3: Solutions" page. SMAP is a State -required process that asks for local resident input on the decision -making process. Tukwila evaluated several factors impacting the present and future health of local streams and has selected Riverton Creek as the stream that is likely to benefit most from targeted stormwater management actions. Now we need your input and ideas as we develop Tukwila's SMAP. See the "Frequently Asked Questions" page to learn about stormwater and targeted stormwater management actions. SMAP Steps The first step of developing the SMAP is to assess the conditions of the streams and rivers in Tukwila. The second step is to ask the community and stakeholders to help staff prioritize one watershed that could benefit most from reducing the harmful effects of urban runoff. The third step is to develop solutions for mitigating stormwater runoff in the priority watershed. During the third step the community will be asked to help prioritize projects and policies that could improve the condition of the stream or river. The fourth step is to write the SMAP for the selected watershed, which will outline the timeline, resources, and funding needed to implement the water quality improvement projects and policies. Developing a SMAP is a new state requirement from the Washington State Department of Ecology (Ecology). To learn more, see the SMAP Guidance. Assess Streams EEO- L66. Introduction Need for SMAP Completed Steps Step 3: Solutions Next Steps FAQ Otak Need for SMAP The Lower Green River, Duwamish River, and their tributaries which flow through the City of Tukwila are highly important for salmon migration. The population of salmon, including Chinook, Coho, chum, and steelhead, has declined since the late 1800s. Chinook, Coho, chum, and steelhead have been listed as threatened under the Endangered Species Act. There are many reasons for the decline, and among them is the change in land cover from forests and prairies to urban and suburban buildings and infrastructure. Historically, forests and wetlands soaked up rain where it fell. As more people moved here, lands were cleared, and wetlands were filled. Now when it rains, the chemicals and particles from our vehicle tires, roofs, lawns, and outdoor storage areas, some of which are harmful to fish populations, get swept quickly into the nearest stream by stormwater runoff. This change continues today as Tukwila grows. Washington State Department of Ecology (Ecology) is asking more than 80 cities and counties in western Washington to be a part of the solution. Under a permit from Ecology, Tukwila and other jurisdictions have looked at how our own development patterns have affected the ability of streams and rivers to support fish and have water quality that is safe for activities like recreation and fishing. Each jurisdiction has identified a priority watershed and is creating an action plan to reduce the harmful effects of stormwater runoff. Stormwater action planning can help the City focus its efforts, align resources, and apply for grants to improve stream health. SMAP aims to benefit Tukwila by: • Improving water quality in Riverton Creek • Protecting fish habitat • Complying with a permit from the state Please take a moment to review two maps of Tukwila below to see how the landscape from 1936 (first map) has changed to roads, neighborhoods, and businesses today (second map): 1936 Tukwila Land Cover 2021 Tukwila Land Cover Find address or place Q ® Find address or place E L J Introduction Need for SMAP Completed Steps Step 3: Solutions Next Steps Otak Completed SMAP Steps Steps 1 and 2 of Tukwila's SMAP are complete. Read this page to see what we did, or skip to the next page (Step 3: Solutions) to help us prioritize our solutions. Step 1: Basin Assessment The Receiving Water Conditions Assessment compared the conditions of streams and rivers in Tukwila to each other. The watersheds assessed were Gilliam Creek, the Green/Duwamish Rivers, Johnson Creek, Mill Creek, Nelson, P17, Riverton Creek, Southgate Creek, and Springbrook Creek. The relative assessment helped inform which stream or river could benefit from stormwater management action planning (SMAP). Each watershed in Tukwila was assessed to understand its water quality and to locate areas where there are opportunities for the City to install stormwater projects. The Green/Duwamish River and Riverton, Southgate, and Gilliam Creek watersheds were candidates for improvements. To learn more about the receiving water conditions assessment please see this StoryMap. I Step 2: Prioritize The purpose of the receiving water prioritization was to decide whether the Green and Duwamish Rivers, Riverton Creek, Southgate Creek, or Gilliam Creek would receive the most benefit from a stormwater management action plan (SMAP). We selected Riverton Creek basin because it is important for fish, has new fish habitat due to the recent removal of the flapgate at the mouth, has older areas of development without modern stormwater management, and has both the need and the opportunity for stormwater investments. Riverton Creek basin received support from the public when we asked for help prioritizing a basin in June 2022 (Visit the StoryMap here). The Green/Duwamish basin also received public support. Since Riverton Creek flows into the Duwamish River, improvements to Riverton Creek will also improve water quality in the river. The interactive map depicts information in Riverton Basin. For help on how to use the interactive map refer to the instructions below. Start typing an address or place name. The map will zoom to the location you select. This is an example of a layer that is not visible unless you select the eye. This is an example of a layer that is currently visible on the map. This is an example of a layer that Is on but not visible unless you zoom in. Once the text Is dark the layer will be visible. 7 Select the + symbol to zoom In. Select the — symbol to zoom out. Select this button to return to the original map extent. Select this button to enter full screen mode. To exit hull screen mode press' "Escape" on your computer. Select this button to see the legend and data (layers) available for this map. The menu will open at the bottom of the map. Otak 1111 ECOLOGY Introduction Need for SMAP Completed Steps Step 3: Solutions Next Steps Otak Step 3: Solutions We invite you to help us prioritize actions the City can take to improve water quality in Riverton Creek. There are two categories of proposed stormwater management solutions in the survey below. The first category is a retrofit project, which means the City will construct new infrastructure to manage stormwater from an area that is not currently managed. The second category is a stormwater program, which means the City will change its operations or change policy to improve water quality. The first question asks you to select your top three types of retrofit projects. The second question asks you to select your preferred program. To help you decide, we have provided key details for each solution. Please answer the survey only once. The survey will be open until November 11th, 2022. If the survey on this page has any trouble loading on your mobile device, please follow this link to open the survey in another browser window. Tukwila Stormwater Management Solutions for Riverton Creek Basin Question 1. Which types of stormwater retrofit solutions do you prefer? Please select your three favorite solutions from the eight options listed below. To help you decide, we have listed some key details for each option. 17 1) Proprietary large underground stormwater management facility (such Introduction Need for SMAP Completed Steps Step 3: Solutions Next Steps Otak �II1 9fr Next Steps f he Tukwila SMAP What's next after the City prioritizes stormwater solutions for Riverton Creek Basin? The City will develop a stormwater management action plan that will guide the timeline, resources, and funding needed to implement the water quality improvement projects and programs. • Receiving Water Conditions Assessment Step 1: Assess Streams January — March 2022 Public Engagement & Watershed Prioritization Step 2: Prioritize One Stream May — June 2022 Public Engagement & Project and Policy Prioritization for Priority Watershed Step 3: Develop Solutions September — November 2022 *You are here Stormwater Management Action Plan Development November 2022 — March 2023 Return to Survey If you have any questions, please contact Sherry Edquid at sherry.edquid@tukwilawa.gov Otak in ECOLOGY Introduction Need for SMAP Completed Steps Step 3: Solutions Next Steps FAQ Otak Frequently Asked Questions What is stormwater runoff? Stormwater runoff is generated from rain and snowmelt that flow over land or impervious surfaces, such as paved streets, parking lots, and buildings, and does not soak into the ground. The runoff picks up pollutants like trash, chemicals, oils, and dirt/sediment that can harm our rivers, streams, lakes, and coastal waters (also known as receiving waters). What is stormwater infrastructure? Stormwater infrastructure is designed to collect, convey, and manage stormwater. The infrastructure (physical facilities) can take many forms including catch basins, pipes, ditches, ponds, vaults, and more. What is a watershed? A watershed is an area of land where all rainfall and snow melt drains to a common stream or waterbody, such as a lake, river, or Puget Sound. All of the watersheds in the City of Tukwila drain to the Green/Duwamish River. What is a basin? For our purposes, a basin is the portion of a watershed located within the City limits. What is stormwater management? Stormwater management is the process of controlling stormwater runoff, most often using facilities that slow down, detain, or remove pollutants from stormwater, with the goal of mitigating changes to the amount and timing of runoff and reducing harmful impacts on water quality. What is a stormwater retrofit? Stormwater retrofits are construction projects which reduce or delay stormwater runoff or prevent chemicals and sediment from coming into contact with our local bodies of water. What is stormwater management action planning (SMAP)? SMAP is a State required comprehensive stormwater planning process. The SMAP process prioritizes stormwater investments and actions in a selected basin to accommodate future growth in a way that minimizes impacts to receiving waters such as Riverton Creek or the Green/Duwamish Rivers. Appendix D Short -Term Retrofit Project Fact Sheets and Cost Opinion Memorandum Otak PROJECT SUMMARY SHEET-SMAP-4 Project Title: Tukwila Intl Blvd: Bus Stop 60983 Water Quality Retrofit Location: In front of the bus stop at 12500 Tukwila International Blvd (bus stop ID 60983) Issue Description: Issue Description ■ Water Quality Stormwater runoff from Tukwila International Blvd is collected and directed to Riverton Creek. Runoff from this heavily traveled road likely contains high concentrations of pollutants, including fine sediment and dissolved metals. The polluted runoff is currently piped to Riverton Creek without treatment. Project Description: Tukwila International Blvd is one of the most highly traveled roads in the City of Tukwila, frequently used by buses, commercial trucks, and personal vehicles. Stormwater runoff is collected along both sides of the road and directed to Riverton Creek. Under existing conditions there is no water quality treatment for stormwater runoff from Tukwila International Blvd in Riverton Creek Basin. This project will install an underground proprietary runoff treatment system along Tukwila International Blvd to provide runoff treatment from 0.63 acres of impervious surface. The proposed facility location is in the public right-of-way between an existing bus stop (bus stop ID 60983) and the driveway to 12500 Tukwila International Blvd. This project will install conveyance pipes in the right-of-way along Tukwila International Blvd to re-route the existing conveyance network to the new facility before reconnecting to the existing network. This project also proposes replacing one pipe to route stormwater to the facility and abandoning another pipe that will no longer be used. The new proprietary underground biofiltration facility will collect stormwater from approximately 800 feet of existing conveyance pipes. Contech Engineered Solutions' Modular Wetlands® Linear Stormwater Treatment System was used to calculate the estimated project cost and facility size. The facility size was calculated using the basin size, peak flow rate, and other considerations such as available space. The facility is sized to provide enhanced treatment (removal of fine sediment and dissolved metals) in accordance with the Washington Department of Ecology's General Use Level Designation (GULD) for Contech Engineered Solutions' Modular Wetlands® Linear Stormwater Treatment System. Other GULD approved technologies that provide enhanced treatment may be considered during final design. The City currently owns Modular Wetlands® facilities and has experience in their operation and maintenance. Pollutants Addressed: The project will remove sediment and dissolved metals from stormwater runoff. Future Considerations: A detailed topographic and utility survey is needed at the proposed facility location and drainage basin. If the project cannot be constructed in the public -right -of way the City of Tukwila can consider a public -private partnership with the private property owner to install the facility at 12500 Tukwila International Blvd. Access to businesses will be disrupted although not halted during construction. Construction will disrupt traffic on Tukwila International Blvd, including pedestrians, through traffic, vehicles entering businesses on the east side of Tukwila International Blvd, and buses. Bus Stop 60983 may need to be relocated temporarily during construction. If construction extends outside of the public right-of-way a pedestrian path will be constructed between parking lots and buildings. The City of City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 SMAP-4: Tukwila Intl Blvd: Bus Stop 60983 Water Quality Retrofit Tukwila will provide early notice to the property owners, tenants, and public transit users that will be affected by construction. Estimated Project Cost: $440,000 Related Projects: None. Looking south along Tukwila International Blvd Looking south along Tukwila International Blvd and private driveway City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 ABANDON EXISTING STORM PIPE -\ REPLACE EXISTING PIPE TO DRAIN SOUTH TO NEW STORM MANHOLE CONNECT TO EXISTING STORM PIPE APPROXIMATE IE OUT: 108' LEGEND 2 FT CONTOURS TAXLOTS STREAM/CREEK EXISTING STORM PIPE PROPOSED STORM PIPE Otak %A\ CONNECT TO EXISTING STORM STRUCTURE APPROXIMATE IE IN: 102' 1\ \\ \\\\\\ \\\ \ \\ \\\\ \ \\ \ \\ \\\\\\\�� N \\ \ \ \\\ \ \ ,,,,N N. \� \ \�\\\ \\ \� \\— �\ -- — 7'W x 9'L x 4'D PROPRIETARY MODULAR WETLAND N • EXISTING STORM CATCH BASIN pp EXISTING STORM MANHOLE • PROPOSED MANHOLE 000e PROPOSED PROPRIETARY MODULAR BIOFILTRATION �\�\\ \'1 �II� \\ 1 SCALE IN FEET SMAP 4 Tukwila Stormwater Management Action Plan PLANNING LEVEL PROJECT COST OPINION LOCATION: TUKWILA INTL BLVD: BUS STOP 60983 WATER QUALITY I BY: MEP PROJ. ID: SMAP-4 DATE: 2/13/2023 CONSTRUCT UNDERGROUND PROPRIETARY RUNOFF TREATMENT SYSTEM ADJACENT TO BUS STOP IN DESC. FRONT OF 12500 TUKWILA INTERNATIONAL BLVD (STOP ID 60983) ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 1 LS $ 15,000 $ 15,000 2 ENGINEERING 25% Of Total Construction $ 74,000 3 SURVEY 2% Of Total Construction $ 6,000 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 14,800 Total Design $ 109,800 LAND (R/W) 5 EASEMENTS 600 SF $ 6 $ 3,600 Total Land (R/W) $ 3,600 CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 10% Of Total Construction $ 29,590 Total Construction Management $ 29,590 CONSTRUCTION Construction Elements 7 STORM SEWER PIPE, 12 IN. DIAM 60 LF $ 190 $ 11,400 8 MANHOLE 48 IN. DIAM. TYPE 1 2 EA $ 8,240 $ 16,500 9 PROPRIETARY UNDERGROUND STORMWATER VAULT* 1 EA $ 108,500 $ 108,500 Subtotal Construction Elements $ 136,400 Required Ancillary Construction Items 10 MOBILIZATION 10% Of Construction Elements $ 13,700 11 EROSION & SEDIMENTATION CONTROL 5% Of Construction Elements $ 6,900 12 TRAFFIC CONTROL 15% Of Construction Elements $ 20,500 13 PLANNING LEVEL CONSTRUCTION CONTINGENCY 40% Of Total Construction $ 118,400 Subtotal Ancillary Items $ 159,500 Total Construction $ 295,900 Total Project Cost $ 438,890 2023 Dollars Total Estimated Project Cost (Rounded) $ 440,000 * For estimating purposes, a Contech Modular Wetlands® 7'x9'x4' Linear Stormwater Bioretention Unit is assumed. Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. PROJECT SUMMARY SHEET-SMAP-5 Project Title: South 130th St Right -Of -Way Bioretention Planters Location: S 130th St, 37th Ave S, and 38th Ave S Issue Description: Issue Description Water Quality Stormwater runoff from S 130th St, 37th Ave S, and 38th Ave S is collected in storm ditches and storm pipes and directed to Riverton Creek. Runoff from these roads and residential properties likely contains pollutants, including fine sediment, dissolved metals, and 6PPD-q'. The polluted runoff is currently sent to Riverton Creek without treatment. Flow Control S 130th St, 37th Ave S, and 38th Ave S are hilly and stormwater is sent downhill quickly. Quick moving stormwater has led to erosion and incising of the storm ditches. Project Description: S 130th St is a highly traveled road in the City of Tukwila, frequently used by buses and commercial vehicles. 37th Ave S and 38th Ave S are residential roads that are mainly used by personal vehicles. Stormwater runoff is collected along both sides of the roads and is directed to Riverton Creek. Under existing conditions, the storm ditches are heavily incised, there are some blockages at the culverts, and there is no water quality treatment for stormwater runoff. This project will replace existing storm ditches with a series of bioretention planters to provide runoff treatment from 1.75 acres of right-of-way impervious surface and 3 acres of residential properties. The bioretention planters will include native plants and will also slow stormwater down before it is directed to conveyance pipes. The planters, totaling 1,400 square feet, will be installed on the east side of 37th Ave S, both sides of 38th Ave S, the north side of S 130th St, and the south side of S 130th St between 37th Ave S and 38th Ave S. Planter locations are preliminary. This project will install a new conveyance pipe and five manholes in the center of S 130th St between 37th Ave S and E Marginal Way S. New conveyance pipes will also be constructed to route stormwater between the bioretention planters and the new central conveyance pipe. The existing conveyance pipes will be abandoned where the bioretention planters will be installed. The volume of stormwater runoff directed to the project area determined the estimated project cost and facility size. The bioretention planters will provide enhanced treatment (removal of fine sediment and dissolved metals) in accordance with the Washington Department of Ecology's design criteria outlined in the 2019 Stormwater Management Manual for Western Washington. Bioretention is also known to remove the tire wear pollutant 6PPD-q, which is emerging as a concern in the Puget Sound region. The City currently owns bioretention planters and has experience in their operation and maintenance. Pollutants Addressed: The project will remove sediment, dissolved metals, and 6PPD-q from stormwater runoff. Preliminary research indicates that dispersion, infiltration, and biofiltration facilities that use bioretention soil media including bioretention planters are anticipated to capture 6PPD-q. 1 6 p-Phenylenediamine quinone City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 SMAP-5: South 130th St Right -Of -Way Bioretention Planters Future Considerations: A detailed topographic and utility survey is needed at the proposed facility locations. Prior to construction, the City may need to discuss property lines with property owners. The City will gather community concerns through public engagement efforts prior to final design of the project and construction. Construction will disrupt traffic on S 130th St, 37th Ave S, and 38th Ave S, including pedestrians, through traffic, and school buses. Street parking will be impacted during construction and depending on the final design of the project street parking could be reduced to accommodate some bioretention planters. The City of Tukwila will provide early notice to the property owners, tenants, and public transit users that will be affected by construction. Estimated Project Cost: $1,340,000. Related Projects: There could be opportunities to partner with the City's Transportation Planning division to install sidewalks along with bioretention planters on S 130 St. Photographs: Looking east on the south side of S 130th St Looking east on the north side of S 130th St near 38th at 37th Ave S Ave S City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 \)55\ \\\\\ / / /I / 5:C \\\\\\� Ji I I I — / r / \ \ \ \ �/ `___ NON \ `- • \ \\\\\\\ \\ \\\\\ i/\\ \ \\ N '� 0 U 0 0 U a_ a d 0 a • N \I 4' WIDTH STREET SIDE STORMWATER PLANTERS TOTAL AREA: 4,000 SF ----I S 130TH ST \ III I111 APPROXIMATELY 940 LF PROPOSED STORMWATER PIPE \ 1 EXISTING PRIVATE STORMWATER VAULT TRACT LEGEND SD 2 FT CONTOURS TAXLOTS EXISTING STORM DITCH EXISTING STORM PIPE PROPOSED STORM PIPE 0 100 200 EXISTING STORM CATCH BASIN 0 EXISTING STORM MANHOLE • PROPOSED MANHOLE PROPOSED STORMWATER PLANTER (BIORETENTION) SCALE IN FEET Otak %A\ SMAP 5 Tukwila Stormwater Management Action Plan PLANNING LEVEL PROJECT COST OPINION SOUTH 130TH ST RIGHT-OF-WAY BIORETENTION LOCATION: PLANTERS BY: MEP PROJ. ID: SMAP-5 DATE: 2/13/2023 INSTALL RIGHT-OF-WAY BIORETENTION PLANTERS IN DESC. EXISTING CONVEYANCE DITCH LOCATIONS ALONG S 130TH ST. AND CROSS STREETS ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 1 LS $ 15,000 $ 15,000 2 ENGINEERING 15% Of Total Construction $ 150,400 3 SURVEY 2% Of Total Construction $ 20,100 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 50,200 Total Design $ 235,700 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 10% Of Total Construction $ 100,300 Total Construction Management $ 100,300 CONSTRUCTION Construction Elements 7 STORM SEWER PIPE, 12 IN. DIAM 1,000 LF $ 190 $ 190,000 8 MANHOLE 48 IN. DIAM. TYPE 1 5 EA $ 8,240 $ 41,200 9 STORMWATER PLANTER 4,100 SF $ 85 $ 348,500 Subtotal Construction Elements $ 579,700 Required Ancillary Construction Items 10 MOBILIZATION 10% Of Construction Elements $ 58,000 11 TEMPORARY WATER MANAGEMENT 5% Of Construction Elements $ 29,000 12 EROSION & SEDIMENTATION CONTROL 5% Of Construction Elements $ 29,000 13 TRAFFIC CONTROL 1% Of Construction Elements $ 5,800 14 PLANNING LEVEL CONSTRUCTION CONTINGENCY 30% Of Total Construction $ 300,700 Subtotal Ancillary Items $ 422,500 Total Construction $ 1,002,200 Total Project Cost $ 1,338,200 2023 Dollars Total Estimated Project Cost (Rounded) $ 1,340,000 Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. PROJECT SUMMARY SHEET-SMAP-12 Project Title: E Marginal Way S Distributed Water Quality Treatment Location: E Marginal Way S between S 120th PI and slightly south of S 128th St Issue Description: Issue Description Water Quality Stormwater runoff from E Marginal Way S is collected and directed to Riverton Creek. Runoff from this heavily traveled road likely contains high concentrations of pollutants, including fine sediment. The polluted runoff is currently piped to Riverton Creek without treatment. Project Description: E Marginal Way S is a highly traveled road in the City of Tukwila, frequently used by buses, commercial trucks, and personal vehicles. Stormwater runoff is collected in catch basins along both sides of the road and directed to Riverton Creek in conveyance pipes. Under existing conditions there is no water quality treatment for stormwater runoff from this section of E Marginal Way in Riverton Creek Basin. This project will replace 22 catch basins with proprietary underground stormwater catch basins. The 22 new catch basins will hold a total of 44 cartridges that treat stormwater. The new catch basins will capture and treat stormwater runoff from 3.5 acres of impervious surface. Selection of catch basins for replacement during design of this project will depend on invert elevations, topography, location, and size of area draining to each catch basin. Contech Engineered Solutions' Stormwater Management StormFilter® Catch Basins were used to calculate the estimated project cost and the number of facilities. The number of catch basins that will be replaced was calculated using the basin size, peak flow rate, and the capacity of each StormFilter® cartridge. The facilities are designed to provide basic treatment (removal of fine sediment) in accordance with the Washington Department of Ecology's General Use Level Designation (GULD) for Contech Engineered Solutions' Stormwater Management StormFilter® with ZPG Media at 1 gpm/sq ft media surface area. Other GULD approved technologies may be considered during final design. The City currently owns Contech StormFilter® facilities and has experience in their operation and maintenance. Pollutants Addressed: The project will remove sediment from stormwater runoff. Future Considerations: A detailed topographic and utility survey is needed of the existing catch basins that will be replaced. Construction will disrupt traffic on E Marginal Way S, including through traffic, buses, and possibly pedestrians and vehicles entering businesses. The project could be phased to limit cost in any one year. To reduce overall project cost, the project extents could be reduced during final design. Estimated Project Cost: $1,420,000 Related Projects: None identified. City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 SMAP-12: E Marginal Way S Distributed Water Quality Treatment Photograph: Looking south along E Marginal Way S City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 I(rri, (Illi /" S 128TH ST MATCHLINE 1 _ J 1 I v I�--��n�I1\III \ —Jr , 6 1 \I \- \J--, I\,— /��, ��II �IIIIi I REPLACE 22 EXISTING CATCH BASINS WITH 2-CARTRIDGE STORMWATER FILTER CATCH BASINS. CATCH BASIN LOCATIONS TBD. llR� V Y� PROJECT EXTENT - SOUTH LEGEND O 2 FT CONTOURS TAXLOTS CIP BOUNDARY EXISTING STORM PIPE EXISTING STORM CATCH BASIN EXISTING STORM MANHOLE MATCHLINE PROJECT EXTENT - NORTH 0 250 500 SCALE IN FEET Otak %A\ S MAP 12 Tukwila Stormwater Management Action Plan PLANNING LEVEL PROJECT COST OPINION LOCATION: E MARGINAL WAY DISTRIBUTED WATER QUALITY TREATMENT BY: MEP PROJ. ID: SMAP-12 DATE: 2/13/2023 INTALL UP TO 44 CONTECH STORMFILTER CARTRIDGES IN CATCH BASIN STUCTURES TO PROVIDE RUNOFF TREATMENT DESC. ON E MARGINAL WAY S. LOCATIONS DETERMINED BASED ON EXISTING STORMWATER INFRASTRUCTURE. ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 1 LS $ 15,000 $ 15,000 2 ENGINEERING 15% Of Total Construction $ 159,200 3 SURVEY 2% Of Total Construction $ 21,300 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 53,100 Total Design $ 248,600 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 10% Of Total Construction $ 106,100 Total Construction Management $ 106,100 CONSTRUCTION Construction Elements 7 PROPRIETARY UNDERGROUND STORMWATER CATCHBASIN* 22 EA $ 28,600 $ 629,200 Subtotal Construction Elements $ 629,200 Required Ancillary Construction Items 8 MOBILIZATION 10% Of Construction Elements $ 63,000 9 EROSION & SEDIMENTATION CONTROL 5% Of Construction Elements $ 31,500 10 TRAFFIC CONTROL 3% Of Construction Elements $ 18,900 11 PLANNING LEVEL CONSTRUCTION CONTINGENCY 30% Of Total Construction $ 318,300 Subtotal Ancillary Items $ 431,700 Total Construction $ 1,060,900 Total Project Cost $ 1,415,600 2023 Dollars Total Estimated Project Cost (Rounded) $ 1,420,000 * For estimating purposes, a Contech 2-Cartridge Stormfilter® Catch Basin with 27-inch cartridges is assumed. Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. PROJECT SUMMARY SHEET-SMAP-14 Project Title: Tukwila School District Stormwater Pond Retrofit and Sanitary Sewer Connection Location: E Marginal Way S and S 128th St Issue Description: Issue Description Water Quality Tukwila School District used to wash school buses in the parking lot of its bus barn. Wash water from the school buses likely contains pollutants including oil, surfactants or soaps, dissolved metals, suspended solids, and other pollutants. The polluted wash water used to be directed to the School District's stormwater pond before being piped to Riverton Creek without water quality treatment. Stormwater runoff from this 1.2-acre property is collected and sent to the School District's stormwater pond. The stormwater pond may provide some treatment; however, it is expected that the treatment provided is not up to current standards. Flow Control Stormwater runoff from the Tukwila School District's property is directed to the stormwater pond in the northeast corner of the property before being routed to the City of Tukwila's stormwater conveyance system, and ultimately Riverton Creek. It is unclear if the stormwater pond provides flow control or to what standard. Project Description: Tukwila School District operates a bus barn at E Marginal Way S and S 128th St. Two existing catch basins capture stormwater from the site, which is then piped to a stormwater pond at the northeast corner of the bus barn. The existing pond was built to a previous standard, and its current effectiveness in managing stormwater runoff is unknown. It is in poor condition with trees growing in the bottom and invasive vegetation often covering it. In the past, district personnel would wash buses in the parking lot, and wash water would enter the district's storm system and then the City's municipal storm system. Because the City of Tukwila prohibits illicit discharges such as wash water from entering its storm system, the School District now must drive the school buses to another location to get washed. The City will partner with the School District to reconfigure the drainage system on the property to separate wash water from stormwater runoff and to provide water quality treatment for stormwater runoff from the site. This project will convert the existing stormwater pond to a large bioretention cell to provide both runoff treatment and flow control for stormwater runoff from the site. An existing flow control structure downstream of the outlet will be replaced to manage stormwater flows. The bioretention cell will provide enhanced treatment for stormwater runoff (removal of fine sediment and dissolved metals) from 1.2 acres of impervious surface which is currently managed in the stormwater pond with unknown efficacy in removing pollutants. This project will also add a diversion valve downstream of the two primary catch basins that collect stormwater from the parking lot. The diversion valve will allow School District staff to direct wash water to the sanitary sewer system operated by Valley View Sewer District. When school buses are no longer being washed staff will turn the diversion valve to the bioretention cell to manage stormwater runoff. City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 SMAP-14: Tukwila School District Stormwater Pond Retrofit and Sanitary Sewer Connection An oil/water separator and clean out will be installed after the diversion valve along a new sewer line. The new six-inch sewer line will direct the wash water from the diversion valve to an existing sanitary sewer line in the parking lot. Pollutants Addressed: The project will prevent illicit discharges from washing operations and remove sediment, dissolved metals, and oil from stormwater runoff. Future Considerations: A detailed topographic and utility survey is needed at the proposed facility installation locations. An infiltration test will need to be performed for the bioretention cell. The School District will need to work with Valley View Sewer District to permit school bus wash water discharges to the sanitary sewer system. Estimated Project Cost: $440,000. The City would pay for 54% of the total estimated project cost ($236,000). The School District would pay for 46% of the total estimated project cost ($204,000). Related Projects: None. Photographs: Looking southwest across the stormwater pond Looking east along S 128th St City of Tukwila Stormwater Management Action Plan (SMAP) February 2023 OIL/WATER SEPARATOR REPLACE EXISTING FLOW CONTROL MANHOLE NEW FLOW CONTROL MANHOLE EXISTING OIL/WATER SEPARATOR CONNECT TO EXISTING SANITARY NETWORK CLEAN OUT • N Oft J REPLACE EXISTING DETENTION BASIN WITH BIORETENTION POND Q DIVERSION VALVE SYSTEM 6" SANITARY SEWER PIPE 11 Q I Lu LEGEND SD 2 FT CONTOURS TAXLOTS EXISTING SANITARY PIPE PROPOSED SANITARY PIPE EXISTING STORM PIPE PROPOSED STORM PIPE • x 0 40 80 EXISTING STORM CATCH BASIN EXISTING STORM MANHOLE EXISTING CLEANOUT PROPOSED DIVERSION VALVE SYSTEM PROPOSED CLEANOUT PROPOSED STORMWATER POND (BIORETENTION) OIL/WATER SEPARATOR SCALE IN FEET Otak %A\ SMAP 14 Tukwila Stormwater Management Action Plan PLANNING LEVEL PROJECT COST OPINION TUKWILA SCHOOL DISTRICT STORMWATER POND LOCATION: RETROFIT AND SANITARY SEWER CONNECTION BY: MEP PROJ. ID: SMAP-14 DATE: 2/13/2023 PARTNERSHIP WITH TUKWILA SCHOOL DISTRICT. RETROFIT EXISTING STORMWATER POND TO PROVIDE DESC. ADDITIONAL TREATMENT, AND INSTALL A SANITARY SEWER DIVERSION VALVE TO PREVENT WASH WATER FROM ENTERING STORM SYSTEM. ITEM NO. ITEM QUANTITY UNIT UNIT PRICE AMOUNT DESIGN 1 BASIC PERMITTING 1 LS $ 15,000 $ 15,000 2 ENGINEERING 25% Of Total Construction $ 73,600 3 SURVEY 2% Of Total Construction $ 5,900 4 PROJECT ADMINISTRATION 5% Of Total Construction $ 14,800 Total Design $ 109,300 LAND (R/W) 5 EASEMENTS 0 SF $ 6 $ - Total Land (R/W) $ - CONSTRUCTION MANAGEMENT 6 CONSTRUCTION MANAGEMENT 10% Of Total Construction $ 29,500 Total Construction Management $ 29,500 CONSTRUCTION Construction Elements 7 CLEAN OUT 2 EA $ 2,000 $ 4,000 8 PVC SANITARY SEWER PIPE 6 IN. DIAM 70 LF $ 130 $ 9,100 9 PROPRIETARY OIL WATER SEPARATOR 1 EA $ 49,000 $ 49,000 10 DIVERSION VALVE SYSTEM 1 EA $ 15,000 $ 15,000 11 BIORETENTION CELL (RETROFIT OF POND) 2,350 SF $ 25 $ 58,800 13 FLOW CONTROL MANHOLE 1 EA $ 11,000 $ 11,000 Subtotal Construction Elements $ 146,900 Required Ancillary Construction Items 14 MOBILIZATION 10% Of Construction Elements $ 14,700 15 TEMPORARY WATER MANAGEMENT 5% Of Construction Elements $ 7,400 16 EROSION & SEDIMENTATION CONTROL 5% Of Construction Elements $ 7,400 17 PLANNING LEVEL CONSTRUCTION CONTINGENCY 40% Of Total Construction $ 117,700 Subtotal Ancillary Construction $ 147,200 Total Construction $ 294,100 Total Project Cost $ 432,900 2023 Dollars Total Estimated Project Cost (Rounded) $ 440,000 * For estimating purposes, a Contech Modular Wetlands® 7'x9'x4' Linear Stormwater Bioretention Unit is assumed. Notes: 1. The above cost opinion is in 2023 dollars and does not include future escalation, financing, or O&M costs. 2. The order -of -magnitude cost opinion has been prepared for guidance in project evaluation from the information available at the time of preparation and for the assumptions stated. The final costs of the project will depend on actual labor and material. 3. Assumes Tukwila School District retains ownership and responsibility for maintenance of the storm facilities on the property. COST SHARING The project is a partnership between City of Tukwila and Tukwila School District, and costs will be shared. The City will fund pipes and upgrades to the pond. The School District will fund the oil/water separator, electrified diversion value, and any items related to the sanitary sewer connection. CITY PORTION 54% $ 236,324 SCHOOL DISTRICT PORTION 46% $ 203,676 Otak Memorandum To: Sherry Edquid (City of Tukwila) From: Trista Kobluskie, Brandon Teetsel, PE Copies: File Date: February 15, 2023 Subject: City of Tukwila SMAP Project Cost Opinion Methodology Project No.: 33383 For the City of Tukwila Stormwater Management Action Plan (SMAP), Otak developed planning -level cost opinions for four retrofit projects. This memorandum summarizes the assumptions made in formulating each element of the cost opinion. 1. Project Scope Cost opinions are based on conceptual project scopes and engineering and are presented in 2022 dollars. Conceptual project scopes and designs are developed with limited detail about permit requirements, existing system attributes (e.g. invert elevations), utility conflicts, and external impacts. Conceptual engineering includes preliminary engineering calculations or uses information from recent similar work. All concepts and costs should be considered preliminary. It is assumed that projects will meet engineering requirements of the King County Surface Water Design Manual in effect when the project is permitted. Cost estimates are based on assumptions derived from current engineering standards. 2. Design Design costs consist of permitting, engineering, survey, and project administration. Type of Cost Includes How Applied How Calculated Basic Permitting* • Basic municipal permits All projects $15,000 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com Ilred-ae.otak.comlprojlproject1333001333831waterres\task 500 - smapltukwila smap cost estimating.docx City of Tukwila SMAP Project Cost Opinion Methodology Page 2 of 3 February 15, 2023 Type of Cost Includes How Applied How Calculated Engineering • Engineering design • Preparation of SWPPP and erosion & sediment control plans • Geotechnical studies (if needed) • Archaeological survey (if needed) • Other special studies when described in fact sheet All projects Varied percentage of total construction cost • 25% for construction under $500,000 • 20% for construction over $500,000 • 15% for construction over $1 million Survey • Survey All projects 2% of total construction Project Administration • City's staffing cost to manage the project and related grants, if any All projects 5% of total construction * Basic Permitting cost is applied to all sites. Based on desktop analysis, no sites trigger federal or state environmental permits or environmental mitigation, which would entail additional cost. 3. Land (Right of Way) Land costs consists of permanent easements, if needed, which are calculated at $6 per square foot. 4. Construction Management Construction management consists of either the City's staffing or a contractor to oversee construction and is calculated as 10% of total construction for all projects. 5. Construction Construction consists of construction elements and required ancillary construction pay items. 5.1. Construction Elements Construction elements are the necessary significant pay items to construct the project. Items are usually presented as a package that includes labor and a variety of materials. For example, the unit cost for a right-of-way bioretention planter is a package based on a typical design and includes labor and materials such as Portland cement, pipe, bioretention soils, plants, and other needed materials. Otak civil engineers researched unit prices from recently completed local and regional construction projects to estimate project costs. Each project includes an engineer's assumption for preliminary unit quantities. 5.2. Required Ancillary Construction Items Required ancillary construction items include mobilization, temporary water management, erosion & sedimentation control, traffic control, and a planning level construction contingency. Each of these is calculated based on a percentage of project costs as described in the table below. Ilred-ae.otak.comlprojlproject1333001333831waterres\task 500 - smapltukwila smap cost estimating.docx City of Tukwila SMAP Project Cost Opinion Methodology Page 3 of 3 February 15, 2023 Type of Cost Includes How Applied How Calculated Mobilization • Contractor's mobilization All projects 10% of construction elements subtotal Temporary Water Management • Contractor's temporary water management costs If needed based on desktop analysis of site conditions Percentage based on engineering judgement Erosion & Sedimentation Control • Contractor's erosion control costs All projects 5% of construction elements subtotal Traffic Control • Contractor's traffic control costs If needed based on desktop analysis of site conditions Percentage based on engineering judgement Planning Level Construction Contingency • Expected costs that are not specified at the planning level All projects Percentage of total construction cost ■ 40% for less than $500,000 construction ■ 30°/a for over $500,000 construction 6. Escalation and Future Estimation Costs were estimated in 2022 dollars. Cost opinions in the SMAP do not include escalation. Otak recommends escalating a cost opinion using an established index when the City adds a project to its capital improvement program. After the project design phase is complete, the construction cost opinion should be replaced by the engineers' estimate. Ilred-ae.otak.comlprojlproject1333001333831waterres\task 500 - smapltukwila smap cost estimating.docx STORMWATER OUTFALL WATER QUALITY RETROFIT PROJECT Design Report Prepared for: City of Tukwila 6200 Southcenter Boulevard Tukwila WA 98188 Prepared by: KPG Interdisciplinary Design 3131 Elliott Ave, Suite 400 Seattle, WA 98121 206-286-1640 October 2020 January 2021 (Revision No. 1) City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report Table of Contents 1. Introduction 1 2. Basin Description 3 3. Site Description 4 3.1 EXISTING AND PROPOSED SITE CONDITIONS 4 3.2 SOILS 4 3.3 THRESHOLD DISCHARGE AREAS 5 4. Applicability of Core Requirements 11 5. Alternatives Considered 11 6. Design Analysis 15 6.1 MWS UNIT SIZING 15 6.2 CONVEYANCE SYSTEM DESIGN 15 7. Water Quality Benefit 17 8. Cost Estimate 18 9. Proposed Schedule 18 10. Operation & Maintenance 18 FIGURES Figure 1— Vicinity Map 2 Figure 2 — Site 4 7 Figure 3 — Site 5 8 Figure 4 — Site 7 9 Figure 5 — Site 8 10 TABLES Table 1 —Alternative Analysis Decision Matrix 12 Table 2 — Runoff Treatment Benefit 17 APPENDICES A — Stormwater Calculations B — Alternative Analysis C—Soils Information D — Probable Cost Estimate E — Design Plans F — GULD & Operation and Maintenance Information Documents October 2020 KPG i City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report 1. Introduction This report documents the stormwater design for the City of Tukwila Stormwater Outfall Water Quality Retrofit Project. The project is a part a City program to provide water quality treatment to the Duwamish Waterway. The City has identified outfalls to the river for a water quality retrofit. An alternative analysis evaluated and ranked eight outfalls. Four projects have been selected for final design. The following are included in this design report: • Site No. 4 — Starfire Way • Site No. 5 — Interurban Avenue South • Site No. 7 — E Marginal Way South • Site No. 8 — TIB at Riverton Creek Water quality treatment facilities will consist of GULD approved media filter units for Enhanced Water Quality . As retrofit projects, storm drainage conveyance piping will be constructed to convey stormwater runoff to and from the treatment facilities with site restoration for all disturbed areas. See Figure 1 for project locations. The design is being funded by the State of Washington Department of Ecology (Ecology) Water Quality Combined Financial Assistance Program, through Agreement No. WQC-2017-Tukwil- 00158 (Grant Agreement). This report is intended to satisfy the Design Report submittal requirement described in Task 2D of the Grant Agreement scope of work. The Grant Agreement states that the project will "improve water quality in the Green- Duwamish River through the design of runoff treatment Best Management Practices included in Ecology's Stormwater Management Manual for Western Washington, at a minimum of two outfalls in the city of Tukwila." Media filter units in will be installed to capture and remove total suspended solids from surface runoff. The project elements have been designed in accordance with the 2016 King County Surface Water Design Manual and the 2019 City of Tukwila Infrastructure Design and Construction Standards. October 2020 1 KPG City ofTukwila Figure 1 —Vicinity Map Design Report City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report 2. Basin Description The sites are located within the Duwamish River watershed. The river discharges into the Lower Duwamish Waterway and into Elliot Bay. Under historic conditions, based on surface topography it appears that runoff from the projects flowed directly to the Duwamish River via sheet flow, with the exception of Site 8 which drains to Riverton Creek before out letting into the Duwamish River. Site 4 The existing storm drainage system at Site 4 consists of a 12-inch diameter system predominantly directing runoff northward to Fort Dent Way, from Interurban Avenue. Runoff from a portion of Starfire Way to also collects in this system, and enters the system at a manhole junction before traveling west. Site 5 The existing storm drainage system at Site 5 is a 12-inch diameter pipe that conveys runoff from the site and upstream areas in an westward direction along Interurban Avenue. Site 7 At Site 7, the existing storm drainage system conveys runoff from the site and upstream areas from southward to the outlet to the Duwamish River. Site 8 The existing storm drainage system at Site 8 conveys runoff from a portion of the roadway in a northward direction to Riverton Creek and eventually the Duwamish-Green River. The Duwamish-Green River has Category 5 303(d) listings for dissolved oxygen, temperature, pH, and fecal coliform. The Duwamish-Green River is a salmonid bearing river within the City of Tukwila limits, and Riverton Creek provides salmonid spawning habitat. Under proposed conditions, the project sites existing drainage patterns will not change. The installation of water quality treatment facilities will seek to improve the quality of runoff within the Duwamish-Green River Basin drainage basin. Soils within the project site are discussed in Section 3.2. The Natural Resources Conservation Service online mapping (websoilsurvey.nrcs.usda.gov) shows the project site as predominantly Urban land and Alderwood complex, with moderately rapid permeability. The soils report is provided in Appendix C. All four sites in the project area are located within the public right-of-way and encompass roadway, sidewalk, and lawn. The land use adjacent to Site 4, Site 5, and Site 7 is predominately commercial areas. The land use adjacent to Site 8 is roadway and shoulder in the right of way and within WSDOT limited access area. October 2020 3 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report 3. Site Description 3.1 Existing and Proposed Site Conditions The project area consists of public right-of-way along Interurban Avenue S at the Intersection of 58th Avenue S, Fort Dent Way at the Intersection of Interurban Avenue S, East Marginal Way S between S 112th Street and S 115th Street, and on Tukwila International Boulevard at SE-599 interchange. See Figures 2 through Figure 5. Within the project area, land cover is mostly impervious, consisting of the roadway, sidewalk, lawn, and adjacent paved driveways and parking lots. Topography and existing site conditions at the sites are as follows: • Site 4 is generally flat, slopes south to north, and consists of a 47-feet wide two lane asphalt roadway with center turn lane and two 5-foot wide concrete sidewalks with curbs and grassed planter strips. • Site 5 is generally flat but slope east to west, and consists of a four -lane street with 63- feet wide asphalt roadway pavement ant two 6-foot wide sidewalk on both sides of the street with curbs. • Site 7 is generally flat, sloping north to south, and is 47-feet wide two lane asphalt roadway with center turn lane and two 6-foot wide concrete sidewalks with curbs. • Site 8 is generally flat, sloping south to north, and consists of a 77-foot wide 6-lane asphalt roadway with no curbs. The northbound side of the road is flush with a concrete Jersey barrier as the road approaches the SR-599 overpass. The proposed site conditions will maintain the existing roadway patterns, and new storm drainage structures to convey runoff for water quality treatment. Proposed stormwater drainage structures include new catch basins to capture surface flows for treatment. 3.2 Soils The NRCS Web Soil Survey was used to determine the soil conditions at the sites. The soils reports from NRCS Web Soil Survey are provided in Appendix C. The soil types at the sites are as follows: • Site 4 is predominantly silt loam • Site 5 lies entirely on urban land soils, and the areas adjacent to the site are predominantly Alderwood. • Site 7 is entirely on urban land. • Site 8 is predominantly Alderwood-Everett-Urban land complex. October 2020 4 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report 3.3 Threshold Discharge Areas The four sites consists of four separate Threshold Discharge Areas (TDAs). TDAs are defined as on -site areas draining to a single natural discharge location or multiple natural discharge locations that combine within % mile downstream from the site. The project TDAs and their downstream paths are described as follows: TDA A consists of Site 4 at Fort Dent Way between Interurban Avenue S and Starfire Way. TDA B consists of Site 5 along Interurban Avenue S near the Intersection of S 141st Street. TDA C consists of Site 7 on East Marginal Way S between S 112th Street and S 115th Street. TDA D consists of Site 8 on Tukwila International Boulevard at the SE-599 interchange. The following downstream drainage system descriptions were developed by reviewing drainage system information available from the on-line City of Tukwila GIS mapping application, site visits, as -built records provided by the City of Tukwila, and research of drainage complaint records. TDA A (Site 4) The downstream flow path for TDA A begins in a storm drain manhole on the southbound side of Fort Dent Way, near the intersection with Starfire Way. From this storm drain manhole, an 18-inch concrete pipe conveys TDA A runoff northwest for 170 feet before entering 24-inch pipe. From there, runoff travels northwest for approximately 50 feet before discharging into the Green River. No drainage complaints have been recorded within this downstream drainage system. Existing problems or problems developing as a result of this project are unlikely. TDA B (Site 5) The downstream flow path for TDA B begins in a storm drain manhole on the westbound side of Interurban Avenue S, near the intersection with South 141st Street. From this storm drain manhole, a 24-inch concrete pipe conveys TDA B runoff northeast for 240 feet before discharging into the Duwamish River. No drainage complaints have been recorded within this downstream drainage system. Existing problems or problems developing as a result of this project are unlikely. TDA C (Site 7) The downstream flow path for TDA C begins in a storm drain manhole on the southbound side of East Marginal Way, near the intersection with South 115th Street. From this storm drain manhole, a 24-inch concrete pipe conveys TDA C runoff south for 53 feet before discharging into the Duwamish River. No drainage complaints have been recorded within this downstream drainage system. Existing problems or problems developing as a result of this project are unlikely. TDA D (Site 8) The downstream flow path for TDA D begins in a vegetated channel near the offramp from SR- 599 to Tukwila International Boulevard. From this vegetated channel, runoff from TDA D enters October 2020 5 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report a double barrel pipe before discharging into Riverton Creek. From there it travels northwest for approximately 3,800 feet before ultimately discharging into Green River. It is in Riverton Creek that the 0.25-mile point is reached. No drainage complaints have been recorded within this downstream drainage system. Existing problems or problems developing as a result of this project are unlikely. October 2020 6 KPG it\DESIGN\Drawings\Working \Drainage\Figure-2-5_Site Areas.dwg 1/21/2021 3:52 PM K:APROJECTS\TUKWILA\19057—Storm n: .s?'�r1'. ii, ,C , 00 ` ft., — AREA TREATED FOR S STORMWATER RETROFIT iI S* ,/ SEE DESIGN PLANS ;IS,, ,,QO •, / ,, %9�,, ,, ' #„.,,iyy • 1 `�1 �' ; FIGURE 2. SITE 4: STARFIRE WAY CITY OF TUKWILA STORMWATER QUALITY OUTFALL RETROFIT PROJECT KPGr Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627.0720 (206) 286-1640 www.kpg.com aaeAFigure-2-5Site Areas.dwa 10 PROJECTS \TUKWILA\19057—Storm WQ Retrof t DES ON Drown — AREA TREATED FOR STORMWATER RETROFIT SEE DESIGN PLANS FIGURE 3. SITE 5: INTERURBAN AVE S CITY OF TUKWILA STORMWATER QUALITY OUTFALL RETROFIT PROJECT KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627.0720 (206) 286-1640 www.kpg.com N ' CO (n C3 A c) LLJ — AREA TREATED FOR STORM WATER RETROFIT SEE DESIGN PLANS DUWAMISH RIVER FIGURE 4. SITE 7: EAST MARGINAL WAY S CITY OF TUKWILA STORMWATER QUALITY OUTFALL RETROFIT PROJECT OUTFALL TO GREEN—DUWAMISH RIVER 0 50 100 200 300 SCALE IN FE KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627.0720 (206)286-1640 www.kpg.com AREA TREATED FOR STORM WATER RETROFIT SEE DESIGN PLANS —OUTFALL TO DUWAMISH RIVER —RIVERTON CREEK 50 100 200 300 SCALE IN FEET FIGURE 5. SITE 8: TIB AT RIVERTON CREEK CITY OF TUKWILA STORMWATER QUALITY OUTFALL RETROFIT PROJECT KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627.0720 (206)286-1640 www.kpg.com City of Tukwila Storm Water Outfall Water Quality Retrofit Project Design Report 4. Applicability of Core Requirements The type of drainage review and the applicability of the Core and Special Requirements of the 2016 KCSWDM is dependent on the size and type of project. The project is a water quality retrofit project, and all replaced pavement is associated to utility work. Each site will trigger a drainage review since replaced pavement restoration will be over the 2,000 square foot threshold of new and replaced hard surfaces. There will be no additional roadway or infrastructure improvements associated with the project. Therefore, the project will not trigger Flow Control, Water Quality Treatment, or On -Site Stormwater BMPs. Erosion control plans will be developed as a part of the final design. 5. Alternatives Considered An alternative analysis evaluated eight outfalls to be considered for water quality improvements. The first step in the evaluation was to determine if "end -of -pipe" treatment was feasible. This task is dependent on an investigation of the existing drainage systems to determine sufficient hydraulic drop required for all GULD media filter devices without the use of stormwater lift stations. The task also considered known river data to determine if the pipe outfalls are surcharged during peak flows. Almost all sites lacked hydraulic drop in the existing system; therefore, end of pipe treatment may not be achieved for this project. Site 5 appears to be feasible; however, the City will need to acquire private property to locate the necessary facilities for a large basin retrofit. This outfall will be further evaluated under the City's program for future development. Since end of pipe treatment is not feasible entirely by gravity, the analysis focused on located untreated roadway right-of-way that is tributary to each outfall for all eight sites. Since the goal of this project is to remove TSS from runoff going to a minimum of two outfalls in the Duwamish-Green River basin, possible locations for treatment were evaluated on the amount of area that may be treated and the anticipated pollution generated by that roadway. See Table 1 for the decision matrix analysis and Appendix B for the associated work. The alternative analysis was presented to City Staff on January 23, 2020. Based on the meeting, the following four sites were selected to continue to a 90% Plans, Specification & Estimate per the Ecology Grant Agreement: • Priority Rank No. 1: Site 5 — Interurban Avenue South (Roadway Only) • Priority Rank No. 2: Site 8—Tukwila International Boulevard (TIB) at Riverton Creek • Priority Rank No. 3: Site 7 — East Marginal Way S • Priority Rank No. 5: Site 4 — Starfire Way Site 6, 48th Avenue S, ranked No. 4 in priority; however, a future roadway improvement project may include providing treatment for the roadway. As discussed above, a full basin retrofit may be feasible for Site 5; however, the evaluation to separately treat a large arterial roadway such as Interurban Avenue ranked high in the alternative selection. This project will be designed to consider the future plans to retrofit the basin's outfall. October 2020 11 KPG City of Tukwila Stormwater Outfall Water Quality Retrofits Site/Alternatives Evaluation ,1/4. a c oa 0 -, as .9 qa �� c c °m � co oi `.7 o iJ0awaJm\ �iae xc J o .-o aca o `ao � vc o o qo Alternatives Areas Costs Analysis (Qualitative) Site 1 -West Valley Highway 4 Feasibility of end of pipe treatment: Not feasible without pump station 1A Media filter units at existing CB locations except where existing conveyance geometry allows for a single unit downstream of several CBs Install up to 16 Filterra, Modular Wetland, or BioPod filters upstream of existing catch basins within tributary area and 1 "Shallow" 4x15 Modular Wetland in the existing shoulder 2.5 ac Arterial Road, Industrial / High 91% $870,000 $348,000 $8,000 Provides full treatment for roadway retrofit with changes to the existing conveyance system. Minimal roadway, sidewalk, and curb and gutter restoration. Single unit serving several CBs on west side makes this alternative most cost effective than 1B. Due to existing catch basin spacing, does not efficiently utilize WQ facility full capacity for each unit. However, offsite run-on from commercial property driveways will provide additional water quality benefit. Treatment systems limited to underground (no plantings). Congestion of sewer and water near existing CBs. High cost, high benefit. 113 Media filter units at existing CB locations Install up to 23 Filterra, Modular Wetland, or BioPod filters upstream of existing catch basins within tributary area 2.5 ac Arterial Road, Industrial / High 91% $940,000 $376,000 $10,000 Provides full treatment for roadway retrofit with minor changes to the existing conveyance system. Minimal roadway, sidewalk, and curb and gutter restoration. Due to existing catch basin spacing, does not efficiently utilize WQ facility full capacity for each unit. However, offsite run-on from commercial property driveways will provide additional water quality benefit. Treatment systems limited to underground (no plantings). Congestion of sewer and water near existing CBs. High cost, high benefit. Site 2 - Christensen Road 1 8 Feasibility of end of pipe treatment: Not feasible without pump station 2A Media filter units at existing CB locations Install up to 11 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area 0.55 ac Low Volume Roadway / Low 91% $460,000 $836,364 $5,000 Provides full treatment for roadway retrofit with minor changes to the existing conveyance system. Minimal roadway, sidewalk, and curb and gutter restoration. Low volume roadway, area is mostly used for hotel parking or trail access. Treatment systems limited to underground (no plantings). Recently developed sidewalk with curb and gutter on east side of Christensen road. Assisted Living Development currently in Construction on west side of road. High cost, low benefit Site 3 - Christensen Road 2 7 Feasibility of end of pipe treatment: Feasible with conveyance revision 3A Single Modular Wetland facility Install 1 "Shallow" 4x6 Modular Wetland unit on east side of Christensen at landscape island 0.50 ac Parking / Med 91% $200,000 $400,000 $600 Treatment of entire area with one unit. Unit may be placed in landscaping and may utilize open top systems. Low volume roadway, area is mostly used for hotel parking or trail access. Requires conveyance modifications. Recently developed area. Assisted Living Development currently in Construction on west side of road. High cost, medium benefit 3B Media filter units at existing CB locations Install up to 5 Filterra, Modular Wetland, or BioPod filters upstream of existing catch basins within tributary area 0.50 ac Parking /Med 91% $190,000 $380,000 $2,300 Provides full treatment of roadway. Low volume roadway, area is mostly used for hotel parking or trail access. Due to existing catch basin spacing, does not efficiently utilize WO facility full capacity for each unit. Treatment systems limited to underground (no plantings). Assisted Living Development currently in Construction on west side of road. High cost, medium benefit Page 1 City of Tukwila Stormwater Outfall Water Quality Retrofits c o 0, • •C* � o o \}a At.. \ate Oo o\o c, c °o •o•° �a �o �d Ja v cc 0 Alternatives Areas Costs Analysis (Qualitative) Site 4 - Starfire Way 6 Feasibility of end of pipe treatment: Not feasible without pump station. 4A Single Modular Wetland Unit upstream from outfall except where Media filter units are required at existing CB locations to pick up runoff not collected by single unit Install 1 "Shallow" 6x8 Modular Wetland west of Starfire access road and new conveyance in cul-de-sac. Install up to 2 Filterra, ModWet, or BioPod filters at catch basins within tributary area not treated within larger Mod Wetland Unit. 1.6 ac Access Road, Commercial, Parking / Med 91% $240,000 $150,000 $1,600 Treatment of major area with one unit. Unit may be placed in landscaping and may utilize open top systems. Unit may be placed in cul-de-sac area for decreased storm conveyance connection lengths and reduced impact to existing trees. Adjacent properties may be connected to roadway system which may increase the size of the facility. Requires conveyance modifications and upstream flow splitter with bypass system. If one unit placed in landscape area existing trees will need to be removed for trenching. Existing CB near intersection in left lane may have existing flow diversion to different outfall which may decrease size treatment are for 6 x 8 units, and require dditional unit(s) for Interuruban Ave. Low cost, medium benefit 4B Media filter units at existing CB locations Install up to 14 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area. 1.6 ac Access Road, Commercial, Parking / Med 91% $540,000 $337,500 $6,300 Provides full treatment of roadway. Due to existing catch basin spacing, does not efficiently utilize WQ facility full capacity for each unit. Catch basin locations area near existing curb ramps. High cost, medium benefit Site 5 - Interurban Ave S 1 Feasibility of end of pipe treatment: Feasible with conveyance revisions 5A Media filter units for Interurban Ave only Install 1- 4' x 21' Modular Wetland unit in existing sidewalk (closed top) or extend bulb out for open top (planted) configuration. 1.80 ac Arterial, Commercial / High 91% $250,000 $138,889 $1,000 Provides treatment of up to 1.80 acres of arterial roadway. Additional costs for curb and sidewalk modifications and restoration within intersection. Shortened bus pullout if curb bulb is extended. Utility coordination consists of existing water and King County Metro sewer force mains. Med cost, high benefit 5B Modular Wetland units for entire basin Install 4 8' x 20' Modular Wetland units in existing landscaped area adjacent to the Green River Trail for 58th Ave S basin and 14' x 19' unit for Interurban Avenue S. Property or easement acquired at 14220 Interurban Ave. So. (Location 1) or at 14101 Interurban Ave. So. (Location 2). 63.5 ac (approx. 4 DU/GA (42% effective impervio us)) Arterial, Commercial, Residential / Med 91% $980,000 $16,333 $12,000 Large basin end of pipe, water quality retrofit. Units may be planted. Facility Location 1 is adjacent to the existing trail which may provide a tool for stormwater educational outreach. Property acquisition or easement may be required for both locations. Unclear if existing drainage line easement would include this type of facility. Modification to conveyance system to provide flow splitter and high flow bypass. High value, but may require prop. acquisition SC Bioretention for treatment of 50% of entire basin Install 1 115' x 20' bottom bioretention area for 50% infiltrated treatment of 63.5 acres (58th Avenue basin) and 4' x 21' Modular Wetland unit for Interurban Avenue S. Property or easement acquired at 14220 Interurban Ave. So. (Location 1) or at 14101 Interurban Ave. So. (Location 2). 63.5 ac (approx. 4 DU/GA (42% effective impervio us) Arterial, Commercial, Residential / Med 50% $500,000 $8,333 $6,000 Open space treatment, with potential infiltration capacity that is adjacent to trail. Potential to create a "park" amenity and a tool for stormwater educational outreach. Does not provide full treatment of basin. Vertical walls required to provide necessary treatment bottom area. Existing trail will need to be relocated. Property acquisition or easement required. Easement does not allow for new parking per 1995 agreement. Geotechnical evaluation needed for separation of groundwater and soil suitability. High value, but requires prop. acquisition Page 2 City of Tukwila Stormwater Outfall Water Quality Retrofits Oo c o �,• •C* a av ,-^Qi2., m Q \b o�� .� ? �� .� o\o boy �o� ��•° oa a � w Q� ¢, ocl � 2� JC C�0 �i 0 Alternatives Areas Costs Analysis (Qualitative) Site 6 - 48th Ave S 5 Feasibility of end of pipe treatment: Not feasible without pump station 6A Media filter units at existing CB locations. Install up to 6 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area and 3 4x6 Modular Wetland Units in travel lane or sidewalk 2 ac Industrial, Commercial / High 91% $410,000 $205,000 $6,400 Adds treatment to industrial/arterial roadway near river. Potential complications due to existing utility congestion. May require more storm conveyance pipe and excavation. Med cost, high benefit Site 7 - E Marginal Way S (112th to Bridge over Duwamish) 3 Feasibility of end of pipe treatment: Not feasible without pump station 7A Media filter units at existing CB locations and utilize existing bioretention at Duwamish Gardens. Install up to 4 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area, and 2 4x6 Modular Wetland Units in sidewalk. Propose existing storm conveyance modifications to make connection to existing bioretention at Duwamish Gardens. 1.5 ac Industrial, Commercial / High 91% $330,000 $220,000 $2,900 May be able to utilize existing Bioretention area at Duwamish Gardens. Adds treatment to industrial/arterial roadway near river. Potential complications due to existing utility congestion. High cost, high benefit Site 8 - TIB at Riverton Creek 2 Feasibility of end of pipe treatment: Feasible 8A Modular Wetland units for entire basin (TIB and SR 599 treatment) Install 1 4' x 17' and 14' x 6' Modular Wetland unit. Will need to tv, flush, inspect storm conveyance upstream along Tukwila International Blvd. May need to extend and add extruded curb to capture runoff. 2 ac Aterial, freeway / High 91% $200,000 $100,000 $1,500 This is a high -value retrofit opportunity because runoff from 2 acres of high -traffic roadway can be treated using only two units. Potential complications due to WSDOT review and extra coordination with adjacent project. High value Page 3 City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report 6. Design Analysis This chapter documents the design of stormwater quality retrofit improvements for the four sites associated with this project, which include GULD approved media filters for Enhanced Basics Water Quality Treatment and storm drainage systems to convey stormwater to and from these BMPs. The approach to the design of is described in the following sections. Appendix A contains WWHM 2012 sizing calculations. Design plans are included in Appendix E. 6.1 MWS Unit Sizing The basis of design uses BioClean Linear Modular Wetlands Units and design requirements per the GULD. Other GULD approved technologies may be considered for the 90% PS&E. The City has implemented existing Modular Wetlands facilities and experience in their operation and maintenance. Five linear modular wetland units are proposed: one in TDA A, TDA B, and TDA C, and two in TDA D. Coordination review with BioClean per GULD will conducted prior to the 90% PS&E which will include developed details by BioClean and confirmation of unit costs for construction. MWS unit sizing is consistent with the requirements of the GULD and modeled using the water quality design flow rate. This design flow rate is the peak 15-minute flow rate as calculated using the latest version of the Western Washington Hydrology Model. A sizing matrix provided by BioClean is used for preliminary sizing and is based on the flow rate and available hydraulic head in the proposed system. Typically, it is difficult to achieve the standard unit 3.4 feet of head. Therefore facilities maybe sized larger and/or allow the upstream pipes to surcharge. The configuration will be refined with the vendor for the 90% submittal. WWHM sizing calculations are provided in Appendix A. Additionally, Appendix F contains a copy of the Department of Ecology's GULD Approval and operation & maintenance guidelines. 6.2 Conveyance System Design Per the KCSWDM, new pipe systems are required to be designed with sufficient capacity to convey and contain the 25-year peak flow. In addition, overflows resulting from the 100-year runoff event are required to be analyzed to verify that any such overflows will not create or aggravate a severe flooding problem or severe erosion problem. The project will add additional collection and conveyance systems to capture the targeted roadway areas for treatment and then reconnect to the existing outfall. Existing drainage systems appear to be adequate and any new pipes will match existing conveyance sizings. XP-Storm software by XP Solutions may be used for hydrologic and hydraulic modeling of the proposed drainage system. If warranted for City review, these calculations will be performed and provided in future submittals for the project. Flow splitter manholes may be required if internal flow splitting from the GULD devices cannot be achieved. The design of the flow splitter will be a part of the 90% PS&E submittal. October 2020 15 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report 7. Water Quality Benefit Treatment ratios have been calculated for the proposed MWS units funded by the Ecology stormwater grant. Detailed calculations are attached in Appendix B and are summarized below. Runoff Treatment Benefit As discussed in Section 6 and shown in the facility sizing calculations included in Appendix A, the proposed runoff treatment facilities have been designed to meet or exceed new and redevelopment design criteria, in that all proposed MWS facilities are sized to treat the water quality design flow rate. As a result, the flow control ratio is one. Therefore, the Equivalent New/Redevelopment Runoff Treatment Areas are as shown in Table 2. Table 2 — Runoff Treatment Benefit Site Runoff Treatment BMP PGIS Area Tributary to Treatment BMP New/Redevelopment Treatment Ratio Equivalent New/Redevelopment Treatment Area 4 8 x 12 Linear MWS Unit 1.158 ac 1 1.158 ac 5 4 x 19 Linear MWS Unit 1.526 ac 1 1.526 ac 7 4x4&4x17 Linear MWS Unit 0.923 ac 1 0.923 ac 8 4 x 8 Linear MWS Unit 1.884 ac 1 1.884 ac 8 4 x 4 Linear MWS Unit 0.358 ac 1 0.358 ac Total 5.85 ac 5.85 ac As a result, a total of 5.85 acres of existing pollution -generating impervious surfaces (PGIS) will be mitigated by this project. October 2020 16 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report 8. Cost Estimate A construction cost estimate has been prepared based on the current level of design (attached in Appendix D). The probable cost option for the project is currently estimated to be $1,975,500. The individual cost per site is as follows: • Site 4 — Starfire Way: • Site 5 — Interurban Avenue S: • Site 7 — East Marginal Way: • Site 8—TIB at Riverton Creek: 9. Proposed Schedule $ 450,057 $ 674,102 $ 778,985 $ 587,730 At this time the proposed schedule for completion of this project and fulfillment of the Ecology Grant Agreement is as follows: • Design Report Submittal: January 2021 • Design Report Review (45 days): January -March 2021 • 90% PS&E Submittal: March 2021 • Ecology Review of 90% PS&E (45 days): March -May 2021 • Final Submittal of 90% PS&E: May -June 2021 • Construction TBD The City may apply for future Department of Ecology Construction Grant Funding. Project construction schedule will be based on available funding (City or State). 10. Operation & Maintenance Operation and Maintenance information for the BioClean Linear Modular Wetland Stormwater Treatment System Units are included in Appendix F of this report. City of Tukwila maintenance crews will be responsible for the inspection and maintenance of all stormwater management facilities installed within the right of way for this project. October 2020 18 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report APPENDIX A — Stormwater Calculations October 2020 KPG City of Tukwila Water Quality Retrofits Project Runoff Treatment and Flow Control Ratio and Equivalent New/Redevelopment Area Calculations 7/30/2020 (Based on 30% Submittal) Runoff Treatment Ratio Calculation (methodology per Section D of Design Deliverables for Stormwter Projects with Ecology Funding , Revised June 2018) TDA A Treatment Ratio (for manufactured treatment device) = Design Flow Rate for proposed retrofit bioretention BMP Design Flow Rate to meet runoff treatment new/redevelopment criteria Tributary Area - Modular Wetlands (Total) Tributary Area - Modular Wetlands (PGIS) Flow rate treated for proposed retrofit: Flow rate to meet new/redevelopment criteria: Treatment Ratio: Equivalent New/Redevelopment Area: 1.158 ac 1.158 ac 0.188 cfs (see attached calcs) 0.188 cfs (as designed, meets new/redevel. criteria) 0.188 cfs/0.188 cfs = 1 1.158 ac x 1 = 1.158 ac TDA B Treatment Ratio (for manufactured treatment device) = Design Flow Rate for proposed retrofit bioretention BMP Design Flow Rate to meet runoff treatment new/redevelopment criteria Tributary Area - Modular Wetlands (Total) Tributary Area - Modular Wetlands (PGIS) Flow rate treated for proposed retrofit: Flow rate to meet new/redevelopment criteria: Treatment Ratio: Equivalent New/Redevelopment Area: 1.526 ac 1.526 ac 0.248 cfs (see attached calcs) 0.248 cfs (as designed, meets new/redevel. criteria) 0.248 cfs/0.248 cfs = 1 1.526 ac x 1 = 1.526 ac 1 City of Tukwila Water Quality Retrofits Project Runoff Treatment and Flow Control Ratio and Equivalent New/Redevelopment Area Calculations 7/30/2020 (Based on 30% Submittal) Runoff Treatment Ratio Calculation (methodology per Section D of Design Deliverables for Stormwter Projects with Ecology Funding , Revised June 2018) TDA C Treatment Ratio (for manufactured treatment device) = Design Flow Rate for proposed retrofit bioretention BMP Design Flow Rate to meet runoff treatment new/redevelopment criteria Tributary Area - Modular Wetlands (Total) Tributary Area - Modular Wetlands (PGIS) Flow rate treated for proposed retrofit: Flow rate to meet new/redevelopment criteria: Treatment Ratio: Equivalent New/Redevelopment Area: 1.045 ac 1.045 ac 0.170 cfs (see attached calcs) 0.170 cfs (as designed, meets new/redevel. criteria) 0.17 cfs/0.17 cfs = 1 1.045 ac x 1 = 1.045 ac TDA D - MWS 1 Treatment Ratio (for manufactured treatment device) = Design Flow Rate for proposed retrofit bioretention BMP Design Flow Rate to meet runoff treatment new/redevelopment criteria Tributary Area - Modular Wetlands (Total) Tributary Area - Modular Wetlands (PGIS) Flow rate treated for proposed retrofit: Flow rate to meet new/redevelopment criteria: Treatment Ratio: Equivalent New/Redevelopment Area: 1.884 ac 1.884 ac 0.306 cfs (see attached calcs) 0.306 cfs (as designed, meets new/redevel. criteria) 0.306 cfs/0.306 cfs = 1 1.884 ac x 1 = 1.884 ac TDA D - MWS 2 Treatment Ratio (for manufactured treatment device) = Design Flow Rate for proposed retrofit bioretention BMP Design Flow Rate to meet runoff treatment new/redevelopment criteria Tributary Area - Modular Wetlands (Total) Tributary Area - Modular Wetlands (PGIS) Flow rate treated for proposed retrofit: Flow rate to meet new/redevelopment criteria: Treatment Ratio: Equivalent New/Redevelopment Area: 0.358 ac 0.358 ac 0.033 cfs (see attached calcs) 0.033 cfs (as designed, meets new/redevel. criteria) 0.033 cfs/0.033 cfs = 1 0.358 ac x 1 = 0.358 ac Total Equivalent New/Redevelopment Area for TDA D : 1.884 ac + 0.356 ac = 2.243 ac 2 City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report WWHM 2012 Calculations -RH' `" i'.•A▪ - g "VEITe . I:•r1T _ '.:] y`." ''s t4. .4A6 riuT :e 'e r. i� .:;, \ ▪ lip .N tiler,. 1 6f 1 a• lac-{ -Prismrit ��yy nr y ' ',�t x 1 LI... �. z �[ � �lI �� rf= - I ,fir ` s— i Qia !!,7lri.b— a . Timestep r 5-Minute G 15-Minute C' 30-Minute C' Hourly r Daily Project Run Time Start 11948/10/01 00:00 End 12009/09/30 24:00 na.r ,ern San October 2020 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report Site 4: TDA A '.ite4A Mitigated Subbasin Name: Site 4 i i Designate as Bypass for FOG: Surface Interlow Groundwater Flows To : F ! 1 I Area in Basin Available Pervious Acres I i Show Only Selected Available Impervious Acres 1d ROADS/FLAT 1.758 al Ana lysis Run Analysis Water Quality On -Line DMP Off -Line l3MP 24 hour Volume (ac-ft) IB.1424 Standard Flom Rate (cfs[ Io11 .1 Standard Flow Rate (cfs) 0.1➢E3 Stream Protection Duration J LID Dtration j Flow Frequency Water quality 1 H drograph Wetland Input Volumes Analyze datasets LID Report King2012 Recharge ' Recharge Predeveloped I Recharge Mitigated Compact WDM I Delete Selected FF I T 1 501 PO C 1 Predeveloped ffolr 801 POC 1 Miti ated Hove October 2020 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report Site 5: TDA B 2 Basin .1 Mitigated Subbasin Name: Flows To : Sife 5 I r Designate as Bypass for FOC: Surface Area in Basin Available Pervious Acres Interflow Groundwater I Show Only Selected Available Impervious Acres i ROADS/FLAT I I1.52E: Rix Analysis Water quality On -Line BMP 24 hour Volume lac-ftl Standard Flow Rate (cfs) 0.1878 Q.2479 Off -Line IMP Standard Flow Rate Ids) 0.1400 Stream Protection Duration I LID Duration Flow Frequency Water quality Wetland Input Volumes Hydrograph LID Report King2012 Recharge Recharge Redeveloped 1 Recharge Mitigated Analyze datasets Compact WDM Delete Selected I r Monthly FF 501 POC 1 Redeveloped flow 801 POC 1 Mi4gaked flout October 2020 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report Site 7: TDA C n SAE Mitigated Subbasin Name:ISite 7.W I I Designate as Bypass for FOC: Surface Inferflow Groundwater Flows To I I I I I Area in Basin Available Pervious Acres W Show Only Selected Available Impervious Acres Tv ROADS/FLAT I.923 ArratysT= Rum Rnalys.K • Water Quality On -Line BHP 24 hour Volume lac-ft) 10.1135 Standard Flow Rate (cis) 101499 Off -Line BHP Standard Flow Rate (cis) 0.0847 Stream Protection Duration 1 LID Duration j Flow Frequency Water Quality J Hydrograph I Wetland Input Volumes , LID Report , King2012 Recharge 1 Recharge Predeveloped , Recharge Mitigated Analyze datase.ts Compact WDM I Delete Selected I r Monthly FF .+ 502 POC 2 Predeveloped flow 802 POC 2 Miti aked flaw 1 October 2020 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report Site 8: TDA C Site a Mitigated Subbasin Name: Site 8A 1 I— Designate as Bypass for POC: Surface Flows To : Area in Basin Available Pervious Acres Interflaw Groundwater IT Show Only Selected Available Impervious Acres i,7 ROADS/FLAT 1,884 51 Run Analysis Water Duality On -Line BMP 24 hour Volume lac-ftj 10.217 Standard Flow Rate (cis) 10.2060 Off -Line BHP Standard Flow Rate (cfs) 0,1729 Stream Protection Duration 1 LID Duration Flow Frequency Water Duality Hydrograph Wetland Input Volumes , LID Report 1 King2012 Recharge Recharge Predeveloped Recharge Mitigated Analyze datasets Compact WDM J Delete Selected Monthly FF 508 POC 3 Predeveloped How 803 POC 3 Mitigated flaw October 2020 KPG City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report SFtE Bb Mrtlgated Subbasin Name:lSite 8b I I Designate as Bypass for POC: Flows To : Surface Area in Basin Interflow Groundwater W Show Only Selected Available Pervious Acres Available Impervious Acres FIQADS/FLAT i.368 aAnafyais 61 Run Analysis Water Duality On -Line BMP 24 hour Volume (ac-ft) 0.8440 Standard Flom Rate (cfs) l0.0581. OR -Line BMP kandard Flom Rate (cfs) 0.0328 Stream Protection Duration J LID Duration I Flom Frequency Water Duality I Hydrograph Wetland Iripuk Volumes LID Report j Kir7g2012 Recharge _Recharge Redeveloped Recharge Mitigated Analyze datasets Compact WDM I Delete Selepted I r fYlarrkhlsf FF I 504 POC 4 Redeveloped flow 804. POC 4 Mitioated floww October 2020 KPG MWS LINEAR 2.0 HGL SIZING CALCULATIONS uPETLANFD MWS MODEL SIZE WETLAND PERMITER LENGTH LOADING RATE GPM/SF HGL HEIGHT SHALLOW MODELS MIMI HEIGHT MODEL HIGH CAPACITY MODELS 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.65 3.70 3.75 3.80 3.85 3.90 3.95 MWS-L-4-4 6.50 1.0000 0.020 0.022 0.023 0.025 0.026 0.028 0.029 0.030 0.032 0.033 0.035 0.036 0.038 0.039 0.041 0.042 0.043 0.045 0.046 0.048 0.049 0.052 0.054 0.054 0.055 0.056 0.057 0.057 0.058 0.059 MWS-L-3-6 10.06 1.0000 0.031 0.034 0.036 0.038 0.040 0.043 0.045 0.047 0.049 0.052 0.054 0.056 0.058 0.061 0.063 0.065 0.067 0.069 0.072 0.074 0.076 0.078 0.081 0.082 0.085 0.087 0.088 0.089 0.090 0.091 MWS-L-4-8 14.80 III 1.0334 0.048 0.051 0.055 0.058 0.061 0.065 0.068 0.072 0.075 0.078 0.082 0.085 0.089 0.092 0.095 0.099 0.102 0.106 0.109 0.112 0.116 0.119 0.123 0.124 0.126 0.127 0.129 0.131 0.132 0.134 MWS-L-4-13 18.40 1.0310 0.059 0.063 0.068 0.072 0.076 0.080 0.085 0.089 0.093 0.097 0.101 0.106 0.110 0.114 0.118 0.123 0.127 0.131 0.135 0.139 0.144 0.148 0.152 0.154 0.156 0.158 0.160 0.163 0.165 0.167 MWS-L-4-15 22.40 1.0307 0.072 0.077 0.082 0.087 0.093 0.098 0.103 0.108 0.113 0.118 0.123 0.129 0.134 0.139 0.144 0.149 0.154 0.159 0.165 0.170 0.175 0.180 0.185 0.188 0.190 0.193 0.195 0.198 0.200 0.203 MWS-L-4-17 26.40 1.0305 0.085 0.091 0.097 0.103 0.109 0.115 0.121 0.127 0.133 0.139 0.145 0.152 0.158 0.164 0.170 0.176 0.182 0.188 0.194 0.200 0.206 h 0.212 0.218 0.221 0.224 0.227 0.230 0.233 0.236 0.239 MWS-L-4-19 30.40 1.0255 0.097 0.104 0.111 0.118 0.125 0.132 0.139 0.146 0.153 0.160 0.167 0.174 0.181 0.188 0.194 0.201 0.208 0.215 0.222 0.229 0.236 h 0.243 0.250 0.254 0.258 0.262 0.265 0.269 0.272 0.276 MWS-L-4-21 34.40 1.0260 0.110 0.118 0.126 0.134 0.142 0.149 0.157 0.165 0.173 0.181 0.189 0.197 0.204 0.212 0.220 0.228 0.236 0.244 0.252 0.260 0.267 0.275 0.283 0.287 0.292 0.296 0.300 0.304 0.308 0.312 MWS-L-8-12 44.40 1.0300 0.143 0.153 0.163 0.173 0.183 0.194 0.204 0.214 0.224 0.234 0.245 0.255 0.265 0.275 0.285 0.296 0.306 0.316 0.326 0.336 IIIIIII 0.357 0.367 0.372 0.377 L 0.382 0.387 0.392 0.397 0.402 MWS-L-8-16 59.20 1.0300 0.190 0.204 0.217 0.231 0.245 0.258 0.272 0.285 0.299 0.312 0.326 0.340 0.353 0.367 0.380 0.394 0.408 0.421 0.435 0.448 0.462 0.476 0.489 0.496 0.503 0.509 0.516 0.523 0.530 0.537 Modular Wetland Systems, Inc. Copyright 2013 www.modularwetlands.com info@modularwetlands.com P: 760-433-7640 2972 San Luis Rey Road, Oceanside CA 92058 City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report APPENDIX B — Alternative Analysis October 2020 KPG City of Tukwila Stormwater Outfall Water Quality Retrofits Site/Alternatives Evaluation ,1/4. a c oa 0 -, as .° qa �� c c °m � co oi `.7 o iJ0awaJm\ �iae xc J o .-o aca o `ao � vc o o qo Alternatives Areas Costs Analysis (Qualitative) Site 1 -West Valley Highway 4 Feasibility of end of pipe treatment: Not feasible without pump station 1A Media filter units at existing CB locations except where existing conveyance geometry allows for a single unit downstream of several CBs Install up to 16 Filterra, Modular Wetland, or BioPod filters upstream of existing catch basins within tributary area and 1 "Shallow" 4x15 Modular Wetland in the existing shoulder 2.5 ac Arterial Road, Industrial / High 91% $870,000 $348,000 $8,000 Provides full treatment for roadway retrofit with changes to the existing conveyance system. Minimal roadway, sidewalk, and curb and gutter restoration. Single unit serving several CBs on west side makes this alternative most cost effective than 1B. Due to existing catch basin spacing, does not efficiently utilize WQ facility full capacity for each unit. However, offsite run-on from commercial property driveways will provide additional water quality benefit. Treatment systems limited to underground (no plantings). Congestion of sewer and water near existing CBs. High cost, high benefit. 113 Media filter units at existing CB locations Install up to 23 Filterra, Modular Wetland, or BioPod filters upstream of existing catch basins within tributary area 2.5 ac Arterial Road, Industrial / High 91% $940,000 $376,000 $10,000 Provides full treatment for roadway retrofit with minor changes to the existing conveyance system. Minimal roadway, sidewalk, and curb and gutter restoration. Due to existing catch basin spacing, does not efficiently utilize WQ facility full capacity for each unit. However, offsite run-on from commercial property driveways will provide additional water quality benefit. Treatment systems limited to underground (no plantings). Congestion of sewer and water near existing CBs. High cost, high benefit. Site 2 - Christensen Road 1 8 Feasibility of end of pipe treatment: Not feasible without pump station 2A Media filter units at existing CB locations Install up to 11 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area 0.55 ac Low Volume Roadway / Low 91% $460,000 $836,364 $5,000 Provides full treatment for roadway retrofit with minor changes to the existing conveyance system. Minimal roadway, sidewalk, and curb and gutter restoration. Low volume roadway, area is mostly used for hotel parking or trail access. Treatment systems limited to underground (no plantings). Recently developed sidewalk with curb and gutter on east side of Christensen road. Assisted Living Development currently in Construction on west side of road. High cost, low benefit Site 3 - Christensen Road 2 7 Feasibility of end of pipe treatment: Feasible with conveyance revision 3A Single Modular Wetland facility Install 1 "Shallow" 4x6 Modular Wetland unit on east side of Christensen at landscape island 0.50 ac Parking / Med 91% $200,000 $400,000 $600 Treatment of entire area with one unit. Unit may be placed in landscaping and may utilize open top systems. Low volume roadway, area is mostly used for hotel parking or trail access. Requires conveyance modifications. Recently developed area. Assisted Living Development currently in Construction on west side of road. High cost, medium benefit 3B Media filter units at existing CB locations Install up to 5 Filterra, Modular Wetland, or BioPod filters upstream of existing catch basins within tributary area 0.50 ac Parking /Med 91% $190,000 $380,000 $2,300 Provides full treatment of roadway. Low volume roadway, area is mostly used for hotel parking or trail access. Due to existing catch basin spacing, does not efficiently utilize WO facility full capacity for each unit. Treatment systems limited to underground (no plantings). Assisted Living Development currently in Construction on west side of road. High cost, medium benefit Page 1 City of Tukwila Stormwater Outfall Water Quality Retrofits c o 0, • •C* � o o \}a At.. \ate Oo o\o c, c °o •o•° �a �o �d Ja v cc 0 Alternatives Areas Costs Analysis (Qualitative) Site 4 - Starfire Way 6 Feasibility of end of pipe treatment: Not feasible without pump station. 4A Single Modular Wetland Unit upstream from outfall except where Media filter units are required at existing CB locations to pick up runoff not collected by single unit Install 1 "Shallow" 6x8 Modular Wetland west of Starfire access road and new conveyance in cul-de-sac. Install up to 2 Filterra, ModWet, or BioPod filters at catch basins within tributary area not treated within larger Mod Wetland Unit. 1.6 ac Access Road, Commercial, Parking / Med 91% $240,000 $150,000 $1,600 Treatment of major area with one unit. Unit may be placed in landscaping and may utilize open top systems. Unit may be placed in cul-de-sac area for decreased storm conveyance connection lengths and reduced impact to existing trees. Adjacent properties may be connected to roadway system which may increase the size of the facility. Requires conveyance modifications and upstream flow splitter with bypass system. If one unit placed in landscape area existing trees will need to be removed for trenching. Existing CB near intersection in left lane may have existing flow diversion to different outfall which may decrease size treatment are for 6 x 8 units, and require dditional unit(s) for Interuruban Ave. Low cost, medium benefit 4B Media filter units at existing CB locations Install up to 14 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area. 1.6 ac Access Road, Commercial, Parking / Med 91% $540,000 $337,500 $6,300 Provides full treatment of roadway. Due to existing catch basin spacing, does not efficiently utilize WQ facility full capacity for each unit. Catch basin locations area near existing curb ramps. High cost, medium benefit Site 5 - Interurban Ave S 1 Feasibility of end of pipe treatment: Feasible with conveyance revisions 5A Media filter units for Interurban Ave only Install 1- 4' x 21' Modular Wetland unit in existing sidewalk (closed top) or extend bulb out for open top (planted) configuration. 1.80 ac Arterial, Commercial / High 91% $250,000 $138,889 $1,000 Provides treatment of up to 1.80 acres of arterial roadway. Additional costs for curb and sidewalk modifications and restoration within intersection. Shortened bus pullout if curb bulb is extended. Utility coordination consists of existing water and King County Metro sewer force mains. Med cost, high benefit 5B Modular Wetland units for entire basin Install 4 8' x 20' Modular Wetland units in existing landscaped area adjacent to the Green River Trail for 58th Ave S basin and 14' x 19' unit for Interurban Avenue S. Property or easement acquired at 14220 Interurban Ave. So. (Location 1) or at 14101 Interurban Ave. So. (Location 2). 63.5 ac (approx. 4 DU/GA (42% effective impervio us)) Arterial, Commercial, Residential / Med 91% $980,000 $16,333 $12,000 Large basin end of pipe, water quality retrofit. Units may be planted. Facility Location 1 is adjacent to the existing trail which may provide a tool for stormwater educational outreach. Property acquisition or easement may be required for both locations. Unclear if existing drainage line easement would include this type of facility. Modification to conveyance system to provide flow splitter and high flow bypass. High value, but may require prop. acquisition SC Bioretention for treatment of 50% of entire basin Install 1 115' x 20' bottom bioretention area for 50% infiltrated treatment of 63.5 acres (58th Avenue basin) and 4' x 21' Modular Wetland unit for Interurban Avenue S. Property or easement acquired at 14220 Interurban Ave. So. (Location 1) or at 14101 Interurban Ave. So. (Location 2). 63.5 ac (approx. 4 DU/GA (42% effective impervio us) Arterial, Commercial, Residential / Med 50% $500,000 $8,333 $6,000 Open space treatment, with potential infiltration capacity that is adjacent to trail. Potential to create a "park" amenity and a tool for stormwater educational outreach. Does not provide full treatment of basin. Vertical walls required to provide necessary treatment bottom area. Existing trail will need to be relocated. Property acquisition or easement required. Easement does not allow for new parking per 1995 agreement. Geotechnical evaluation needed for separation of groundwater and soil suitability. High value, but requires prop. acquisition Page 2 City of Tukwila Stormwater Outfall Water Quality Retrofits Oo c o �,• •C* a av ,-^Qi2., m Q \b o�� .� ? �� .� o\o boy �o� ��•° oa a � w Q� ¢, ocl � 2� JC C�0 �i 0 Alternatives Areas Costs Analysis (Qualitative) Site 6 - 48th Ave S 5 Feasibility of end of pipe treatment: Not feasible without pump station 6A Media filter units at existing CB locations. Install up to 6 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area and 3 4x6 Modular Wetland Units in travel lane or sidewalk 2 ac Industrial, Commercial / High 91% $410,000 $205,000 $6,400 Adds treatment to industrial/arterial roadway near river. Potential complications due to existing utility congestion. May require more storm conveyance pipe and excavation. Med cost, high benefit Site 7 - E Marginal Way S (112th to Bridge over Duwamish) 3 Feasibility of end of pipe treatment: Not feasible without pump station 7A Media filter units at existing CB locations and utilize existing bioretention at Duwamish Gardens. Install up to 4 Filterra, ModWet, or BioPod filters upstream of existing catch basins within tributary area, and 2 4x6 Modular Wetland Units in sidewalk. Propose existing storm conveyance modifications to make connection to existing bioretention at Duwamish Gardens. 1.5 ac Industrial, Commercial / High 91% $330,000 $220,000 $2,900 May be able to utilize existing Bioretention area at Duwamish Gardens. Adds treatment to industrial/arterial roadway near river. Potential complications due to existing utility congestion. High cost, high benefit Site 8 - TIB at Riverton Creek 2 Feasibility of end of pipe treatment: Feasible 8A Modular Wetland units for entire basin (TIB and SR 599 treatment) Install 1 4' x 17' and 14' x 6' Modular Wetland unit. Will need to tv, flush, inspect storm conveyance upstream along Tukwila International Blvd. May need to extend and add extruded curb to capture runoff. 2 ac Aterial, freeway / High 91% $200,000 $100,000 $1,500 This is a high -value retrofit opportunity because runoff from 2 acres of high -traffic roadway can be treated using only two units. Potential complications due to WSDOT review and extra coordination with adjacent project. High value Page 3 a.. MIL MINKLER BLVD I PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 20.5 +f Y RIM=26.60 IE OUT=25.10 RIM 26.30 IE OUT=23.74 RIM=25.10 IE OUT=22.90 RIM=27 IE OUT=23.05 RIM=26.30 IE OUT=22.84 RIM=26.70 IE OUT=22.48 RIM 26.60 IE OUT=22 RIM 27 IE OUT=21.62 RIM 26.60 GIS MISS CONNECTION TO MAINLINE? RIM=27 IE OUT=20.31 RIM=27.90 IE=19 CB in curb cut EXISTING OUTFALL EXISTING OUTFALL NO. 15 WITH FLAP GATE IE 21.20 RIM=27.00 IE OUT=24.24 RIM=26.80 E OUT=23.70 POTENTIAL TREATMENT AREA RIM=26.40 IE IN=24.50 E IE IN=22.90 W RIM=26.30 IE IN=23.90 N IE OUT=24.80 IE OUT= 23.10 S RIM=26.50 IE OUT=22.76 RIM=26.00 IE OUT=24.17 RIM=26.70 IE IN N=22.20 IE IN W=24.10 IE OUT S=22.28 RIM=27.08 IE OUT=21.80 RIM=26.60 IE OUT=22.04 R M=26.80 IE OUT=22 R M=26.90 IE OUT=21.27 RIM-26.80 IE OUT=20.50 RIM=27.10 IE OUT=20.65 R M=28.10 IE OUT=20.26 RIM=28.80 GIS SHOWS CB, BUT NO CONNECTION TO STORM CONVEYANCE. SEE TREATMENT OPTION FIGURES SITE ALT-1A & ALT-1 B TREATMENT SITE #1 TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT 0 50 150 300 450 SITE #1 TREATMENT AREA: 2.5 AC Interdisciplinary Design 3131 Elliott Ave Suite 400 Seattle. WA 98121 23 S Wenatchee Ave Suite 223 Wenatchee, WA 96801 (206) 286-1640 i (509) 663-2711 www.k goon) CITY WATER CITY SANITARY SEWER TYPE 1 CB (TYP) PROPOSED STORM PIPE 4' X 15' MODULAR WETLAND UNIT IN EXISTING SHOULDER FOR WESTSIDE OF W WEST VALLEY HWY BASIN. PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 20.5 TREATMENT SITE #1- ALT 1A TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT I4' X 4' MODULAR WETLAND UNIT REPLACE OR SET UPSTREAM AND TIE -INTO EXISTING CB (TYP) 0 25 50 100 150 SITE #1 TREATMENT AREA: 2.5 AC Kp� Interdisciplinary Design 3131 Elliott Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663.2711 wwm.kpg.cam PRELIMINARY DESIGN •• -TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE vIINELEV = 20.5 El TREATMENT SITE #1- ALT 1B TUKWILA WATER QUALITY RETROFIT PLANNING CITY SANITARY SEWER 'WI .,I.. EXISTING' OUTFALL LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT 4' X 4' MODULAR WETLAND UNIT REPLACE OR SET UPSTREAM AND TIE -INTO EXISTING CB (TYP) 0 50 100 200 300 SITE #1 TREATMENT AREA: 2.5 AC Kp� Interdisciplinary Design 3131 Elliott Ave Suite 400 Seattle. WA 98121 23 S Wenatchee Ave Suite 223 Wenatchee, WA 98801 (206) 286-1640 I (509) 663-2711 www.k g,com NEW ASSISTED LIVING CURRENTLY UNDER DEVELOPMENT 4' X 4' MODULAR WETLAND UNIT REPLACE OR SET UPSTREAM AND TIE -INTO EXISTING CB (TYP) PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 17.5 TREATMENT SITE #2 - ALT2A TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT RIM=28.90 IE OUT=18.87 IE OUT=23.40 IS RIM ELEV: 22.80 'GIS CONTOUR ELEV:23 0 25 50 100 150 SITE #2 TREATMENT AREA: 0.55 AC Kp� Interdiscipinary Design 3131 Elliott Ave Suite 400 Seattle, WA 98121 23 S Wenatchee Ave Suite 223 Wenatchee, WA 98801 (206) 286-1640 I (509) 663.2711 wew.kpg.com 0 <W LA PA<WAY CITY WATER Solid Lid RIM=29.90 IE OUT=25.08 RIM=26.90 IE OUT=23.99 Couldn't find in field. 1111111RIM=30.60 IE IN=25.10 IE OUT=22.37 NEW ASSISTED LIVING CURRENTLY UNDER DEVELOPMENT PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 17.5 RIM=26.60 IE OUT=23.10 POTENTIAL TREATMENT AREA VERIFY WITH NEW DEVELOPMENT Vaned lid in C&G RIM=29.30 IE OUT=24.96 PROPOSED STORM PIPE PROPOSED CB (TYP) 4'x6' MODULAR WETLAND UNIT CLOSED TOP OR SHIFTED TO LANDSCAPE FOR CONFIGURATION GIS DRAIN POINT ELEV: 22.80 GIS CONTOUR ELEV: 22.00 EXISTING OUTFALL LEGEND TREATMENT SITE #3 - ALT3A TUKWILA WATER QUALITY RETROFIT PLANNING EXISTING CATCH BASIN EXISTING STORM PIPE PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT 0 30 60 90 SITE #3 TREATMENT AREA: 0.50 AC Interdiscipinary Design 3131 Elliott Ave Suite400 Seattle, WA 98121 23 S Wenatchee Ave Suite 223 Wenatchee, WA 98801 (206) 286-1640 1(509) 663.2711 waw.kpg.com <WLA PA CITY WATER Solid Lid RIM=29.90 IE OUT=25.08 RIM=26.90 IE OUT=23.99 Couldn't find in field. 111111111M=30.60 IE IN=25.10 IE OUT=22.37 NEW ASSISTED LIVING CURRENTLY UNDER DEVELOPMENT PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 17.5 rnx RIM=26.60 IE OUT=23.10 tt TREATMENT SITE #3 - ALT3B TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE PROPOSED CATCH BASIN PROPOSED STORM PIPE • PROPOSED TREATMENT POTENTIAL TREATMENT AREA VERIFY WITH NEW DEVELOPMENT Vaned lid in C&G RIM=29.30 IE OUT=24.96 4'x4' MODULAR WETLAND UNIT REPLACE OR SET UPSTREAM AND TIE -INTO EXISTING CB (TYP) EXISTING OUTFALL GIS DRAIN POINT ELEV: 22.80 GIS CONTOUR ELEV: 22.00 0 30 60 90 SITE #3 TREATMENT AREA: 0.50 AC Interdiscipinary Design 3131 Elliott Ave Suite400 Seattle, WA 98121 23 S Wenatchee Ave Suite 223 Wenatchee, WA 98801 (206) 286-1640 1(509) 663.2711 waw.kpg.com PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 16.75 GIS OUTLET ELEV: 12.90 24" CMP GIS CONTOUR ELEV:17 VERIFY DRAIN POINT GIS ELEV: 33.10 CURRENTLY UNDER DEVELOPMENT TREATMENT SITE #4 EXISTING OUTFALL VERIFY DRAIN POINT GIS ELEV: 32.60 CURRENTLY UNDER DEVELOPMENT GIS RIM ELEV: 35.90 IE SW 32.20 1IE W 31.94 IE NE 31.94 FLOW SPLIT Air" TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT POTENTIAL TREATMENT AREA GIS: SOLID MANHOLE LID DRAIN POINT GIS ELEV: 29.20 DRAIN POINT GIS ELEV: 28.60 GIS: 48" LINE APPROXIMATE LOCATION USGS GAGE 12113350 GREEN RIVER AT TUKWILA, WA DATUM: NGVD 1929 0 75 150 300 DRAIN POINT r GIS TOP OF RIVERBANK: 26.60. GIS CONTOUR ELEV:26.40 *�1 SEE TREATMENT OPTION FIGURES SITE ALT-4A & ALT-4B SITE #4 TREATMENT AREA: 1.6 AC Interdisciplinary Design 3131 Elliott Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA98801 (206)286-1640 (509) 663-2711 mak Scorn RIM=30.40 IE in=15.20 IE out=14.54 8' X 16' MODULAR WETLAND UNIT CLOSED TOP CONFIGURATION, FOR FORT DENT WAY TREATMENT AREA IE IN= 22.2 IE OUT= 22.0 RIM= 27.5 PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 16.75 Noticeable triangular area that doesn't get much traffic. RIM=27.50 IE in=16.10 IE out=16.00 4x4 MODULAR WETLAND UNIT TIE -INTO EX CB TREATMENT SITE #4 - ALT4A TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT atM=28.00 in= 16.78 NE in = 21.50 SE in= 22.2 SW E out =16.40 W TYPE 1 CB WITH SHALLOW firliliall*RIM=27.19 E out=16.92 0 10 20 40 60 RIM=27.40 IEINN=22.9 IE OUT NW = 22.67 VANED TYPE 1 IE IN NW = 36" MEASURE DOWN IE OUT SW = OIL SEP SITE #4 TREATMENT AREA: 1.6 AC Kp� Interdiscipinary Design 3131 Elliott Ave Suite400 Seattle, WA 98121 23 S Wenatchee Ave Suite 223 Wenatchee, WA 98801 (206) 286-1640 1(509) 663.2711 waw.kpg.com PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 16.75 EXISTING OUTFALL 4' X 4' MODULAR WETLAND UNIT REPLACE OR SET UPSTREAM AND TIE -INTO EXISTING CB (TYP) TREATMENT SITE #4 - ALT4B LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE TUKWILA WATER QUALITY RETROFIT PLANNING • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT CITY SANITARY SEWER CITY WATER 0 25 50 100 150 SITE #4 TREATMENT AREA: 1.6 AC Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 mak porn BASIN RETROFIT SEE TREATMENT OPT ONS ON FIGURES 5B & 5C SITE 5 PRELIMINARY DESIGN TAILWATER CONDITION 1ELEV = 15.5TYP WINTER/SPRING, HIGH TIDE "• ELEV = 15.5 S 144TH ST S 149TH ST TREATMENT SITE #5 TUKWILA WATER QUALITY RETROFIT PLANNING S 142ND ST S 14/IH ST LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT EXISTING 'OUTFALL GREEN RIVER SURFACE RETROFIT SEE OPTION 5A OUTFALL BASIN AREA (APPROX.) S 149TH ST 0 50 150 300 450 OUTFALL BASIN AREA (APPROX.) SEE TREATMENT OPTION FIGURES SITE ALT-5A, ALT-5B, & ALT-5C SITE #5 TOTAL BASIN AREA: 63.6 AC Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 mak g,com LOCATION OPTION 2 4 - 8' X 20' MODULAR WETLAND UNITS PLANTED OR CLOSED TOP CONFIGURATION IN EXISTING PARKING LOT, FOR 58TH AVE S SUB -BASIN PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 15.5 TREATMENT SITE #5B TUKWILA WATER QUALITY RETROFIT PLANNING TIDEFLEX VALVE AT OUTFALL TO EXISTING STORM DRAIN RIM=22.90 IE OUT = 14.09 LEGEND RIVERSIDE CASINO FLOW SPLITTER EXISTING CATCH BASIN EXISTING STORM PIPE • • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT 0 10 20 40 60 LOCATION OPTION 1 4 - 8' X 20' MODULAR WETLAND UNITS (PLANTED) IN EXISTING LANDSCAPE AREA OR CLOSED TOP CONFIGURATION IN EXISTING PARKING LOT, FOR 58TH AVE S SUB -BASIN REALIGN GRAVEL PATH 4' X 19' MODULAR WETLAND UNIT (PLANTED) IN EXISTING LANDSCAPE AREA OR CLOSED TOP CONFIGURATION IN EXISTING PARKING LOT, FOR INTERURBAN AVE SUB -BASIN FAIRWAY CENTER 4' X 21' MODULAR WETLAND UNIT FOR INTERURBAN AVE SAME AS ALTERNATIVE 5A SITE #5 TOTAL BASIN AREA: 63.6 AC TREATMENT AREA: 60.0 AC Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 www.k g,com IE = 19.4 CONNECT TO OUTFALL PIPE INSTALL TIDE FLEX VALVE TO NEW PIPE EXISTING UTILITY POLES FLOW SPLITTER GREEN RIVER EXISTING OUTFALL OVERLFLOW STRUCTURE' 115' X 20' BOTTOM AREA BIORETENTION CELL WITH UNDERDRAIN, WALLS ON TWO SIDES FAIRWAY CENTER RESTORE GREEN RIVER TRAIL WITH POTENTIAL TRAILHEAD IMPROVEMENTS 4' X 21' MODULAR WETLAND UNIT FOR INTERURBAN AVE SAME AS ALTERNATIVE 5A PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 15.5 TREATMENT SITE #5C TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT 0 10 20 40 60 SITE #5 TOTAL BASIN AREA: 63.6 AC TREATMENT AREA: 32.0 AC Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 mak porn PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 15.5 LOW SPLITTER TREATMENT SITE #5A TUKWILA WATER QUALITY RETROFIT PLANNING CONNECT TO EXISTING STRUCTURE EXISTING UTILITY POLES 4' X 21' MODULAR WETLAND UNIT LOCATED IN EXISTING CURB BULB AS CLOSED TOP OR EXTENDED CURB BULB TO BE PLANTED FOR INTERURBAN AVE SUB -BASIN LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT FAIRWAY CENTER 0 10 20 40 60 SURFACE TREATMENT AREA FROM INTERURBAN AVE S � r , SITE #5 TOTAL BASIN AREA: 63.6 AC TREATMENT AREA: 1.8 AC Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 mak porn 4x4 MODULAR WETLAND UNIT REPLACE OR SET UPSTREAM AND TIE -INTO EXISTING CB (TYP) RIM=18.2 IE IN NW =NEAR 14.25 IE OUT=14.15 INLET IN SWALE IE IN OPEN DRAIN IE OUT SW R ` INLET IN SWALE IEIN44"N IE IN 44" NE IEIN44"SW IE OUT 44" SE TO CITY S „PRELIMINARY DESIGN �S9 1TAILWATER CONDITION 9 t TYP WINTER/SPRING, HIGH TIDE ELEV\ 14.0 TREATMENT SITE #6 TUKWILA WATER QUALITY RETROFIT PLANNING RIM=17.40 IE OUT=13.56 LEGEND RIM=20.40 IE OUT=16.77 GIS: CONC. 24" DIAM. SLOPE RIM=18.80 IE OUT=? RIM=19.10 IE OUT=15.73 RIM=18.80 IE OUT=? SOUD LID RIM=19.30 IE OUT=11.87 RIM=18 � RIM=18.10 IE OUT=12.90 i IE OUT=12.90 EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT _--INLET IE IN NE IE OUT NW OIL SEP <0 RIM=17.60 '- SOLID LID RIM=18.70 IE OUT=13.29 IE IN NW IE IN SW IE IN SE SOLID LID RIM=18 ,OUT NE=12.64 IE OUT=13.60 SOLID LID RIM=18 60' R IE OUT=13.99 0 50 100 200 300 RIM=19.50 IE OUT=16.21 SOLID LID RIM=19.60 IE OUT=10.65 AL EXISTING OUTFALL GIS OUTLET ELEV: 8.80 GIS CONTOUR ELEV:6.00 SOUD LID RIM=20.60 IE OUT=9.12 RIM=20 IE OUT=15.71 RIM=20.50 IE OUT=16.65 SOLID LID RIM=21.20 IE OUT=10.09 4' X 6' MODULAR WETLAND UNIT CLOSED TOP CONFIGURATION IN EXISTING DRIVE LANE, FOR GATEWAY BASIN (TYP) POTENTIAL TREATMENT AREA SEE TREATMENT OPTION FIGURE SITE ALT-6A FOR ZOOM IN SITE #6 TREATMENT AREA: 2.0 AC N Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286--1640 (509) 663-2711 mak g,com PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 14.0 TREATMENT SITE #6 - ALT6A TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT 0 4' X 6' MODULAR WETLAND UNIT CLOSED TOP CONFIGURATION IN EXISTING DRIVE LANE, FOR GATEWAY BASIN (TYP) 30 60 90 SITE #6 TREATMENT AREA: 2.0 AC Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 mak porn S 112TH ST PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 12 (near tidal effects) RIM=19.15 IE OUT=15.35 NE RIM=19.85 IE OUT=15.4 E IE IN(8"SW)= connected to downpipe at column. BOT=14.8 MAY NEED TO REPLACE TYPE 1 TO TYPE 2 RIM=22.80 IE OUT=19.85 E BOT= 19.55 4X4 MOD WETLAND UPSTREAM EXISTING CB VALLEY VIEW SANITARY SEWER PROPOSED TYPE 1 TIE -INTO BIORETENTION DUWAMISH RIVER EXISTING VANED CB LIDS REPLACE WITH SOLID LIDS TREATMENT SITE #7 - ALT7A TUKWILA WATER QUALITY RETROFIT PLANNING LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT RIM=19.05 IE IN=8.05 NW IE OUT=8.05 SE IE IN=13.65 SW BOT = 5.95 TYPE 1 IN SIDEWALK 4' X 6' MODULAR WETLAND UNIT CLOSED TOP CONFIGURATION IN SIDEWALK TYPE 1 IN CURB LINE CITY WATER RIM=19.90 IE IN=7.85 NW IE IN=14.85 W IE OUT=7.8 SE BOT=6.10 4' X 6' MODULAR WETLAND UNIT CLOSED TOP CONFIGURATION IN SIDEWALK TYPE 1 IN CURB LINE RIM=22.80 IE IN=7.40 NW IE IN=18.50 W IE OUT=7.25 SE BOT=5.10 4' X 4' MODULAR WETLAND UNIT ADJACENT TO EXISTING CB (TYP) EXISTING OUTFALL EL 6.42 0 75 150 225 SITE #7 TREATMENT AREA: 1.57 AC Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 mak g,com PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE TYP = 12 (near tidal effects) TREATMENT SITE #8 TUKWILA WATER QUALITY RETROFIT PLANNING RIM 23.00 IE 19.8 OUT OUTLET ELEV: 19.00 EXISTING OUTFALL RIM 19.97 f +S IE 14.7 OUT IE 16.2 IN itteFik �GIS OUTLET ELEV: NOT GIVEN GIS CONTOUR ELEV:15.00 EXISTING OUTFALL DITCH, CB AND CULVERT PRESENT POTENTIAL TREATMENT AREA LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT 0 75 150 225 '''SEE TREATMENT OPTION FIGURE SITE ALT-8A ZOOM IN SITE #8 TREATMENT AREA: 2.0 AC WPC& Interdisciplinary Design 3131 Elliot Ave 23 S Wenatchee Ave Suite 400 Suite 223 Seattle, WA 98121 Wenatchee, WA 98801 (206)286-1640 (509) 663-2711 mak g,com PRELIMINARY DESIGN TAILWATER CONDITION TYP WINTER/SPRING, HIGH TIDE ELEV = 12 (near tidal effects) EX. CULVERT TREATMENT SITE #8 - ALT8A EX. CULVERT NOT LOCATED DURING SITE VISIT FURTHER INVESTIGATION REQUIRED LEGEND EXISTING CATCH BASIN EXISTING STORM PIPE TUKWILA WATER QUALITY RETROFIT PLANNING • PROPOSED CATCH BASIN PROPOSED STORM PIPE PROPOSED TREATMENT TYPE 2 CB WITH FLOW SPLITTER 0 EX. DITCH EXISTING OUTFALL 4' X 17' MODULAR WETLAND UNIT (CLOSED TOP) FOR SOUTH TREATMENT AREA (APPROX. 1.5 AC) TYPE 1 CB 20 40 60 4' X 6' MODULAR WETLAND UNIT FOR NORTH TREATMENT AREA (APPROX. 0.5 AC) EXISTING OUTFALL SITE #8 TREATMENT AREA: 2.0 AC Kp� Interdiscipinary Design 3131 Elliott Ave Suite 400 Seattle, WA 98121 23 S Wenatchee Ave Suite 223 Wenatchee, WA 98801 (206) 286-1640 1(509) 663.2711 waw.kpg.com City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report APPENDIX C — Soils Information October 2020 KPG 556440 556490 Soil Map —King County Area, Washington (Site 4) 556590 556640 556740 556790 a Fl 47° 28' 5" N 8 MUM Soil Map may not be; valid 47° 27' 54" N s .lai_ I 556440 556490 556540 556590 Fl 8 N 8 Map Scale: 1:2,410 if pro fled on A landscape (11" x 8.5") sheet. 0 35 70 140 0 100 200 Feet 403 600 556640 556690 Meters 210 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 556740 556790 556840 556890 47° 28' 5" N 47° 27' 54" N USDA Natural Resources rilra Conservation Service Web Soil Survey National Cooperative Soil Survey 4/8/2020 Page 1 of 3 Soil Map —King County Area, Washington (Site 4) Area of Interest (AOI) Soils 0 C MAP LEGEND MAP INFORMATION Area of Interest (AOI) Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot • Closed Depression • Gravel Pit 4 Gravelly Spot ▪ Landfill Lava Flow Marsh or swamp an4 Mine or Quarry CD Miscellaneous Water • Perennial Water • Rock Outcrop ▪ Saline Spot 4 • #• Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip • Sodic Spot g Spoil Area 0 Stony Spot Very Stony Spot Wet Spot ▪ Other Special Line Features Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Transportation Rails 0.10 Interstate Highways O .10 US Routes Major Roads Local Roads Background . Aerial Photography Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 15, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 29, 2019—Jul 21, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources rilra Conservation Service Web Soil Survey National Cooperative Soil Survey 4/8/2020 Page 2 of 3 Soil Map —King County Area, Washington Site 4 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 3056 Urban land-Alderwood complex, 5 to 12 percent slopes 0.0 0.2% 3057 Urban land-Alderwood complex, 12 to 35 percent slopes 1.3 5.5% 3063 Alderwood-Everett complex, 35 to 60 percent slopes 1.8 7.8% Ng Newberg silt loam 15.0 64.0% Ur Urban land 1.9 8.2% W Water 3.3 14.2% Wo Woodinville silt loam 0.0 0.2% Totals for Area of Interest 23.5 100.0% USDA Natural Resources Web Soil Survey 4/8/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 47° 28' 23" N C P1 122° 15' 49" W ti Soil Map —King County Area, Washington (Site 5) 10 555610 555700 555790 Map Scale: 1:4,120 if printed on A landscape (11" x 8.5") sheet. 0 50 100 200 Meters 300 Feet 0 200 403 800 120D Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone lON WGS84 556240 555970 556060 556150 556240 556330 a Fo P1 47° 28' 42" N USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/8/2020 Page 1 of 3 Soil Map —King County Area, Washington (Site 5) Area of Interest (AOI) Soils 0 C MAP LEGEND MAP INFORMATION Area of Interest (AOI) Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot • Closed Depression • Gravel Pit 4 Gravelly Spot ▪ Landfill Lava Flow Marsh or swamp an4 Mine or Quarry CD Miscellaneous Water • Perennial Water • Rock Outcrop ▪ Saline Spot 4 • #• Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip • Sodic Spot g Spoil Area 0 Stony Spot Very Stony Spot Wet Spot ▪ Other Special Line Features Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Transportation Rails 0.10 Interstate Highways O .10 US Routes Major Roads Local Roads Background . Aerial Photography Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 15, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 29, 2019—Jul 21, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources rilra Conservation Service Web Soil Survey National Cooperative Soil Survey 4/8/2020 Page 2 of 3 Soil Map —King County Area, Washington Site 5 Map Unit Legend Map Unit Symbol ' Map Unit Name Acres in AOI Percent of AOI 988 Urban land, 0 to 5 percent slopes 31.3 51.2% 999 Water, fresh 3.7 6.0% 3056 Urban land-Alderwood complex, 5 to 12 percent slopes 4.7 7.7% 3057 Urban land-Alderwood complex, 12 to 35 percent slopes 10.7 17.5% 3063 Alderwood-Everett complex, 35 to 60 percent slopes 4.4 7.2% 3064 Anthraltic Xerorthents gravelly sandy loam, 0 to 12 percent slopes 6.4 10.5% Totals for Area of Interest 61.2 100.0% USDA Natural Resources Web Soil Survey 4/8/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 Soil Map —City of Seattle, Washington (Site 7) 47° 29' 55" N 122° 17' 42" W I I I I I I I 553200 5533W 5534W 553500 553600 553700 553800 5539W Map Scale: 1:5,920 if printed on A portrait (8.5" x 11") sheet. Meters N 0 50 100 200 300 Feet 0 m250 500 1000 1500 Map projection: Web Mercator Coer coordinates: WGS84 Edge tics: UTM Zone lON WGS84 47° 30' 34" N 47° 29' 55" N U A Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 4/13/2020 Page 1 of 3 Soil Map —City of Seattle, Washington (Site 7) MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons 0 Soil Map Unit Lines O Soil Map Unit Points Special Point Features (.ej Blowout Borrow Pit Clay Spot • Closed Depression • Gravel Pit Gravelly Spot ▪ Landfill • Lava Flow 46 Marsh or swamp an4 Mine or Quarry ▪ Miscellaneous Water • Perennial Water • Rock Outcrop ▪ Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot g Spoil Area 0 Stony Spot Very Stony Spot Wet Spot ▪ Other •� Special Line Features Water Features Streams and Canals Transportation 1--1-+ Rails r•,,r Interstate Highways US Routes Major Roads Local Roads Background ® Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:12,000. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: City of Seattle, Washington Survey Area Data: Version 3, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 29, 2019—Jul 21, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/13/2020 Page 2 of 3 Soil Map —City of Seattle, Washington Site 7 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 988 Urban land, 0 to 5 percent slopes 153.3 87.8% 999 Water, fresh 15.7 9.0% 3055 Urban land-Alderwood complex, 0 to 5 percent slopes 5.6 3.2% Totals for Area of Interest 174.6 100.0% USDA Natural Resources Web Soil Survey 4/13/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 Soil Map —City of Seattle, Washington (Site 8) 47° 30' 6" N 47° 29' 35" N 552800 552900 553100 553200 553300 553400 8/1 552800 552900 553000 553100 II5 3200 553300 553400 N Map Scale: 1:4,670 if printed on A portrait (8.5" x 11") sheet. Meters 0 50 100 2C0 300 Feet 0 200 400 800 1200 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 47° 30'6" N 47° 29' 35" N U A Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 4/8/2020 Page 1 of 3 Soil Map —City of Seattle, Washington (Site 8) Area of Interest (AOI) Soils 0 C MAP LEGEND MAP INFORMATION Area of Interest (AOI) Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot • Closed Depression • Gravel Pit 4 Gravelly Spot ▪ Landfill Lava Flow Marsh or swamp an4 Mine or Quarry CD Miscellaneous Water • Perennial Water • Rock Outcrop ▪ Saline Spot 4 • #• Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip • Sodic Spot g Spoil Area 0 Stony Spot Very Stony Spot Wet Spot ▪ Other Special Line Features Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Transportation Rails 0.10 Interstate Highways O .10 US Routes Major Roads Local Roads Background . Aerial Photography Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: City of Seattle, Washington Survey Area Data: Version 3, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 29, 2019—Jul 21, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources rilra Conservation Service Web Soil Survey National Cooperative Soil Survey 4/8/2020 Page 2 of 3 Soil Map —City of Seattle, Washington Site 8 Map Unit Legend Map Unit Symbol ' Map Unit Name Acres in AOI Percent of AOI 988 Urban land, 0 to 5 percent slopes 31.3 40.5% 989 Urban land, 5 to 20 percent slopes 4.9 6.3% 999 Water, fresh 6.2 8.0% 3059 Alderwood-Everett-Urban land complex, 12 to 35 percent slopes 33.1 42.8% 3060 Alderwood-Everett-Urban land complex, 35 to 60 percent slopes 1.8 2.3% Totals for Area of Interest 77.2 100.0% USDA Natural Resources Web Soil Survey 4/8/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report APPENDIX D — Probable Cost Opinion October 2020 KPG CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS Date: Oct. 2020 2020 Water Quality Retrofits By: WRE Engineer's Cost Opinion - October Submittal Project No. 19057 Site 4 - Fort Dent & Starfire Way No. Section No. Item Qty Unit Unit Cost Total Cost ROADWAY 1 1-04 Unexpected Site Changes 1 FA $10,000 $ 10,000 2 1-09 Mobilization (10%) 1 LS $38,000 $ 38,000 3 1-10 Project Temporary Traffic Control 1 LS $5,000 $ 5,000 4 2-01 Clearing and Grubbing 1 LS $5,000 $ 5,000 5 2-02 Pavement Removal Incl. Haul 160 SY $15 $ 2,400 6 2-03 Unsuitable Foundation Excavation Incl. Haul 150 CY $35 $ 5,250 7 4-04 Crushed Surfacing Top Course 200 TN $45 $ 9,000 8 5-04 HMA Cl. 1/2" PG 64-22 50 TN $160 $ 8,000 9 8-01 Temporary Water Pollution / Erosion Control 1 LS $10,000 $ 10,000 10 8-04 Cement Conc. Traffic Curb and Gutter 50 LF $80 $ 4,000 11 8-14 Cement Conc. Sidewalk 10 SY $100 $ 1,000 ROADSIDE DEVELOPMENT 12 8-02 Property Restoration 1 FA $2,500 $ 2,500 STORM DRAINAGE 13 7-04 Storm Sewer Pipe 12 In. Diam 126 LF $100 $ 12,600 14 7-04 Remove/Abandon Existing Storm Sewer Pipe 65 LF $15 $ 975 15 7-05 Connection to Drainage Structure 1 EA $1,500 $ 1,500 16 7-05 Concrete Inlet 1 EA $1,000 $ 1,000 17 7-05 Catch Basin, Type 1 1 EA $1,500 $ 1,500 18 7-05 Catch Basin Type 2 48 In. Diam. 3 EA $3,500 $ 10,500 19 7-05 Adjust Utility 1 EA $1,500 $ 1,500 20 7-15 8' x 12' Modular Wetland Unit 1 EA $150,000 $ 150,000 21 7-20 Temporary Bypass System 1 LS $10,000 $ 10,000 22 8-30 Resolution of Utility Conflicts 1 LS $25,000 $ 25,000 PROBABLE CONSTRUCTION COST CONTINGENCY (30%) Tax (10%) $ 314,725 $ 94,418 $ 40,914 TOTAL PROBABLE CONSTRUCTION COST $ 450,057 J CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS Date: Dec. 2020 K p 2020 Water Quality Retrofits By: WRE Engineer's Cost Opinion - October Submittal Project No. 19057 Site 5 - Interurban Ave S No. Section No. Item Qty Unit Unit Cost Total Cost ROADWAY 1 1-04 Unexpected Site Changes 1 FA $10,000 $ 10,000 2 1-09 Mobilization (10%) 1 LS $64,000 $ 64,000 3 1-10 Project Temporary Traffic Control 1 LS $ - $ 20,000 4 2-01 Clearing and Grubbing 1 LS $ 1,000 $ 5,000 5 2-02 Pavement Removal Incl. Haul 115 SY $ 15 $ 1,725 6 2-03 Unsuitable Foundation Excavation Incl. Haul 125 CY $ 35 $ 4,375 7 4-04 Crushed Surfacing Top Course 200 TN $ 45 $ 9,000 8 5-04 HMA Cl. 1/2" PG 64-22 125 TN $ 160 $ 20,000 9 8-01 Temporary Water Pollution / Erosion Control 1 LS $ 20,000 $ 20,000 10 8-04 Cement Conc. Traffic Curb and Gutter 60 LF $ 80 $ 4,800 11 8-14 Cement Conc. Sidewalk 50 SY $ 100 $ 5,000 ROADSIDE DEVELOPMENT 12 8-02 Property Restoration 1 FA $ 2,500 $ 2,500 13 11-Aug Traffic Signal and Channelization Restoration 1 LS $ 25,000 $ 25,000 STORM DRAINAGE . 14 7-04 Storm Sewer Pipe 12 In. Diam 115 LF $ 100 $ 11,500 15 7-04 Storm Sewer Pipe 24 In. Diam. 100 LF $ 130 $ 13,000 15 7-04 Remove/Abandon Existing Storm Sewer Pipe 100 LF $ 15 $ 1,500 16 7-05 Connection to Drainage Structure 1 EA $ 1,500 $ 1,500 17 7-05 Concrete Inlet 1 EA $ 1,000 $ 1,000 18 7-05 Catch Basin, Type 1 1 EA $ 1,500 $ 1,500 19 7-05 Catch Basin Type 2 48 In. Diam. 2 EA $ 3,500 $ 7,000 20 7-05 Flow Splitter Structure 1 EA $ 10,000 $ 10,000 21 7-05 Adjust Utility 2 EA $ 1,500 $ 3,000 22 7-15 4' x 19' Modular Wetland Unit 1 EA $200,000 $ 200,000 23 7-20 Temporary Bypass System 1 LS $ 15,000 $ 15,000 24 8-30 Resolution of Utility Conflicts 1 LS $ 15,000 $ 15,000 PROBABLE CONSTRUCTION COST CONTINGENCY (30%) Tax (10%) $ 471,400 $ 141,420 $ 61,282 TOTAL PROBABLE CONSTRUCTION COST $ 674,102 CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS Date: Oct. 2020 K p G 2020 Water Quality Retrofits By: WRE Engineer's Cost Opinion - October Submittal Project No. 19057 Site 7 - E Marginal Way No. ion Section No No. Item Qty Unit Unit Cost Total Cost ROADWAY 1 1-04 Unexpected Site Changes 1 FA $25,000 $ 25,000 2 1-09 Mobilization (10%) 1 LS $53,000 $ 53,000 3 1-10 Project Temporary Traffic Control 1 LS $15,000 $ 15,000 4 2-01 Clearing and Grubbing 1 LS $5,000 $ 5,000 5 2-02 Pavement Removal Incl. Haul 270 SY $15 $ 4,050 6 2-03 Unsuitable Foundation Excavation Incl. Haul 200 CY $35 $ 7,000 7 4-04 Crushed Surfacing Top Course 500 TN $45 $ 22,500 8 5-04 HMA Cl. 1/2" PG 64-22 120 TN $160 $ 19,200 9 8-01 Temporary Water Pollution / Erosion Control 1 LS $10,000 $ 10,000 10 8-04 Cement Conc. Traffic Curb and Gutter 40 LF $80 $ 3,200 11 8-14 Cement Conc. Sidewalk 40 SY $100 $ 4,000 ROADSIDE DEVELOPMENT 12 8-02 Property Restoration 1 FA $2,500 $ 2,500 STORM DRAINAGE 13 7-04 Storm Sewer Pipe 12 In. Diam 650 LF $100 $ 65,000 14 7-04 Remove/Abandon Existing Storm Sewer Pipe 53 LF $15 $ 795 15 7-05 Connection to Drainage Structure 2 EA $1,500 $ 3,000 16 7-05 Concrete Inlet 5 EA $1,000 $ 5,000 17 7-05 Catch Basin, Type 1 1 EA $1,500 $ 1,500 18 7-05 Catch Basin Type 2 48 In. Diam. 5 EA $3,500 $ 17,500 19 7-05 Flow Splitter Structure 1 EA $10,000 $ 10,000 20 7-05 Adjust Utility 1 EA $1,500 $ 1,500 21 7-15 4' X 4' Modular Wetland Unit 1 EA $40,000 $ 40,000 22 7-15 4' x 17' Modular Wetland Unit 1 EA $175,000 $ 175,000 23 7-20 Temporary Bypass System 1 LS $10,000 $ 10,000 24 8-30 Resolution of Utility Conflicts 1 LS $45,000 $ 45,000 PROBABLE CONSTRUCTION COST CONTINGENCY (30%) Tax (10%) $ 544,745 $ 163,424 $ 70,817 TOTAL PROBABLE CONSTRUCTION COST $ 778,985 CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS Date: Oct. 2020 2020 Water Quality Retrofits By: WRE Engineer's Cost Opinion - October Submittal Project No. 19057 Site 8 - Tukwila International Blvd Se ction No. Item Qty Unit Unit Cost Total Cost ROADWAY 1 1-04 Unexpected Site Changes 1 FA $10,000 $ 10,000 2 1-09 Mobilization (10%) 1 LS $55,000 $ 55,000 3 1-10 Project Temporary Traffic Control 1 LS $ 35,000 $ 35,000 4 2-01 Clearing and Grubbing 1 LS $ 8,000 $ 8,000 5 2-02 Pavement Removal Incl. Haul 300 SY $ 15 $ 4,500 6 2-03 Unsuitable Foundation Excavation Incl. Haul 150 CY $ 35 $ 5,250 7 4-04 Crushed Surfacing Top Course 250 TN $ 45 $ 11,250 8 5-04 HMA Cl. 1/2" PG 64-22 100 TN $ 160 $ 16,000 9 8-01 Temporary Water Pollution / Erosion Control 1 LS $ 35,000 $ 35,000 ROADSIDE DEVELOPMENT 10 8-02 Property Restoration 1 FA $ 1,000 $ 1,000 11 8-11 Guardrail 140 LF $ 150 $ 21,000 12 11-Aug Traffic Signal and Channelization Restoration 0 LS $ 5,000 $ 5,000 STORM DRAINAGE 13 7-04 Storm Sewer Pipe 12 In. Diam 175 LF $ 100 $ 17,500 14 7-05 Connection to Drainage Structure 1 EA $ 1,500 $ 1,500 15 7-05 Outfall Protection 1 EA $ 5,000 $ 5,000 16 7-05 Catch Basin, Type 1 2 EA $ 1,500 $ 3,000 17 7-05 Catch Basin Type 2 48 In. Diam. 2 EA $ 3,500 $ 7,000 18 7-05 Flow Splitter Structure 1 EA $ 10,000 $ 10,000 19 7-15 4' X 4' Modular Wetland Unit 1 EA $ 40,000 $ 40,000 20 7-15 4' x 8' Modular Wetland Unit 1 EA $ 100,000 $ 100,000 21 7-20 Temporary Bypass System 1 LS $ 10,000 $ 10,000 22 8-30 Resolution of Utility Conflicts 1 LS $ 10,000 $ 10,000 PROBABLE CONSTRUCTION COST CONTINGENCY (30%) Tax (10%) $ 411,000 $ 123,300 $ 53,430 TOTAL PROBABLE CONSTRUCTION COST $ 587,730 City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report APPENDIX E — Design Plans October 2020 KPG K:\PROJECTS\TUKWILA\19057—Storm WO Retrofit \DESIGN\Drawings\Contract\19057COV.dwg 1/21/2021 2:31 PM STORMWATER OUTFACES WATER QUALITY RETROFIT PROJECT PROJECT NO. 91241202 AGREEMENT NO. WQC-2017-TUKWIL-00158 FUNDED IN PART BY THE WASHINGTON STATE DEPARTMENT OF ECOLOGY MAYOR ALLAN EKBERG DIRECTOR OF PUBLIC WORKS HENRY HASH CITY ENGINEER HARI PONNEKANTI, P.E. SCHEDULE OF DRAWINGS SHEET NO. TITLE 1 COVER 2 LEGEND & ABBREVIATIONS 3 STARFIRE WAY 4 STARFIRE WAY PROFILES 5 INTERURBAN AVE S 6-7 E MARGINAL WAY 8 E MARGINAL WAY PROFILES 9 TUKWILA INTL BLVD 10-13 STORMWATER DETAILS CITY COUNCIL DE'SEAN QUINN, PRESIDENT VERNA SEAL KATHY HOUGARDY KATE KRULLER THOMAS McLEOD ZAK IDAN CYNTHIA DELOSTRINOS JOHNSON PROJECT LOCATIONS TUKWILA INT. BLVD & SR 599 THIS PROJECT IS FUNDED IN PART BY THE WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER FINANCIAL ASSISTANCE PROGRAM AGREEMENT NO. WQC-2017-00158 CALL 2 DAYS BEFORE YOU DIG 811 5w5 5124 E MARGINAL WAY S INTERURBAN AVE S & S 141ST ST er STARFIRE WAY & FORT DENT WAY it 3 F IL 0 o- F P UBLIC WORKS LJEP T_ * ENGINEERING ■STREETS *WATER* SEWER ■BUILDING * designed drawn checked by MKE MKE KDA date 10/2020 10/2020 10/2020 prof eng prof dir field bk no Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286-1640 Tacoma, WA 98402 (253) 627-0720 wwe.kpg.cam DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT COVER 1 l 13 file no 19057C0V.DWG scale 1" = 40.00' no date revisions date 10/2020 / 905 Covdwg1/21/2021 K:APROJECTS\TUKWILA\19057—Storm WA Retroft\DESGA\D LEGEND EXISTING Mlcep MONUMENT IN CASE O MAC NAIL/MAG SPIKE ❑ CATCH BASIN STORM DRAIN MANHOLE CULVERT (J SEWER MANHOLE POWER POLE POWER POLE WITH LUMINAIRE POWER POLE WITH LUMINAIRE AND UNDERGROUND CONNECT POWER TRANSFORMER POWER METER GUY ANCHOR N JUNCTION BOX m N D, TELEPHONE MANHOLE FIBER OPTIC MANHOLE GAS VALVE WATER VALVE WATER METER WATER MANHOLE WATER VAULT LID FIRE HYDRANT BLOW —OFF FIRE DEPARTMENT CONNECT N HOSE BIB IRRIGATION CONTROL VALVE O UTILITY MANHOLE (GENERIC/UNKNOWN) UTILITY VAULT LID (GENERIC/UNKNOWN) STAND —PIPE (GENERIC/UNKNOWN) 0 GATE POST/BOLLARD BOULDER SIGN (oW , STUMP, DIAMETER DECIDUOUS TREE, DIAMETER (# OF TRUNKS) PAINTED POWER 3D PAINTED TELEPHONE PAINTED FIBER OPTIC PAINTED WATER PAINTED GAS STORM SEWER FENCE PAINTED STRIPE PAINTED SKIP STRIPE RAISED —BUTTON SOLID STRIPE RAISED —BUTTON SKIP STRIPE CHLK BAD. GENERAL NOTES - ALL SITES 1. CONTRACTOR SHALL PROVIDE CONTINUOUS ACCESS TO ALL DRIVEWAYS AND WALKWAYS BOTH INSIDE AND OUTSIDE OF THE WORKING AREA. 2. GAS, WATER, AND SEWER SERVICES TO INDIVIDUAL HOMES OR BUSINESSES ARE TYPICALLY NOT SHOWN. THE CONTRACTOR SHALL LOCATE SERVICES AND COORDINATE WITH UTILITY OWNER TO RELOCATE SERVICES THAT CONFLICT WITH NEW STORM DRAIN AS NECESSARY. 3. HAND DIG WITHIN 2 FT OF ALL EXISTING UTILITIES. INSTALL ETHOFOAM PAD AT ALL UTILITY CROSSINGS WITH LESS THAN 6" CLEARANCE TO NEW STORM DRAIN. 4. PIPE INVERTS AND RIM ELEVATIONS ARE SPECIFIED TO THE PROJECTED CENTER OF THE STRUCTURE. CATCH BASIN STATION AND OFFSETS ARE APPROXIMATED TO THE CENTER OF STRUCTURE. PIPE LENGTHS ARE APPROXIMATED AS 2 DIMENSIONAL PLAN VIEW DIMENSIONS. 5. REMOVE EXISTING STORM DRAIN PIPE AT ALL LOCATIONS WHERE THE PROPOSED STORM DRAIN ALIGNMENT CONFLICTS WITH THE EXISTING STORM DRAIN ALIGNMENT. FILL AND ABANDON PIPE SEGMENTS LEFT IN PLACE PER SPECIFICATIONS. EXCAVATIONS FOR PIPE REMOVAL SHALL BE BACKFILLED PER COT STD DETAIL G-1. 6. CLEAR AND GRUB EXISTING VEGETATION AS NECESSARY FOR CONSTRUCTION. PRESERVE AND PROTECT TREES LARGER THAN 4" DIAMETER UNLESS OTHERWISE NOTED ON THE PLANS. 7. UNLESS OTHERWISE NOTED, PIPE PROFILES ARE SHOWN ALONG THE PIPE CENTERLINE ALIGNMENT. 8. FURNISH AND INSTALL INLET PROTECTION, SILT FENCE, WATTLES, AND OTHER EROSION CONTROL MEASURES TO MINIMIZE SEDIMENT MIGRATION INTO STREAMS AND STORM DRAINAGE SYSTEMS. 9. IF PIPE CONNECTIONS ARE DISCOVERED THAT ARE NOT NOTED ON THE PLANS, CONTRACTOR SHALL INSTALL CONNECTION OF EXISTING PIPE TO THE NEW SYSTEM. 10. MARK ALL STORM DRAIN INLETS WITH "DUMP NO WASTE" AND EITHER "DRAINS TO STREAMS", "DRAINS TO WETLANDS", OR "DRAINS TO GROUNDWATER", AS APPLICABLE. INSTALL 4 INCH RAISED PAVEMENT STORM DRAIN MARKERS AT ALL CATCH BASIN INLETS. 11. POTHOLE EXISTING UTILITY CROSSINGS. POTHOLING OF EXISTING UTILITIES SHALL BE APPROVED BY THE ENGINEER PRIOR TO POTHOUNG. 12. FOGLINE AND CHANNELIZATION TO BE REPLACED IN AREAS AFFECTED BY STORM TRENCHING AND WATER QUAUTY RETROFIT INSTALLATION. EDGE OF PAVEMENT FLOWUNE CONTOUR CONCRETE GRAVEL GRASS ASPHALT/CONCRETE CHAINUNK DRIVEWAY BARK AND SHRUB ORDINARY HIGH WATER UNE WETLAND BOUNDARY UNE RIGHT OF WAY LINE PROPERTY LINE PROPOSED STORM DRAIN UNE, WITH DIRECTION OF FLOW STORM DRAIN CATCH BASIN, TYPE 2 STORM DRAIN CATCH BASIN, TYPE 1, TYPE 1L REMOVE/ABANDON STORM DRAINAGE PIPE CATCH BASIN INSERT PER WSDOT STANDARD PLAN 1-40.20 SAWCUT APPROX. GRADING OMITS NEW HMA (IN PLAN & SECTION) CEMENT CONCRETE PAVEMENT (IN PLAN & SECTION) SIGN SURVEY NOTES (SITES TIB, E MARGINAL WAY S, STARFIRE WAY) 1. THE PURPOSE OF THIS TOPOGRAPHIC SURVEY IS FOR CIVIL ENGINEERING DESIGN. THIS IS NOT A BOUNDARY SURVEY. SOURCES OF BOUNDARY INFORMATION AS SHOWN INCLUDE FIELD —TIED MONUMENTATION, PLATS, COUNTY RECORDS OF SURVEY, AND AUDITOR INDEXING INFORMATION. 2. THE LOCATIONS OF EXISTING UNDERGROUND UTILITY SYSTEMS, AS SHOWN HEREON, ARE TAKEN FROM U1lUTY LOCATE PAINT MARKS OR AS —BUILT PLANS AND ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTIUTIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTIUTIES. ALL LOCATOR SERVICES SHOULD BE CONTACTED PRIOR TO ANY CONSTRUCTION OR SUBSURFACE EXPLORATION. CALL 1-800-424-5555. 3. FIELD SURVEY: KPG, MARCH, 2020. UCENSEE MICHAEL R. BOWEN, P.L.S. NO. 29294/RONALD D. REICHEL, P.L.S. NO. 38015. 4. CONTOUR INTERVAL = 1 FOOT, ±0.5 FOOT PER NATIONAL MAPPING STANDARDS. CONTOURS DERIVED FROM DIRECT FIELD OBSERVATIONS. 5. STORM AND SEWER CONNECTIONS HAVE BEEN DRAWN FROM CENTER OF LID TO CENTER OF LID. 6. THE LOCATIONS AND DIMENSIONS OF UNDERGROUND VAULTS HAVE NOT BEEN VERIFIED AND ARE APPROXIMATE. 7. DUCTS ARE NOTED AS INDICATED IN THE FIELD BY UTIUTY LOCATORS. MULTIPLE UNES AND/OR UTILITIES MAY SHARE DUCT RUNS; THIS MAY NOT BE SHOWN IN THE DRAWING. HORIZONTAL AND VERTICAL DATUM HORIZONTAL DATUM: NAD 83/11 VERTICAL DATUM NAVD 88 HORIZONTAL AND VERTICAL DATUMS ESTABUSHED BY RTK GPS OBSERVATION UTILIZING WSRN (WASHINGTON STATE REFERENCE NETWORK) WITH CHECK TO WSDOT CONTROL POINT HC17-5 ABBREVIATIONS ABND AC AC ACP ADA AP APPROX AVE BLDG BMP BOW CB CDF COT CI CL CO CONC CONST CONT COT CSTC DCVA DI DIA, 0 DWG E EG EL ELEV EOP EX EXIST FDC FL FL FOC HORIZ HMA ICV ID IE INTL LT LF LP MAX MIN MH ABANDONED ASPHALT ASBESTOS CEMENT WATER PIPE ASPHALT CONCRETE PAVEMENT AMERICANS WITH DISABILITIES ACT ANGLE POINT APPROXIMATE AVENUE BUILDING BEST MANAGEMENT PRACTICE BACK OF WALK CATCH BASIN CONTROLLED DENSITY FILL CITY OF TUKWILA CAST IRON CENTERLINE CLASS CLEANOUT CONCRETE CONSTRUCTION CONTAINER CITY OF TUKWILA CRUSHED SURFACING TOP COURSE DOUBLE CHECK VALVE ASSEMBLY DUCTILE IRON DIAMETER DRAWING EASTING/EAST EXISTING GRADE ELEVATION ELEVATION EDGE OF PAVEMENT EXISTING EXISTING FIRE DEPARTMENT CONNECTION FLANGE FLOWLINE FACE OF CURB HORIZONTAL HOT MIX ASPHALT IRRIGATION CONTROL VALVE INSIDE DIAMETER INVERT ELEVATION INTERNATIONAL LENGTH OF CURVE LEFT LINEAR FEET LOW POINT MAXIMUM MINIMUM MANHOLE MIC MJ MW N NO NTS OC OD OH PC PCC PE PG PI PIV POB POC POE PRC PT PVC PVI PVMT R RJ RT S SD SDP SEW SHT SSMH ST STA STD T TIB TOC TOG TYP VC VERT VLT W WAT WDFW WSDOT WY MONUMENT IN CASE MECHANICAL JOINT MONITORING WELL NORTHING/NORTH NUMBER NOT TO SCALE ON CENTER OUTSIDE DIAMETER OVERHEAD UTILITIES POINT OF CURVATURE POINT OF CURVE ON CURVE POLYETHYLENE PERFORMANCE GRADE POINT OF INTERSECTION POST INDICATOR VALVE POINT OF BEGINNING POINT OF CONNECTION POINT OF ENDING POINT OF REVERSE CURVATURE POINT OF TANGENCY POLYVINYL CHLORIDE POINT OF VERTICAL INTERSECTION PAVEMENT RADIUS RESTRAINED JOINT RIGHT SLOPE/SOUTH STORM DRAIN STORM DRAIN PIPE SEWER SHEET SANITARY SEWER MANHOLE STREET STATION STANDARD TANGENT LENGTH TUKWILA INTERNATIONAL BOULEVARD TOP OF CURB TOP OF GRATE TYPICAL VERTICAL CURVE VERTICAL VAULT WEST/WITH WATER WASHINGTON DEPARTMENT OF FISH AND WILDLIFE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION WAY PUBLIC WORKS DEPT_ * ENGINEERING *STREETS *WATER* SEWER *BUILDING * designed drawn checked prof eng prof dir field bk no by MKE MKE KDA date 10/2020 10/2020 10/2020 IKPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seatlle, WA 98121 (206) 286-1640 Tacoma, WA 98402 (253) 627-0720 www.kpg,com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT LEGEND & ABBREVIATIONS 2 13 file no 19057COV.DWG no date revisions scale 1' = 40.00' date 10/2020 \PROJECTS\TUKVOLA\19057—Storm WO Retrofit\DESIGN\Drawings\Contract\19057STRMPLAN.dwg 1/21/2021 2:32 PM 0+00 EX 24" SD TO OUTFALL SDMH 1679 RIM 30.83 IE 14.9 NW, 24° NO OTHER PIPES VISIBLE STCR FULL OF WAi - FORT DENT WAY ALIGNMENT DATA NUMBER START STA NORTHING EASTING LENGTH BRNG L4 10+00.00 173163.87 1290330.76 251.56' N 30'34'54" E L5 12+51.56 173380.44 1290458.74 358.44' N 22'35'57" E STARFIRE WAY ALIGNMENT DATA NUMBER START STA NORTHING EASTING LENGTH BRNG L6 0+00.00 173830.18 1290397.62 325.00' S 59'08'30" E 1+00 STARFIR 00T24" DT12"� SD SD 0 10 20 40 60 SCALE IN FEET SDMH 1010 RIM 28.42 IE 16.7 NE, 18° NOT ALL PIPES VISIBLE STCR FULL OF WATER G SD SDMH 1011 RIM 27.94 IE 16.4 SE, 18° IE 16.2 NW, 18° PIPES NOT VISIBLE STCR FULL OF WATER 8" DIP PROTECT EXISTING 4" SEWER FORCE MAIN SDMH 1009 RIM 27.52 IE 17.6 SE, 18" 16.9 SW, 18" 12" SD CB 1729 IE32.9N TER RISE DUCT SDMH 1006 RIM 28.02 IE 17.4 NE, 18° IE 17.4 NW, 18" STCR FULL OF WATER CB 1008 RIM 27.84 IE 26.1 SE, 8" CONC Co M SSMH 1005 RIM 27.96 �/ IE 20.6 NE -SW ®CL 8" PVC CB 1004 RIM 27.70 Afri,w �fr V IE 24.8 NW, 88" ONC CON IE 24.8i SW, 8" CONC SW PIPE 0148 BY OVERFLOW STCR !3+OOH 1007 RIM 27.97 IE 20.5 NE -SW ®CL 8" PVC DUCT SPIKE 102 N: 173678.20 E: 1290639.53 REV: 28.28 CB 1003 RIM 27.77 c� IE 23.4 NE, 8° CONC IE 23.0 NW, 12" CONC EXISTING SEWER UFT STATION SMH #1360 RIM 30.76' SDMH 1722 RIM 36.31 IE 30.4 NE&SW, CHANNELIZED 48" CMP /9V 5.89 E 321 NW, 12" PVC E 321 SE, 12" PVC _ DM .1723 rn IE 32.9SE, 12" IRON 0/M I IE 31.3 NW, 12" PVC IE 30.4 NE, 36" CMP CB 1728 RIM 37.16 IE 32.6 W, 12II' CPP IE 32.5 NE, 19" CPP PLAN IE 30.3 NE & SW, CHANNELIZED 48" CMP CB 1725 IE 35.4 NE, S INTERURBAN AVE S 0 10 20 40 SCALE IN FEET 60 CB 1735 RIM 37.43 IE 34.9 SE, 12" PVC IE 34.8 SW, 12" IRON IE 34.8 NW, 12" IRON PK3 N: 173109.27 E: 1290386.15 ELE�T 37.84 GENERAL NOTES 1. SEE SHEET 2 FOR ADDITIONAL GENERAL NOTES. CONSTRUCTION NOTES ®SAWCUT, REMOVE AND RESTORE PAVEMENT & MARKINGS TO INSTALL STORM DRAIN SYSTEM, PER COT STD PLAN RS-03. OSAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE SIDEWALK TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-09. ®SAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE TRAFFIC CURB AND GUTTER TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-04 AND RS-15. O7 CONNECT EXISTING STORM DRAIN PIPE TO NEW STRUCTURE. ® CONNECT NEW STORM DRAIN PIPE TO EXISTING STRUCTURE. OINSTALL MODULAR WETLAND UNIT MWS 8' X 12' WITH INTERNAL BYPASS FOR HIGHER FLOWS. SEE STANDARD DETAIL 11 REMOVE STORM DRAIN STRUCTURE 23 STORM PROFILE STA/OFF BASED UPON STARFIRE WY. J PUBLIC' WORKS LDEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP MKE WRE date 10/2020 10/2020 10/2020 prof eng proj dir field bk no KPG Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286.1640 Tacoma, WA 98402 (253)627-0720 WWW.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER PLAN AND PROFILES STARFIRE WAY 3 ` 13 file no 19057STRMPLAN.DWG scale 1" = 40' no date revisions date 10/2020 a so 0 40 35 f0 30 25 20 15 10 CB TYPE 2-48" ROUND SOLID LID STA 14+95.75, 8.82' LT RIM 28.47 IE OUT 22.83 (12"N) IE IN 22.83 (12"SW) CB TYPE 2-48" 41 ROUND SOUD LID STA 15+69.51, 23.10' LT RIM 28.56 IE IN 22.45 (12"S) IE IN 24.86 (8"W) IE OUT 22.45 (12"N) EG ALONG PIPE CENTERLINE n 75 LF 12" SD UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL 35 30 25 20 15 10 5 S=0.50% SAME STRUCTURE 40CB TYPE 1L 40 STA 1+97.66, 52.11' RT RIM 27.91 IE OUT 24.96 (8"E) EG ALONG PIPE CENTERLINE UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL r- 35 LF 12" SD S=0.50% 19 LF 8" DIP S=0.52% CB TYPE 2-48" ROUND SOUD LID STA 16+03.28, 30.37' LT 04 RIM 28.20 IE IN 22.31 (12"SE) IE IN 22.28 (12"S) IE IN 24.71 (12"NE) IE OUT 22.28 (12"W) CB TYPE 1 STA 2+09.39, 11.15' LT RIM 27.83 IE OUT 24.83 (12"SW) 23 LF 12" SD S=0.50% 40 35 30 25 20 15 10 SAME 40 35 30 25 20 15 10 CB TYPE 2-48" ROUND SOLID LID STA 2+67.07, 23.04' RT RIM 28.35 IE OUT 22.64 (12"NW) IE IN 22.64 (12"SE) EG ALONG PIPE CENTERLINE 66 LF 12" SD CONNECT PIPE TO NEW STRUCTURE S=0.50% UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL 35 30 25 20 15 10 5 PROFILE HOR: 1"=40' VER: 1"=5' STRUCTURE CB TYPE 2-48" ROUND SOUD LID STA 1+87.73, 23.06' RT 15 RIM 28.55 IE IN 22.18 (12"E) IE OUT 22.18 (12"SW) MWS8'X12' L19 LF 12" SD S=0.52% 8 LF 12" SD S=0.50% 40 35 30 25 20 15 LJ I EXIST CB TYPE 2-48" 64 10 STA 1+96.45, 45.72' RT RIM 27.94 IE IN 16.40 (18"E) IE OUT 16.20 (18"W) IE IN 19.09 (12"N) — CONNECT PIPE TO EXISTING STRUCTURE _PUBLIC WORKS DEP T_ * ENGINEERING *STREETS *WATER* SEWER *BUILDING * designed drawn checked prof eng prat dir field bk no by XXX xxx XXX date 10/2020 10/2020 10/2020 KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627-0720 (206)286.1640 wws.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER PLAN AND PROFILES STARFIRE WAY PROFILES no date revisions 4 13 file na 19057STRMPLAN.DWG scale 1' = ao' date 10/2020 \PROJECTS\TUKVOLA\19057—Storm WO Retrofit\DESIGN\Drawings\Contract\19057STRMPLAN.dwg 1/21/2021 2:33 PM 8" 'VC SS 24" CONC SD 5 OHP- 24" CONS SD 12" SD 8'' PVC SS W 12" SD 8" PVC SS HP- Gay =t=+esrsr:rtr 24" CONS SD 8" DIP INTERURBAN AVE S ALIGNMENT DATA NUMBER START STA NORTHING EASTING LENGTH BRNG L1 0+00.00 176907.13 1287968.68 100.00' N 43'44'01" W L2 1+00.00 176979.38 1287899.55 200.00' N 49'31'49" W CONNECT EXISTING PIPES—=== TO NEW STRUCTURE 30 CB TYPE 2-72" 0 (2) ROUND SOLID LID STA 0+05.17, 22.96' RT 25 RIM 20.07 IE OUT 14.17 (12"NE) IE IN 14.27 (24"SE) —IE OUT 14.27 (24"NW) 20 15 10 5 UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL 1 24" CONIC SD 12" SD CB TYPE 2-48" ROUND SOLID LID STA 0+05.13, 31.13' RT 51 RIM 20.02 IE IN 14.13 (12"SW) IE OUT 14.13 (12"NW) MWS 4'X19' o -i rn , - -N-Nik PVC Awn Psi PLAN 0 10 20 40 60 SCALE IN FEET LF 12" SD_ S=0.50% EXIST 24" RCP 76 LF 12" SD 8 LF 12" SD S=0.50% S=0.50% CB TYPE 2-48" ROUND SOLID LID STA 0+98.32, 21.25' RT 54 RIM 19.97 IE IN 13.09 (12"NE) IE OUT 12.87 (24"NW) IE IN 14.07 (24"SE) - CONNECT PIPE TO NEW STRUCTURE ■. 'VC SS OHP 12" " OHP ONC SD INTERURBAN AVE S 92 LF 24" SD S=0.25% c 0HP , —OHP— — �I r LA4-ot : $ : $ $ $ B tea JtdoLr HOC ADDITIONAL BASEMAPPING TO BE COMPLETED PRIOR TO 90% SUBMITTAL 30 EXIST CB TYPE 2-60" STA 1+86.92, 38.72' RT RIM 19.49 25 IE IN 13.40 (24"SW) IE OUT 12.64 (24"NE) IE IN 12.64 (24"SE) LL SAME CONNECT NEW PIPE 20 TO EXISTING STRUCTURE 15 10 5 WM dH0— — 30 25 20 15 10 5 e: GENERAL NOTES 1. SEE SHEET 2 FOR ADDITIONAL GENERAL NOTES. CONSTRUCTION NOTES OSAWCUT, REMOVE AND RESTORE PAVEMENT & MARKINGS TO INSTALL STORM DRAIN SYSTEM, PER COT STD PLAN RS-03. O SAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE SIDEWALK TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-09. OSAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE TRAFFIC CURB AND GUTTER TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-04 AND RS-15. 0 CONNECT EXISTING STORM DRAIN PIPE TO NEW STRUCTURE. ® CONNECT NEW STORM DRAIN PIPE TO EXISTING STRUCTURE. 8 INSTALL FLOW SPLITTER. 21 TRAFFIC LOOPS SHOWN ARE SCHEMATIC ONLY. CONTRACTOR TO VERIFY EXISTING LOOP LOCATION PRIOR TO EXCAVATION. 0 STORM PROFILE STA/OFF BASED UPON INTERURBAN AVE S. 0 INSTALL MODULAR WETLAND UNIT MWS 4' X 19'. SEE DETAIL MWS 4'X19' PROFILE HOR: 1"=40' VER: 1"=5' SAME STRUCTURE STRUCTURE 30 CONCRETE INLET STA 0+84.21, 36.73' RT 52 RIM 19.73 IE OUT 17.50 (8"SW) 20 15 5LF8"DIP S=2.00% 10 5 PUBLIC' WORKS DEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP MKE WRE date 10/2020 10/2020 10/2020 prof eng proj dir field bk no KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286.1640 Tacoma, WA 98402 (253)627-0720 une.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER PLAN AND PROFILES INTERURBAN AVE S 5 13 file 10 '9057STRMPLAN,DWG scale 1'=40' no date revisions date 10/2020 GENERAL NOTES \PROJECTS\TUKVOLA\19057—Storm WO Retrofit\DESIGN\Drawings\Contract\19057STRMPLAN.dwg 1/21/2021 2:34 PM SSMH 4508 RIM 26.92 IE 12.2 E-N 0 CTR CHANNEL 12" PVC IE 23.2 ELBOW - E MARGINAL WAY 0+00 13 NAG -FL SD OUTFALL GAS M RKER ANTES STEAM GAUGING STATIO CB 4503 RIM 27.19 IE 6.7 N, 24" CONC IE 6.4 S, 24" CONC 35 30 25 20 15 10 5 CHERRO6" SD 6 IF 12" SD UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL 0+00 CB 4550 RIM 26.68 RIM 25.42 IE 23.2 E, 12" CONC IE 22.8 S, 12" CONC IE23�7 W, 8"CAPS CB 4528 CONC WV MARKER CB 4507 RIM 26.36 IE 7.1 N, 24" CONC IE 21.8 N, 12" CONC IE 6.8 S, 24" CONC CONC WV MARKER SEE STORM DRAIN CROSSING ON SHEET 8 CB TYPE 1L O91 RECTANGULAR SOLID COVER STA 1+60.06, 16.14' LT RIM 25.63 IE NJ 23.36 (12"E) 1+00 IE OUT 22.38 (12"N) 110 1 NAG- FFFLLL SSMH 4524 RIM 23.57 IE 11.7 S-N 0 CTR CHAN" " 12" SD PLAN GP 0 10 20 40 SCALE IN FEET 60 SEE STORM DRAIN CROSSING ON SHEET 8 2+00 140 LF 12" SD S-2.41% CB 4526 12" SD RIM 22.54 IE 19.2 E. 12 CONC WV M CB TYPE 1L 92 ROUND SOLID LID STA 3+01.53, 15.78' LT RIM 22.67 IE IN 19.00 (12"S) IE IN 19.00 (12"E) IE IN 19.00 (12"W) IE OUT 19.00 (12"N) 3+00 CB 4525 RIM 22.49 RKER IE 7.4 N, 24" CONC IE 6.8 S, 24" CONC IE 18.0 W, 12" CONC 109 SPIKE 1• r. to SSMH 3148 RIM 21.21 IE 11.3 S-N 0 CTR CHANNEL 12" PVC 151 LF 12" SD S=1.49% 4+00 0 0 Z 1- 35 30 25 20 15 10 5 1. SEE SHEET 2 FOR ADDITIONAL GENERAL NOTES. CONSTRUCTION NOTES 0 SAWCUT, REMOVE AND RESTORE PAVEMENT & MARKINGS TO INSTALL STORM DRAIN SYSTEM, PER COT STD PLAN RS-03. O SAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE SIDEWALK TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-09. OSAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE TRAFFiC CURB AND GUTTER TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-04 AND RS-15. 12 INSTALL RECTANGULAR SOLID METAL COVER PER WSDOT STANDARD PLAN B-30.20. 0 ADJUST WATER METER. (37),REMOVE EXISTING CB AND CONNECT EXISTING STORM DRAINAGE PIPE TO PROPOSED MWS. 25 STORM PROFILE STA/OFF BASED UPON E MARGINAL WY. 30 INSTALL MODULAR WETLAND UNIT MWS 4' X 4' CLOSED VAULT WITH HIGH FLOW BYPASS. CONTROL POINT LIST PT # DESCRIPTION NORTHING EASTING ELEVATION 13 MAG-FL 186136.89 1280819.34 28.51' 109 SPIKE 186497.05 1280687.24 21.29' 110 MAG-FL 186275.14 1280682.07 23.71' E MARGINAL WAY ALIGNMENT DATA NUMBER START STA NORTHING 186122.32 EASTING LENGTH BRNG L7 0+00.00 1280790.20 110.28' N 817'07" W L8 1+10.28 186231.45 1280774.30 76.54' N 9'39'07" W L9 1+86.82 186306.91 1280761.47 84.58' N 11'43'00" W L10 2+71.41 186389.73 1280744.29 97.81' N 14'41'16" W L11 3+69.22 186484.34 1280719.49 39.43' N 16'55'41" W L12 4+08.65 186522.06 1280708.01 391.36' N 17'21'29" W PUBLIC' WORKS LDEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP MKE WRE date 10/2020 10/2020 10/2020 prof eng proj dir field bk no KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286.1640 Tacoma, WA 98402 (253)627-0720 WWW.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER PLAN AND PROFILES STA 0+00 TO STA 4+00 E MARGINAL WAY 6 ` 13 file no 19057STRMPLAN.DWG scale 1" = 40' no date revisions date 10/2020 GENERAL NOTES \PROJECTS\TUKWILA\19057—Storm WO Retrofit\DESIGN\Drawings\Contract\19O57STRMPLAN.dwg 1/21/2021 2:34 PM 35 30 25 20 15 10 5 CO MATCH LINE STA 4+00 S 4+00 GP CB 3149 RIM 19.63 IE 7.5 N, 24" CONC IE 7.4 S, 24" CONC IE 14.0 W, 12" CONC GP 12" SD 12" SD CB TYPE 1L RECTANGULAR SOLID COVER 93 STA 4+53.01, 17.55' LT RIM 20.01 IE IN 16.76 (12"E) SEE STORM DRAIN CROSSING IE IN 16.76 (12"S) ON SHEET 8 IE IN 16.76 (12"W) IE OUT 16.76 (12"N) 134 LF134 LF==159% 5+00 WEST SIDE CB 3100 RIM 19.17 IE 8.0 E, 24" CONC SSMH 3159 RIM 19.58 IE 15.8 S, 8"CPP IE 15.8 W, 8" CPP 411114 IE 8.3 S-E 0 CTR CHANNEL 12" CONC � o M CB 3151 RIM 18.91 IE 8.0 N, 24"C IE 8.0 S, 24"C IC 13.1 W, 12" 12" SD PLAN SSMH 3158 RIM 19.66 IE 6.0 W-E @ CTR CHANNEL 12" CONC 0 10 20 40 SCALE IN FEET CB TYPE 2-48" RECTANGULAR SOLID COVER 94 STA 5+87.24, 18.52' LT RIM 19.09 IE IN 16.50 (12"W) IE IN 14.62 (12"S) IE OUT 14.62 (12"NE) 60 SEE STORM DRAIN CROSSING ON SHEET 8 ------------- n 6+00 UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL 7+00 35 30 25 20 15 35 30 25 20 15 CB 3161 RIM 19.41 IE 8.2 5, 24" CONC IE 8.5 W, 24" CONC ISKai. LS 10 10 14 LF 12" DIP S=2.007 5 48" WATER PIPE 8+00 CB TYPE 1L STA 5+95.93, 27.12' RT RIM 18.91 IE IN 13.90 (12"SW) IE OUT 13.90 (12"E) TO WATER TREATMENT IE OUT 16.18 (12"N) OVERFLOW EXIST CB TYPE 2-48" STA 6+09.44, 26.84' RT RIM 18.92 IE IN 8.00 (24"N) 25 IE IN 0 (12) CONNECT NEW PIPES TO IE OUT 8.8.00 (24"S) EXISTING STRUCTURE IE IN 12.66 (12"E) SEE STORM DRAIN CROSSING IE IN 15.91 (12"S) !!! ON SHEET 8 20 5 EXIST 24" RCP 5+50 1. SEE SHEET 2 FOR ADDITIONAL GENERAL NOTES. CONSTRUCTION NOTES OSAWCUT, REMOVE AND RESTORE PAVEMENT & MARKINGS TO INSTALL STORM DRAIN SYSTEM, PER COT STD PLAN RS-03. O SAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE SIDEWALK TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-09. OSAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE TRAFFIC CURB AND GUTTER TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-04 AND RS-15. ® CONNECT NEW STORM DRAIN PIPE TO EXISTING STRUCTURE. @ REMOVE OR ABANDON (PLUG) STORM DRAINAGE PIPE. 12 INSTALL RECTANGULAR SOLID METAL COVER PER WSDOT STANDARD PLAN B-30.20. 25 STORM PROFILE STA/OFF BASED UPON E MARGINAL WY. 28 INSTALL MODULAR WETLAND UNIT MWS 4' X 17' CLOSED VAULT WITH HIGH FLOW BYPASS. 32 REMOVE AND RELOCATE EXISTING NO PARKING SIGN. CONTROL POINT LIST PT # DESCRIPTION NORTHING EASTING ELEVATION 12 SPIKE 186861.15 1280634.48 20.08' 35 LJ 6+00 EXIST 24" RCP EAST SIDE 7+00 30 15 10 5 PUBLIC' WORKS DEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked proj eng proj dir field bk no by KP MKE WRE WRE date 10/2020 10/2020 10/2020 10/2020 KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286.1640 Tacoma, WA 98402 (253)627-0720 WWW.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER PLAN AND PROFILES STA 4+00 TO STA 8+00 E MARGINAL WAY 7 ` 13 file no 19057STRMPLAN.DWG scale 1" = a0' no date revisions date 10/2020 \PROJECTS\TUKVOLA\19057—Storm WO Retrofit\DESIGN\Drawings\Contract\19057STRMPLAN.dwg 1/21/2021 2:35 PM 35 30 25 6 LF 12" DIP S=9.62%\ 86 CONCRETE INLET STA 4+53.07, 24.02' LT 20 RIM 20.43 - IE OUT 17.38 (12"E) 15 10 5 UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL 35 30 25 20 15 10 5 CB TYPE 1L CONVERSION RISER W ROUND SOLID LID STA 1+60.06, 16.14LT RIM 25.63 IE IN 23.36 (12"E) CONCRETE INLET IE OUT 22.38 (12"N) S=0.75% 40 LF 12" DIP 35 CB TYPE 1L CONVERSION RISER W/ ROUND SOLID LIDO. STA 4+53.01, 17.55' LT RIM 20.01 30 IE IN 16.76 (12"E) IE IN 16.76 (12"S) IE IN 16.76 (12"W) IE OUT 16.76 (12"N) 42 LF 1= S=2.17% CB TYPE 1 STA 4+52.27, 24.06' RT 85 RIM 19.80 IE OUT 17.66 (12"W) EG ALONG PIPE CENTERUNE 25 20 15 10 5 STA 1+62.88, 24.00' RT RIM 25.69 IE OUT 23.66 (12"W) 35 30 25 EG ALONG PIPE CENTERLINE 20 15 10 5 35 CB TYPE 2-48" 94 ROUND SOLID LID STA 5+87.24, 18.52' LT RIM 19.09 IE IN 16.50 (12"W) 30 IE IN 14.62 (12"S) IE OUT 14.62 (12"NE) 8 LE 12" DIP_ S=2.00% 25 20 15 10 5 T. CONCRETE INLET STA 5+86.87, 26.74' LT RIM 18.88 IE OUT 16.67 (12"E) 35 30 25 20 15 10 5 EG ALONG PIPE CENTERLINE 46 LF 12" SD S=1.55% PROFILE HOR: 1"=40' VER: 1"=5 6 LF 12" SD S=0.50% CB TYPE 1L CONVERSION RISER W ROUND SOLID LID 92 STA 3+01.53, 15.78' LT RIM 22.67 IE IN 19.00 (12"S) IE IN 19.00 (12"E) IE IN 19.00 (12"W) IE OUT 19.00 (12"N) CB TYPE 1L STA 5+95.93, 27.12' RT 83 RIM 18.91 IE IN 13.90 (12"SW) IE OUT 13.90 (12"E) IE OUT 16.18 (12"N) r 4'X17 MWS CLOSED VAULT 0 EG ALONG PIPE CENTERUNE 3939 L 12" DIP 35 30 35 30 CONCRETE INLET STA 2+97.25, 23.14' RT 87 RIM 22.58 IE OUT 20.56 (12"W) 25 35 20 15 10 5 EXIST CB TYPE 2-48" STA 6+09.44, 26.84' RT RIM 18.92 PLUG EXIS11NG PIPE IE IN 8.00 (24"N) IC IN 13.10 (12"SW) 25 25 IE OUT 8.00 (24"S) CONNECT NEW PIPES TO IE IN 15.9(12") EXISTING STRUCTURE IE IN 15.91 (12"S) 30 20 20 15 10 5 15 10 SAME 5 01 0� LJ STRUCTURE 35 30 25 6 LF 12" SD S=1.00% 20 r L. 4'X17' MWS CLOSED VAULT 15 10 5 PUBLIC WORKS DEPT_ * ENGINEERING *STREETS *WATER* SEWER *BUILDING * designed drawn checked proj eng proj dir field bk no by KP xxx WRE date 10/2020 10/2020 10/2020 IKPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627-0720 (206)286.1640 www.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER PLAN AND PROFILES E MARGINAL WAY PROFILES no date revisions 8 13 file no 19057STRMPLAN.DWG scale 1' = ao' date 10/2020 SITE SPECIFIC GENERAL NOTES DESIGN\Drawings\Contract\19057STRMPLAN.dwg 1/21/2021 2:36 PM \PROJECTS\TUKNLA\19057—Storm WQ Re 0+00 121 I CONC JERSEY BARRIER - 12" SD CB 5068 RIM 20.20 IE 16.4 SE, 6" CONC IE 16.2 S, 12" CONC IE 14.9 SE, 12" CONC V\''YCB 5053 RIM 20.41 IE 17.1 NE, 6" CONC IE 17.1 5, 12" CONC IE 17.1 N, 12" CONC SD 1+00 ® , , 1.74 CULV 5097 memtm ® �w�� IE 13.7. 12" CONS ��//i` � 12" SD TUKWILA INTL BLVD ALIGNMENT DATA NUMBER START STA NORTHING EASTING LENGTH BRNG L1 0+00.00 185236.62 1279085.02 300.00' N 10'44'10" E CONNECT EX PIPES TO NEW STRUCTURE INSTALL 18" RISER 30 CB TYPE 2-54" 81 ROUND SOLID LID STA 1+15.31, 13.20' RT RIM 20.21 IE OUT 16.20 (12"N) IE IN 16.20 (12' S IE IN 16.40 (6"SE 0 IE OUT 14.90 (12"SE) ON EXISTING OUTLET PIPE. SEE DETAIL SHEET. 15 10 5 0 CB TYPE 1L STA 1+24.41, 7.62' RT `1W RIM 21.13 IE IN 16.15 (12"S) IE OUT 16.15 (12"N) MWS 4'X8'-\ 49 LF 12" SD S=0.50% 1 LF 12" SD S=0.50% UTILITY LOCATION AND COORDINATION TO BE INCLUDED IN 90% SUBMITTAL SIBLE.CU LV. LOCATION -NOT. FOUND SCALE IN FEET CB TYPE 2-48" ROUND SOLID LID STA 1+74.87, 22.41' RT 80 RIM 22.82 CB TYPE 2-48" IE IN 14.10 (12"W) ROUND SOLID LID IE OUT 14.10 (12"S) STA 1+29.04, 41.27' RT RIM 21.86 IE IN 13.82 (12"N) IE OUT 13.82 (12"S) n 77 50 LF 12" SD S=0.55% 11 LF 12" SD S=0.50% 25 LF 12" SD S=0.50% OUTLET IE 13.72 REMOVE EXISTING SEDIMENT IN DITCH TO EL. 13.00 EX 24" CONC CULVERT IE 13.00 (E) ... .... .... 2+0 TUKWILA INTL BLVD " SD EG ALONG PIPE CENTERLINE PROFILE HOR: 1"=40' VER: 1"=5' 30 25 20 15 10 5 0 1 SD CB 5149 RIM 23.08 IE 19.7 E, 12" CONC CULV 5174 1E 712,77S C91,14. 3+00 30 LF RIVERTON CREEK CB TYPE 1L STA 2+61.08, 29.37RT RIM 23.42 IE OUT 21.00 (12"S) 25 EG ALONG PIPE-� CENTERLINE 20 3 LF 12" SD S=2.00% 15 10 5 MWS 4'X4' CLOSED VAULT 25 20 15 EXISTING ROCKERY WALL FACE 10 5 1. SEE SHEET 2 FOR ADDITIONAL GENERAL NOTES. 2. OHW, WETLAND, AND RIVERTON CREEK FLOWUNE, ARE AT APPROXIMATE LOCATIONS AS DELINEATED IN THE FIELD BY THIRD PARTY. REVEGETATION NOTES 1. REMOVE ALL EXCESS MATERIAL AND DEBRIS FROM AREAS TO BE SEEDED. DISPOSE OF REMOVED MATERIALS OFFSITE. 2. PREPARE ROADSIDE SEEDING AREA TO A WEED FREE AND BARE CONDITION. 3. BRING AREA TO UNIFORM GRADE AND TILL 3" FINE COMPOST INTO TOP 6" OF NATIVE SOIL AREA TO BE SEEDED. ANY SLOPES 3(H) TO 1(V) OR STEEPER SHALL NOTE BE TILLED UNLESS OTHERWISE SPECIFIED. 4. COMPACT TO PROVIDE A REASONABLY FIRM BUT FRIABLE SEEDBED. CONDITION THE SOIL WITH SUFFICIENT WATER UNTIL COMPLETION OF THE SEEDING. 5. SEED WITHIN 2 DAYS OF PREPARATION PER STANDARD SPECIFICATION 9-14.3. CONSTRUCTION NOTES OSAWCUT, REMOVE AND RESTORE PAVEMENT & MARKINGS TO INSTALL STORM DRAIN SYSTEM, PER COT STD PLAN RS-03. SAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE SIDEWALK TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-09. OSAWCUT, REMOVE, AND RESTORE CEMENT CONCRETE TRAFFIC CURB AND GUTTER TO INSTALL STORM DRAIN SYSTEM PER COT STD PLAN RS-04 AND RS-15. 0 CONNECT EXISTING STORM DRAIN PIPE TO NEW STRUCTURE. 0 REMOVE STORM DRAIN STRUCTURE 13 REMOVE SEDIMENT FROM EXISTING DITCH. REPAIR OR REPLACE EXISTING PIPE OUTFALL PROTECTION. 0 REMOVE AND RESTORE ROCKERY. 0 REMOVE AND RESET GUARDRAIL PER WSDOT STD PLAN C-20.10. 20 INSTALL MODULAR WETLAND UNIT MWS 4' X 8' CLOSED VAULT. ;- REMOVE EXISTING CB AND CONNECT EXISTING STORM DRAINAGE PIPE TO PROPOSED MWS. 26 STORM PROFILE STA/OFF BASED UPON TUKWILA INTL BLVD. 27 RESTORE VEGETATION AROUND GRADING UNITS IN -KIND. SEE REVEGETATION NOTES, THIS SHEET. 30 INSTALL MODULAR WETLAND UNIT MWS 4' X 4' CLOSED VAULT WITH HIGH FLOW BYPASS. 31 PROTECT AND MAINTAIN EXISTING ROCKERY WALL STABILITY DURING INSTALLATION OF WQ IMPROVEMENTS. 33 INSTALL 18" CMP RISER IN EXISTING 12" OUTLET PIPE. SET TOP OF RISER AT ELEVATION EQUAL TO MODULAR WETLAND HIGH FLOW BYPASS WEIR WALL. LEGEND ORGINARY HIGH WATER LINE WETLAND BOUNDARY UNE APPROX. GRADING LIMIT BANKWIDTH UNE PUBLIC' WORKS LDEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP MKE WRE date 10/2020 10/2020 10/2020 proj eng proj dir field bk no KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286-1640 Tacoma. WA 98402 (253) 627-0720 www,kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER PLAN AND PROFILES TUKWILA INTL BLVD no date revisions 9 13 file no 19057STRMPLAN.DWG scale 1. = 40' date 10/2020 / \PROJECTS\TUKI1LA\19057—Storm WQ Retrofit\DESIGN\Drawings\Contract\19057STRMDET.dwg 1/21/2021 2 SITE SPECIFIC DATA PROJECT NUMBER PROJECT NAME PROJECT LOCATION STRUCTURE ID TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (Cf5) N/A 0.346 PEAK BYPASS REQUIRED (CES) - IF APPLICABLE OFFUNE PIPE DATA I.E. MATERIAL DIAMETER INLET PIPE 1 INLET PIPE 2 N/A N/A N/A OUTLET PIPE PRETREATMENT BLO1TLIA170N DISCHARGE RIM ELEVATION SURFACE LOAD PEDESTRIAN FRAME & COMER 2EA 030' IOPENPLANTER I 024' NOTE: `PRELIMINARY NOT FOR CONSTRUCTION INSTALLATION NOTES 1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS' AND INCIDENTALS REQUIRED RO OFFLOAD AND INSTALL THE Sr51EM AND APPURTENANCES IN ACCORDANCE MITI THIS DRAWING AND THE MANUFACTURERS SPECIFICATIONS, UNLESS OTHERMSE STATED IN MANUFACTURERS CONTRACT. 2. UNIT MUST BE INSTALLED ON LEVEL BASE MANUFACTURER RECOMMEIDS A MINIMUM 6' LEVEL ROCK BASE UNLESS SPECLA0 BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE RO VERIFY PROJECT ENGINEERS RECOMMENDED BASE SPECIRATTONS. 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXIERRA CONNECTING PIPES ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE. (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CYL4MBER FLOOR. ALL PIPES SHALL BE SEALED WATER TIGHT PER MANUFACTURERS STANDARD CONNECTION DETAIL 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL RISERS MANHOLES AND HATCHES CONTRACTOR TO GROUT ALL MANHOLES AND PATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS ALL UNITS Mill VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPUED AND INSTALLED BY OTHERS. 7. CONTRACTOR RESPONSIBLE FOR CONTACTING BIO CLEAN FOR ACTIVATION OF UNIT MANUFACTURERS WARRANTY IS VOID WITH OUT PROPER ACTIVATION BY A /10 CLEAN REPRESENTATIVE WETIANOMEDM BED PATENTED PERIMETER VOID AREA chi PRE -FILTER CARTRIDGE INLET PIPE SEE NOTES GENERAL NOTES 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2. ALL DIMENSIONS ELEVATIONS SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WETCHIS AND ACCESSORIES PLEASE CONTACT BID CLEAN c/L DRAIN DOWN LINE PLAN VIEW 12' 0' 13' 0' ELEVATION VIEW VERTICAL UNDERORAIN MANIFOLD `OUTLET PIPE SEE NOTES VEGETATION—_ 1' PLANT ESTABLISHMENT NEON if6" LEFT END VIEW RIGHT END VIEW TREATMENT FLOW (CfS) STING HEAD (FT) PRETREATMENT LOADING RATE (GPM/SF) WETLAND MEDIA LOADING RATE ((,PM/SF) 0.346 3.4 2.0 1.0 routmc Rums F Bio qv aean ,, nae.vn nnEo; wr r usfq ROW= m zoame exam rem wwr d ANI OMER Aml ON NE IRMA' COMMIT OF MOM ARROMOCMPIM PROPRIETARY AND CONFIDENTIAL: MWS-L-8-12-V STORMWATER BIOFILTRATION SYSTEM STANDARD DETAIL MODULAR WETLAND SYSTEMS LINEAR 8' X 12' NTS NOTE: STANDARD DETAIL WILL BE REPLACED BY VENDOR PROVIDE DRAWINGS FOR 90% SUBMITTAL. BASIS OF DESIGN IS BIOCLEAN LINEAR MODULAR WETLAND UNITS AND MAY BE REPLACED BY EQUIVALENT DOE GULD APPROVED ENHANCED WATER QUALITY TREATMENT TECHNOLOGY. CONFIGURATION OF FACILITY WILL BE CLOSED TOP (NO PLANTINGS) WITH LIDS AND HATCHES RATED FOR H-20 TRAFFIC LOADING. VENDOR TO DESIGN HATCHES TO MAINTAIN MEDIA FILTER SYSTEMS. PUBLIC' WORKS DEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP KP WRE date 10/2020 10/2020 10/2020 prof eng proj dir field bk no KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286-1640 Tacoma, WA 98402 (253)627-0720 www.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER DETAILS STARFIRE WAY DETAILS 10 13 file no 19057STRMDET.DWG scale 1 = ao' no date revisions date 10/2020 0_ \PROJECTS\TUKI1LA\19057—Storm WQ Retrofit\DESIGN\Drawings\Contract\19057STRMDET.dwg 1/21/2021 2 TYPE 2 CB, 72" DIA. HANDHOLD AND STEPS OR LADDER ACCESS (PROVIDE LADDERS TO BOTH SIDES OF WALL) INFLOW 4" MIN. THICKNESS REINFORCED CONCRETE BAFFLE WALL OR APPROVED EQUAL TO BYPASS CONVEYANCE SYSTEM A REINFORCED BAFFLE WALL GROUTED TO MANHOLE STRUCTURE (BOTH ENDS) INFLOW TO WQ FACILITY PLAN VIEW NTS TWO ROUND SOUD LIDS LOCATE ON BOTH SIDES OF WEIR WALL SECTION A —A NTS BYPASS PIPE TOP OF 6' WIDE WEIR COORDINATE WITH VENDOR FOR TREATMENT FACILITY TO ESTABLISH ELEVATION TYPICAL FLOW SPLITTER STRUCTURE DETAIL NTS TO WQ FACILITY SITE SPECIFIC DATA PROJECT NUMBER PROJECT NINE PATENTED VORTICAL UMANJFONDERDRAIN PROJECT LOCATION LD C/L STRUCTURE ID MANHOLE • TREATMENT REQUIRED - V INLET PPE i� - �L� 1�fa'i`: �. C/L ALUME BASED (CF) FLOW BASED (CFS) SEE NOTES 11-- Dy �� ]Pi .0 N/A 0.237 1 !4 u l�T 1A • • 6 •� o • • •u►��� I•� i PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE OFFLINE �' E,: U / y. ir�33 - PIPE DATA LE MINERAL DIAMETER SI CI 3 f ~.- Ail - ._ `�.: 37"'' OUTLET PIPE —U INLET PIPE 1 PRE �� - �G .. -5 r e3 SEE AWES I�II CARTRIDGE I INLET PIPE 2 N/A N/A N/A 11 OUTLET PIPE PRETREATMENT B/Of1LRUTION DISCHARGE WENANDM£DIA DRAIN DOWN LINE BED • 4' O. , `D RIM ELEVATION 5' 0• SURFACE LOAD PEDESTRIAN FRAME & COVER 030• IOPENPLANTER I /24' PLAN LEFT END VIEW NOTES: • PRELIMINARY NOT FORCONSTRUCTTON INSTALLATION NOTES VECETADONti1 I I. CONRACTOR TO PROVIDE ALL TABOR, EQUIPMENT, MATERIALS AND RANT! / I I MANHOLE INCIDENTALS REQUIRED 73 OFFLOAD AND INSTALL THE SROEM AND ESTABLISHMENT�. L/`C 1 /.. C/L APPURTENANCES IN ACCORDANCE WIN 771S DRAWING AND THE MEOW I / J i!/ �Ilt' �/ / '10 , 1 MANUFACTURERS SPECIFICATIONS, UNLESS OIHEROOISE STATED N RBI/FG L�-�� RIM/FG M� �1=1 MANUFACTURERS CONTRACT, 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6• LEVEL ROCK 845E UNLESS BY �� v ':G M- ' - _ - _�•ic, c.�. FLOW }T IT) VERIFY THE PROJECT ENGINEER. CONTRACTOR RESPONSIBLE 7a VERIFY I- w,N Ss^ wununi.�uwuwuu*uwmnum *wwwuun�. r"e-�` - CONTROL PROJECT ENGINEERS RECOMMENDED BASE SPEGH7C9710N5: 4. CONTRACTOR 70 SUPPLY AND INSTALL ALL EXTERNAL CONNECTING . : s.;= y :"� -Y RISER _ PIPES. ALL PIPES MUST BE RUSH WITH INSIDE SURFACE OF 'ti deli noun] ununumuu umiinmmu (• n LI I'J 1o CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF fi IE OUT OUTFLOW PIPE MUST BE FLUSH W1TH DISCHARGE CHAMBER FLOOR- I ALL PIPES SHALL BE SEALED WATER ]/GAIT PER MANUFACTURERS 6'—I I 1 _.:. ..-.-.e _BA,RE --. 79'-0' - 6. h STANDARD CONNECTION DETAIL 20'-0' 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL RISERS, MANHOLES, AND HATCHES. CONITACTOR TO GROUT ALL MANHOLES AND ELEVATION VIEW RIGHT END VIEW HATCHES TO MATCH FNISHED SURFACE UNLESS SPECIRED OMERWISE 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS ALL UNITS WITH VEGETATION MUST HAIE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS TREATMENT FLOW (CFS) 0.237 Z CONTRACTOR RESPONSIBLE FOR CONTACTING BIO CLEAN FOR ACTIVATION OF UNIT. MANUFACTURERS WARRANTY IS VOID WITH OUT OPERATING HEAD (F7) 3,4 PROPER ACTIVATION BY A DO CLEAN REPRESENTATIVE PRETREATMENT LOADING RATE (CPM/SF) 2.1 GENERAL NOTES WETLAND MEDIA LOADING RATE (GPM/SF) 1.0 ! 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2. ALL DIMENSION$ E2EYARMS SPECYFIATIONS AND CAPACITIES ARE SUBJECT 70 CND AC FOR ES FAR CONTACT 910 L aEraLuvc ENACT awMEruNONs WE7GAI75 AND ACCESSORIES PIFdSE CONTACT BIO CLEW. 7Q, „ _ _ „ F.�a �iV%f71 A" " IVUS ----- PROPRIETARY AND CONE/DENIAL ME wnaxrKw mvurrn N ]I6 uw•xx b ]IE ser N a.5 MI5 OR LYtlS smm. as 55555155. N 511A°AAS Anit •"- ", "m"' vem,¢ww Cr wacw xcn,w9s snma b ran • `i v Rio Clean AM•nOm••• MWS-L-4-19-V STORMWATER 8/OFILTRATION SYSTEM STANDARD DETAIL MODULAR WETLAND SYSTEMS LINEAR 4' X 19' NTS NOTE: STANDARD DETAIL WILL BE REPLACED BY VENDOR PROVIDE DRAWINGS FOR 90% SUBMITTAL BASIS OF DESIGN IS BIOCLEAN LINEAR MODULAR WETLAND UNITS AND MAY BE REPLACED BY EQUIVALENT DOE GULD APPROVED ENHANCED WATER QUALITY TREATMENT TECHNOLOGY. CONFIGURATION OF FACIUTY WILL BE CLOSED TOP (NO PLANTINGS) WITH LIDS AND HATCHES RATED FOR H-20 TRAFFIC LOADING. VENDOR TO DESIGN HATCHES TO MAINTAIN MEDIA FILTER SYSTEMS. PUBLIC' WORKS DEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP KP WRE date 10/2020 10/2020 10/2020 proj eng proj dir field bk no KPG Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286-1640 Tacoma, WA 98402 (253)627-0720 www.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER DETAILS INTERURBAN AVE S DETAILS 11 13 file no 19057STRMDET.DWG scale 1 = a0' no date revisions date 10/2020 } 0_ \PROJECTS\TUKI1LA\19057—Storm WQ Retrofit\DESIGN\Drawings\Contract\19057STRMDET.dwg 1/21/2021 2 INLET PIPE SEE NOTES PRE —FILTER CARTRIDGE OUTLET PIPE SEE NOTES PLAN VIEW VERTICAL UNDERDRAIN MANIFOLD WETLANDMEDIA BED PATENTED PERIMETER VOID AREA RIGHT END VIEW LEFT END VIEW ELEVATION VIEW MODULAR WETLAND SYSTEMS LINEAR 4' X 4' NTS HATCH CAST —IN 8" THICK CONCRETE COLLAR BY PRE —CASTER. CONTRACTOR TO SHIM/WEDGE COLLAR TO MEET FS FLOW CONTROL RISER SITE SPECIFIC DATA PROJECT NUMBER PROJECT NAME PATENTED VERTICAL UNDERDRAIN PROJECT LOCATION PER/METE? VOID AREA C/L MANIFOLD STRUCTURE ID MANHOLE TREATMENT REQUIRED INLET PIPE �'-'L■ _ " �'. '.� � C/L VOLUME (CF) FLOW BASED (Cf5) SEE NOTES i i,, YIN'V ]0i _�C _ N/A n H I 1 !' ;, i► �i d 0 •' c .• • •i PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE OFFLINE ;tii• PIPE DATA I.E. MATERIAL DIAMETER '�: till V ,,. DIME( PIPE U- INLET PIPE I PRE-FILTER��� � SEE NOTES CARTRIDGE INLET PIPE 2 WA WA N/A ,II OUTLET PIPE WOOIANDMEDIA B/0FN77L4IION DISCHARGE BED DRAIN DOWN LINEPRETREATMENT 6' 5' 0' 'O RIM ELEVATION SURFACE LOAD PEDESTRIAN 5' 0' /76WE & COVER 030' I OPEN PLANTER I 024' PLAN VIEW LEFT END VIEW NOTES: • PRELIMINARY NOT FOR CONSTRUCTION INSTALLATION NOTES VEGETATION.,, I. CONTRACTOR TO PROVIDE ALL LABOR, EWIPMEN(, MATE IALS AND PUNT INCIDENTALS REWIRED TO OFFLOAD AND INSTALL THE SYSTEM AND ESTABLISHMENT APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MEDIA I 1 A ' / J MANHOLE l C/C C/L 6/A j I ' J f / J f % f IT' MANUFACTURERS SPECIFICATIONS UNLESS OTHERWISE STATED IN RIM J�CI ,,� �� '1 RIM/FG i� MANUFACTURERS CONTRACT. 2. UNIT MUST BE INSTALLED LW LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6' LEVEL ROCK BASE UNLESS SPECIFIED BY -' `'; FLOW CONTROL THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE TO VERIFY L IN PROJECT ENGINEERS RECOMMENDED 80.5E SPECIFICATIONS 4. CONTRACTOR TO SUPPLY AND INSTALL AU EXTERNAL CONNECTNG . •"� III . _--- u* -. iwwwuw* uwnunuo� -_4 1rrp-. ., . >'2; _ M_ ,illl I I RISER N ' (") I� PIPES. ALL PIPES MUST BE FLUSH WITH IA/SIDE SURFACE OF CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF v L - fifi I IE OUT 1 I OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. I AU PIPES SMALL BE SEALED WATER TIGHT PER AAANIIFACTURERS I � f 16`MI BASE ',.1 • _ -. 6'�i T7'-0' 1�6' In STANDARD CONNECTION DETAIL. I TB'-O' I 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OFALL RISERS MANHOLES AND HATCHES CONTRACTOR TO GROUT AU MANHOLES AND ELEVATION VIEW RIGHT END VIEW MATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE 6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS ALL UNRS WITH VEGETATION MUST MVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS TREATMENT FLOW (CFS) 0.206 7 CONTRACTOR RESPONSIBLE FOR CONTACTING BID CLEAN FOR ACTIVATION OF UNIT MANUFACTURERS WARRANTY IS VOID W7IH OUT OPERATING HEAD (FT) 3.J PROPER ACTIVATION BY A BID CLEAN REPRESENTATIVE PRETREATMENT LOADING RATE (GPM/SF) GENERAL NOTES WERAND MEDIA LOADING RATE (GPM/SF) L7 I. MWUFACTURER TO PROWDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2 ALL DIMENSIONS. ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE FOR PROJECT SPECIFIC DRAWINGS DOWLING EXACT DIMENSIONS WEIGHTS AND ACCESSORIES PI FAWF CONTACT BID CLEAN. �.,„ a. us Awn muse „o, u PROPRIETARY AND CONFIDENTIAL' r .m N 1 kale. A,wr "` 5°" III MT OF AS A ME 11E MTfX PF96SpV or IIODULR WINOS snaps mamma w `l ,, Bio �/ Clean Afal•n0awp MWS-L-4-17-V STORMWATER B10FlLTRATION SYSTEM STANDARD DETAIL NOTE: STANDARD DETAIL WILL BE REPLACED BY VENDOR PROVIDE DRAWINGS FOR 90% SUBMITTAL. BASIS OF DESIGN IS BIOCLEAN LINEAR MODULAR WETLAND UNITS AND MAY BE REPLACED BY EQUIVALENT DOE GULD APPROVED ENHANCED WATER QUALITY TREATMENT TECHNOLOGY. CONFIGURATION OF FACILITY WILL BE CLOSED TOP (NO PLANTINGS) WITH LIDS AND HATCHES RATED FOR H-20 TRAFFIC LOADING. VENDOR TO DESIGN HATCHES TO MAINTAIN MEDIA FILTER SYSTEMS. MODULAR WETLAND SYSTEMS LINEAR 4' X 17' NTS PUBLIC' WORKS D_EP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP KP WRE date 10/2020 10/2020 10/2020 prof eng proj dir field bk no KPQ Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286-1640 Tacoma, WA 98402 (253)627-0720 www.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER DETAILS E MARGINAL WAY DETAILS 12 13 file no 19057STRMDET.DWG scale 1 = ao' no date revisions date 10/2020 } \PROJECTS\TUKI1LA\19057—Storm WQ Retrofit \DESIGN\Drawings\Contract\19057STRMDET.dwg 1/21/2021 2 INLET PIPE SEE NOTES PRE —FILTER CARTRIDGE OUTLET PIPE SEE NOTES RISER OVERFLOW VERTICAL UNDERDRAIN MANIFOLD WETLANDMEDIA BED PATENTED PLAN VIEW PERIMETER VOID AREA ELEVATION VIEW ELEVATION TO BE COORDINATION WITH VENDOR STAINLESS STEEL BAND FASTENERS TO MOUNT RISER TO FACE OF INSIDE WALL OF STRUCTURE INSERT RISER OUTLET INTO EXISTING 12" PIPE. CONTRACTOR TO VERIFY PIPE SIZE AND PROVIDE WATER TIGHT FIT RIGHT END VIEW LEFT END VIEW MODULAR WETLAND SYSTEMS LINEAR 4' X 4' NTS RISER OVERFLOW DETAIL FOR HIGH FLOW BYPASS HATCH CAST —IN 8" THICK CONCRET= COLLAR BY PRE —CASTER. CONTRACTOR TO SHIM/WEDGE COLLAR TO MEET FS FLOW CONTROL RISER SITE SPECIFIC DATA PROJECT NUMBER PROJECT NAME PROJECT LOCATION STRUCTURE ID TREATMENT REQUIRED VOLUME BASED (CF) fLOW BASED (CfS) N/A 0.115 PEAK BYPASS REQUIRED (CIS) - IF APPLICABLE OFFLINE PIPE DATA LE. MATERIAL DIAMETER INLET PIPE 1 INLET PIPE 2 WA WA WA OUTLET PPE PRETREATMENT B/OF7L7RAIION DISCHARGE RIM ELEVATION SURFACE LOAD PEDESTRIAN FRAME k COVER 36' X 36' I OPEN PLANTER I N/A NOTES:' • PRELIMINARY NOT FOR CONSTRUCTION INSTALLATION NOTES 1. CONTRACTOR 70 PROVIH£ ALL LABOR, EQUIPMENT, MATERIALS AND INCIDENTALS REQUIRED 70 OFFLOAD AND INSTALL THE srsIEM AND APPURTENANCES IN ACCORDANCE NTH THIS DRAWING AND THE MANUFACTURERS SPECIFICATIONS, UNLESS O7HERIWSE STATED IN MANUFACTURERS CONTRACT. 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6' LEVEL ROCK 84SE UNLESS SPECIFIED BY 7H£ PROJECT ENGINEER. CONTRACTOR /S RESPONSIBLE 70 Vfl1IFY PROJECT ENGINEERS RECOMMENDED BASE SPECIFICATIONS 4. CONTRACTOR TO SUPPLY AND INSTALL All EXTERNAL CONNECTING POPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE. (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE 'PAIFD WATER TIGHT PER MINUFACT7/RERS STANDARD CONNECTION DETAIL 5. CONTRACTOR RESPONSIBLE FIR INSTALLATION OF ALL ROSERS, MANHOLES AND HATCHES CONTRACTOR 70 GROUT ALL MANHOLES AND PATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE 6 VEGETATION SUPPLIED AND INSTALLED BY OTHERS ALL UNITS IRO/ VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS 7. CONTRACTOR RESPONSIBLE FOR CONTACTING B10 CLEAN FOR ACTIVATION OF UNIT. MANUFACTURERS WARRANTY IS VOID WITH OUT PROPER ACTIVATION BY A B/0 CLEAN REPRESENTATIVE GENERAL NOTES 1. MANUFACTURER 70 PROVIDE ALL MATERIALS UNLESS °THERIWWSE NOTED. 2. ALL DIMENSIONS; ELEVATIONS SPECIFICATIONS AND CAPACITIES ARE SUBJECT 70 CHANCE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WOWS AND ACCESSORIES PLEASE CONTACT B10 CLEAN. WETLANDMEDIA C/L BED PATENTED PERIMETER VOID AREA DRAIN DOWN LINE VERTICAL UNDERDRAIN MANIFOLD INLET PIPE OUTLET PPE SEE NOTES SEE NOTES PLAN VIEW ELEVATION VIEW VEGETATION-, / ) PLANT ESTABLISHMENT MEDIA LEFT END VIEW TREATMENT FLOW (CPS) OPERATING HEAD (FT) PRETREATMENT LOADING RATE (CPM/SF) WETLAND MEDIA LOADING RA7E (GAM/SF) 0.115 3.4 2.0 1.0 k .L� PROPRIETARY AND CONFIDENIAL IV _oAL 110111.1 oRi•o�Clean IM.VER/Y LFONN O Mtl !/5 LtlM1lS 116 LELY.PE B V Riff PRIff DEREK NAY BE OSFA WOWED OR WPM 'ro=i. s a RI MO uwxx KW d? Aa NW. mm? OF rzwaAM ��a// AMn•Osms MWS—L-4-8—V STORMWATER B/OF/LTRATION SYSTEM STANDARD DETAIL NOTE: STANDARD DETAIL WILL BE REPLACED BY VENDOR PROVIDE DRAWINGS FOR 90% SUBMITTAL. BASIS OF DESIGN IS BIOCLEAN LINEAR MODULAR WETLAND UNITS AND MAY BE REPLACED BY EQUIVALENT DOE GULD APPROVED ENHANCED WATER QUALITY TREATMENT TECHNOLOGY. CONFIGURATION OF FACIUTY WILL BE CLOSED TOP (NO PLANTINGS) WITH LIDS AND HATCHES RATED FOR H-20 TRAFFIC LOADING. VENDOR TO DESIGN HATCHES TO MAINTAIN MEDIA FILTER SYSTEMS. MODULAR WETLAND SYSTEMS LINEAR 4' X 8' NTS INSTALL EROSION CONTROL FABRIC 12" DEPTH QUARRY AND HYDROSEED DISTURBED SLOPE SPALLS & HAND PLACED RIPRAP FOR CHANNEL PROTECTION, 5' MIN 2:1 MAX SLOPE WIDTH. CHOKE VOIDS WITH QUARRY SPALLS EXISTING CHANNEL CONSTRUCTION GEOTEXTILE FOR SEPARATION COMPACTED SUBGRADE PIPE SLOPE PROTECTION & SLOPE RESTORATION DETAIL NTS NTS PUBLIC WORKS DEP T_ * ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked by KP KP WRE date 10/2020 10/2020 10/2020 prof eng proj dir field bk no KPG Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Seattle, WA 98121 (206) 286-1640 Tacoma, WA 98402 (253)627-0720 www.kpg.com DOE DESIGN REPORT SUBMITTAL STORMWATER OUTFALLS WATER QUALITY RETROFIT PROJECT STORMWATER DETAILS TUKWILA INTL BLVD DETAILS 13 13 file no 19057STRMDET.DWG scale 1 = 40 no date revisions date 10/2020 } City of Tukwila Stormwater Outfall Water Quality Retrofit Project Design Report APPENDIX F — GULD & Operation and Maintenance Information October 2020 KPG WASHINGTGN STATE EECAOTLEOTG GY July 2017 GENERAL USE LEVEL DESIGNATION FOR BASIC, ENHANCED, AND PHOSPHORUS TREATMENT For the MWS-Linear Modular Wetland Ecology's Decision: Based on Modular Wetland Systems, Inc. application submissions, including the Technical Evaluation Report, dated April 1, 2014, Ecology hereby issues the following use level designation: 1. General use level designation (GULD) for the MWS-Linear Modular Wetland Stormwater Treatment System for Basic treatment • Sized at a hydraulic loading rate of 1 gallon per minute (gpm) per square foot (sq ft) of wetland cell surface area. For moderate pollutant loading rates (low to medium density residential basins), size the Prefilters at 3.0 gpm/sq ft of cartridge surface area. For high loading rates (commercial and industrial basins), size the Prefilters at 2.1 gpm/sq ft of cartridge surface area. 2. General use level designation (GULD) for the MWS-Linear Modular Wetland Stormwater Treatment System for Phosphorus treatment • Sized at a hydraulic loading rate of 1 gallon per minute (gpm) per square foot (sq ft) of wetland cell surface area. For moderate pollutant loading rates (low to medium density residential basins), size the Prefilters at 3.0 gpm/sq ft of cartridge surface area. For high loading rates (commercial and industrial basins), size the Prefilters at 2.1 gpm/sq ft of cartridge surface area. 3. General use level designation (GULD) for the MWS-Linear Modular Wetland Stormwater Treatment System for Enhanced treatment • Sized at a hydraulic loading rate of 1 gallon per minute (gpm) per square foot (sq ft) of wetland cell surface area. For moderate pollutant loading rates (low to medium density residential basins), size the Prefilters at 3.0 gpm/sq ft of cartridge surface area. For high loading rates (commercial and industrial basins), size the Prefilters at 2.1 gpm/sq ft of cartridge surface area. 4. Ecology approves the MWS - Linear Modular Wetland Stormwater Treatment System units for Basic, Phosphorus, and Enhanced treatment at the hydraulic loading rate listed above. Designers shall calculate the water quality design flow rates using the following procedures: • Western Washington: For treatment installed upstream of detention or retention, the water quality design flow rate is the peak 15-minute flow rate as calculated using the latest version of the Western Washington Hydrology Model or other Ecology -approved continuous runoff model. • Eastern Washington: For treatment installed upstream of detention or retention, the water quality design flow rate is the peak 15-minute flow rate as calculated using one of the three methods described in Chapter 2.2.5 of the Stormwater Management Manual for Eastern Washington (SWMMEW) or local manual. • Entire State: For treatment installed downstream of detention, the water quality design flow rate is the full 2-year release rate of the detention facility. 5. These use level designations have no expiration date but may be revoked or amended by Ecology, and are subject to the conditions specified below. Ecology's Conditions of Use: Applicants shall comply with the following conditions: 1. Design, assemble, install, operate, and maintain the MWS — Linear Modular Wetland Stormwater Treatment System units, in accordance with Modular Wetland Systems, Inc. applicable manuals and documents and the Ecology Decision. 2. Each site plan must undergo Modular Wetland Systems, Inc. review and approval before site installation. This ensures that site grading and slope are appropriate for use of a MWS — Linear Modular Wetland Stormwater Treatment System unit. 3. MWS — Linear Modular Wetland Stormwater Treatment System media shall conform to the specifications submitted to, and approved by, Ecology. 4. The applicant tested the MWS — Linear Modular Wetland Stormwater Treatment System with an external bypass weir. This weir limited the depth of water flowing through the media, and therefore the active treatment area, to below the root zone of the plants. This GULD applies to MWS — Linear Modular Wetland Stormwater Treatment Systems whether plants are included in the final product or not. 5. Maintenance: The required maintenance interval for stormwater treatment devices is often dependent upon the degree of pollutant loading from a particular drainage basin. Therefore, Ecology does not endorse or recommend a "one size fits all" maintenance cycle for a particular model/size of manufactured filter treatment device. • Typically, Modular Wetland Systems, Inc. designs MWS - Linear Modular Wetland systems for a target prefilter media life of 6 to 12 months. • Indications of the need for maintenance include effluent flow decreasing to below the design flow rate or decrease in treatment below required levels. • Owners/operators must inspect MWS - Linear Modular Wetland systems for a minimum of twelve months from the start of post -construction operation to determine site -specific maintenance schedules and requirements. You must conduct inspections monthly during the wet season, and every other month during the dry season. (According to the SWMMWW, the wet season in western Washington is October 1 to April 30. According to SWMMEW, the wet season in eastern Washington is October 1 to June 30). After the first year of operation, owners/operators must conduct inspections based on the findings during the first year of inspections. • Conduct inspections by qualified personnel, follow manufacturer's guidelines, and use methods capable of determining either a decrease in treated effluent flowrate and/or a decrease in pollutant removal ability. • When inspections are performed, the following findings typically serve as maintenance triggers: • Standing water remains in the vault between rain events, or • Bypass occurs during storms smaller than the design storm. • If excessive floatables (trash and debris) are present (but no standing water or excessive sedimentation), perform a minor maintenance consisting of gross solids removal, not prefilter media replacement. • Additional data collection will be used to create a correlation between pretreatment chamber sediment depth and pre -filter clogging (see Issues to be Addressed by the Company section below) 6. Discharges from the MWS - Linear Modular Wetland Stormwater Treatment System units shall not cause or contribute to water quality standards violations in receiving waters. Applicant: Applicant's Address: Modular Wetland Systems, Inc. PO. Box 869 Oceanside, CA 92054 Application Documents: • Original Application for Conditional Use Level Designation, Modular Wetland System, Linear Stormwater Filtration System Modular Wetland Systems, Inc., January 2011 • Quality Assurance Project Plan: Modular Wetland system — Linear Treatment System performance Monitoring Project, draft, January 2011. • Revised Application for Conditional Use Level Designation, Modular Wetland System, Linear Stormwater Filtration System Modular Wetland Systems, Inc., May 2011 • Memorandum: Modular Wetland System -Linear GULD Application Supplementary Data, April 2014 • Technical Evaluation Report: Modular Wetland System Stormwater Treatment System Performance Monitoring, April 2014. Applicant's Use Level Request: General use level designation as a Basic, Enhanced, and Phosphorus treatment device in accordance with Ecology's Guidance for Evaluating Emerging Stormwater Treatment Technologies Technology Assessment Protocol — Ecology (TAPE) January 2011 Revision. Applicant's Performance Claims: • The MWS — Linear Modular wetland is capable of removing a minimum of 80-percent of TSS from stormwater with influent concentrations between 100 and 200 mg/l. • The MWS — Linear Modular wetland is capable of removing a minimum of 50-percent of Total Phosphorus from stormwater with influent concentrations between 0.1 and 0.5 mg/l. • The MWS — Linear Modular wetland is capable of removing a minimum of 30-percent of dissolved Copper from stormwater with influent concentrations between 0.005 and 0.020 mg/l. • The MWS — Linear Modular wetland is capable of removing a minimum of 60-percent of dissolved Zinc from stormwater with influent concentrations between 0.02 and 0.30 mg/l. Ecology Recommendations: • Modular Wetland Systems, Inc. has shown Ecology, through laboratory and field- testing, that the MWS - Linear Modular Wetland Stormwater Treatment System filter system is capable of attaining Ecology's Basic, Total phosphorus, and Enhanced treatment goals. Findings of Fact: Laboratory Testing The MWS-Linear Modular wetland has the: • Capability to remove 99 percent of total suspended solids (using Sil-Co-Sil 106) in a quarter -scale model with influent concentrations of 270 mg/L. • Capability to remove 91 percent of total suspended solids (using Sil-Co-Sil 106) in laboratory conditions with influent concentrations of 84.6 mg/L at a flow rate of 3.0 gpm per square foot of media. • Capability to remove 93 percent of dissolved Copper in a quarter -scale model with influent concentrations of 0.757 mg/L. • Capability to remove 79 percent of dissolved Copper in laboratory conditions with influent concentrations of 0.567 mg/L at a flow rate of 3.0 gpm per square foot of media. • Capability to remove 80.5-percent of dissolved Zinc in a quarter -scale model with influent concentrations of 0.95 mg/L at a flow rate of 3.0 gpm per square foot of media. • Capability to remove 78-percent of dissolved Zinc in laboratory conditions with influent concentrations of 0.75 mg/L at a flow rate of 3.0 gpm per square foot of media. Field Testing • Modular Wetland Systems, Inc. conducted monitoring of an MWS-Linear (Model # MWS-L-4-13) from April 2012 through May 2013, at a transportation maintenance facility in Portland, Oregon. The manufacturer collected flow -weighted composite samples of the system's influent and effluent during 28 separate storm events. The system treated approximately 75 percent of the runoff from 53.5 inches of rainfall during the monitoring period. The applicant sized the system at 1 gpm/sq ft. (wetland media) and 3gpm/sq ft. (prefilter). • Influent TSS concentrations for qualifying sampled storm events ranged from 20 to 339 mg/L. Average TSS removal for influent concentrations greater than 100 mg/L (n=7) averaged 85 percent. For influent concentrations in the range of 20-100 mg/L (n=18), the upper 95 percent confidence interval about the mean effluent concentration was 12.8 mg/L. • Total phosphorus removal for 17 events with influent TP concentrations in the range of 0.1 to 0.5 mg/L averaged 65 percent. A bootstrap estimate of the lower 95 percent confidence limit (LCL95) of the mean total phosphorus reduction was 58 percent. • The lower 95 percent confidence limit of the mean percent removal was 60.5 percent for dissolved zinc for influent concentrations in the range of 0.02 to 0.3 mg/L (n=11). The lower 95 percent confidence limit of the mean percent removal was 32.5 percent for dissolved copper for influent concentrations in the range of 0.005 to 0.02 mg/L (n=14) at flow rates up to 28 gpm (design flow rate 41 gpm). Laboratory test data augmented the data set, showing dissolved copper removal at the design flow rate of 41 gpm (93 percent reduction in influent dissolved copper of 0.757 mg/L). Issues to be addressed by the Company: 1. Modular Wetland Systems, Inc. should collect maintenance and inspection data for the first year on all installations in the Northwest in order to assess standard maintenance requirements for various land uses in the region. Modular Wetland Systems, Inc. should use these data to establish required maintenance cycles. 2. Modular Wetland Systems, Inc. should collect pre-treatment chamber sediment depth data for the first year of operation for all installations in the Northwest. Modular Wetland Systems, Inc. will use these data to create a correlation between sediment depth and pre -filter clogging. Technology Description: Download at http://www.modularwetlands.com/ Contact Information: Applicant: Zach Kent BioClean A Forterra Company. 398 Vi9a El Centro Oceanside, CA 92058 zach. kept@forterrabp. corn Applicant website: http://www.modularwetlands.com/ Ecology web link: http://www.ecy.wa.gov/programs/wg/stormwater/newtech/index.html Ecology: Revision Histo Douglas C. Howie, P.E. Department of Ecology Water Quality Program (360) 407-6444 douglas.howie@ecy.wa. gov Date Revision June 2011 Original use -level -designation document September 2012 Revised dates for TER and expiration January 2013 Modified Design Storm Description, added Revision Table, added maintenance discussion, modified format in accordance with Ecology standard December 2013 Updated name of Applicant April 2014 Approved GULD designation for Basic, Phosphorus, and Enhanced treatment December 2015 Updated GULD to document the acceptance of MWS-Linear Modular Wetland installations with or without the inclusion of plants July 2017 Revised Manufacturer Contact Information (name, address, and email) WETLANDS Maintenance Guidelines for Modular Wetland System - Linear Maintenance Summary o Remove Trash from Screening Device - average maintenance interval is 6 to 12 months. ■ (5 minute average service time) . o Remove Sediment from Separation Chamber - average maintenance interval is 12 to 24 months. • (10 minute average service time). o Replace Cartridge Filter Media - average maintenance interval 12 to 24 months. ■ (10-15 minute per cartridge average service time) . o Replace Drain Down Filter Media - average maintenance interval is 12 to 24 months. ■ (5 minute average service time) . o Trim Vegetation - average maintenance interval is 6 to 12 months. • (Service time varies) . System Diagram Inflow Pipe (optional) Pre -Treatment Chamber Access to screening device, separation chamber and cartridge filter Biofiltration Chamber www.modularwetlands.com Discharge Chamber Access to drain down filter Outflow Pipe Maintenance Procedures Screening Device WETLANDS 1. Remove grate or manhole cover to gain access to the screening device in the Pre - Treatment Chamber. Vault type units do not have screening device. Maintenance can be performed without entry. 2. Remove all pollutants collected by the screening device. Removal can be done manually or with the use of a vacuum truck. The hose of the vacuum truck will not damage the screening device. 3. Screening device can easily be removed from the Pre -Treatment Chamber to gain access to separation chamber and media filters below. Replace grate or manhole cover when completed. Separation Chamber 1. Perform maintenance procedures of screening device listed above before maintaining the separation chamber. 2. With a pressure washer spray down pollutants accumulated on walls and cartridge filters. 3. Vacuum out Separation Chamber and remove all accumulated pollutants. Replace screening device, grate or manhole cover when completed. Cartridge Filters 1. Perform maintenance procedures on screening device and separation chamber before maintaining cartridge filters. 2. Enter separation chamber. 3. Unscrew the two bolts holding the lid on each cartridge filter and remove lid. 4. Remove each of 4 to 8 media cages holding the media in place. 5. Spray down the cartridge filter to remove any accumulated pollutants. 6. Vacuum out old media and accumulated pollutants. 7. Reinstall media cages and fill with new media from manufacturer or outside supplier. Manufacturer will provide specification of media and sources to purchase. 8. Replace the lid and tighten down bolts. Replace screening device, grate or manhole cover when completed. Drain Down Filter 1. Remove hatch or manhole cover over discharge chamber and enter chamber. 2. Unlock and lift drain down filter housing and remove old media block. Replace with new media block. Lower drain down filter housing and lock into place. 3. Exit chamber and replace hatch or manhole cover. www.modularwetlands.com WETLANDS Maintenance Notes 1. Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. 2. The owner should keep maintenance/inspection record(s) for a minimum of five years from the date of maintenance. These records should be made available to the governing municipality for inspection upon request at any time. 3. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. 4. Entry into chambers may require confined space training based on state and local regulations. 5. No fertilizer shall be used in the Biofiltration Chamber. 6. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may require irrigation. www.modularwetlands.com WETLANDS Maintenance Procedure Illustration Screening Device The screening device is located directly under the manhole or grate over the Pre -Treatment Chamber. It's mounted directly underneath for easy access and cleaning. Device can be cleaned by hand or with a vacuum truck. Separation Chamber The separation chamber is located directly beneath the screening device. It can be quickly cleaned using a vacuum truck or by hand. A pressure washer is useful to assist in the cleaning process. www.modularwetlands.com Cartridge Filters WETLANDS The cartridge filters are located in the Pre -Treatment chamber connected to the wall adjacent to the biofiltration chamber. The cartridges have removable tops to access the individual media filters. Once the cartridge is open media can be easily removed and replaced by hand or a vacuum truck. Drain Down Filter The drain down filter is located in the Discharge Chamber. The drain filter unlocks from the wall mount and hinges up. Remove filter block and replace with new block. www.modularwetlands.com WETLANDS Trim Vegetation Vegetation should be maintained in the same manner as surrounding vegetation and trimmed as needed. No fertilizer shall be used on the plants. Irrigation per the recommendation of the manufacturer and or landscape architect. Different types of vegetation requires different amounts of irrigation. www.modularwetlands.com WETLANDS Inspection Form Modular Wetland System, Inc. P. 760.433-7640 F. 760-433-3176 E. Info@modularwetlands.com www.modularwetlands.com MO CLEAN' [ NYrkONMEN7At SER YICS. ONC. Inspection Report Modular Wetlands System M O D . I A P. WFTI AI'.ID.; Project Name Project Address Owner / Management Company Contact (city) (Zip Code) Inspector Name Phone ( Date Type of Inspection ❑ Routine ❑ Follow Up ❑ Complaint ❑ Storm Additional Notes Weather Condition Time For Office Use Only (Reviewed By) (Date) Office personnel to complete section to the left. AM / PM Storm Event in Last 72-hours? ❑ No ❑ Yes Inspection Checklist Modular Wetland System Type (Curb, Grate or UG Vault): Size (22', 14' or etc.): Structural Integrity: Yes No Comments Damage to pre-treatment access cover (manhole cover/grate) or cannot be opened using normal lifting pressure? Damage to discharge chamber access cover (manhole cover/grate) or cannot be opened using normal lifting pressure? Does the MWS unit show signs of structural deterioration (cracks in the wall, damage to frame)? Is the inlet/outlet pipe or drain down pipe damaged or otherwise not functioning properly? Working Condition: Is there evidence of illicit discharge or excessive oil, grease, or other automobile fluids entering and clogging the unit? Is there standing water in inappropriate areas after a dry period? Is the filter insert (if applicable) at capacity and/or is there an accumulation of debris/trash on the shelf system? Does the depth of sediment/trash/debris suggest a blockage of the inflow pipe, bypass or cartridge filter? If yes, specify which one in the comments section. Note depth of accumulation in in pre-treatment chamber. Depth: Does the cartridge filter media need replacement in pre-treatment chamber and/or discharge chamber? Chamber: Any signs of improper functioning in the discharge chamber? Note issues in comments section. Other Inspection Items: Is there an accumulation of sediment/trash/debris in the wetland media (if applicable)? Is it evident that the plants are alive and healthy (if applicable)? Please note Plant Information below. Is there a septic or foul odor coming from inside the system? Waste: Yes No Sediment / Silt / Clay Trash / Bags / Bottles Green Waste / Leaves / Foliage Additional Notes: Recommended Maintenance No Cleaning Needed Schedule Maintenance as Planned Needs Immediate Maintenance Plant Information Damage to Plants Plant Replacement Plant Trimming 2972 San Luis Rey Road, Oceanside, CA 92058 P (760) 433-7640 F (760) 433-3176 WETLANDS Maintenance Report 107,..fm;46, 1,.fd • Modular Wetland System, Inc. P. 760.433-7640 F. 760-433-3176 E. Info@modularwetlands.com www.modularwetlands.com 13140 CLEAN ENVIRONMENTAL SERVICES, INC. Cleaning and Maintenance Report Modular Wetlands System WETLANDS Project Name Project Address Owner / Management Company (city) (Zip Code) Contact Inspector Name Type of Inspection ❑ Routine ❑ Follow Up ❑ Complaint Weather Condition Phone ( Date / / Time ['Storm Storm Event in Last 72-hours? ❑ No ❑ Yes Additional Notes For Office Use Only (Reviewed By) (Date) Office personnel to complete section to the left. AM / PM Site Map # GPS Coordinates of Insert Manufacturer / Description / Sizing Trash Accumulation Foliage Accumulation Sediment Accumulation Total Debris Accumulation Condition of Media 25/50/75/100 (will be changed @ 75%) Operational Per Manufactures' Specifications (If not, why?) Lat: MWS Catch Basins Long: MWS Sedimentation Basin Media Filter Condition Plant Condition Drain Down Media Condition Discharge Chamber Condition Drain Down Pipe Condition Inlet and Outlet Pipe Condition Comments: 2972 San Luis Rey Road, Oceanside, CA 92058 P. 760.433.7640 F. 760.433.3176 Otak Memorandum To: Sherry Edquid From: Trista Kobluskie, Shailee Jain, PE Copies: Date: May 7, 2024 Subject: Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Project No.: 33383.000 Introduction The City of Tukwila operates a municipal storm sewer and a surface water utility which is funded primarily through rates and changes on developed surfaces authorized by Tukwila Municipal Code (TMC) Chapter 14.32, Storm and Surface Water Rates and Charges. The Washington State Department of Transportation (WSDOT) operates several limited access highways within the city limits which can be subject to the City's storm and surface water service charge under certain conditions. The conditions are itemized in the Revised Code of Washington (RCW) Chapter 90.03.525, and they include the following: • Stormwater fees may be charged on WSDOT limited access highways. • Rate charged is limited to 30% of rate charged on comparable property. • The City's roads department must be charged the same rate or more. • Use of revenue is limited solely to planning and constructing stormwater control facilities that directly reduce impacts of runoff from state limited access highways or implementing best management practices that will reduce the need for these facilities. • The utility must submit an annual plan to WSDOT that shows how fees charged will be spent. • The utility must provide a progress report on use of charges assessed for the prior year. • The annual plan must be consistent with the objectives identified in former RCW 90.78.010, Stormwater Management Funding and Implementation Program for Highway -Related Problems, such as the following: ▪ Greater state-wide coordination for the construction of stormwater treatment facilities; ▪ Encouraging multijurisdictional projects; ▪ Developing priorities and approaches for implementing activities within watersheds; ▪ Identifying and prioritizing stormwater retrofit programs; ▪ Evaluating methods to determine cost benefits of proposed projects; ▪ Identifying ways to facilitate sharing technical resources; ▪ Developing methods for evaluating activities carried out under the program; and ▪ Identifying potential funding sources for continuation of the program. 11241 Willows Road NE, Suite 200 I Redmond, WA 98052 I Phone 425.822.4446 I otak.com o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Page 2 of 9 May 7, 2024 The annual plan must include percent impact due to highway runoff for each proposed stormwater facility and the location and number of highway acres treated. WSDOT fees may not be used for amenities incorporated into the facilities. The City may accumulate fees over time to fund planned larger projects. The City would like to continue assessing an annual Surface Water fee to WSDOT, and it has incorporated identification of opportunities to retrofit runoff from WSDOT limited access highways into the Surface Water Comprehensive Plan update in 2024 (SWCP 2024). An evaluation of the set of projects selected for advancement under the SWCP 2024 determined that none of the selected projects met the stringent criteria of RCW 90.03.525 which would allow the City to assess an annual Surface Water fee to WSDOT. Therefore, the City requested a separate analysis to identify projects to retrofit and maintain WSDOT stormwater infrastructure on limited access facilities. Project and Fee History The City has assessed a Surface Water fee to WSDOT under the current criteria since 2019. It has planned for and used WSDOT funds for the following projects since 2020: ■ Stormwater Outfall Water Quality Retrofit at Tukwila International Boulevard/State Route 599 (SR 599) ■ Surface Water Comprehensive Plan ■ Gilliam Creek Fish Barrier Removal and Habitat Enhancement Project ■ Nelsen Side Channel Project Table 1 contains a history of Surface Water fees charged to WSDOT. Table 1 Annual WSDOT Billing and Fund Balance Year Annual Billing to WSDOT Beginning Account Balance WSDOT Share of Project(s) Ending Fund Balance 2020 $141,870.44 $141,870.44 $1,763 $140,107 2021 $144,708.22 $284,815.50 $4,797 $139,912 2022 $151,943.80 $431,962.62 $1,280 $150,664 2023 $159,695.73 $590,378.38 TBD TBD With more than $500,000 fund balance, the City has an opportunity to implement a moderate stormwater retrofit project or continue to bank annual fees to fund a larger retrofit project. Coordination with WSDOT Retrofit Planning WSDOT has been engaged in planning stormwater retrofits for several years. In 2022, the Washington State Legislature passed the Move Ahead Washington funding bill to encourage WSDOT to enhance stormwater treatment from existing roads and infrastructure. The Legislature established direct goals and also prioritization criteria for projects. As a result, WSDOT is in the process of identifying and prioritizing hundreds of stormwater retrofit opportunities throughout the state. The process will result in a map indicating high and medium priority locations to address the Move Ahead Washington priority focus areas. The prioritization will consider preferred locations of tribes, cities, counties, and others. The prioritization process is expected to complete later in 2024. o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Page 3 of 9 May 7, 2024 The approximately $500 million in construction funding identified by the Legislature will become available beginning in the 2029-2031 biennium. As part of the prioritization, WSDOT is identifying locations of elevated structures near water bodies in the Puget Sound region where bioretention boxes may be installed on downspouts. Elevated structures have become a priority because of the emerging research showing that 6PPD-q, a stormwater contaminant related to tire -wear, has lethal effects on coho salmon and detrimental effects on other fish, the proximity of many elevated structures to water bodies, and the typical lack of treatment of runoff from elevated structures. The retrofit and maintenance projects selected for Tukwila's Retrofit and Maintenance Plan for WSDOT Facilities are intended to manage some of the same pollutants identified by the Legislature as a critical concern for salmon, such as 6-PPD-q. Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Otak used the methodology described in this section to develop this Tukwila Retrofit and Maintenance Plan for WSDOT Facilities. Eligible Highways and Project Types Interstate 5 (1-5), Interstate 405 (1-405) and State Routes 518 (SR-518) and 599 (SR-599) are the eligible limited access highways in Tukwila (Figure 1). Eligible projects must "directly reduce impacts of runoff." WSDOT personnel have indicated that the agency's interpretation of the phrase "directly reduce impacts of runoff" has been broad in recent years and has included fish passage projects where WSDOT has impacts on downstream conveyance and water quality and projects to restore native vegetation where temperature impairments exist. The eligible project types may be narrowed due to public input. Because WSDOT has not published guidance for the interpretation of the phrase "directly reduce impacts of runoff," this study has taken a narrow interpretation and has only considered stormwater facilities that provide runoff treatment, flow control, or a combination of these functions. Projects which use best management practices (BMPs) found in either the Stormwater Management Manual for Western Washington or the Highway Runoff Manual are considered eligible projects. Eligible projects may be located either on City rights -of -way or WSDOT rights -of -way, and responsibility for long term maintenance can vary. Location and maintenance considerations should be negotiated during the project design phase. Fees may also be used to compensate the City for implementing BMPs that would reduce the need for stormwater facilities. Locations identified by City staff were considered for this portion of the study, which identified one possible Maintenance Project location. Potential Site Selection Before identifying potential sites, City staff and Otak met with WSDOT personnel to learn about known water quality and facility maintenance problems in the two WSDOT maintenance areas that intersect Tukwila. The meeting did not reveal any potential sites with obvious water quality or maintenance issues that could be eligible for retrofit by the City. The meeting revealed some highway segments which were removed from consideration for various reasons, including: o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Page 4 of 9 May 7, 2024 • The segments of 1-5 south of the 1-5/1-405 interchange in Tukwila have numerous functioning stormwater facilities, and WSDOT personnel indicated they are in good condition. Those segments of I- 5 were therefore excluded from the study. • Two limited access highways in Tukwila will be improved pursuant to WSDOT's I-405/SR 167 Corridor Program. The improvements associated with this program will result in the construction of runoff treatment and flow control facilities serving most of the segments of 1-405 within Tukwila and the I-5/1- 405 interchange. As a result, the team did not consider costly permanent stormwater facilities to serve 1-405 or the 1-5/1-405 interchange vicinity in the study. Subsequently, Otak conducted a rapid desktop analysis of the WSDOT highway drainage system within Tukwila to identify potential locations for retrofits. Criteria for potential sites included: • Drains a limited access highway. • Not located in the excluded segments of 1-5, as described above. • Existing drainage to discharge/outfall is piped. • Discharge is at a surface water. • Identified as untreated by WSDOT or appears untreated based on review of the drainage system in GIS. Two sites were selected using the following preferences: • Drainage from elevated structures without treatment. These were preferred because they have been identified as a priority by WSDOT due to emerging research on the lethal effects of a contaminant related to tire -wear on coho salmon. • Near to City rights -of -way or property (e.g. Park) which would facilitate maintenance access. • Feasibility of construction and maintenance, such as avoiding long duration of traffic control on the highway. Selected Project Locations Two retrofit project sites and a maintenance project site were selected. See Figure 1 for locations. Site WSDOT-1 — Retrofit Project Bioretention Boxes Under Elevated Structures, similar to the ones piloted through Stewardship Partners adopt -a -down spout program in Collaboration with WSDOT (Stewardship Partners, 2022). See Figure 2. The bioretention boxes will be located on the Green River Trail near the Intersection of Interurban Avenue S and 1-405 ramps (See Figure 2). The locations were identified as elevated structures in WSDOT's Stormwater Retrofit Prioritization Draft Web Map (WSDOT, 2024). This project will improve water quality, including addressing 6-PPD-q, in the effluent from elevated 1-405 ramps and Interurban Avenue S roadway runoff. The information relating to WSDOT stormwater infrastructure in the area is limited; known infrastructure available in GIS is mapped in Figure 2. There are three mapped WSDOT surface water outfalls near this location (GIS Discharge Point feature numbers DISC00016550, DISC00017959, and DISC00020524). Each outfall has a conveyance mode of "Open Pervious" and a feature type of "Pipe Unknown" according to their GIS attributes. It is unclear whether these outfalls are the same as down spouts from the elevated structures or whether they are a feature downstream of the down spouts with other stormwater inputs. The first step will be to verify the presence of downspouts from the 1-405 ramps and Interurban S onto the Green River Trail and how they discharge into the Green River. If there are downspouts, the feasibility of installing bioretention boxes in those locations needs to be evaluated. Then, the catchment areas draining into the downspouts will be o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Page 5 of 9 May 7, 2024 delineated. For catchment area delineation, survey of adjacent stormwater infrastructure and/or review of WSDOT contract plans will be conducted. Based on the topography, the approximate area to be surveyed is delineated in Figure 2. Once the area draining to each downspout has been determined, the number of bioretention boxes to be installed to provide maximum benefit for the cost will be analyzed. The bioretention boxes may be constructed from 330-gallon Intermediate Bulk Container (IBC) totes with soil/filtration media (Stewardship Partners, 2022) and could be installed by a City maintenance crew. The dimensions of a 350-gallon IBC are approximately 42-in x 48-in x 51-in. The essential components of the bioretention boxes are an inlet pipe that drains up to the water quality flow rate into a forebay with a baffle to slow velocity and collect sediment, soil media for filtration, an outlet pipe that drains into the downstream infrastructure, and a bypass pipe that conveys flows above the water quality flow rate to the downstream stormwater infrastructure. The water quality flow rate and amount of filtration media needed to treat the runoff will be determined based on Department Ecology's 2019 Stormwater Management Manual for Western Washington sizing of BMP T7.30 Bioretention for water quality treatment. Downspouts serving larger areas may require more than one bioretention box. Where there is a need for multiple boxes, the boxes will need a flow splitter upstream to divert flows so that they can function in parallel. For one bioretention box installation, Otak estimates a total cost of $50,000 to $70,000. The cost assumes a field reconnaissance, desktop review, basic engineering design, materials, and installation using a City crew. There may be economies of scale if single units are to be installed at multiple locations, but the cost may increase at locations where more than one box needs to be set up in parallel because of a large catchment area with higher water quality flows. Note the Green River Trail at this location forms the White Swan levee. Any permitting considerations related to construction on the levee are not accounted for in the above cost. Table 2 WSDOT-1 - Bioretention Boxes Under Elevated Structures - Cost Opinion Item Cost Opinion Field Reconnaissance and Desktop Review $10,000 Survey and Basic Engineering $20,000 Materials $10,000 - $20,000 Construction $10,000 - $20,000 Total Per Box $50,000 - $70,000 Units 3 Total Project $150,000 - $210,000 Site WSDOT-2 — Retrofit Project Bioretention Urban Retrofit (BURito) along SR-599 east embankment between S 112th Street and Tukwila International Boulevard. See Figure 3. BURitos are filtration devices that consist of a non-proprietary filter media wrapped in a high -density polyethylene sock. The media is composed of a compost and sand bioretention mix. Runoff is filtered as it flows horizontally through the device. BURitos were developed and tested by the City of Bellevue in o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Page 6 of 9 May 7, 2024 concert with Cedar Grove VIS Systems® in 2019. This solution treats 6-PPD-q, has low capital costs, uses natural materials, and supports innovation. The project will treat highway runoff from eleven WSDOT outfalls along SR-599 (GIS Discharge Point feature numbers DISC00012138, DISC00012137, DISC00012136, DISC00011775, DISC00011774, DISC00011773, DISC00011772, DISC00011771, DISC00011770, and two features which do not have ID numbers). The outfalls discharge runoff from approximately one quarter mile of the four -lane highway into the Duwamish River. One or more of these outfalls could also be conveying a fish -bearing stream under SR-599, but the specific characteristics of each culvert were not confirmed in the desktop analysis. The first step in the project will be to complete a field reconnaissance, identify any outfalls that also are conveying streams, and omit those locations from the project plan. Because the BURitos might act as fish barriers, they should not be placed below culverts conveying streams. During the field reconnaissance it will also be important to identify the vertical elevations of the outfalls. BURitos should not be installed downstream of any outfalls discharging at or below the ordinary high-water mark of the Duwamish River. Invasive vegetation appears to have grown on the embankment between SR-599 and the Duwamish River, based on Google Street View, which may need to be cleared prior to installation of the BURitos. The BURitos will be field fitted downstream of the outfalls and keyed into the river embankment to hold them in place. The BURitos will be installed above the Duwamish River ordinary high-water mark. The 100-year base flood elevation, regulated by the Federal Emergency Management Agency (FEMA), for the Duwamish River at this location is 12.3' (NAVD 88) (King County, 2024). If possible, the BURitos will also be installed along contours with elevations greater than 12.3'. The length and number of BURitos will be quantified during design based on information gathered from the field reconnaissance. The installation may be completed by a City crews. BURitos may need to be replaced every 2-3 years based on the testing at the City of Bellevue facility. The estimated cost for this project is $100,000 which includes field reconnaissance, collaboration with Cedar Grove VIS Systems® for design, and construction using a City crew. FEMA permitting is not anticipated for this project. I able 3 WSDUT-2 - 13ioretention Urban Ketrotit (13UKito) along SK-599 - Cost Upir Item Cost Opinion Field Reconnaissance and Desktop Review $30,000 Basic Engineering $20,000 Materials $30,000 Construction $20,000 Total $100,000 ion Site WSDOT-3 — Maintenance Project City staff identified a maintenance project location just north of Southcenter Blvd. where a WSDOT culvert passes under the offramp from 1-5 South. Drainage from 1-5 may comingle with natural flow in a series of ditches and conveyance pipes flowing south for approximately 3,000 linear feet adjacent to 1-5 South from S 144th Street to just north of Southcenter Blvd. Flows are treated through engineered dispersion. The WSDOT proportion of contribution to the issue at this site is 100%. The drainage infrastructure is o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Page 7 of 9 May 7, 2024 associated with the 1-5 Tukwila to Lucile Street HOV and SC&DI — Stage 3 project constructed between 1995 and 1998. See Figures 4 and 5. Due to debris blocking the inlet to the culvert, the location backs up and floods Southcenter Blvd on a regular basis. The flooding impacts traffic on Southcenter Blvd. and could mobilize roadway pollutants into runoff discharged to Gilliam Creek. City crews routinely remove blockages from the inlet to the culvert prior to storms in order to prevent flooding. The WSDOT asset identification for selected elements of the drainage system related to this flooding and water quality maintenance location is given is given in Table 4. Table 4 WSDOT-3 - Southcenter Maintenance Project Location Details WSDOT Feature Type Relative Position WSDOT Asset Reference No. WSDOT Asset Reference Text Ditch North extent of drainage system 919114 WSDOT0000919114 Catch Basin Northern extent of drainage system N/A WSDOT0000129596 Catch Basin Southern extent of drainage system 928900 WSDOT0000928900 Drain Pipe Southern extent of drainage system 987688 WSDOT0000987688 Discharge Point Location of Clogging 965223 WSDOT0000965223 The City proposes to track and report to WSDOT the labor and equipment costs for two to three maintenance visits per year to clear blockages at the inlet to the culvert as a source control measure. Next Steps The City may submit the selected projects in the next annual plan to WSDOT and incorporate them into the SWCP 2024 Capital Improvement Program. When WSDOT publishes the final retrofit prioritization study, then the City may review it and select additional stretches of highway within Tukwila where more thorough retrofit identification can be performed. When WSDOT publishes guidance for interpreting the meaning of "projects that directly reduce impacts of runoff', the City should reevaluate whether vegetation restoration, habitat improvement, and fish passage projects may be included in Tukwila's Retrofit and Maintenance Plan for WSDOT Facilities and annual report to WSDOT. References Cedar Grove Composting, Undated. Cedar Grove VIS Systems® web page. https://cedar- grove.com/cedar-grove-vis-stormwater-systems. Accessed March 2024. McIntyre, Jenifer, 2021. Roads to Ruin; Will Water Quality Retrofits Save Salmon? Report to King County WaterWorks Grant Program. Washington State University. July. https://www.wastormwatercenter.org/wp- content/uploads/B U Rito-Report-Final-July-2021. pdf Otak, 2024. Unpublished Summary of City of Tukwila on Stormwater Retrofit and Stormwater Fees Meeting. Prepared on behalf of City of Tukwila. February 21. o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Tukwila Retrofit and Maintenance Plan for WSDOT Facilities Page 8 of 9 May 7, 2024 Stewardship Partners, 2022. Adopt -a -Downspout 1-5 Ship Canal Bridge Pilot Project. Available at: https://www.stewardshippartners.org/just-a-box-of-rain/. WSDOT, 2023. WSDOT Stormwater Retrofit Prioritization WORKING DRAFT Web Map. Stormwater Priority Analysis Puget Sound (Draft) (arcgis.com). Accessed December 2023, January 2024, and April 2024. WSDOT, 2023. MOVE AHEAD WASHINGTON STORMWATER RETROFIT 2023 Legislative Report. WSDOT Environmental Services Office. September 18. Tukwila, 2023. GIS Feature Data Set "Tukwila_SFI_Draft". Contains DRAFT Data of WSDOT's Stormwater Management System as of 10/12/2023 within the boundaries of Tukwila City Limits. Prepared by WSDOT HQ ESO SFI Program. October 12. o:Iproject1333001333831waterres\task 600 - swcplt-650 fundinglwsdot retrofit and maintenance plan 2024-05.docx Figures Bioretention Urban Retrofit Along SR 599 CITY OF BURIEN I I CITY OF DES MOINES FIGURE 1 WSDOT STORMWATER RETROFIT PROJECTS TUKWILA SWCP 133383 TUKWILA, WASHINGTON CITY OF SEATTLE Maintenance Project CITY OF SEATAC Legend 0 City Boundary r =1 Neighboring Cities — Streams and Rivers — WSDOT Limited Access Highway CITY OF MERCER ISLAND Washington UNINCORPORATED 4.. KING COUNTY �. Black River CITY OF KENT eek L Can d Bioretention Boxes ®e Under Elevated Structures CITY OF RENTON Mile 0 1 Otak Data Sources: King County, City of Tukwila, Google Maps. Date: 4/9/2024 Disclaimer: This data is not to survey accuracy and is meant for planning purposes only. O:\PROJECT\33300\33383\CADD\GIS1APRXs\WSDOT Runoff Retrofits \WSDOT Runoff Retrofls.apro Locations for bioretention boxes will be on the Green River Trail at the downspouts from 1405 and interurban Ave S ► , • I, I,\ z r. ii//// '7 III J / • /ws 1.74 11jllir:l��r.allllj't�I;7i41 /// ////11 I I' ' ./ ri NIIIIIIII // - ;/1/,/. e/ - , l ,I I!1��t-j Yyy/ill, l��p-;/ll/ll�i lr v /'// a�VTi.J�lgll r,w-,4f17M.r i•. , FIGURE 2 BIORETENTION BOXES UNDER ELEVATED STRUCTURES TUKWILA SWCP 133383 TUKWILA, WASHINGTON Data Sources: King County, City of Tukwila, Google Maps. Date: 4/9/2024 Disclaimer: This data is not to survey accuracy and is meant for planning purposes only. O:\PROJECT\33300\33383\CADD\GIS1APRXs\WSDOT Runoff Retrofits \WSDOT Runoff Retrofls.apro Survey Extent - stormwater infrastructure l � 'tt' '� , / \\\\\\\0\ �\ l O %// -- • • — \\\\\\ \\\\\ et-- i _- ,- / e \\\0\ C \ i- / . / / i — — /y I /I CI �/ I y �i; ii I i '��i; / / ll1 I \ � \ _ — i ce • fa. / —/ // / / / l I �Il a*i h er_ •'1`%-J i,.., 4. // ,�l/l 1 I I i I I I % ei I \ \ ....► - I i\\. \ / • ./ ,1 1 /. . M \ \ \ .. \ F \ \ \ or \z"T{s a\=,t IT�I• I I I / 1 e t Legend 0 City Boundary — Streams and Rivers DischargePoint • Incoming Managed System I\\>R. /4. • Subsurface • Surface Water Media Filter Drain Contours Feet 0 200 So 0 Otak fif;ty of Burien Stake approximately 700 feet of BURito along contour to treat runoff from multiple outfalls and sheetflow from highway Notes: 1. Identify outfalls carrying streams considered fish bearing. Do not install BURito across those outfalls. 2. BURito to be installed above Duwamish River ordinary high-water mark. Stake BURito along contour extending approximately 10 feet on either side of outfall DISC00012138 DISC00012137 .ui. DISC00012136 DISC00011775 ID Not Given DISC00011774 DISC00011773 DISC00011772 ID Not Given DISC00011771 DISC00011770 'i� , \ ,. •i,/, lit1 FIGURE 3 BIORETENTION URBAN RETROFIT ALONG SR 599 TUKWILA SWCP 133383 TUKWILA, WASHINGTON Data Sources: King County, City of Tukwila, Google Maps. Date: 4/11/2024 Disclaimer: This data is not to survey accuracy and is meant for planning purposes only. O:\PROJECT\33300\33383\CADD\GIS1APRXs\WSDOT Runoff Retrofits \WSDOT Runoff Retrofls.aprz Legend 0 City Boundary — Streams and Rivers — Stormwater Conveyance Ditches Culvert Pipe Drain Pipe — Storm Sewer Pipe Unknown ❑ Catch Basin, Active ❑ Concrete Inlet, Active ❑ Manhole, Active Feet 0 200 Unknown, Active Other, Active 0 Surface Water Outfall Curb Contours Otak FIGURE 4 WSDOT MAINTENANCE PROJECT - NORTH EXTENT TUKWILA SWCP 133383 TUKWILA, WASHINGTON Approximate Basin - North Extent Legend Defy 504.5 K.) C.191.y. C.!y Gonale Maps — D.1r:4.1D2D2a Divloiner. This data if nD a caner aawecy cad is Mews fd lfervd.g Lao.aa . onry ❑,PRUJECrI79DD'dY32!CADDiGISµPR%o1WSODT Rnan R.nroNDWSDDT uundi RBIrorIaa,. City Boundary Stormwater Conveyance Ditches Culvert Pipe Drain Pipe Storm Sewer Pipe Underdrairi Pipe Not Active Grate Inlet, Active ❑ Catch Basin, Active Engineered Dispersion Contours Feet a 200 C Otak Location of blockages and maintenance activity 1:SOuthcenter Blvd FIGURE 5 WSDOT MAINTENANCE PROJECT - SOUTH EXTENT TUKWILA SWCP I 33383 TUKWILA, WASHINGTON Figure 4 Approximate • Basin - South Extent Legend 1=1 City Boundary Underdrain Pipe — Streams and Rivers Not Active — Stormwater Conveyance Ditches T] Grate Inlet, Active Drain Pipe Catch Basin. Active — Storm Sewer Pipe Manhole, Active NI. Savona C.e9y. cry .311A9.1e 11,99044 Maps Da4o: 4.17/292 Dittlaimver. "Mit daLt is..1 furvery alitaikace mtilC trttlard rcw 414.4.g C.1w .344 D,P11494ECT1332903,3381CADNGISOPIR24.1WSII0T Rr.iil RetratsVWSPCIT Rune; ReIrcilivs aprt Feet 200 () Land Surface 0 Surface Water Engineered Dispersion Contours 0 Otak