HomeMy WebLinkAboutTIS 2024-05-21 Item 2H - Resolution - 2025-2030 Transportation Improvement ProgramCity of Tukwila
Thomas McLeod, Mayor
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director / City Engineer
BY: Cyndy Knighton, Senior Program Manager
CC: Mayor McLeod
DATE: May 17, 2024
SUBJECT: Resolution for Six -Year Transportation Improvement Program (2025 - 2030)
ISSUE
Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program for
2025 - 2030.
BACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of
Washington (RCW) 35.77.010. The TIP is adopted by resolution after a public hearing at the local agency
level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for
projects competing for grants. Any project submitted for federal grant funding must be included in the local,
regional, and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants,
developer, and local funds. Projects "roll" as funds or stages occur (design report, final design, and
construction).
Tukwila's Six Year TIP and the Capital Improvement Program (CIP) list many of the same transportation -
related projects. The TIP generally lists only those transportation -related projects planned within the next six
years that are deemed regionally significant or that have grant funding awarded or expected.
ANALYSIS
The attached spreadsheet is the "Draft" 2025 - 2030 TIP and was created by modifying the 2024 - 2029 TIP
to add or remove projects and adjust project costs. No prioritization was assigned, and the list of projects is
presented in alphabetical order. Prioritization of projects is reflected in the current CIP. No projects were
removed. Six new projects were added, all but one fully funded with recently awarded grants.
Added: Funding Source
42nd Avenue S Bikeway 100% Grant Funded (Sound Transit)
Boeing Access Road Overlay 100% Grant Funded (Federal)
Interurban Avenue S Overlay 100% Grant Funded (Federal)
Orillia Road S Overlay 100% Grant Funded (Federal)
S Ryan Way City, private, and potential grants
Southcenter Blvd Bikeway and Ped Xing Upgrades 100% Grant Funded (Sound Transit)
FINANCIAL IMPACT
None.
RECOMMENDATION
Council is being asked to approve the Resolution for the 2025 - 2030 Six -Year Transportation Improvement
Program and consider this item at a Public Hearing at the June 10, 2024, Committee of the Whole and
subsequent June 17, 2024, Regular Meeting.
ATTACHMENTS:
• Draft Resolution
• Draft 2025-2030 TIP Summary
• 2025-2030 Draft Transportation Improvement Program
• Current Adopted 2024-2029 TIP
115
DRAFT
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2025-
2030), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2025-2030); and
WHEREAS, on June 10, 2024, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2025 to 2030, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
116
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2024.
ATTEST/AUTHENTICATED:
Andy Youn, CMC, City Clerk Mohamed Abdi, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Office of the City Attorney
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2025 to 2030
117
DRAFT 2025 - 2030 TIP SUMMARY
2023-2028
CIP Sheet
PROJECT TITLE
Project Costs in Thousands of Dollars
Funding Sources
Unsecured
2025
2026
2027
2028
2029
2030
TOTAL
Federal
State/TIB
City/Local
Grant
City*
9
42nd Avenue S Bridge Replacement
200
1,800
19,000
10,000
0
0
31,000
13,500
18,400
1,000
1,400
NEW
42nd Avenue S Bikeway
55
295
0
0
0
0
350
1,895
500
1,895
500
5
46th Avenue Safe Routes to School
0
250
75
2,070
0
0
2,395
2,060
520
2,060
410
10
Allentown Truck Reroute Project
10
0
0
0
0
0
10
10
14
ADA Improvements
100
100
100
100
100
100
600
600
600
20
APE/Minkler Blvd Intersection
220
1,800
0
0
0
0
2,020
1,440
580
1,440
360
22
APE/Industry Drive Intersection
0
170
1,750
0
0
0
1,920
1,530
390
1,530
220
13
Annual Bridge Inspections and Repairs
215
220
230
235
240
240
1,380
1,380
1,380
12
Annual Overlay and Repair Program
2,500
2,500
2,500
2,500
2,500
2,500
15,000
15,000
15,000
15
Annual Traffic Signal Program
130
130
130
150
160
160
860
860
860
NEW
Boeing Access Road Overlay
564
3,426
0
0
0
0
3,990
3,990
-
25
E Marginal Way S (BAR - S 112th St)
0
0
250
900
3,000
0
4,150
2,300
1,850
2,300
1,850
NEW
Interurban Avenue S Overlay
0
397
4,561
0
0
0
4,958
4,958
-
Keeping South King County Moving with TDM
235
260
260
260
130
0
1,145
1,880
840
6
Macadam Road S Complete Streets Project
0
0
300
200
3,100
0
3,600
3,240
360
3,240
360
NEW
Orillia Road S Overlay
0
105
1,204
0
0
0
1,309
1,309
18
S 119th St Pedestrian Bridge Painting
0
200
0
0
0
0
200
200
200
23
S 133rd St/SR 599 Southbound Intersection
0
0
0
0
550
2,700
3,250
1,620
1,630
1,620
1,630
21
S 144th St Bridge Sidewalks
0
579
2,690
0
0
0
3,269
2,802
467
2,302
388
4
S 152nd Street Safe Routes to School
350
4,225
0
0
0
0
4,575
2,140
2,435
2,140
2,085
NEW
S Ryan Way (pending planning level estimate)
400
900
9,200
0
0
0
10,500
8,080
2,420
8,080
2,420
-
South King County Regional TDM
130
130
159
159
159
159
896
1,000
106
50
636
NEW
Southcenter Blvd Bikeway and Ped Xing Upgrade:
65
325
0
0
0
0
390
390
19
Southcenter Blvd/65th Avenue S Signal
1,182
0
0
0
0
0
1,182
280
187
-
PROJECTS REVISED FROM 2024-2029 TIP
47
47
47
47
47
45
280
94
TOTAL
6,403
17,859
42,456
16,621
9,986
5,904
99,229
27,559
45,065
30,642
29,670
28,263
PROJECTS REVISED FROM 2024-2029 TIP
New
42nd Avenue S Bikeway
Boeing Access Road Overlay
Interurban Avenue S Overlay
Orillia Road S Overlay
S Ryan Way
Southcenter Blvd Bikeway and Ped Xing Upgrades
Deleted/Completed:
none
* Unsecured City funding includes all funds necessary outside of the current biennial budget cycle
May 14, 2024
118
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
Amendment
___A
Resolution No.
Improvement Type
c
—
,�
Total Length
Environmental Type
RW Required
D. Road Name or Number
m
0
E. Begin & End Termini
w.
o.
F. Project Description G. Structure ID
c
a
N
05
/ 1037(004) TUK-62
06/10/24
6/17/24
11
0.100
DCE
No
42nd Ave S Bridge Replacement
N
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
preliminary engineer design, right-of-way, and construction phases. The new
structure will meet current road and bridge design standards. The replacement
structure configuration will be two through -lanes, possibly a turn pocket, and include
sidewalks.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fe•
. Funds
St
and Code
State Funds
Local Funds
Total Funds
S
PE
2025
STBG
1,
0
1,000,000
2,500,000
P
RW
2026
0
MAW
1,400,000
0
1,400,000
S
CN
2027
BR
600,000
MAW
17,000,000
0
29,000,000
jlli
s
1 , '00
18,400,000
1,000,000
32,900,000
Expenditure Schedule
Phase
1st
2nd
3r
4th
5th & 6th
PE
200,000
400,000
0
0
0
RW
0
1,400,000
0
0
0
CN
0
0
19,000,000
10,000,000
0
Totals
200,000
1,800,000
19,000,000
10,000,000
0
Report Date: May 14, 2024
Page1 119
ANL
111171 v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
c.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-15812
42nd Avenue S Bikeway
42nd Avenue S
Southcenter Blvd to S 150th Street
Develop a traffic -calmed bikeway along 42nd Ave S between S 150th St and
Southcenter Blvd. On the west side of the street, add striped southbound bike lane
between Southcenter Blvd and S 150th St. On the east side of the street, add striped
bike lane between Southcenter Blvd and S 151st St. Remove on -street parking to
widen the sidewalk on the east side of the street between S 151 st St and S 150th St,
creating a shared path; add shared lane markings to the roadway I‘L)
06/10/24
6/17/24
N
28
C G P S T
W
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
al Fun
and Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
55,000
55,000
S
CN
2026
0
0
295,000
295,000
s
0
0
350,000
350,000
Expenditure Schedule
2ndN4th5th
295,0
0
0
& 6th
0
0
Phase
1st
PE
55,000000
CN
0
Totals55,000295,0
Report Date: May 14, 2024
Page 2 120
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
0.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
N
Total Length
Environmental Type
RW Required
19
WA-11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/10/24
6/17/24
N
05
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
0
SRTS
170,000
80,000
250,000
P
RW
2026
RTS
65,000
10,000
75,000
P
CN
2028
SRTS
1,660,000
410,000
2,070,000
Tota� 0
1,895,000
500,000
2,395,000
Expenditure Schedule
Phase
1st
2nd
4th5th
& 6th
PE
0
25{!1*
0
0
0
RW
0
0
75,000
0
0
CN
0
0
0
2,070,000
0
Totals
0
250,000
75,000
2,070,000
0
Report Date: May 14, 2024
Page 3 121
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
a
Amendment
___A
Resolution No.
Improvement Type
c
,�
c�
o.
N
Total Length
Environmental Type
RW Required
00
WA05409
Allentown Truck Reroute Project
to
Study alternatives for truck access to reroute outside of residential neighborhood. _
06/10/24
6/17/24
N
18
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Funds
Local Funds
Total Funds
S
PL
2025
Vilate
0
600,000
600,000
Totals
jill10
0
600,000
600,000
Expenditure Schedule
V
Phase
1st
2nd
3r
4th
5th & 6th
PL
10,000
0
0
0
0
Totals
10,000
0
0
Report Date: May 14, 2024
Page 4 122
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
�.
c
a
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
N
Total Length
Environmental Type
RW Required
00
WA-05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/10/24
6/17/24
N
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
600,000
600,000
Totals
0
0
600,000
600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
100,000
100,00
0
100,000
200,000
Totals
100,000
10
100,
100,000
200,000
v
Report Date: May 14, 2024
Page 5 123
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
0.
c
a
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
co
Total Length
Environmental Type
RW Required
16
WA-07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/10/24
6/17/24
N
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
200,000
200,000
S
RW
2025
0
0
20,000
20,000
P
CN
2026
TIB
1,440,000
360,000
1,800,000
Totals
0
1,440,000
580,000
2,020,000
Expenditure Schedule
Phase
1st
2nd
'
4th
5th & 6th
PE
200,000
0
0
0
RW
20,000
0
0
0
0
CN
0
1,800,000
0
0
0
Totals
220,000
1,800,000
0
0
0
Report Date: May 14, 2024
Page 6 124
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
�.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
N
Total Length
Environmental Type
RW Required
04
WA-15107
Andover Park East/Industry Dr Intersection
Andover Park E
Industry Drive to
Design and construct traffic signal with Andover Park East left turn lanes and
crosswalks.
06/10/24
6/17/24
N
03
P
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
P
PE
2026
0
0
150,000
150,000
P
RW
2026
0
0
20,000
20,000
P
CN
2027
TIB
1,530,000
220,000
1,750,000
Totals
0
1,530,000
390,000
1,920,000
Expenditure Schedule
Phase
1st
2nd
4
4RW
4th
5th & 6th
PE
0
150,1.
0
0
0
0
20,000
0
0
0
CN
0
0
1,750,000
0
0
Totals
0
170,000
1,750,000
0
0
Report Date: May 14, 2024
Page 7 125
ANL
1117, v�rasr�ingti n state
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
o
Q.
N
Total Length
Environmental Type
RW Required
14
WA-03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/10/24
6/17/24
N
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
1,380,000
1,380,000
Totals
0
0
1,380,000
1,380,000
Expenditure Schedule
Phase
lst
2nd
3rd
4th
5th & 6th
ALL
215,000
220,00
0
235,000
480,000
Totals
215,000
22
230,
235,000
480,000
v
Report Date: May 14, 2024
Page 8 126
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
�.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
N
Total Length
Environmental Type
RW Required
16
WA-03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/10/24
6/17/24
N
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
15,000,000
15,000,000
Totals
0
0
15,000,000
15,000,000
Expenditure Schedule
Phase
lst
2nd
3rd
4th
5th & 6th
ALL
2,500,000
2,500,00
2,
0
2,500,000
5,000,000
Totals
2,500,000
2,50
2,500,
2,500,000
5,000,000
v
Report Date: May 14, 2024
Page 9 127
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
—
,�
0
o.
N
Total Length
Environmental Type
RW Required
00
WA-15104
Annual Traffic Signal Program
Varies
to
Design and construct traffic signal upgrades and repairs of signals that exceed
routine maintenance work;loop replacement, head replacement, and controllers.
Replace direct bury cable for existing lighting system.
06/10/24
6/17/24
N
44
P
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
860,000
860,000
Totals
1
0
860,000
860,000
Expenditure Schedule
Phase
1st
2nd
d
4th
5th & 6th
ALL
130,000
130,
15
150,000
320,000
Totals
130,000
130,
150,000
150,000
320,000
Report Date: May 14, 2024
Page10 128
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
�.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,..
°a
0E.
N
Total Length
Environmental Type
RW Required
03
TUK-68
Boeing Access Road Overlay
Boeing Access Road
East Marginal Way S to Martin Luther King Jr Way S
Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF
railway.
06/10/24
6/17/24
N
05
0.560
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
PE
2025
NHPP
0
0
0
564,000
S
CN
2026
NHPP
3,42
0
0
0
3,426,000
Totals
3
0
0
3,990,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
PE
564,000
0
0
ALL
0
3,426,
0
0
0
Totals
564,000
3,426,000
0
0
0
Report Date: May 14, 2024
Page11 129
ANL
1117, v�rasr�ingIi n state
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
�.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
N
Total Length
Environmental Type
RW Required
04
WA-15109
E Marginal Way S (BAR - S 112 St)
E Marginal Way S
Boeing Access Road to S 112th St
Design and construct curb, gutter, drainage, lighting, turn lanes, and traffic control.
06/10/24
6/17/24
N
03
C G O P S
TW
0.270
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
P
PE
2027
0
0
350,000
350,000
P
RW
2028
0
TIB
500,000
300,000
800,000
P
CN
2029
TIB
1,800,000
1,200,000
3,000,000
Totals
0
2,300,000
1,850,000
4,150,000
Expenditure Schedule
Phase
1st
2nd
'
4th
5th & 6th
PE
0
250,000
100,000
0
RW
0
0
0
800,000
0
CN
0
0
0
0
3,000,000
Totals
0
0
250,000
900,000
3,000,000
Report Date: May 14, 2024
Page12 130
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
0.
c
a
Amendment
___A
Resolution No.
Improvement Type
c
,..
°a
0E.
N
Total Length
Environmental Type
RW Required
03
TUK-66
Interurban Avenue S Overlay
Interurban Avenue S
E Marginal Way S to S 143rd Street
Complete pavement repairs, overlay, and curb and gutter repair. _
06/10/24
6/17/24
N
05
2.250
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
ate
d -
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
'00
0
0
397,000
S
CN
2027
NHPP
4,56
0
0
0
4,561,000
Totals
4,9
10
0
0
4,958,000
Expenditure Schedule
Phase
1st
2nd
d
4th
5th & 6th
PE
0
397,0
0
0
ALL
0
561,000
0
0
Totals
0
397,00
,561,000
0
0
Report Date: May 14, 2024
Page 13 131
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
—
,�
0
o.
co
Total Length
Environmental Type
RW Required
00
TUK-63
Keeping South King County Moving with TDM
South King County
Various to Various
This project will help people access sustainable transportation options that reduce
drive -alone travel and traffic congestion in South King County. TDM programming
and services will be provided to residents, workers, visitors, employers, property
managers, and students in Tukwila and the partnering jurisdictions of Burien, Des
Moines, Kent, Renton, and SeaTac. The program will target those willing and able to
try sustainable modes of transportation at activity centers (community hubs,
commercial areas, business parks, multifamily housing complexes, and educational
institutions). Examples of activity centers include the Tukwila International Boulevard
District, Southcenter, and Sea-Tac Airport. The TDM Program will work in
partnership with transit agencies, nonprofits, employers, and community
organizations to reach priority populations through trusted channels. The project
aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled.
06/10/24
6/17/24
N
44
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund
Fun
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
WSDOT
672,000
0
672,000
S
ALL
2025
0
OTHER
168,000
0
168,000
P
ALL
2025
0
WSDOT
832,000
0
832,000
P
ALL
2025
0
OTHER
208,000
0
208,000
Totals
0
1,880,000
0
1,880,000
Expenditure Schedule
Phase
lst
2nd
3rd
4th
5th & 6th
ALL
235,000
260,000
260,000
260,000
130,000
Totals
235,000
260,000
260,000
260,000
130,000
Report Date: May 14, 2024
Page14 132
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
—
,�
0
o.
N
Total Length
Environmental Type
RW Required
17
WA-11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/10/24
6/17/24
N
04
0.350
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
0
P ike Program
350,000
50,000
400,000
P
RW
2028
Pe e Program
90,000
10,000
100,000
P
CN
2029
/Bike Program
2,800,000
300,000
3,100,000
Tota
0
3,240,000
360,000
3,600,000
Expenditure Schedule
Phase
1st
2nd
{IS.
4th
5th & 6th
PE
0
300,000
100,000
0
RW
0
0
0
100,000
0
CN
0
0
0
0
3,100,000
Totals
0
0
300,000
200,000
3,100,000
Report Date: May 14, 2024
Page15 133
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
-,.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
o
o.
N
Total Length
Environmental Type
RW Required
03
TUK-67
Orillia Road South Overlay
Orillia Road S
S 188th Street to S 204th Street
Complete pavement repairs; overlay; and curb and gutter, sidewalk, and guardrail
repair.
06/10/24
6/17/24
N
05
0.750
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
0
0
0
105,000
S
CN
2027
NHPP
1,20
0
0
0
1,204,000
Totals
1
0
0
1,309,000
Expenditure Schedule
Phase
lst
2nd
4th
5th & 6th
PE
0
10
0
0
ALL
0
,204,000
0
0
Totals
0
105,000
1,204,000
0
0
Report Date: May 14, 2024
Page16 134
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
—
,�
0
o.
N
Total Length
Environmental Type
RW Required
00
WA13494
S 119th St Pedestrian Bridge Painting
S 119th Street Bridge
West bank Duwamish River to East bank Duwamish River
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
needed.
06/10/24
6/17/24
N
06
0.040
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
Fund Code
State Funds
Local Funds
Total Funds
P
CN
2026
0
0
200,000
200,000
Totals
1
0
200,000
200,000
Expenditure Schedule
Phase
1st
2nd
d
4th
5th & 6th
CN
0
200,
0
0
Totals
0
200,
0
0
0
Report Date: May 14, 2024
Page17 135
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
0.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
N
Total Length
Environmental Type
RW Required
03
WA-15108
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 SB Ramp to
Design and construct intersection improvements, which could include a new traffic
signal or a roundabout,
lighting, pedestrian facilities, and drainage.
06/10/24
6/17/24
N
03
C G O P S
TW
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fede
nds
`
- Fund Code
State Funds
Local Funds
Total Funds
P
PE
2028
0
0
400,000
400,000
P
RW
2028
0
150,000
150,000
P
CN
2029
0
TIB
1,620,000
1,080,000
2,700,000
TIONNI
0
1,620,000
1,630,000
3,250,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
400,000
0
RW
0
0
0
150,000
0
CN
0
0
0
0
2,700,000
Totals
0
0
0
550,000
2,700,000
Report Date: May 14, 2024
Page18 136
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
m
�.
c
a
Amendment
___A
Resolution No.
Improvement Type
c
,�
-
°a
0E.
N
Total Length
Environmental Type
RW Required
19
WA-11112
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
06/10/24
6/17/24
N
05
0.300
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
250,000
250,000
S
RW
2025
0
0
100,000
100,000
P
CN
2026
ke Program
2,140,000
2,085,000
4,225,000
Totals
0
2,140,000
2,435,000
4,575,000
Expenditure Schedule
Phase
1st
2nd
'
4th
5th & 6th
PE
250,000
0
0
0
RW
100,000
0
0
0
0
CN
0
4,225,000
0
0
0
Totals
350,000
4,225,000
0
0
0
Report Date: May 14, 2024
Page19 137
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
a
Amendment
___A
Resolution No.
Improvement Type
c
—
,�
0
o.
N
Total Length
Environmental Type
RW Required
04
WA-15829
S Ryan Way
SR 900 to 51 st Ave S
Resurface and rechannel S Ryan Way to improve failing pavement and improve
safety. Add pedestrian and bicycle facilities where appropriate. Signalize intersection
with 47th Avenue S to accommodate future growth and improve safety.
06/10/24
6/17/24
N
06
C G P S T
W
0.500
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fede nds
- - Fund Code
State Funds
Local Funds
Total Funds
P
PE
2025
0
TIB
780,000
520,000
1,300,000
P
CN
2027
TIB
7,300, 000
1,900,000
9,200,000
Totals
0
8,080,000
2,420,000
10,500,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
PE400,00090IO
,00
0
CN0,200,0000
0
Totals400,000900,00,200,000
0
0
Report Date: May 14, 2024
Page 20 138
ANL
1117, v�rasr�ingIi n state
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
a
Amendment
___A
Resolution No.
Improvement Type
c
—
,Z
0
o.
N
Total Length
Environmental Type
RW Required
05
TUK-65
South 144th Street Bridge Sidewalks
S 144th Street Bridge
51 st Ave S to 53rd Ave S
The project entails replacing approximately 320 feet of raised bridge deck on the S
144th street bridge with 6-foot-wide sidewalks, which will be separated from the
traffic lanes by a crash tested barrier and a pedestrian railing. Sharrows will also be
added to the traffic lanes for bicycle traffic.
06/10/24
6/17/24
N
28
0.060
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fede ' nds
Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
STBG(UL)
50J0
0
78,035
578,035
P
CN
2027
SRTS
2,302,000
388,000
2,690,000
Totals
00,000
2,302,000
466,035
3,268,035
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
PE
0
57Ilk)0
0
0
CN
0
,690,000
0
0
Totals0
578,03,690,000
0
0
Report Date: May 14, 2024
Page 21 139
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
Road Name or Number
Begin & End Termini
m
0.
Amendment
___A
Resolution No.
Improvement Type
c
,Q.D.
-
°a
0E.
Total Length
Environmental Type
RW Required
F. Project Description G. Structure ID
c
a
N
00
TUK-64
06/10/24
6/17/24
24
0.000
No
South King County TDM
N
South King County
N/A to N/A
This project will provide TDM programming and services at selected activity centers
in Tukwila and partnering South King County jurisdictions. Activity centers include
community hubs, commercial areas, business parks, multifamily housing complexes,
and educational institutions. For example, places such as Tukwila International
Boulevard District, Southcenter, and Sea-Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive -alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willing and able to try sustainable modes of transportation. The
program will work in partnership with partner agencies, nonprofits, employers, an
community organizations.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Co
al F
State Fund Code
State Funds
Local Funds
Total Funds
S
PL
2025
CMAQ
4 67
OTHER
20,164
50,000
519,731
P
PL
2027
CMAQ
550,000
OTHER
85,838
0
635,838
To
999,567
106,002
50,000
1,155,569
Expenditure Schedule
Nr
Phase
1st
2nd
3rd
4th
5th & 6th
PL
129,933
129,933
158,960
158,960
317,909
Totals
129,933
129,933
158,960
158,960
317,909
Report Date: May 14, 2024
Page 22 140
ANL
111171 v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
c.
c
A
Amendment
___A
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15813
Southcenter Blvd Bikeway and Pedestrian Crossing Upgrades
Southcenter Boulevard
International Boulevard to 42nd Avenue S
Improve the existing bike lanes and crosswalks on Southcenter Blvd within a half -
mile of Tukwila International Boulevard Station (TIES). Re-channelize to 11 ft
general purpose lanes to accommodate separated (tuff curb and post) bike lanes.
Tighten intersection with 40th Ave S to shorten crossing distance. Add bike
channelization and upgrade to high -visibility crosswalk markings at Southcenter
Blvd/TIBS station entrance and Southcenter Blvd/42nd Ave S intersections. I‘L)P
06/10/24
6/17/24
N
28
C G P S T
W
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
al Fun
and Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
65,000
65,000
S
CN
2026
0
0
325,000
325,000
s
0
0
390,000
390,000
Expenditure Schedule
2ndN4th5th
325,0
0
0
& 6th
0
0
Phase
1st
PE
65,000000
CN
0
Totals65,000325,0
Report Date: May 14, 2024
Page 23 141
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
w.
c
Q.
Amendment
___A
Resolution No.
Improvement Type
c
,�
o
o.
N
Total Length
Environmental Type
RW Required
04
WA-13495
Southcenter Blvd/65th Avenue S Signal
Southcenter Boulevard
65th Avenue S to
Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue
S intersection to improve level of service and safety.
06/10/24
6/17/24
N
21
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
nd Code
State Funds
Local Funds
Total Funds
S
CN
2025
0
TIB
782,090
400,000
1,182,090
Totals
0
782,090
400,000
1,182,090
Expenditure Schedule
Phase
lst
2nd
3rd
4th
5th & 6th
CN
1,182,000
0
0
0
Totals
1,182,000
0
0
v
Report Date: May 14, 2024
Page 24 142
ANL
1117, ViastungIi n state
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
Amendment
___A
Resolution No.
Improvement Type
c
—
,Z
Total Length
Environmental Type
RW Required
D. Road Name or Number
m
0
E. Begin & End Termini
-,.
o.
F. Project Description G. Structure ID
c
Q.
co
00
WA-13491
06/10/24
6/17/24
44
0.000
No
Transportation Demand Management Implementation
to
N
Provision of TDM services to Commute Trip Reduction -affected employment sites.
Facilitate employer reporting and records associated with biennial CTR survey.
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fede
nds
- Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
SDOT
93,300
0
93,300
P
ALL
2027
SDOT
186,600
0
186,600
Totals
0
279,900
0
279,900
Expenditure Schedule
Phase
lst
2nd
3r
4th
5th & 6th
ALL
46,650
46,6
46,650
46,650
93,300
Totals
46,650
46,650
46,650
46,650
93,300
Mineral Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
25,256,567
45,994,992
31,461,035
102,712,594
Report Date: May 14, 2024
Page 25 143
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
v
�.
to
Resolution No.
Amendment
Adopted
Improvement Type
c
ot
%
C)
o.
N
Total Length
Environmental Type
RW Required
05
/ 1037(004)
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. T replacement w
preliminary engineer design, right-of-way, and constru n phase Th
structure will meet current road and bridge design stan . T pla
structure configuration will be two through -lanes, possibly cket, a
sidewalks.
equire
ew
ens
TUK-62
e R
06/12/23
06/26/23
N
11
0.100
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Fed
Co
Funds
State F
e
St
s
Local Funds
Total Funds
S
PE
2024
TBG
)
1,5r
A
Mr
1,100,000
2,600,000
S
RW
2024
^, i
13,500
100,000
S
CN
2024
BR
1 ,• - e
17,00i 100
0
28,913,500
To a s
13,500,001
, 00,0i1
1,113,500
31,613,500
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
800,000
0
0
0
0
RW
100,000
0
0
0
0
CN
0
15,636,500
13,500,000
0
0
Totals
900,000
15,636,500
13,500,000
0
0
Report Date: May 04, 2023
Page 1 144
1117, ViastungIi n state
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
1
�.
to
Amendment
Adopted
Resolution No.
Improvement Type
c
ot
,
C)
o.
N
Total Length
Environmental Type
RW Required
19
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the
including curb bulb -out at the SE corner of 46th Avenu
crosswalk across S 144th Street with RRFB.
st side of 46th
/S 144th e
WA-1111:06/12/23
enue S,
ith rail
R
06/26/23
N
05
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code Federal Funds
State Fund Code State Funds
Local Funds
Total Funds
P9
PE
2024
90,000
270,000
P
RW
20242
10020,000240,000
P
CN2025
9
7801,•'
6� '�0
7TS
410,000
2,070,000
taps
_
6�00
520,000
2,580,000
v
■
v
v
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
270,000
0
0
0
0
RW
240,000
0
0
0
0
CN
0
2,070,000
0
0
0
Totals
510,000
2,070,000
0
0
0
Report Date: May 04, 2023
Page 2 145
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
m
�'.
t
Amendment
Adopted
,:,
`D
o
E
o
Z
P
Improvement Type
C
C)
a
N
Total Length
Environmental Type
RW Required
00
Allentown Truck Reroute Project
to
Study alternatives for truck access to reroute outside
esidential neig
rhood.
WA05409 06/12/23
1::0 1::0
06/26/23
18
EIS
No
Funding , `
, ` ` ,
.
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code Federal Funds
State Fund Code State Funds
Local Funds
Total Funds
S
PL
2024
0
0
600,000
600,000
- To AIIIMIII AP
600,000
600,000
Expenditure Schedule
Phase
1st
2nd
_
zy
5
6th
PL
600,000
p
Totals
600,000
0
0
Report Date: May 04, 2023
Page 3 146
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Amendment
Adopted
Resolution No.
Improvement Type
%
c
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
Q.
F. Project Description
G. Structure ID
to
N
00
WA-05405 06/12/23
06/26/23
06
No
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City
with a City developed plan.
rastructure in
1111
junction
IR IR
N
Funding w
—
_ m _ - _
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2024
0
0
435,000
435,000
^
^
A
^
^
435,000
435,000
Expenditure Schedule
Phase
1st
24
d
& 6th
ALL
50,000
,00
50,00 0,0
1
Totals
50,000
50,000
50,000
50,000
100,000
Report Date: May 04, 2023
Page 4 147
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Amendment
Adopted
Resolution No.
Improvement Type
C
%
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
Q.
F. Project Description
G. Structure ID
to
N
16
WA-07746 06/12/23
06/26/23
03
C G O P S
No
TW
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and re
struct tray si
I
IR IR
N
Funding — _ m _ -
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
134,000
134,000
S
RW
2025
I
10,000
10,000
P
CN
202611
IA
III
1,570,000
1,570,000
, -
1,714,000
1,714,000
Expenditure Schedule
r • r r
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
134,000
0
0
0
RW
0
10,000
0
0
0
CN
0
0
1,570,000
0
0
Totals
0
144,000
1,570,000
0
0
Report Date: May 04, 2023
Page 5 148
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Amendment
Adopted
Resolution No.
Improvement Type
C
,
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
o.
F. Project Description
G. Structure ID
to
N
04
WA-15107 06/12/23
06/26/23
03
P
0.100
Yes
Andover Park East/Industry Dr Intersection
Andover Park E
Industry Drive to
Design and construct traffic signal with Andover Park
crosswalks.
t left turn lane
if
nd
IR IR
N
Funding — _ m _ -
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
75,000
75,000
S
RW
2025
1
10,000
10,000
P
CN
202611
IA
III
657,000
657,000
, -
742,000
742,000
Expenditure Schedule
r • r r
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
75,000
0
0
0
RW
0
10,000
0
0
0
CN
0
0
657,000
0
0
Totals
0
85,000
657,000
0
0
Report Date: May 04, 2023
Page 6 149
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
v
�.
to
Amendment
Adopted
Resolution No.
Improvement Type
c
ot
%
C)
o.
N
Total Length
Environmental Type
RW Required
14
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well
repairs and maintenance
construct nec
if
ary
WA-03731 06/12/23
IR IR
06/26/23
N
06
No
Funding
—
_ m _ -
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2024
0
0
1,345,000
1,345,000
^
^
A
^
^
1,345,000
1,345,000
Expenditure Schedule
Phase
1st
24
d
& 6th
ALL
205,000
220,00
0,0
4
,00
Totals
205,000
215,000
220,000
230,000
475,000
Report Date: May 04, 2023
Page 7 150
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Amendment
Adopted
Resolution No.
Improvement Type
C
%
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
Q.
F. Project Description
G. Structure ID
to
N
16
WA-03733
06/12/23
06/26/23
06
C G O P S
No
TW
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as neede
an annuipr
m
Funding
—
_ m _ -
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2024
0
0
8,850,000
8,850,000
^
^
A
^
^
8,850,000
8,850,000
Expenditure Schedule
Phase
1st
24
d
& 6th
ALL
1,400,000
,00
, 0,0
3,1
,400,00
Totals
1,400,000
1,400,000
1,400,000
1,500,000
3,150,000
Report Date: May 04, 2023
Page 8 151
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
v
�.
to
Adopted
Amendment
Resolution No.
Improvement Type
c
ot
%
C)
o.
N
Total Length
Environmental Type
RW Required
00
WA-15104
Annual Traffic Signal Program
Varies
to
Design and construct traffic signal upgrades and repai of signals that eed
routine maintenance work;loop replacement, head rep ment, a o Ilers.
Replace direct bury cable for existing lighting system.
06/12/23
06/26/23
44
P
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code Federal Funds
State Fund Code State Funds Local Funds
Total Funds
S
ALL
2024
1,040,000
1,040,000
el taps n A
n n el% 1,040,000
1,040,000
Expenditure Schedule
ZI=
4.1
Phase
1st
21
ALL
130,000
130,000
130,000
150,000
300,000
Totals
130,000
130,000
130,000
150,000
300,000
Report Date: May 04, 2023
Page 9 152
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Amendment
Adopted
Resolution No.
Improvement Type
C
%
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
o.
F. Project Description
G. Structure ID
to
N
04
WA-15109 06/12/23
06/26/23
03
C G O P S
0.270
Yes
TW
E Marginal Way S (BAR - S 112 St)
E Marginal Way S
Boeing Access Road to S 112th St
Design and construct curb, gutter, drainage, lighting, t
lanes, antra
control. IR IR
N
Funding — _ m _ -
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2025
0
0
288,000
288,000
P
RW
2029
1 -
281
420,000
700,000
P
CN
2029
IA IBIII
• 7 111
1,460,000
2,430,000
, -
1,250,
2,168,000
3,418,000
Expenditure Schedule
r • r r
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
50,000
0
0
170,000
RW
0
0
0
0
700,000
CN
0
0
0
0
2,430,000
Totals
0
50,000
0
0
3,300,000
Report Date: May 04, 2023
Page10 153
ANL
111171 v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
1
�.
to
Adopted
Amendment
Resolution No.
Improvement Type
c
ot
,
C)
o.
N
Total Length
Environmental Type
RW Required
00
TUK-63
Keeping South King County Moving with TDM
South King County
Various to Various
This project will help people access sustainable transation options t reduce
drive -alone travel and traffic congestion in South King , unty. TD pro mming
and services will be provided to residents, workers, visi . ern. ' rs, ert
managers, and students in Tukwila and the partnering juri . of Buri R
Moines, Kent, Renton, and SeaTac. The program will target those willing and able to
try sustainable modes of transportation at activity centers (community hubs,
commercial areas, business parks, multifamily housing complexes, and educational
institutions). Examples of activity centers include the Tukwila International Boulevard
District, Southcenter, and Sea-Tac Airport. The TDM Pr ill fler
with transit agencies, nonprofits, employers, and com ity o npriority populations through trusted channels. The project aim r97
vehicle trips and 8,093,549 vehicle miles traveled.ono()
06/12/23
06/26/23
N
44
0.000
No
Funding ` v ` '
,_
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2024
0
WSDOT
672,000
0
672,000
S
ALL
2024
0
OTHER
168,000
0
168,000
Totals
0
840,000
0
840,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
210,000
105,000
0
0
0
Totals
210,000
105,000
0
0
0
Report Date: May 04, 2023
Page 11 154
1117, ViastungIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
v
�.
to
Amendment
Adopted
Resolution No.
Improvement Type
c
ot
%
C)
o.
N
Total Length
Environmental Type
RW Required
17
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Maca
and rechannelization to add 5-foot bike lanes and 5-fo
the roadway. Includes illumination, curb, and storm drai
m Road. Road
idewalks b
WA-1111(
ening
sides o
R
06/12/23
06/26/23
N
04
0.350
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code Federal Funds
State Fund Code State Funds
Local Funds
Total Funds
P
PE
2024
am
50,000
400,000
P
RW
2024
Ped/B Prog 9 �00
10,000
100,000
P
CN
2025Ped/Bike
9Ped/Bik
9
Pr m2350S
80k '.0
300,000
3,100,000
24�00
360,000
3,600,000
v
■
v
v
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
400,000
0
0
0
0
RW
100,000
0
0
0
0
CN
0
3,100,000
0
0
0
Totals
500,000
3,100,000
0
0
0
Report Date: May 04, 2023
Page12 155
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
v
�.
to
Amendment
Adopted
Resolution No.
Improvement Type
c
ot
%
C)
o.
N
Total Length
Environmental Type
RW Required
00
S 119th St Pedestrian Bridge Painting
S 119th Street
West bank Duwamish River to East bank Duwamish R.
Ongoing maintenance of the S 119th Street Pedestria
Allentown/Duwamish neighborhoods. Painting of bridg
needed.
ridge in the
outstan
WA-13494
ntenanc
R
06/12/23
06/26/23
N
06
0.040
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code Federal Funds
State Fund Code State Funds Local Funds
Total Funds
P
CN
2024
200,000
200,000
el taps n A
n n filo%200,000
200,000
Expenditure Schedule
‘01.111
4.1
Phase
1st
2
CN
0
200,000
0
0
Totals
0
200,000
0
0
0
Report Date: May 04, 2023
Page13 156
ANL
1117, v�rasr�ingIi n state
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Resolution No.
Amendment
Adopted
Improvement Type
c
%
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
o.
F. Project Description
G. Structure ID
to
N
03
WA-15108 06/12/23
06/26/23
03
C G O P S
0.100
Yes
TW
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 SB Ramp to
Design and construct intersection improvements, whic
signal or a roundabout,
lighting, pedestrian facilities, and drainage.
ould inclu
a
w traffic
R R
N
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2028
I
1
300,000
300,000
P
RW
2028
iI
,
i
50,000
50,000
P
CN
2029
I
2,070,000
2,070,000
1
W &IrW
2,420,000
2,420,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
300,000
RW
0
0
0
0
50,000
CN
0
0
0
0
2,070,000
Totals
0
0
0
0
2,420,000
Report Date: May 04, 2023
Page14 157
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
m
�'.
Amendment
Adopted
XI
`D
o
o
Z
P
Improvement Type
C
,
n
a
co
Total Length
Environmental Type
RW Required
17
S 144th St Bridge Sidewalks
S 144th Street
51 st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between
t Ave S and 53
Ave S
WA03782 06/12/23
1::0 IZI
06/26/23
28
0.250
CE
No
Funding
, `
, ` `
, .
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
STBG(UL)
500,000
0
79,000
579,000
P
CN
2025
2,302,0
38,000
2,690,000
ei
taps
^ 2,80
^
^ 0�
467,000
3,269,000
Expenditure Schedule
Phase
PE
1st
0
CN
0
Totals
0
2
1Z ZikAa
579,000 0
0 0 2,690,000 0
0 579,000 2,690,000 0
Report Date: May 04, 2023
Page15 158
ANL
1117, v�rasr�ingti n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Amendment
Adopted
Resolution No.
Improvement Type
%
C
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
o.
F. Project Description
G. Structure ID
to
N
19
WA-1111 '
06/12/23
06/26/23
05
0.300
No
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on b
pavement width by 3 feet to construct on -street parkin
sides including
ne on nob si
idening
of street
Funding
—
_ m _ -
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2024
0
TIB
3,200,000
815,000
4,015,000
^
^
A
^
01.4k2020%
815,000
4,015,000
Expenditure Schedule
Phase
1st
2nki)
d kii)&
6th
CN
4,015,000
Totals
4,015,000
0
0
0
0
Report Date: May 04, 2023
Page16 159
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
v
�.
to
Adopted
Amendment
Resolution No.
Improvement Type
c
ot
%
C)
o.
N
Total Length
Environmental Type
RW Required
00
TUK-64
South King County TDM
South King County
N/A to N/A
This project will provide TDM programming and servic at selected act y center
in Tukwila and partnering South King County jurisdicti . Activity to include
community hubs, commercial areas, business parks, m mil sin le R
and educational institutions. For example, places such as nterna
Boulevard District, Southcenter, and Sea-Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive -alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willingand able tosustainable mode port e
9 9try
program will work in partnership with partner agencies onpro loye a re) A
community organizations.
06/12/23
nnn
06/26/23
N
24
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Fe
CoAG
unds
State
a
Local Funds
Total Funds
S
PL
2024
CMAQ
450,000
OTHER
55,232
15,000
520,232
Totals
450,000
55,232
15,000
520,232
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PL
260,116
0
0
0
0
Totals
260,116
0
0
0
0
Report Date: May 04, 2023
Page17 160
ANL
1117, v�rasr�ingIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
B. STIP ID
Amendment
Adopted
Resolution No.
Improvement Type
%
c
ot
Total Length
Environmental Type
RW Required
D. Road Name or Number
v
C)
E. Begin & End Termini
�.
o.
F. Project Description
G. Structure ID
to
N
04
WA-13495 06/12/23
06/26/23
21
No
Southcenter Blvd/65th Avenue S Signal
Southcenter Boulevard
65th Avenue S to
Design and construct a new traffic signal at the South
S intersection to improve level of service and safety.
ter Boulevard/
IIII
h Avenu
IR IR
N
Funding w — _ m _ - _
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds Local Funds
Total Funds
S
PE
2024
0
0 200,000
200,000
P
CN
2025
er)
500,000
A eo
1,000,000
taps
n A
in 700,000
1,200,000
Expenditure Schedule
Phase
1st
PE
100,000
0
0
0
0
CN
1,000,000
0
0
0
0
Totals
1,100,000
0
0
0
0
Report Date: May 04, 2023
Page 18 161
ANL
1117, ViastungIi n State
Department ot Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2024 to 2029
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
v
�.
to
Amendment
Adopted
Resolution No.
Improvement Type
%
c
ot
C)
o.
N
Total Length
Environmental Type
RW Required
00
Transportation Demand Management Implementation
to
Provision of TDM services to Commute Trip Reductio
Facilitate employer reporting and records associated
Engage CTR employment sites with opportunities for i
connected via technical meetings with other CTR jurisdict
WA-13491 06/12/23
ected employIvey.
biennial R
nt sites.RR
em nd in
resenta
06/26/23
N
44
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code Federal F9unds
State Fund Code State Funds
Local Funds
Total Funds
S
ALL
2024
O 8'
0
88,526
P
ALL
20259
WSDOT 4
0
46,650
taps
135,
0
135,176
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
46,650
46,650
0
0
0
Totals
46,650
46,650
0
0
0
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
16,752,000
28,280,408
23,504,500
68,536,908
Report Date: May 04, 2023
Page19 162