Loading...
HomeMy WebLinkAbout20-116 - Amendment E - TranTech Engineering, LLC - Plans and Engineering Services - 42nd Avenue South Bridge Replacement Project� Washington State vI/ Department of Transportation 20-116(e) Council Approval N/A Supplemental Agreement Organization and Address Number 05 David Evans and Associates, Tnc. 14432 SE Eastgate Way, Ste. 400 Original Agreement Number Bellevue, WA 98007 20-116 Phone: 425-519-6500 Project Number Execution Date Completion Date 91810404 11/06/2020 12/31/2027 Project Title New Maximum Amount Payable 42nd Ave S Bridge Replacement $3,993,355 + $0 = $3,993,355 Description of Work Remove and replace the existing 280'(30':220':30') 3 -span fracture critical bridge structure with multi -girder 3 -span 325'(35':255':35') long and 43' wide bridge. The superstructure of the main span and approaches will be composed of steel plate girders and precast concrete girders respectively. The Local Agency of City of Tukwila desires to supplement the agreement entered into with David Evans and Associates, Inc. (previously TranTech Engineering, LLQ and executed on 11/06/2020 and identified as Agreement No. 20-116(a) All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: (No change) 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: (No change) III Section V, PAYMENT, shall be amended as follows: Total maximum amount payable is not changed; labor classifications and ANTE rates are amended/updated per the attached Exhibit A. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: Khashayar Nikzad, PE By: L Digi��signed b KM1asl, ., o c- Us, Qdea1nN1 �,o 0- sry a— Khashayar Nikzad o� � Kas zee ��hava­d Consultant Signature Jen Tetatzin Signed by: j'.*_ ��a% Approv Adeffdll�nature 1/23/2026 13:01 PM PST uate APPROVED AS TO FORM DOT Form 140-063 BY CITY ATTORNEY 1/23/26. Revised 09/2005 APPROVAL ON FILE. Actuals Not To Exceed Table (ANTE) David Evans and Associates, Inc. 1 of 4 SAACCOUNT\Fee Schedules -Fiscal OVH Letters\FY-Client Sch\FY 2025\City of Tukwila_2025-12-10_42nd Ave. Bridge_KANI_RFAH 2025 2025 Overhead Fixed Fee All Inclusive JOB CLASSIFICATIONS Labor Rate NTE NTE Hourly Billing NTE 176.24% 30.17% Rate NTE Administrative Assist IV (ADM4) $47.25 $83.27 $14.26 $144.7 Business Development Leader I (BUD1) $73.74 $129.96 $22.25 $225.9 Business Development Leader II (BUD2) $119.32 $210.28 $36.00 $365.6 Business Development Leader III (BUD3) $113.59 $200.19 $34.27 $348.0 Business Development Leader IV (BUD4) $155.40 $273.88 $46.88 $476.1 BU/COE Sr. Manager I (BUST) $88.81 $156.52 $26.79 $272.1 BU/COE Sr. Manager II (BUS2) $122.17 $215.31 $36.86 $374.3 BU/COE Sr. Manager III (BUS3) $164.85 $290.53 $49.74 $505.1 CAD Technician I (CAD1) $31.19 $54.97 $9.41 $95.5 CAD Technician II (CAD2) $39.52 $69.65 $11.92 $121.0 CAD Technician III (CAD3) $41.04 $72.33 $12.38 $125.7 CAD Technician IV (CAD4) $58.16 $102.51 $17.55 $178.2 CAD Technician V (CADS) $59.24 $104.40 $17.87 $181.5 COE Delivery Leader I (CDL1) $54.32 $95.72 $16.39 $166.4 COE Delivery Leader II (CDL2) $61.63 $108.62 $18.60 $188.8 COE Delivery Leader III (CDL3) $92.49 $163.00 $27.90 $283.3 Construction Inspector I (CIN1) $38.50 $67.85 $11.62 $117.9 Construction Inspector II (CIN2) $44.85 $79.04 $13.53 $137.4 Construction Inspector III (CIN3) $53.29 $93.91 $16.08 $163.2 Construction Inspector IV (CIN4) $64.98 $114.52 $19.60 $199.1 Construction Inspector V (CINS) $70.00 $123.37 $21.12 $214.4 Construction Services Manager I (CSM1) $44.31 $78.09 $13.37 $135.7 Construction Services Manager II (CSM2) $54.27 $95.64 $16.37 $166.2 Construction Services Manager III (CSM3) $81.10 $142.93 $24.47 $248.5 Construction Services Manager IV (CSM4) $86.43 $152.32 $26.08 $264.8 Deputy Construction Manager (DCON) $46.45 $81.86 $14.01 $142.3 Designer I (DES1) $37.05 $65.30 $11.18 $113.5 Designer II (DES2) $48.30 $85.12 $14.57 $148.0 Designer III (DES3) $61.95 $109.18 $18.69 $189.8 Designer IV (DES4) $72.47 $127.72 $21.86 $222.0 Designer V (DESS) $74.09 $130.58 $22.35 $227.0 Electrical Engineer II (ELE2) $53.13 $93.64 $16.03 $162.8 Electrical Engineer III (ELE3) $52.08 $91.79 $15.71 $159.5 Engineering Designer I (END1) $45.13 $79.54 $13.62 $138.2 Engineering Designer II (END2) $56.13 $98.93 $16.93 $171.9 Engineering Designer III (END3) $62.15 $109.53 $18.75 $190.4 Engineer III (ENG3) $64.94 $114.44 $19.59 $198.9 Engineer IV (ENG4) $72.98 $128.62 $22.02 $223.6 1 of 4 SAACCOUNT\Fee Schedules -Fiscal OVH Letters\FY-Client Sch\FY 2025\City of Tukwila_2025-12-10_42nd Ave. Bridge_KANI_RFAH Actuals Not To Exceed Table (ANTE) David Evans and Associates, Inc. JOB CLASSIFICATIONS 2025 Labor Rate NTE Overhead NTE 176.24% Fixed Fee NTE 30.17% 2025 All Inclusive Hourly Billing Rate NTE Engineer V (ENGS) $82.95 $146.19 $25.03 $254.17 Engineer VI (ENG6) $96.60 $170.25 $29.14 $295.99 Engineer VII (ENG7) $119.70 $210.96 $36.11 $366.77 Flight Operations Manager (FLOM) $81.23 $143.16 $24.51 $248.90 Field Survey Technician I (FST1) $28.35 $49.96 $8.55 $86.87 Field Survey Technician II (FST2) $30.62 $53.97 $9.24 $93.84 Field Survey Technician III (FST3) $34.67 $61.10 $10.46 $106.23 Field Survey Technician IV (FST4) $37.14 $65.46 $11.21 $113.80 GIS Analyst II (GIA2) $47.25 $83.27 $14.26 $144.78 GIS Analyst III (GIA3) $51.99 $91.62 $15.68 $159.30 GIS Analyst IV (GIA4) $55.65 $98.08 $16.79 $170.52 GIS Manager (GISM) $61.95 $109.18 $18.69 $189.82 Graphic Designer II (GRD2) $48.30 $85.12 $14.57 $148.00 Graphic Designer III (GRD3) $51.65 $91.02 $15.58 $158.25 Geospatial Technician I (GST1) $41.18 $72.58 $12.42 $126.18 Geospatial Technician II (GST2) $45.00 $79.31 $13.58 $137.88 Geospatial Technician III (GST3) $51.50 $90.76 $15.54 $157.80 Geospatial Technician IV (GST4) $64.18 $113.11 $19.36 $196.65 Hydrographer I (HYD1) $32.49 $57.25 $9.80 $99.54 Hydrographer II (HYD2) $35.09 $61.83 $10.59 $107.50 Hydrographer III (HYD3) $42.00 $74.02 $12.67 $128.69 Hydrographer IV (HYD4) $61.86 $109.02 $18.66 $189.55 Hydrographer V (HYD5) $73.50 $129.54 $22.17 $225.21 Hydrographer VI (HYD6) $85.00 $149.80 $25.64 $260.45 Intern I (INT1) $27.52 $48.49 $8.30 $84.31 Intern II (INT2) $24.05 $42.38 $7.26 $73.69 Landscape Designer I (LAD1) $30.87 $54.40 $9.31 $94.59 Landscape Designer IV (LAD4) $50.04 $88.19 $15.10 $153.33 Landscape Architect II (LAR2) $43.50 $76.66 $13.12 $133.29 Landscape Architect III (LAR3) $51.54 $90.84 $15.55 $157.93 Landscape Architect IV (LAR4) $63.53 $111.96 $19.17 $194.65 Landscape Architect V (LARS) $65.61 $115.63 $19.79 $201.04 Office Survey Technician I (OST1) $35.18 $61.99 $10.61 $107.78 Office Survey Technician II (OST2) $35.28 $62.18 $10.64 $108.10 Office Survey Technician III (OST3) $42.71 $75.28 $12.89 $130.88 Office Survey Technician IV (OST4) $48.15 $84.86 $14.53 $147.54 Office Survey Technician V (OST5) $50.83 $89.58 $15.34 $155.75 Office Survey Technician VI (OST6) $56.00 $98.69 $16.90 $171.59 2 of 4 SAACCOUNT\Fee Schedules -Fiscal OVH Letters\FY-Client Sch\FY 2025\City of Tukwila_2025-12-10_42nd Ave. Bridge_KANI_RFAH Actuals Not To Exceed Table (ANTE) David Evans and Associates, Inc. JOB CLASSIFICATIONS 2025 Labor Rate NTE Overhead NTE 176.24% Fixed Fee NTE 30.17% 2025 All Inclusive Hourly Billing Rate NTE Project Accountant II (PAC2) $37.91 $66.80 $11.44 $116.14 Project Accountant III (PAC3) $43.58 $76.80 $13.15 $133.53 Project Accountant IV (PAC4) $49.35 $86.97 $14.89 $151.21 Project Accountant V (PAC5) $53.32 $93.97 $16.09 $163.37 Party Chief I (PCH1) $38.33 $67.54 $11.56 $117.43 Party Chief II (PCH2) $44.18 $77.86 $13.33 $135.37 Party Chief III (PCH3) $50.69 $89.33 $15.29 $155.31 Party Chief IV (PCH4) $58.28 $102.70 $17.58 $178.56 Party Chief V (PCHS) $65.00 $114.56 $19.61 $199.17 Project Controls Specialist I (PC51) $41.00 $72.26 $12.37 $125.63 Project Controls Specialist II (PC52) $48.00 $84.60 $14.48 $147.08 Project Controls Specialist III (PC53) $53.97 $95.12 $16.28 $165.37 Project Controls Specialist IV (PCS4) $63.29 $111.53 $19.09 $193.91 Project Controls Specialist V (PCS5) $72.44 $127.67 $21.86 $221.96 Project Coordinator I (PJC1) $33.50 $59.04 $10.11 $102.65 Project Coordinator II (PJC2) $36.87 $64.98 $11.12 $112.97 Project Coordinator III (PJC3) $41.30 $72.79 $12.46 $126.55 Project Coordinator IV (PJC4) $46.14 $81.33 $13.92 $141.39 Project Coordinator V (PJC5) $51.54 $90.84 $15.55 $157.93 Project Coordinator VI (PJC6) $61.50 $108.39 $18.55 $188.44 Project Manager I (PJM1) $59.24 $104.40 $17.87 $181.52 Project Manager II (PJM2) $71.48 $125.97 $21.56 $219.01 Project Manager III (PJM3) $86.58 $152.59 $26.12 $265.29 Project Manager IV (PJM4) $106.04 $186.89 $31.99 $324.92 Project Manager V (PDMS) $124.95 $220.21 $37.70 $382.86 Project Manager VI (PJM6) $138.60 $244.27 $41.82 $424.68 Planner I (PLN1) $38.99 $68.72 $11.76 $119.47 Planner II (PLN2) $48.74 $85.91 $14.71 $149.36 Planner III (PLN3) $61.12 $107.72 $18.44 $187.28 Planner IV (PLN4) $72.53 $127.82 $21.88 $222.23 Project Surveyor I (PSV1) $56.84 $100.17 $17.15 $174.16 Project Surveyor II (PSV2) $56.18 $99.00 $16.95 $172.13 Project Surveyor III (PSV3) $65.10 $114.73 $19.64 $199.47 Project Surveyor IV (PSV4) $75.60 $133.24 $22.81 $231.65 QA/QC Specialist II (QAC2) $43.23 $76.19 $13.04 $132.47 QA/QC Specialist III (QAC3) $54.60 $96.23 $16.47 $167.30 QA/QC Specialist IV (QAC4) $96.60 $170.25 $29.14 $295.99 Remote Pilot I (RPL1) $30.56 $53.85 $9.22 $93.62 3 of 4 SAACCOUNT\Fee Schedules -Fiscal OVH Letters\FY-Client Sch\FY 2025\City of Tukwila_2025-12-10_42nd Ave. Bridge_KANI_RFAH Actuals Not To Exceed Table (ANTE) David Evans and Associates, Inc. 2025 2025 Overhead Fixed Fee All Inclusive JOB CLASSIFICATIONS Labor Rate NTE NTE Hourly Billing NTE 176.24% 30.17% Rate NTE Remote Pilot II (RPL2) $44.18 $77.86 $13.33 $135.37 Remote Pilot III (RPL3) $68.25 $120.28 $20.59 $209.12 Survey Analyst I (SAN1) $40.72 $71.77 $12.29 $124.78 Survey Analyst II (SAN2) $60.38 $106.40 $18.22 $185.00 Scientist I (SCI1) $38.71 $68.23 $11.68 $118.62 Scientist II (SCI2) $43.05 $75.87 $12.99 $131.91 Scientist III (SCI3) $45.48 $80.16 $13.72 $139.37 Scientist IV (SCI4) $76.65 $135.09 $23.13 $234.86 Support Svcs Specialist II (SSS2) $23.27 $41.02 $7.02 $71.32 Support Svcs Specialist III (SSS3) $32.51 $57.30 $9.81 $99.62 Support Svcs Specialist IV (SSS4) $35.00 $61.68 $10.56 $107.24 Support Svcs Specialist V (SSSS) $43.00 $75.78 $12.97 $131.76 Support Svcs Specialist VI (SSS6) $50.00 $88.12 $15.09 $153.21 Support Svcs Specialist VII (SSS7) $58.80 $103.63 $17.74 $180.17 Survey Manager I (SVM1) $66.93 $117.97 $20.19 $205.09 Survey Manager II (SVM2) $80.85 $142.49 $24.39 $247.73 Survey Manager III (SVM3) $85.05 $149.89 $25.66 $260.60 4 of 4 SAACCOUNT\Fee Schedules -Fiscal OVH Letters\FY-Client Sch\FY 2025\City of Tukwila_2025-12-10_42nd Ave. Bridge_KANI_RFAH Exhibit A Aft MM Washington State Tro Department of Transportation Apri 117, 2025 David Evans and Associates, Inc 703 Douglas Fir Dr. Magnolia, TX, 77354 Subject: Acceptance FYE 2024 ICR — Cognizant Review Dear Marie Fuzzell: DeMomsment DiAss on Contract Services Office PO Box 47408 07 yrnpliLa, WA 98504-7408 7845 I._inderson Way SW Turnvvater, WA 98501-6504 TTY: 1-800-88A3- 5388 XAgniWa aniscicit.wF).gc)V We have accepted your firm's FYE 2024 Indirect Cost Rate (ICR) of 177.26% of direct labor (rate includes 0.90% Facilities Capital Cost of Money) based on the "Cognizant Review" from The Oregon Department of Transportation (ODOT). This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 704-6397 or via email con sultan trates(dwsdot.wa.i!ov. Regards, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, S hiaitzlie, Nairve�y «�pr :4.8, 2025 06 9 SCHATZIE HARVEY, CPA Contract Services Manager SH:kb