CONTRACT FOR SERVICES
Amendment 2
Between the City of Tukwila and Parametrix, Inc.
That portion of Contract No. 24-108 between the City of Tukwila and Parametrix, Inc. is hereby
amended as follows:
Section 4A: Payment. Payment for the work provided by the Consultant shall be made as
provided on Exhibit "B" attached hereto, provided that the total amount of payment to the
Consultant shall not exceed $639,218.83 without express written modification of the
Agreement signed by the City.
All other provisions of the contract shall remain in full force and effect.
Dated this 7t" day of May, 2026.
CITY OF TUKWILA
Signed by:
Initial
r hctu�
l bw�aS
�J Thomas McLeod, Mayor
ATTEST/AUTHENTICATED:
Signed by:
y_
EB
Andy Youn-Barnett, City Clerk
APPROVED AS TO FORM:
Signed by:
L499Office o e6t Attorney
PARAMETRIX, INC:
By: ,�
Printed Name: John C. Hungerford
Title: Water Division Manager
CA Reviewed May 2020 Page 1 of 1
let's create tomorrow, tq.jether
Exhibit A
ti91 M, w
City of Tukwila
Lift Station 12 Upgrade
Amendment 2 - Final Design, Bid Support, and Services During
Construction
This scope of work (SOW) describes the services to be provided by Parametrix, Inc. (Parametrix) for
the Lift Station 12 Upgrade Project for the City of Tukwila (City). The City seeks to upgrade Lift Station
(LS) 12 to improve reliability, provide renewed longevity, enhance operational efficiency, and bring
the station into compliance with current codes. The City tasked Parametrix to provide alternatives on
how to address these concerns.
Lift Station 12 was initially built in 1972 and serves Drainage Basins 4 and 8. Upgrades to the LS
were completed between 2001 and 2003, including pump replacements and a new on-site
generator. According to the City's 2014 Comprehensive Sanitary Sewer Plan (Carollo 2014), the
average annual flow for Lift Station 12 is approximately 0.19 million gallons per day (mgd) and peak
day average flow is approximately 0.72 mgd. Peak instantaneous flows were estimated to reach
approximately 1.18 mgd with infiltration and inflow contributing to approximately 0.57 mgd.
As identified in the City's 2014 Comprehensive Sanitary Sewer Plan (Carollo 2014), it was
anticipated that the pumps and the LS structure would reach their useful life by 2023. The City has
considered alternative options to serve Drainage Basin 4, and currently, the pumps at the existing LS
have not been able to keep up with the variable flows due to wear.
On June 5, 2024, city staff and the Parametrix team conducted a site visit at LS 12 to discuss the
project. Alternatives initially discussed at the site visit with city staff included upgrades to the existing
station, converting the station to a submersible pump station, or building a new wet well.
The Lift Station 12 Upgrade Project includes developing and evaluating potential upgrade
alternatives through collaborative workshops with city personnel, conducting an alternatives
analysis, and determining a preferred design alternative for improvements at the existing lift station.
Subsequently, a preliminary design submittal will be prepared, including 30% design plans, an
outline of technical specifications, and a construction cost estimate.
Amendment 2 to the Lift Station 12 Upgrade Project is to complete the design for the rehabilitation
of LS 12, and to extend the scope of services from final design through bidding support and
construction. Amendments to the initial contract are highlighted in yellow.
The original scope of work included an alternatives analysis that resulted in the preliminary design,
which included major structural changes to the LS. After the preliminary design was underway, the
City requested to pursue a simpler rehabilitation of the LS in a meeting on October 30, 2025. A site
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 1 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
visit was held on November 4, 2025, to discuss simpler rehabilitation options. The simplified rehab
work includes the following:
■ Replacement of pumps with Vaughan chopper pumps and associated rigging/maintenance
access.
■ Standardized controls/Human-Machine Interface (HMI)/Supervisory Control and Data
Acquisition (SCADA) consistent with city stations (LS 2/8/10 basis).
■ National Fire Protection Association (NFPA) 820 ventilation and safety improvements in wet
well and dry pit.
■ Practical bypass provisions (including a potential permanent discharge bypass connection) to
streamline future work.
■ Exhibit A: Scope of Work (Amended).
■ Exhibit B: Limits of Survey.
■ Exhibit C: Preliminary Sheet List - Preliminary and Final Design (Amended).
■ Exhibit D: Rates and Fee Estimate (Amended).
f_€.hihi+C: Dv.,Jnr++.,rlDvr,inr.+Cr.hr_,r-11f,
Work Breakdown Summary:
■ Task 01
Project Management and Quality Control (Amended).
■ Task 02
Data Collection and Review (Amended).
■ Task 03
Develop Alternatives.
■ Task 04
Alternatives Analysis.
■ Task 05
Preliminary Design (Amended).
■ Task 06
Subconsultant Allocation.
■ Task 07
Management Reserve.
■ Task 08
Final Design.
■ Task 09
Bid Phase Services.
■ Task 10
Construction Phase Services.
The schedule below summarizes project tasks based on the anticipated notice to proceed (NTP) in
March 2026. Receipt of NTP after this day may result in a corresponding delay in the following
projected schedule for tasks included in this SOW.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 2 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
Task Start Finish
Task 01 Project Management and Quality Control
03/2026
12/2027
Task 02 Data Collection and Review
03/2026
04/2026
Task 03 Develop Alternatives (Completed under Original
NA
NA
Contract)
Task 04 Alternatives Analysis
NA
NA
Task 05 Preliminary Design
05/2026
09/2026
Task 06 Subconsultant Allocation (Not used under new
NA
NA
scope)
Task 07 Management Reserve
NA
NA
Task 08 Final Design
10/2026
02/2027
Task 09 Bid Phase Services
03/2027
05/2027
Task 10 Construction Phase Services
05/2027
12/2027
■ 1om =,,I=
This SOW includes the following assumptions:
■ The Lift Station 12 Upgrade Project will be designed, bid, and constructed as a single
rehabilitation package, with one contractor responsible for implementing all civil, structural,
mechanical, electrical, controls, HVAC, and bypass -related improvements.
■ The project is based on a simplified rehabilitation approach to the existing LS 12 facility,
without construction of a new wet well or conversion to a submersible pump station, as
directed by the City following the October 30, 2025, decision and November 4, 2025, site visit.
■ The Final Design will advance the preferred rehabilitation concept validated during
Preliminary Design, including pump replacement with Vaughan chopper pumps, standardized
controls and SCADA integration, NFPA 820 ventilation improvements, and enhanced bypass
provisions. This will include notification of proper ventilation, and the methods of notification
should be coordinated with the City.
■ The design will be completed in sequential phases consisting of Preliminary Design (30%),
90% Design, and Final Design (Bid Set), with City review and comment periods occurring
after 30% and 90% in accordance with the project schedule.
■ Construction will be executed while maintaining continuous wastewater service, utilizing
temporary bypass pumping and sequencing strategies developed during design; no extended
station outages are anticipated.
■ For budgeting and planning purposes, the design phase duration is assumed to be
approximately 12 months, and the construction phase duration is assumed to be
approximately 8 months, exclusive of procurement or unforeseen delays.
■ Hydraulic design flows, including Average Dry Weather Flow (ADWF) and Peak Wet Weather
Flow (PWWF), will be based on historical station data, City -provided information, and/or prior
planning documents, unless otherwise directed by the City.
■ Final pump sizing, control logic, and operating strategies will be developed to meet firm
capacity requirements and city operational preferences, including lead/lag/alternate
operation.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 3 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ Electrical, instrumentation, controls, and SCADA design will be standardized to match City of
Tukwila Lift Stations 2, 8, and 10, including programmable logic controller/remote terminal
unit (PLC/RTU) architecture, HMI conventions, alarm philosophy, and tag naming.
■ SCADA integration will be coordinated with the city's systems and integrator; final
programming and system cutover will be completed by the City during construction and
commissioning.
■ The design will comply with applicable codes and standards, including NFPA 820,
Washington State and City of Tukwila design requirements, and current industry standards
for wastewater facilities.
■ All above -grade equipment (including generator, yard lighting, enclosures, and
appurtenances) will be designed to remain within confirmed easement and right-of-way
(ROW) limits.
■ No major off-site utility relocations are anticipated; any unforeseen utility conflicts discovered
during construction may require additional services.
■ Environmental permitting is not anticipated; no cultural resource investigations or specialized
environmental studies are required.
■ The City will lead public outreach, contractor procurement, advertisement for bid, and
contract award activities with Parametrix assisting as outlined below.
■ The City will provide timely access to facilities, records, staff, and review comments
necessary to support design development, bidding, and construction -phase services.
■ Changes to project scope, sequencing constraints, regulatory requirements, or city standards
may require schedule and fee adjustments.
■ No geotechnical investigation, coring, or structural load testing is included as part of this
amendment.
Task 01 provides tracking scope, schedule, and budget for the project; overseeing project
administration (filing, invoicing, etc.); coordination and communication with the City; and ensuring
that Parametrix properly implements quality assurance/quality control (QA/QC) procedures over the
duration of this project.
For this amendment, Task 01 services remain unchanged but are extended to cover the amended
project duration.
ub ;11„ ;;I1„ ;Project , Management
agym, , , ent
Subtask 01.1 includes project start-up and establishing a project Share Point site; documenting and
communicating the scope of work, budget, and schedule as a road map for the project team;
coordinating with the project team and addressing issues throughout the project; tracking the project
budget using Parametrix in-house tools to verify that progress aligns with spending; and conducting
check-in meetings with the city's project manager (PM) to discuss and review information and issues
that may affect the work's progress.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 4 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametrik Scope of Work
Sub
task 1. ;;IIIG,� voicin ; r rens ;;Il1 e, r
Subtask 01.2 includes preparing monthly progress reports to accompany each monthly invoice.
Progress reports will include a narrative of work completed, anticipated work for the next period, and
a description of issues affecting project progress and proposed resolutions if necessary.
Subtask 01,3rre - an ence ,gym, Coordination, ° with. -the it
Subtask 01.3 includes regular communication with the city's PM to discuss and review information
and issues that may affect the progress of the work. Communication may include phone
conversations, scheduled meetings, and electronic communication.
Subtask "1. rdination., Wit1k, the'Parametrix Team,
,
Subtask 01.4 includes regular communication with the Parametrix team to discuss and review
information needs, project information, and issues that may affect the progress of the work.
Communication may include phone conversations, scheduled meetings, and electronic
communication.
Subtask 01.5 includes time to perform quality assurance to verify quality checks have been
completed and addressed, and time to review design as contract plans and specifications are being
prepared. QA/QC will be performed to ensure that City comments have been thoroughly addressed
and internal reviews have been completed prior to delivery of all work products to verify consistency
with internal standards of practice and care.
■ Project duration is 8 months.
■ Budget assumes up to six PM check-in meetings to be attended virtually by up to two
Parametrix staff for up to 0.5 hours each.
■ Budget assumes up to 10 design team meetings to be attended virtually by up to three
Parametrix staff for up to 0.5 hours each.
■ Amended efforts are anticipated to add 7 months to the initial projected project schedule.
■ Amended meetings will include monthly client check -ins during the design phases.
■ Amended budget assumes up to five PM check-in meetings to be attended virtually by up to
two Parametrix staff for up to 0.5 hours each.
■ Amended budget assumes up to 10 design team meetings to be attended virtually by up to
four Parametrix staff for up to 0.5 hours each.
m Miscellaneous correspondence to document project management issues.
■ Monthly progress reports enclosed with invoices (in PDF file format).
■ Project Schedule (in PDF file format).
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 5 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametrik Scope of Work
11
IIIIIC s°JIII °11111 ,°11111, N, iiia 1,and Reviil',,ew
Task 02 includes the collection, review, and assessment of available information and mapping prior
planning efforts before beginning the alternatives analysis and preliminary design. The Parametrix
team will provide comprehensive written request for information (RFI) lists, which may include record
drawings and relevant planning studies.
Subtask 02 1 ]IData Collection ,gym, ]ll evie
Subtask 02.1 includes collecting and reviewing available historical data, design specifications,
performance metrics, and maintenance records as they pertain to the existing LS, as well as
collecting and reviewing available technical specifications, performance data, and cost estimates for
submersible pumps, dry pit pumps, and new wet well designs.
This Subtask has been completed under the original scope.
Subtask ,gym, ' , ;,ing
Subtask 02.2 includes determining the ROW for Andover Park W, as shown in Exhibit B. Parametrix
will provide topographic mapping for the LS located near the southeast corner of the Westfield
Shopping Center, as shown in Exhibit B. The topographic limits will include the location of the LS and
the surrounding parking lot of Key Bank. Parcel boundaries will be limited to within the area to be
surveyed, and easements of record depicted on the subject property's binding site plan will be plotted
on the basemap. Survey work will include the setting of any survey monuments at any of the exterior
boundary points of the subject properties.
All physical improvements—such as signs, guardrails, fences, driveways, utility poles, water features,
telecommunication features, storm drainage features, sewer manholes, and other features—will be
mapped during the survey within the ROW as well. All storm drainage and sewer structure invert
elevations will be included within the scope of work. Trees will be mapped on-site but will be limited
to trees that have trunk diameters of 6 inches or larger.
Parametrix will coordinate with Applied Professional Services (APS) to have the utilities marked out.
Conductible utilities will be mapped per the locate company's markings. Potholing is not included.
Survey, easement, and title coordination will be performed to confirm existing property and utility
constraints affecting the project site. The Engineer will overlay current ROW and recorded easements
onto the survey base to verify the location of the existing generator, pad, and other equipment
relative to easement boundaries and access limitations.
A limited title review will be completed using a City -provided title report or City -provided records to
identify utility easements, encumbrances, and conditions that may affect equipment siting or access.
The Engineer will summarize the findings and document any implications for the project, including
potential requirements to adjust equipment locations to remain within established easement limits.
Utility coordination will be initiated to support verification of existing underground infrastructure.
Utility locate requests will be facilitated by the City, and available as -built information will be
reviewed and reconciled with field markings to preliminarily trace the force main alignment and
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 6 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
identify potential bypass discharge tie-in locations for subsequent confirmation during later design
and construction phases.
X11D Scanning
Subtask 02.3 includes 3D laser scanning of the site property, building structure exterior and
internals, and existing equipment. This will include both wet well and dry well locations. Laser
scanning provided will initially only be used to confirm and view structure and component locations
and dimensional relevance to each other. Scanning performed will not be to any survey coordinate
system but will be tied into surveyed temporary benchmarks so it can later be combined with the
survey basemap during Task 05 Preliminary Design. Scanning will require physical access to areas
and spaces needed to complete this project, and City shall provide access as required to complete
this effort.
This subtask has been completed under the original scope.
ubtask 02 4 .......... 11111YRecords & O&M ]Review
This task aims to document operational and maintenance needs and reconcile records so design
assumptions reflect real-world 0&M practices and constraints.
This subtask includes direct engagement with Operations and Maintenance (0&M) staff, to
document operational challenges, maintenance issues, and user preferences that influence long-
term maintainability and reliability of the facility. Topics will include ragging frequency and impacts,
pump removal and replacement workflows, laydown and rigging requirements, hatch sizing and
usability, ventilation and dehumidification performance, level control and instrumentation reliability,
and expectations for equipment and controls/SCADA standardization. Information gathered during
these interviews will be used to validate design assumptions and develop proposed improvements
that align with operational practices.
This subtask is to verify material condition and remaining wall thickness at critical locations to
confirm rehabilitation feasibility and inform replacement/repair decisions by performing targeted
thickness testing of the ductile iron pipe at wall penetrations; spot -assess concrete/wet well liner
interface; and to photo -document conditions. This task also includes performing targeted thickness
testing at metallic wall penetrations and representative straight runs (suction/discharge) to
determine remaining wall thickness; to calibrate the gauge to known thicknesses; and to record
readings on an annotated key plan. Parametrix will establish acceptance thresholds with the City
(e.g., relative to nominal wall) and identify any locations that trigger replacement/design
modifications.
ff,TMUI` r
■ Up to three RFI lists will be prepared and provided to the City.
■ City response for each RFI list is 7 business days.
■ RFI lists and shared documents will be shared and accessed via an established Project
Share Point site.
■ Parametrix survey crews will be provided reasonable access to all areas requiring surveys.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 7 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ Parametrix will be omitting topographic mapping with Andover Park. The topographic survey
will extend to the west face of the curb within the ROW of Andover Park.
■ All electronic mapping standards will be based on Parametrix drafting standards.
■ Parametrix survey crews have client permission to perform minor brushing with machetes to
conduct this survey, if needed, for field crews to perform work described within this SOW.
■ Unless otherwise specified by the City, horizontal datum shall be North American Datum
(NAD) 83/11 Washington Coordinate System, North Zone, and vertical datum shall be North
American Vertical Datum of 1988 (NAVD 88).
■ The boundary of the property will be merged into the topographic mapping, as appropriate,
and shown for graphical purposes only. This service can be provided if required at a later
date; however, any setting of property corners, and filing of a record of survey (if required) will
be considered Additional Services and billed separately as described below.
■ For safety reasons, Parametrix survey crews are not allowed to enter subsurface vaults.
Parametrix work will be conducted from the surface, using measure -down techniques.
Parametrix survey crews will also not open any structure covers over 80 pounds.
■ Site scanning will be approximately 20 to 35 scans. Once complete, scans will then be
combined and stitched together, providing a single site scan.
■ Budget assumes up to 6 hours of scanning time shall be required and up to 8 hours to
combine all scans into a single site scan.
■ City will provide available record drawings, SCADA exports, maintenance logs, and electrical
documentation within 10 business days of request.
■ Key assumptions, constraints, and decisions resulting from the 0&M interviews and drawing
reconciliation will be documented and carried forward into the Basis of Design report.
■ City will facilitate access to prior project records and station access for nondestructive
examination (NDE).
■ City 0&M staff will provide ventilation for wet well concrete and liner assessment.
■ Assume four 30 -minute virtual meetings to include three Parametrix staff.
1 � �
■ RFI lists (provided electronically).
■ One PDF copy of the topographic survey.
■ An electronic drawing file of the topographic survey in AutoCAD Civil 3D 2020 format in one
drawing file.
■ Meeting agendas and notes for meetings (PDF file format).
IIIIII '1111 "' 11111 11111, �� 11111,° ri °ilii
Task 03 provides developing and evaluating viable alternatives for upgrading LS 12 and ensuring
improved performance and compliance with current standards while minimizing bypass pumping.
Initial concept alternatives include:
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 8 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametrik Scope of Work
■ Alternative 1: Upgrade Existing Station.
■ Alternative 2: Convert to Submersible Pump Station.
■ Alternative 3: Build New Wet Well.
For this amendment, Task 03 services remain unchanged and were completed under the initial
contract.
Subtask 03 1„ ;;Ill e -ter, .:i.: ,e „ , . er,n,i, es
Subtask 03.1 includes providing technical evaluation and support in preparation for Workshop 1 (see
Task 03) in support of a concept screening to determine the two design alternative types to develop
for refinement, selected from the three concept alternatives: submersible, dry pit, and new wet well.
Parametrix will assess available information to determine the practicality of implementing each
alternative. This subtask includes developing a description of each of the three alternatives as listed
above, a concept feasibility layout, a brief list of advantages and disadvantages, and a Class 5
engineer's opinion of construction cost. If initial evaluation determines the alternative has a fatal
flaw, the concept layout and opinion of construction cost will not be developed.
-til)task , e, `i„n,e „ ; -ter:n,a-t:i e
Subtask 03.2 includes providing technical evaluation and support to refine two design alternatives in
preparation for Workshop 2 (see Task 04). This subtask includes developing a detailed description of
two design alternatives and identifying potential risks and challenges for each alternative, including
technical, financial, and operational. This subtask includes developing confirmation layouts for each
alternative and an evaluation of real estate needs, including staging area, traffic impacts during
construction, construction feasibility, as well as a Class 4 engineer's opinion of construction cost.
Estimate of property purchase costs are not included.
Task 03 Assumptions
■ The number of evaluated alternatives will remain as listed in this task.
■ No computer sewer model development will be included in this task.
■ Sufficient data on the current pump station's performance, maintenance and operational
history, and technical specifications will be available to evaluate and prepare cost estimates
for submersible, dry pit, and new wet well alternatives for accurate comparison and
evaluation.
■ The three concept feasibility layouts will be one page each.
■ The two planning -level confirmation layouts will be one page each.
■ Subtasks 03.1 and 03.2 engineer's opinion of construction costs will be prepared to the
Association for the Advancement of Cost Engineering (RACE) Classes 5 and 4, respectively.
Typical accuracy ranges for AACE classes vary depending on the technological complexity of
the project, appropriate reference information, and the inclusion of an appropriate
contingency determination.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 9 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
UTMMIM)n-e
■ Information and documentation to support Alternative Analysis Workshops. See Task 03
(various file formats).
■ Three concept layouts (in PDF file format).
■ Two feasibility layouts (in PDF file format).
■ Class 5 and Class 4 engineer's opinion of construction costs (in PDF file format).
°JIIII7as °JIIIi,°
1
Task 04 provides a holistic evaluation of viable options for upgrades to LS 12 with city staff. Two
workshops will be conducted: the first to screen initially identified alternatives, and the second to
evaluate alternatives using a Triple Bottom Line (TBL) Analysis to determine a preferred upgrade
design option. This task also includes a technical memorandum (tech memo) summarizing the
decision process in determining the preferred alternative.
Subtask 04.1 includes providing key services to prepare for and conduct two Alternative Analysis
Workshops, including the development of presentation materials, facilitating the workshops,
providing technical expertise during the workshop, and providing documentation of discussion,
decisions, and action items.
Parametrix will meet with city personnel to evaluate the identified alternatives, as well as discuss the
information collected and analyzed in Task 03. These workshops include:
■ Workshop 1: Review project goals and preferences with city staff to conduct a concept
screening of the three identified concept alternatives to determine two alternatives to further
refine and evaluate.
■ Workshop 2: Conduct an alternatives comparison (TBL Analysis) of two identified alternatives
to determine one preferred design alternative.
This subtask has been completed under the original scope.
Subtask 04.2 includes documenting and summarizing the alternatives and decisions made during
the Alternatives Analysis Workshops into a tech memo, ensuring clear communication of the
selection process, alternative descriptions, and supporting exhibits.
Preliminary Alternative Analysis Tech Memo sections include:
■ Project Introduction and Background.
■ Workshop 1 and Alternative Descriptions.
■ Workshop 2 and Alternative Descriptions.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 10 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ Preferred Alternatives and Recommendations.
■ Attachments:
—� Concept and Confirmation Layouts.
—� Engineer's opinions of construction cost.
—� Workshop Agendas and Summaries.
—� Presentation Materials.
This subtask has been completed under the original scope.
1 r 0
■ Budget assumes each Alternative Analysis Workshop will be attended by up to three
Parametrix staff (two in-person and one virtually) for up to 1.5 hours each. Budget includes
travel time to the City of Tukwila Public Works Office/Conference Room from the Parametrix
Puyallup office and mileage.
■ Each Alternative Analysis Workshop may be attended by up to five city personnel.
■ Criteria for the TBL Analysis will be developed with the City via check-in meetings with the city
PM (see Subtask 01.3). The criteria for evaluation shall include financial, environmental, and
social benefits, impacts, and risks.
■ Workshop materials may include tables, charts, and a decision matrix to facilitate discussion
and engagement.
■ The Alternative Analysis Tech Memo will be up to 15 pages with up to approximately four
attachments, as described above.
■ The Draft Alternative Analysis Tech Memo review comments will be collected and
consolidated by the city PM and returned to the Parametrix team within 10 business days of
Draft Tech Memo delivery.
■ Budget assumes that review comments will not involve changes to decision made in the
workshops, and will include limited tracked edit suggestions and margin comments provided
by the City on the Draft Alternative Analysis Tech Memo.
■ Parametrix will finalize the Alternative Analysis Tech Memo within 10 business days after
receiving City review comments.
■ An agenda for each Alternative Analysis Workshop (in PDF file format).
■ Workshop presentation materials (various file formats).
■ Alternative Analysis Workshop Summaries (in PDF file format).
■ Alternative Analysis Tech Memo (Draft and Final in PDF file format).
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 11 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametrik Scope of Work
11
III u Ma n D s NIln y
n
� hl
Task 05 provides initiating the Preliminary Design Phase of the preferred alternative determined in
Task 04. This task includes an initial design meeting with city staff, preparation and submission of
the Preliminary Design (30%) Submittal, including plans, specification outline, and engineer's opinion
of construction cost, as well as a design review workshop with city staff.
This task will establish the technical basis, performance criteria, and code compliance for the
rehabilitation.
Subtask 05Illl n1. IIIIIIIIIII ;;III[ni 1. ;]I e i ,gym, ;Nleetin
Subtask 05.1 includes kicking off the preliminary design phase with city staff and ensuring
stakeholders are aligned with the identified preferred alternative in Task 04, project goals, design
requirements, and project expectations for producing the 30% Design Submittal for LS 12 upgrades.
This meeting will focus on reviewing and confirming project goals and requirements; revisiting the
project schedule, including milestones and deliverables; and addressing any initial questions or
concerns from stakeholders.
Subtask k IIII IIIIIII ; „ e;l„i,m,:i: , r ;;IIIC; a ,i, :n,
Subtask 05.2 includes developing preliminary design plans for the proposed upgrades to LS 12
based on the preferred alternative determined in Task 04, generating a proposed list of Construction
Specifications Institute (CSI) and Washington State Department of Transportation (WSDOT) technical
specifications for the project, and preparing a 30% engineer's opinion of construction cost.
A preliminary Drawing Sheet List is included as Exhibit C.
Subtask 05.2 is amended to include:
■ Confirm design flow and select a pump.
■ General arrangement plans/sections showing pump fit, monorails/hoists, hatch/grating
geometry, new I-beam over check valves, valve replacements, piping modifications, and davit
sockets.
■ Wet well liner limits and mezzanine replacement concept.
■ Generator constraints and alternatives (in-place vs. relocation within easement).
■ Preliminary bypass plan and traffic/temporary work needs.
■ Confirm design flows and firm capacity assumptions using historical data and City input.
■ Size Vaughan chopper pumps for duty/standby with required firm capacity.
■ Update the 3D model to support clash identification and fit.
■ Check pump dimensions/weights versus hatch openings, lift heights, monorail clearances,
and lay -down workflow.
■ Document operating logic assumptions (lead/lag/alternate, anti -short cycling) for carry-
forward into design.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 12 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ Confirm generator constraints and document whether relocation is required to remain within
easements.
■ Prepare schematic general arrangement plans and sections demonstrating pump fit, rigging
paths, hatch/grating modifications, and valve access.
■ Develop revised 30% plans indicating layout feasibility and access, including:
—+ Mechanical Design - Pump arrangement, major piping, valve types, rigging concepts, and
pump removal envelopes.
—> Structural Design - Conceptual support steel, hatch/grating modifications,
monorail/davit concepts, and load paths.
—> Electrical/Controls - Preliminary one -line diagram, major loads, panel concepts,
generator interface assumptions, and controls architecture consistent with LS 2/8/10.
—> HVAC/Ventilation - Preliminary NFPA 820 ventilation zoning, air change assumptions,
and equipment concepts.
—� Civil/Site - Site access, equipment footprints, easement compliance, and surface
restoration limits.
—� Bypass - Schematic bypass layout and sequencing narrative sufficient to confirm
feasibility.
■ Prepare a 30% Engineer's Opinion of Probable Construction Cost (EOPCC) reflecting the
confirmed rehabilitation scope and sequencing assumptions.
-ti„l)-tas k 05 3 .......... � Prl i , ,inary ;]IDes ,gym, ]Ilkeview Wleeti ,
Subtask 05.3 includes a Preliminary Design Review meeting with city staff to review City comments
and feedback on the Preliminary Design Submittal.
Subtask 05.3 is amended to include:
■ Conduct a second Preliminary Design Review meeting to review City comments, confirm
scope alignment, and identify required refinements prior to advancing to 90% design.
■ Prepare a comment response log documenting how each City comment is addressed,
deferred, or incorporated into subsequent phases.
Subtask i ;]IDesi n (; „ ;;IIID) ]Ekeport
This task includes establishing and documenting project -wide design criteria, assumptions, and
discipline requirements to provide a consistent foundation for Task 08 (90% Design) and Task 09
(Final Design/Bid Set).
Parametrix will prepare a comprehensive Basis of Design (BOD) Report documenting the technical
foundation and design assumptions for the Lift Station 12 Rehabilitation. The BOD will consolidate
all discipline -specific criteria and serve as the reference point for 90% design development.
The BOD is anticipated to include:
■ Project Background and Decision Basis.
■ Project Assumptions and Design Criteria.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 13 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
—> Hydraulic Design Summary.
—> Pump Selection Summary.
■ Existing Conditions Assessment.
—+ ROW/Easement and Access Constraints.
—+ Thickness Testing Results Summary.
—+ Record Documents Reconciliation.
■ Rehabilitation Strategy and Alternatives Summary.
■ Operational and Maintenance Considerations.
■ Controls, SCADA, and Integration Requirements.
■ Bypass Requirements and Sequencing Basis.
—> Bypass Design Basis.
■ Permitting and Regulatory Basis.
■ Coordination Record.
■ Preliminary Layout.
■ Budget assumes the Initial Design meeting will be attended by up to four Parametrix staff
(two in-person and one virtually) for up to 1.0 hours each. Budget includes travel time to the
City of Tukwila Public Works Office/Conference Room from the Parametrix Puyallup office
and mileage.
■ Budget assumes up to 12 sheets will be developed as part of the Preliminary Design
Submittal, as listed in Exhibit C. Should the preferred alternative determined in Task 04
require more Preliminary Design Plans than assumed, an amendment may be required.
■ The preliminary cost estimate will be prepared to the AACE Class 3. Typical accuracy ranges
for AACE classes vary depending on the technological complexity of the project, appropriate
reference information, and the inclusion of an appropriate contingency determination.
■ The preliminary cost estimate will generally be estimated as single lump sum prices, with unit
prices for earthwork and underground piping as appropriate.
■ The City review of the Preliminary Design Submittal is 10 business days.
■ The City will provide review comments and feedback to Parametrix prior to the Preliminary
Design Review meeting.
■ Budget assumes the Preliminary Design Review meeting will be attended by up to four
Parametrix staff (two in-person and one virtually) for up to 2.0 hours each. Budget includes
travel time to the City of Tukwila Public Works Office/Conference Room from the Parametrix
Puyallup office and mileage.
■ City review comments and feedback of the Preliminary Design Submittal will be incorporated
into the Final Design phase.
■ City will provide control panel examples (e.g., LS 2) for standardization reference.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 14 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ Preliminary Design represents approximately 30% design completeness, intended to confirm
feasibility, layout, and sequencing.
■ The City review of the BOD Report is 10 business days.
■ Budget assumes one consolidated set of City comments per deliverable.
■ Only minor permits will be required for this project, such as ROW permits or permits of similar
effort. No major land use, environmental, shoreline, State Environmental Policy Act (SEPA), or
building permits are anticipated as part of this rehabilitation scope. The City will prepare,
submit, obtain, and pay for all required permits.
■ Budget assumes the Preliminary Design Review meeting will be attended virtually by up to
three Parametrix staff for up to 1.5 hours each.
■ Alternatives evaluation was completed under the original contract. This task does not re-
evaluate submersible or new wet well alternatives.
UFTM[Im7m_
■ Agenda and meeting summary for Initial Design meeting (draft and final in PDF file format).
■ Preliminary Design Plans, half-size, 11 by 17 inches (in PDF file format).
■ Preliminary Design Specification Outline (in PDF file format).
■ Class 3 engineer's opinion of construction cost (in PDF file format).
■ Meeting summary for Preliminary Design Review meeting (draft and final in PDF file format).
■ Revised Project Schedule (in PDF file format).
■ Revised Preliminary Design Deliverable, which includes:
—> Revised Preliminary Plans, half-size, 11 by 17 inches (in PDF file format).
—> Revised Preliminary Design Specification Outline (in PDF file format).
—> Revised Class 3 engineer's opinion of construction cost (in PDF file format).
■ Meeting summary for second Preliminary Design Review meeting (draft and final in PDF file
format).
■ Preliminary Design Review meeting summary and comment response log (PDF or Excel).
■ Basis of Design (BOD) Report (Draft and Final PDF).
IIIIIC s 'll
Task 06 provides a budgetary allocation for subconsultant services that will be required for the
Alternatives Analysis and Preliminary Design of the Lift Station 12 Upgrade Project.
Subtask 06 1„ .......... Utility 1.mocate Services
Subtask 06.1 includes a detailed proposal for utility locate services, prepared by subconsultant, APS,
included in Exhibit E. In general, APS will locate and mark known utilities within the project
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 15 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
boundaries and will sweep the project boundary areas to attempt to identify any unknown or
abandoned utilities. Utility potholing not included.
For this amendment, Subtask 06.1 services do not change and were completed under the initial
contract. Exhibit E mentioned above was included in the original scope of work and is not included
herein, nor is any additional work with APS.
■ The City will review subconsultant's scope and fee proposals in advance of contract
execution between prime consultant (Parametrix) and subconsultant. Once proposals are
acceptable to the City, authorization will be issued in writing to allow the subconsultant to be
added to the prime consulting contract and provide authorization to proceed with the scoped
work.
■ Work will not proceed for any of the sub -consulting efforts until the City has provided
authorization for the subcontractor to be added to the primary contract, has approved of the
subconsultant's scope and fee, and has issued NTP for the work.
U7,11111,11M
■ See Exhibit E, Subconsultant Proposals, for detailed deliverables.
�, This was completed under the initial contract.
IIIIIC, as"Ilk 07 Reserve
/ ,'
Task 07 is a budgetary allocation so that the City has a discretionary budget to cover professional
services that are not defined in this SOW and are unknown at the time of the scope development.
Parametrix will provide a written scope and fee estimate for any additional services requested prior
to execution for the City's consideration. This task will remain unused unless the City issues a written
(email) authorization for work to be completed under this task.
For this amendment, Task 07 services do not change.
&TMTIIM"T=! =11
■ The budget for this work may be used by Parametrix, as authorized by the City.
■ The City will authorize the use of funds in this task in writing (email) prior to Parametrix
starting the work.
■ Documentation for professional services not defined in this SOW, as required or requested by
the City.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 16 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametrik Scope of Work
Objective
Task 08 advances the 30% Preliminary Design and Basis of Design into a coordinated 90% design
package and a bid -ready contract document set suitable for bidding and construction.
Subtask 08.1 includes:
■ Develop 90% preliminary plans, specification list, and cost estimate for the selected design
alternative.
■ Incorporate City comments and update deliverables for use in the 90% design phase.
ubt % '.111I a i, , , ;;Ill e- ,i,e , ,ee-t,i„ ,
Subtask 08.2 is amended to include:
■ Conduct a 90% Design Review meeting to review City comments on the 90% Design.
■ Prepare and maintain a comment response log documenting how each City comment is
addressed, deferred, or incorporated into subsequent phases.
■ Advance the 90% deliverables and update deliverables to be used for Bid -Ready submittals
(plans, specifications, and engineer's estimate), incorporating City comments received from
the 90% design review.
■ Finalize drawings for stamp/seal and issue for bid.
■ Finalize bid -format engineer's estimate, bid schedule, and quantity basis to support City
procurement and bid tabulation.
■ The City will determine the location of staging and areas and negotiate with adjacent
property owners if necessary.
■ Task 08 assumes the City has approved the 30% deliverables and Basis of Design (Task 05)
prior to advancing to 90%. City will provide one consolidated set of comments per
deliverable.
■ The City review of the 90% Design Submittal is 10 business days.
■ Budget assumes the Preliminary Design Review meeting will be attended virtually by up to
three Parametrix staff for up to 1.5 hours each.
■ Budget assumes one 90% review meeting and one consolidated round of comment
incorporation.
■ The City will provide the Bid Forms and General Conditions for inclusion in the contract
documents.
■ Anticipated Final Design Sheets are included in Exhibit C.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 17 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ Only minor permitting will be required (i.e., ROW) and city staff will apply for and obtain
permits.
URMT11-01im-
■ 90% Design Deliverables (in PDF file format):
—� 90% plans.
—� 90% cost estimate.
—> Quantity take off with backup calculations.
—> 90% project specifications.
—> Draft bypass and sequencing narrative suitable for inclusion in the construction
documents.
—> Updated comment response log that shows comment responses at 30% design.
■ Meeting agenda and summary for the review meeting (PDF file format).
■ Bid -Ready Design Deliverables (in PDF file format):
—� Stamped and sealed electronic copy of drawing set (22 by 34).
—� PDF and MS Excel format Engineer's EOPCC to be used for bidding and bid tab. Note: this
is different from Total Project Cost Estimate (TPCE).
—> Stamped and sealed specifications with all appendices.
—� Final bypass and sequencing narrative suitable for inclusion in the construction
documents.
—> Updated comment response log that shows comment responses at 30% and 90%
design.
II��� � �r ,� IIIIIV u
Task 09 provides assistance to the City during bidding and award phase of the project on an as -
needed basis and includes:
■ Assist the City in responding to bidders' questions and preparing addenda as necessary to
clarify the Contract Documents.
■ Attend one prebid meeting.
■ Upon referral from the City, Parametrix will respond to up to three questions (Q&A). These
responses will be posted by the City on the advertisement websites as part of the Q&A and
will be limited to clarification of the plans, specifications, quantities, sequencing, and design
intent.
■ Prepare two draft addenda, if needed, to clarify, revise, or modify construction plans,
technical specifications, or project conditions during the bidding process.
■ Provide supporting documentation, if requested, for award approval and prepare Award
Recommendation letter.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 18 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ City will issue the advertisement for bid and manage procurement logistics (QuestCDN, plan
holders list, etc.).
■ The City will be the lead in receiving questions from bidders, subcontractors, equipment
suppliers, and other vendors.
■ No significant changes will be made to the design requiring model changes to the plans or
page updates to the specifications.
■ Number of addenda is assumed to be up to two; additional addenda may require a
scope/fee adjustment.
■ Prebid meeting will be attended by one Parametrix staff member and last up to 6 hours,
including travel time.
■ The bidding period will last 3 weeks and may be extended by 1 additional week, if necessary,
to respond to bidders' questions from the prebid meeting, to prepare and issue addenda, or
if the City deems an extension justified based on bidder requests.
UFT -MAIM
■ Prebid meeting agenda, attendance record, and meeting summary (PDF file format).
■ Written responses to bidders' questions as required in MS Word format via email to city PM.
■ Up to two draft addenda in Word format emailed to city PM.
■ Bid Evaluation and Award Recommendation (PDF file format).
iI, ',11ll 'i , � „� i°, uii�° °i°,ilii, � ]111?'1,1111�aasei SellirvIllbes
Objectives
Task 10 provides services to assist the City during construction on an as -needed basis during the
construction phase of the project. Effort and services for this task are limited to the Level of Effort
(LOE) assumed for the tasks shown below. Should the actual tasks require more LOE than assumed,
a contract amendment may be authorized by the City.
Subtask 11 ;1. .......... 1 Construction, ;]lKi kof ,Progress Nleetings
n
Subtask 10.1 includes:
■ Attend kickoff meeting to review design intent, critical sequencing, bypass expectations, and
submittal procedures.
■ Attend up to 12 construction progress meetings, in-person or virtual, as directed by the City.
■ Provide technical input during meetings related to interpretation of the Contract Documents
and design intent when requested by the City.
■ Prepare meeting summaries when requested by the City.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 19 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametrik Scope of Work
Subtask 10.2 includes:
■ Review Contractor submittals, shop drawings, product data, and 0&M manuals for general
conformance with the Contract Documents.
■ Provide consolidated review comments identifying conformance issues, required
clarifications, or deviations from the Contract Documents.
■ Review of Contractor's wet well sequencing procedure to confirm that the Contractor's
proposed work sequence maintains continuous, safe, and code -compliant operation of the
wet well while modifications are performed.
Subtask 10.3 includes:
■ Respond to RFIs in a timely manner; prepare supplemental drawings, details, or written
clarifications, as necessary.
■ Receive, log, and track RFls assigned by the City for engineering response.
■ Track design clarifications to ensure consistency across disciplines.
uh;k ."1 'p 'l„i, -t,i, , , ' e-v:i.e- , , ' e ; „ ,,; „ ,e:n, -t:i, :n, ,for
;
Payment
„ent
Subtask 10.4 includes pay application review services during construction to support the City's
payment decisions and to confirm that requested payments are consistent with Contract
requirements and observed progress.
Work will be performed in the following sequence:
■ Receive and log Contractor pay applications referred by the City; confirm the submittal
includes required forms, lien releases/affidavits (as applicable), certified payroll/labor
compliance documentation (if applicable), updated schedule/progress documentation (if
required), and stored materials documentation (if applicable).
■ Review the Schedule of Values (SOV) and pay request line items for general consistency with
the Contract, bid schedule, approved change orders, unit prices, and agreed
measurement/payment provisions.
■ Compare the requested percent complete and quantities to available supporting
documentation and general field observations (when site visits occur) to identify
discrepancies or items requiring clarification.
■ Prepare a written recommendation for payment to the City that identifies the recommended
pay amount, retainage, any holds/withholds, stored materials recommendations (if
applicable), and the basis for adjustments from the Contractor's request.
■ Maintain a pay application log documenting application number, period, amount requested,
amount recommended, retainage, and cumulative totals for city records.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 20 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametrik Scope of Work
Subtask 10.5 includes:
■ Conduct up to eight periodic site visits during critical activities (bypass installation,
demolition, wet well work, pump installation), as requested by the City.
■ Prepare field observation reports documenting conformance, issues, and recommended
actions.
Subtask."1;gyman e Order ;;Illf evie, &INegotiation, Support
Subtask 10.6 includes:
■ Evaluate Contractor change order requests (CORs) for technical validity, schedule impacts,
and cost reasonableness.
■ Perform independent, engineering -level cost evaluations of proposed changes using unit
pricing, labor/equipment assumptions, or historical cost data as appropriate to assist the
City in negotiations, as requested.
■ Document findings and recommendations in written memoranda or annotated COR
responses.
uh;k ."1 tart Up, "resting , , ,. „ ,issz, nzm
Subtask 10.7 includes:
■ Review Contractor -submitted start-up, testing, and commissioning plans and procedures for
general conformance with the Contract Documents and design intent.
■ Attend up to two on-site start-up/commissioning events, as requested by the City.
■ Support pump testing, electrical/SCADA functional checks, controls integration, and alarms
testing.
■ Assist with punch list development during substantial completion walkthroughs.
' Mask 1.
Subtask 10.8 includes:
■ Review Contractor -provided as -built drawings, redlines, and field markups for general
completeness and consistency with the Contract Documents.
■ Prepare Record Drawings based solely on Contractor -provided as -built information and
approved change documentation.
■ Incorporate approved change orders, RFIs, and field -directed revisions into the Record
Drawings.
■ Review closeout documentation packages (0&M manuals, warranties, testing reports) for
general completeness and conformance with Contract requirements.
■ Assist the City with close-out acceptance documentation and confirmation that required
deliverables have been received.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 21 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
1 ' o
■ Construction duration is assumed to be 8 months; extended duration or significant delays
may require a contract amendment.
■ Task 10 does not include directing the Contractor's work, approving construction means or
methods, verifying quantities, or performing construction management or inspection
services.
■ Assume construction kickoff meeting attended by three Parametrix staff members, with one
person attending in person.
■ Budget assumes 12 virtual progress meetings with three Parametrix staff and city PM for up
to 0.5 hours each.
■ City will provide the Engineer with access to Contractor submittals, RFIs, pay applications,
and change requests via the City's designated platform and will provide direction on required
response timeframes and distribution.
■ Submittal reviews assume up to 30 distinct submittal items, each with one initial review and
one resubmittal review.
—> Budget assumes up to 60 total reviews. Additional review cycles may require a contract
amendment.
—+ Review duration is assumed up to 7 business days per submittal.
■ Budget assumes up to 20 total RFIs and is limited to interpretation/clarification of the
Contract Documents. Additional review caused by incomplete submittals or bidding errors
may require scope adjustment.
■ RFI log tracking is limited to RFIs assigned by the City for response.
■ Budget assumes up to one pay application per month for the assumed construction duration
(up to seven total).
■ Field observations are limited to general observation and do not constitute full-time
construction inspection, quality control, acceptance testing, or supervision of the
Contractor's work.
■ Site visits, when requested by the City, are assumed at up to eight visits, scheduled around
critical activities (bypass installation, demolition, pump installation, start-up, etc.).
■ Site visits assumed up to 4 hours on-site each, plus travel, and include one field observation
report per visit.
■ Start-up/commissioning support limited to two on-site events plus remote review of testing
procedures.
■ Change order support is limited to up to five CORs. Support for additional CORS may require a
contract amendment.
■ Change orders resulting in design changes will require a contract amendment.
■ Start-up and commissioning support is observational and advisory only and does not
constitute acceptance of the work or certification of system performance.
—> The Contractor remains fully responsible for start-up, testing, commissioning execution,
system tuning, safety, and compliance with manufacturer requirements.
—> Commissioning support includes up to two on-site events.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 22 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
70MM71 MW
■ All SCADA/controls integration with the City's existing systems will be performed with City
integrator support. Parametrix's role is limited to review and coordination support unless
otherwise authorized.
■ Record drawings based solely on Contractor -provided redlines and assume field markups
shall be legible.
■ Additional site visits to verify as -built conditions are not included and may require a contract
amendment, if requested.
■ Revisions resulting from incomplete, illegible, or late Contractor redlines may require
additional services.
■ Review of 0&M manuals is limited to confirming presence and general compliance with
specified requirements.
1 � �
■ Progress meeting attendance and meeting summary, when requested (PDF file format).
■ Construction kickoff meeting summary (PDF file format).
■ Submittal review and updated submittal log (PDF and Excel file format).
■ RFI response and updated RFI log (PDF and Excel file format).
■ Field observation reports for each site visit (PDF file format).
■ Change order review memoranda or annotated COR responses (PDF file format).
■ Payment recommendation and updated pay application log (PDF and Excel file format).
■ Start-up/commissioning testing observation notes, punch list, and deficiency tracking (PDF or
Excel file format).
■ Record Drawings (PDF and AutoCAD file format).
■ Final closeout support documentation confirming review of 0&M manuals, warranties,
testing reports (PDF file format).
Rates iili d,'F ,, Es iiiii mato
Rates and fee estimate for this SOW is included as Exhibit D. This budget is reflective of this SOW,
known information, and previous experience regarding the LOE on similar projects.
Carollo (Carollo Engineers). 2014. City of Tukwila, WA, Final Comprehensive Sanitary Sewer Plan,
Carollo Engineers, Seattle, WA.
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 23 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
let's create tomorrow, tq.jether
Survey Limits
t
.33913MUMid
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 1 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
Parametri lk INScope of Work
let's create tomorrow, ltg.jether
Exhibit
Preliminary Drawing Sheets
Sheet Number
Sheet Title
30%
60%
90% & Final
G-1
Title Sheet, Vicinity Map, and Index
X
X
X
G-2
Symbols and Legend and Abbreviations
X
X
X
P-1
P&ID Process and Abbreviations
X
X
X
P-2
Wet Well and Pumps
X
X
X
P-3
Valve, Vault, HVAC and Generator
X
X
X
D-1
Demo Site Plan
X
X
X
D-2
Demo Section
X
X
X
D-3
Demo Section
X
X
X
C-1
Demolition Plan
X
X
X
C-2
Site Layout Plan and Survey Control
X
X
X
C-3
Plan and Elevations
X
X
X
C-4
Civil Details
X
X
M-1
Mechanical Demolition Plan
X
X
M-2
Pump and Piping Floor Plan
X
X
M-3
PumpandPipingSections
X
M-4
Mechanical Details
X
S-1
Structural Demolition Plan
X
X
8-2
Structural Plans 1
X
X
S-3
Structural Plans 2
X
X
8-4
Structural Details
X
E-1
Electrical Legend and Abbreviations
X
X
X
E-2
Electrical One -Line Diagram and Load Calculations
X
X
X
E-3
Electrical Site Plan
X
X
X
E-4
Lighting, Receptacle and Grounding Plan
X
X
E-5
Conduit and Cable Schedule
X
X
E-6
Typical Motor Elementary Diagram
X
X
E-7
Electrical Details
X
1-1
Network Block Diagram
X
X
1-2
PCP -001 Wiring Diagram
X
X
1-3
PCP -001 Control System Block Diagram
X
X
City of Tukwila 216-2067-007
Lift Station 12 Upgrade 1 February 2026
Amendment 2 - Final Design, Bid Support, and
Services During Construction
let's create tomorrow, tq.jether
Exhibit D
City of Tukwila
Lift Station 12 Upgrade
Amendment 2 - Final Design, Bid Support, and
Services During Construction
ti91 0, w
216-2067-007
February 2026
Exhibit D - Rates and Project Fee Estimate
City of Tukwila
Lift Station 12 Upgrade
Amendment 2 — Final Desien. Bid SuDDOrt, and Services During Construction
Phase Task
Description
Original Budget
Budget Remaining Transfers
Labor Hours To
Complete
Amendment
Labor Dollars To Amendment2
Complete Amendment 2 Revised Budget
MEME
1
Project Management & Meetings
$22,977.14
$6,082.91
172
$39,761.68
$33,678.77
2
Data Collection and Review
$30,229.70
$12,841.90
136
$24,622.82
$11,780.92
3
Develop Alternatives
$59,574.40
-$5,856.09
0
$0.00
$0.00
Transfer from Task 4
$5,856.09
4
Alternatives Analysis
$30,628.86
$9,408.18
0
$0.00
$0.00
Transfers to Task 3
-$5,856.09
Transfers to Task 5
-$3,552.09
5
Preliminary Design
$65,954.62
$3,201.96
471
$109,888.69
$92,629.28
Tra nsfer from Management Reserve
510,505.36
Transfer from Task a
3,552.09
6
Subconsultant Allocation(includes 10% Markup)
$742.50
$0.00
0
$0.00
$0.00
7
Management Reserve
$10,505.36
$10,505.36
0
$0.00
$0.00
Transfer to Task 5
-$10,505.36
8
Final Design
524
$116,032.61
$116,032.61
9
Bidding Support
-
60
$13,540.64
$13,540.64
10
Construction Phase Services
672
$150,040.88
$150,040.88
216-2u6?-uo?
Fcb—y 2026
Ciq, of Tak,Ai41
Lift Statiau 12 Upemuc
Haul D",,,, Biu Spp—. -d Sc,,- , D—n--, Cnu,t—uoa