HomeMy WebLinkAboutTIS 2026-05-28 Item 1C - Resolution - 2027-20232 Transportation Improvement ProgramCity of Tukwila
Thomas McLeod, Mayor
Marty Wine, City Administrator
AGENDA BILL
ITEM NO.
1.C.
Agenda Item
Sponsor Jen Tetatzin, Public Works Director, City Engineer
Cyndy Knighton, Senior Program Manager - Transportation
Legislative History May 28, 2026 Transportation & Infrastructure Services
Committee
June 8, 2026 Committee of the Whole
June 15, 2026 Regular Meeting Consent
Recommended Motion ❑ Discussion Only ❑x Action Requested
MOVE TO adopt a resolution adopting the Six -Year Transportation
Improvement Program (2027-2032)
Resolution to Adopt Six -Year Transportation Improvement Program
(2027-2032)
EXECUTIVE SUMMARY
State law requires cities to approve a resolution adopting the annual update to the Six Year
Transportation Improvement Program (TIP) after holding a public hearing. The proposed Six Year TIP
for 2027-2032 include 22 new projects related to the 2024 Transportation Element, the 2025 Local
Road Safety Plan, and the proposed Transportation Impact Fee updated schedule. Staff is requesting
the Committee forward this item to the June 8, 2026 Committee of the Whole Meeting for a Public
Hearing.
DISCUSSION
The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of
Washington (RCW) 35.77.010. The TIP is adopted by resolution after a public hearing at the local agency level
and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects
competing for grants. Any project submitted for federal grant funding must be included in the local, regional,
and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer, and
local funds. Projects "roll" as funds or stages occur (design report, final design, and construction).
Tukwila's Six Year TIP, the Capital Improvement Program (CIP), the Transportation Element, and the Local
Road Safety Plan list many of the same transportation -related projects. The TIP typically lists only those
transportation -related projects planned within the next six years that are deemed regionally significant or that
have grant funding awarded or expected.
The attached Draft 2027 - 2032 TIP and was created by modifying the 2026 - 2031 TIP to add or remove
projects and adjust project costs. With the current budget cycle beginning and the proposed Transportation
Impact Fee schedule being discussed along the same timeline as the TIP update, the draft TIP also includes
many more new projects than a typical year. The list of projects is presented in alphabetical order. Prioritization
of projects is reflected in the current CIP but new projects added are not prioritized at this point. During the
current budget cycle, Council priorities will be established along with budget projections, which will help identify
the top priority projects to consider over the next 6 years and beyond. The TIP can be modified at any time
throughout the year to rearrange project schedules or the Council can simply wait until next year's annual
update to add, remove, or modify projects based on the final biennial budget adopted this year.
97
Two projects were removed and 22 new projects were added. The majority of new projects added are identified
as top priority projects in the Transportation Element and the Local Road Safety Plan. All new projects added
to the proposed Transportation Impact Fee schedule are included as they are the majority of the top priority
projects in the Transportation Element. The Draft 2027-2032 TIP summary identifies all the new projects and
where they originate from, as well as the current projects with the page number of the current CIP.
Deleted
Southcenter Boulevard Road Diet
S 144th Bridge Sidewalks
King County is taking lead and project is
included in their TIP
.........................................................................................................................................................................................................................
Grant was returned, project can be added
back in once funding is identified
ATTACHMENTS
• Draft 2027-2032 TIP Summary
• Draft Resolution & 2027-2032 Draft Transportation Improvement Program
• Current Adopted 2025-2030 TIP
98 https://tukwilawa.sharepoint.com/sites/clerksintranet/Council Agenda Items/05-28 TIS Committee/Resolution Adopting Annual TIP/1.Agenda Bill TIP 2027.docx
DRAFT 2027 - 2032 TIP SUMMARY
Source' or
2025-2030 CIP
Sheet
PROJECT TITLE
Project Costs in Thousands of Dollars
Funding Sources
Unsecured
2027
2028
2029
2030
2031
2032
TOTAL
Federal
State/TIB
City/Local
Grant
City*
39
42nd Avenue S Bridge Replacement
600
17,500
17,500
35,600
23,600
17,000
4,500
47
42nd Avenue S Bikeway
295
295
295
30
46th Avenue Safe Routes to School
325
2,070
2,395
1,895
500
1,725
420
New
Airport Way Overlay
574
3,424
3,998
3,988
10
49
ADA Improvements
61
61
61
61
61
61
366
54
APE/Minkler Blvd Intersection
375
2,400
2,775
1,900
875
1,900
500
58
APE/Industry Drive Intersection
265
2,400
2,665
2,665
2,400
New
Andover Park W (Strander to Tukwila Pkwy)
923
923
923
923
45
Annual Bridge Inspections and Repairs
232
237
242
242
247
247
1,447
1,447
35
Annual Overlay and Repair Program
2,520
2,520
2,720
2,720
3,155
3,155
16,790
16,720
43
Annual Traffic Signal Program
160
160
170
190
190
1
1,060
1,060
38
Boeing Access Road Overlay
3,526
3,526
3,990
TE, TIF
Buffered Shared Path on 42nd Ave S Sect. 3
550
550
550
550
57
E Marginal Way S (BAR - S 112th St)
75
75
75
75
TE, LRSP
E Marginal Way S (N City Limit to BAR)
6,917
917
6,917
6,917
New
E Marginal Way S Overlay
685
5,058
3
5,743
TE, TIF
E Marginal Way S Section 2 Sidewalks
03
803
803
LRSP
Interurban Avenue S (140th St to S 144th St)
1,484
1,4
1,484
1,484
52
Interurban Avenue S Overlay
356
356
356
TE, LRSP
Klickitat Dr (53rd Ave S to Southcenter Pkwy)
582
582
582
582
31
Macadam Road S Complete Streets
300
200
3,100
3,600
3,160
350
3,160
350
TE, TIF
Macadam Road S Sect. 1 Sidewalk
992
992
992
TE, TIF
Minkler Blvd Sect. 2 Sidewalk
1,4
1,430
1,430
1,430
44
Orillia Road S Overlay
1,204
1,204
1,204
TE, TIF
S 115th SUE Marginal Way Intersection Impr
2,00
2,000
2,000
2,000
41
S 119th St Pedestrian Bridge Painting
200
200
200
55
S 124th St/50th PI S Reconfiguration
50
1,022
1,072
898
254
59
S 133rd St/SR 599 SB Intersection
2,700
3,250
1,620
1,630
1,620
1,630
TE, TIF
S 141 st St Sect. 1 Sidewalk
510
510
510
510
TE, TIF
S 142nd St Sidewalk
541
541
541
541
TE, TIF
S 144th St Complete Streets
869
869
869
LRSP
S 144th St Improvements (Military Rd to TIB)
: r
580
580
580
28
S 152nd Street Ped & Bike Improvements
530
5,480
3,960
1,520
3,960
990
LRSP
S 180th St (Sperry Dr to IU Trail)
806
806
806
806
TE, TIF
S Norfolk St Bike Facilities
497
497
497
497
37
S Ryan Way
1,
13,0:
14,335
8,850
55,606
8,850
4,231
48
Southcenter Blvd Bike and Ped Xing U. -s
352
352
352
352
TE, TIF
SR 518 EB Off Ramp/Klickitat Drive Im. ents
850
850
850
850
TE, TIF
Strander Boulevard Sidewalk
467
467
467
467
TE, TIF
TIB Sect. 2 Sidewalk (north)
377
377
377
377
TE, TIF
TIB Sect. 2 Sidewalk (south)
1,673
1,673
1,673
1,673
-
TDM Implementation
52
52
52
52
52
312
312
Tukwila and South King County TDM
4
260
130
650
832
208
-
South King County Regional TDM
59
159
159
159
636
550
56
LRSP
Tukwila Int'I Blvd (S 152nd St to S 144th St)
4,347
4,347
TOTAL
14,356
56,738
34,911
11,769
6,984
10,622
135,380
39,431
40,483
111,118
21,215
33,799
PROJECTS REVISED FROM 2025-2030 TIP
New
List out all new projects, ID as LRSP or TE
Deleted/Completed: Modified
Southcenter Boulevard Road Diet (King County lead) I don't think any were modified
S 144th Bridge Sidewalks
I E: I ransportation Element, I Ih: I ransportation Impact Fee Schedule, LKSP: Local Koad Satety Plan
• Unsecured City funding includes all funds necessary outside of the current biennial budget cycle
May 13, 2026
99
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2027-
2032), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2027-2032); and
WHEREAS, on June 8, 2026, a public hearing was held regarding the City's Six -Year
Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2027 to 2032, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
2026 Legislation: 2027-2032 TIP
Version: 04/30/2026
Staff: C. Knighton
Page 1 of 2
100
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2026.
ATTEST/AUTHENTICATED:
Andy Youn-Barnett, CMC, City Clerk Armen Papyan, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Office of the City Attorney
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2027 to 2032
2026 Legislation: 2027-2032 TIP
Version: 04/30/2026
Staff: C. Knighton
Page 2 of 2
101
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
/ 1037(004) TUK-62
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
preliminary engineer design, and construction phases. The new structure will meet
current road and bridge design standards. The replacement structure configuration
will be two through -lanes, possibly a turn pocket, and include sidewalks.
06/08/26
0 /15/26
11
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Feder •
S
Fund Code
State Funds
Local Funds
Total Funds
S
PE
2027
40
0
500,000
500,000
S
RW
2027
r
0
100,000
100,000
P
CN
2028
BR
�Q000
0
0
13,000,000
S
CN
2028
BR
10, ' �6
MAW
17,000,000
3,900,000
31,499,306
T
599, 06
17,000,000
4,500,000
45,099,306
Expenditure Schedule
Phase
1st
2nd
Ni
4th
5th & 6th
PE
500,000
0
0
0
0
RW
100,000
0
0
0
0
CN
0
17,500,000
17,500,000
0
0
Totals
600,000
17,500,000
17,500,000
0
0
Report Date: May 13, 2026
Page 1
102
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-15812
42nd Avenue S Bikeway
42nd Avenue S
Southcenter Blvd to S 150th Street
Develop a traffic -calmed bikeway along 42nd Ave S between S 150th St and
Southcenter Blvd. On the west side of the street, add striped southbound bike lane
between Southcenter Blvd and S 150th St. On the east side of the street, add striped
bike lane between Southcenter Blvd and S 151st St. Remove on -street parking to
widen the sidewalk on the east side of the street between S 151 st St and S 150th St,
creating a shared path; add shared lane markings to the roadway Al I‘)P
06/08/26
0 /15/26
28
C G P S T
W
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fed
e Fund Code
State Funds
Local Funds
Total Funds
S
CN
2027
0
0
295,000
295,000
Tota
0
0
295,000
295,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
295,000
0
0
0
0
Totals
295,000
0
0
0
0
Report Date: May 13, 2026
Page 2
103
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Designland construct of curb, Er ancorner
r of 46th otke westside o4tith Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
WA-11113
t\
06/08/26
0 /15/26
05
C G P S T
W
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
- Fund Code
State Funds
Local Funds
Total Funds
S
PE
2027
•RTS
170,000
80,000
250,000
P
RW
2027
.
SRTS
65,000
10,000
75,000
P
CN
2028
0
SRTS
1,660,000
410,000
2,070,000
Tole"111111k 0
1,895,000
500,000
2,395,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
250,000
0
0
0
0
RW
75,000
0
0
0
0
CN
0
2,070,000
0
0
0
Totals
325,000
2,070,000
0
0
0
Report Date: May 13, 2026
Page 3
104
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
TUK-71
Airport Way Overlay
Airport Way
S Boeing Access Road to North Tukwila City Limit
Plane, pavement repair, pave; channelization, and repair of curb and gutter,
sidewalk, and guardrail, as necessary.
06/08/26
0 /15/26
05
0.380
CE
No
Funding
Status
S
S
Phase
PE
CN
Phase Start Year (YYYY)
2027
2028
Federal Fund Code
NHFP
NHFP
Totals
Federal Fun
and Core
State Funds
0
0
0
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
PE
574,000
0
0
0
0
CN
0
3,424,000
0
0
0
Totals
574,000
3,424,000
0
0
0
Report Date: May 13, 2026
Local Funds
10,000
0
10,000
Total Funds
574,000
3,424,000
3,998,000
Page 4
105
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/08/26
0 /15/26
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
S
ALL
2027
0
366,000
366,000
Totals
0
366,000
366,000
Expenditure Schedule
Phase
1st
2nd
1\
4th
5th & 6th
ALL
61,000
61,000
61,
61,000
122,000
Totals
61,000
61,000
61,000
61,000
122,000
Report Date: May 13, 2026
Page 5
106
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID16
Hearing
c/15726
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
WA-07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal _
06/08/26
0
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
S
PE
2027
0
275,000
275,000
S
RW
2027
0
100,000
100,000
P
CN
2028
TIB
1,900,000
500,000
2,400,000
Totals
0
1,900,000
875,000
2,775,000
Expenditure Schedule
1
Phase
1st
2nd
3rd
4th
5th & 6th
PE
275,000
0
0
0
0
RW
100,000
0
0
0
0
CN
0
2,400,000
0
0
0
Totals
375,000
2,400,000
0
0
0
Report Date: May 13, 2026
Page 6
107
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15107
Andover Park EasUlndustry Dr Intersection
Andover Park E
Industry Drive to
Design and construct traffic signal with Andover Park East left turn lanes and
crosswalks.
06/08/26
0 /15/26
03
C G P S T
W
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
Fund Code
State Funds
Local Funds
Total Funds
S
PE
2027
0
190,000
190,000
S
RW
2027
0
75,000
75,000
P
CN
2028
'
0
0
2,400,000
2,400,000
Totals,
0
0
2,665,000
2,665,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
190,000
0
0
0
0
RW
75,000
0
0
0
0
CN
0
2,400,000
0
0
0
Totals
265,000
2,400,000
0
0
0
Report Date: May 13, 2026
Page 7
108
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17047
Andover Park W (Strander to Tukwila Parkway)
Andover Park W
Strander Boulevard to Tukwila Parkway
Construct driveway access improvements, provide bus lanes, install RRFB's, and
improve signal timing
06/08/26
0 /15/26
04
0.390
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2030
0
923,000
923,000
Totals
0
923,000
923,000
Expenditure Schedule
Phase
1st
2nd
liSI
4th
5th & 6th
ALL
0
0
923,000
0
Totals
0
0
0
923,000
0
Report Date: May 13, 2026
Page 8
109
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA-03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/08/26
0 /15/26
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
S
ALL
2027
0
1,447,000
1,447,000
Totals
0
1,447,000
1,447,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
232,000
237,000
42,
242,000
494,000
Totals
232,000
237,000
42,000
242,000
494,000
Report Date: May 13, 2026
Page 9
110
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID4606
Hearing
D
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA-03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/0
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
S
ALL
2027
0
16,790,000
16, 790, 000
Totals
0
16,790,000
16,790,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
2,520,000
2,520,000
720,
2,720,000
6,310,000
Totals
2,520,000
2,520,000
20,000
2,720,000
6,310,000
Report Date: May 13, 2026
Page 10
111
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-15104
Annual Traffic Signal Program
Varies
to
Design and construct traffic signal upgrades and repairs of signals that exceed
routine maintenance work;loop replacement, head replacement, and controllers.
Replace direct bury cable for existing lighting system.
06/08/26
0 /15/26
44
P
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2027
0
1,060,000
1,060,000
Totals
0
1,060,000
1,060,000
Expenditure Schedule
Phase
1st
2nd
3
4th
5th & 6th
ALL
160,000
160,00
70,00
190,000
380,000
Totals
160,000
160,000
70 000
190,000
380,000
Report Date: May 13, 2026
Page 11
112
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
/ 1380(005) TUK-68
Boeing Access Road Overlay
Boeing Access Road
East Marginal Way S to Martin Luther King Jr Way S
Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF
railway.
06/08/26
0 /15/26
05
0.560
CE
No
Funding
Status
S
S
Phase
PE
CN
Phase Start Year (YYYY)
2027
2027
Federal Fund Code
NHPP
NHPP
Totals
Federal Fun
and Core
State Funds
0
0
0
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
PE
100,000
0
0
0
0
CN
3,426,000
0
0
0
0
Totals
3,526,000
0
0
0
0
Report Date: May 13, 2026
Local Funds
0
0
0
Total Funds
564,000
3,426,000
3,990,000
Page 12
113
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17026
Buffered Shared Path on 42nd Ave S Section 3
42nd Ave S
S 150th St to S 144th St
Remove parking on one side and widen sidewalk to create shared -use path
06/08/26
0 /15/26
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
at1111111111'
State Funds
Local Funds
Total Funds
P
ALL
2030
0
550,000
550,000
Totals
"
0
550,000
550,000
Expenditure Schedule
Phase
1st
2nd"111111111c111.11111r
4th5th
& 6th
ALL0
550,000
0
Totals
0
550,000
0
Report Date: May 13, 2026
Page 13
114
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
E Marginal Way S (BAR - S 112 St)
E Marginal Way S
Boeing Access Road to S 112th St
Goaad ito design la and construct full
Planning phase te determine project parameters.l.Could
street improvements and traffic control. Could include additional lanes and bike lanes
to support the new Sound Transit Link Light Rail infill station.
WA-15109
t\
06/08/26
0 /15/26
03
C G O P S
TW
0.270
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
- Fund Code
State Funds
Local Funds
Total Funds
P
PL
2028
0
75,000
75,000
Totals
0
75,000
75,000
Expenditure Schedule
Ni
Phase
1st
2nd
3rd
4th
5th & 6th
PL
0
75,000
0
0
0
Totals
0
75,000
0
0
0
Report Date: May 13, 2026
Page 14
115
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-17053
E Marginal Way S (N City Limit to S Boeing Access Rd)
Boeing Access Road to Northern City Limit
Widen and extend asphalt paving on E Marginal Way S north of S Boeing Access
Road. Bike facilities may be desired here, pending BAR Infill station and area
redevelopment, could connect to bike facilities on Airport Way if Seattle/Tukwila
install, connecting via Norfolk to EMWS If this project moves forward, need to update
bike network.
06/08/26
0 /15/26
04
C P S
1.900
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fed:
St
and Code
State Funds
Local Funds
Total Funds
P
ALL
2032
0
6,917,000
6,917,000
Totals
0
0
6,917,000
6,917,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
6,917,000
Totals
0
0
0
0
6,917,000
Report Date: May 13, 2026
Page 15
116
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
TUK-70
E Marginal Way S Overlay
E Marginal Way S
Interurban Avenue S to MP 2.27
Plane, pavement repair, pave, channelization, and repair of curb and gutter and
sidewalk, as necessary.
06/08/26
0 /15/26
05
0.960
CE
No
Funding
Status
S
S
Phase
PE
CN
Phase Start Year (YYYY)
2027
2028
Federal Fund Code
NHPP
NHPP
Totals
Federal Fun
and Core
State Funds
0
0
0
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
PE
685,000
0
0
0
0
CN
0
5,058,000
0
0
0
Totals
685,000
5,058,000
0
0
0
Report Date: May 13, 2026
Local Funds
0
0
0
Total Funds
685,000
5,058,000
5,743,000
Page 16
117
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17043
E Marginal Way S Section 2 Sidewalk
E Marginal Way S
Interurban Ave S to S 120th PI
Construct sidewalk on both sides of road segment.
06/08/26
0 /15/26
28
0.140
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
at1111111111'
State Funds
Local Funds
Total Funds
P
ALL
2031
0
803,000
803,000
Totals
"
0
803,000
803,000
Expenditure Schedule
Phase
1st
2nd"111111111c111.11111r
4th
5th & 6th
ALL0
0
803,000
Totals
0
0
803,000
Report Date: May 13, 2026
Page 17
118
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-17049
Interurban Ave (140th St to S 144th St)
Interurban Ave S
140th St to 144th St
Construct two landscape medians, install RRFB's, and a new pedestrian crossing
06/08/26
0 /15/26
28
0.270
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
at1111111111'
State Funds
Local Funds
Total Funds
P
ALL
2031
0
1,484,000
1,484,000
Totals
"
0
1,484,000
1,484,000
Expenditure Schedule
Phase
1st
2nd
dIIIIIIIIIIr
4th
5th & 6th
ALL
0
0
0
1,484,000
Totals
0
0
1,484,000
v
Report Date: May 13, 2026
Page 18
119
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
1391(004) TUK-66
Interurban Avenue S Overlay
Interurban Avenue S
E Marginal Way S to S 143rd Street
Complete pavement repairs, overlay, and curb and gutter repair.
06/08/26
0 /15/26
05
2.250
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
at
iiiip
State Funds
Local Funds
Total Funds
S
CN
2027
NHPP
0
0
4,561,000
Totals
4,561,
0
0
4,561,000
Expenditure Schedule
Phase
1st
2nd"111111111c111.11111r
4th5th
& 6th
CN356,100
0
0
Totals
356,100
0
0
Report Date: May 13, 2026
Page 19
120
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17054
Klickitat Dr (53rd Ave S to Southcenter Pkwy)
53rd Ave S to Southcenter Pkwy
Multimodal improvements to improve connectivity and accessibility of existing path
wayfinding, signage, width improvements, etc.
06/08/26
0 /15/26
28
0.410
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2029
0
582,000
582,000
Totals
0
582,000
582,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
0
0
582,
0
0
Totals
0
0
82,000
0
0
Report Date: May 13, 2026
Page 20
121
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
"112S0/15)
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA-11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/08/26
/
04
0.350
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
P ike Program
350,000
50,000
400,000
P
RW
2028
ike Program
10,000
0
10,000
P
CN
2029
0
ed/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,160,000
350,000
3,510,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
300,000
100,000
0
0
0
RW
0
100,000
0
0
0
CN
0
0
3,100,000
0
0
Totals
300,000
200,000
3,100,000
0
0
Report Date: May 13, 2026
Page 21
122
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17028 06/08/26
Macadam Rd S Section 1 Sidewalk
42nd Ave S and Macadam Rd S
S 124th St to S 130th St
Construct sidewalk on west side of
42nd Ave S from S 124th St to entrance
of 42nd Ave S Bridge, construct
sidewalk on both sides of 42nd Ave S
from entrance of 42nd Ave S Bridge to
on
Interboth ides Ave Sa Construct from
both sides of Macadam Rd0t S from
Interurban Ave S to S 130th St. Ic?°
0 /15/26
28
0.340
No
FundingIIllmoir
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2031
0
0
992,000
992,000
T
0
0
992,000
992,000
Expenditure Schedule
Phase
1st
2nd
Nii104
4th
5th & 6th
ALL
0
0
0
0
992,000
Totals
0
0
0
0
992,000
Report Date: May 13, 2026
Page 22
123
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-17027
Minkler Blvd Section 2 Sidewalk
Minkler Boulevard
Andover Park W to Andover Park E
Construct sidewalk on both sides of
road segment
06/08/26
0 /15/26
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2029
0
1,430,000
1,430,000
Totals
0
1,430,000
1,430,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
0
430,
ICI
0
0Totals0
30,000
0
0
Report Date: May 13, 2026
Page 23
124
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
/ 1230(007) TUK-67
Orillia Road South Overlay
Orillia Road S
S 200th Street to S 188th Street/WSDOT ROW
Complete pavement repairs; overlay; and curb and gutter, sidewalk, and guardrail
repair. Make minor improvements to channelization and improve safety near the
188th street intersection.
06/08/26
0 /15/26
05
0.640
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
Fund Code
State Funds
Local Funds
Total Funds
S
CN
2027
NHPP
1,204,
0
0
1,204,000
Totals
1,2
0
0
1,204,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
CN1,204,000
c1,
0
0
Totals1,204,00000
0
0
Report Date: May 13, 2026
Page 24
125
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-17025
S 115th SUE Marginal Way Intersection Improvements
E Marginal Way
300' South of S 115th St to 300' North of S 115th St
Design and construct a new traffic signal, lighting, and pedestrian facilities, including
crosswalks and pedestrian push buttons.
06/08/26
0 /15/26
03
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2029
0
2,000,000
2,000,000
Totals
0
2,000,000
2,000,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
0
0
N 00,
0
0
Totals
0
0
00,000
0
0
Report Date: May 13, 2026
Page 25
126
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA13494
S 119th St Pedestrian Bridge Painting
S 119th Street Bridge
West bank Duwamish River to East bank Duwamish River
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
needed.
06/08/26
0 /15/26
2117
06
0.040
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F Fund Code
State Funds
Local Funds
Total Funds
S
CN
2027
0
200,000
200,000
Totals
0
200,000
200,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
CN200,000
c1,
0
0
Totals200,000
00
0
0
Report Date: May 13, 2026
Page 26
127
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-16476
S 124th St/50th PI S Reconfiguration
S 124th Street
49th Ave S to 51st PI S
Reconfigure intersection to remove EB slip lane, new c/g/s on S 124th from 49th to
124thetrainaconnecting to inexistinglslip
new paved shoulder oe5walkwaytPk, n south side trfeatment/rain
walkway on west side of 50th Pk, new stormwater treatment/rain garden in old slip
w5alkway
lane ROW.
06/08/26
0 /15/26
21
0.140
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Feder •
S
Fund Code
State Funds
Local Funds
Total Funds
S
PE
2027
40
TIB
101,000
29,000
130,000
S
CN
2028
r
TIB
796,300
225,200
1,021,500
Totals-
0
897,300
254,200
1,151,500
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
50,000
0
0
0
0
CN
0
1,021,500
0
0
0
Totals
50,000
1,021,500
0
0
0
Report Date: May 13, 2026
Page 27
128
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 SB Ramp to
Design and construct intersection improvements, which could include a new traffic
signal orr aa roundabout,
lighting, pedestrian facilities, and drainage.
WA-15108
t\
06/08/26
0 /15/26
03
C G O P S
TW
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
- Fund Code
State Funds
Local Funds
Total Funds
P
PE
2028
0
400,000
400,000
P
RW
2028
.
0
150,000
150,000
P
CN
2029
0
TIB
1,620,000
1,080,000
2,700,000
TotTotle1111111k 0
1,620,000
1,630,000
3,250,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
400,000
0
0
0
RW
0
150,000
0
0
0
CN
0
0
2,700,000
0
0
Totals
0
550,000
2,700,000
0
0
Report Date: May 13, 2026
Page 28
129
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
07
WA-17045
S 141st St Section 1 Sidewalk
S 141st
37th Ave S to Tukwila International Boulevard
Construct sidewalk on both sides of
road segment
06/08/26
0 /15/26
28
0.120
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
PE
2029
0
510,000
510,000
Totals
0
510,000
510,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
0
0
510,
0
0
Totals
0
0
10,000
0
0
Report Date: May 13, 2026
Page 29
130
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
07
WA-17044
S 142nd St Sidewalk
S 142nd St
37th Ave S to Tukwila International Boulevard
Construct sidewalk on both sides of
road segment
06/08/26
0 /15/26
28
0.130
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2029
0
541,000
541,000
Totals
0
541,000
541,000
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
0
0
541,
0
0
Totals
0
0
41,000
0
0
Report Date: May 13, 2026
Page 30
131
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
a
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17041
S 144th St Complete Street
42nd Ave S to 51 st Ave S
accoewamfacdate on t lanes, side bof ter,
and Restripe and-wayremove parking . one side tosidewalk
and 1-10ft two-way cycle track. Construct sidewalk facilities on the south side of the
street. t\
04
C G P S T
W
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
- Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2030
0
869,000
869,000
Totals
0
869,000
869,000
Expenditure Schedule
Ni
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
869,000
0
Totals
0
0
0
869,000
0
Report Date: May 13, 2026
Page 31
132
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17046
S 144th St Improvements (Military to TIB)
S 144th St
Military Rd S to Tukwila International Boulevard
Construct sidewalk improvments, curb and gutter, install RRFB's, and a pedestrian
refuge island
06/08/26
0 /15/26
28
0.310
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2028
0
580,000
580,000
Totals
0
580,000
580,000
Expenditure Schedule
Phase
1st
2ndell
4th
5th & 6th
ALL
0
580,000
\NI
0
0
Totals
0
580,000 0
0
0
Report Date: May 13, 2026
Page 32
133
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11112
S 152nd Street Pedestrian and Bike Improvements
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Install curb, gutter, sidewalks on S 152nd Street, including widening pavement and
construction of a buffer between the roadway and sidewalk on the south side.
06/08/26
0 /15/26
05
C G O P S
TW
0.300
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
Fund Code
State Funds
Local Funds
Total Funds
S
PE
2027
0
300,000
300,000
S
RW
2027
0
230,000
230,000
P
CN
2028
' 0
TIB
3,960,000
990,000
4,950,000
Totals,
0
3,960,000
1,520,000
5,480,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
300,000
0
0
0
0
RW
230,000
0
0
0
0
CN
0
4,950,000
0
0
0
Totals
530,000
4,950,000
0
0
0
Report Date: May 13, 2026
Page 33
134
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-17048
S 180th St (Sperry Drive to Interurban Trail)
S 180th St
Sperry Drive to Interurban Trail
Construct shared use path on the north side and stall no turn on red phasing at
180th and Sperry Dr.
06/08/26
0 /15/26
28
0.280
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2030
0
806,000
806,000
Totals
0
806,000
806,000
Expenditure Schedule
Phase
1st
2nd
liSI
4th
5th & 6th
ALL
0
0
806,000
0
Totals
0
0
0
806,000
0
Report Date: May 13, 2026
Page 34
135
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17021
S Norfolk St Bike Facilities
S Norfolk Street
E Marginal Way S to East city limit
Add bike facilities on S Norfolk St
06/08/26
0 /15/26
28
P S T W
0.140
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
at1111111111'
State Funds
Local Funds
Total Funds
P
ALL
2029
0
497,000
497,000
Totals
"
0
497,000
497,000
Expenditure Schedule
Phase
1st
2nd
d
4th
5th & 6th
ALL
0
0
49
0
0
Totals
0
97,0
0
0
Report Date: May 13, 2026
Page 35
136
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
S Ryan Way
SR 900 to 51 st Ave S
Resurface and rechannel S Ryan Way to improve failing pavement and improve
safety. Add pedestrian and bicycle facilities where appropriate. Signalize intersection
with 47th Avenue S to accommodate future growth and improve safety.
WA-15829
t\
06/08/26
0 /15/26
06
C G P S T
W
0.500
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federa
- Fund Code
State Funds
Local Funds
Total Funds
S
PE
2027
0
1,275,000
1,275,000
P
RW
2028
.
TIB
200,000
100,000
300,000
P
CN
2028
0
TIB
8,650,000
4,131,000
12,781,000
TotTotle1111111k 0
8,850,000
5,506,000
14,356,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
1,275,000
0
0
0
0
RW
0
300,000
0
0
0
CN
0
12,760,000
0
0
0
Totals
1,275,000
13,060,000
0
0
0
Report Date: May 13, 2026
Page 36
137
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15813
Southcenter Blvd Bikeway and Pedestrian Crossing Upgrades
Southcenter Boulevard
International Boulevard to 42nd Avenue S
Improve the existing bike lanes and crosswalks on Southcenter Blvd within a half -
mile of Tukwila International Boulevard Station (TIES). Re-channetze to 11 ft
general purpose lanes to accommodate separated bike lanes. Tighten intersection
with 40th Ave S to shorten crossing distance. Add bike channelization and upgrade
to high -visibility crosswalk markings at Southcenter Blvd/TIBS station entrance and
Southcenter Blvd/42nd Ave S intersections. Al I‘)P
06/08/26
0 /15/26
28
C G P S T
W
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fed
e Fund Code
State Funds
Local Funds
Total Funds
S
CN
2027
0
0
325,000
325,000
Tota
0
0
325,000
325,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
325,000
0
0
0
0
Totals
325,000
0
0
0
0
Report Date: May 13, 2026
Page 37
138
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-17022
SR 518 EB Off-ramp/Klickitat Dr Intersection Improvements
Klickitat Drive
51 st Ave S to Klickitat Drive
Design and construct a new traffic signal, lighting, and pedestrian facilities including
crosswalks and pedestrian push buttons.
06/08/26
0 /15/26
03
P S W
0.020
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2030
0
850,000
850,000
Totals
0
850,000
850,000
Expenditure Schedule
Phase
1st
2nd
liSI
4th
5th & 6th
ALL
0
0
850,000
0
Totals
0
0
0
850,000
0
Report Date: May 13, 2026
Page 38
139
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-17029
Strander Blvd Sidewalk
Strander Blvd and SW 27th St
Christensen Rd to Interurban Trail
Construct sidewalk on south side of
Strander Blvd from Christensen Rd to W
Valley Hwy. Construct sidewalk on both
sides of Strander Blvd from W Valley
Hwy to east boundary of Tukwila city
limits ...am....
06/08/26
bill*
0 /15/26
28
0.200
No
Funding
Nund
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fe
Fund
Code
State Funds
Local Funds
Total Funds
P
ALL
2029
0
0
467,000
467,000
Totals
0
0
467,000
467,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
467,000
0
0
Totals
0
0
467,000
0
0
Report Date: May 13, 2026
Page 39
140
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
a
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-17039
TIB Section 2 Sidewalk (North)
Tukwila International Blvd
S 112th Ave to SR99
Construct sidewalk on east side of Tukwila International Blvd from S 112th St to the
HW 99 Exit Ramp.
28
C G P S T
W
0.260
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2029
0
377,200
377,200
Totals
0
377,200
377,200
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
0
n77,2
0
0
Totals
0
77,200
0
0
Report Date: May 13, 2026
Page 40
141
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
dc
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-17040
TIB Section 2 Sidewalk (South)
SR 99 to 12400 Block
Construct sidewalk on both sides of Tukwila International Blvd from the HW 99 Exit
Ramp to 12400 Block.
28
C G P S T
W
0.440
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F
Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2029
0
1,672,800
1,672,800
Totals
0
1,672,800
1,672,800
Expenditure Schedule
Phase
1st
2nd
4th
5th & 6th
ALL
0
n72,8
0
0
Totals
0
72,800
0
0
Report Date: May 13, 2026
Page 41
142
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-13491
Transportation Demand Management Implementation
to
Provision of TDM services to Commute Trip Reduction -affected employment sites.
Facilitate employer reporting and records associated with biennial CTR survey.
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
06/08/26
0 /15/26
44
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Feder •
S
Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2027
40
SDOT
103,200
0
103,200
P
ALL
2028
r
WSDOT
258,000
0
258,000
Totals-
0
361,200
0
361,200
Expenditure Schedule
_
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
51,600
51,600
51,600
51,600
103,200
Totals
51,600
51,600
51,600
51,600
103,200
Report Date: May 13, 2026
Page 42
143
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-17063
Tukwila and South King County TDM
to
Provide TDM services to help people use sustainable transportation options that
increase access to opportunity, and reduce drive -alone travel and traffic congestion
in Tukwila and South King County.
06/08/26
0 /15/26
18
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal F Fund Code
State Funds
Local Funds
Total Funds
S
PL
2027
THER
832,000
208,000
1,040,000
Totals
832,000
208,000
1,040,000
Expenditure Schedule
Phase
1st
2nd
4th
Sth & 8th
PL260,000
260,0030,000
in
0
Totals260,000260
0003Q 000
0
0
Report Date: May 13, 2026
Page 43
144
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n,
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
TUK-69
Tukwila and South King County TDM
Tukwila and South King County
N/A to N/A
This project will provide TDM programming and services to help people access
sustainable transportation options that reduce drive -alone travel and traffic
congestion in Tukwila and South King County. Tukwila's TDM Program reaches
people regionally at employment centers, community hubs, multifamily housing
complexes, and educational institutions.
06/08/26
0 /15/26
24
0.000
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Fed:
St
and Code
State Funds
Local Funds
Total Funds
S
PL
2027
CMAQ
SDOT
85,838
0
635,838
Totals
0,000
85,838
0
635,838
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PL
158,959
158,959
58,960
158,960
0
Totals
158,959
158,959
158,960
158,960
0
Report Date: May 13, 2026
Page 44
145
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2027 to 2032
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
ca
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-17042
Tukwila International Boulevard (S 152nd St to S 144th St)
S 152nd St to S 144th St
Construct landscape median, refine corridor access, roadway diet, and multimodal
lanes.
04
C P S W
0.530
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun
and Core
State Funds
Local Funds
Total Funds
P
ALL
2030
0
4,347,000
4,347,000
Totals
0
4,347,000
4,347,000
Expenditure Schedule
Phase
1st
2nd
liSI
4th
5th & 6th
ALL
0
0
4,347,000
0
Totals
0
0
0
4,347,000
0
ede. unds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
43,635,306
40,561,338
65,774,200
149,970,844
Report Date: May 13, 2026
Page 45
146