Loading...
HomeSearchMy WebLinkAboutTIC 2017-11-14 COMPLETE AGENDA PACKETTIC 2017-11-14 Agenda Front SheetTIC 2017-11-14 Item 2A - Grant Acceptance - NPDES: 2017-2019 Biennial Stormwater Capacity Grant from Department of EcologyTIC 2017-11-14 Item 2B - Update - NPDES: 2017 Surface Water Management Program Survey and Assessment ResultsTIC 2017-11-14 Item 2C - Agreement - Martin Luther King Jr Way South Water Main Design with Carollo EngineersTIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK IncTIC 2017-11-14 Item 2E - Grant Acceptance - 2017-2019 Non-Traditional Commute Trip Reduction Pilot Program Grant from WA State Department of Transportation (WSDOT)TIC 2017-11-14 Item 2F - Update - Tukwila International Boulevard Retrofit Implementation RecommendationsTIC 2017-11-14 Item 2G - Final Settlement - Change Order #9 for Interurban Avenue South (South 143rd - Fort Dent Way) with Walsh Construction