Loading...
HomeSearchMy WebLinkAboutTIS 2021-09-13 COMPLETE AGENDA PACKETTIS 2021-09-13 Agenda Front SheetTIS 2021-09-13 Item 2A - Update - Permanent Small Wireless FacilitiesTIS 2021-09-13 Item 2B - Change Order #4 - Macadam Road South Water Upgrade - Design with PACE EngineersTIS 2021-09-13 Item 2C - Change Order #1 - Sewer Lift Stations 2, 4 and 12 Upgrades - Design and Construction Management with PACE EngineersTIS 2021-09-13 Item 2D - Changer Order #1 - 42nd Avenue South Bridge Replacement - 100% Design with TranTech Engineering