Loading...
HomeSearchMy WebLinkAboutSpec 2025-03-03 COMPLETE AGENDA PACKETSpec 2025-03-03 Agenda Front SheetSpec 2025-03-03 Item 5C - Contract - Orillia Rd S Overlay Design with SCJ Alliance for $125,935.27Spec 2025-03-03 Item 5D - Contract - S Boeing Access Rd Overlay Design with Psomas Inc for $563,983.14Spec 2025-03-03 Item 5E - Contract - Interurban Ave S Overlay Program Design with Psomas Inc for $649,418.88Spec 2025-03-03 Item 5F - Contract Supplement #4 - 42nd Ave S Bridge Replacement with David Evans & Associates for $1,386,694.00Spec 2025-03-03 Item 5F - Handouts to be Distributed at Meeting - 42nd Ave S Bridge Replacement Consent Form / Scope of WorkSpec 2025-03-03 Item 5G - Contract - Ryan Hill Water System Connection Design with Carollo Engineers for $601,505.00Spec 2025-03-03 Item 5H - Bid Award / Contract - S 149th St & S 150th St Watermain Replacement with Pape & Sons Construction for $1,214,012.98Spec 2025-03-03 Item 5I - Contract - 2025 Annual Overlay & Repair Program Design & Construction Management with Psomas Inc for $487,198.99Spec 2025-03-03 Item 5J - Final Acceptance - 2024 Annual Overlay & Repair Program with ICON Materials for $867,537.54Spec 2025-03-03 Item 6 - Resolution - City Council Rules of Procedure RevisionSpec 2025-03-03 Item 8B - Update / Contracts - Asylum Seeker Response / Multiple Grant Funded ContractsSpec 2025-03-03 Item 9C - Report - City AdministratorSpec 2025-03-03 Tentative Agenda Schedule