Loading...
HomeMy WebLinkAboutUtilities 2009-08-25 COMPLETE AGENDA PACKET is Distribution: J. Morrow S. Hunstock C ity of Tuk �r q B. Giberson S. Kerslake s der F. Iriarte M. Miotke Utilities Committee P. Brodin J. Pace Mayor Haggerton G. Labanara C_J;"isH J u..- R. Larson E Kathy Hougardy, Chair R. Berry M. Cusick �AAa"_ P. Lau 4- F�1e -Eory�r Pam Linder D. Speck M. Mathia Single side to Dana C. O'Flaherty S. Anderson 3 Extra Copies Dennis Robertson M. Hart J. Howat e -mail to Saxton,Hart S. Norris B. Still C. O'Flaherty, Narog, S. Norris and S. Kirby AGENDA TUESDAY, AUGUST 25, 2009 Time: 5:00 PM Place: Conference Room #1 item Recommended Action Page I. Current Agenda Review I. II. Presentation(s) II. III. Business Agenda III. A. Howard Hanson Dam Flood Response Plan A. Forward to 9/14/09 C.O.W. Pg• 1 Resolution Declaring Surplus Property akd`l /21 /09 B. Gilliam Creek Basin Stormwater Overflow B. Forward to 9/14/09 C.O.W. Pg. 5 Bid Award and 9/21/09 Regular C. 2009 Annual Small Drainage Program C. Forward to 9/14/09 C.O.W. Pg. 11 King County Interlocal Cooperation Agreement and 9/21/09 Regular IV. Old Business IV. Future Agendas: Next Scheduled Meeting: Tuesday, September 15, 2009 Committee Goals: Study the feasibility and implementation of televised City Council meetings. Continue to foster relationships within local, regional, and state entities that encourage opportunities for joint partnership and outreach. S The City of Tukwila staves to accommodate individuals with disabilities. Please contact the Public Works Department at 205- 433 -0179 for assistance. City of Tukwila TO: Mayor Haggerton Utilities Committee Attachments: Draft Resolution Vicinity Map INFORMATIONAL MEMORANDUM FROM: Public Works Director Ttil DATE: August 18, 2009 SUBJECT: Howard Hanson Dam Flood Response Plan Project No. 10901301 Resolution Declaring Surplus Property Jim Haggerton, Mayor ISSUE Declare the log cabin at 5829 S 140 St (Parcel No. 3365901016) as surplus by Resolution so it can be demolished and a flood fighting project can be constructed. BACKGROUND The City of Tukwila previously rented out the residential structure (log cabin) on S 140 St. The cabin requires extensive repairs and restoration would be too costly. The cabin could also be a significant risk and liability to the City. ANALYSIS A resolution is required to surplus this property. If approved, staff will proceed with an asbestos survey and preparation of bid documents for demolition. After bid award, the structure will be demolished and the site regraded. This property is located at the east end of South 140 St, which is a low spot on the west bank of the Duwamish River. Working with the Army Corps of Engineers and King County Flood Control District, staff would be able to install a low -cost demonstration project for an advance measures flood protection system. This flood protection may include minor clearing, grading and installation of sand filled wire baskets along the river. RECOMMENDATION The Council is being asked to approve the Resolution and consider this item at the September 14, 2009 Committee of the Whole meeting and subsequent September 21, 2009 Regular meeting. fib' \PW Eng \I \II RCiLNCY UPS '\I IIID Flood Response Plan 1090130I'Info \Irmo Log Cabin Surplus Resolution doc A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DECLARING THE PROPERTY LOCATED AT 5829 SOUTH 140Th STREET IN TUKWILA AS SURPLUS. WHEREAS, the City of Tukwila owns real property at 5829 South 140th Street in Tukwila, Washington, also identified as King County Parcel Number 3365901016; and WHEREAS, the residential structure on the subject property is in very poor condition; and WHEREAS, the adjacent river bank of the Duwamish River is a known low spot with flooding potential for the South 140th Street neighborhood, including the City of Tukwila's George Long Shops and part of Interurban Avenue South; and WHEREAS, TMC Chapter 2.64 provides for the disposition of surplus property. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Declaration of Surplus. The residential structure at 5829 South 140th Street in Tukwila, Washington, is hereby declared surplus. Section 2. Demolition of Surplus Structure. Staff is hereby authorized to proceed with the preparation of bid documents 'to advertise for construction bids to demolish the unsafe structure at 5829 South 140th Street in Tukwila, Washington. Standard bid advertisement and award procedures will be followed. Section 3. Flood Advance Measure Demonstration Project. Staff is hereby authorized to proceed with the installation of a demonstration project for an advance measures flood protection project that may include minor clearing, grading and installation of sand filled wire baskets. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Council Meeting thereof this day of 20 ATTEST/ AUTHENTICATED: Christy O'Flaherty, City Clerk APPROVED AS TO FORM BY: Office of the City Attorney DRAFT Joan Hernandez, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: Resolution Surplus Log Cabin.docResolution Surplus Log Cabin.doc 8/19/2009 Page 1 George Long Shoos Golf /Parks Maintenance Log Cabin 5829 S 140th (AP #3365901016) t N CityGis 132 ft Copyright p 2006 All Rights Reserved. The information contained herein is the proprietary property of the contributor supplied under license and may not be approved except as licensed by Digital Map Products. City of Tukwila TO: Mayor Haggerton UTILITIES COMMITTEE FROM: Public Works Directoriri) DATE: August 19, 2009 INFORMATIONAL MEMORANDUM SUBJECT: Gilliam Creek Basin Stormwater Overflow Project No. 03 -DRO9 BID AWARD ISSUE Award the bid for construction of the Gilliam Creek Basin Stormwater Overflow. Jim Haggerton, Mayor BACKGROUND This project is not currently budgeted for construction until 2013 but is proposed for construction in 2009 in response to the problems at Howard Hanson Dam. Additional flows from the dam may lead to flooding in Gilliam Creek and affect the Tukwila Urban Center. This project will construct an 18" overflow pipe along Strander Blvd between the intersections of Andover Park West and Andover Park East. This overflow pipe will allow the Gilliam Creek Basin to drain to the Strander Blvd Pump Station to reduce potential flooding associated with high river events. The project was advertised for bids on August 5 and 12, 2009 and nine bids were received and opened on August 19, 2009. Reed Trucking Excavating, Inc. is the low bidder with a bid of $360,530.00. The engineer's estimate was $376,825.00. ANALYSIS The bids were reviewed and tabulated. No errors were found. Reed Trucking Excavating Inc's references were checked and found to be satisfactory. BUDGET AND BID SUMMARY (All amounts include sales tax.) Bid Results Estimate *Budget Construction 360,530.00 376,825.00 0 Contingency (20 72,106.00 75,365.00 0 Total 432.636.00 452.190.00 0 *Funding for this project is not programmed until 2013 and will come from the Surface Water Fund's ending fund balance. RECOMMENDATION Due to the urgency of this project, the Council is being asked to award the construction of the Gilliam Creek Basin Stormwater Overflow project to Reed Trucking Excavating, Inc. in the amount of $360,530.00 at the September 8, 2009 Regular Meeting. Attachments Bid Tabulation CIP Sheet W \PVd Eng \PROJECTS\A- DR Protects \03 -DR09 (Gilliam Creek Basin Stormwate: Overflow); Into Memc Bid Award doc Owner: City of Tukwila Project: Gilliam Creek Basin Sformwater Overflaw Engineers: PACE Engineers. Inc. ITEM ITEM OR NO. TASK DESCRIPTION ,I I, 2 3 4 1 5 6 7 I8 19 i 10 11 12 13 14 15 16 17 18 19 1 20 21 22 23 ROADWAY 11 -inch HMA 1/2" Patch TRAFFIC CONTROL DEVICES Traffic Control Devices Loop Detector. 6 -foot Diameter Plastic Arrow Plastic Stripe Raised Pavement Markers Type 1, Type 2 ROADSIDE DEVELOPMENT Property Restoration STORM DRAINAGE Contractor- Supplied Surveying and Staking Temporary Water Polution/Erosion Control Mobilization Resolution of Utility Conflicts Pothotnq Traffic Control Labor (Min, $35 /hr) Uniformed Police Officer Abandon Storm Drain Structure Trench Excavation Protection Storm Drain Pipe, 24 -inch Diameter Catch Basin. Type 2, 54 -inch Catch Basin, Type 2, 60 -inch with canal gate Catch Basin. Type 2. 72 -inch Connection to Drainage Structure Plug Existing Storm Drain Monument, Casing and Cover Sales Tax included in Unit and Lump Sum prices per Rule 171 Gilliam Creek Bid Tab 8-19-09.xls ENGINEER'S ESTIMATE QUANTITY NO. UNIT UNIT UNIT UNITS PRICE COST PRICE COST 1,160 SY $6400 574,240.00 $60.00 $69,600.00 1 LS 57.000,00 37,000 00 $5,000 00 95.000 00 $10,000.00 I 510.000 00 2 EA 5400.00 5800,00 51,000.00 52,000.00 5740,00 51,480.00 13 EA $95,00 $1,23500 3170.00 02,210.00 $165.00 92.145 100 LF $3.00 5300.00 $6 50 $650 00 $7.00 $700.00 20 100 5185.00 $3.70000 $1.00 520.00 $510.00 $10,200.00 1 FA 55.000.00 $5,000.00 55,000.00 $5,000.00 35,000.00 1 LS 53,000.00 83,000,00 53,800.00 1 FA 02,000.00 32,000,00 $2,000.00 1 LS $35.000.00 535.000 00 530,000.00 1 FA 55.000.00 $5,000.00 $5,000.00 1 FA 52,300 00 $2,300.00 $2,300 00 350 Hour 1 535.00 512,250.00 $35 00 175 Hour 1 $80 00 514,000,00 550,00 1 EA 1 $500 00 5500.00 $2,500,00 1 LS 515,000.00 $15,000.00 55,000,00 1030 LF 0150,00 5154,500.00 1 5165,00 2 EA 54,500.00 89,000,00 11 $5,000.00 2 EA i t $10,200 00 520,400.00 1 $6,000 00 1 EA 1 59 000.00 59,000,00 $10,000.00 1 EA 51.000,00 $1,000.00 11 5500,00 2 EA 0300.00 5600.00 1 2 EA 5500,00 $1,000 00 5750 00 Subtotal $376,825.00 $360,530.00 TOTAL BID $376,825.00 5360,530.00 REED TRUCKING 8 r ARCHER CONSTRUCTION I SCI INFRASTRUCTURE LLC 11 RODARTE CONSTRUCTION I ROAD CONSTRUCTION NW MOSBRUCKER EXCAVATING UNIT UNIT UNIT UNIT UNIT PRICE COST PRICE COST II PRICE COST PRICE COST PRICE 582,00 $95.120.00 871,50 082.940,00 575.00 $87,000.00 858,25 867,570.00 1 $62.00 53,800.00 $2,200.00 32,000.00 $2.000.00 $30,000 00 538,000.00 35,000.00 $5.000.00 52,300.00 $2,300.00 512,250.00 $45.00 58,750 00 $125.00 52,500.00 I $2,000.00 55,000.00 1 53,500.00 5169,950 00 11 5120,00 510,000.00 11 $5,700.00 $12.000 00 1 $9,420.00 510,000.00 1 $10,750.00 5500,00 11 52,150.00 5500.00 11 $670.00 $1,500.00 11 $930 00 11 $5,000 00 52,200 00 32.000,00 538,000.00 55,000.00 52,300.00 $15,750,00 $21,875.00 52,000.00 $3,500 00 5387,210.00 $387,210.00 BID TABULATION $2.000,00 5725.00 $115.00 $16,00 5215 00 $5,000.00 52,000.00 52,000.00 515.000,00 $5,000,00 $2,300.00 $42.50 $55,00 $1,500 00 54,200.00 5123,60000 $200.00 $11.400 00 82,800,00 $18,840.00 1 $7,000.00 510,750.00 11 011,500,00 52.150,00 1F$2.000.00 51,340.00 1 $750 00 $1,860.00 1 5800 00 1 52,000.00 51,450,00 31,495,00 $1,600,00 $4,300.00 $9.000 00 $800 00 5200 00 317.00 510,00 35,000.00 II 55,000.00 $2,000.00 52,000.00 $15,000.00 $5,000 00 $2,300.00 $14,875.00 $9,625.00 $1,500.00 $4,200.00 $206,000,00 55,600,00 $14,000 00 $11,500,00 $2,000.00 $1,500.00 $1,600.00 $5.000.00 $2,000 00 548,000.00 $5,000 00 $2,300.00 542 00 575.00 $2,000 00 $100.00 5250.00 $5,000,00 59,000.00 $12,000,00 $6,000,00 5200 00 $500,00 $9,000.00 51.600.00 $2,600.00 $1,700.00 $200,00 $5,000.00 $5,000.00 $5,000.00 $2,000.00 $48,000.00 $5,000.00 52,300.00 514,700.00 $13,125.00 52,000 00 $100.00 $257.500.00 $10.000,00 518,000.00 $12,000.00 $6,000.00 $400.00 $1,000.00 5397,485,00 5504,225 00 $397,485 00 $504,225.00 56,000.00 $765 00 $165 00 $13.00 $355.00 $5,300,00 52.000.00 342,400,00 $5,000.00 $2,300.00 548.00 380.00 $1,400,00 $16,800.00 $270.00 $6,100.00 $10,000.00 $12,600.00 51.200,00 $500 00 $900.00 I. 56,000,00 1 1 52,400.00 $1,530,00 I $770.00 $2.145,00 $170 00 $1,300,00 $6.60 $7.100.00 1 $530 00 05,00000 '1 55,000.00 $5,300,00 $2,000,00 $42,400 00 $5,000 00 52,300.00 $16,800 00 $14,000.00 51,400,00 516,800.00 $278,100.00 $12,200.00 $20,000.00 $12,600 00 31,200.00 $1,000.00 51.800 00 $523,545,00 $523,545 00 53,700.00 52,000,00 $34,940.00 55,000.00 $2.300.00 $51.00 $55.00 53,065.00 53.000.00 $348 40 54,790.00 $10,039.00 816.054 00 33,134,00 $1,069.00 5160.00 CONSTRUCTION COST 871.920.00 52,400.00 $1,540.00 $2,210.00 3660.00 $10.600,00 55,000.00 $3,700,00 52,000.00 $34,940.00 $5.000.00 $2,300.00 517,850.00 $9,625.00 $3,065.00 $3,000,00 $358,852.00 59.580,00 $20.078 00 $16,054.00 33,134,00 $2,178,00 5320 00 3586,006.00 5586,006,00 DONOVAN EXCAVATING 1fR. L. ALIA COMPANY UNIT PRICE COST $85.00 $7,700 00 $760.00 $170.00 $7.00 $525.00 $5,000.00 $2,200.00 $2,000.00 $34,000.00 $5,000,00 52,300.00 $44.00 $87.00 $4,900,00 $16,200.00 $278 00 511,100.00 $15,200 00 524,100.00 $7,400.00 $900.00 $770 00 $98,600 00 1l $70.00 $7,700,00 $1,520,00 52,210.00 $700.00 $10,500 00 55.000,00 $2.200.00 $2,000 00 $34,000.00 $5,000,00 52,300,00 $15,400 00 $15,225.00 $4,900.00 $16,200,00 5286,340,00 $22,200.00 1 $30,400.00 $24,10000 $7,400.00 $1,800.00 51,540.00 $597,235.00 5597,235.00 UNIT PRICE $7,000,00 $735,00 $160.00 $6.00 5500.00 55,000.00 $3,500.00 $2,000.00 $58,000,00 55,000 00 52,300.00 543,00 $80.00 52,900.00 510,000,00 $234 00 $12.500,00 $18,000,00 575,000.00 $3,000 00 $500.00 $700,00 08/20/2009 COST $81,200.00 $7,000,00 $1,470,00 $2,080,00 $600.00 1 510,000.00 I $5,000.00 53.500,00 $2.000 00 $58,000.00 $5,000.00 $2,300.00 515,050 50 510,500.00 $2.900 00 $10,000.00 $241,020.00 325.000,00 536,000 00 $75,000.00 $3,000 00 51.000,00 51 400.00 $599,020.00 $599,020.00 PROJECT: Gilliam Creek Basin Stormwater Overflow LINE ITEM: 412.02.594.38 PROJECT NO. 03 -DRO9 Provide storm drainage system to route Gilliam Creek basin outflow to the new Strander Boulevard storm drainage pump, when the flap gates are closed at the Gilliam Creek outlet. Reduces flooding at downstream properties by providing a method to drain the Gilliam Creek basin during high river events. DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: Decreases need for emergency pumping. COMMENT: Will reduce likelihood of roadway flooding at intersection of Andover Park East and Tukwila Parkway. FINANCIAL Through Estimated (in $000's) 2007 2008 2009 2010 2011 2012 2013 2014 BEYOND TOTAL EXPENSES Design 50 50 Land (RAN) 0 Const. Mgmt. 50 50 Construction 350 350 TOTAL EXPENSES 0 0 0 0 0 50 400 0 0 450 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 0 0 0 50 400 0 0 450 TOTAL SOURCES 0 0 0 0 0 50 400 0 0 450 Project Location CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2009 to 2014 J Monti Crook a N m 0 Q 2a 2009 2014 Capital Improvement Program 153 Existing Storm Drainage System ,0 Provide New I Overflow Pipe I StranderlBlvd W' Y tit a 0 Existing Storm Drainage System ro+I! Cnnsirsen Rd Puep'Slauon i TO: City of Tukwila INFORMATIONAL MEMORANDUM Mayor Haggerton Utilities Committee FROM: Public Works Director DATE: May 21, 2009 SUBJECT: 2009 Annual Small Drainage Program Project No. 09 -DR01 King County Interlocal Cooperation Agreement ISSUE Jim Haggerton, Mayor Authorize Mayor to sign an Interlocal Cooperation Agreement with King County for distribution of the King County Flood Control Zone District's Sub Regional Opportunity Fund. BACKGROUND The King County Flood Control Zone District (KCFCZD) was created in 2008 with the purpose of addressing major river flooding problems. In establishing the KCFCZD, the Board of Supervisors set aside 10% of the monies collected for a Subregional Opportunity Fund to address flooding at the local level. The KCFCZD Board of Supervisors has voted to allocate these funds proportionally to each jurisdiction from which funds were collected. The amount of funding available per year to Tukwila is estimated at $44,000. This is the first year of distributions of these funds so a total of approximately $87,823.00 is currently available for 2008 and 2009. The City may either let these funds build up for a future project or submit a current project that meets the required flood reduction criteria for reimbursement of all or a portion of these funds. Action Taken The Public Works staff reviewed the list of upcoming Capital Improvement Projects for 2009 and submitted a request to receive all available funding for the two culvert replacement projects on S 133rd S and S 131st St (Site 2) currently under construction as part of the 2009 Small Drainage Program. Flooding has been experienced in this area and the replacement of these culverts meets King County standards for flood reduction. King County has prepared an Interlocal Agreement for Tukwila to obtain reimbursement through this program. RECOMMENDATION The Council is being asked to approve an Interlocal Cooperation Agreement with King County Flood Control Zone District and consider this item at the September 14, 2009 Committee of the Whole meeting and the subsequent September 21, 2009 Regular meeting. Attachment Interlocal Cooperation Agreement W \PW Eng \PROJECTS\A- DR Projects \09 -DRO1 (2009 SDP) \Design \Info Memo Grant doc INTERLOCAL COOPERATION AGREEMENT BETWEEN THE KING COUNTY FLOOD CONTROL ZONE DISTRICT AND THE CITY OF TUKWILA FOR OPPORTUNITY FUND PROJECTS THIS INTERLOCAL COOPERATION AGREEMENT is entered into between the CITY OF TUKWILA, a municipal corporation of the State of Washington "City and the KING COUNTY FLOOD CONTROL ZONE DISTRICT, a quasi municipal corporation of the State of Washington "District "Parties" or when singular "Party and shall be effective upon execution by the Municipality and the District. Article I. Recitals. In April 2007, the King County Council, as authorized by chapter 86.15 RCW, created the District as a quasi municipal corporation. The King County Council members ex officio constitute the Board of Supervisors of the District, the governing body of the District. In Resolution FCZD 2008 -15.2, the Board of Supervisors approved the District's 2009 budget and annual work program, and allocated 10 percent of the District's annual property tax revenues for a sub regional opportunity fund to be used by King County municipalities The Board of Supervisors further determined that eligibility of projects for opportunity funds be based on consistency with chapter 86.15 RCW; provided that expenditures under RCW 86.15.035 and RCW 39.34.190 for salmonid habitat protection be linked to the construction of a flood or stormwater project. The Board of Supervisors also allocated the opportunity funds to a municipality based on that municipality's proportional contribution to the overall King County assessed valuation, as collected. In Resolution FCZD 2009 -01.1, the Board of Supervisors included the projects and activities described in Attachment A to this Agreement in an amendment to the District's annual budget and work program for the year 2009. The Board of Supervisors desires to have the City implement its approved opportunity fund projects and activities for the years 2008 and 2009, as well as the projects and activities that are approved for the City in subsequent District annual budgets and work programs. The City desires to implement such projects and activities, and to receive opportunity funds to finance in whole or in part such projects and activities. The City and the District are authorized to enter into this Agreement pursuant to Chapter 39.34 RCW (the Interlocal Cooperation Act), and agree as follows: Article II. Definitions. 2.1 Eligibility Criteria. The term "Eligibility Criteria" means one of the two following criteria that Projects shall meet to qualify for Opportunity Funds: 2.1.1. Under RCW 86.15.110, Opportunity Funds may be expended for either flood control improvements or stormwater control improvements that are extended, enlarged, acquired or constructed, provided that the City has developed a comprehensive plan of development for flood control or for stormwater control, respectively, and the improvement contributes to the objectives of the plan. For flood control improvements, such plan shall be submitted to and approved by the Department of Ecology. In addition, for newly constructed improvements, the City shall develop preliminary engineering studies and plans, and such plans and studies shall be filed with the District's engineer. For all projects, the City shall provide cost estimates and underlying data and shall describe the benefit provided by the improvement. -2- 2.1.2. Pursuant to the criteria in RCW 86.15.035 and RCW 39.34.190, as modified by Resolution FCZD 2008-15.2, District funds may be expended for cooperative watershed management actions, including watershed management partnerships and other intergovernmental agreements, for the purposes of water supply, water quality, and water resource and habitat protection and management, provided that Opportunity Funds expended for salmon habitat protection shall be linked to the construction of a flood or stormwater project, and provided further that all such funds shall be used for the implementation of watershed management plans, including but not limited to the following: The authority to use funds for implementation of these plans is broadly construed to include: a. Watershed plans developed under chapter 90.82 RCW; b. Salmon recovery plans developed under chapter 77.85 RCW; c. Watershed management elements of comprehensive land use plans developed under the growth management act, chapter 36.70A RCW; d. Watershed management elements of shoreline master programs developed under the shoreline management act, chapter 90.58 RCW; e. Nonpoint pollution action plans developed under the Puget Sound water quality management planning authorities of chapter 90.71 RCW and chapter 400 -12 WAC; f. Other comprehensive management plans addressing watershed health at a WRIA level or sub -WRIA basin drainage level; g. Coordinated water system plans under chapter 70.116 RCW and similar regional plans for water supply; and h. Any combination of the foregoing plans in an integrated watershed management plan. 1. Coordination and oversight of watershed management plan implementation, including funding a watershed management partnership for this purpose; 2. Technical support, monitoring, and data collection and analysis; 3. Design, development, construction, and operation of projects included in the plan; and 4. Conducting activities and programs included as elements in the plan. -3- 2.2 Project. The terra "Project" or "Projects" means specific projects or activities that meet the Eligibility Criteria of this Agreement, are approved by the Board of Supervisors in a resolution approving the annual budget and work program, or amendment thereto, and are described in an attachment to this Agreement that is approved pursuant to this Agreement. 2.3 Opportunity Funds. The term "Opportunity Funds" means the funds made available by the Board of Supervisors to the municipalities within King County for implementation of Projects. For each of the years 2008 and 2009, these funds represent 10 percent of property tax revenues collected for each of those years, and are available to individual municipalities based on the proportional amount that municipality's assessed valuation as collected (as determined by the King County Assessor's office) bears to the entire amount of assessed valuation in all of King County (as determined by the King County Assessor's office). For the years after 2009, this term means District funds that are designated as "Opportunity Funds" by the Board of Supervisors in either a resolution approving the District's annual budget and work program or a separate resolution. 2.4 Service Provider. The term "Service Provider" means the Water and Land Resources Division of the King County Department of Natural Resources and Parks. Article III. Duration of Agreement Survival of Agreement. This Agreement shall be effective upon execution by both Parties, and shall remain in effect until terminated by one or both of the Parties. Either Party may terminate this Agreement by providing written notice of termination to the other Party no less than sixty (60) days prior to the effective date of termination. This Agreement also may be terminated upon mutual agreement of the Parties expressed in writing. Sections 4.2, 5.2, 5.3, 5.4, 5.5, 6.3, 6.4 and 6.5 and Article VII shall survive any termination of this Agreement. Article IV. Conditions of Agreement. 4.1 Project Descriptions. The initial approved Projects are described in Attachment A, which is incorporated by reference. Subsequent approved Projects shall be described in new Attachments to this Agreement that are approved through the amendment process of Section 7.2.2, which Attachments shall be incorporated by reference into this Agreement. 4.2 Use of Funds. The City shall use Opportunity Funds distributed pursuant to this Agreement only for expenses related to the Projects. Article V. Responsibilities of City. 5.1 Project Application and Description. The City may submit an application for distribution of Opportunity Funds within a period of time designated by the Service Provider and on a form approved by the Service Provider. As part of the application to receive Opportunity Funds, the City shall submit to the Service Provider the following information for each proposed Project: 5.1.1. Name of proposed project or activity; 5.1.2. Description of the flooding, stormwater, or watershed management problem to be addressed (one to two paragraphs); 5.1.3. Description of how the proposed project or activity will address the problem (one to two paragraphs); 5.1.4. Type of project or activity (e.g., feasibility study, design, construction, acquisition, programmatic activities, etc.); -5- 5.1.5. Description of how the project or activity satisfies the "Eligibility Criteria," as defined in this Agreement; 5.1.6. Identification of the plan (flood control, stormwater control, or watershed management) that includes the Project; 5.1.7. Product /deliverable and, for constructed Projects, design plans or studies; and 5.1.8. Schedule, milestones, costs and budget for each Project, consistent with the requirements of this Agreement. The schedule for a Project shall provide for the expenditure of Opportunity Funds within two years after the commencement date of the Project. The City shall submit a request for distribution of Opportunity Funds after an actual expenditure is incurred for the Project, provided that the City may request distribution of up to 10 percent of Opportunity Funds for a Project upon approval of a Project by the Board of Supervisors. After approval of the Project by the Board of Supervisors, the application form, as approved by the Board of Supervisors, shall become an attachment to this Agreement through the amendment process in Section 7.2.2. 5.2 City Obligations for Projects. The City shall implement the Project as described and provided for in the approved attachment to this Agreement. Upon receipt, the City shall deposit Opportunity Funds in a separate account, which shall accrue interest at the rate earned by the City on its investments. To request a distribution of Opportunity Funds, the City shall submit to the Service Provider such information and proof of expenditure as requested by the Service Provider. 5.3. Projects Seeking Opportunity Funds Beyond Current Appropriation Year. The City may request distribution of Opportunity Funds beyond the appropriation year for the District's budget and annual work program, provided that District approval of such distribution of Opportunity Funds shall not be construed as nor constitute a District obligation or commitment to appropriate Opportunity Funds for the Project beyond the approved appropriation year. The District shall have no obligation to provide Opportunity Funds beyond the appropriation year for the District's budget and annual work program, provided that the District shall distribute to the City after such appropriation year any Opportunity Funds that were allocated to the City in such appropriation year and in previous years and that have not been distributed to the City. 5.4 Reporting. 5.4.1. Until the Project is completed or all Opportunity Funds for a Project have been spent, the City shall provide semi annually to the Service Provider brief written reports describing the progress on and status of the Project and any other relevant information that the Service Provider may request to determine compliance with this Agreement. 5.4.2. Upon completion of a Project, or upon expenditure of all of the Opportunity Funds for the Project, whichever occurs first, the City shall submit a final report to the Service Provider within 90 days of such completion or expenditure. The final report shall contain a summary of all Project expenditures, copies of invoices if requested by the Service Provider, a description of the Project status and accomplishments, and other relevant information requested by the Service Provider to verify compliance with this Agreement. The final report also shall contain a certification that all Opportunity Funds —7— provided to the City were expended solely on the Project in accordance with this Agreement and the Project approval. If a Project is not completed prior to termination of this Agreement, a report as described in this Section shall be provided to the Service Provider within 90 days of such termination. All records relating to a Project shall be retained by the City for a minimum of seven years, unless required by law to be retained for a longer period, in which case the longer period shall apply. 5.5 City obligations upon Project completion or termination. As consideration for receipt Opportunity Funds to implement the Project, the City agrees that: 5.5.1. If the Project involves developing a report or study, undertaking a study or collecting data, or producing written or electronic materials of any kind, copies of all such materials shall be provided upon request to the District or the Service Provider; and 5.5.2. If the Project involves the acquisition, extension, enlargement, or construction of a physical improvement, the City shall take ownership of, and shall be obligated to operate, maintain, and repair such improvement for the ordinary expected useful life of such improvement. 5.5.3 If the City terminates a Project, and the City has not expended all of the Opportunity Funds paid in advance pursuant to Section 6.3, the City shall return to the Service Provider the remaining Opportunity Funds within 60 days of the close of the calendar year in which the Project was terminated. Such returned Opportunity Funds shall be credited to the City's Opportunity Fund account, and may be used on future approved Projects, provided that if the Board of Supervisors has terminated the Opportunity Fund program at that time, the returned Opportunity Funds may be used by the District for District projects and activities. -8- Article VI. Responsibilities of District. 6.1 Upon timely submission of a Project application by the City, the Service Provider will review the application, provide reasonable and appropriate feedback, and consider including the Project as an element of the District's annual budget and work program. 6.2 If the Board of Supervisors approves the Project application by including the Project in the District's annual budget and work program, or an amendment thereto, the Service Provider shall attach a copy of the Project application as approved to this Agreement and it shall become a part hereof. 6.3 The District, through the Service Provider, shall distribute Opportunity Funds, up to the remaining amount of the City's total Opportunity Fund allocation, after City expenditure of funds for a Project as set forth in the approved schedule for the Project, provided that upon request of the City, the District shall pay up to 10 percent of the total Opportunity Funds allocated for a Project upon approval of an attachment to this Agreement. The Service Provider shall pay the Opportunity Funds after confirming that the expenditures have been made consistent with the Project approval and schedule. 6.4 The District assumes no obligation for future support of Projects meeting the Eligibility Criteria except as expressly set forth in this Agreement. 6.5 The District shall have no obligation to provide Opportunity Funds beyond the appropriation year for the District's budget and annual work program, provided that the District shall distribute to the City after such appropriation year any Opportunity Funds that were allocated to the City in such appropriation year and in previous years and that have not been distributed to the City. -9- Article VII. Other Provisions. 7.1 Hold Harmless and Indemnification. 7.1.1. The District assumes no responsibility for the direct payment of any compensation, fees, wages, benefits or taxes to or on behalf of the City, its employees, contractors or others by reason of this Agreement. The City shall protect, indemnify and save harmless the District, its officers, agents, employees and the Service Provider from any and all claims, cost and whatsoever occurring or resulting from (1) the City's failure to pay any compensation, fees, wages, benefits or taxes, and (2) the supplying to the City of works services, materials or supplies by City employees or agents or other contractors or suppliers in connection with or in support of performance of this Agreement. 7.1.2. The City further agrees that it is financially responsible for and will repay the District all indicated amounts following an audit exception, which occurs due to the negligent or intentional acts by the City, its officers, employees, agents or representatives. 7.1.3. The City shall protect, indemnify and save harmless the District from any and all costs, claims, judgments, or awards of damages, arising out of or in any way resulting from the negligent acts or omissions of the City, its officers, employees or agents in connection with the implementation of the terms of this Agreement and /or implementation of the Projects. For purpose of this Agreement only, the City agrees to waive the immunity granted it for industrial insurance claims pursuant to Washington Statute Chapter 51 to the extent necessary to extend its obligations under this paragraph to any claim, demand, or cause of action brought by or on behalf of any employee, including judgments, awards and costs arising therefrom including attorney's fees. -10- 7.2 Amendment. 7.2.1. This Agreement may be modified by written instrument approved by the City Council and the District Board of Supervisors and signed by the Parties. 7.2.2. This Agreement also may be modified by additional attachment for Projects subsequently approved by the Board of Supervisors. After approval of a Project in the District's annual budget and work program, or amendment thereto, the Project application as approved shall become an attachment to this Agreement and shall constitute an amendment to this Agreement without further action by either Party. 7.3 Contract Waiver. No waiver by either Party of any term or condition of this Agreement shall be deemed or construed to be a waiver of any other term or condition, nor shall a waiver of any breach be deemed to constitute a waiver of any subsequent breach whether of the same or different provision of this Agreement. No waiver shall be effective unless made in writing. 7.4 No Third Party Rights. Nothing in this Agreement shall be construed to create any rights in or duties to any third party, nor any liability to or standard of care with reference to any third party. 7.5. Entirety. This Agreement is the complete expression of the terms hereto and any oral representations or understandings not incorporated are excluded. This Agreement merges and supersedes all prior negotiations, representations and agreements between the parties relating to the projects and constitutes the entire agreement between the parties. The parties recognize that time is of the essence in the performance of the provisions of this Agreement. IN WITNESS WHEREOF, authorized representatives of the parties hereto have signed their names in the spaces put forth below: By Mayor (or City Manager or Executive) Date: Approved as to form: Municipal Attorney KING COUNTY FLOOD CONTROL ZONE DISTRICT Atotk Becutive Director Date: Julcn 2001 Acting under the authority of Resolution rCZrj 2005 --1 S.2_ KING COUNTY King County Water Land Resource Division FLOOD CONTROL D I S T R I C T River and Floodplain Management Sub Regional Opportunity Fund Project Application Application Due Date: December 8, 2008 Jurisdiction: City of Tukwila 1) Do you wish to forego the receipt of your Opportunity Fund allocation this year, allowing it to accrue for a future year? I 1 Yes No 2) Would you prefer to apply your Opportunity Funds toward an existing project on the District's 6 -year CIP? LI Yes No If Yes, please provide the name of the project: If you said Yes to either (1) or (2) above, you do not need to complete the remainder of this form. 3) Proposed project or activity name 2009 Small Drainage Project, S. 133rd and S. 131St Culvert Replacement and location: 4) Description of the flooding, stormwater, or linked watershed management problem that this project or activity will address (1500 character maximum): Southgate Creek overflows its banks 2 -3 times per year causing localized flooding of a business. Two downstream culverts are undersized preventing peak flows from passing through them resulting in the overtopping of the stream channel. 5) Description of how the proposed activity will address the problem outlined in number 2 (1500 character maximum): Two downstream culverts will be replaced with fish passable culverts that will carry additional flows to alleviate upstream flooding. 6) Type of Activity: I1 1 1 Feasibility Study Project Design E Project Property Acquisition Construction Programmatic identify: ATTACHMENT A Other identify: 7) Describe how the proposed project or activity satisfies the eligibility criteria for at least one of the three categories listed in Section III of the attached document (1500 character maximum): Item 2, Section III: The project is a stormwater control improvement, there has been a comprehensive plan prepared for the area, and this project is consistent with this plan. 8) Identify the management plan (i.e. flood control, stormwater control, or watershed management) within which implementation of the project or activity is an element or is recommended: City of Tukwila Comprehensive Surface Water Management Plan 9) Identify deliverables and any relevant design plans or studies (for construction projects): 2009 Small Drainage Program P,S,& E 10) Identify a timeline for this project from inception to completion. List any relevant milestones, and provide a rough estimate of project costs and budget: Project Design 1/2009 5/2009, Project Construction 7/2009 10/2009, Estimated contruction cost is $150,000. King County For Informational Purposes Only: We wish to inform the Flood Control District Board of Supervisors on how 1 Opportunity Funds leverage other resources, and we appreciate any information you are willing to provide in this regard. If you plan to partner with other jurisdictions to conduct a project or otherwise intend to use your Opportunity Fund allocation to leverage grant funds or other surface water management funds, please provide us with this information (1200 character limit): For Internal Use Only Project Eligible and Accepted Project Ineligible uth&ized: Signature Table 1: Opportunity Fund Allocation Jurisdiction Algona Auburn Beaux Arts Bellevue Black Diamond Bothell Burien Carnation Clyde Hill Covington Des Moines Duvall Enumclaw Federal Way Hunts Point Issaquah Kenmore Kent King County Kirkland Lake Forest Park Maple Valley Medina Mercer Island Milton Newcastle Normandy Park North Bend Pacific Redmond Renton Sammamish SeaTac Seattle Shoreline Skykomish Snoqualmie Tukwila Woodinville Yarrow Point Total Source: Percent of 2008 Est. Total County Opportunity Taxable Value Fund 2009 Est. Opportunity Fund 0.1528% 5,135 5,309 2.0363% I 68,433 70,753 0.0395% I 1,328 1,373 8.8558% 297,616 307,703 0.1891% 6,353 6,569 0.7930% 26,649 27,552 1.2187% 40,958 42,346 0.0666% 1 2,238 2,314 0.5326% 17,899 18,505 0.6065% 20,383 21,074 0.8536% 28,688 29,661 0.2609% 8,770 9,067 0.3286% 11,044 11,419 2.6621% 89,465 92,497 0.2543% 8,547 8,837 1.5577% 52,349 54,123 0.8850% 29,741 30,749 3.1048% 104,344 107,880 15.9487% 535,988 554,154 2.9329% 98,566 101,907 0.6957% 23,379 24,172 0.7257% 24,388 25,214 0.8853% 29,754 30,762 2.8452% 95,619 98,860 0.0264% 886 916 0.6401% 21,513 22,242 0.4290% 14,417 14,905 0.2277% 7,651 7,910 0.1469% 4,937 5,104 3.4622% 116,355 120,299 3.1429% 105,622 109,202 2.7701% 93,094 96,249 I 1.3038% 43,818 45,303 34.3826% 1,155,495 1,194,656 2.2660% 76,154 78,735 0.0073% 246 254 0.4788% 16,092 16,637 1.2848% 43,180 44,643 0.7454% 25,050 25,899 0.2546% 8,556 8,846 1.00 3,360,700 3,474,600 2008 Assessors Data, KC DNRP GIS 6 Combined 2008 2009 Opportunity Fund 10,444 139,186 2,700 605,318 12,922 54,201 83,303 4,551 36,404 41,458 58,349 17,836 22,463 181,962 17,385 106,473 60,490 212,224 1,090,142 200,473 47,551 49,602 60,516 194,479 1,803 43,755 29,322 15,561 10,040 236,654 214,824 189,343 89,120 2,350,151 154,890 500 32,729 87,823 50,949 17,403 6,835,300