Loading...
HomeMy WebLinkAboutOrd 0623 - 1970-1975 Comprehensive Urban Arterial Street Plan 3 6 iaoe CITY OF TUK WASHINGTON ORDINANCE NO. 623 AN ORDINANCE adopting a Six Year Comprehensive Urban Arterial Street Plan RECITALS: 1. This is a Six Year Comprehensive Urban Arterial Street Plan pursuant to the Laws of the State of Washington. 2. A public hearing was held on the proposed plan on Monday, June 15, 1970, at 8:00 P.M., in the Tukwila City Hall. THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Pursuant to R.C.W. 35.77 and the Public Hearing on June 15, 1970, the attachment marked Exhibit One and designated as the "Urban Area Six Year Construction Program" is hereby incorporated by reference and adopted and ordained as the Tukwila Six Year Comprehensive Urban Arterial Street Plan. Section 2. The City Clerk and Street Department are authorized and directed to file the plan with the appropriate State Officials as provided by law. PASSED BY THE CITY COUNCIL D PPROVED BY THE MAYOR this 15th day of June, 1970. ad6 MAYOR ATTEST: r L&-v: /l u:� -ti/ CITY CLERK APPROVED AS TO FORM i v CITY ATTORWE /fez A ,1.0.41 24-411" /4.u- /9 URBAN AREA SIX A/AR CONSTRUCTION PROC _AM CITY OR COUNTY HEARING DATE 4 4r/7.400 ADOPTION DATE A /S1fD RESOLUTION NO. `AS CITY OF TUKWILA REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN ARTERIAL 1971 1 1972 1 1973 COLLECTOR I TRUST 1974 1975 1976 FUNDS 1/1 7/1 1/1 7/1 1/1 7/1 to to to to to to 1. Local Name of Arterial Arterial No. Priority No. 6/30 12/31 6/30 12/31 6/30 1 2/31 Macadam Rd., 53rd Ave. S. 9003 1 5. P.E. 2. Detailed Location of Project and Termini Length in Miles 62 340 3 0, 0 0 0 32,340 Renton Three Tree Point Rd. to RAY !Interurban Ave (West Valley Hiwy) 1.35 3. Description of Proposed Work 143,625 70,000 73,625 Gr. ,Dr.,Surf.,Pave.,Swk.,I11.,Curb Const: widen driving surf to 44 feet I ESTIMATE OF TOTAL COST 1 631,125 100,0a1 531,125 4. P:ciim. Eng. Right of Way Construction Total Total 1 100,000 205,965 531,125 176,600 176,250 774,850 1,027,700 837,090 (Joint Project with Kir_q County Costs reflect total cost incl. King Co_ Po 1. Local Name of Arterial Arterial No. Priority No. 5. P.E. l y Detailed Location of Project and Termini Length in Miles R,7N 3. Description of Proposed Work Const. J Z ESTIMATE OF TOTAL COST I Total w 1 4. Prelim. Eng. Right of Way Construction Total U w O c 1 1. Local Name of Arterial Arterial No. Priority No. 5. P.E. w' 0 ce a. w Detailed Location of Project and Termini Length in Miles R Q rx 0 3. Description of Proposed Work Const. Z D J O ESTIMATE OF TOTAL COST Total w 4. PreI:m. Eng. Right of Way Construction Total H w N 11AR_7 °CV 7 /7n v CITY OR COUNTY URBAN AREA SIX AR CONSTRUCTION PRO *AM CITY OF TUKWILA HEARING DATE 6 As- /70 ADOPTION DATE G /S RESOLUTION NO.data REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN 1 ARTERIAL I 1971 1 1972 1 1973 SECONDARY TRUST 1974 1975 1976 FUNDS 1/1 7/1 1/1 7/1 1/1 7/1 t to to to to to 1. Local Name of Arterial Arterial No. Priority No. 6/30 12/31 6/30 12/31 6/30 1 2/31 Renton Three Tree Point Rd. 9005 1 5. P.E. 2. Detailed Location of Project and Tcrmini Lcngth in Miles 46,350 25,000 21,350 Interurban Ave. (West Valley Highway) RAY [to Connection with I -5 0.90 3. Description of Proposed Work 45,000 25,000 20,000 Gr., Dr.,Surf.,Pave.,Swk.,i11.,Sig., Const. widen driving surface to 60 feet i ESTIMATE OF TOTAL COST I 569, 430 1150, 000 419,430 4. Prelim. Eng. Right of Way Construction Total Total 1 51,500 50,000 632,700 734,200 660,780 50,000 [191,350 419,430 1 I. Local Name of Arterial Arterial No. Priority No. 5. P.E. 2. Detailed Location of Project and Tcrmini Length in Miles R'W Description of Proposed Work Const. J Z I ESTIMATE OF TOTAL COST I Total ,n Right of Way F— 4. Prelim. Eng. g Y Construction Total V w O ct a ,1 1 i I I r:15 I. Local Name of Arterial Arterial No. Priority No. 5. P.E. w 0 ce n_ ti 2. Detailed Location of Project and Termini Length in Miles Q Ce 0 tL 7 3. Description of Proposed Work Const. Z D J O ESTIMATE OF TOTAL COST Total v 4. Prelim. Eng. Right of Way Construction Total H w N D iIA R_7 DFV 1 /7n URBAN APPROVED SIX S EAR CONSTRUCTION PRC AIAM CITY OR COUNTY HEARING DATE 44/Ar 7a ADOPTION DATE 6// -/7r RESOLUTION NO.4 CITY OF TUKWILA REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN ARTERIAL 1971 1 1972 1 1973 1 COLLECTOR TRUST 1974 1975 197; r FUNDS 1/1 7/1 1/1 7/1 1/1 7/1 to to 'to to to to 1. Local Name of Arterial Arterial No. Priority No. 6/30 12/31 6/30 12/31 6/30 12/31 S. 144th St. Et. Al. 9001 8-1-116-(0A' P.E. ale oca o e a th in Miles S �i 4it L. of P om nd 5i i i Len Ave. S. to 58th g 78,930 Ave. S. 58th Ave. S. from S.S.H. 181 to R/W -S. 147th St Et Al to Rcnton Throe Trca 1.2 i 3. Description of Proposed Work Pt. Road. 96,020 I Gr. Dr., Surf.., Pave, I11. Sig. const: ESTIMATE OF TOTAL COST 614,750 4. Prelim. Eng. Right of Way Construction Total Total 64,000 85,000 650,700 899,700 789,700 70,000314,750 .1 i IL Local Name of Arterial Arterial No. Priority No. 5. P.E. 2. Detailed Location of Project and Termini Length in Miles R/W 3. Description of Proposed Work Const. i J 33 Z i ESTIMATE OF TOTAL COST I Total w 1- 4. Prelim. Eng. Right of Way Construction Total U W 0 tY 1 i 0 i _1. Local Name of Arterial Arterial No. Priority No. 5. P.E. W O Ce 12. Detailed Location of Project and Termini Length in Miles R/W Q IX 0 IL 13. Description of Proposed Work Const.. Z I O I ESTIMATE OF TOTAL COST I Total ,n 4. Prelim. Eng. Right of Way Construction Total H W ttAR.l PFV 1/7rt