Loading...
HomeMy WebLinkAboutOrd 0622 - 1971-1976 Comprehensive Arterial Street Plan z� rooe CITY of TUK WASHINGTON ORDINANCE NO 622 AN ORDINANCE adopting a Six Year Compre- hensive Arterial Street Plan RECITALS: 1. This is a Six Year Comprehensive Arterial Street Plan pursuant to the Laws of the State of Washington. 2. A public hearing was held on the proposed plan on Monday, June 15, 1970 at 8:00 P.M., in the Tukwila City Hall. THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Pursuant to R.C.W. 35.77 and the Public Hearing held on June 15, 1970, the attachment marked Exhibit One and designated as the "Six Year Construction Program 1971- 1976" is hereby incorporated by reference and adopted and ordained as the Tukwila Six Year Comprehensive Arterial Street Plan. Section 2. The City Clerk and Street Department are authorized and directed to file the plan with the appropriate State Officials as provided by law. PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR this 15th day of June, 1970. A Ail MAYOR ATTEST: CITY CLERK G APPROVED AS TO FORM: CITY ATTORNEY/ 3 i /f /7 /97. SIX YEAR CONSTRUCTION PROGRAM 1871 -1876 a ral� „oC HEARING DATE 6/15/70 ADOPTION DATE }d�SG�l.A.LI �N NO Calls (CITY) City of Tukwila ROAD F C U R ESTIMATE OF COST ITEM LOCAL NAME OR U L R U LENGTH OF STREET N A B R TYPE OF WORK IN NO ROAD OR STREET NO. C S A A MILES 1971 1972. 1973 1974 -76 TOTAL T' S N L 1. S. 144th St. et al 9001 C X Gr., Dr., Pave, Curb, Swk, 1.7 940,000 940,000 Illum (Approved UAB Project) 2. Interurban Ave. 9002 S X Illumination 1.8 76,000 76,000 3. S. 178th St, 9004 S X Illumination 0.3 6,000 6,000 4. Klickitat Drive 9006 A X Illumination 0.3 13,500 13,500 5. Renton -3 Tree Pt Rd 9005 S X Gr., Dr., Pave, Curb, Swk, 0.9 734,200 734,200 Ill., Sig. 6. macadam Rd 53d Av S9003 C X Gr., Dr., Pave, Curb, Swk, 1.4 3,027,600 1,027,600 (Renton 3 Tree Pt Rd I11., Sig. to Interurban Ave.) (Joint project with King Co- -costs reflect total cost incl King Co) 7. S.133rd St (42nd Ave. 9031 C X Gr., Dr., Pave, Curb, Swk, 0.1 50,000 50,000 S. to S. 132nd) I11. 8. S. 152nd Street (McAdam Rd to 57 Ave. S.) 9007 A X Gr., Dr., Pave, Curb, Swk, 0.2 162,000 162,000 Ill. 9. 56 Av S 56 P1 S 9011 C X Gr., Dr., Pave, Curb, Swk, 0.5 272,000 272,000 Ill. 10. James Christianson Rd (North Section) 9020 A X Gr., Dr., Pave, Curb, Swk, 0.8 450,000 450,000 I11. 11. S. 152nd St.(57th Ave 9007 A K 3r., Dr., Pave, Curb,Swk,I11. 0.3 235,000 235,000 3 to 62nd Ave. S) SA -1 REV. 1/7i. SIX YEAR CONSTRUCTION PROGRAM 1971 -1976 Or�I,t>rs�►oG 5ERTVF HEARING DATE 6/15/70 ADOPTION DATE 4/,5/70 ^'_'_`T`°"-N0. 4. (CITY) city of Tukwila ROAD F C U R ESTIMATE OF COST ITEM LOCAL NAME OR U L R U LENGTH N0. OF STREET N AB R TYPE OF WORK IN ROAD OR STREET N0. C 5 AA MILES 1971 1972. 1973 1974.76 TOTAL T S N L 4 12. James Christianson Rd 9020 A X Gr.,Dr.,Pave,Curb, Swk, Ill. 0.8 450,000 450,000 (South Section) 13. 57th Ave S (S 180th 9023 C X Gr.,Dr.,Pave,Curb, Swk, I11. 0.6 390,000 390,000 to So. City Limits) 14. Andover Park West 9022 C X Gr.,Dr.,Pave,Curb,Swk, I11. 1.0 514,000 514,000 15. Andover Park E 9021 S X Gr.,Dr.,Pave,Curb,Swk, ill. 1.0 275,000 275,000 16. S. 160 53d Ave S 9012 A X Gr.,Dr.,Pave,Curb,Swk, I11. 0.5 272,000 272,000 17. 62nd Ave. S. 9008 A X Gr.,Dr.,Pave,Curb,Swk,I11. 0.4 249,000 249,000 18. 56 Ave S S 147 St. 9014 A X Gr.,Dr.,Pave,Curb,Swk,I11. 0.5 189,000 189,000 19. 51st Ave. S. 9030 C X Gr.,Dr.,Pave,Curb,Swk, Ill. 0.6 378,000 378,000 (S 166th to S 160th Interstate 405 to S 151st) 1.,135, 000 683, 300 TOTAL $2,847,300 434,000 2,267,000 SA-1 REV. 1/70