HomeMy WebLinkAboutOrd 0622 - 1971-1976 Comprehensive Arterial Street Plan z�
rooe
CITY of TUK
WASHINGTON
ORDINANCE NO 622 AN ORDINANCE adopting a Six Year Compre-
hensive Arterial Street Plan
RECITALS:
1. This is a Six Year Comprehensive Arterial Street
Plan pursuant to the Laws of the State of Washington.
2. A public hearing was held on the proposed plan on
Monday, June 15, 1970 at 8:00 P.M., in the Tukwila City Hall.
THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO
ORDAIN AS FOLLOWS:
Section 1. Pursuant to R.C.W. 35.77 and the Public
Hearing held on June 15, 1970, the attachment marked Exhibit One
and designated as the "Six Year Construction Program 1971- 1976" is
hereby incorporated by reference and adopted and ordained as the
Tukwila Six Year Comprehensive Arterial Street Plan.
Section 2. The City Clerk and Street Department are
authorized and directed to file the plan with the appropriate State
Officials as provided by law.
PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR
this 15th day of June, 1970.
A Ail
MAYOR
ATTEST:
CITY CLERK G
APPROVED AS TO FORM:
CITY ATTORNEY/ 3
i /f
/7 /97.
SIX YEAR CONSTRUCTION PROGRAM
1871 -1876
a ral� „oC
HEARING DATE 6/15/70 ADOPTION DATE }d�SG�l.A.LI �N NO Calls (CITY) City of Tukwila
ROAD F C U R ESTIMATE OF COST
ITEM LOCAL NAME OR U L R U LENGTH
OF STREET N A B R TYPE OF WORK IN
NO ROAD OR STREET NO. C S A A MILES 1971 1972. 1973 1974 -76 TOTAL
T' S N L
1. S. 144th St. et al 9001 C X Gr., Dr., Pave, Curb, Swk, 1.7 940,000 940,000
Illum (Approved UAB Project)
2. Interurban Ave. 9002 S X Illumination 1.8 76,000 76,000
3. S. 178th St, 9004 S X Illumination 0.3 6,000 6,000
4. Klickitat Drive 9006 A X Illumination 0.3 13,500 13,500
5. Renton -3 Tree Pt Rd 9005 S X Gr., Dr., Pave, Curb, Swk, 0.9 734,200 734,200
Ill., Sig.
6. macadam Rd 53d Av S9003 C X Gr., Dr., Pave, Curb, Swk, 1.4 3,027,600 1,027,600
(Renton 3 Tree Pt Rd I11., Sig.
to Interurban Ave.)
(Joint project with
King Co- -costs reflect
total cost incl King Co)
7. S.133rd St (42nd Ave. 9031 C X Gr., Dr., Pave, Curb, Swk, 0.1 50,000 50,000
S. to S. 132nd) I11.
8. S. 152nd Street (McAdam
Rd to 57 Ave. S.) 9007 A X Gr., Dr., Pave, Curb, Swk, 0.2 162,000 162,000
Ill.
9. 56 Av S 56 P1 S 9011 C X Gr., Dr., Pave, Curb, Swk, 0.5 272,000 272,000
Ill.
10. James Christianson Rd
(North Section) 9020 A X Gr., Dr., Pave, Curb, Swk, 0.8 450,000 450,000
I11.
11. S. 152nd St.(57th Ave 9007 A K 3r., Dr., Pave, Curb,Swk,I11. 0.3 235,000 235,000
3 to 62nd Ave. S)
SA -1 REV. 1/7i.
SIX YEAR CONSTRUCTION PROGRAM
1971 -1976
Or�I,t>rs�►oG 5ERTVF
HEARING DATE 6/15/70 ADOPTION DATE 4/,5/70 ^'_'_`T`°"-N0. 4. (CITY) city of Tukwila
ROAD F C U R ESTIMATE OF COST
ITEM LOCAL NAME OR U L R U LENGTH
N0. OF STREET N AB R TYPE OF WORK IN
ROAD OR STREET N0. C 5 AA MILES 1971 1972. 1973 1974.76 TOTAL
T S N L
4
12. James Christianson Rd 9020 A X Gr.,Dr.,Pave,Curb, Swk, Ill. 0.8 450,000 450,000
(South Section)
13. 57th Ave S (S 180th 9023 C X Gr.,Dr.,Pave,Curb, Swk, I11. 0.6 390,000 390,000
to So. City Limits)
14. Andover Park West 9022 C X Gr.,Dr.,Pave,Curb,Swk, I11. 1.0 514,000 514,000
15. Andover Park E 9021 S X Gr.,Dr.,Pave,Curb,Swk, ill. 1.0 275,000 275,000
16. S. 160 53d Ave S 9012 A X Gr.,Dr.,Pave,Curb,Swk, I11. 0.5 272,000 272,000
17. 62nd Ave. S. 9008 A X Gr.,Dr.,Pave,Curb,Swk,I11. 0.4 249,000 249,000
18. 56 Ave S S 147 St. 9014 A X Gr.,Dr.,Pave,Curb,Swk,I11. 0.5 189,000 189,000
19. 51st Ave. S. 9030 C X Gr.,Dr.,Pave,Curb,Swk, Ill. 0.6 378,000 378,000
(S 166th to S 160th
Interstate 405 to S
151st)
1.,135, 000 683, 300
TOTAL $2,847,300 434,000 2,267,000
SA-1 REV. 1/70