HomeMy WebLinkAbout09-159 - Nordic Construction - Macadam Road Bridge Soffit RepairsCITY OF TUKWILA CONTRACT CHANGE ORDER NO. 3 DATE: January 11, 2010 BUDGET NO.: 91910402.3000.170 PROJECT NO.: 09 -RWO2 CONTRACT NO.: 09 -159 PROJECT NAME: Macadam Road Bridge Soffit Repairs TO: Jack Miller, Vice President, Nordic Construction, Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D.The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: Page 1 of 2 09- 159(c) Council Approval N/A During the project construction, the Contractor approached the City Project Staff, and suggested to apply epoxy anti corrosion bonding agent to the exposed rebar during this construction. City Project Staff believed that this is an excellent opportunity to reinforce the existing rebar at the fourteen spall repair locations; thus accepted this suggestion. Please see the enclosed Request For Information #3a for this corrosion prevention work approval details. The corrosion prevention coating work were performed under force account. Please see the force account sheet from the Contractor for the proposed change order cost calculation. The finalized change order cost is $808.00. of O6 /A/4 -(-S We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACCEPTED: Date By/ Previous Change Orders REV. CONTRACT AMOUNT 45,814.00 ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Contractor Nordic Construction, Inc. Title C inal Contract (without tax) 39,198.00 APPROVED BY THE CITY OF TUKWILA 5,808.00 Date This Change Order (without tax) 808.00 By Original Contract Time: 30 Calendar Days Additional Calendar Days for this Change Order: 0 Calendar Days Updated Contract Time: 30 Calendar Days Page 2 of 2 i& J/4r cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File fl T M NORE01C CONSTRUCTION General Mechanical REQUEST FOR INFORMATION Project: Macadam Road Bridge Soffit Repairs Macadam Road over South 133r St Tukwila Project No. 09 -RWO2 Contract No. 09 -159 TO: Peter Lau City of Tukwila Department of Public Works 6300 Southcenter Boulevard, Suite 212 Tukwila, WA 98188 FROM: Jack Miller, Nordic Construction, Inc. SUBJECT: Corrosion of rebar in soffit repairs REPLY: Date: December 10, 2009 Return By: ASAP RFI Number: 3a QUESTION: Since Field Directive 1 included the use of epoxy anti corrosion bonding agent for the rebar exposed under the west side of the bridge, we will have this material on the project for use. We suggest that its use be extended to the rebar on the east side of the bridge to reduce the potential for corrosion after the repairs are completed. This RFI #3a response supersedes RFI #3 response dated 11 -16 -2009. The following paragraph is corrected with the correct number of soffit spots. "As Peter Lau and Jack Miller discussed on the field, the Contractor is allowed to provide epoxy anti corrosion bonding agent to protect the exposed rebar on both east and west sides of the bridge. This additional work shall be performed under force account. In the referred field meeting, the Contractor described that to protect the rebar at each soffit spot, about 0.25 hour of a 2 -labor crew is required. A total of 14 soffit spots will be addressed, in which 2 of the 14 soffit spots were uncovered after the bid opening. The material cost of the epoxy anti corrosion bonding agent could be around $150.00." BY: 106 55 Ave. E., Tacoma, WA 98424 Contractor's License No. NORDICI11 OLZ (z Ho— 0 f DATE Office Phone: (253) 922 -3100 Fax: (253) 922 -4594 An Equal Opportunity Employer RFI ft3a response Contractor's inquiry on preventing rebar corrosion, 12 -10 -09 12/10/2009 Contract Title: Macadam Road Bridge Soffit Repairs Owner: City of Tukwila CuAprnosmnprnventmn Prime Contractor 1 Direct Materials 2 Markup on materials 3 Direct Labor 4 Labor Markup 5 Rental Equipment 6 Sales Tax on Rental Equipment 7 Equipment Ownership Operating 8 SUBTOTAL (Add lines 1 7) 9 Markup on equipment rental 10 SUBTOTAL (Add lines 8 9) Prime Remarks: Sub-Contractor 11 Direct Materials 12 Markup on materials 13 Direct Labor 14 Labor Markup 15 Rental Equipment 16 Sales Tax on Rental Equipment 17 Equipment Ownership Operating 18 SUBTOTAL (Add lines 11 -17) 19 Field Overhead 20 SUBTOTAL (Add lines 18 19) 21 Home Office Overhead 22 Profit 23 SUBTOTAL (Add lines 20 22) Subs Remarks: 24 Prime Contractor's Wor (line 10) 25 Sub Contractors Work (tine 23) 26 SUBTOTAL (add lines 24 25) 27 Prime Overhead on Subcontractor 28 Prime's Home Office Overhead 29 Prime's Profit 30 SUBTOTAL (add lines 26 29) 31 Prime Contractors Bond Premium 32 TOTAL COST (Add lines 30 31) Estimated Time Extension arid Juxufica8on Prime Contractor Name: Subcontractor Name Signature Title of Preparer 1/11/2010 coating of rebar in soffit repair Proposal No, 3 PRME CONTRACTOR'S WORK �U 21.00f6 of line 1 1 21.00961 $0 $465 2Q.8O°/0of line 3 I 29.O0961 $135 9.50% of line 5 9.50%1 $774 21.DOY6of lines 5+) 21961 $35 1 $808 SUB CONTRACTORS WORK 21.0096 pf line 11 31.0096 2Q.O096of line 13 29.0O96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 096 nf line 18 O.00%| $0.00 0Y6 of line 2D 0Y61 $0.00 O96of line 2O 0Y61 $0.00 Date 1/7/2010 $0.00 SUMMARY $808 1O.0O96of line 25 10.00961 $0 U.0096of line 24 0.00%1 $0 096 of line 2G I 0961 $0 $808 D.DO96of line 3O 1 8.00Y61 $O $808 Nordic Construction Sub-Contractor Project Manager Date: Revisions/Comments 1/7/2010 CO 3 Corrosion treatment ri xis Contract Title: Macadam Road Bridge Soffit Repairs 1/7/2010 0 CO/ Corrosion prevention coating of rebar in soffit repair 3 Items of Work for Qty Unit 1 MATERIAL 1 LABOR 1 Equipment Prime Contractor 1 Unit 1 Total 1 Hours 1 Hr 1 Total 1 Days Rate Total Add Corr Bond Corrosion Epoxy ag4nt to reinforcing steel in 14 repair locations Foreman 14 ea 0.25 $51.20 Laborer 14 ea 0.25 $46.61 40' Boom Manlift 1 ea Flagger Supervisor 1 ea 1.5 $42.31 Flagger 1 ea 1.5 $39.62 Shop truck 1 ea Supervision 0% of labor Safety 0% of labor DIRECT Prime Contractor's TOTALS See attached summary $0 $0 DIRECT Sub Contractor's TOTALS 1 $0 1 1 Page 1 $179 $163 $63 $59 $0.00 1 $85.90 $86 R 1 $80.00 $80 1 $465 I R Total Rental $80 1 0 Total Owned $86 Items of Work for Qty Unit MATERIAL 1 LABOR 1 1 Equipment 1 Sub- Contractor Unit 1 Total 1 Unit 1 1 Total 1 1 Days Rate Total 1 $0 1 R Total Rental $0.00 1 1 0 Total Owned $0.00 1 DATE: January 11, 2010 BUDGET NO.: 91910402.3000.170 PROJECT NO.: 09 -RWO2 CONTRACT NO.: 09 -159 C b) PROJECT NAME: Macadam Road Bridge Soffit Repairs TO: Jack Miller, Vice President, Nordic Construction, Inc. CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 2 You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D.The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: Page 1 of 2 09- 159(b) Council Approval N/A Between the project bid opening and the construction start, two additional spalls at the Macadam Road Bridge were uncovered by the Contractor. As a result, the City directed the Contractor to repair these two spalls as well, on top of the specified twelve spalls. The added spall repairs were performed under force account. Please see the enclosed Memorandum and force account sheet from the Contractor for the proposed change order details. The finalized change order cost is $2,195.00. 5/e, �'�l //t/!+ LS We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACCT TED: Date 11 L ei Contractor Nordic Construction, Inc. Title Pjrii4- al Contract (without tax) Previous Change Order This Change Order (without tax) 39,198.00 3,613.00 2,195.00 REV. CONTRACT AMOUNT 45,006.00 Original Contract Time: Additional Calendar Days for this Change Order: Updated Contract Time: ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Page 2 of 2 APPROVED BY THE CITY OF TUKWILA f Date By 1 4V 30 Calendar Days 0 Calendar Days 30 Calendar Days 1.7, 70 cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File FROM NORDIC CONSTRUCTION (FRI)JAN 8 2010 14: 38/ST.14: 34/No.7383423887 P 2 M NORDIC CONSTRUCTION General Mechanical Memorandum DATE: January 8, 2010 TO: Peter Lau, Tukwila Public Works FROM: Jack Miller, Nordic Construction, Inc. Project: Macadam Bridge Repair RE: Faxing Change Order files lost in email Hi Peter: Here is what I wrote this morning in my email to you: Hi Peter I don't know what happened. I have all three in my "sent" file from yesterday afternoon, but here they are. Possibly another dcmonstration of how unreliable email is. 1 will be working on Saturday, so please don't hesitate to call me with any issues. T will be available to come to your office to sign CO's or discuss problems or whatever needs to be done, either Saturday or Monday. Thank you, And here is the explanation I attached to the Change calcs for the extra two delamination sites. Hello Peter Here are calculations for extra work to repair two spalls not shown on the plans, but disclosed by manual sounding of the soffit surface. The times were arrived at by taking the total hours working on demo and repair of spalls, 126 hours, and multiplying by .857, which is 12/14 (contract count divided by count actually done). This gives the hours to contract work, 108, leaving 18 hours to the two extra spalls. I figured that one was over the road, requiring flaggcrs, and one was not. 106 55 Ave. E., Tacoma, WA 98424 Contractor's License No. NORDTCT 11 OLZ Office Phone: (253) 922-3100 Fax: (253) 922-4594 An Equal Opportunity Employer 11x xummory.doc 1!8!2010 Contract Title: Macadam Road Bridge Soffit Repairs Owner; City of Tukwila Repair two extra delamination sites, Prime Contractor 1 Direct Materials 2 Markup on materials 3 Direct Labor 4 Labor Markup 5 Rental Equipment 6 Sales Tax on Rental Equipment 7 Equipment Ownership Operating 8 SUBTOTAL (Add lines 1 7) 9 markup on equipment rent 10 SUBTOTAL (Add lines 8 9) Prime Remarks: Sub Contractor 11 Direct Materials 12 Markup on materials 13 Direct Labor 14 Labor Markup 15 Rental Equipment 16 Sales Tax on Rental Equipment 17 Equipment Ownership Operating 18 SUBTOTAL (Add lines 11 -17) 19 Field Overhead 20 SUBTOTAL (Add lines 18 19) 21 Home Office Overhead 22 Profit 23 SUBTOTAL (Add lines 20 22) Subs Remarks: 24 Prime Contractor's Work (line 10) 25 Sub Contractor's Work (line 23) 26 SUBTOTAL (add lines 24 25) 27 Prime Overhead on Subcontractor 28 Prime's Home Office Overhead 29 Prime's Profit 30 SUBTOTAL (add lines 26 29) 31 Prime Contractor's Bond Premium 32 TOTAL CAST (Add lines 30 31) Estimated Time Extension and Justification Prime Contractor Name: Subcontractor Name Signature Title of Preparer 1/11/2010 not shown on plans Proposal No. 2 PRIME CONTRACTOR'S WORK $128 1 21.00 %I $27 ><<`I $1,340 29.00% of line 3 29.00 %1 $389 9.50% of line 5 1 9.50 %I $8 $172 $2,143 21.00% of line 8 21 %1 $53 1 1 $2,195 21.00% of line 1 SUB CONTRACTOR'S WORK $0.00 21.00% of line 11 21.00%1 $0.00 $0.00 29.00% of line 13 29.00 %1 $0.00 0.00 8.10% of line 15 8.10 %1 $0.00 >'?!I $0.00 0% of line 18 0.00 %1 $0.00 0% of line 20 0% of line 20 SUMMARY Nordic Construction Sub Contractor Project Manager 0 %1 $0.00 0 %1 $0.00 Date 1/7/2010 Date: is $2,195 $2,195 10.00 %I 0.00 %I 10.00% of line 25 0.00% of line 24 0% of line 26 1 0 %1 $0 I?;«`'i` $2,195 1 0.00% of line 30 1 0.00 %I $0 $2,195 1 Revisions /Comments 1/7/2010 CO 2, 2 extra locations r1.xls Contract Title: Macadam Road Bridge Soffit Repairs 117/2010 0 Repair two extra delamination sites, not shown on plans 2 Items of Work for Qty Unit 1 MATERIAL I LABOR Equipment Prime Contractor I Unit Total I Hours I Hr I Total Days Rate Total Repair two locations where delamination was riot apparent, not included in plan sheet Remove damage, prep for repair Foreman 1 ea 5 $51.20 Laborer 1 ea 5 $46.61 40' Boom Manlift 1 ea Flagger Supervisor 1 ea 2.5 $42.31 Flagger 1 ea 2.5 $39.62 Pack two locations with repair mate ial, install in lifts, finish surfac°. Foreman 1 ea Laborer 1 ea Gel patch 3 ea $42.50 $128 40' Boom Manlift 1 ea Flagger Supervisor 1 ea Flagger 1 ea Items of Work for Sub Contractor Shop truck 1 ea Supervision 0% of labor Safety of labor See attached summary $0 DIRECT Sub Contractor's TOTALS 1 $0 I 4.5. 4.5 3 2 $51.20 $46.61 $42.31 $39.62 $256 $233 $106 $99 $230 $210 $127 $79 $0.00 1 $85.90 $86 1 $85.90 $86 R 1 $80.00 $80 DIRECT Prime Contractor's TOTALS I $128 1 $1,340 R Total Rental $80 0 Total Owned $172 Qty Unit MATERIAL 1 LABOR 1 I Equipment Unit 1 Total I Unit I I Total I I Days Rate Total $0 I R Total Rental $0.00 1 0 Total Owned $0.00 09- 159(a) Council Approval N/A CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 1 DATE: January 11, 2010 BUDGET NO.: 91910402.3000.170 PROJECT NO.: 09 -RWO2 CONTRACT NO.: 09 -159 CGS PROJECT NAME: Macadam Road Bridge Soffit Repairs TO: Jack Miller, Vice President, Nordic Construction, Inc. You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C.AII claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D.The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: As the Contractor started to work on the spall repairs at the Macadam Bridge Road, utility conduits and metal pipes were successively uncovered from the spall areas. As a result, the soffit repair approach was changed twice to accommodate these field discoveries. Please see the enclosed Field Directives #1 and #2 for the repair approach change details. The effects of these repair approach changes were mainly the drastic reduction of repair materials, and the increase of labor hours to complete this project. Per the Project Bid Item #4 "Bridge Deck Repair the repair work is measured by the cubic foot of pre packaged concrete material placed in the repaired bridge deck. With the reduction in repair material consumption and based on how this Bid Item was structured, the Contractor was compensated considerably below the repair cost that the Contractor actually incurred. Thus, it is contractually appropriate to compensate the Contractor for the additional labor hours needed and material cost difference for the repair approach changes. Please see the enclosed Memorandum and force account sheet from the Contractor for the proposed change order details. The finalized change order cost is $3,613.00. Page 1 of 2 �s��� C G //,,74—e—,s7 We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ��JJ� ACV PTED: Date ka G L (l�G V Contractor Nordic Construction. Inc. "fin AZert'4"--Title f c E r 11�t ia° final Contract (without tax) 39,198.00 APPROVED BY THE CITY OF TUKWILA Previous Change Order 0.00 Date 1 F J r 0 I 0 'OA This Change Order (without tax) 3.613.00 By May REV. CONTRACT AMOUNT 42,811.00 Original Contract Time: Additional Calendar Days for this Change Order: Updated Contract Time: ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) Page 2 of 2 30 Calendar Days 0 Calendar Days 30 Calendar Days cc: Finance Department (w /encumbrance) Project Management File PW Project Finance File To: Nordic Construction, Inc. 106 55 Avenue East Tacoma, WA 98424 Attn: Jack Miller CITY OF TUKWILA PUBLIC WORKS DEPARTMENT 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: (206) 433 -0179 FIELD DIRECTIVE 1 Page 1 of 2 Date: November 15, 2009 Work to be performed: As previously sent to you through an email on October 20, 2009, please completely replace the Project Plans with this enclosed updated Project Plans dated October 16, 2009. Reason for modification: Utility conduits were identified in the As- constructed Plans of the bridge. As a result, the soffit repair approach needs to be changed. Work under this Field Directive modification will be accomplished: Project Name: Macadam Road Bridge Soffit Repairs Project No.: 09 RWO2 Contract No.: 09 -159 n With no change to the contract price. For a lump sum increase /decrease of /i-�T 1). to the contract price. U On a unit price basis with a maximum allowable increase /decrease of With work to start immediately and determination of any change to the contract price and /or completion date to be negotiated. Negotiations to be completed by To be finalized ,(within 14 calendar days or a reasonable time as determined by the Engineer). With no change in contract completion date. With no contract completion date extended /decreased calendar days. Performance of this Field Directive is authorized by afl signatures betow: Accepted by: Approved by: Verifiedbvl City C�nstruction Engineer City C nstmuion Inspector Date Page zmz y Date —7 Date L��� Dote m /onas Sidewalk and bridge all Reinforcement Location we vary depending on spal7 /dc/am location Seal pint at each curb, full length of bridge w/ epoxy kjected into jalnt Make as large a hole as possible without damaging reinforcing so that R7I concrete can be Nbrated--„,,, Saa/e..3 /4'= 1-0' BY I Revision sr. 1 oRr..,at mak, or todl aide d,o 00000nn Typical Span J Remove loose material at delaminafed locations #1' 0 existing grouted hole Step 1: Seal Curb Construction Joint /i1 St Sidewalk and bridge rod Onlf out grou ed hole through slob and sidewalk Avoid damaging rebar during drilling operation Step 2: Drill Out Grouted Hole /i Scala•3 /4'= /-0' St Sidewalk and bridge rail Step 3: Core Concentric Hole Scale :3 /4'= f =0' Sco %:3/4'= I' -0' CUNT REFERENCE 1 1 2 16,,Ity Sidewalk Remove spalkng concrete In conical shape Exposed periphery of renforcement near cored hole. Expose at least (2) bars so concrete con be bonded to bars. Bridge Deck Bridge Plan View Scale:1 /4'= 1' -0' Sidewalk and bridge roil E Macadam Bridge Soffit Repairs Indicates delam/nated location, Op. Step 4: Prepare Spoiled Surface o indicates spoiled location, Tjp. Typ. at all spoil /delam locations at west sidewalk Typ, at all spall /delant locations at east sidewalk Place and consolidate bridge deck repair material Sidewalk end bridge rail Instal adequate formwork on soffit 1 Step 5: Place Repair Material Scale :3 /4' 1' -0' Tukwila Bridge Repairs City of Tukwila Tukwila, WA Macadam Bridge Repairs S1 1 71 I DESIGN"TEAM 11' SHEET DESIGNED 8 0 1 S.C.Otson cNEQIED BY: 1M..I.smith 11 S1 119.1. DRAFTER I S.C.otson 1 On 1 I 1 2 1 1 1 MEM 1 1 (1 Sri REF NO. (ISSUED: 1 4/24/2009 A09115.00 Sidewalk and bridge to Reeorceme't Location n location depending on sp old Seal joint of bri w epoxy length injected into joe w W o Typicd Spoil loose mat s Remove t at Ste 1: Seat Curb Gonstrtaction 3°1111 Sack 3/ Sidewalk and bridge ror 1 Insert perforated 2' tong in PYD pipe hole lace and Secure PVC Materials Step 4. P Scale: 3/4' F-0" Dean and xs xpoSEd reinforce me ted hole Sidewdk and bridge f Avoid dcmaGlnq d grouted hole Dal H as i b soffit ell Nole 1• fir PI H Repada Mortar� or Set DOT approved eea Mortar, equal Std Place Re air ere Scde:3f4' 7 Macadam ep Sidewalk and bridge rai Remove spoilin e bars bars Exposed da. Expose at least (2t) b near concrete can be bond ed Pre 1-o Step 3 Scale. ailed Surf ace Tukwila Bridge Repairs City of juiolle Tukwila, WA ldaead f 1 I Y -2 Qi 1908 To: Nordic Construction, Inc. 106 55 Avenue East Tacoma, WA 98424 Attn: Jack Miller CITY OF TUKWILA PUBLIC WORKS DEPARTMENT 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: (206) 433 -0179 FIELD DIRECTIVE 2 Work to be performed: As previously provided to you by our Design Engineer on the field, please completely replace the current Project Plans with this enclosed updated Project Plans dated November 2, 2009. Reason for modification: Metal pipes were discovered in the spall areas during construction. As a result, the soffit repair approach needs to be changed. Work under this Field Directive modification will be accomplished: With no change to the contract price. For a lump sum increase /decrease of On a unit price basis with a maximum allowable increase /decrease of With work to start immediately and determination of any change to the contract price and /or completion date to be negotiated. Negotiations to be completed by To be finalized (w 14 calendar days or a reasonable time as determined by the Engineer). With no change in contract completion date. With no contract completion date extended /decreased calendar days. Page 1 of 2 Date: November 15, 2009 Project Name: Macadam Road Bridge Soffit Repairs Project No.: 09 -RWO2 Contract No.: 09 -159 to the contract price. Performance of this Field Directive is authorized by all signatures below: Accepted by: Approved by: Verified by: Title Date e 4...„-. 7 City Constru6Ki Engineer Date Contractor's Rep Name City Construction Inspector Date Page 2 of 2 —2(7/o E Rev.l Date By 1 1 10/2009 1 9^.0 Z 1 11/2009 S00 o f l F- I I S and bridge rod Re/Mcrcement Location wp1 vary dependng on spa6 /delam location Seo /,b/nt at each curb, Poll length of bridge w/ epoxy injected into pint scare /4'= 1' -0' bloke a 6'0 hole about about 2' into bodge deck without damaging x0//1/0 clog Seal sidewalk /deck construction joint around the circumference w/ epoxy in into pint Avoid damaging rebar during operation Remove spelling concrete In conical shape Exposed periphery of reinforcement near cored hole. Expose at leas( (2) bars so concrete con be bonded to bars Revision I(09,,1 repo?, p• M ion Ye0ifiee moon. in account 1, e1e0 eineee Sidewalk and bridge rail Typical Spell d•1' 0 existing Remove loose material nl grouted hole w/ at delaminated lacabbns stee sleeve Step 1: Seal Curb Construction Joint Scale:) /4'= 1 -0' -7 I 1 Dn1l out grou ed hole through slob and sidewalk Avoid damaging rebar during dolling operation Step 2: Drill Out Grouted Hole Z Sidewalk and badge rail S1 1. 1 0 Step 3: Prepare Surfaces For Repairs 0 Scale1J /4'= 1=0' s1,/ CLIENT REFERENCE: I Sidewalk Bridge Deck Bridge Plan View Scale: 1/4'= 1' -0' Sidewalk and bridge rail Place and consolidate bridge deck repair material ep Plug hole to retain I repair material above 0 0 Step 4: Place Deck Repair Material Scale:J/4'= 1' -0' \SI) Macadam Bridge Soffit Repairs Indicates delaminoted location, ryp. Indicates spoiled 10,10/1 n, Typ.1 at all spell /delam locations of west sidewalk Tip. at all spall /delam locations at east sidewalk 0 0 C Sidewalk and bridge roll I r —7 I Place Rapid Set DOT Repair Mortar BASF Gel P01011, or approved equal Tukwila Bridge Repairs City of Tukwila Tukwila, WA f '^ti Macadam Bridge Repairs St Step 5: Place Soffit Repair Material X51 Scale:3/4'= 1' -0' \S DESIGN TEAM DESIGNED SY: S.COlson ICNECKED DT: M.J.Smlth 1 79 DRAFTIER S.C.Olson 4/24/2009 .1 1 SHEET S1 CF 2 S4E:12 I SE REF N0. A09115.00 Sidewalk and bridge naB Reinforcement innaii /dt w elan location dep Seal l of bridg w epoxy ksjected into joint typical Spoll 1 Remove loose t s at delaninated Ste i Seri Curb C 0 Joint S'.. Se a .,sae raH N App l y sealant to d e sec n c e of coupler to concrete and coupler New Shoat genskn see ov Dole vs 000 oMinei to cocas bf de Goon and epoxy coat exposed i 2.x1" reducing c oupler xi "P PVC pi inset ui th of 1 centric with required I atal can dolled—out hole y Core euf d steel to sleeve insert coupler to n Sim Secure PAC µat eriais p cote and Scde: Sidewalk and bridge raa 0.:1 t 01- Avoid dol :n M c d} Brridge Repairs spoiling concrete Remove in c onical shape Exposed periphery of near corgi e• Expose at bonded o bars. so concrete can ban r, oiled A rface Pre are Ste 3: Sca opr 1-0" Repairs Tukwila Bridge City of Tukwila Tukwila, WA Maca Bridge 1 G.alson 2 0100 xo. Ogl FROM NORDIC CONSTRUCTION NORDIC CONSTRUCTION General Mechanical DATE: January 7, 2010 TO: Peter Lau, Tukwila Public Works FROM: Jack Miller, Nordic Construction, Inc. Project: Macadam Bridge Repair RE: change No &uantity of Bid Itemp 4. Bridge Deck ltepair Bid hem 4 was for refilling of demolished concrete necessary to replace all unsound concrete in twelve places on the soffit and the bridge deck. The work was primarily labor for forming and placing repair mortar, and flagging for traffic control both on the bridge and under it, as necessary. As the work developed and the physical condition of the bridge was exposed by the demolition work, the scope and design were adjusted accordingly, with the final plan being represented by Modification 2. Instead of pouring repair mortar down through the demolished hole through the bridge deck, the spalls were refilled from below with a revised repair material. The material was applied in 2" lifts rather than being installed in one placement. On the west side of the bridge, all repairs were completed by installing a drain pipe fitted to a plastic bell reducer which was ground to fit onsite to accommodate interferences from reinforcing steel which had to remain undisturbed. The effect of these changes was to drastically reduce the volume of repair material consumed, while increasing the labor required and the unit cost of the repair material. Since the work was done under a unit priced bid item, the amount paid was reduced to 36% of the original total as bid, while the labor increased to135% of the original estimate. The cost of the demolition was 108% of the estimated amount, as losses due to inefficiency (caused by as -found conditions) were balanced by reduced volume of excavated concrete. While discussing the cost impact of the changes discussed above, Nordic Construction, Inc. agroed to perform the changed work, including changes to the sealing of the joint at the bridge deck sidewalk interface, for the original contract amounts, without being able to estimate at the time what effect the changes would have on the items measured by quantity. Please find attached calculations demonstrating the extra cost associated with this change. According to our agreement in the field, we propose to bill Bid Item 4 at the original estimated amount of 5,640.00. 106 S5 Ave. E., Tacoma, WA 98424 Connector's License No. NORDICI1 1012 (FRI)JAN 8 2010 14: 38/ST.14: 34/No.7383423887 P 7 Memorandum Office Phone: (253) 922 -3100 Fax: (253) 922-4594 An Equal Opportunity Employer CO 3 lhv 4 roper Quw.doe 1/7/1010 Contract Title: Macadam Road Bridge Soffit Repairs Owner: City of Tukwila Adjustment for Bid Item 4 Under -run of quantity Proposal No. 1 Prime Contractor PRIME CONTRACTOR'S WORK 1 Direct Materials >`?:I $334 2 Markup on materials 21.00% of line 1 21,00 %I $70 3 Direct Labor $2,172 4 Labor Markup 29.00% of line 3 29.00 %I $630 $180 9.50 %I $17 $172 $3,575 21.00% of line 8 1 21 :..$38 1 1 $3,613 5 Rental Equipment 6 Sales Tax on Rental Equipment 7 Equipment Ownership Operating 8 SUBTOTAL (Add lines 1 7) 9 Rental Eq markup 10 SUBTOTAL (Add lines 8 9) Prime Remarks: Sub Contractor 11 Direct Materials 12 Markup on materials 13 Direct Labor 14 Labor Markup 15 Rental Equipment 16 Sales Tax on Rental Equipment 17 Equipment Ownership Operating 18 SUBTOTAL Add lines 11 -17 -17) 19 Field Overhead 20 SUBTOTAL (Add lines 18 19) 21 Home Office Overhead 22 Profit 23 SUBTOTAL (Add lines 20 22) Subs Remarks: 24 Prime Contractor's Work (line 10) 25 Sub Contractor's Work (line 23) 26 SUBTOTAL (add lines 24 25) 27 Prime Overhead on Subcontractor 28 Prime's Horne Office Overhead 29 Prime's Profit 30 SUBTOTAL (add lines 26 29) 31 Prime Contractor's Bond Premium 32 TOTAL COST (Add lines 30 31) Estimated Time Extension and Justification Prime Contractor Name: Subcontractor Name Signature Title of Preparer 1/11/2010 9.50% of line 5 0% of line 20 0% of line 20 Project Manager SUMMARY Nordic Construction Sub- Contractor SUB CONTRACTOR'S WORK 21.00% of line 11 21.00% 29.00% of line 13 1 29.00 /o 8.10% of line 15 1 8.10% 0% of line 18 0.00% Date 1/7/2010 $0.00 $0.00 $0.00 $0.00 0.00 $0,00 $0.00 $0.00 0 %1 $0.00 0%1 $0.00 1 $3,613 I' 13 0.00% of line 25 0.00% $0 0.00% of line 24 0.00 %1 $0 I;< 0% of line 26 0 %I $0 $3,613 0.00% of line 30 0.00 %1 1=is >ii' 3, 6 13 1 Date: Revisions /Comments 1/7/2010 co 1, bi 4 wens rl.xls Contract Title: Macadam Road Bridge Soffit Repairs 1/7/2010 0 Adjustment for Bid Item 4 Under -run of quantity 1 Items of Work for Qty Unit MATERIAL LABOR I f Equipment Prime Contractor Unit 1 Total Hours 1 Hr Total j 1 Days Rate Total l Additional hours due to changes in soffit replacement design caused by site conditions not as sl See Modification 2 for description o the revisions. Foreman 1 ea Laborer 1 ea Flagger Supervisor 1 ea Flagger 1 ea 40' boom manlift 1 ea Runner (additional materials) 1 ea Shop truck 1 ea Supervision 0% of labor Safety of labor DIRECT Prime Contractor's TOTALS Items of Work for Sub Contractor Materials used Gel patch 20 ea $42.50 Repair mortar -24 ea $19.50 Mortar extender -24 ea $2.00 See attached summary $850 ($468) ($48) $0 1 $334 DIRECT Sub Contractor's TOTALS $0 I 13 13 10 10 5 4 $51.20 $46.61 $42.31 $39.62 $16.25 $666 $606 $423 $396 $81 R 1 $80.00 $80 $0.00 2 $85.90 $172 R 1.25 $80.00 $100 I $2,172 R Total Rental $180 0 Total Owned $172 Qty Unit MATERIAL I LABOR 1 I Equipment Unit 1 Total I Unit 1 I Total I I Days Rate Total $0 R (Total Rental I $0.00 0 'Total Owned I $0.00 CITY OF TUKWILA, WASHINGTON (Owner) By: c A/•s Mayor Attest: This C day of ec er 20 175 h City Clerk Approved as to Form: Address for giving notices: ity Attorney c0 1\ v (cv GJA AGREEMENT FORM 09 -159 CONTRACT NO Council Approval 9/21/09 THIS AGREEMENT is made and entered into on this2 ofSeptember, 20 09, by and between the City of Tukwila, Washington ("Owner") and Nordic Construction. ("Contractor Now, therefore the parties agree as follows: Inc. 1. Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project entitled Macadam Road Bridge Soffit Repairs, Project No. 09 -RW02, including all changes to the Work and force account work, in accordance with the Contract Documents, as described in Section 1- 04.2 of the Supplemental General Requirements. 2. Payments. Owner shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Proposal according to the Contract Documents as to time, manner, and condition of payment. The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work. 3. Completion Date. Contract time shall commence upon Owner's Notice to Proceed date. The Work under this Agreement shall be completed within the time specified in the Proposal. If the Work under this Agreement is not completed within the time specified, as detailed in the Contract Documents, Contractor shall pay liquidated damages and all engineering inspection and supervision costs to Owner as specified in the Proposal.. 4. Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees. 5. Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this Agreement, except as expressly provided in this Agreement. 6. Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which shall for all purposes be deemed an original. Nordic Construction, Inc. (Contractor) By: Martin J. Ericksen Title: Pres i dPni Attest: This 29tldayof spot 2009 Contractor's License No. NORDICI110T,7 Address for giving notices: 106 55th Avenue Fife, WA 98424 Fast C -1 X /67/(//4Z s Rev. 8 -11 -09 To the Mayor and City Council City of Tukwila, Washington PROPOSAL (unit price) Cnntrootor'uNane Nord ln Coost rue t ion In Contractor's State License No. mnPnrpr O r. r City af Tukwa Project No. 09'BVVO2 The undersigned hereby certifies that he personally examined the location and construction details of Work outlined in the Contract Documents for the City of Tukwila (Owner) project titled Macadam Road Bridge Soffit Repairs, which project includes but is not limited to drilling from below through the deck and sidewalk, preparing spelled or dm}amoioated surface, installing formwork to soffit, placing and consolidating material; and has read and thoroughly understands these Documents which govern mU Work embraced in this improvement and the methods by which payment will be made for said VVurk, and thoroughly understands the nature of said Work: and hereby proposes to undertake and complete all Work embraced in this improvement in accordance with these Contract Documents and at the following schedule of rates and prices. The Bidder understands that the quantities mentioned herein are approximate only and are subject to increase or decrease, and hereby proposes to perform all quantities of work as either increased or decreased in accordance with the Contract Documents. As evidence of good faith, (check one) 2 bid bond orO cash, O cashier's check, Ocertified check, or []postai money order made payable to the City of Tukwila equal to five percent (5%) of the Total Bid Price is attached hereto. Bidder understands that, should this offer be accepted by Owner within ninety (90) co/endarde}m after the day of Bid Opening and the Bidder fails or refuses to enter into an Agreement and fumish the required Payment and Performance Bond and tiabitity insurance within ten (10) calendar days after Notice of Award, the Contract shall be null and void and the Bid Deposit or Bond accompanying this Proposal shall be forfeited and become the property of Owner as liquidated damages, all as provided for in the Bid Documents. Bidder shall attain Physical Completion of all Work in ail respects within thirty (30] calendar days from the date stated in the written Notice to Proceed. If the work is not completed within this time period, Bidder shall pay liquidated damages to Owner as specified in Section 1-08.9 of the Standard Specifications for every calendar day work is not Physically Complete after the expiration of the Contract time stated above. In addition, Bidder shall compensate Owner for actual engineering inspection and supervision costs and any other legal hues incurred by Ownor as a result of such dotay. age 10 Proposal rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see vwvw bxwmcom' Always Verify Scale Rev. 8-11-09 Proposal MACADAM ROAD BRIDGE SOFFIT REPAIRS SCHEDULE A Project No. 09-RW02 Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totais shall be corrected to conform thereto. For Schedule A, include applicable Sales Tax in the various Unit and Lump Sum prices. Item No. Item Descriptior, BRIDGE 1. Mobilization 2. SPCC Plan 3. Removing Portion of Existing Bridge 4. Bridge Deck Repair 5. Epoxy Crack Sealing 6. Project Temporary Traffic Control (Minimum Bid $10,000.00) 7. Roadside Cleanup Quantity Unit Unit Price 1 1 1 24 128 1 EST Schedule A Total LS LS LS CF LF LS 3 age 11 Macadam Road Bridge Soffit Repairs Schedule A )rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see wvvw.bxwa.com Always Verify Scale P Amount .5 c• i DO 1235 6-.)z t ci 6 'lag CC() C'kX FA J $3,000.00 $3,000.00 Rev. 4.15-09 C-2 PAYMENT MD PERFORMANCE BONO Bond to City of Tukwila, Washington Bond Nor. 01.3 8 516 We, Nordic Construction, Inc. and ra.,rkley Regional Insurance Co (Principal) (Surety) a Delaware corporation, and as a surety corporation authorized to become a surety upon Bonds of Contractors with municipal corporations In Washington State, are jointly and severally bound to the City of Tukv la, Washington "Owner"), In the penal sum of TV t M x p Thousand One. Hundred NN.i.net: i/ mart` and Nc 100THS Doilars 39,198.00 the payment of which sum, on demand, we bind ourselves and our successors, heirs, administrators, executors, or personal representatives, as the case may be. This Payment and Performance Bond is provided to secure the performance of Principal in connection with a contract dated September 29 200 between Principal end Owner for a project entitled Macadam Road Bridge Soffit Repairs, Contract No. 09 R W r; 2 "Contract"). The initial penal sum shalt equal 100% of the Total Bid Price, Including sales tax, as specified in the Proposal submitted by Principal. NOW, THEREFORE, this Payment end Performance Bond shall be satisfied and released only upon the condition that Principal: Faithfully performs all provisions of the Contract and changes authorized by Owner in the manner and within the time specified as may be extended under the Contract; Pays all laborer's, mechanics, subcontractors, lower tier subcontractors, material men, and all other persons or agents who supply labor, equipment, or materials to the Project; indemnifies and holds Owner, Its officers, and agents harmless from and against all claims, liabditios, causes of r3ctbn, damages, and costs for such payments for labor, equipment, and materials by satisfying all claims and demands incurred under the Contract, and reimbursing and paying Owner all expenses that Owner may Incur in making good any default by Principal; and indemnifies and holds Owner harmless from all claims, liabilities, causes of action, damages and costs, including property damages and personal injuries, resulting from any defect appearing or developing in the material provided or workmanship performed under the Contract. The indemnities to Owner shall also Inure to the benefit of the Consulting Engineers and other design professionals retained by Owner in connection with the Prefect. This bond shall remain in effect for one (1) year after Final Acceptance of the Contract at ton percent (10%) of the Total Bid Price, Including sales tax, to insure against all defects and corrections nested In the material provkled or workmanship performed. The liability of Surety shalt be limited to the penal sum of this Payment and Performance Bond. No change, extension of tune, alteration, or addition to the terms of the Contract or to the Work to be performed under the Contract shall In any way affect Surety's obligation on the Payment and Performance Bond. Surety hereby waives notice of any change, extension of time, alteration, or addition to the terms of the Contract or the Work, with the exception that Surety shall be notified if the Contract time is extended by more than twenty percent (20%). Row. -I1-09 Payment Performance Bond C-3 ti any modification or change increases tho total amount to be paid under the Contract, Surety's obligation under this Payment and Performance Bond shah automatically increase in a like amount. My such Increase shall not exceed twenty-five percent (25%) of the original amount of the Payment and Performance Bond without the prior written consent of Surety. This Payment and Performance Bond shall be governed and construed by the laws of the State of Washington, and venue shall be In King County, Washington. IN WITNESS WHEREOF, the parties have executed this instrument in two (2) identical counterparts this 28th day of September 2009, Nordic Construction, Inc., SI/pawns of Auttior' Official Martin J. Ericksen prpsial:afif Titia Name and address a local office of agent and/or Surety Company: Berkley Regional Insurance Company Surety ASIga of A.hodzad Officlat By/ L r 1.14 fer p. Mornay in Foot j (Attach Power or Attorney) Propel Insurance PO Box 2940 rcn WA R 4) Surety companies executing bonds must appear an the current Authorized !neutrino Llst in the State of WaaNngton per SeeilOti 1-02.7 of the Standard Specifications.