HomeMy WebLinkAboutCOW 2009-09-14 Item 4E - Bid Award - Nordic Construction for Macadam Road Bridge Soffit Repairs for $39,198 COUNCIL AGENDA SYNOPSIS
-rl Initials ITEM NO.
O Meeting Date 1 Prepared by e_ I Mayor's review I Council review
09/14/09 BG 1 1 1
09/21/09 BG_, I 1 1
z 90 I I I `T‘
ITEM INFORMATION
CAS NUMBER: 09-128 I ORIGINAL AGENDA DATE: SEPTEMBER 14, 2009
AGENDA ITEM TITLE Bid Award for Macadam Road Bridge Soffit Repairs
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 09/14/09 Mtg Date Mtg Date Mtg Date Mtg Date 09/21/09 Mtg Date Mtg Date
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &R Police PW
SPONSOR'S This project will provide concrete bridge repairs to the Macadam Road Bridge, including
SUMMARY removal of loose and spalling concrete, drilling through the bridge deck and concrete
placement. The project was advertised for bids on August 19 and 26, 2009 and five bids
were opened on September 2 with the low bid of $39,198.00 from Nordic Construction.
Nordic Construction has successfully worked for the City in the past.
REVIEWED BY COW Mtg. CA &P Cmte F &S Crnte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 09/08/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMIrrEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$39,198.00 $65,000.00 $0.00
Fund Source: 104.01 ANNUAL BRIDGE INSPECTIONS REPAIRS (PG. 8, 2009 CIP)
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
09/14/09
09/21/09
MTG. DATE ATTACHMENTS
09/14/09 Informational Memorandum dated 09/02/09
Vicinity Map
Bid Tabulation
Minutes from the Transportation Committee meeting of 09/08/09
09/21/09
TO:
City of Tukwila
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
FROM: Public Works Director
DATE: September 2, 2009
SUBJECT: Macadam Road Bridge Soffit Repairs
Project No. 09 -RWO2
BID AWARD
ISSUE
Award the bid for construction of the Macadam Road Bridge Soffit Repairs.
BACKGROUND
This project will provide concrete bridge repairs to the Macadam Road Bridge,
including removal of loose and spalling concrete, drilling through the bridge deck and
concrete placement.
The project was advertised for bids on August 19 and 26, 2009 and bids were
opened September 2, 2009. Five bids were received with the apparent low bid of
$39,198.00 from Nordic Construction. The engineer's estimate was $42,260.00.
Jim Haggerton, Mayor
ANALYSIS
The bids were reviewed and tabulated. No errors were discovered in the bids. Nordic
Construction has been in business for 20 years satisfactorily performing work on a
variety of projects for government entities involving concrete work and crack sealing.
BUDGET AND BID SUMMARY
Bid Results Estimate Budget
Construction $39,198.00 $42,260.00 $65,000.00
Contingency (15 5,879.70 6,339.00 0
Total $45.077.70 $48.599.00 $65.000.00
RECOMMENDATION
The Council is being asked to award the construction bid for the Macadam Road
Bridge Soffit Repairs to Nordic Construction in the amount of $39,198.00 and
consider this item at the September 14, 2009 Committee of the Whole meeting and
subsequent September 21, 2009 Regular Meeting.
Attachments Vicinity Map
Bid Tabulation
W: \PW Eng \PROJECTS\A- RW RS Projects \09RW02 2009 Bridge Insp \Macadam Bridge Repairs\Award Memo 2009 doc
N
Maoada.m Boat Bridge Soffit Repairs
S 127 St
S120Pt
KWILA.
5 124 St c
0
N
S` 126 St
S \128 St
�W I
4
co
to
to
S 122 St
D r D D
N 0) N
S 124 St
lf
Highline
Specialty D
Center w
1 i w
S 133 St p N o w
W
O N D
S 13 St co y q
D
d ro o m
m
S 135 St N S to W cn S 136 St
l 1 1 S 136 St
S 136 N S 137 St
S 1 137 St N N D \I) N m 9
S 13? �t .J q f° y u� w .5-1.3.9--St
L j
4.
S 140 St W 5141
in St D
I` D m
N m S 142 St I to in i t0
S 142 St D
l PI
S ,�2 S 14� \'!'z S 144 St
S 144 St
N N
i
N 146 St ,rn
V. ``1�
D jD
N
VICINITY MAP
Scale: N.T.S.
139 St
c
Foster
Golf
Course
S 140
St
al
S 142
CO CP
(3' St
N D
J
N
O rn D
CD
d
a. D 0 co co
CITY OF TUKWILA
Macadam Road Bridoe Soffit Renairs
Project No. 09 -RWO2
Bid Opening Date: September 2, 2009
ITEM
ND ITEM OR TASK DESCRIPTION
1 (Mobilization
2 (SPCC Plan
3 IRemoving Portion of Existing Bridge
4 (Bridge Deck Repair
5 IEpoxv Crack Sealing
6 Project Temporary Traffic Control
7 Roadside Cleanup
QUANTITY II
UNITS UNIT II
1 1 LS
1 1 LS
1 1 LS
24 1 CF
128 1 LF
1 LS
EST LS
Total
BID TABULATION
Engineer's Estimate II
UNIT PRICE I COST II
3.900.001
1,000.001
5.000.001
350.001
70.001
12,000.001
3.000.001
3.900.001
1,000.001
5.000.001
8,400.001
8,960.001
12,000.001
3,000.001
42,260.001
Nordic Construction
UNIT PRICE I COST I
6.800.001 6,800.001
1.300.001 1.300.001
6,250.001 6.250.001
235.001 5.640.001
48.501 6.208.001
10.000.001 10,000.001
3.000.001 3,000.001
39,198.00
Certified Bid Tabulation Prepared by:
Ebenal General
UNIT PRICE 1 COST
5,000.001 5,000.00
5,000.001 5,000.00
10,000.001 10,000.00
200.001 4,800.00
60.001 7,680.00
10,000.001 10,000.00
3,000.001 3,000.00
45,480.00
Date:
Epic Construction
UNIT PRICE COST 1
4,500.00 4,500.001
315.00 315.001
21.000.00 21,000.001
100.00 2,400.001
35.00 4,480.001
10,000.00 10,000.001
3.000.00 3,000.001
45,695.001
2- o
I I Advanced Construction I Serpanok Construction
UNIT PRICE 1 COST I UNIT PRICE I
10,000.001 10,000.001 16,500.001
2,000.001 2,000.001 1,000.001
5,000.001 5,000.001 10,000.001
500.001 12.000.001 250.001
60.001 7,680.001 85.001
10,000.001 10,000.001 10.000.001
3,000.001 3,000.001 3,000.001
49,680.001
COST 1
16,500.0
1,000.00
10,000.00
6,000.00
10,880.00
10,000.00
3,000.00
57,380.00
City of Tukwila
Transportation Committee
TRANSPORTATION COMMITTEE
Meeting Minutes*
September 8, 2009 5:00 p.m. Conference Room 1 '`Tuesdcn. meeting due to holiday
PRESENT
Councilmembers: De'Sean Quinn, Chair; and Verna Griffin
Staff: Bob Giberson, Frank Iriarte, Pat Brodin, Shawn Hunstock, Jack Pace and Cyndy Knighton.
CALL TO ORDER: Committee Chair Quinn called the meeting to order at 5:00 p.m.
I. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. Macadam Road Bridge Soffit Renairs Bid Award
Staff is seeking full Council approval to award a bid in the amount of $39,198.00 to Nordic Construction for
construction of the Macadam Road Bridge Soffit Repairs project.
Staff discussed receiving favorable bids, with the lowest bid being under the Engineer's Estimate. Nordic
Construction has performed well on previous contracts with the City of Tukwila and other jurisdictions.
UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 14 COW FOR DISCUSSION.
B. Tukwila Urban Center Access Project (Klickitatl Resolution of Intent to Form a Local Improvement District
Staff is seeking full Council approval of a resolution of intent to form a Local Improvement District (LID)
for the Tukwila Urban Center Access Project (Klickitat).
Cyndy began with a slide presentation that was used at the previous two LID open houses, held on August
28"' and September 3 The presentation focused on the project history, necessity and how the LID fills the
funding gap for the project. This resolution of intent to form the LID is only to notify the property owners
that a LID is being considered. For clarification, all No- Protest Agreements are being researched and
verified along with traffic impact fees that will be credited against the LID assessment. The La Pianta No-
Protest Agreement appears to be for a future sanitary sewer project, not for the Klickitat project.
The preliminary assessment roll will be presented to Council on September 21 UNANIMOUS
APPROVAL. FORWARD TO SEPTEMBER 14 COW FOR DISCUSSION.
III. MISCELLANEOUS
Meeting adjourned at 5:50 p.m.
Next meeting: Monday, September 21, 2009 5:00 p.m. Conference Room 1
Committee Chair Approval
Minutes by BG.