HomeMy WebLinkAboutReg 2009-08-03 Item 5C - Final Acceptance - Infiltration and Inflow 2009 Side Sewer Installation by Duane Cameron Bulldozing for $43,690.05CAS NUMBER: 09-110
MTG. DATE
08/03/09
MTG. DATE
08/03/09
Oct 1I0
COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date Prepared by 1 Mayor's review 1 Council review
08/03/09 7M I I n
I
I I
ITEM INFORMATION
EXPENDITURE REQUIRED AMOUNT BUDGETED
$43,690.05 $75,000.00
Fund Source: 402.02 SEWER FUND (PG. 122, 2009 CIP)
Comments:
ORIGINAL AGENDA DAIS: AUGUST 3, 2009
RECORD OF COUNCIL ACTION
ATTACHMENTS
Informational Memorandum dated 07/22/09
State of WA Dept of Revenue Notice of Completion 09 -057
Minutes from the Utilities Committee meeting of 07/28/09
ITEM No.
AGENDA ITEM TITLE Accept as complete Infiltration and Inflow (I&I) 2009 Side Sewer Installation at
13906 51 Ave S and release retainage
CATEGORY Discussion Motion Resolution Ordinance ['Bid Award Public Hearing Other
Mtg Date Mtg Date 08/03/09 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PIV
SPONSOR'S The contract with Duane Cameron Bulldozing, Inc. of Enumclaw, WA is complete for the
SUMMARY Infiltration and Inflow (I&I) 2009 Side Sewer Installation at 13906 51st Ave S.
Construction began April 1, 2009 and was completed on April 21, 2009. One change order
at a significant cost (approved by Council 7/6/09) was issued for a new sewer stub.
Council is being asked to accept and finalize the contract in the amount of $43,690.05.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DA "IE: 07/28/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMITTEE unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT FUND SOURCE
APPROPRIATION REQUIRED
$0.00
City of Tukwila
TO: Mayor Haggerton
Utilities Committee
FROM: Public Works Director,)
INFORMATIONAL MEMORANDUM
Jim Haggerton, Mayor
DATE: July 22, 2009
SUBJECT: Infiltration and Inflow (MI) 2009 Side Sewer Installation at 13906 51 Ave S Pro
Project No. 09 -SW02, Contract No. 09 -057
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize for release of the retainage.
BACKGROUND
The Notice to Proceed for Contract No. 09 -057 with Duane Cameron Bulldozing, Inc., of Enumclaw,
Washington was issued April 1, 2009 for construction of the Side Sewer Installation at 13906 51
Ave S Project.
ANALYSIS
This contract was completed on April 21, 2009. One Change Order was issued during construction.
A new stub had to be installed and the sewer main was found to be 18 feet deep. This was an
extraordinary depth that was not expected and required a significant cost increase. Council
approved Change Order No. 1 for $28,317.28 on July 6, 2009.
Contract Award Amount
Unit Price Underruns
Sales Tax (N /A)
Total Amount Paid (incl. retainage)
RECOMMENDATION
The Council is being asked for formal acceptance and retainage release authorization, subject to
standard claim and lien release procedures, for the contract with Duane Cameron Bulldozing in the
amount of $43,690.05 and consider this item on the consent agenda of the August 3, 2009 Regular
Meeting.
Attachment: Dept of Revenue Notice of Completion
11,582.31
28,317.28
3.790.46
43.690.05
W: \PW Eng \PROJECTSW- SW Projects \09sw02 13906 51 Ave S SSS \INFO MEMO Closeout 7 -22 -09 gl.doc
State of Washington
Department of Revenue
PO Box 47474
REVEN Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 601 227 683
From:
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Duane Cameron Bulldozing
Comments:
Date 7/13/09
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Name Address of Public Agency
Notice is hereby given relative to the completion of contract or project described below
Contract Number
Description of Contract
I I 2009 Side Sewer 13906 51 Ave S 09 -SW02 09 -057
Contractor's Name Telephone Number
360- 825 -3989
Contractor's Address
PO Box 274, Enumclaw WA 98022
Date Work Commenced Date Work Completed Date Work Accepted
4/1/09 4/21/09
Surety or Bonding Company
West American Insurance Company
Agent's Address
Hentschell Associates, Inc., 621 Pacific Ave Ste 400, Tacoma WA 98402
Contract Amount 11,582.31
Additions 28,317.28 Liquidated Damages 0.00
Reductions 0.00
Sub -Total 39,899.59 Amount Disbursed 41,695.08
Amount of Sales Tax Paid at 9.5 3,790.46 Amount Retained 1,994.97
(If various rates apply, please send a breakdown.)
TOTAL 43,690.05 TOTAL 43,690.05
o
Assigned To
Date Assigned
Signature
Type or Print Name Diane Jaber
Phone Number 206 -433 -1871
Disbursing Officer
Department Use Only
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue,
PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO
PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in
accordance with said certificate.
To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype
(TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov.
REV 31 0020e (6- 27 -01)
UTILITIES COMMITTEE
Meeting Minutes
July 28, 2009 5:00 p.m. Conference Room #1
CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:00 p.m.
I. PRESENTATIONS
No Presentations
City of Tukwila
Utilities Committee
PRESENT
Councilmembers: Kathy Hougardy, Chair; Pam Linder, and Dennis Robertson
Staff: Bob Giberson, Frank Iriarte, Pat Brodin, Mike Cusick, Mary Miotke, Gail Labanara and
Kimberly Matej
Guest: Chuck Parrish and David Weaver
II. BUSINESS AGENDA
A. Resolution for Sole Source Purchase: Lift Station Control Systems
Staff is seeking full Council approval of a resolution waiving the competitive bidding requirements
and authorizing the sole source purchase of lift station control systems from Calvert Technical
Services, Inc.
The City is currently in the process of upgrading the Allentown Storm Pump Station No. 18. In order
to maintain interoperability with the other lift stations throughout the City, upgrades and /or changes
made to the Allentown location should be configured, built and supported by the same vendor as the
other lifts stations, which is Calvert Technical Services, Inc. UNANIMOUS APPROVAL.
FORWARD TO AUGUST 10 COW FOR DISCUSSION.
B. Interurban Water Reuse: Reclaimed Water Service and Use Agreement with Starfire Snorts
Staff is seeking full Council approval to enter into an agreement with Starfire Sports and King
County for the use and service of reclaimed water.
In the past, Starfire Sports utilized reclaimed water to irrigate the softball fields which were located
at Fort Dent Park. With the addition of a new soccer field and landscaped areas in the northern
portion of the park, they would like to expand the use to reclaimed water to that area.
King County Department of Natural Resources requires a formal user agreement for the distribution
of reclaimed water to ensure compliance for distribution. The City of Tukwila is responsible for the
service, metering and billing of the reclaimed water. UNANIMOUS APPROVAL. FORWARD
TO AUGUST 10 COW FOR DISCUSSION.
C. Proiect Closeout Acceptance: Side Sewer Installation at 13906 51st Avenue South
Staff is requesting full Council approval for formal contract acceptance and release of retainage to
Duane Cameron Bulldozing, Inc. for the side sewer installation at 13906 51st Avenue South.
One change order was required on this project due to sewer stub location issues and extraordinary depth
(see Utilities Committee minutes dated 06/09/09. UNANIMOUS APPROVAL. FORWARD TO
AUGUST 3 CONSENT AGENDA.