HomeMy WebLinkAboutCOW 2009-07-13 Item 5C - Contract Supplement #1 - 2009 Small Drainage Program Management with KPG for $29,956.68CAS NUMBER: 09-096
AGENDA ITEM TITLE
CATEGORY
SPONSOR
SPONSOR'S
SUMMARY
REVIEWED BY
MTG. DATE
07/13/09
07/20/09
MTG. DATE
07/13/09
07/20/09
COUNCIL AGENDA SYNOPSIS
Meeting Date
07/13/09
07/20/09
Prepared by
JM
JM
CA &P Cmte
Arts Comm.
Initials
1 Mayor's review
1
ITEM INFORMATION
09 0 9 7 I ORIGINAL AGENDA DATE: JULY 13, 2009
2009 Small Drainage Program Construction Management Services
Supplement No. 1 with KPG, Inc.
Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 07/13/09 Mtg Date 07/20/09 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date
Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW
Base Contract No. 09 -044 with KPG, Inc. included design engineering services for the 2009
Small Drainage Program. The construction contract was awarded to Green River
Construction on June 15, 2009. Supplement No 1 with KPG has been negotiated for
construction management services in the amount of $29,956.68. The scope of work will
provide site inspections, construction review, and as- builts.
F &S Cmte
Parks Comm.
Co uncil review 1
COW Mtg.
Utilities Cmte
DATE: 06/ 23/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMIF1EE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED
$29,956.68 $40,000.00
Fund Source: 412.02 SURFACE WATER FUND (PG. 146, 2009 CIP)
Comments:
RECORD OF COUNCIL ACTION
ATTACHMENTS
Informational Memorandum dated 06/16/09
Supplemental Agreement No. 1 with Exhibits
Minutes from the Utilities Committee meeting of 06/23/09
ITEM No.
Transportation Cmte
Planning Comm.
APPROPRIATION REQUIRED
$0.00
City of Tukwila
TO: Mayor Haggerton
Utilities Committee
FROM: Public Works Director
DATE: June 16, 2009
INFORMATIONAL MEMORANDUM
SUBJECT: 2009 Small Drainage Program
Project No. 09 -DR01, Contract 09 -044
Supplement No. 1 for Construction Management
ISSUE
Approve Supplemental Agreement No. 1 to Consultant Contract No. 09 -044.
BACKGROUND
Jim Haggerton, Mayor
Base contract No. 09 -044 with KPG, Inc. of Seattle, WA was to provide design engineering
services for the 2009 Small Drainage Program. Council awarded the construction contract to
Green River Construction on June 15, 2009. This supplemental agreement with KPG will
provide construction management support during the construction phase.
ANALYSIS
To properly manage this construction project, the City will need construction management
support during the construction phase. Through this supplement, KPG staff will provide limited
site inspections, reviews for material submittals, change order requests and as -built drawing
preparation. Tukwila construction management staff will provide the majority of the construction
management and field inspections.
BUDGET SUMMARY
Supplemental Agreement No. 1 was carefully reviewed and is reasonable.
Contract Budget
Construction Management $29,956.68 $40,000
RECOMMENDATION
The Council is being asked to approve Supplemental Agreement No. 1 with KPG, Inc. in the
amount of $29,956.68 for the 2009 Small Drainage Program and consider this item at the July
13, 2009 Committee of the Whole meeting and subsequent July 20, 2009 Regular Meeting.
Attachment: Supplemental Agreement No. 1
W \PW Eng \PROJECTS\A- DR Protects \09 -DRO (2009 SDP) \Construction\8efore Construction \Info Memo for KPG's CM Sup #1 6 -16 -09 Final doc
City of Tukwila
Public Works Department
6300 Southcenter Boulevard #100
Tukwila, WA 98188
PROJECT: 2009 Small. Drainage Program Construction Engineering Services
This SUPPLEMENTAL AGREEMENT NO. 1 is to supplement the agreement entered into with KPG,
Inc. and the City of Tukwila, which was executed on the 17`'' day of February, 2009.
All provisions in the basic agreement remain in effect, except as expressly modified as follows:
Article 2, Scope of Services, shall be modified as follows:
The Consultant agrees to provide construction engineering services as requested by the City in
accordance with the scope of work included as Exhibit A.
Article 4, Payment, shall be modified as follows:
Payment for work provided by Consultant shall be made as provided on Exhibit B, attached hereto,
provided that the total amount of payment to the Consultant for this work not exceed 529, 956.68 without
express written modification of the Agreement signed by the City. The new total contract shall not exceed
588,541.54 without express written modification of the Agreement signed by the City.
IN WITNESS WHEREOF, the parties hereto have set their hands and seals this day
of 2009.
APPROVED:
Jim Haggerton
Mayor
Attested:
Christy O'Flaherty, City Clerk
SUPPLEMENTAL AGREEMENT NO. 1
AGREEMENT No. 09 -044
PROJECT No. 09 -DRO1
APPROVED:
CITY OF TUKWILA KPG, INC.
KPG, Inc.
753 9th Avenue N.
Seattle, WA 98109
Nelson Davis, P.E.
Principal
The Consultant shall provide Construction Engineering support services for the 2009
Small Drainage Program as outlined below:
A. Prepare for and attend pre construction conference with the City, Contractor, and
affected utilities.
B. The Consultant shall provide the field support to the inspector for the duration of
construction. The level of effort for field support time is estimated at 12 hours per
week for the contract duration.
C. The Consultant shall review material submittals and RF1's provided by the
Contractor as requested by the City.
D. The Consultant shall review change conditions as they arise and make
recommendation to the City for field changes /change orders.
E. Prepare Record Drawings for the 2009 Small Drainage Program based on
redline drawings provided by the City.
Deliverables:
Exhibit A
City of Tukwila
2009 Small Drainage Program
Supplement No. 1
Construction Support
Scope of work
June 5, 2009
Items to be provided by the Consultant:
Documentation from site meetings, change conditions, and field directives.
Change orders, if required.
Full size Record Drawing mylars, 2009 Small Drainage Program
HOUR AND FEE ESTIMATE EXHIBIT B
Project: City of Tukwila
2009 Small Drainage Program
Supplement No. 1 Construction Support
1 Labor Hour Estimate
Project Project Design
Task Description Manager Engineer Engineer Technician Clerical
178.51 125.35 106.11 93.28 65.78
June 5, 2009
KPG
Architecture
Landscape Architecture
Civil Engineering
Total Fee
Fee
Task 1 Construction Support
A. Prepare for and attend pre con meeting 2 4 0 1 0 1 0 858.42
B. On call field support 8 I 0 144 I 0 1 8 17,234.16
C. Submittal Review 4 0 16 1 0 1 4 2,674.92
D. Field reviews /change orders 8 0 16 1 16 1 4 4,881.44
E. Prepare Record Drawings 1 2 0 8 24 1 4 3,707.74
Reimbursable expenses see breakdown for details 1 1 600.00
Task Totals 1 24 1 4 184 40 1 20 29,956.68
Total Estimated Fee: 29,956.68
Reimbursable Breakdown Cost
Task 1 Construction Support
Mileage 400.00
Reproduction 200.00
Task 1 Total 600.00
UTILITIES COMMITTEE
Meeting Minutes
June 23, 2009 5:00 p.m. Conference Room #1
City of Tukwila
Utilities Committee
PRESENT
Councilmembers: Joan Hernandez (filling in for Kathy Hougardy, Chair); Pam Linder, and Dennis Robertson
Staff: Jim Morrow, Frank Iriarte, Pat Brodin, Bob Giberson, Ryan Larsen, Mike Cusick, Peter Lau,
Greg Villanueva, Gail Labanara and Kimberly Matej
Guest: David Weaver
CALL TO ORDER: Acting Committee Chair Hernandez called the meeting to order at 5:01 p.m.
I. PRESENTATIONS
No Presentations
II. BUSINESS AGENDA
A. 2009 Small Drainage Program Construction Management Sunt,Iement
Staff is seeking full Council approval of Supplement Agreement No. 1 to Consultant Contract No.
09 -044 with KPG, Inc. in an amount not to exceed $29,956.68 for construction management services.
Now that the construction contract has been awarded, the above supplemental agreement will provide
construction management support during the construction phase of the project. This support will
include: limited site inspections, review of material submissions, possible change order requests, and
as -built drawing preparation. This contract will also allow staff the flexibility to manage the
construction with the assistance of KPG's design expertise. UNANIMOUS APPROVAL.
FORWARD TO JULY 13 COW FOR DISCUSSION.
B. Gilliam Creek Basin Stormwater Overflow Consultant Selection and Design Agreement
For Information Purposes: Gilliam Creek is a natural stream drainage basin which runs along
SR518 from SeaTac and through Tukwila.
Staff is seeking full Council approval of a consultant agreement with PACE Engineering for design
of the Gilliam Creek Basin Stormwater Overflow Project.
The Gilliam Creek Overflow Project was originally planned for 2012. However, due to recent and
anticipated high river occurrences and potential flooding, as well as complications with the Howard
Hansen Dam, staff recommends this project begin sooner. Specifically, this project will connect an
overflow pipe from Andover Park West to Andover Park East along Strander Boulevard allowing
additional water flows to be diverted from Gilliam Basin during high river events.
The Surface Water Fund will be utilized to finance this project, including construction. Future CIP
projects will be adjusted accordingly to account for this expenditure. Staff anticipates this project can
be completed by this October/ November.
Due to the urgency and potential for flooding, the Committee recommended this item be forwarded
directly to the next scheduled Council meeting (July 6 Regular) in order to expedite Council
discussion and staff's ability to mitigate the City's flooding potential.