HomeMy WebLinkAboutCOW 2009-06-22 Item 4A - Agreement - Change Order for 51st Avenue South Side Sewer Installation with Duane Cameron Bulldozng for $28,317.28CAS NUMBER: 09-087
AGENDA ITEM TITLE
CATEGORY
SPONSOR
SPONSOR'S
SUMMARY
MTG. DATE
06/22/09
07/06/09
07/06/09
Meeting Date
06/22/09
07/06/09
0°1- OS T
COUNCIL AGENDA SYNOPSIS
Prepared
7
Initials
Mayors review
0
1 Council review
ti
1
1
ITEM INFORMATION
1 ORIGINAL AGENDA DA 1E: JUNE 22, 2009
Side Sewer Installation at 13906 51 Ave S Project
Approval of Budget for Construction Change Order No 1
Z Discussion Motion ['Resolution
Mtg Date 06/22/09 Mtg Date 07/06/09 Mtg Date
Council Mayor Adm Svcs DCD
$28,317.28 $75,000.00
Fund Source: 402.02 SEWER FUND (PG. 122, 2009 CIP)
Comments:
RECORD OF COUNCIL ACTION
MTG. DATE 1 ATTACHMENTS
06/22/09 Informational Memorandum dated 05/26/09
Change Order No. 1 with Duane Cameron Bulldozing
Minutes from the Utilities Committee meeting of 06/09/09
$0.00
ITEM No.
L
Ordinance Bid Award Public Hearing I 1 Other
Mtg Date Mtg Date
Finance Fire Legal P&R Police PW
Mtg Date Mtg Date
This project installed a side sewer at 13906 51 Ave S. As- builts showed a side sewer stub,
but after many hours of video inspection and excavation, a sewer stub was not found. A
new sewer stub had to be installed at an extraordinary depth of 18 -feet. This circumstance
required substantially more effort and materials to complete the side sewer connection.
Council approval of Change Order No. 1 for $28,317.28 is requested.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. n Parks Comm. n Planning Comm.
DATE: 06/09/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMIFI'EE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
ANALYSIS
City of Tukwila
INFORMATIONAL MEMORANDUM
To: Mayor Haggerton
Utilities Committee
From: Public Works Director
Date: May 26, 2009
Subject: Side Sewer Installation at 13906 51 Avenue South
Project No. 09 -SW02, Contract 09 -057
Change Order No. 1
ISSUE
Approve Change Order No. 1 to Contract Number 09 -057.
BACKGROUND
Jim Haggerton, Mayor
Duane Cameron Bulldozing was awarded the construction contract for side sewer
installation at 13906 51 Avenue South for $11,582.31, plus sales tax. Council approval
was not necessary for the original contract as it was under the $25,000.00 approval
threshold. The Notice to Proceed was issued March 31, 2009.
The additional work in Change Order No. 1 is the result of extra labor, equipment and
materials required to install side sewer to the house at 13906 51 Avenue South. The as-
built plans show a side sewer stub out to the house. However, after many hours of video
inspection and excavation, a sewer stub was not found. A new stub had to be installed and
the sewer main was found to be 18 feet deep. This is an extraordinary depth that was not
expected.
This change order will add $28,317.28 to the original contract for a new total contract
amount of $39,899.59 (plus tax). Remaining budget is available for this change order from
the $75,000 Sewer Infiltration Inflow (I &I) Project (page 122, 2009 CIP).
RECOMMENDATION
The Council is being asked to approve Change Order No. 1 for the Side Sewer Installation
at 13906 51 Ave S Project with Duane Cameron Bulldozing in the amount of $28,317.28
for consideration at the June 22, 2009 Committee of the Whole meeting and subsequent
July 6, 2009 Regular Meeting.
attachment: Change Order No. 1
W: \PW Eng \PROJECTS\A- SW Projects \09sw02 13906 51 Ave S SSS \Info Memo Change Order 1.doc
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 1
DATE: 05/20/09 BUDGET NO. 402.02.594.353.63.05
PROJECT NO. 09 -SW02 CONTRACT NO. 09 -057
PROJECT NAME: Side Sewer Installation at 13906 51st Avenue South
TO:
You are hereby directed to make the herein described changes to the plans and specifications or do the
following described work not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the Owner" and a notice to proceed is issued.
Conditions:
A. The following change, and work affected thereby, is subject to all contract
stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of this
change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates
for approval in advance of all change orders..
CHANGE:
The contractor excavated in the marked location and did not locate the side sewer stub. The City of Tukwila
sewer video truck data for the location of existing side sewer was in error by ten (10) feet. The contractor
then had to dig 18 feet down to the existing sewer Tine to make the connection to the sanitary sewer line.
ACCEP D Date: -5 9
By: hvkiLL4,\
Contractor:
Title'
Original Contract (without tax) $11,582.31 APPROVED BY THE CITY OF TUKWILA
Previous Change Order Date:
This Change Order 28,317.28 I3y:(] T()
Mayor
REV. CONTRACT AMOUNT 39,899.59
ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w /encumbrance)
Contractor (2 of 2) Construction Inspector
Construction Engineer
file:
Change Order lids
Sheet 1 of 1
UTILITIES COMMITTEE
Meeting Minutes
June 9, 2009 5:00 p.m. Conference Room #1
I. PRESENTATIONS
No Presentations
III. MISCELLANEOUS
Meeting adjourned at 5:16 p.m.
Next meeting: Tuesday, June 23, 2009 5:00 p.m. Conf. Room No. 1.
7f 1 Committee Chair Approval
Minut d by KAM. Reviewed by GL.
City of Tukwila
Utilities Committee
PRESENT
Councilmembers: Kathy Hougardy, Chair; Pam Linder, and Dennis Robertson
Staff: Jim Morrow, Frank Iriarte, Bob Giberson, Peter Lau, Mike Cusick, Gail Labanara and
Kimberly Matej
CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:01 p.m.
II. BUSINESS AGENDA
A. 2008 Small Drainage Program Proiect Completion and Acceptance
Staff is requesting full Council approval for formal contract acceptance and release of retainage to
Washington Pipeline, LLC for the 2008 Small Drainage Program.
Seven change orders were required on this project due to schedule adjustments, site conditions and
utility conflicts. The project came in under budget with the included 10% contingency.
UNANIMOUS APPROVAL. FORWARD TO JUNE 15 REGULAR MEETING CONSENT
AGENDA.
B. Side Sewer Installation at 13906 51 Avenue South Change Order No. 1
Staff is seeking full Council approval of a change order in the amount of $28,317.28 to Contract No. 09-
057 with Duane Cameron Bulldozing for the side sewer installation at 13906 51 Avenue South.
The original amount of this contract was for $11,582.31 and did not require Council approval since it was
under $25,000. Extensive labor, equipment and materials are required to install this side sewer due to
sewer stub location issues and extraordinary depth. UNANIMOUS APPROVAL. FORWARD TO
JUNE 22 COW FOR DISCUSSION.