HomeMy WebLinkAboutCOW 2009-06-22 Item 4B - Resolution - Reject All Bids for Codiga Park ConstructionCAS NUMBER: 09-088
Ac,i:ND.\ I'ri,\[ Trim An resolution rejecting all bids for Codiga Park Construction
CATEGORY
Si )NS()R
SPONSOR'S
Sl' \[:\L \R
,11/::, Dare 06/22/09 Nits Date
Di.rcat.ision U Motion Resolution I 1 Ordinance E. Bid Award n Public hearing n Other
E�PI :NDPI'Ulti: RNQUIRI?D
$0
Fund Source:
Comments:
MTG. DATE
6/22/09
MTG. DATE
6/22/09
COUNCIL AGENDA SYNOPSIS
1Vleetina Date Prepared by 1 Mayor's review
06/22/09 BF iC_S
07/06/09 BF
ITEM INFORMATION
ORIGINAL AGENDA D, \'i'IS: JUNE 22, 2009
Alts Date 07/06/09 Alts Date
Initiab
Council 1 Mayor Adm Svcs I DCD Finance Fire n Legal P&R n Police Pr
AMOUNT B UDGETED
$0
Alts Date
The Codiga Park Construction bid opening was April 21, 2009; 15 bids were received and
all were under budget. However, due to the economic environment, this project has been
moved from the CIP list to the discretionary future projects list. Therefore, a resolution is
necessary to reject all bids at this time.
The Council is being asked to approve the resolution to reject all bids for the construction
of Codiaa Park.
n F &S Cmte
Parks Comm.
Its Date II Its Date
COI-1111'd reviely
COW Mtg. CA &P Cmte
n Utilities Cmte Arts Comm.
DATE: 6/8/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Passage of Resolution
COMMIYI1 :r. Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
RECORD OF COUNCIL ACTION
ATTACHMENTS
Informational Memorandum dated 6/9/09
Bid Award Recommendation Memorandum dated 4/23/09 in Draft Form
Bid Results
Resolution in Draft Form
Minutes from the Community Affairs and Parks Committee meeting of 6/8/09
ITEM No.
Transportation Cmte
U Planning Comm.
APPROPRIATION REQUIRED
$0
City of Tukwila
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Community Affairs and Parks Committee
FROM: Bruce Fletcher, Director of Parks and Recreation
Robert Eaton, Facilities Operations Technician
DATE: June 9, 2009
SUBJECT: Codiga Park Construction
Project No. 98- DR06- CODIGA -09
BID REJECTION
CC: Rhonda Berry, City Administrator
Rick Still, Deputy Director of Parks and Recreation
ISSUE
Rejecting all bids for the construction of Codiga Park.
BACKGROUND
The Codiga Park Project has been on the drawing board for a number of years. The project
consists of the construction of Codiga Park along the Duwamish River as a passive use
educational park providing both environmental and historical educational opportunities. The rich
history of the site will be honored and remembered through informational signs with pictures and
text about the history of the site and a custom fabricated picnic shelter. The shelter replicates
the gable and roof structure of the Codiga Barn that had been on site before, and it will also be
located in the same footprint and orientation of the previous barn. The environmental education
opportunities include an overlook deck viewing the side channel, informational signs about the
purpose of the side channel as a spawning fish rest area, the life cycle of salmon, and native
plant species along the river. Also, because of the natural environment, it is an ideal location for
special groups such as The People for Puget Sound who host volunteer work parties at this site
twice a year, and Stewardship Partners working with Washington State University Extension
who selected this site for a grant funded Rain Garden.
The project was advertised on March 31 and April 7 with the Bid Opening on April 21, 2009.
Fifteen bids were received and all were under the Engineer's Estimate of $552,975 and under
the $610,000 CIP budget. The Codiga Project has been on the CIP books for the past decade.
ANALYSIS
Jim Haggerton, Mayor
Analysis was done on all bids and a background check on the apparent low bidder. The low
base bid was $244,282.46 with tax plus a 35% contingency of $85,498.46 totaling $329,781.32,
which is far below the total budget of $610,000. A Bid Award Recommendation Memo detailing
the base bid and contingency was drawn up for the May 11, 2009 Committee of the Whole
Meeting agenda for The City Council's review (see Attachment A). The Codiga project has
been placed on hold while the city's revenues continue to decline.
INFORMATIONAL MEMO
Page 2
The City has already invested over $40,000 for the shelter and other site amenities by the City
Council's approval in June 2008 and $22,000 for design and engineering. The custom
fabricated picnic shelter and amenities are currently in the city's possession awaiting
installation.
OPTIONS
A) Proceed with Codiga Park Construction
B) Reject all bids for Codiga Park Construction
RECOMMENDATION
In the current economic climate, we anticipated low bids such as the ones we received.
Unfortunately, it is this same economic climate that necessitates the City placing several
General Fund CIP projects on hold. As Council will recall, despite such favorable bids, the
Codiga Park project is one of those I recommended for postponement. State law requires that
bids be awarded or rejected within 90 days of a bid opening. Given that, Council is being asked
to reject all bids; the project will remain in the CIP to be built at a date in the future.
ATTACHMENTS
A) Bid Award Recommendation Memorandum dated April 23, 2009
B) Bid Results
C) Draft Resolution
W.12009 InfoMemos\Codiga Bid Rejection Memo (6- 9- 09).doc
TO:
ISSUE
City of Tukwila
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Community Affairs and Parks
FROM: Rick Still, Deputy Director of Parks and Recreation
DATE: April 23, 2009
SUBJECT: Codiga Park Construction BID AWARD
Project Number 98- DR06- CODIGA -09
Bid Award for the development of Codiga Park.
Jim Haggerton, Mayor
BACKGROUND
In 2003, the Codiga Farm barn was demolished. The Army Corps built the side channel in 2004.
They did not complete the project by constructing the parking lot, picnic shelter, information
boards, overlook, landscaping with irrigation, nor the pathways to get through the park. The park
was left fenced to keep people out until December, 2007. The City took down the fence and
started construction design efforts with the anticipation of constructing the park in 2008.
However, with the three year delay in the project all of the permits were expired and the City
needed to obtain all of those again. The design is complete and the project is ready to construct.
DISCUSSION
Staff has worked with the project design consultant SLA Landscape Architects to obtain all the
necessary permits and to prepare the construction documents with alternatives that would give
options to assist the City in obtaining bids within budget.
A Call for Bids was advertised on March 31, 2009 and April 7, 2009 and the bids were opened
at 11 AM on April 21 Staff and our landscape architect performed and analysis of the 15 bids
received and a background check on the apparent low bidder. Please see attached Bid Opening
Results, Bid Proposal, Agreement and Award Recommendation Letter. Below is a comparison
of the Bid Results and the Architect's estimate
Bid Summary (All amounts include sales tax.)
Bid Results Architect's Estimate Difference
Bid Amount $244,282.46 $492,750.00 $248,467.55
Contingency (35 85.498.46 (15 73,912.50
Total $329.781.32 $566.662.50 $236.881.19
The landscape architect's construction estimate is $492,750 with tax plus a 15% construction
contingency of $73,912.50. The project specifications were written in a way that the contract
would be decided upon the base bid price. The bid alternatives are:
INFORMATIONAL MEMO
Page 2
1. Installing owner provided benches, tables and bike rack;
2. Installing owner provided picnic shelter structure;
3. Providing and constructing an overlook deck and railings;
4. Installing Pervious Concrete instead of regular concrete on all pathways; and
5. A cubic yard unit cost for exporting materials off site
The bidding climate is such that the alternate efforts weren't necessary to obtain a bid within our
budget. The City has the ability to accept or decline these alternatives as Change Orders during
construction. This gives the City the flexibility to manage the project with known prices. Bid
Alternate 5 is a unit price rather than a lump sum price. This item was needed because there
has been a lot of dumping of materials on site since the survey was completed in 2008. We may
need to haul some of this material off site or we may be able to spread the materials on site.
The unit price gives us flexibility to only pay by the unit as is needed to make the extra materials
work on site. This will be coordinated during construction. A 35% contingency will be needed to
later accept the anticipated alternates and unknown potential changes during construction.
The Capital Improvement Program has $610,000 listed as construction expenses. We have
used value engineering to reduce the construction cost and staff will be performing the
construction management to eliminate this project expense. The grant is for boat launch
construction that is not included in this scope of work. There will be some additional consultant
cost during bidding and construction and the noted Change Order. However, of the $610,000
there should be a balance of over $260,000 after completion of this project.
RECOMMENDATION
Award the Bid and authorize the Mayor to execute a construction contract for the Codiga Park
Construction project to Construct Company, LLC for the base bid amount of $244,282.46 with a
35% contingency of $85,498.46
The City Council is being asked to consider the Codiga Park Construction Bid Award at the
May 11, 2009 Committee of the Whole meeting and subsequent May 18, 2009 Regular Meeting.
ATTACHMENTS
Bid Results, Bid Proposal, Agreement Form and Award Recommendation Letter
W:1Administration\CAS\Codiga Park 2008\CAS Codiga Park 4 -23 -09 new format InfoMemolnterlocal 2- 09.doc
CITY OF TUKWILA
OFFICE OF THE CITY CLERK
Christy O'Flahertv, CMC, Citv Clerk
BID OPENING
Codiga Park Construction
98- DR06- Codiga -09
April 21, 2009 11:00 A.M.
APPARENT
ADDENDUMS LOWEST
SECURITY GRAND TOTAL ACKNOWLEDGED BIDDER
BIDDER NAME BID (RANK
DATE STAMP OF RECEIPT REC'D.? ORDER)
Merlino Bros LLC
4/21/09 8:50 AM Y 234,253.00 Y 2
Dennis R. Craig
Construction, Inc.
4/21/09 9:30 AM Y 322,879.75 Y 13
Freeman Bell LLC
4/21/09 9:33 AM Y 262,965.00 Y 8
Wyser Construction
4/21/09 9:34 AM Y 246,000.00 Y 4
Joe Hall Construction, Inc.
4/21/09 9:38 AM Y 396,309.00 Y 15
Paul Brothers, Inc.
4/21/09 9:41 AM Y 254,423.00 Y 6
Road Construction
Northwest, Inc.
4/21/09 9:45 AM Y 298,956.00 Y 10
L.W. Sundstrom, Inc.
4/21/09 9:46 AM Y 305,001.00 Y 11
Evergreen Landscape
Construct Inc.
4/21/09 9:47 AM (1) Y 307,200.00 Y 12
Archer Construction Inc.
4/21/09 9:47 AM (2) Y 254,000.00 Y 5
R.W. Scott Construction Co.
4/21/09 9 :49 AM Y 256,920.00 Y 7
Controlled Rain LLC
4/21/09 9:50 AM Y 296,643.00 Y 9
Henderson Partners LLC
dba Bedrock Construction
4/21/09 9:51 AM Y 240,691.00 Y 3
Precision Earthworks, Inc.
4/21/09 9:52 AM Y 327,400.00 Y 14
Construct Co.
4/21/09 9:55 AM Y 223,089.00 Y 1
ENGINEER'S ESTIMATE 492,750.00
The above figures appear as written within bid documents; and as read aloud at bid opening. THEY
DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise.
DATED this 21 day of April, 2009.
/s/ L OF av3)
Christy O'Flaherty, City Clerk
DRAFT
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, REJECTING ALL BIDS SUBMITTED FOR CODIGA
PARK CONSTRUCTION PROJECT NO. 98- DR06- CODIGA -09 DUE TO
PROJECT POSTPONEMENT BASED ON THE CURRENT ECONOMIC
CLIMATE.
WHEREAS, sealed bids were solicited for Codiga Park Construction Project No. 98-
DR06- CODIGA -09; and
WHEREAS, the City received 15 bids that were all publicly opened, examined and
declared by the City Clerk's Office on April 21, 2009; and
WHEREAS, all 15 bids were responsive, met experience qualifications, and came in
under the engineer's budget estimate; and
WHEREAS, due to the City's current economic climate with revenues falling below
budget projections, creating budget cut -backs and reductions in all departments, it is
the recommendation of the Mayor to postpone this project and reject all bids received;
and
WHEREAS, RCW 35.23.352 provides for the rejection of any or all bids by
resolution of the City Council;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Bids Rejected. All bids for Codiga Park Construction Project No. 98-
DR06- CODIGA -09 are hereby rejected. The bid deposits received by the City shall be
returned to the bidders with notification of the rejection.
Section 2. City Staff Directed. City staff is hereby directed to postpone the Codiga
Park Construction Project indefinitely until the City determines the project is financially
feasible.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of 2009.
ATTEST/ AUTHENTICATED:
Christy O'Flaherty, CMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
W: \Word Processing \Resolutions \Codiga Park Bid Reject.doc
RE:kn 6/4/2009
Joan Hernandez, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Page 1 of 1
COMMUNITY AFFAIRS AND PARKS COMMITTEE
Meeting Minutes
June 8, 2009 5:00 p.m.; Conference Room #3
PRESENT
Councilmembers: Verna Griffin, Chair; Joe Duffle and Kathy Hougardy
Staff: Bruce Fletcher, Rick Still, Robert Eaton, Rhonda Berry and Kimberly Matej
CALL TO ORDER: Committee Chair Griffin called the meeting to order at 5:02 p.m.
I. PRESENTATIONS
No presentations.
III. MISCELLANEOUS
Meeting adjourned at 5:17 p.m.
Next meeting: Tuesday, June 22, 2009— 5:00 p.m. Conference Room #3
II. BUSINESS AGENDA
A. Resolution Reiectine Bids for Codiga Park
At the May 28, 2009, Budget Workshop, Mayor Haggerton recommended a number of projects from the
CEP be delayed through 2010 due to the current state of the economy. Codiga Park was included in that
list of CEP projects.
Per the recommendation above, Parks Recreation staff is seeking full Council approval of a resolution
rejecting all bids for the construction of Codiga Park.
This project, on hold through 2010, will remain in the CIP and project funding will go into the out years.
Although Committee members believe the City is invested in this project, they recognize the need to be
economically responsible during these times. UNANIMOUS APPROVAL. FORWARD TO JUNE 22
COW FOR DISCUSSION.
Committee Chair Approval
KAM.
City of Tukwila
Community Affairs and Parks Committee