ITEM
CAS NUMBER: 09-075 I ORIGINAL AGENDA DATE: JUNE 8, 2009
AGENDA ITEM TITLE Resolution adopting the Six -Year Transportation Improvement Program 2010 2015
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mfg Date 06/08/09 Mtg Date tbltg Date 06/15/09 Aft Date Mtg Date Mtg Date 06/08/09 Mtg Date
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &R Police Ply
SPONSOR'S The Transportation Improvement Program (TIP) is required by RCW to be updated
SUMMARY annually. The TIP is primarily a financial planning document for projects competing for
grants. A Public Hearing is scheduled on June 8, 2009 for the 2010 2015 TIP. After the
Public Hearing, the TIP is adopted by resolution and is then incorporated into the Regional
and State TIPs.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 05/18/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works Hold Public Hearing and adopt resolution
COMMrnEE Unanimous Approvai; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AIMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
06/08/09
06/15/09 1
MTG. DATE I ATTACHMENTS
06/08/09 Informational Memorandum dated 05/06/09
Draft Resolution
Draft 2010 2015 TIP Spreadsheet
Current Adopted 2009 2014 TIP
Minutes from the Transportation Committee meeting of 05/18/09
06/15/09 1
City of Tukwila
O
a 9 1 Jim Haggerton, Mayor
9os INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
TRANSPORTATION COMMITTEE
FROM: Public Works Director
DATE: May 6, 2009
SUBJECT: Six -Year Transportation Improvement Program (2010 -2015)
ISSUE
Annual update of the Six -Year Transportation Improvement Program for the years 2010 2015.
BACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by RCW. The TIP
is adopted by resolution after a public hearing at the local agency level and incorporated into the
regional and state TIPs. The TIP is primarily a financial planning document for projects competing
for grants. Any project submitted for federal grant funding must be included in the local, regional
and state adopted TIPs.
The TIP is a rolling plan showing various funding sources: grants, developer, and local funds.
Projects "roll" as funds or stages occur (design report, final design, and construction).
Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation related
projects. The TIP lists only those transportation- related projects planned within the next six years
that are deemed regionally significant. The City's CIP lists transportation projects planned in the
next six years and beyond, as well as water, sewer, surface water, and capital facilities. The TIP is
required to be adopted by July 1 on an annual basis, while the CIP is prepared during summer /fall
in conjunction with the City's budget preparation. Differences between the two may be due to
priority changes, funding availability changes, or other factors that normally occur during the time
between adoption of each document.
ACTION TAKEN
The attached spreadsheet is the "Draft" 2010 2015 TIP and was created by modifying the 2009
2014 TIP to add or remove projects, adjust project costs, and reprioritize the list of projects.
Added: Project 11— Walk Roll Plan (Nonmotorized Transportation Plan)
Deleted: Tukwila Int'I Blvd (Phase II)
Deleted: Tukwila Int'I Blvd (Phase III)
RECOMMENDATION
The Council is being asked to approve and forward the resolution for the updated annual Six -Year
Transportation Improvement Program of 2010 2015 for consideration at the June 8, 2009
Committee of the Whole meeting to hold a Public Hearing and subsequent June 15, 2009 Regular
Meeting for Adoption.
Attachment: Resolution
2010 2015 "Draft" Transportation Improvement Program (TIP) Spreadsheet
Current Adopted 2009 2014 TIP
P:\PROJECTS \TIP \Current TIP \02010 memo gl.doc
DRAFT
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (2010- 2015), AND DIRECTING THE SAME
TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION
AND THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six-Year Transportation Improvement Program for the
ensuing six calendar years (2010- 2015); and
WHEREAS, on June 8, 2009, a public hearing was held regarding the City's Six-
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six-year Transportation Improvement Program
for the calendar years 2010 -2015 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of 2009.
ATTEST/ AUTHENTICATED:
Joan Hernandez, Council President
Christy O'Flaherty, CMC, City Clerk
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Office of the City Attorney Resolution Number:
Exhibit: City of Tukwila' s Six-Year Transportation
Improvement Program from 2010 to 2015
W: \Word Processing Resolutions TIP 2010 -2015 Adoption.doc
RT:GLkn 5/14/2009 Page 1 of 1
(DRAFT 2010 -2015 TIP SUMMARY
I
2010.20151 2009 CIP
TIP I PROJECT TITLE Poo No, 2010
1
1 'Neighborhood Traffic Calming Pronrom 4 0
2 .Annual Bridge Inspacllons and Rooalrs --1291-1-7,',56
145
3 Bo01n8 AcC85o Rd 8ridpu Roplocumunl
4 Tukwila UPoUn Conlor- P0tl /008 Bridgo 10 U
5 Soulhcontor Parkway (S 180 SI S 200 St)_ 14 5,820
---1--- 6 Tukwllu Urban Contor Access (ICIIckltai 15 __23,480
7 144 S (Phase 11) 10 01
8 'Annual Ovorlay Rupulr Pro(tram 20
9 Tul /wIlo Urban Conlur- Transit Conlor 22
10 Andovor Park Wool (Tuk. Pkway. Strandor)1 25
11 Walk Roll Plan (Nonmolorlrod Trans. Pion, 24
12 Macadam Rd 0 14410 St Intorsucllon 27
13 ,Andovor Pk E Mlnklor Blvd Inlursacllon 28
14 W Valloy Hwy/ S 150 St 29
15 Andover Park E Industry Dr. Slam' 30
16 S 133 St SR 599 Ramps Intorcccllon I 31
17 IEasl Morainal Way (8AR to 0 112 St) 1 32
18 Ilnlerurbnn Avu 0 IS143 St FS. DonlWy): .33
19 ITUC/TOD Pudostrlan Irnprov0monls 1 34
20 IMInklor Blvd. (Soulhconlur Pkwy APWJI 35
21 'Tukwila Intl Blvd. (Pismo IV) 1 35
22 ITroffic Slnnal Interconnect Program 1 37
23 ISC Blvd Wldonin0 (1.5. 61st Aoo 0 Bridge) 1 38
24 Tukwila Inl'I Blvd. S 116 Wy/ 0/1500 1 39
25 S 168 SI (51C Parkwy to Andovor Pk 0) 1 40
26 Mott Volley 11wy (1.405 Strondor Blvd.) I 41
27 Nolson Place (0 158 SI S 156 St) 1 43_
20 S 180 St/ Andovor Park W Inluraaction 44
20 S 14410 0) Brid9u SldwoIkc 47
30 Groonbull Mulll rp Irpo oo Tralin 50
TOTAL
1
PROJECTS REVISED FROM 2009.2014 TIP:
Dulutod ITokwIIa Inl'I Dlvd. Phdsu 11)
au
U0lolud 'Tukwila Intl 00d. (Phu III) I
Now Wulk (toll Plan (Nonmotorl/od Trans, Plon)1 24
1,2501 1,25
1,150 1,15
0 1,46
2001 2
171
751
751
751
01 2
0 1 0
oi
01
01
of
01
DI
01
01
01
431 4
34,OOG 31,320
2010 2015 Draft
Transportation Improvement Program (TIP)
Projoct Carts In Thousands of Do
2011 2012
1
01 0
1451 205
1,75 13,817
500
25,25 0
0
0
2013 _2014
01 0 0
01 0 1,750
1,250 1,250 1,250 1,2501 7,500
O 0 1 0 4,300 6,600
6 01 0 1,461
200 2001 200 0 1,000
O 01 0 510 627
01 01 0 002 677
0) 01 0 1,032 1,107
01 0 0 5 75( 5
01 01 0 6301 050
0 01
O 0 31 3,350
400 8,42.51 4,275 0 11,100
01 1,1001 1,100
O 01 4251 425
O 01 4,5011 4.591
O 3,0001 3.000
0 20,0001 20,000
O 4,675 4,075
0 __2 23,244
O 6301 630
2001 200
0
0
0 0
205 270
13,6171 0
1001 1,400
01 0
210 210
100 100
43 4' 0 172
10,215 21,84 7,3051 72,494 103,350 31,671 301702
ars.
2015
0
270
0
0
0
TO
0
1,240
30,734
2,000
31,077
23,480
1,750
Fodorol
24,588
400
3,083
3,000
Juno 2, 2009 1
i I
FUNDING SOURCES
Stalo TIB Dovolonor Un30curoc City
15,000
5.250
452
a
1.245
6,146
1,600
6,307 6,087
12,139 3,091
1,000 750
7,500
4,620 1,520
940 521
17 610
75 602
75 440 592
75 575.
20 460 17C
1,040 1,300 1,010
5,000 6,100
500 600
425
216 3,500 870
1,200 1,000
20,000
1,900 2,775
5,300 17,044
530 100
205
30 100 80
10C
1 172
28,7891 20,0201 8 2,160
Agency:
Co. No.:
City No.:
00 2
14 3
00 4
14 5
16 6
Washington State Department of Transportation
Tukwila
17
1320
Greenbelt Trolls
Co. Name: King
MPO /RTPO: PSRC
Project Identification
A. PIN /Fodoral Ald No. B. Bridge No.
C. Project Title
D. Street/Road Namo or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Neighborhood Traffic Calming Program
Various City Streets
from: to:
Program to address neighborhood traffic concerns using striping, signogo,
roadway improvements, traffic calming, and education to reduce speeding
and Improve safety.
from: to:
Provide safe connections to public trails to promote pedestrian and bicycle
modes of transportation In lieu of motorized vehicles.
Annual Bridge Inspections and Repairs
Various City Streets
from: to:
Perform load ratings and bi- annual Inspections as well as construct
necessary repairs and maintenance.
Tukwila Urban Center Ped /Bike Bridge
from: Baker Blvd. to: West Valley Hwy
Pedestrian bridge over the Green River connecting the CBD and roll station.
Boeing Access Rd Bridge Replacement
Boeing Access Road
from: Airport Way to: 1.5
Reconstruct bridge.
Southcentor Parinwoy (S 180 St S 200 St)
Southcenler Parkway
from: S 180 St to: S 200 St
Construct widening to 4 lanes with center turn pockets Including curb 8
gutter, sidewalks, drainage, landscaping, and utility undorgrounding.
16 7
Tukwila Urban ContorAccess (Klickitat)
Southcenter Parkway
from: 1.5 Off Ramp to: S 168 St
Design and construct safety and capacity improvements.
08002.500
01
E
N c o N
w o
U 0
J
w z o Start
li (mm/dd /yyyy)
4 5 6 7 8 9
ALL 1/1/2009
12 S
32 P
11 S
32 ID 1,000 Ft
08
09 P
1,000 Ft T
P
0
01 S 7,400 Ft W
T
S
P
G
05 P 1,500 Ft W
T
S
P
G
08
Totals
PE 1/1/2009
Totals
ALL 1/1/2009
Totals
PE 1/1/2010
CN 1/1/2012
Totals
ALL 1/1/2014
Totals
CN 1/1/2009
Totals
CN 1/1/2009
Totals
Report Date: June 27, 2005 Page 1
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Federal State
Fund Cost by Fund
Code Phase Code
10 11 12
BR
Discretionary
Discretionary
7444
7,444
9476
3401
TPP
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
State Local
Funds Funds
TPP 5250
13 14
215
1015
6931
5000 16526
9,476 5000 16526
21209
Total
Funds
1015 1015
500 500
1600 1600
2100 2100
6931 143751
2151 43
10151 120
14375
310021 10175
31002 10175
29860 1 29860
3 5250 21209 29860 29860
6/9/2008 Adoption Date: 6/16/2008
Resolution No.: 1663
Expenditure Schedule
(Local Agency)
1st 2nd 3rd
15 16 17 18 19
215 215 43 43 43 86
140
120 140 140 615
400 100
400 100
20827
20827
43 1 43
140
4th
Thru
6th
86
615
1600 CE
1600
14375 CE
14375
Federally Funded
Projects Only
RAN
Required
Envir. Date
Type (MM'YY)
20 21
CE
CE
Yes
12/31/12
No
Yes
7/1/09
Yes
12/31/09
v. 5.7 Supersedes previous editions
AM.
Washington State Department of Transportation
Agency: Tukwila
Co. No.: 17
City No.: 1320
1 2
14 8
14 9 03 S
Tukwila Int'I Blvd (Phase 3)
Tukwila Int'I Blvd
from: S 132 St to: S 138 St
Reconstruct roadway Including paving, curb gutter, sidewalks,
Illumination, drainage, and utility undergrounding.
17 10
14 14
Co. Name: King
MPO /RTPO: PSRC
Project Identification
A. PIN /Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
Tukwila Int'1 Blvd (Phase 2)
Tukwila Int'I Blvd
from: S 116 St to: S 132 St
Construct overlay, curb gutter, sidewalks, Illumination, drainage,
landscaping, and utility undergrounding.
S 144 St (Phase 2)
S144St
from: 42 Ave S to: Tukwila Int'I Blvd
Design and construct paving, curb gutter, sidewalks, drainage,
illumination, and utility undergrounding,
16 11 07 S
Annual Ovorloy and Ropair Program
Various City Streets
from: to:
Repair, rehabilitate, and ovedoy City streets as needed In an annual
program.
16 12
Tukwila Urban Canter- Transit Cantor
Central Business District
from: to:
Design and construct a transit center.
16 13
Andover Park Wost
Andover Park West
from: Tukwila Parkway lo: Strander Blvd.
Complete widening for center left turn lane.
Interurban Ave S
Interurban Ave S
from: S 143 St to: Fort Dent Way
Reconstruct street Including paving, curb gutter, drainage, Illumination,
sidewalk, and landscaping.
03 P 1000 P
T
W
s
G
C
21 P
05 P
2,100 Ft G
C
S
P
T
W
C
G
0
P
S
T
W
T
w
P
S
2000 C
G
P
S
T
w
03 P 4,500 Ft W
T
S
P
G
C
CN 1 1/1/2009
Totals
ALL 1/1/2014
Totals
ALL 1/1/2009
Totals
ALL 1/1/2009
Totals
ALL 1/1/2009
Totals
CN 1/1/2014
Totals
STP(U)
STP(U)
Report Date: June 27, 2005 Page 2
3104
800
Six Year Transportation Improvement Program
From 2009 to 2014
Project Costs in Thousands of Dollars Federally Funded
d E m Fund Source Information Expenditure Schedule Projects Only
E7' N o N (Coca Agency)
a 0 Federal Funding R/N/
a� N T Phase Federal Federal State 4th Required
E r Start Fund Cost by Fund State Local Total Thru Envir. Date
ti (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Mnyyy)
4 5 6 7 8 9 10 11 ,,12 I 13 14 15 16 17 18 19 20 21
03 S 5,000 Ft G CN 1/1/2009 STP(U) 1715 TPP 2000 1296 5011 5011
0 CE
0 No
P
S
T
W
C Totals 1,71 2000 1296 5011 5011
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
668
3,104 668 3772 3772
1750
1750 1750 1750
7500
7500 7500 1250 1250 1250
4600
800 4600 5400 3100 2300
1461
7625
37721 3772
17501
75001 1250
54001 3100
14611 1461
1461 1461 1461
7625 1
1250 1 1250
1750
3750
7625 7625 7625
3750
2300 CE
7625 CE
CE
Yes
7/1/08
Yes
12/31/14
Yes
1/1/12
v. 5.7 Supersedes previous editions
,1111.
ter' Washington State Department of Transportation
Agency: Tukwila
Co. No.: 17
City No.: 1320
N
O y
u-
a`1
'aE
aZ
1 2
17 15
16 16 12 P
S 133 St/ SR 599 Ramps Intersection
17 17 05 P 1000
Macadam Rd S 144 St lntorsection
Macadam Road
from: S 144 St to: 1,000 Ft on south leg
Widen Macadam Rood to add a northbound left turn lane.
16 18 12 S 1,000 Ft
Andovor Park E Mlnklor Blvd. Intorsoction
14 19
16 20
14 21
Co. Name: King
MPO /RTPO: PSRC
Project Identification
A. PIN /Fodoral Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
3
TUC/TOD Pedestrian Improvements
from: Tukwila Urban Center to: Rail Station
Construct bike /pedestrian connection betwoon Tukwila Urban Center and
Commuter Roll Stallon/TOD oroa.
from: 500 Ft. on each leg to: 500 Ft. on each leg
Design and construct intersection Improvomonls Including a now traffic
signal:
from: 500 Ft. on each leg lo: 500 Fl. on each leg
Design and construct Intersection and traffic signal Improvements and
widening for left turn lanes.
Wost Va/loy Hwy /S 156 St
from: Southcenler Blvd. to: S 158 St
Construct additional northbound left turn lane at S 168 St for northbound
HOV to northbound 1 -405,
Andover Pk E Industry Dr. Signal
from: 500 Ft. on each leg lo: 500 Ft. on each leg
Design and construct a traffic signal and Intersection Improvements.
Tukwila Intl Blvd. (Phase 4)
Tukwila Int'I Blvd
from: Boeing Access Rd. to: S 116 St
Design and construct widening Including paving, curb gutter, sidewalk,
drainage, illumination, landscaping, and utility undergrounding,
Project Costs In Thousands of Dollars Federally Funded
E N 8 v u Fund Source Information Expenditure Schedule Projects Only
o (Local Agency)
d 8 w L Federal Funding Riw
a 0 o ,S Phase Federal Federal State State Local Total 4th Envir. Required
I— D Start Fund Cost by Fund 1st 2nd 3rd Thru Date
(mm /ddyyyy) Code Phase Code Funds Funds Funds 6th Type (myyj
4 5 6 7 8 9 10 11 12 I 13 14 15 16 17 19 20 21
CN 1/1/2009 630 630 630
32 S 0 CE
06 No
1,000 Ft W
T
S
G
C
P
12 P 1,500 Ft T
P
12 p 1,000 Ft W
T
S
P
G
03 p 3,500 Fl P
S
W
O
Totals
ALL 1 1/1/2009
Totals
ALL 1/1/2010
Totals
ALL 1/1/2010
Totals
ALL 1/1/2010
Totals
ALL 1/1/2010
Totals
ALL 1/1/2014
Totals
Report Date: June 27, 2005 Page 3
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
630 630 630
690
690 690 60 630
610
654
1080
500
500
4591
6901 60
610 1
610 610 180 430
654
10801
500 1
500
4591
630
180 1 430
75
654 654 75 579
48
1080 1080 48 1032
48
579
1032
452
48 452
4591
4591 4591 4591
v. 5.7 Supersedes previous editions
4
Washington State Department of Transportation
Agge en ncy: Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
Project Identification
ti A. PIN /Federal Aid No. B. Bridge No. d rn
C. Project Title E J o L
r, Y-2 D. Street/Road Name or Number a� N 3 j2 CL Phase
u` E. Beginning MP or Road Ending MP or Road E r°- o Start
F. Describe Work to be Done a. (mm /dd/yyyy)
1 2 3 4 5 6 7 8 9
16 22 12 S w ALL 1/1/2014
14 23
16 25
14 26
Wost Valley Highway
West Valley hlwy
from: 1 -405 to: Strander Blvd
Design and construct widening to 7 lanes Including curb gutter, sidewalks,
Illumination, and drainage.
16 28
Traffic Signal Interconnect Program
Various City Streets
from: to:
Doslgn and Install hard wire Interconnect system between traffic signals and
the Traffic Operations Center.
SC Blvd. Widening
Southcenter Blvd
from: 1.5 to: 61 Ave S
Widen Southcenter Blvd. and the 61 st Ave S Bridge to add a lane for future
traffic 'growth.
S 168 St
S 168 St
from: Southcenter Pkwy to: Andover Pk E
Construct new roadway Including curb gutter, sidewalk, drainage,
illumination, and landscaping.
S 180 St Andover Park W Intersection
from: 500 Ft. on each leg to: 500 Ft. on each leg
Widen for north south tum lands,
T
G
C
P
S
04 P 0.5 C
G
P
S
T
W
14 24 04 P 2000 P
Tukw/la lnt'I Blvd /S 116 St
Tukwila Intl Blvd
from: 1,000 Ft. on each leg to: 1,000 Ft. on each log
Design and construct widening on Tukwila Intl Blvd and Intersection
Improvements at T.I.B. /S 116 St.
01 P 4,000 Ft P
T
W
S
05 P 0.5 Mi W
17 27 03 P 600 Ft
Nelson Ploco
Nelson Place
from: S 156 St to: S 158 St
Cosign and construct paving, curb gutter, sidewalks, drainage, and
Illumination.
T
S
P
G
12 P 1000 w
T
P
Totals
ALL 1 1/1/2013
Totals
ALL 1/1/2014
Totals
ALL 1/1/2014
Totals
ALL 1/1/2014
Totals
ALL 1/1/2014
Totals
ALL 1/11/2014
Totals
Report Date: June 27, 2005 Page 4
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Federal State
Fund Cost by Fund
Code Phase Code
10 11 12
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
R/W
4th Required
State Local Total Thu Envir. Date
Funds Funds Funds 1st 2nd 3rd 6th Type (MM
13 14 15 16 17 18 19 20 21
3000 3000 3000
3000 3000 3000
1700 1 17001
1700 1700 1700
4675 1 46751
4675 4675 4675
1372
630
200
210
13721
630
200
210
Expenditure Schedule
(Local Agency)
1700
4675
1372
1372 1372 1372
630
630 630 630
200
200 200 200
210
210 210 210
Federally Funded
Projects Only
v. 5.7 Supersedes previous editions
Washington Stato Department of Transportation
Agency: Tukwila
Tukwila
Co. No.: 17 Co. Name: King
City No.: 1320 MPO /RTPO: PSRC
Project Identification
A. PIN /Federal AId No. B. Bridge No.
U 2 'o E C. Project Title
LL a z D. Street/Road Namo or Number
E. Beginning MP or Road Ending MP or Road
F. Describe Work to be Done
1 2 3
17 29
16 30
16 31
S 144 St Bridge Sidewalks
S 144 St
from: 51 Ave S to: 53 Ave S
Widen existing sidewalks on bridge over 1.5 between 51st Ave S and 53rd
Ave S.
MinklorBlvd
Minkler Blvd
from: Southcenter Pkwy to: Andover Park W
Consruct widening for 3 lanes Inccuding curb gutter, sidewalk, drainage,
and landscaping.
East Marginal Way
East Marginal Way
from: Boeing Access Rd. to: S 112 St
Design and construct widening to 3 lanes Including curb gutter, sidewalks,
drainage, landscaping, and utility undergrounding.
4 5 6 7 8
05 P 0.25 C PE 1/1/2014
G
P
S
T
W
Totals
ALL 1/1/2012
04 p 2,000 Ft W
T
5
P
03 P 1,500 Ft P
S
T
W
Project Costs in Thousands of Dollars
2 a, Fund Source Information
o
o Federal Funding
Z
tY Phase Federal Federal State
Start Fund Cost by Fund State
(mm /dd/yyyy) Code Phase Code Funds
Totals
ALL 1/1/2011
Totals
Grand Totals for Tukwila
STP(U)
Report Date: June 27, 2005 Page 5
9 10 11 12 13
700
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 6/9/2008 Adoption Date: 6/16/2008
Amend Date: Resolution No.: 1663
Expenditure Schedule
(Local Agency)
R/W
4th Required
Local Total Thu Envir. Date
Funds Funds 1st 2nd 3rd 6th Type (MMJVY)
14 15 16 17 18 19 20 21
25 25 25
25 25 25
425 1 4251
425 425
1255
19551
35
425
700 1255 1955 35 1920
26,640 12,250 95,143 134,033 55,482 23641 4,061 50,849
425
1920 CE
Federally Funded
Projects Only
No
v. 5.7 Supersedes previous editions
444 q\
City of Tukwila
o
.-t.-t
'Q Transportation Committee
2�90�
COUECTED
TRANSPORTATION COMMITTEE
Meeting Minutes
May 18, 2009 5:00 p.rn. Conference Room 1
PRESENT
Councilmembers: De'Sean Quinn, Chair; Dennis Robertson and Verna Griffin
Staff: Jim Morrow, Bob Giberson, Peter Lau, Robin Tischmak, Gail Labanara and Kimberly Matej
CALL TO ORDER: Committee Chair Quinn called the meeting to order at 5:00 p.m.
L PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. 2009/10 Overlay Repair Program Bid Award
Staff is seeking full Council approval to award a bid in the amount of $1,560,638.50 to Lakeside Industries
for the construction of the 2009 /10 Annual Overlay Repair Program. The 2009/10 Program will provide
roadway and overlay repairs to 20 street segments and 4 additive items for a total of 23 street segments, a
gas valve adjustment and a private utility casting adjustment.
As lowest bidder, Lakeside Industries' base bid came in over $500,000 under the engineer's estimate, which
allowed four additive items to be awarded and constructed within budget. The base bid plus the four
additives still comes in approximately $400,000 under budget when totaled for the 2009/10 biennium
construction budgets. This cost savings will be returned to the City's General Fund Budget: 104 Arterial
Streets. Lakeside Industries has successfully worked on past City projects. FORWARD TO MAY 26
COW FOR DISCUSSION.
B. 2009/10 Overlay Repair Program Construction Management Services
Staff is seeking full Council approval to enter into a consultant agreement with Anchor -QEA, LLC in the
amount of $216,085 for assisting with the construction management, inspection and review relative to the
2009/10 Overlay Repair Program. Anchor -QEA has successfully worked on past City projects.
The Committee questioned the viability of managing this project in -house if budget constraints forced cost
cutting in this area. Staff reported that due to other ongoing projects, the respective workforce is not able to
take on additional significant responsibilities without risking attention to project details. Also, the City is
unable to provide in -house material testing experts. UNANIMOUS APPROVAL. FORWARD TO MAY
26 COW FOR DISCUSSION.
C. Six -Year Transportation Improvement Program
Staff is seeking Council adoption, via resolution, of the 2010 -2015 Six -Year Transportation Improvement
Program (TIP). The TIP is a list of regionally significant transportation projects that have grant funding
potential. This list does not commit the City to implement or construct any project.
ti Staff discussed the annual update to the TIP, as required by the Revised Code of Washington (RCW). This
Ft annual rolling program is generally modified to reflect the City's CIP, as the two are updated at different
times of the year. Differences between the two plans are often based on and reflective of the time between
the adoptions of each document as well as changes in priority and funding availability.
Three changes are noted in the current document; one addition and two deletions:
Transportation Committee Minutes May 18. 2009 Page 2
Addition: Walk Roll Plan (Nonmotorized Transportation Plan) has been added in order to
seek and qualify for grant funds (State requires inclusion in plan for grant consideration).
Deletion: Tukwila International Boulevard Phase II although ongoing, this project is funded
and no longer needs to be in the TIP.
Deletion: Tukwila International Boulevard Phase 111 although ongoing, this project is funded
and no longer needs to be in the TIP.
Prior to submitting to full Council, an update will be made to the draft TIP summary reflecting increased
federal funding for Project Number 5: Southcenter Parkway. The Committee recommends forwarding the
update to COW for discussion. A public hearing will be held prior to passing the resolution at the same
meeting. UNANIMOUS APPROVAL. FORWARD TO JUNE 8 COW FOR DISCUSSION.
D. 35 Avenue South Street Vacation
Staff is seeking full Council approval of an ordinance extending the 35 Avenue Street vacation from April
30, 2009, to December 31, 2009. This is the final street vacation of seven which were originally requested
(see Finance Safety Committee minutes dated May 14, 2007; Transportation Committee minutes dated
April 29, 2008, and November 12, 2008).
These street vacations were agreed upon by the City and Sound Transit as part of the Link Light Rail
Project; however, Sound Transit is working with the Washington State Department of Transportation to
clarify underlying rights regarding a potion of this particular street vacation. UNANIMOUS APPROVAL.
FORWARD TO MAY 26 COW FOR DISCUSSION.
E. 2009 1' Ouarter Reports
The Committee reviewed the status of program goals as outlined in the 2009 1' Quarter Report, and asked
clarifying questions as appropriate. INFORMATION ONLY.
III. MISCELLANEOUS
Jim Morrow provided an update on the status of the Howard Hanson Dam.
Committee Member Robertson discussed budget infouuation and service reduction scenarios recently presented
by King County Metro. He will be bringing this item to full Council tonight in order to determine the Council
and Mayor's preferred service model so that he can communicate this information as the City's representative at
the next SCATBd meeting which is scheduled for tomorrow, May 19, 2009.