CAS NUMBER: 09-80 ORIGLNAL AGENDA DATE: JUNE 8, 2009
AGENDA ITEM TITLE Standby Power Upgrades Year One
Approval of Budget and Change Order No. 5 for $50,565.03
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 06/08/09 Mtg Date 06/15/09 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date
ISPONSOR Council Ma Adm Svcs DCD Finance Fire Legal P&R Police P11"
SPONSOR'S This project installed standby generators at City Hall and Fire Station 52, 53, and 54. The
SUMMARY three fire station generators have been successfully installed and tested. The City Hall
location was found to be located in a stream buffer and needed to be relocated into the
Police parking lot. The new site costs with other minor change orders total over the 10%
contingency of $52,300.00. Council approval is needed for Change Order No. 5 in the
amount of $50,565.03.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 05/27/09
RECOMMENDATIONS:
SPONSOR /ADM. Public Works
CON fII rEE Unanimous Approval; Forward to Committee of the Whole
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$50,565.03 $764,000.00 $0.00
Fund Source: 303 FACILITIES
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
06/08/09
06/15/09
MTG. DATE ATTACHMENTS
06/08/09 Informational Memorandum dated 05/14/09
Change Order No. 5 with Ebenal General, Inc.
Minutes from the Utilities Committee meeting of 05/27/09
06/15/09
o y City of Tukwila
a GSZI o Jim Haggerton, Mayor
tft
Igo- INFORMATIONAL MEMORANDUM
To: Mayor Haggerton
Utilities Committee
From: Public Works Director
Date: May 14, 2009
Subject: Standby Power Upgrades —Year One
Project No. 06 -BG01, Contract 08 -086
Change Order No. 5
ISSUE
Approve Change Order No. 5 to Contract Number 08 -086.
BACKGROUND
Ebenal General, Inc. was awarded the construction contract for the Standby Power Upgrades
Year One Project and Notice to Proceed was issued October 6, 2008. This contract was for four
standby generators to be installed at City Hall and Fire Stations 52, 53 and 54 for $480,000 plus
sales tax with a 10% contingency of $52,300.
The Fire Stations generators have been installed and tested with four change orders totaling
$14,742 (without tax). Upon closer analysis of the proposed City Hall generator location on the
west side of City Hall, it was discovered that the site was within a stream buffer and would
require a significant amount of mitigation.
ANALYSIS
It was determined that a new City Hall site, not located near the stream, was needed. Several
new sites were evaluated and design plans were revised with a location on the sloped lawn area
in front of City Hall, however, the costs associated with that site were extremely prohibitive. A
final site was chosen in the furthest west parking stall of the lower City Hall parking lot (near the
lunchroom deck). This is the closest feasible location to the existing electrical facilities.
After negotiations with Ebenal General, Change Order No. 5 will add $50,565.03 and 76
calendar days to the original contract. The new contract total will be $545,307.03 (without sales
tax). The cost increase for all change orders is over the authorized 10% construction
contingency of $52,300 and Change Order No. 5 will require Council approval.
RECOMMENDATION
The Council is being asked to approve Change Order No. 5 for the Standby Power Upgrades
Year One Project with Ebenal General, Inc., in the amount of $50,565.03 for consideration at
the June 8, 2009 Committee of the Whole meeting and subsequent June 15, 2009 Regular
Meeting.
Attachment: Change Order No. 5
W IPN Erg1PROJECTS}A- 8G Prolects\06BG01 Stand Power UcgradelConstruction \Ebena9lnfo Memo CO 95 CH 5-14 -09 Final.doc
o CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 5
DATE: 5 -14 -09 BUDGET NO: 303.00.594.190.62.35 City Hall
PROJECT NO: 06 BG01 CONTRACT NO: 08 086
PROJECT NAME: Standby Power Upgrades Year One Construction
TO: Ebenal General, Inc.
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions: A. The following change, and work affected thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of
this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates
for approval in advance of all change orders.
CHANGE:
The proposed work in Change Order No. 5 initially resulted from the discovery of the proposed generator site location at the west
side of was within a stream buffer. This location would create a sizeable amount of mitigation if built in this location. A new site
was needed to be determined. New sites were evaluated and design plans were revised with a location in the sloped lawn area in
front of City Hall. The costs associated with this location were becoming prohibitive. Finally a site was chosen in the furthest
westerly stall of the lower parking lot. This is the nearest feasible location in regard to the location of the existing electrical facilities
being connected.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all
services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
This change represents a fair, equitable and complete compensation.
ACCEPTED: Contractor: Ebenal General, Inc.
By Title I AAA,/c ,qtr
Original Contract (without tax) 480,000.00 APPROVED BY THE CITY OF TUKWILA
Previous Change Order 14742.00 Date
This Change Order (without tax) 50,565.03
By
REV. CONTRACT AMOUNT $545,307.03 Mayor
Additional Calendar Days due to this change: 76 for a revised total of 243 days
ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w /encumbrance)
Contractor (2 of 2) Construction Inspector
Construction Engineer
file: p:lformsl
C:lDocuments and Settings\Don.EGC\Local Settings\Temporary Internet Files\ Content- Outlook'KLX6JY70\Ebenal CO #5 CH 4 -09 -09 draftl doc
City of Tukwila
Utilities Committee
\I90�
UTILITIES COMMITTEE
Meeting Minutes
May 27, 2009 5:00 p.m. Conference Room #1 *Wedfiesday, due to holiday
PRESENT
Councilmembers: Kathy Hougardy, Chair; Joe Duffie (sitting in for Pam Linder), and Dennis Robertson
Staff: Jim Morrow, Frank Iriarte, Bob Giberson, Pat Brodin, Peter Lau, Ryan Larson, Mike Cusick,
Mike Mathia, Gail Labanara and Kimberly Matej
CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:00 p.m.
I. PRESENTATIONS No Presentations
II. BUSINESS AGENDA
A. Interurban Avenue South Waterline Proiect Gary Merlino Chance Order Nos. 2 3
In 2008, Council approved a bid award for replacement of the Interurban Avenue South Water Line. This
project replaces an aging cast iron water line which has been consistently problematic (see Utilities
Committee Minutes dated 08/18/08, 10/20/08). The waterline runs along Interurban Avenue South from
42n Avenue South to 48 Avenue South.
Staff is seeking full Council approval for Change Orders Nos. 2 and 3 to Construction Contract No. 08-
093 with Gary Merlino Construction Company in the amount of $30,714 ($16,390.21 and $14,323.79
respectively), for replacement of the Interurban Avenue South Water Line. This project replaces an aging
cast iron water line which has been consistently problematic.
These changes orders are a result of unknown waterlines and connection requirements including a change
in waterline size. Council approval is required because the project change orders now total more than the
Council authorized 10% construction contingency (project is still within budget). UNANIMOUS
APPROVAL. FORWARD TO JUNE 8 COW FOR DISCUSSION.
B. Interurban Avenue South Waterline Proiect Anchor OEA CM Supplement No. 7
Staff is seeking full Council approval for Supplemental Agreement No. 7 (to Consultant Agreement No.
06 -049) with Anchor QEA, LLC (formerly known as Anchor Environmental, LLC) in the amount of
$21,206 for additional construction management services needed as a result of the change orders as
discussed in Bern A above. UNANIMOUS APPROVAL. FORWARD TO JUNE 8 COW FOR
DISCUSSION.
C. Standby Power Unerades Year One Ebenal General Change Order No. 5
In 2008, Council approved a bid award to Ebenal General, Inc. for standby power upgrades at the
following locations: City Hall and Fire Stations 52, 53 and 54 (see Utilities Committee Minutes dated
08/04/08).
The Standby Power Upgrades for the Fire Station locations have been completed. However, the original
installation location and subsequent locations for the City Hall generator were determined to be cost
prohibitive, and another location needed to be identified.
As a result of the identification of a feasible installation area, staff is seeking full Council approval of
Change Order No. 5 to Contract No. 08 -086 with Ebenal General in the amount of $50,565.03 and 76
calendar days for the Standby Power Upgrade at City Hall. Council approval is required because the
project change orders now total more than the Council authorized 10% construction contingency (project
is still within budget). UNANIMOUS APPROVAL. FORWARD TO JUNE 8 COW FOR
DISCUSSION.