AGENDA ITEM TITLE Bid Award for Tukwila Village Northfield Car Wash Demolition
Resolution
SPONSOR Council Mayor Adrn Svcs DCD n Finance n Fire Legal P&R Police PIV
This project will demolish the Northfield Car Wash at the Tukwila Village site. The project
was advertised on November 24 and December 1, 2008 and twenty -one bids were opened
on December 31, 2008. The low bid of $35,109.34 was from Pacific NW Earthworks, LLC.
of Fall City, Washington, who has previously done this type of work satisfactorily. The
Council is being asked to award the contract to Pacific NW Earthworks, LLC.
REVIEWED BY COW Mtg CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DAZE: 01/13/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMirrrEE Unanimous Approval; Forward to Committee of the Whole
COST- IMPACT =FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$35,109.34 $40,000.00 $0.00
Fund Source: 302 FUND (PAGE 74, 2009 CIP)
Comments:
Initials
Mayor's review
TEM INFORMATION
(ORIG1NALAGENDADAIb: 26, 2009
Mtg Date
RECORD OF COUNCIL ACTION
ATTACHMENTS
Informationat Memorandum dated 01/07/09
City Clerk Bid Opening Results
Bid Tabulation
Minutes from the Utilities Committee meeting of 01/13/09
Council review
i'ttg Date 02/02/09 Altg Date
I2EmNo.
3tC
Ordinance BtdArvard Public Hearing Other
TO: Mayor Haggerton
Utilities Committee
FROM: Public Works Director
DATE: January 7, 2009
SUBJECT: Tukwila Village Northfield Car Wash Demolition
Project 00 -BG22
Bid Award
ISSUE
Award the Northfield Car Wash Demolition Project to Pacific NW Earthworks, LLC.
BACKGROUND
This project will demolish the Northfield Car Wash at the Tukwila Village site. The project was advertised
for bids on November 24 and December 1, 2008 and bids were opened on December 31, 2008. Twenty
one bids were received with the low bid of $35,109.33 from Pacific NW Earthworks, LLC. of Fall City,
Washington. The low bid was in error by $0.01 in the calculation of sales tax and will be corrected to
$35,109.34. This error does not affect the bid results. The Engineer's Estimate was $60,000.00.
ANALYSIS
The bids were reviewed and minor mathematical errors were found. The math errors did not affect the
bidding outcome of the project. References indicate that Pacific NW Earthworks, LLC has done this type of
work satisfactorily.
BUDGET
City of Tukwila
BID RESULTS ESTIMATE BUDGET
Construction $35,109.34 $60,000.00 $40,000.00
Contingency (10 3,510.93 6,000.00 0.00
Total $38.620.27 $66.000.00 $40.000.00
Attachment: City Clerk Bid Opening Results
Bid Tabulation
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
RECOMMENDATION
Award the Northfield Car Wash Demolition Project to Pacific NW Earthworks, LLC. in the amount of
$35,109.34 and consider this item at the January 26, 2009 Committee of the Whole meeting and
subsequent February 2, 2009 Regular Meeting.
PAPROJECTSI BG Projects OQbg22 TUK VILLAGEUvc third Cawash Derry Bid Awad.doc
SECURITY
BIDDER NAME BID
DATE STAMP OF REC'D.?
RECEIPT
Sloans Enterprise
12/18/08 2:55 PM Yes
Wester Forest, LTD
12/19/08 8:10 AM Yes
Mayer Construction
12/19/08 8 :15 AM Yes
Providence Trucking
12/19/08 8:15 AM Yes
R.W. Rhine, Inc. Yes
12/19/08 8:20 AM Cashier Ck
3 Kings Environmental
12/19/08 8:30 AM Yes
Construct Co.
12/19/08 8 :33 AM Yes
Nor Tec Construction
12/19/08 8 :37 AM Yes
Higrade Bark, Topsoil
and Rock, Inc.
12/19/08 8:40 AM Yes
Advanced
Underground Yes
12/19/08 8:41 AM Cashier Ck
Buckley Recycle
Center, Inc.
12/19/08 9:40 AM Yes
ESE Corporation
12/19/08 9:00 AM Yes
Pacific Northwest
Earthworks LLC
12/23/08 8:46 AM Yes
Cutter Inc.
12/23/08 8:55 AM Yes
Carman's Construction
12/23/08 9:50 AM Yes
Brike Excavating
12/23/08 10:30 AM Yes
Shinstine Assoc.
12/30/08 1:45 PM Yes
Mike McClung Const.
12/30/08 1:56 PM Yes
CITY OF TUKWILA
OFFICE OF THE CITY CLERK
Christy O'Flaherty, CMC, City Clerk
BID OPENING
Tukwila Village Northfield Car Wash Demo
00 -BG22
December 31, 2008 10:30 A.M.
GRAND TOTAL
Including Sales
Tax
47,006.25
56,629.86
37,105.78
49,867.50
47,690.00
43,199.97
210,697.00
42,946.00
38,027.92
39,240.00
40,875.00
54,302.71
35,109.33
86,110.00
37,550.50
39,971.86
106,734.00
55,045.00
ADDENDUMS
(2)
Acknowledged
APPARENT
LOWEST BIDDER
(RANK ORDER)
Yes 11
Yes 17
Yes 2
Yes 13
Yes 12
Yes 9
Yes 21
Yes 8
Yes 4
No 5
Yes 7
Yes 15
Yes 1
Yes 19
Yes 3
Yes 6
Yes 20
Yes 16
Global Diving
Salvage, Inc.
12/30/08 2:07 PM Yes 77,152.38 Yes 18
Reed Trucking
Excavating, Inc.
12/31/08 8:47 AM Yes 44,145.00 Yes 10
Juhl Development,
LLC
12/31/08 8:51 AM Yes 51,775.00 Yes 14
I I I I I
I I I I
ENGINEER'S
ESTIMATE
60,000.00
The above figures appear as written within bid documents; and as read aloud at bid opening.
THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise.
DATED this 31 day of December, 2008.
/s/
Christy O'Flaherty, City Clerk
NORTHFIELD CAR WASH DEMOLITION
BID RESULTS
00-BG22
MIKE CUSICK PE
DECEMBER 31, 2008
UTILITIES COMMITTEE
Meeting Minutes
January 13, 2009 5.•00 p.m. Conference Room #1
PRESENT
Councilmembers: Kathy Houagrdy, Chair; Joan Hernandez (filling in for Pam Linder), and Dennis Robertson
Staff: Jim Morrow, Frank Iriarte, Bob Giberson, Pat Brodin, Mike Cusick, Gail Labanara,
Derek Speck and Kimberly Matej
CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:09 p.m.
I. PRESENTATIONS
No Presentations.
City of Tukwila
Utilities Committee
II. BUSINESS AGENDA
A. Interurban Water Reuse Foster Golf Links Reclaimed Water Pipeline Extension Proiect Bid Award
Staff is seeking full Council approval to award a bid in the amount of $103,385.41 to Precision
Earthworks, Inc. for the Foster Golf Links Reclaimed Water Pipeline Extension Project. Throughout
2007, staff brought forward information regarding this pipeline extension to the Utilities Committee as
well as full Council (see Utilities Committee minutes dated: 06/02/08, 04/07/08, 02/19/08).
The project will involve extension of the current reclaim water pipeline from Interurban Avenue South to
the existing pond at Foster Golf Links for the use of reclaimed for irrigation. The lowest bidder, in this
competitive process, was Precision Earthworks; who have previously worked with the City, but have
since expanded their services.
King County will not reimburse construction costs associated with this extension to the City until the
project is complete. UNANIMOUS APPROVAL. FORWARD TO JANUARY 26 COW.
B. Tukwila Village Northfield Car Wash Demolition Bid Award
Staff is seeking full Council approval to award a bid in the amount of $35,109.34 to Pacific NW
Earthworks, LLC, for the Tukwila Village Northfield Car Wash Demolition.
As with the bid above, this was also a very competitive process in which 21 bids were submitted. Pacific
NW Earthworks, has not worked with the City before; however, all references have been checked and
cleared.
Staff distributed a new tabulation sheet (page 8), to replace the original, incorrect tabulation sheet (page
8) which was included in the agenda packet. UNANIiVIOUS APPROVAL. FORWARD TO
JANUARY 26 COW.
III. MISCELLANEOUS
For a future agenda item, Jim Morrow suggested the Committee discuss the creation of a formal policy
regarding residential and commercial water leak adjustments. Committee members concurred.
Meeting adjourned at 5:42 p.m.
Next meeting: Monday, January 27, 2009 5:00 p.m. Conference Room No. 1.
Committee Chair Approval
Minut by KA`:',.'Reviewed by GL.