1 CAS NUMBER: 08-105 1 ORIGLNAL AGENDA DATE: AUGUST 25, 2008
AGENDA ITEM TITLE 2008 Overlay Repair Program Construction Management Services
Supplement No. 1 with KPG, Inc.
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 8/25/08 Mtg Date 9/2/08 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date:
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &RZ Police PW
SPONSOR'S Base Contract 08 -017 with KPG, Inc included design engineering services for the 2008
SUNLMARY Overlay Program. The construction bid was awarded to Watson Asphalt on July 7, 2008.
Supplement No. 1 for construction management services has been negotiated with KPG
in the amount of $42,719.72. The scope of work includes all construction management
and inspection services during the overlay and repair construction contract.
REVIEWED BY COW Mtg. CA &P Cmte F&S Cmte
Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 8/12/08
RECOMMENDATIONS:
SPONSOR /ADMIN. Authorize Mayor to sign supplement with KPG, Inc.
COMMIrrEE Unanimous approval; forward to COW.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$42,719.00 $186,000.00
Fund Source: 103 Residential and 104 Commercial Streets (pages 3 and 44, 2008 CIP)
Comments:
1 MTG. DATE RECORD OF COUNCIL ACTION
1 08/25/08
1 09/02/08 1
I I
MTG. DATE 1 ATTACHMENTS
08/25/08 Information Memo dated August 13, 2008 (revised after TC)
Supplement No. 1 with Exhibits
Transportation Committee Meeting Minutes from August 12, 2008
09/02/08 1
I I
INFORMATION MEMO
To: Mayor Haggerton
From: Public Works Director
Date: August 13, 2008
Subject: 2008 Overlay Program
Project No. 08 -RWO1
Consultant Agreement 08 -017, Supplemental Agreement No. 1
Construction Management and Inspection Services
ISSUE
Approve Supplemental Agreement No. 1 to Consultant Agreement Number 08 -017.
BACKGROUND
Base contract No. 08 -017 with KPG, Inc. of Seattle, WA, included design engineering services for the
2008 Overlay Program in the amount of $89,561.60. This was budgeted under Design in the CIP.
On July 7, 2008, the City Council approved a construction contract for the 2008 Annual Overlay
Repair Program. This Annual Overlay will provide roadway repairs and overlays on nine residential and
commercial road segments. To provide adequate construction management (CM) and inspection support
to Public Works project staff, we solicited a proposal from KPG, Inc.
ANALYSIS
KPG, Inc. was the design consultant firm for this construction project. This firm provided similar CM
and inspection support to the 2007 Overlay Program, and has staff availability to provide such services
again this year. Supplemental Agreement No. 1 was carefully reviewed and consists of reasonable scope
and fees.
BUDGET AND BID SUMIi IARY
CM Supplement CM Budget
KPG, Inc. 42,719.72
Residential Overlay (Page 3, 2008 CIP) 36,000.00
Arterial Overlay (Page 44, 2008 CIP) 150.000.00
Total CM 5 42- 719.72 5186.000.00
RECOMMENDATION
Approve Supplemental Agreement No. 1 to KPG, Inc., in the amount of $42,719.72 for a new contract
total of $132,281.32. This modified contract amount is funded by Design and CM in the CIP.
Attachments: Supplemental Agreement No. 1
Exhibit A Scope of Work
Exhibit B Hour and Fee Estimate
P:\PROJECTS \A- R \V RS Projects \08RWO1 2008 Overlay Repair`.Consstruction Phase\Before Construction \KPG's Contract PropasaMnfo Memo for KPG Supplement 01, 8 -13-08 doe
SUPPLEMENTAL AGREEMENT NO. 1
AGREEMENT No. 08.017
PROJECT No. O8 -RWO1
City of Tukwila KPG, Inc.
Public Works Department 753 9th Avenue N.
6300 Southcenter Boulevard #100 Seattle, WA 98109
Tukwila, WA 98188
PROJECT; 2008 Overlay Program Construction Engineering Services
This SUPPLEMENTAL AGREEMENT NO. 1 is to supplement the agreement entered into with KPG,
Inc. and the City of Tukwila, which was executed on the 17 day of March 2008.
All provisions in the basic ar eementremain in effect, except as expressly modified as follows:
Article 2, Scope of Services, shall be modified as follows:
The Consultant agrees to provide construction engineering services as requested by the City in
accordance with the scope of work included as Exhibit A.
Article 4, Payment, shall be modified as follows:
Payment for work provided by Consultant shall be made as provided on Exhibit B, attached hereto,
provided that the total amount of payment to the Consultant for this work not exceed 342, 719.72 without
express written modification of the Agreement signed by the City. The new total contract shall not exceed
$132,281.32 without express written modification of the Agreement signed by the City.
MI WITNESS WHEREOF, the parties hereto have set their hands and seals this day
of 2008.
APPROVED: APPROVED:
CITY OF TUKWILA KPG, INC.
Jim Haggerton Nelson 13avis, P.E.
Mayor Principal
Attested:
Christy O'Flaherty, City Clerk
Exhibit A
City of Tukwila
2008 Overlay Program
Supplement No. 1
Construction Support
Scope of work
August 5, 2008
The Consultant shall provide Construction Engineering support services for the 2008
Overlay Program as outlined below:
A. Prepare for and attend pre construction conference with the City, Contractor, and
affected utilities.
B. The Consultant shall provide the field support to the inspector for the duration of
construction. Primary inspection will be by the City with on call support provided
by the Consultant. The level of effort for field support time is shown on Exhibit B
based on approximately 15 hours per week field inspection and necessary office
support.
C. The Consultant shall review traffic control, schedule, and materials submittals
provided by the Contractor as requested by the City.
D. The Consultant shall review change conditions as they arise and make
recommendation to the City for field changes /change orders.
E. The Consultant shall field review all sites and prepare a comprehensive punchlist
at project substantial completion.
F. The Consultant shall complete all other construction support tasks as requested
by the City. The level of effort for this additional construction support allowance
is shown on Exhibit B.
Deliverables:
Items to be provided by the Consultant:
Documentation from site meetings, change conditions, and field directives.
Change orders, if required.
Inspectors Daily Reports
Punchlist
2008 OVERLAY PROGRAM p d"O d' N O =O N �y O -O O
to
t7= V N 3Oi0 W O:O O
�G m 0):1`.-- rn €o CO: mo o o:o a
C1 .}.1 N =M N:h CC C") N r 0 0 0 CD
A ii U k 9 Y 1 O
o a
W •k .1 j "Et}'6}= :64 64;69- 69- 69- 69-
4140 Rl3 C
w rj
.0 -N:� N -4- tYsco: M LL
v -a
(0o E
r c h -O O..)- V C O 0 Lij
o
E p
o F—
Lu 3 U� :o o o o o
O o
1 C m
L ti
Ja co c Q o
-�,C c am t o "N d N 0'
U O C7: N`
o C
CO O
v CN O
X rn W
i Q
0
fr.
O
Q. O
a O F-
a*: (6
CO a o
c 0.
O C N.
U C: C
N
O' r
Q) o �x
a O. ;o m:
E. c as
Y
no U v c: fl c.)
al O o co: s m: N N.,x
y .�.a N N- tnt N
Q L.3 Z0 -0 O: N_ T, N r O
of w O.: c: 0= a
x r C 3 a) O: 0 N C O. C
W o O ;t,: C 'N a) O :p DO
7= L 0 N' a
LL, O 3 0 N U a U m O N
U N Cn to 0'`.. w a' 0 c v N
z 0 3: 23 C
N O
0 t 0_ 'O U)_Ll.. O...Q O
D c x E
2 13 gl
(ell City of Tukwila
f ;zyy
`N VA) Transportation Committee
ins
TRANSPORTATION COMMITTEE
Meeting Minutes
August 12, 2008 5:00 p.m. Conference Room #1
PRESENT
Councilmembers: Pam Linder, Chair; Dennis Robertson and De'Sean Quinn
Staff: Jim Morrow, Bob Giberson, Robin Tischmak, Mike Ronda and Kimberly Matej
CALL TO ORDER: Committee Chair Linder called the meeting to order at 5:04 p.m.
L PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. 2008 Overlay Repair Program Construction Management Supplement with KPG, Inc.
Staff is seeking full Council approval for Supplemental Agreement Number 1 with KPG, Inc. in the amount
of $42,719.72 for construction management and inspection services relative to the 2008 Overlay and Repair
Program.
KPG, Inc. provided engineering design services for the 2008 Overlay Repair Program. On July 7, 2008,
the Council awarded a contract to Watson Asphalt Paving Company for project construction. This
supplement agreement with the project design consultant will provide part-time on -call construction
management support and engineering consulting services during project construction.
This portion of the project has come in under budget because a greater amount of City staff is being utilized
to supplant contract staff. Next year, this overlay and repair program is anticipated to begin earlier since the
project design consultant was selected for a two year period (2008- 2009).
Committee Chair Linder requested some clarifications be made in the informational memo submitted to full
Council regarding budget details. UNANIMOUS APPROVAL. FORWARD TO AUGUST 25 COW
FOR DISCUSSION.
B. Tukwila International Boulevard Phase II and III Update
Since TIB Phase II and III construction bids are anticipated to be advertised in September, staff wanted to
provide a project update to the Committee prior to bid advertisement.
Staff discussed some of the project challenges and changes that have taken place since the project's
inception in December 2002. The following four areas are currently be worked on and addressed by staff:
Right of Way Certification
Washington State Department of Transportation Permitting
Utility Coordination
Community Outreach INFORMATION ONLY.
C. Infrastructure Turnover Documents for SC -3 Retail Building
Staff is seeking full Council authorization for the Mayor to sign acceptance forms for the turnover of the
storm drainage system located within the public storm drain easement at 17401 Southcenter Parkway. This
development area is also known as the SC -3 Retail Building Development (formerly Winners, currently
Famous Footwear, The Vitamin Shoppe, etc.).