Loading...
HomeMy WebLinkAboutReg 2008-07-07 Item 5B - Bid Award - Purcell Painting for Green River Pedestrian and Utility Bridge Painting for $134,000 w; w COUNCIL AGENDA SYNOPSIS y Initials ITEM NO. ._.i 1i, G4 I Meeting Date Prepared by 1 Mayor's review Council review 1.1 eau I 07/07/08 1 RT A Ai,' f� rsas 1 I L 1 1 ITEM INFORMATION CAS NUMBER: 08-081 ORIGINAL AGENDA DA 1 L: JULY 7 AGENDA I1'EMTITLE Bid Award for Painting the Green River Pedestrian and Utility Bridge CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date 7/07/08 NItg Date Mtg Date Mtg Date Mtg Date 7/07/08 Mtg Date Mtg Date SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PI" SPONSOR'S The project was bid for painting the Green River Pedestrian and Utility Bridge on May SUMMARY 29 and June 5, 2008. Five bids were received and opened on June 13, 2008. The low bid of $134,000.00 was from Purcell Painting. References indicate that Purcell Painting has performed well on similar type projects with other agencies. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DA'Z'E: 06/24/08 RECOMMENDATIONS: SPONSOR /ADM1N. Award contract to Purcell Painting. COMMITI•EE Unanimous approval: forward to Regular (due to full schedule at next COW). COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $134,000.00 $270,000.00 $0.00 Fund Source: 104.01 Bridges (page 32, 2008 CIP) Comments: MTG. DATE I RECORD OF COUNCIL ACTION 7/07/08 1 MTG. DATE I ATTACHMENTS 7/07/08 1 Information Memo dated June 17, 2008 1 Vicinity Map Bid Tabulation Transportation Committee Meeting Minutes from June 24, 2008 I 1 INFORMATION MEMO To: Mayor Haggerton From: Public Works Director Date: June 17, 2008 Subject: Green River Pedestrian and Utility Bridee (TUK18) Re -Bid of Paintine Only Project No. 07 -RWO2 BID AWARD ISSUE Award the bid for sealing of the Green River Pedestrian and Utility Bridge. BACKGROUND This project will provide sealing of the Green River Pedestrian Bridge on the Green River Trail near S. 180 St. and Andover Park East. This project is a re -bid of a previously advertised project which included repair work with the sealing of the bridge. The repair work was bid as a separate project and was completed in 2007. This contract includes coating the entire bridge with a stain/sealant to preserve the wood from further deterioration. The project was advertised for bids on May 29th and June 5th and bids were opened June 13, 2008. Five bids were received with the low bid of $134,000 from Purcell Painting. The engineer's estimate was $197,300. ANALYSIS The bids were reviewed and one mathematical error was found in the bid total calculated by Memo's Construction. The error caused a change in the bid order moving Memo's Construction from second lowest to third lowest bid, but does not affect the low bid from Purcell Painting. Purcell Painting has been given favorable references from the City of Seattle and WSDOT and has successfully performed painting work for Tukwila in the past. BUDGET AND BID SUMMARY Bid Results Estimate Budeet Construction 134,000.00 197,300.00 270,000.00 Contingency (10 13.400.00 19330.00 0.00 Total 147.400.00 217.030.00 270.000.00 RECOMMENDATION Award the sealing bid for the Green River Pedestrian and Utility Bridge to Purcell Painting in the amount of $134,000.00. Attachments: Vicinity Map Bid Tabulation P :\PROJECTS\A- RW RS Projects \07RW02 Gr Riv Ped Br\2008 Sealing Re- Bid\Award Info Memo.doc E v ansI I5 j �v yJV� J Y i ibU Black Dr j vi i o a S 161 St Baker Blvd a n ir 1 r 0 I° St 62 f4 4 P Q ICI' V' �'S 16 t �i� Q ry �,I ,ro w S trander Blvd S 164 St y Q Q' {tr% n ,..n.:... /7. Treck 4 S166S Dr) �Q a S t U1 n Q o W .Z..„44.' vi .•E Corporate -5 t Drive N Q C orporate n Drive S Mink er B vd s n Upland Dr r i e s D Q s T y a O n t4 s Midland Dr o te g F -5 -5 S axon -If Drive i+ a t 70 r i aa 14 Tritand Dr Q t St ro n to .-.4.- -s SW4 S n S 180St .a_.�. rn n- 'pi d I p V- Segale Pk D r S 18= t!7 r D r r- A R �i,,,� J ro P rod ta Q T o e4 �Loc Se h p a �'k D r v Az s `1;,'f S Glacier St c, s...- 7 a J 4 a d a A 3 4. 1771;...- 7 i//2/2ii//// 7 S a S Green River Ped Utility Bridge 1RILA Re-Bid of Painting Only ig” :4 1� of Tukwila City Vicinity a� y June 47, 2008 Map J 19 '�o 07-rw02 0 0 0 0 co a co O o O co O O H O O O O O m U w (1) co O O O O c 2 V 0 O O 12, 2 O N t 00 (0 O Tr; o U c M U W o 0 0 0 1- m w U o 0 0 o v E a o 00 0 o o to Ci H o m to f` 0 Z N C 0 0 0 0 0 O 0 0 0 0 0 J CO 0 0)) 0 0 0 O O (o O N- ui. 0 0 0 N- 0 O N- •:1- h- N (0 W O O O O cc U 0 0 0 o 0 a) co o 0 0 o E 0 ocootn 'L H (6 (o i R a_ Z T D O O O O O O O O O O H O O o 0 O H o 0 0 o 0 O) CO 0 0 0 0 O V) O O O O O a 0 to O O Lo O 0 tfi LO O to to IP 0 Nrntn v U N N LC) h t` C r CO V co O co ca r c N CO r 0. W o 0 0 0 W o o o o Ira- 0000 0 0 0o0 O U 0 0 0 0 L o o o o 0 t0 o L 0 0 o O 0 fn 0 o LO a f n I n a F- CV N In N 1- N f3) to t� M O Z N 0) o 0 0 o 0 0 0 o U o 0 0 0 0 0 0 16 1 0 0 0 0 0 (n 0000 O Z 0N- N- E O co O o o M O O co O Ln w 0 (O c6 to t` ti y 0 O O) tri f` N u) ro a) C L0 a) W r O O O O O 0 0 0 0 a) W 0 0 0 0 O O O O t) W O Ln O O 0 O r- O O 'C) Z- 00 O O to o R Z 0 (O O Lr) UJ W co. (0 1.6 f) h a to N Ln r` N- Q 00 I- (n() o Y Z J co J u. LL I- ci) J J LL LL_ 1- 1- Z H Z C a Z? W co 0 Z r W W a O CO IS v Z z 1 0 0 T.D. o F' a o N 0 U v 0 c) 'C M 0 CO W 0 W o Z 14 0 W H p c H O Q(ac c c L's Y J's:. 0 N n Q W <n ro O a0) C O d a c a H 'O 0, o_ J Y d c ca O d a c w 0 ce 0 c4 (0 0)) a 7 6 O N U U W N co c U U d O F"' (�0 O H 3 co C O 1 1 OZ C o a) c U a i— O O a U n C1 l N r- N F-. y Co O W O r N p p p p O O W O N L L CO U C7 m r i,A,„, Ci ty o f Tukwila V z Transportation Committee rsoa TRANSPORTATION COMNIITTEE Meeting Minutes June 24, 2008 5:00 p.m. Conference Room #1 PRESENT Councilmembers: Pam Linder, Chair; Dennis Robertson and De'Sean Quinn Staff: Jim Morrow, Frank Iriarte, Bob Giberson, Robin Tischmak, Gail Labanara, and Kimberly Matej CALL TO ORDER: Committee Chair Linder called the meeting to order at 5 :06 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. East Marginal Wav Sout/92" d Place South Signal Pole Replacement Bid Award Staff is seeking full Council approval to award a contract in the amount of $83,061 to TransTech Electric, Inc. to replace the traffic signal pole at East Marginal Way South and 92n Place South. This pole requires replacement due to damage sustained during a vehicular collision. Washington Cities Insurance Authority (WCIA) has confirmed that the insurance company of the responsible party will be funding the total cost of the replacement. UNANIMOUS APPROVAL. FORWARD TO JULY 7 REGULAR MEETING. B. Green River Pedestrian Utility Bridge Bid Award (Painting Only) This item has been previously heard in Committee (see minutes dated August 27, 2007). It was determined that the project would be re -bid in two separate packages one for bridge repair and the second for bridge painting. The bridge repair is complete and painting is ready to commence. Staff is seeking full Council approval to award the project to the lowest bidder, Purcell Painting in the amount of $134,000. Purcell Painting has successfully performed work for the City in the past. Bid repackaging has kept the project below budget. UNANIMOUS APPROVAL. FORWARD TO JULY 7 REGULAR MEETING. C. 2008 Overlay Program Bid Award Staff is seeking full Council approval to award a bid in the amount of $697,322.75 to Watson Asphalt Paving Company for the construction of the 2008 Annual Overlay and Repair Program. Watson Asphalt is the apparent low bidder after the original lowest bid was retracted and relieved due to a calculation error. Although Watson Asphalt has not worked on City projects recently; their work has been satisfactory for the City in the past. The company is currently working on projects for King County and the Department of Transportation. UNANIMOUS APPROVAL. FORWARD TO JULY 7 REGULAR MEETING. M. ANNOUNCEMENTS No announcements. IV. MISCELLANEOUS In order to assist with balancing upcoming City Council agendas, the Committee has agreed to recommend forwarding all above items directly to the July 7 Regular meeting, rather than proceeding to the next scheduled Committee of the Whole. All items are routine in nature. Next meeting: Tuesday, July 15, 2008 5:00 p.m. Conference Room 1 e S 1 Committee Chair Approval Minutes by KAM. Reviewed by GL.