Loading...
HomeMy WebLinkAboutReg 2008-06-02 Item 3C - Final Acceptance - Interurban Avenue South Pavement Repair by Lakeridge Paving Company for $30,655.94 Go UNCIL AGENDA Siwosis J 1 4 y Initials ITEM No. -1 j A M eeting Date Prepared a i by Mayor's review Council review I "t I0 06/02/08 I BG AA-A- I- I Te I I lit I I I ITEM INFORMATION CAS NUMBER: 08-065 I ORIGLNAL AGENDA DATE: JUNE 2, 2008 AGENDA I1'EM TITZE Accept as complete Interurban Ave South Pavement Repair Project and release retainage. CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Pits Dote 06/02/08 Mtg Dale Mfg Date Mtg Date Mtg Date Mtg Date: SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal PdrR fl Police PI/ SPONSOR'S The contract with Lakeridge Paving Company is complete for the Interurban Ave South SUMMARY Pavement Repair Project. Construction began February 29, 2008 and was completed on March 25, 2008. The contract repaired and overlaid the outside travel lanes in the vicinity of 14900 Interurban Ave S. Unit price overruns were due to additional asphalt. This project is ready for final acceptance and the total contract amount was $30,655.94. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. r] Planning Comm. DA1E: 05/28/08 RECOMMENDATIONS: SPONSOR /ADMIN. Accept contract as complete and authorize release of retainage. CONiri II I n E Unanimous approval; forward to Regular Consent Agenda. COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $30,655.94 Engineer's Estimate $33,000.00 Fund Source: 104 Commercial Streets (Annual Overlay Repair, page 44, 2008 CIP) Comments: MTG. DATE 1 RECORD OF COUNCIL ACTION 1 06/02/08 I I I MTG. DATE 1 ATTACHMENTS 1 06/02/08 Information Memo dated May 28, 2008 Notice of Completion of Public Works Contract 08 -007 I Transportation Committee Meeting Minutes from May 28, 2008 I I I INFORMATION MEMO To: Mayor Haggerton From: Public Works Director Date: May 28, 2008 Subject: Interurban Ave S Pavement Repair Project No. 07 -RWO1 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 08 -007 with Lakeridge Paving Company of Maple Valley, Washington, was issued February 29, 2008, for construction of the Interurban Ave S Pavement Repair Project. This project repaired and overlaid the outside travelled lanes of Interurban Avenue South in the vicinity of the Interurban Plaza building (14900 Interurban Ave South). This contract was completed on March 25, 2008. Minor unit price overruns were primarily due to using more asphalt concrete pavement then originally estimated. Contract Award Amount 28,574.00 Unit Price Overruns 2,081.94 Sales Tax (N /A Rule 171) 0.00 Total Amount Paid (incl. retainage bond) 30.655.94 RECOMMENDATION It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of the retainage, subject to the standard claim and lien release procedures. Attachment: Notice of Completion of Public Works Contract P: \PROJECTS \A RW RS Projects \07RW012007 Overlay \14900 Interurban SWR fix \INFO MEMO Acceptance 111 Pvmt Rpr.doc State of Washington z. I 7 of 4 Revenue REVENUE Olympia WA 98504-7474 Contractor's Registration No. (UBI No.) 601 592 135 Date NOTICE 05F COMPLETION (W PUBLIC WORKS CONTP-ACT From: U*6 City of Tukwila Assigned To Attn: Diane Jaber 6200 Southcenter Boulevard Tukwila, WA 98188 Date Assigned Notice is hereby given relative to the completion of contract or project described below Descnption of Contract Contract Number Interurban Avenue s Pavement Repairs 08 Contractor's Name Telephone Number Lakendge Paving Company LLC 253 Contractor's Address 19606 SE 252' St., P.O.Box 8500, Covington, WA. 98042 Date Work Commenced Date Work Completed Date Work Accepted 2/29/08 3/25/08 Surety or Bonding Company North American Specialty Insurance Company Agent's Address Hentschell Associates, Inc., 621 Pacific Avenue, #400, Tacoma, WA. 98042 Contract Amount 28,574.00 Additions 2,081.94 Liquidated Damages 0.00 Reductions Sub-Total Amount Disbursed 29,123.14 Amount of Sales Tax Paid at 0.0 0.00 Amount Retained 1,532.80 (If various rates apply, please send a breakdown.) TOTAL 30,655.94 TOTAL 30,655.94 4:11s0ii-1k .'ilffie r Comments: Sales Tax not paid pursuant to Signature "Rule 171". Type or Pnnt Name Diane Jaber Finance Approval vi 1 Phone Number 206 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504-7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753-3217. Teletype (TTY) users please call (800) 451-7985. You may also access tax information on our Internet home page at http://dor.wa.gov. REV 31 0020e (6-27-01) Transportation Committee Minutes Mav 28. 2008 Paae 2 Staff also reported that the condemnation notification process has changed, and several new requirements have been placed on the party seeking acquisition (which in this instance is the City). In response to a general inquiry from the Committee, staff reported that this project was delayed for a time due to design issues and discussions with property owners. UNANIMOUS APPROVAL. FORWARD TO JUNE 9 COW FOR DISCUSSION. C. Annual Concurrencv Model Update Contract with Fehr Peers/Mirai for Model Update Staff is seeking full Council approval to enter into a consultant agreement with Fehr Peeers/Mirai in the amount of $32,453 for transportation modeling services. This consultant agreement will conduct transportation analysis and update the City's Transportation Model and ensure that the City is meeting the needs of the Concurrency Management Program. Current development throughout the City requires that model be updated annually to reflect the needs of the City. As a side note, staff reported that effective June 1, 2008, Mirai will merge with Fehr Peers. Mirai has provided some of the City's past modeling services (2002, 2006 and 2007). UNANIMOUS APPROVAL. FORWARD TO JUNE 9 COW FOR DISCUSSION. D. Annual Concurrencv Model Update Contract with Traffic Data Gathering for Traffic Counts As an information only item which ties into the previous agenda item, staff reported that the City is entering into an agreement with Traffic Data Gathering. This agreement will provide services related to traffic counts. Staff has eliminated and added count locations (i.e.: do to congestion, etc.) which need to be updated as well as intersection, turning and 24 -hour volume counts. Any substantial/notable changes in traffic counts will return to the Committee for presentation at a later time. INFORMATION ONLY. E. Interurban Avenue South Pavement Repair Contract Acceptance and Closeout Staff is seeking full Council approval for project completion, contract acceptance and authorization to release retainage for the Interurban Avenue South Pavement Repair which was completed on March 25, 2008. The final cost of the project was $30,655.94, which includes a $2,081.94 overrun as a result of an increase in the amount of asphalt concrete pavement needed to complete the project. This project bid award originally came to Committee on January 15, 2008. UNANIMOUS APPROVAL. FORWARD TO JUNE 2 CONSENT AGENDA. F. Review of Draft Walk Roll Plan Staff provided a general overview of the draft Walk and Roll Plan which was distributed to Council approximately three weeks ago. The draft Plan is currently available on the City's website, and staff has been gathering suggestions from the public as well as the City's Planning Commission. A brief history of the Plan's foiuiulation was given, including information about the grant through Washington State Depaitnient of Community, Trade and Economic Development which was awarded to the City in 2006 to develop a City -wide non motorized plan exclusive to pedestrian and bicycle traffic. Once adopted, this will be a functional plan which will be utilized as a guide to assist in project prioritization as well as grant applications. The intent of the Plan is to build on what is currently in the City's Comprehensive Land Use Plan regarding the building and establishment of the connectivity of pedestrian and bicycle routes. This connectivity can be implemented in three ways: Through private construction Through public projects Through public /private partnerships Committee members reviewed a portion of the Plan and offered the following suggestions for incorporation: Address needs of shoppers and encourage walkability between stores Look at school bus policies in relation to connectivity /walkability