Loading...
HomeMy WebLinkAboutPermit 1549 - Benaroya CompanyBUILDING PERMIT • 4 CITif )F TUKWILA BUILDING PLAIT 14475 - 59th Ave. So. / Tukwila, Washington 98067 Applicant to complete numbered spaces only. BUILDING PERMIT NO. N2 , -, JOB ADDR ESS 17501 Southcenter Parkway DATE 9 August 1978 LEGAL 1 DESCR. LOT NO. BLK TRACT (EISEE ATTACHED SHEET) OWNER MAIL ADDRESS ZIP PH z Jack A. Benaroya Co. 5950 6th Ave. S. Seattle, Wa. 762-4750 CONTRACTOR MAIL ADDRESS PHONE LICE SE NO. 3 Howard S. Wright ii ty po�,-t,, «� q �k, 41 `i- 7G5i223- 01- WR- IG- HH- S370'IJ0 0 r,. ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE N0. 4 ENGINEER MAIL ADDRESS PHONE LICENSE NO. 5 LENDER MAIL ADDRESS BRANCH 6 USE OF BUILDING 7 Office Bldg. 8 Class of work: X (] NEW • ADDITION • ALTERATION ❑ REPAIR ■ MOVE • REMOVE s Describe work: 9 Story Office Bldg. with basement. 228,292 square feet total. 10 Change of use from Change of use to Total Fee: $ 10,539.00 11 Valuation of work: $— �(�(}(} PLAN CHECK FEE 4, 152.00 PERMIT FEE 6. 387.00 SPECIAL CONDITIONS: Typo of I Const. Occupancy B. Group Division see permit # 1482 for valuation of foundation -- $600,000.00. (Total) BSqid. stooroe 9 Occ. Load 1$00 Fire Zone 3 Use ( Zone " 1 Fire Sprin rs Required Yes • No APPLICATION ACCEPTED BY: PLANS CHECKED BY: APPROVED FOR ISSUANCE BY: w /7/ LP w`��/ No. of Dwelling Units OFFSTREET PARKING Covered SPACES: Uncovered NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM- MENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. N `..S / =Ky - - — Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING FINAL N. 51 'ATURE OF OWN R 11 OW R SUIL•ER) ‘ - . // SIGNATURE OR AUTHORIZED AGENT IRATE) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION cK. M.O. CASH PERMIT VALIDATION CK. OCCUPANCY PERMIT REQUIRED M.O. CASH BUILDING PERMIT CITY)E TUKWILA BUILDING PE 'AIT 14415 - 59th Ave. So. / Tukwila, Washington 98067 Applicant to complete numbered spaces only. JOB ADDR ES3 17501 Southcenter Parkway DATE 9 August 1978 LEGAL 1 DIM. LOT NO, BLB, TRACT (EI3CE AT TACN Eb SHEET) 2OWNER Jack A. Benaroya Co.. 595016thR Ave. S. Seattle, zWa. 762 -N4750 CONTRACTOR MAIL ADDRESS PHONE LIC NSE NO. 3 Howard S. Wright 223 -01 WR- IG- HH- S370J0 ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. 4 ENGINEER MAIL. ADDRESS PHONE LICENSE NO. 5 LENDER MAIL ADDRESS BRANCH 6 USE OF BUILDING Office Bldg. 8 Class of work: XIR] NEW • ADDITION • ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 9 Describe work: 9 Story Office Bldg. 10 Change of use from Change of use to 11 Valuation of work: $ ( . 0. PLAN CHECK FEE 4,152.00 PERMIT FEE 6. 387.00 SPECIAL CONDITIONS: Typo of const. 1 occupancy Group 62 Division see permit # 1482 for valuation of foundation -- $600,000.00. Size of Bldg 28s29) slot! s 9 Max. Load MO • Fire Zone 3 Use A Zone C i Fire Sprinktprs Required Yes ❑No APPLICATION ACCEPTED BY: PLANS CHECKED BV; APPROVED FOR ISSUANCE BY : No. of Dwelling Units OFFSTREET PARKING Covered SPACES: Uncovered NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM- MENCED. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING SIGNATURE OF OWNER (IF OWNER BUILDER) FINAL SIGNATURE OH AUTHORIZED AGENT (DATE) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION cK. M.O. CASH PERMIT VALIDATION cK. M.O. CASH OCCUPANCY PERMIT REQUIRED CITY OF pgiVIILA BUILDING DEPARTrliT 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242-2177 :ATION OF WORK / NUMBER & STREET r NER BLOCK SUBDIV .044-4-447 ISION 1APP-76 - 4 7 =7,9., 7'A • DRESS p ��+ 777' /7 P PHONE 2 VIE OF BUILDS / // '' ,,,, Ral011# S37DNO SALES TAX NO. •I4 p tl9/°iAar7 4 DRESS P PHONE • RR C 1'VED B ESTIMATED VALUE COMPLETED WORK $ 4 4 , 1 7 : 5 1 = 3 : / ' 1 " ' ' ' ' APPLICATION P PERMIT FEE $ to 3. 7- FOR P PLAN CHECK FE . $ 4, /6-e, i BUILDING PERMIT M TOTAL FEE $ /0 5-'3 3 y 0 iCRIPTION OF WORK: -rOrkc. 2 Z ,21 z .g3 CZ- !c31' c O t -v 6- t. )ATURE OF BUSINESS: THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS. SEPARATE PERM /TS ARE REQUIRED FOR ELECTR /CAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONF • RM TO TUKWILA CODES AND ORDINANCES. APPLICANT /1 .. BY J I' Legal Description Parkway Plaza West Office. Building That portion of the Southeast 4 of the Southwest 3.; of Section 26, Town- ship 23 North, Range 4 East, W.M., and the Northeast 4 of the Northwest 4 of Section 35, Township 23 North, Range 4 East, W.M., King County, Washington, described as follows: Beginning at the Northeast corner of said Northeast 4 of the Northwest 4; thence North 87 °45'57" West along the North line of said Northeast 4 of the Northwest 4, a distance of 481.05 feet to the West margin of Southcenter Parkway and the point of beginning; thence South 11 °59'33" East along said West margin a distance of 41.27 feet; thence North 87 °45'57" West a distance of 229.11 feet; thence South 42 °30'27" West a distance of 537 feet, more or less, to a point on a line which is 19.5 feet Southwesterly of the center line of a 19 foot railroad. easement established by instrument recorded under Auditor's File No. 6643574; thence Northerly along a line which is concentric and parallel with said center line 481 feet, more or less, to the North line, said Section 35; thence North 87 °45.'57" West along said North line a distance of 20 feet, more or less, to a point on a line which is parallel with and 39.0 feet Northwesterly of the center line .of a 19 feet railroad easement established by instrument recorded under Auditor's File No. 6643573; thence North 16 018'55" East along said parallel line 92 feet, more'or less, to the center line of a 40 foot drainage easement granted to the State of Washington by instruments recorded under Auditor's File Nos. 6233536 & 6233537; thence North 50 038'32" West along said drainage easement center line 224 feet, more or less, to the West line of the Southeast 4 of the Southwest 4 of said Section 26; thence North 00 °56'36" East along said West line 344.61 feet; thence North 82 018'16" East 680.15 feet to said West margin of Southcenter Parkway; thence South 11 °59'33" East along said West margin 707.86 feet t0 the true point of beginning; Situate in the City of Tukwila, County of King, State of Washington. -- site plan legal description parkway plaza building . landscape site plan first floro plan basement floor plan basement floor plan first floor plan typical floor plan partial floor plan floor plan site utility plan roof plan parkway plaza building chester l lindsey deails elevations elevations longitudinal section transverse section basement floor core plan enlarged first floor core plan floor core plan details floor plan wall sections details sections stair plans details miscellaneous steel window details door schedule details structural notes footing plan foundation plan . floor framing plan floor beam and girder schedule floor framing plan framing plan floor framing plan floor framing plan roof framing plan shear wall elevations details column schedule floor beam and girder schedule slab schedule joist schedule framing stair miscellaneous steel brick equipment list allied sheet metal fabricators piping schematic basement floor plan hvac floor plan hvac allied sheet metal fabricators second floor plan hvac floor plan hvac floor plan hvac fifth floor plan hvac floor plan hvac seventh floor plan hvac floor plan floor plan roof plan hvac penthouse floor plan duct rigers and pump room detail