Loading...
HomeMy WebLinkAboutUtilities 2013-10-21 COMPLETE AGENDA PACKET(0j City of Tukwila Utilities Committee •• Joe Duffie, Chair ❖ Allan Ekberg •• Verna Seal Distribution: J. Duffle A. Ekberg V. Seal K. Hougardy D. Robertson Mayor Haggerton D. Cline K. Matej L. Humphrey B. Giberson F. Iriarte R. Tischmak G. Labanara P. Brodin S. Kerslake Clerk File Copy 2 Extra A. Le (e -mail pkt. pdf) e -mail cover to: C. O'Flaherty, D. Almberg, B. Saxton, S. Norris, M. Hart, D. Robertson AGENDA MONDAY, OCTOBER 21, 2013 5:00 PM in Conference Room #1 (6300 Bldg.) Next Scheduled Meeting: Monday, November 4, 2013 t> The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. Item Recommended Action. Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) Water, Sewer, and Surface Water Rates for 2014 a) Forward to 10/28/13 C.O.W. and 11/4/13 Regular Pg. 1 b) Sewer Repair at 6450 Southcenter Blvd Bid Award b) Forward to 10/28/13 C.O.W. and 11/4/13 Regular Pg. 23 3. ANNOUNCEMENTS 4. MISCELLANEOUS Future Agendas: - Adoption of SWCP Next Scheduled Meeting: Monday, November 4, 2013 t> The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206- 433 -0179 for assistance. City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM To: Mayor Haggerton Utilities Committee From: Bob Giberson, Public Works Director- By: Gail Labanara, Public Works Analyst Date: October 16, 2013 Subject: Water, Sewer, and Surface Water Rates for 2014 ISSUE Adopt 2014 water, sewer, and surface water rate increases. WATER Public Works has analyzed the needs of the water enterprise fund. Cascade Water Alliance's (CWA) wholesale water rates are projected to increase 5.1% for 2014. A rate increase on the minimum water meter charge (see Table 1) is being proposed for residential and multi - family customers to maintain the current level of service and lessen the impact of future increases for purchased water. Increases are also proposed for consumption charges for multi - family and commercial /industrial rates. Exhibit A is a rate matrix of all of the proposed utility rate increases for residential customers. Exhibit C -1 shows a comparison of adjoining cities and their water rates. Exhibit D is the Resolution which updates the Public Works Fee Schedule. SEWER King County Ordinance No. 17606 has no sewer rate increase for King County sewage disposal fees in 2014. The King County sewer rate will remain $39.79 per residential customer equivalent per month. The King County sewage treatment capacity charge (for any new sewer connections) will increase from the current $53.50 to $55.35 per month for fifteen years for any sewer connection occurring between January 1, 2014 and December 31, 2014. Exhibit B is King County Ordinance No. 17606. Tukwila's sewer base rate is scheduled for an increase (see Table 2) in accordance with the rate model which analyzes the City's operational and capital needs. The City's sewer rate will increase from $23.10 to $25.40 per residential connection and from $40.48 to $44.52 for up to 750 cubic feet or fraction thereof for commercial /industrial customers. Exhibit C -2 shows a comparison of adjoining cities and their sewer rates. SURFACE WATER Tukwila's surface water base rate is scheduled for an increase in 2014. The City's surface water rate will increase from $107.00 to $118.00 per residential parcel, per year and will range from $142.22 to $1,188.86 per 4,356 square foot for all other parcels. Exhibit C -3 shows a comparison with other cities and their surface water rates. 1 INFORMATIONAL MEMO Page 2 TABLE 1 - WATER RATES PROPOSED FOR 2014 CATEGORY Current 2013 Charges Proposed for 2014 Single Family $14.00 $15.00 Multi - Family (each condo, apt, or dwelling unit) $14.00 $15.00 Multi- Family Consumption Charges per 1 CCF $2.92 & $4.08 $3.06 & $4.28 Commercial /Industrial Consumption per 1 CCF $3.98 & $5.46 $4.18 & $5.72 TABLE 2 - SEWER RATES PROPOSED FOR 2014 CATEGORY Current 2013 Rates Proposed for 2014 Residential Sewer Service (single dwelling unit) Flat rate of $23.10 per month Flat rate of $25.40 per month Residential Sewer Service (multiple dwelling unit, permanent type) Flat rate of $23.10 per month for each dwelling unit Flat rate of $25.40 per month for each dwelling unit Commercial /Industrial Sewer Service Flat rate of $40.48 per month and, any usage over 750 cubic feet of water per month shall be at the rate of $40.48 per 750 cf Flat rate of $44.52 per month and, any usage over 750 cubic feet of water per month shall be at the rate of $44.52 per 750 cf The attached Public Works Fee Schedule Resolution is also removing the Public Works Permit fees for development and combining those fees with one Resolution under the Department of Community Development for ease of use for permit users. The attached Public Works Fee Resolution will now only include utility and transportation fees. RECOMMENDATION The Council is being asked to adopt the City's 2014 water, sewer, and surface water proposed rate increases in accordance with the Public Works Fee Schedule Resolution and consider this item at the October 28, 2013 Committee of the Whole Meeting and subsequent November 4, 2013 Regular Meeting. Attachments: Exhibit A Rate Matrix Exhibit B King County Ordinance No. 17606 for 2014 Exhibit C -1 through C -3 Comparison of Rates with Adjoining Cities Exhibit D Public Works Fee Schedule Draft Resolution Attachment D — Water Attachment E — Sewer Attachment F — Surface Water W: \PW Eng \OTHER \Gail Labanara \Water & Sewer Documents \Info Memo Water Sewer & SWM 2014 Rates 10- 16- 13.docx 2 City of Tukwila Proposed Utility Rate Increases Monthly Fees for Residential Customers With 10 % Utility Tax EXHIBIT %-1 Utility 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Total WATER +9% +3% +106 +15% +15% +10% +100 +10% +5% +5% +5% +5% +5% +5% +1.6% King County Sewer Treatment $23.40 to $25.60 $25.60 +11.7% $27.95 $27.95 to $31.90 $31.90 531.9010 $36.10 $36.10 +2.5% +2.5% +2.5% +2.5% +2.5% $44.51 to $45.16 CWA Purchased Water Pass - through $2.98 to $3.07 $3.07 to $3.38 $3.38 to $3.77 $2.35 $0.00 $3.95 $5.92 to $7.08 $4.20 03.90 to $3.99 $4.08 to $4.18 $4.28 to $4.38 $4.48 to $4.59 $4.70 to $4.82 $1.78 (Average monthly rate with 10 ccf) $0.74 $22.50 $0.90 $3.10 $3.90 +10% +15% +15% +15% +20% $0.90 $1.00 $1.00 $1.10 $1.20 $13.10 +5% +5% $13.00 City of Tukwila Sewer $7 +3.3% $8 to $8.80 $8.80 to $10.12 $10.12 to $11.64 $11.64 to $13.39 $13.39 to $16.06 +2.5% +2.5% +2.5% +2.5% +2.5% $28.00 to 529.40 City of Tukwila Water 830.86 10 $32.40 (Monthly Flat Rate) 0.00 $3.77 to $3.89 $0.80 $1.32 $1.52 $1.75 $2.67 $3.99 to $4.08 $4.18 to $4.28 $4.38 10 $4.48 $4.59 to 44.70 $4.82 to $4.94 $1.40 (Average monthly rate with 10 ccf) $1.54 $25.40 Mcnthly Sewer Bill (Residential) $32.60 $1.20 $36.75 $38.07 $43.54 $45.29 $52.16 $0.90 $1.00 $1.00 $1.10 $1.20 $6.40 $87.27 $87.27 +2016 Range 3%-20% Range 3 % -20 % Range 3%-20% Range 3 5/0-20% Range 3%-7% Range 3 % -7% Range 3%-7% Range 3%-754 Range 3%-7% Range 3 % -7% City of Tukwila Minimum Monthly $45 to $54 $6.00 to $8.00 $8.00 to $10.00 $10.00 to $12.00 $12.00 to $14.00 $14.00 10 415.00 $15.00 to $16.00 $16.0010 $17.00 $17.00 to $18.00 $18.00 to $19.00 $19.00 to $20.0 charge per meter /each dwelling unit $9.00 Fire lines only $2.00 $2.00 and Fire Lines, misc. wtr srvcs $2.00 $2.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $14.00 SEWER City of Tukwila Surface Water +9% 0% +9.17% 0% +14.13% 0% +13.17% 0% +10.22% 0% +5.4% +1.8% +4,2% +1.5% +1.6% King County Sewer Treatment $23.40 to $25.60 $25.60 $25.6010 $27.95 $27.95 $27.95 to $31.90 $31.90 531.9010 $36.10 $36.10 $36.10 to $39.79 $39.79 $39.7910 $41.95 $41.95 to $42.73 $42.73 to 544.51 $44.51 to $45.16 $45.16 to $45.90 (Monthly Flat Rate) $2.20 $4.33 to $5.17 $2.35 $0.00 $3.95 $5.92 to $7.08 $4.20 $7.75 to 48.50 $3.69 $8.9210 $9.83 $2.16 $0.78 $1.78 $0.65 $0.74 $22.50 Monthly Increase fcr chart +15% +10% +15% +15% +15% +20% +20% +20% +10% +5% +5% +5% +5% +5% $13.00 City of Tukwila Sewer $7 $710 $8 $8 to $8.80 $8.80 to $10.12 $10.12 to $11.64 $11.64 to $13.39 $13.39 to $16.06 $16.06 to $19.26 $19.2610 023.10 $23.10 to $25.40 525.40 10 $26.67 526.67 10 $28.00 $28.00 to 529.40 $29.40 to $30.86 830.86 10 $32.40 (Monthly Flat Rate) 0.00 $1.00 $0.80 $1.32 $1.52 $1.75 $2.67 $3.20 $3.84 $2.30 $1.27 $1.33 $1.40 $1.46 $1.54 $25.40 Mcnthly Sewer Bill (Residential) $32.60 $33.60 $36.75 $38.07 $43.54 $45.29 $52.16 $55.36 $62.89 $66.35 $73.48 $77.86 $81.73 $87.27 $87.27 King County Metro Capacity Charge (information only) $34.05 $34.05 $42.00 $5,195.65 $46.25 55,721.40 $47.64 $5,893.35 $49.07 $6,070.25 $50.45 $6,240.96 551.95 $6,426.52 $53.50 $55.35 $56.88 $58.58 $60.00 $62.00 $62.00 SURFACE WATER City of Tukwila Surface Water +20% +15% +206 +10% +10% +5% +10% +20% +10% +10% +10% +10% Annual Charge (billed Jan & July) $52 to $62 $62.00 $62 to $71 $71.00 $71 to $85 $85 to $93 $93 to $102 $102 to $107 $107 to $118 $118 to $142 $142 to $156 $156 to $172 $172 to $189 $189 to $208 Annual Charge divided monthly $4.33 to $5.17 $5.17 to $5.92 $5.92 to $7.08 $7.08 to $7.75 $7.75 to 48.50 08.50 to $8.92 $8.9210 $9.83 $9.83 to $11.83 $11.83 10 013.00 013.00 to $14.33 $14.33 to $15.75 $15.75 to $17.33 Monthly Increase fcr chart $0.84 $0.75 $1.16 $0.67 $0.75 $0.42 $0.91 $2.00 $1.17 $1.33 $1.42 $1.58 $13.00 Total per Month $2.20 $1.84 $4.05 $5.17 $10.57 $4.91 $9.54 $5.95 $9.95 $4.21 $8.23 $6.28 $7.51 $6.73 $7.26 $94.40 ragail\cip \rate matrix GJ 10/8/2013 King County Metropolitan King County Council Anne Noris, Clerk of the Council King County Courthouse 516 Third Avenue, Room 1200 Seattle, WA 98104 -3272 Tel: 206 - 296 -1020 Fax: 206- 205 -8165 TTY/TD D : 206- 296 -1024 Email: anne.noris @kingcounty.gov Web: www.kingcounty.gov /council /clerk June 21, 2013 Mr. Pat Brodin, Operations Manager City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 Dear Mr. Brodin, Monetary Requirements for 2014 EXHIBIT RECEIVED jUNZ52013 TUKWILA =:,3EWI^LA T ` �'j,'/P:�v The Metropolitan King County Council approved the sewer rate for 2014 and the sewage treatment capacity charge for 2014 with the adoption of Ordinance 17606 on June 10, 2013. A copy of Ordinance 17606 is enclosed for your information. If you have any questions, please call the Clerk of the Council's Office at our new number 206 477 -1020. Sincerely, Anne Noris Clerk of the Council Enclosure 4 King County KING COUNTY Signature Report June 10, 2013 Ordinance 17606 1200 King County Courthouse 516 Third Avenue Seattle, WA 98104 Proposed No. 2013- 0217.1 Sponsors McDermott and Phillips 1 AN ORDINANCE determining the monetary requirements 2 for the disposal of sewage for the fiscal year beginning 3 January 1, 2014, and ending December 31, 2014, setting 4 the sewer rate for the fiscal year beginning January 1, 2014, 5 and ending December 31, 2014, and approving the amount 6 of the sewage treatment capacity charge for 2014, in 7 accordance with RCW 35.58.570; and amending Ordinance 8 12353, Section 2, as amended, and K.C.C. 4A.670.100, and 9 Ordinance 11398, Section 1, as amended, and K.C.C. 10 28.84.055. 11 BE IT ORDAINED BY THE COUNCIL OF KING COUNTY: 12 SECTION 1. Ordinance 12353, Section 2, as amended, and K.C.C. 4A.670.100 13 are each hereby amended to read as follows: 14 A. Having determined the monetary requirements for the disposal of sewage, the 15 council hereby adopts a ((204)) 2014 sewer rate of thirty -nine dollars and seventy -nine 16 cents per residential customer equivalent per month. Once a sewer rate ordinance 17 becomes effective, the clerk of the council is directed to deliver a copy of that ordinance 18 to each agency having an agreement for sewage disposal with King County. 1 5 Ordinance 17606 19 B. The King County council approves the application of Statement of Financial 20 Accounting Standards No. 71 (FAS 71) to treat pollution remediation obligations and 21 RainWise Program expenditures as regulatory assets, and establish a rate stabilization 22 reserve for the purpose of leveling rates between years. 23 C. As required for FAS 71 application, amounts are to be placed in the rate 24 stabilization reserve from operating revenues and removed from the calculation of debt 25 service coverage. The reserve balance shall be an amount at least sufficient to maintain a 26 level sewer rate between 2013 and 2014, and shall be used solely for the purposes of: 27 maintaining the level sewer rate in 2014; and if additional reserve balance is available, 28 moderating future rate increases beyond 2014. The estimated amount of the reserve, as 29 shown in the financial forecast, Attachment A to ((Ordinance 17313)) this ordinance, 30 shall be revised in accordance with the ((2943)) 2014 adopted budget and financial plan. 31 If the reserve needs to be reduced to meet debt service coverage requirements for ((201 -2) 32 )2013, the county executive shall notify the council of the change by providing an 33 updated financial forecast. 34 D. The executive shall provide monthly cost reports to the council on Brightwater 35 as outlined in K.C.C. 28.86.165. 36 SECTION 2. Monetary requirements for the disposal of sewage as defined by 37 contract with the component sewer agencies for the fiscal year beginning January 1, 38 2014, and ending December 31, 2014. The council hereby determines the monetary 39 requirements for the disposal of sewage as follows: 40 Administration, operating, maintenance repair and replace (net of other income): 41 $64,930,132. 2 6 Ordinance 17606 42 Establishment and maintenance of necessary working capital reserves: 43 ($21,812,667). 44 Requirements of revenue bond resolutions (not included in above items and net of 45 interest income): $296,912,277. 46 TOTAL: $340,029,742. 47 SECTION 3. Ordinance 11398, Section 1, as amended, and K.C.C. 28.84.055 are 48 each hereby amended as follows: 49 A. The amount of the metropolitan sewage facility capacity charge adopted by 50 K.C.C. 28.84.050.0. that is charged monthly for fifteen years per residential customer or 51 residential customer equivalent shall be: 52 1. Seven dollars for sewer connections occurring between and including January 53 1, 1994, and December 31, 1997; 54 2. Ten dollars and fifty cents for sewer connections occurring between and 55 including January 1, 1998, and December 31, 2001; 56 3. Seventeen dollars and twenty cents for sewer connections occurring between 57 and including January 1, 2002, and December 31, 2002; 58 4. Seventeen dollars and sixty cents for sewer connections occurring between 59 and including January 1, 2003, and December 31, 2003; 60 5. Eighteen dollars for sewer connections occurring between and including 61 January 1, 2004, and December 31, 2004; 62 6. Thirty -four dollars and five cents for sewer connections occurring between 63 and including January 1, 2005, and December 31, 2006; 3 7 Ordinance 17606 64 7. Forty -two dollars for sewer connections occurring between and including 65 January 1, 2007, and December 31, 2007; 66 8. Forty -six dollars and twenty -five cents for sewer connections occurring 67 between and including January 1, 2008, and December 31, 2008; 68 9. Forty -seven dollars and sixty -four cents for sewer connections occurring 69 between and including January 1, 2009, and December 31, 2009; 70 10. Forty -nine dollars and seven cents for sewer connections occurring between 71 and including January 1, 2010, and December 31, 2010; 72 11. Fifty dollars and forty -five cents for sewer connections occurring between 73 and including January 1, 2011, and December 31, 2011; 74 12. Fifty -one dollars and ninety -five cents for sewer connections occurring 75 between and including January 1, 2012, and December 31, 2012; ((and)) 76 13. Fifty -three dollars and fifty cents for sewer connections occurring between 77 and including January 1, 2013, and December 31, 2013; and 78 14. Fifty -five dollars and thirty -five cents for sewer connections occurring 79 between and including January 1, 2014, and December 31, 2014. 80 B.1. In accordance with adopted policy FP- 15.3.d. in the Regional Wastewater 81 Services Plan, K.C.C. 28.86.160.C., it is the council's intent to base the capacity charge 82 upon the costs, customer growth and related financial assumptions used in the Regional 83 Wastewater Services Plan. 84 2. In accordance with adopted policy FP- 6 in the Regional Wastewater Services 85 Plan, K.C.C. 28.86.160.C, the council hereby approves the cash balance and reserves as 86 contained in the attached financial plan for ((20 -13.)) 2014. 4 8 Ordinance 17606 87 3. In accordance with adopted policy FP- 15.3.c., King County shall pursue 88 changes in state legislation to enable the county to require payment of the capacity charge 89 in a single payment, while preserving the option for new ratepayers to finance the 90 capacity charge. 91 Ordinance 17606 was introduced on 5/6/2013 and passed by the Metropolitan King County Council on 6/10/2013, by the following vote: Yes: 7 - Mr. Phillips, Mr. Gossett, Ms. Patterson, Ms. Lambert, Mr. Dunn, Mr. McDermott and Mr. Dembowski No: 0 Excused: 2 - Mr. von Reichbauer and Ms. Hague ATTEST: Anne Noris, Clerk of the Council APPROVED this 1•ay of KING COUNTY COUNCIL KING COUNTY, WASHINGTON arry Gossett, Chair ,2013. 6rN Constantine, County Executive Attachments: A. Wastewater Treatment Division Financial Plan for the 2014 Proposed Sewer Rate 5 7-CJ (, l m m C 9 ATTACHMENT A: Wastewater Treatment Division Financial Plan for the 2014 Proposed Sewer Rate to 0 U) N 0) O) 4 O N O U- m8 O N 0 W y _n 0 O N O U- co 8 O N N 0 LL us U O � N (O N t8 O N N LL N co O N (p N N O O N C O) O o CO CO n CO CO N N u) u) - CO N CD CO (O u) N CO 0) t 0 t O 0) CO r O O m n m r CO m O .- CO t CO 0) N r r CO n u) N t t O O • O) N N u) m r n n as r 0 n r 0 us F u) N v N- CO c n 00,- CU) CO CON- u) F W Cl) u) m N m O) C m CO u) CO r O r- 4 u) r N (D t m O) n (O O M co v p N NI- N.- (» r m n tOD v N t t CD m O u) CO CO 0 0 CO m r N- n r o n t N r W u) 00 N CO 6 6 N n n d- tO N co M O O CO n m t N- CO r 0 t M CO CO CO n u) m r CO O t r r v 0 O) N N N • t CO u) t • n r O) N r u) m ct t C-- E9 r CO (0 r(0 t N N LO r r CO n CO o t CO n m m N t CO N- HD N CD 0 a N O) t u) U) I,- (» m m o m n • O n ▪ 69 CO CO m 0 r M O) u) u) CO CO N m n M r N- 0 CO CO r 0 N CO () O M co t a) M N n r. r . 0 O r M N 0) N v CO N 6 m m r u) M M y co t v M M n n ✓ � N CO t M 0 N- N O m O) n u) r N N u) O) t co 0) t CO u) CO t a) co N CO r O m 0) CO O L m 0 CO u) CO r 0 (0 co co r r v LO M M N (O C6 O r u M r N N m r O M co- CO CO u) r r V CO N v CO r r N 0 0) u) 0) u) CO m 1:----- CO' ([) u) 0 .�- m 6) u) n N 0 N- 0) (0 m m n CO O) u) CO r O O) u) m t CO LO N N u) .- 0) N t 0) CO • CO y r r m CO m O r O N O u) Cl) O N m N- ca CO to t u) N r N N N r _ v N r CO CO t N... •.. N O) e M t N O N an tl' O) — co u) (D N W 0 0 0 u ) n N m m CO N (O O) CO 0 CO t CO r M CO M u) 0 O p O N n m N t CO u) 0 co co co co r co Or N r t Oi r m (O 0i 0) O) (O o t (D CV CO- N- n n C t r v v CV v CO t r u) CO 0 CO r O m co co 0 N- n n 0 CO t 0 N m CO CO u) t N- O CO CO 0 (O 0 u) O O m M O) CO CO N CO m CO O m m O) r N- W O) O N- CO CO r r r O CO CO t 0 m r r • O C r t t u V O .- O N .- t m o O r m O) r (v `-• CO CO r N- CO M v CO F .. Z W CO >- X w ° a w ° F z z a, J o < < O O co > CO a F- FQ F w > J O Z 7 Z U Q: W m K W m W 7 W W> W w . F. w (n U' [r LL > W X 0 0 } Z J (n W Z • Z W d' w - (n W W W �U H _ y z Ei 0 17- C7 0. W a 7 U) F Z w I-- W to a) * Z W w O O Z 0 0 W m � 00 <WO =7 J • F a w 8 a ,q < w w w O w 0 C O w to 0 U- L 4 E w 0 U Q U U ° 2 H J J LL Z• _, m Z Z a) d _y, m u O Z 0 Z tY D r w ¢ Z Z F. W 2 L Z Q a E V UJ --I Q (1) 0) 0) In LL r t>_ ° F I- D Z Z • a m a :� ,= F W m m m m W- Z F 0. W cc 2 m 0 U C U O O O 0) ° O ? d 1- NY O 0 CONSTRUCTION FUND 0 u) N O N O CO 0) CO v 0 0 O O O n O m u) N u) m 0 O O O 0 0 CO t 0 0 CO M t O O n O n n u) (.6 n u) u) V C u) u) u) O u) N (0 m n r co co N N N 0 N CO 0 0) 0 0 Cl) O) v 0 N 0 N CO 0 0 0 0 CO u) 0) t 0 0 CO O CO CO 0 t() 0 u) O O u) V' 0 0 m O (O CO u) O n u) n ( N n u) m N. 0 r N N CV _. N N N O t 0 0 u) N 0 0) v 0 m O CO O) O 0) CO 0 CO 0 O) O O 0 0 r O N 0 O) O) CO t CO 0 m O m CO (ri CO m N ( C n m ti v ai (CO ✓ r z. .- N N O N- N O m CO CO t 0 O v 0 0 O u CO O) CO 0 m t r 0) N- 0 0 0 0 0 G G r 0 m CO c 0 O O O O u) CO- m m M u) C' M u) N u) n N o CO N n CT) r Cl N N O u) N O O N 0) CO u) N m 0 0 0 0 0 N CO O O) CO N 0 (O 0 N- 0 n N- O u) u) M u) u) (0 N O n O n n u) m m m O O) N (4 v u) u) u) O u) O m m m N N t O n t o CO 0 n r N CO 0 N O N CO O O 0 m O MO 0 CO N N CO Cl CO u) O N u) n N- CO CO 0 CO 0 CO 0) CO- O N M 0D t m u) m L m t co N u) t m *- O N N M O O M O m u) 000 M t n 0 n O) 0 N 0 CO CO N O O) N- 0 u) O m m t 0 r u) m t t O CO m u) N. O n N N O N t o co- r V C) C7 t0 m N O u) t CO CV m v t CO r O) t N m 0 0 N 0 N- O) n m O CO t CO *- 0 t t O 0 0) O CO m m t m CO m O) CO O M N (O 0 0 Q) u) M 00 M 1---.4-070 t CO 0 CO CO O O ui O) u) N O v d. N O u7 0 m W CO 0 r CO M 0) .N... (=, CO N. 0) CO N v N BEGINNING FUND BALANCE > cc w 0) w NY 0) w w co Z ? > 0 'O 0 Et z F w W w 0 N m CO O¢ ¢J w W m 0 m to Z F Z Z d > Z o p D 0 • O H U Q (=i. H w L7L CD e E W w U> W CO o O K a X O W o° J a w = 0) ct W LL J d 7 7 ces 7 m N 2 J Q CO X w H (9 H' LL > m m L E FO a m Z m� E Z o o F Z cn W a> 001=F < WW O O O Z 0 (0a 0 0 10 Exhibit C -1 Residential Water Rate Comparison as of September 2013 2012 Ranking 2013 Ranking CITY 1 Summer City Base Rates Rate Per CCF Consumption Assume 10 CCF 2013 TOTAL 2012 RATE Difference 2014 TOTAL 1 1 WATER DISTRICT 119 (Duvall) ; $ 37.50 2.90 $ 29.00 1 $ 66.50 $ 66.50 1 - 3 2 SEATTLE 1 13.50 4.73/5.72 52.20 65.70 60.70 5.00 $ 65.75 2 3 DUVALL 1 23.96 1 3.57/6.63 40.80 64.76 63.07 1 1.69 12 4 WOODINVILLE 17.50 5.66 45.28 62.78 47.80 14.98 19 5 KIRKLAND 17.32 4.16 41.60 1 58.92 40.88 18.04 5 6 KENT 12.72 ! 3.99/5.09 43.20 39.00 ' 39.00 55.92 53.00 54.33 I 50.90 1.59 1.00 2.10 $ 54.00 7 TUKWILA 2014 7 " TUKWILA 2013 15.00 t 3.90 14.00 i 3.90 8 8 HIGHLINE WATER DISTRICT 13.90 1 3.50/4.14 38.20 52.10 50.69 1.41 9 9 SKYWAY (CWA) 15.59 3.46/4.38 36.44 i 52.03 49.51 2.52 10 10 'COVINGTON (CWA) 22.53 2.95 29.50 52.03 49.20 2.83 4 11 IBELLEVUE CEDAR RIVER WATER DIST 16.61 3.32+ 18.33 j 2.42/4.26 33.20 + 30.98 1 49.81 49.31 44.40 51.94 5.41 53.57 6 12 11 13 ':COAL CREEK +- 18.91 3.01 30.10 li 49.01 49.01 - 53.69 13 14 ;KING COUNTY WD #125 15 EDMONDS 12.50 !� 3.30 22.15 I 2.30 33.00 1 23.00 45.50 45.15 45.30 40.56 0.20 4.59 21 15 16 RENTON 16.76 2.42/3.24 28.30 i 45.06 42.91 2.15 47.35 16 17 NORTHSHORE 1 13.50 3.00 30.00 43.50 42.50 1.00 14 22 I 18 l, 19 ',SAMMAMISH ISSAQUAH 12.78 1.65/3.93 30.18 42.96 42.96 - PLATEAU KING COUNTY WD #20 23.48 !, 1.62/1.97 17.60 41.08 40.28 20 20 19.75 2.13 21.30 41.05 40.75 ! 0.30 24 21 1AUBURN 13.17 2.61/3.20 27.87 1 41.04 37.22 ' 3.82 18 22 ,ALDERWOOD 13.63 2.73 27.30 40.93 38.80 40.93 !, 35.51 26 23 TINE SAMMAMISH 16.30 2.25 22.50 1, 17 24 'ISOOS CREEK 13.25 1.70/3.40 25.50 38.75 41.35 (2.60) 23 25 REDMOND (CWA) 13.10 1 1.60/3.20 25.60 38.70 37.65 1.05 25 26 :BOTHELL 10.67 2.10/3.08 25.90 36.57 36.01 I 27 27 MERCER ISLAND 10.83 2.57 25.70 1 36.53 34.99 1.54 28 28 1TACOMA 16.76 1.45/1.81 16.60 ' 33.36 32.16 1 1.20 29 29 LAKEHAVEN (FEDERAL WAY) 15.24 1.43 14.30 29.54 27.15 I 2.39 30 30 LYNNWOOD 16.14 1 1.85 9.25 1 25.39 22.49 1 2.90 25.39 W:\PW Eng \OTHER \Gail Labanare \Water & Sewer Documents \Utility Rate Surveys Water, Sewer & SSW M2.dsx 11 Exhibit C -2 Residential Sewer Rate Comparison as of September 2013 2012 Ranking 2013 Ranking CITY 2012 2013 City Charge King County I Sewer 2013 Total 2014 1 1 SEATTLE KC 74.76 76.71 39.79 116.50 2 2 MERCER ISLAND KC 68.79 48.60 39.79 1 88.39 11 3 BELLEVUE KC 55.84 30.30 39.79 70.09 5 4 VASHON SEWER KC 62.44 30.18 I 39.79 69.97 69.97 7 I 5 SAMMAMISH PLATEAU KC 61.27 29.20 39.79 ' 68.99 4 6 SKYWAY KC 63.03 27.60 39.79 67.39 6 7 RENTON ,KC 62.34 26.33 40.95 67.28 68.60 3 8 DUVALL 64.35 66.09 66.09 8 9 'WOODINVILLE KC t ;KC 61.04 25.98 39.79 65.77 ITUKWILA 2014. i 25.40 1 39,79. $ 65,19 9 10 BOTHELL KC 59.43 25.05 I 39.79 64.84 13 10 T 11 - TUKW ILA 2013 1 KC 55.36 23.10 1 39.79 1, $ 62.89 12 NE SAMMAMISH KC 57.35 21.89 39.79 61.68 18 13 ISSAQUAH KC 53.02 21.70 1 39.79 61.49 15 r 14 ,AUBURN 15 ICEDAR RIVER W & S KC KC 55.20 55.67 21.02 20.07 I 39.79 39.79 60.81 59.86 12 14 16 DIAMOND KC 55.26 19.16 39.79 58.95 1BLACK 17 17 COAL CREEK KC 54.29 19.00 39.79 58.79 59.45 16 18 LAKEHAVEN 54.37 12.68 L 39.79 ! 52.47 21 19 'KENT , KC 52.71 17.27 39.79 57.06 20 20 SOOS CREEK IKIRKLAND KC KC 52.95 53.02 17.20 17.08 39.79 1 39.79 1 56.99 56.87 19 21 22 22 ,LAKE FOREST PARK ALDERWOOD 'KC KC 51.75 51.46 15.65 15.36 39.79 39.79 55.44 55.15 23 ! 23 24 24 REDMOND I KC 48.67 13.10 39.79 52.89 25 1 25 VALLEY VIEW SEWER KC 47.10 11.51 ! 39. 79 51.30 26 , 26 NORTHSHORE KC 46.10 I 11.31 39.79 51.10 27 I 27 ALGONA KC 45.22 9.12 , 39.79 I 48.91 28 28 'SOUTHWEST Suburban Sewer 27.50 27.50 ! 0.00 27.50 29 T 29 MIDWAY SEWER DISTRICT 24.00 24.00 0.00 24.00 'AVERAGE 54.29 62.84 W:\PW Eng \ OTHER \Gail Labanara \Water & Sewer Documents \Utility Rate Surveys Water. Sewer & SSWM2.xlsx 12 CITY SINGLE FAMILY SURFACE WATER RATES AS OF August 2013 Monthly Rate (2013) 2012 Yearly Rate 2013 Yearly Rate Exhibit C -3 2014 Yearly Rate Seattle (High 10,000 SF) 30.50 $ 328.55 365.97 $ 365.97 Seattle (Low 3,000 SF) 13.67 147.28 164.05 $ 164.05 Duvall 17.93 209.52 215.16 $ 221.61* Auburn 17.41 193.56 208.92 $ 225.36 Redmond (range, minimum shown) 16.56 198.72 198.72 $ 198.72 Mercer Island 15.14 181.68 $ 181.68 Sammamish 14.75 $ 177.00 Issaquah 14.08 168.96 $ 168.96 Newcastle 13.28 159.36 159.36 $ 159.36 King County 12.58 133.00 151.00 $ 171.50 Renton 12.09 138.12 145.08 $ 152.28 Shoreline 11.42 133.00 137.00 $ 141.00* Burien 11.26 135.16 151.38 Kent 11.09 126.72 133.08 $ 139.68* Tukwil 80 Tukwila'21 Lynnwood 7.86 90.24 94.32 97.68 Federal Way 7.10 85.15 85.15 85.15 Seatac 6.90 90.24 82.80 * Recommended but not approved by Council $400.00 $350.00 $300.00 $250.00 $200.00 $150.00 $100.00 $50.00 $- Seriesl W: \PW Eng \OTHER \Gail Labanara \Water & Sewer Documents \Utility Rate Surveys Water, Sewer & SSWM2.xlsx 13 ron FT EXHIBIT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A NEW PUBLIC WORKS FEE SCHEDULE. WHEREAS, each year the City analyzes the rate model for the three utility enterprise funds, which are water, sewer and surface water, to ensure revenues keep pace with expenses, to update the traffic model, and to analyze the transportation network to ensure continued compliance with the Growth Management Act and the City's adopted Comprehensive Plan; and WHEREAS, the City is authorized to impose fees to recoup the costs of services rendered; and WHEREAS, the City is combining the Public Works permit fees with the Department of Community Development permit fees under a consolidated permit fee resolution, and the Public Works Fee Schedule will now only include utility fees and transportation fees; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Public Works utility and transportation fees will be charged according to the following schedule, which shall supersede any previously adopted Public Works Fee Schedule and take effect as of January 1, 2014: PUBLIC WORKS FEE SCHEDULE PERMIT-DESCRIPTION FEE e- • - •• e• e. TYpe-G- (Infrastrusture and Grading on Private Property and City Right of Way and Disturbance of-Qty Right of Way) $ 50.00 $4-00,00 $250.00 application base fee, plus four components based on construction-vat-61e; 4) Plan Review - • 3) Pavement-Mitigatioa Grading Plan Review $40000 Type E (Potential Disturbance of City Right of Way) Type--F--(-Blan-ket Permits) $4-00-00 $2.50,00-p Ae. flail • t-tt ft et. • WAVVord Processing\Resolutions\PW fee sot-led-utility and transportation fees strike-thru 10-16-13 GL:bjs Page 1 of 5 14 PTION $60.00 -per-i nspeetion Street-Vacation $-17200424 Latesorner'o An eements .. l s e.- as u dministrative fee, $50.00 Copy of City of Tukwila's Infrastructure - -Design and Construction- Standards $50-00 WATER RATES FEE Water Meter Installation .75 inch 1 inch 1.5 inch 2 inch 3 inch 4 inch 6 inch $ 600.00 $ 1,100.00 $ 2,400.00 $ 2,800.00 $ 4,400.00 $ 7,800.00 $12,500.00 Water Meter Deduct $25.00 Water Base Charge (Monthly) Single Family (one dwelling unit) Multi- Family (more than one dwelling unit) Commercial /Industrial Customers: 3/4 inch Service 1 inch Service 1-1/2 inch Service 2 inch Service 3 inch Service 4 inch Service 6 inch Service 8 inch Service 10 inch Service 12 inch Service In addition to the monthly water base charge, each 100 cubic feet of water used will be charged as shown in "Water Rates (Monthly)." Current 2013 Proposed 2014 $ 14.00 $15.00 $ 14.00* $15.00* *each dwelling unit $ 40.00 $ 50.00 $ 75.00 $100.00 $145.00 $195.00 $290.00 $385.00 $480.00 $575.00 Water Rates (Monthly) Single Family Residence (Oct -May) Single Family Residence (Jun -Sept) Multi - Family (Oct -May) Multi - Family (Jun -Sept) Commercial /Industrial (Oct -May) Commercial /Industrial (Jun -Sept) In addition to the monthly water base charge listed above, each 100 cubic feet of water will be charged at the following rates: Current 2013 Proposed 2014 $2.80 $3.90 $2.92 $3.06 $4.08 $4.28 $3.98 $4.18 $5.46 $5.72 W: Word Processing\Resolutions\PW fee sched - utility and transportation fees strike -thru 10 -16 -13 GL:bjs Page 2 of 5 15 Fire Protection Service Charges (Monthly) 2 inch Service 3 inch Service 4 inch Service 6 inch Service 8 inch Service 10 inch Service 12 inch Service Per month based on size of service. $ 9.00 $ 20.00 $ 35.00 $ 80.00 $120.00 $200.00 $260.00 WATER SERVICES FEE Water Turn On $ 50.00 After -Hour Water Turn On — additional fee for customer requested after -hours water turn on $100.00 Unauthorized Water Usage — after shut -off for non - payment $100.00 Special Meter Read -- customer requested meter read outside normal read schedule $ 30.00 Shut -off notice $ 30.00 Change in owner, tenant, and/or third party paying agent $ 20.00 - z _ _ - • _ • +• $-- .20.00 Emergency Conservation Sanction $100.00 Temporary Water Meter Deposit .75" and 1" water meter 2.5" water meter Temporary Water Meter Rental per minimum 60 days expiration .75" and 1" water meter 2.5" water meter $ 300.00 $1 ,500.00 $ 75.00 $ 150.00 WATER INTEREST CHARGE RATE On all water accounts 30 days in arrears from the date of delinquency until paid 8% per annum computed on a monthly basis SEWER RATES FEES Residential Sewer Service (single dwelling unit) Flat rate of $2349- $25.40 per month [TMC 14.16.030 (1)] Residential Sewer Service (multiple dwelling unit, permanent type) Flat rate of $23.10 $25.40 per month for each dwelling unit [TMC 14.16.030 (2)] Commercial and Industrial Sewage Service Flat rate of $49:4 -8 $44.52 per month and, in addition, any usage over 750 cubic feet of water be the $48-45 $44.52 per month shall at rate of per 750 cubic feet fTMC 14.16.030 (4)] SEWER INTEREST CHARGE RATE On all sewer accounts 30 days in arrears from the date of delinquency until paid 8% per annum computed on a monthly basis W:1Word Processing\Resolutions \PW fee sched- utility and transportation fees strike -thru 10 -16 -13 GL:bjs Page 3 of 5 16 SURFACE WATER RATES FEE PER YEAR Surface Water Utility Rates Per Year Category: Service Charge Per Acre Current 2013 Proposed 2014 $ 129.32 $ 142.24 $ 281.15 $ 309.26 $ 515.30 $ 566.82 $ 768.90 $ 845,78 $ 926.32 $1,018.94 $1,080.55 $1,188.60 $ 107.00 per parcel $ 118.00 per parcel 1. Natural 2. 0 -- 20% Developed Surface 3. 21 - 50% Developed Surface 4. 51 - 70% Developed Surface 5. 71 - 85% Developed Surface 6. 86 - 100% Developed Surface 7. Single - Family Residential Parcels SURFACE WATER INTEREST CHARGE RATE On all surface water accounts 30 days in arrears from the date of delinquency until paid o 8 /o per annum computed on a monthly basis TRANSPORTATION CONCURRENCY TEST FEE SCHEDULE Fees for Residential Use UNIT ALL TYPES OF RESIDENTIAL Between 1 and 3 $ 300.00 Between 4 and 5 $ 600.00 Between 6 and 10 $ 1 ,200.00 Between 11 and 15 $ 2,000.00 Between 16 and 20 $ 3,500.00 Between 21 and 25 $ 5,000.00 Between 26 and 30 $ 6,500.00 Between 31 and 40 $ 8,000.00 Between 41 and 60 $10,000.00 Greater than 60 $12,000.00 1 All residential uses defined by the ITE Trip Generation Manual Land Use Codes 200 -299, including single family, multi - family, mobile home parks, and shared housing Fees for Non - Residential Use GROSS FLOOR AREA INDUSTRIAL2 OFFICES RETAIL EATERY5 INSTITU- TIONAL & PORTS ALL OTHER USES Less than 5,000 $1,000 $1,800 $2,700 $5,400 $500 $1,500 Between 5,001 and 10,000 $1,500 $2,700 $4,050 $8,100 $1,000 $2,000 Between 10,001 and 20,000 $2,000 $3,600 $5,400 $10,800 $1,500 $2,500 Between 20,001 and 30,000 $3,000 $5,400 $8,100 $10,800 $2,000 $2,500 Between 30,001 and 40,000 $4,000 $7,200 $10,800 $10,800 $2,500 $2,500 Between 40,001 and 50,000 $5,000 $9,000 $13,500 $10,800 $3,000 $2,500 Between 50,001 and 70,000 $6,000 $10,800 $16,200 $10,800 $4,000 $2,500 Between 70,001 and 90,000 $7,000 $12,600 $18,900 $10,800 $5,000 $2,500 Between 90,001 and 150,000 $8,000 $14,400 $21,600 $10,800 $6,000 $2,500 Between 150,001 and 200,000 $9,000 $16,200 $24,300 $10,800 $7,000 $2,500 Greater than 200,000 $10,000 $18,000 $24,300 $10,800 $8,000 $2,500 W:1Word Processing\Resolutions\PW fee sched- utility and transportation fees strike -thru 10 -16 -13 GL:bjs Page 4 of 5 17 2 All industrial /agricultural uses defined by the ITE Trip Generation Manual Land Use Codes 100 -199, including light and heavy industrial, manufacturing, and warehousing 3 All office, medical, and service related uses defined by the ITE Trip Generation Manual Land Use Codes 600 -699, 700 -799, and 900 -999, including general office, medical facilities, and banks 4 All retail and recreation uses defined by the ITE Trip Generation Manual Land Use Codes 400 -499, 800 -830 and 837 -899, including retail sales, rental sales, athletic clubs, and theaters 5 All food service uses defined by the ITE Trip Generation Manual Land Use Codes 831 -836, excluding accessory (stand - alone) drive - through espresso stands (or similar) under 250 sq. ft., which are assessed $300 6 All institutional and transportation uses defined by the ITE Trip Generation Manual Land Use Codes 000 -099 and 500 -599, including schools, places of worship, day care, terminals, and transit PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2013. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President APPROVED AS TO FORM BY: Shelley M. Kerslake, City Attorney Filed with the City Clerk: Passed by the City Council: Resolution Number: W: \Word Processing \Resolutions \PW fee sched - utility and transportation fees strike -thru 10 -16 -13 GL:b}s Page 5 of 5 18 ATTACHMENT D City of Tukwila WATER ENTERPRISE FUND 2014 - 2019 Analysis in 000's REVENUES 2011 2012 2013 2013 Actual Actual Budget Estimate 2014 2015 2016 2017 2018 2019 Totals Monthly Water Charges (1) Base Base Base +5% +5% +5 +5% +5% +5% Cascade Water Affiance (CWA) 2,010 2,198 2,186 2,339 2,310 2,402 2,498 2,597 2,726 2,863 15,396 Regular City Water 2,737 2,955 3,026 3,237 3,207 3,367 3,535 3,712 3,898 4,093 21,812 Subtotal Water 4,747 5,153 5,212 5,576 5,517 5,769 6,033 6,309 6,624 6,956 37,208 Other Miscellaneous Revenue 215 193 130 145 130 150 170 200 220 230 1,100 Interlocal Ags \PWTF \Grants 1,888 4 0 0 0 0 0 0 0 0 0 Repayment of Interfund Loan TUC Ped Bridge 0 50 50 50 50 50 250 Water Connection Fees (2) 10 4 50 75 50 50 25 25 25 10 185 Total Revenues 6,860 5,354 5,392 5,796 5,697 6,019 6,278 6,584 6,919 7,246 38,743 EXPENDITURES CWA Purchased Water (1) 2,010 2,198 2,186 2,000 2,310 2,402 2,498 2,597 2,726 2,863 15,396 Water Operations & Maintenance 1,274 1,689 1,786 1,786 1,827 1,881 1,928 2,005 2,086 2,168 11,895 Debt Service (4) 554 555 544 544 555 550 162 161 162 161 I 1,751 Interfund Utility Tax (5) 10% 475 518 534 572 565 592 620 651 684 719 1 3,831 Engineering Labor (7) 70 62 74 74 76 78 80 83 85 87 489 Subtotal 4,383 5,022 5,124 4,976 5,333 5,503 5,288 5,497 5,743 5,998 33,362 Water Capital- CIP Program 1,982 191 1,473 112 1,455 1,103 3,297 1,108 730 342 8,035 Total Expenditures 6,365 5,213 6,597 5,088 6,788 6,606 8,585 6,605 6,473 6,340 41,397 FUND BALANCE Change in Fund Balance (' Beginning Balance Ending Balance 495 141 (1,205) 708 (1,091) (587) (2,307) (21) 446 906 (2,654) 6,000 6,043 6,078 6,078 6,786 5,695 5,108 2,801 2,780 3,226 6,495 6,184 4,873 6,786 5,695 5,108 2,801 2,780 3,226 4,132 6,786 4,132 Fund Balance: Reserved (2') 20% of revenue Unreserved 1,070 5,716 Ending Balance 6,495 6,184 4,873 6,786 i 1,078 1,139 1,204 1,256 1,317 1,384 1 1,384 4,617 3,969 1,597 1,525 1,909 2,748 II 2,748 5,695 5,108 2,801 2,780 3,226 4,132 4,132 (a) Revenues in excess of (less than) expenditures (b) Annual reserve balance requirement equals 20% of the prior year operating revenues. 2014 - 2019 Financial Planning Model XXIII 10/8/2013 19 ATTACHMENT E City of Tukwila SEWER ENTERPRISE FUND 2014 - 2019 Analysis in O00's REVENUES 2011 2012 2013 2013 Actual Actual Budget Estimate 2014 2015 2016 2017 2018 2019 Totals Monthly Sewer Charges King County Metro Sewer (1) 3,385 3,611 3,749 3,815 3,749 3,951 4,022 4,191 4,254 4,322 1 24,489 Regular City Sewer (2) 2,128 2,693 1,886 2,586 2,760 2,870 2,985 3,105 3,229 3,358 18,307 Subtotal Sewer Revenue 5,513 6,304 5,635 6,401 6,509 6,821 7,007 7,296 7,483 7,680 42,796 Other Misc. Revenue 184 200 150 150 150 160 180 200 210 220 1,120 Grant /Bonds /PWTF 1,228 2 750 45 705 0 0 0 800 0 1,505 Sewer Connection Fees (3) 115 104 120 213 120 120 125 125 100 100 690 Total Revenues 7,040 6,610 6,655 6,809 7,484 7,101 7,312 7,621 8,593 8,000 46,111 +20% +20% +20% +10% +5% +5% +5% +5% +5% EXPENDITURES Sewer Operations & Maintenance King County Metro Sewer (4) 3,385 3,611 3,749 3,815 3,749 3,951 4,022 4,191 4,254 4,322 24,489 Regular City Sewer (5) 913 1,106 987 1,200 1,012 1,036 1,067 1,099 1,132 1,166 6,512 Debt Service (6) 357 356 355 355 394 392 391 389 390 448 2,404 Interfund Utility Tax (7) 10% 562 647 579 655 666 698 719 750 769 790 4,392 Engineering Labor (9) 137 85 74 74 77 78 80 83 85 87 490 Subtotal 5,354 5,805 5,744 6,099 5,898 6,155 6,279 6,512 6,630 6,813 38,287 Sewer Capital - CIP Program 2,327 484 1,420 650 1,700 855 755 755 1,200 1,083 6,348 Total Expenditures 7,681 6,289 7,164 6,749 7,598 7,010 7,034 7,267 7,830 7,896 44,635 FUND BALANCE Change in Fund Balance tar Beginning Balance Ending Balance (641) 321 (509) 60 (114) 91 278 354 763 104 1,476 1,685 1,890 2,199 2,199 2,259 2,145 2,236 2,515 2,869 3,631 2,259 1,044 2,211 1,691 2,259 2,145 2,236 2,515 2,869 3,631 3,735 ! 3,735 Fund Balance: Reserved - 20% of prior year's revenue 1,322 1,353 1,356 1,420 1,462 1,524 1,559 1,559 Unreserved 937 792 881 1,095 1,406 2,107 2,177 1 2,177 Ending Balance 1,044 2,211 1,691 2,259 2,145 2,236 2,515 2,869 3,631 3,735 3,735 If the Ending Fund Balance (Accumulated Totals listed above) goes negative, an interfund loan would be requested and an emergency rate increase may be considered. (a) Revenues in excess of (less than) expenditures 2014 - 2019 Financial Planning Model XXV 10/8/2013 20 ATTACHMENT F City of Tukwila SURFACE WATER ENTERPRISE FUND 2014 - 2019 Analysis in 000's REVENUES 2011 2012 2013 2013 Actual Actual Budget Estimate 2014 2015 2016 2017 2018 2019 , Total +10% +10% +5% +5% Annual Billings (Current) (1) 3,320 3,669 3,833 3,833 Other Revenues 56 55 19 20 Grants /Bond Proceeds (2) 131 131 355 45 Total Revenues 3,507 3,855 4,207 3,898 EXPENDITURES Operations & Maintenance 1,343 1,445 1,667 1,667 Debt Service (3) 345 308 315 315 Interfund Utility Tax (4) 10% 335 369 385 385 Engineering Labor (6) 289 301 275 275 Subtotal 2,312 2,423 2,642 2,642 SSWM Capital - CIP Program 1,230 1,170 2,485 1,500 Total Expenditures 3,542 3,593 5,127 4,142 FUND BALANCE Change in Fund Balance (a Beginning Balance Ending Balance (35) 262 (920) (244) 2,291 2,151 2,329 2,329 2,256 2,413 1,409 2,085 +10% +20% +10% +10% +10% +10% 4,217 5,060 5,566 6,123 6,735 7,408 35,109 ,� 20 30 50 75 75 80 330 335 90 95 545 45 45 1,155 4,572 5,180 5,711 6,743 6,855 7,533 36,594 1,752 1,790 1,879 1,954 2,032 2,113 , 11,520 314 313 312 311 310 308 1,868 424 509 562 620 681 749 ! 3,544 285 293 302 311 321 330 1,842 2,775 2,905 3,055 3,196 3,344 3,500 18,774 3,565 1,718 2,510 2,674 2,212 2,263 14,942 6,340 4,623 5,565 5,870 5,556 5,763 33,716 (1,768) 557 146 873 1,299 1,770 2,878 2,085 317 874 1,021 1,894 3,193 2,085 317 874 1,021 1,894 3,193 4,963 4,963 Fund Balance: Reserved (1') 20% of revenue Unreserved 745 1,340 Ending Balance 2,256 2,413 1,409 2,085 i 771 847 1,018 1,123 1,240 1,362 1,362 (453) 27 3 771 1,953 3,601 3,601 317 874 1,021 1,894 3,193 4,963 4,963 (a) Revenues in excess of (less than) expenditures (b) Annual reserve balance requirement equals 20% of the prior year operating revenues. 2014 - 2019 Financial Planning Model XXVII 10/8/2013 21 22 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, P.E., Senior Program Manager DATE: October 18, 2013 SUBJECT: Sewer Repair at 6450 Southcenter Blvd Project No. 91340203 Bid Award ISSUE Award bid to Green River Construction, Inc. for the repair of the sanitary sewer line near 6450 Southcenter Blvd. BACKGROUND When City staff was cleaning and jetting the sewer line near the intersection of Southcenter Blvd and 65th Ave S, the jetting head got stuck in the sewer line. Staff then pushed the jet head to the next manhole up stream of the clog and removed the jet head from the hose and tried to pull the hose back to the Vactor truck. At that time, the hose became stuck in the sewer line. Staff was unable to free the hose and it had to be cut and left in the manhole where the Vactor truck was parked. Staff then tried to video the sewer line but was unable to see the blockage because it was under water. It was determined that the only way the blockage could be cleared is to install a new manhole where the jet hose is stuck. This proposed manhole location was determined by the counter on the Vactor truck hose reel. After the installation of the proposed manhole, staff will be able to determine the exact location of the blockage in the sewer line. A second excavation may be required once the exact location is found. The sewer line is located near fiber optic lines and if it is determined that the sanitary sewer was damaged during the installation of the fiber optic lines, the City will file a claim against the fiber company. If the sewer line is not repaired at this time and the pipe collapses, by- pass pumping will be required so that sewer service can be maintained to the north hill of Tukwila. DISCUSSION Four firms from the MRSC Small Works Roster were asked to submit quotes for this project. King Construction and Omega Contractors elected not to bid due to scheduling conflicts. The low quote came from Green River Construction in the amount of $34,164.00, including sales tax, bonding, and insurance. Green River Construction has done successful work for the City in the past. Engineer's Bid FINANCIAL IMPACT Estimate Results Construction (includes tax) $30,670.95 $34,164.00 Contingency 10% 2.801.00 3,416.40 Total $33.471.95 $37.409.58 As this is an emergency repair, this project is not budgeted and construction costs will come from the Sewer Fund's ending fund balance. RECOMMENDATION Council is being asked to approve the contract with Green River Construction, Inc. in the amount of $34,164.00 for the installation of the proposed manhole and sewer line repair and consider this item at the October 28, 2013 Committee of the Whole and subsequent November 4, 2013 Regular Meeting. attachments: Vicinity Map Bid Tab Green River Construction's Proposal W \PW EngtPROJECTSW- SW Projects\2013 Annual Sewer Repair (91340201)tlnto Memo 65th manhole duo 23 lAirr? 0, 4 t EXISTING r Joey #, 4 _ P i A EXISTING �� MANHOLE STING soutmenter Blvd PROPOSED MANHO.. PROP F M CUSICK, Oct 17, 2013 QUOTE TAB FOR 6450 SOUTHCENTER BLVD. MANHOLE INSTALLATION PRESENT AT FIELD MEETING FOR PREBID BUT DID NOT SUBMIT QUOTES TO THE CITY DO TO SCHEDULING CONFLICTS ENGINEERS OPINION GREEN RIVER NORDIC OMEGA KING COST CONSTRUCTION CONSTRUCTION CONTRATORS CONSTRUCTION ALL WORK $ 28,010.00 $ 29,550.00 $ 46,312.73 * * * * * * ** * * * * * * ** TRENCH SAFTEY SYSTEM $ 850.00 $ 3,500.00 $ - TRENCH DEWATERING $ 800.00 $ 6,000.00 SALES TAX $ 2,660.95 $ 2,964.00 $ 5,302.21 #VALUE! #VALUE! TOTAL $ 30,670.95 $ 34,164.00 $ 61,114.94 #VALUE! #VALUE! PRESENT AT FIELD MEETING FOR PREBID BUT DID NOT SUBMIT QUOTES TO THE CITY DO TO SCHEDULING CONFLICTS 10/15/2013 10:30 2062462274 PROPOSAL GREEN RIVER CONST PAGE 02/02 October 10, 2013 MANHOLE INSTALLATION at 65Th Avenue andSouthcenter Boulevard THIS IS A PREVAILING WAGE JOE Installation of Side Sewer Description Perform all work associated with this project including bonding and insurance, Trench Safety System Unit Cost Lump Lump Sum Trench Dewatering System Tax (9.5 %) Total Company Name: Contact Name: Address: Telephone: Lump Sum $. q &y- $39/ _.62e-pu A(ec-emehee#,Q$5x,2?/0. Please return to: Mike Cusick, P.E. City of Tukwila Public Works Department 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Pease return to the City of Tukwila by 5:00 PM October 15, 2013. 26