HomeMy WebLinkAboutUtilities 2013-10-21 Item 2B - Bid Award - 6450 Southcenter Boulevard Sewer Repair to Green River ConstructionCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, P.E., Senior Program Manager DATE: October 18, 2013 SUBJECT: Sewer Repair at 6450 Southcenter Blvd Project No. 91340203 Bid Award ISSUE Award bid to Green River Construction, Inc. for the repair of the sanitary sewer line near 6450 Southcenter Blvd. BACKGROUND When City staff was cleaning and jetting the sewer line near the intersection of Southcenter Blvd and 65th Ave S, the jetting head got stuck in the sewer line. Staff then pushed the jet head to the next manhole up stream of the clog and removed the jet head from the hose and tried to pull the hose back to the Vactor truck. At that time, the hose became stuck in the sewer line. Staff was unable to free the hose and it had to be cut and left in the manhole where the Vactor truck was parked. Staff then tried to video the sewer line but was unable to see the blockage because it was under water. It was determined that the only way the blockage could be cleared is to install a new manhole where the jet hose is stuck. This proposed manhole location was determined by the counter on the Vactor truck hose reel. After the installation of the proposed manhole, staff will be able to determine the exact location of the blockage in the sewer line. A second excavation may be required once the exact location is found. The sewer line is located near fiber optic lines and if it is determined that the sanitary sewer was damaged during the installation of the fiber optic lines, the City will file a claim against the fiber company. If the sewer line is not repaired at this time and the pipe collapses, by- pass pumping will be required so that sewer service can be maintained to the north hill of Tukwila. DISCUSSION Four firms from the MRSC Small Works Roster were asked to submit quotes for this project. King Construction and Omega Contractors elected not to bid due to scheduling conflicts. The low quote came from Green River Construction in the amount of $34,164.00, including sales tax, bonding, and insurance. Green River Construction has done successful work for the City in the past. Engineer's Bid FINANCIAL IMPACT Estimate Results Construction (includes tax) $30,670.95 $34,164.00 Contingency 10% 2.801.00 3,416.40 Total $33.471.95 $37.409.58 As this is an emergency repair, this project is not budgeted and construction costs will come from the Sewer Fund's ending fund balance. RECOMMENDATION Council is being asked to approve the contract with Green River Construction, Inc. in the amount of $34,164.00 for the installation of the proposed manhole and sewer line repair and consider this item at the October 28, 2013 Committee of the Whole and subsequent November 4, 2013 Regular Meeting. attachments: Vicinity Map Bid Tab Green River Construction's Proposal W PW Eng PROJECTSW- SW Projects\2013 Annual Sewer Repair (91340201) : nfo Memo 65th manhole doc 23 6450 southcenter boulevard sewer repair map M CUSICK, Oct 17, 2013 QUOTE TAB FOR 6450 SOUTHCENTER BLVD. MANHOLE INSTALLATION PRESENT AT FIELD MEETING FOR PREBID BUT DID NOT SUBMIT QUOTES TO THE CITY DO TO SCHEDULING CONFLICTS ENGINEERS OPINION GREEN RIVER NORDIC OMEGA KING COST CONSTRUCTION CONSTRUCTION CONTRATORS CONSTRUCTION ALL WORK $ 28,010.00 $ 29,550.00 $ 46,312.73 * * * * * * ** * * * * * * ** TRENCH SAFTEY SYSTEM $ 850.00 $ 3,500.00 $ - TRENCH DEWATERING $ 800.00 $ 6,000.00 SALES TAX $ 2,660.95 $ 2,964.00 $ 5,302.21 #VALUE! #VALUE! TOTAL $ 30,670.95 $ 34,164.00 $ 61,114.94 #VALUE! #VALUE! PRESENT AT FIELD MEETING FOR PREBID BUT DID NOT SUBMIT QUOTES TO THE CITY DO TO SCHEDULING CONFLICTS 10/15/2013 10:30 2062462274 GREEN RIVER CONST PAGE 02/02 PROPOSAL October 10, 2013 MANHOLE INSTALLATION at 65Th Avenue andSouthcenter Boulevard THIS IS A PREVAILING WAGE JOE Installation of Side Sewer Description Unit Perform all work associated with this project including bonding and insurance, Trench Safety System Trench Dewatering System Tax (9.5 %) Total Company Name: Contact Name: Address: Telephone: Lump Sum Lump Sum Lump Sum Cost _.62e-pu 4/(e_c-emehee,Q$5k2?/0. Please return to: 1h cr Mike Cusick, P.E. City of Tukwila Public Works Department 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Pease return to the City of Tukwila by 5:00 PM October 15, 2013. 26