HomeMy WebLinkAboutFS 2013-10-22 Item 2D - Discussion - Permit User Fee for Technology InvestmentsCity of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Finance and Safety Committee
FROM: Jack Pace, DCD Director
BY: Nora Gierloff, Deputy DCD Director
Brenda Holt, Permit Coordinator
Christy O'Flaherty, City Clerk
DATE: October 15, 2013
SUBJECT: Permit User Fee for Technology Investments
(This item was also presented to CAP; based on the discussion, clarifying
information has been added to pages 2 -3, highlighted in yellow.)
ISSUE
Should Tukwila adopt a technology fee on building, public works and and use permits to offset
the cost of the new permit tracking system and the cost of preserving and providing electronic
access to permits?
BACKGROUND
The City is replacing its current permit tracking system, Permits Plus by Accela, with CRW's
Trakit system. Our current system is used by Building, Planning, Public Works, Code
Enforcement and Rental Housing. Fire enters their reviews of development and land use
permits in Permits Plus but uses a separate system for issuing their own permits. The new
system will provide significant customer service improvements including online public access to
permit status and history; electronic plan submittal and review; online inspection scheduling;
mobile access for inspectors; citizen comment tracking; and integrated GIS mapping. We
anticipate a go live date of November 6"
Once issued, the City is required to permanently preserve land use and development related
permits and their associated records and make them available upon request. The City currently
microfilms the records as a security back -up measure for long -term protection, and the City
Clerk's office would also like to make permit records available in the City's Digital Records
Center powered by the Laserfiche Imaging System. This would allow the end -user to search for
and retrieve records online, as opposed to making public records requests utilizing a paper -
based system.
Having historical permit records available online will provide a significant customer service
improvement by eliminating the delay of submitting a public records request. It would also
reduce the substantial amount of staff time spent fulfilling public records requests for permit
files, which have a high rate of retrieval.
The new Trakit permit system will allow permit records to be sent directly into Laserfiche as they
are closed. However, importing historical permit records into Laserfiche is currently on hold due
to staffing limitations. Identifying a revenue source would enable the City to work through the
W:\2013 Info Memos - Council \TechFeeMemoFS.doc 1 10/17/2013
17
INFORMATIONAL MEMO
Page 2
backlog of scanned historical permits (back to 1958) and continue adding the current permits to
the Digital Records Center on an ongoing basis.
ANALYSIS
As requested by Council, staff is providing technology fee options for consideration. The
technology fee level chosen will determine the revenue raised.
Trakit Costs
Costs for implementation of Trakit are below the budgeted amount of $375,000 and
maintenance costs will be lower than Permits Plus.
Project Cost Summary Purchase Cost
A. Total Software & Licensing $152,500
B. Implementation & Project Management $ 83,250
C. Data Conversion from Permits Plus $ 15,500
D. Training $ 34,000
E. CRW Travel & Expenses $ 19,500
F. Customizations $ 23,000
G. Negotiated Discounts $ (15,000)
H. Taxes $ 25,000
I. ArcGIS Server to support GIS functionality $ (17,3721)
J. Larger Monitors for ePlan review $ 4,000
K. Increase Data Storage Capacity for ePlans $ 14,710
Permit System Cost $356,460
1 Purchased with emergency management funds
Records Management/Accessibility Costs
A portion of the technology fee could be earmarked to offset some of the costs associated with
expanding access to permit records beyond that required by the State. The City Clerk's office
does not have the staff time to import, index, review and merge the digitized permits in order to
make them available online. Funding of up to $20,000 annually through the technology fee, as
well as $17,241 to be taken from the microfilming /digitizing budget would allow this process to
move forward by enabling the Digital Records Coordinator position in the Clerk's Office to
become full time in 2014.
Based on discussion at the CAP meeting, further investigation was done regarding the level of
service provided by the cities surveyed in Attachment A. A review of each of the agency
websites demonstrated that none of the surveyed cities offer online accessibility to finalized
permit records. While options are available to search for database summaries with permit
information, the end user is not able to acquire a copy of the finalized permit, plans and other
documents online. DCD permits have the highest document retrieval rate from the City's
Records Center with 101 files retrieved to date in 2013, with permit dates ranging from
1960 -2009. (This does include requests for more current permit records housed in DCD).
Based on the chosen funding level, we are proposing to more efficiently meet the demand by
providing online accessibility of finalized permit records for the public to self- serve, saving them
the cost of paying the City for paper records.
W:\2013 Info Memos - Council \TechFeeMemoFS.doc 2 10/17/2013
18
INFORMATIONAL MEMO
Page 3
Revenue Options
Given the significant investment required to upgrade to a new permit system and accept
electronic plans, many cities are imposing technology user fees. Fees are assessed as either a
flat fee, fee per sheet or percentage of the permit fee that ranges from 1.3% to 5 %, see
Attachment A. The Master Builders have written a letter in support of city technology fees if they
are used to provide better service, and in our informal discussions with applicants many think
the efficiencies of electronic permit review would be worth a modest fee increase.
The proposed technology fee would be applied to all permits that are processed through our
tracking systems except rental housing inspections. However, it would apply to the "Permit" fee
only, excluding the plan review fee, mailing fees, state building code fee, impact fees, Cascade
Water Alliance Fee and any other water or sewer assessments.
A chart of the amount Tukwila would have collected from different fee structures is included as
Attachment B. The actual permit revenues are listed in Attachment C. Over time we could
recover the expenses associated with the new permit tracking system and expanded records
access with a fee in line with that charged by other jurisdictions in our area.
Estimated Revenue
The proceeds from different technology fee levels are shown below, assuming annual permit
revenues of $1,300,000 which is an average of recent years. The other columns show the
amount of technology fee that would be added to our current permit fees for a typical new single
family house, moderate commercial tenant improvement and 8,450 sf new commercial building.
Technology
Fee Level
Estimated
Annual
Revenue
Tech Fee for a
2,900 SF House
Tech Fee for a
$100,000 TI
Tech Fee for a
New 8,450 SF
Restaurant
3%
$ 39,000
$145
$45
$450
4%
$ 52,000
$192
$60
$600
5%
$ 65,000
$240
$75
$750
6%
$ 78,000
$288
$90
$900
7%
$ 91,000
$336
$105
$1,050
Payback Period
The funds available for retiring the Trakit investment, contributing to the City Clerk's staffing to
make historical permits available online, and developing a fund for future updates are listed
below. This assumes a 10 year payback period for Trakit, after that point those funds would be
available for future investments. We have not accounted for inflation in these figures, but as
construction costs rise so would permit and technology fee revenues.
Technology
Fee Level
Estimated
Annual
Revenue
10 year
Repayment of
Trakit Investment
Annual
contribution to
Digital Records
Center
Annual
Contribution to
Fund for Future
Technology
Replacement
3%
$ 39,000
$35,600
$3,400
$0
4%
$ 52,000
$35,600
$16,400
$0
5%
$ 65,000
$35,600
$20,000
$9,400
6%
$ 78,000
$35,600
$20,000
$22,400
7%
$ 91,000
$35,600
$20,000
$35,400
W:\2013 Info Memos - Council \TechFeeMemoFS.doc 3
10/17/2013
19
INFORMATIONAL MEMO
Page 4
Future Costs
Fire is working with CRW to develop a quote to integrate Fire permits into the Trakit system in
2014. Once they are using CRW the technology fee will be added to their permits. Finance may
wish to switch to LicenseTrak for business licenses in the future. The LicenseTrak expense
should be reimbursed through a fee on business licenses rather than the technology fee as it
would not directly benefit permit applicants.
Other Changes
In addition to the changes to the fee resolution related to the technology fee there is one
additional change proposed. In June of 2010 DCD moved from flat fees for all land use permits
in favor of having fees for more complex, less predictable permits structured as a retainer with
an hourly fee for staff time over the number of retainer hours. In the 2013 -14 fee schedule we
reduced the number of permits subject to hourly fees after analysis showed that the retainers
were rarely exceeded and did not justify the additional time to track the hours and bill the
applicants. In this version we are proposing to eliminate the hourly fees completely to simplify
the permit review and issuance process as we transition to Trakit. The additional staff time
required for record keeping and the delay in issuing the permit while the applicant paid the
additional fees has not been justified by the minor amounts of revenue generated.
RECOMMENDATION
Staff recommends that the Committee set a technology fee level of 5% and forward the
resolution to the October 28th Committee of the Whole and November 4th Regular meeting for
action. The level of funding for records management can be set as part of the 2014 budget
review.
ATTACHMENTS
A. Technology Fee Survey — Updated to reflect B & 0 Tax
B. Potential Technology Fee Revenue Chart
C. Permit Revenue Table
D. Draft Technology Fee Resolution
E. Draft Building /Electrical /Plumbing /Mechanical Permit Fee Ordinance
W:\2013 Info Memos - Council \TechFeeMemoFS.doc 4 10/17/2013
20
Technology Fee Survey
A
Fee
Department
B & 0 Tax
Permit System
Notes:
City of Auburn (8/13)
$ -
No
CRW TRAKiT
City of Bellingham
$ -
Yes
Accela
City of Black Diamond
$ -
No
Bitco
City of Bonney Lake
$ 4.00
No
Eden /Tyler
Technology
City of Bothell (8/13)
5%
building, planning,
public works, fire
No
EnerGov
City of Burien (8/13)
$ -
Yes
CityView
City of Covington (8/13)
$ 40.00
building, planning,
fire, licenses
No
Accela
A technology surcharge will be assessed for
development projects at each step in the land
use process (concurrency review,
preliminary, engineering, notice to proceed
and final approvals). Individual impact fees
not paid with an associated building permit
will be required to pay a separate technology
surcharge fee at the time of payment.
City of Des Moines (8/13)
$25 /comm -
$10 /res
building
Yes
Bitco
City of Federal Way (8/13)
$ 20.00
building, planning,
public works, fire
No
Amanda
Charge to scan single family plans submitted
on paper = $39.50. Charge to scan
commercial plans submitted on paper =
$118.50
City of Issaquah (8/13)
1.3%
building, planning,
public works, fire
Yes
CRW TRAKiT
1.3% goes to EGovAlliance. Electronic plans
are required for projects exceeding $10,000
in value. City charges to scan as follows: 0 -4
pgs = $8 + $1.90 per page; 5+ pgs = $32.70 =
$1.90 per page.
City of Kent
3%
building, planning,
public works, fire
Yes
Accela
City of Kirkland
1.3%
building, planning,
public works, fire
No
EnerGov
1.3% goes to ECityGovAlliance
City of Lynnwood
10%
No
EnerGov
Raised their permit fees 10% across the
board 5 years ago to pay for the system, only
recently went live.
City of Maple Valley (8/13)
$ -
No
CRW TRAKiT
City of Mercer Island
(8/13)
3%
building, planning,
public works, fire
Yes
CRW TRAKiT
1.3% goes to ECityGovAlliance
City of Newcastle (8/13)
$ -
No
City of Ocean Shores
$ -
Yes
City of Puyallup
$ -
No
Eden /Tyler
Technologies
City of Redmond
3%
building, planning,
public works, fire
No
EnerGov
System was paid for through an ongoing Tech
Fund.
City of Renton (8/13)
3% moving
to 5%
building, planning,
public works, fire
No
EnerGov
Increase to 5% when Renton accepts on -line
permits other than through
MyBuildingPermit.com
City of Sammamish
$ -
No
CRW TRAKiT
City of SeaTac
$ -
No
CRW TRAKiT
City of Tacoma
5%
building, planning,
public works
Yes
Updated: October 2013
Attachment A
21
The fee calculation does not include plan review fees, impact fees, mitigation, special assessment fees collected. The land use fees collected is the application or retainer fee.
2
W
H
I
I
I I N
i-I
ei
a0
O
M
M
.--1
VT
N
O
‘--I
,--I
N
O
M
ih
Cr)
O
1 )
CO
.--I
ri
11)
ih
00'0£5'L$
$10,259.44
$44,444.87
$74,074.78
O
O
00
m
n
N
.-i
i/?
$22,243.64
$51,331.48
$85,552.46
O
O
4
M
.-i
0l
.-i
iR
111
00
M
ce
in.
$19,473.36
$32,455.59
0
O
Lei
N
O
`I
VI
tD
01
N
111
01
t0
ei
i/}
0
N
N
N
a-I
Oi
M
i/}
N
LE)
M
0
N
111
tD
i/}
$12,378.00
$51,575.00
01
M
tf1
a0
00
tD
.--I
i/}
CO
N
tD
tD
01
W
M
i/}
$64,943.80
$14,100.00
M
O
lD
N.
ei
M
ei
i/?
$30,406.23
Lf1
O
N
N
to
O
IIl
i/?
$13,440.00
N
O
ei
O
N
$40,024.15
O
O
tD
co
M
• 1.3% of fee collected
• 3.0% of fee collected
■ 5.0% of fee collected
• $6.00 per issued permit
The fee calculation does not include plan review fees, impact fees, mitigation, special assessment fees collected. The land use fees collected is the application or retainer fee.
2
W
H
24
Technology Fee Estimate
Plan Review
2013 thru June Type of Building Mechanical Plumbing Electrical Fee (bldg, Land Use Public Works Total # of Total Technology
technology fee Permit Fee Permit Fee Permit Fee Permit Fee mech, plumb) Pre -app Application Signs Permit Fee permits Total fee Fee
Plan Review
Public Works
0 v
0
W
Permit Fee
_O
N
Permit Fee
T
U a)
ca
•C LL
t 0 E
a)) a
a )
2 a
CO
N
O
O
O
T
E9
E9.
0)
0
v
N
V3
N
N
0
0
E9.
O
O
CO
M
EA
M
N
O
O
O
N
LC)
0)
CV
E9
co
LO
O
O
E9
O
co
O
O
M
E9
O
O
O
N.
E9
0
O
N
O
LC)
E9
O
O
O
O
M
co
LO
O
O
0)
O
O
E9
O
O
N
N
E9
O)
O
O
E9
O
co
CD
co
co
E9.
O
O
CO
CO
N
E9
0
0
O
O
E9
O
O
0)
O
0)
E9.
M
N
0)
M
O
E9.
M
N
C0
O)
co
N
E9.
LC)
O
N.
0)
0)
M
E9.
O
O
O
CO
E9.
O
O
N
E9.
N
E9
E9.
E9
E9.
E9
E9.
E9
E9
E9
E9.
E9.
E9.
N
CO
O
O
N
O
co
EFT
M
co
M
N
N
EFT
co
O
QO
LC)
ER
0
O
M
O
ER
O
O
CV
O
co
M
E9
O
O
O
Lf)
O
EFT
O
O
co
co
O
E9.
O
N
0
N
EA
O
O
O
V
E9.
O
N
O
E9
O
O
O
O
E9.
O
O
o
co
M
N
EFT
O
O
O
to
co
co
LC)
E9
co
co
0)
O
E9
O)
CO
M
E9
co
N
M
CO
N
Ca
E9
O
O
N
co
E9
0
O
Ln
CO
CO
N
E9
0
O
N
O
M
E9.
O
O
O
E9.
0)
co
O
QO
co
O
E9.
LO
O
O_
M
E9.
O
O
N
QO
E9.
0
O
O
N
0)
E9.
Number of Permits
O
0
0
M
O
O
O
O
O
E9
Permit Fees Collected
% of fee collected
% of fee collected
% of fee collected
Flat fee per permit
Flat fee per permit
N
a)
1-
Total # of
Public Works
Permit Fee
1
0 U
()
N
W
Permit Fee
1,013,541.00 I
E9.
M
O
EC
N.
0)
EA
M
N
10
0
M
E9.
LE)
O
ti
N-
CO
0
0
E9
O
O
0)
O
O
O
O
O
E0
u)
E9.
N
O
N
N
N
CO
O
O
N
QO
N
LC)
0-
O_
N
0)
O
CO
Number of Permits
O
O
00
O
M
O
O)
E9
O
O
O
O
N
104,043.00 1 $
E9.
O
O
E9
n
0)
0)
M
E9
CO
O
N
O
M
E9.
N
0)
0
N
E9.
co
V
LC)
Lt)
ER
O
O
O)
LC)
E9
N
O
N
O
E9.
O
O
N
0)
ER
O
O
C0
r-
O
ER
0
O
N
0)
E9.
O
O
O
O
co
M
E9
O
O
O
O
N
E9
0
Co
O
O
O
N
E9.
E9
Ea
E9
E9
f9.
E9
262,205.00 $
E9
E9.
N.
O
00
O
E9
E9.
O
(0 O
CD
E9
O
O
V
N
N
O
M
82,239.00 $
$ 415,332.00 1 $
O
N
O)
M
E9.
Permit Fees Collected
O)
co
O
E9
N
O)
O)
co
O
E9.
0 c
M
N
O
O
E9.
CO
CO
N
E9
CO
0)
0)
O
N
E9.
13,110.25 $
E9
0
N
O
E9
LO
O)
20,766.60 1 $
E9.
0
O
(6
O
O
E9.
O
O
O
O
O
ER
O
O
O
O
N
E9.
O
O
E9
O
O
CV
N
E9.
O
O
O
ER
E9.
O
O
M
O)
N
ER
O
O
O
LC)
N
O
E9.
0
O
E9
O
O
O
O
co
W
E9.
0
O
00
N
E9.
% of fee collected
% of fee collected
% of fee collected
E
4)
a
m
Q
a)
m
To
Flat fee per permit
0
N
co
co
0)
0
co
ER
O
co
M
0)
t0
O
O
O
0
E9.
1,298,876.00
E9.
V3
Public Works
Permit Fee
O
M
N
O
0
O
CO
CO
M
O
CO
ER
M
O
CO
QO
E9
0)
O)
E9
O
O
M
CO
E9
co
O
N
co
ER
O
O
LC)
O
N
E9
N
C
O
O
O
N
rs-
O
O
M
E9
Co)
co
E9
co
0
O
Ea-
co
co
M
CO
E9
O
O
O
O
E9
0
O
Ln
E9
O
O
ca
U
Q
Q
O
O
C)
N
N
O
E9.
co
C)
O
E9.
N-
00
O
co
O
E9.
O
O
O
E9.
O
O
co)
N
V
E9.
O
O
O
O
r-
E9.
0.
0.
16
G)
a`
E9
E9
E9
E9
E9
E9
E9
E9.
64
E9.
E9
E9.
To
U
0
0)
W
Permit Fee
CO
LO
O
O
4r
V
CD
M
E9
0
O
M
co
E9
M
O
E9
0
O
N
O
N-
6
M
E9.
co
N-
o.;
O
M
E9.
co
N
N
C)
E9.
O
CO
i)
N
0-
E9
O
0-
M
O
E9.
O
QO
O0)
E9
0
O
N
N
E9.
O
O
O
O
0)
a0
N
E9
O
O
O
co
co
Ea
R d
0 a)
C LL
R E
N N
2 a
o
co
O
O
co
co
ER
M
0)
M
0
N
E9
N
00
O
0-
E9
O
M
co
E9
O
O
co
O
E9
O
O
O
O
co
E9
0)
CO
M
Number of Permits
0
O
O
0)
N
E9.
Permit Fees Collected
O
co
E9.
0
O
CO
M
n
E9.
0
0
M
O
N
co
N
N
E9.
0
0
lfi
O
O
M
co
N
E9.
O
O
O
E9
0
O
LI)
N
O
E9.
O
O
Ln
N
E9.
% of fee collected
% of fee collected
% of fee collected
Flat fee per permit
Flat fee per permit
25
0)
cn
0
O
O
c
CL) d
d LL
H
10
0
H
N
i6
O
F
Total # of
Plan Review
l6 a)
o a)
co
C LL
E
to a)
2 a
d
w
w T
O O
()
N
Number of Permits 316 179 174 1049 28 99 108 138 2091
Permit Fees Collected $ 555,622.94 $ 110,432.08 $ 28,972.45 $ 300,563.00 $ - $ - $ 120,942.00 $ 19,587.00 $ 167,954.00 $ 1,304,073.47
% of fee collected 1.30% $ 7,223.10 $ 1,435.62 $ 376.64 $ 3,907.32 $ - $ - $ 1,572.25 $ 254.63 $ 2,183.40 $ 16,952.96
% of fee collected 3.00% $ 16,668.69 $ 3,312.96 $ 869.17 $ 9,016.89 $ - _ $ - $ 3,628.26 $ 587.61 $ 5,038.62 $ 39,122.20
% of fee collected 5.00% $ 27,781.15 $ 5,521.60 $ 1,448.62 $ 15,028.15 $ - $ - $ 6,047.10 $ 979.35 $ 8,397.70 $ 65,203.67
Flat fee per permit $6.00 $ 1,896.00 $ 1,074.00 $ 1,044.00 $ 6,294.00 $ - $ - $ 594.00 $ 648.00 $ 828.00 1 $ 12,378.00
Flat fee per permit $25.00 $ 7,900.00 $ 4,475.00 $ 4,350.00 $ 26,225.00 $ - $ - $ 2,475.00 $ 2,700.00 $ 3,450.00 $ 51,575.00
EH
O
O
M
O
O
O
O
co
V)
0
V
N
0)
O
00
rn
N
CO
O
O
0
M
co
0)
O
N
EH
O
N
ti
EH
EH
EH
M
N
O
to
M
O
N.
co
N
co
(0
co
ua
O
M
N
N
E*
0
0
O
N
N
N
0)
M
to
N
CO
co
M
O
Lf)
O
CIO
LO
Ef)
CO
O
N
CO
M
Efl
Efl
0)
co
_O
O
Oi
co
co
co
to
N
M
co
64
0)
co
CIO
O
co
O
0
0
r)
t0
M
O
N
C
CD
Vf
O
N
n
O)
M
00
EA
LO
M
O)
0)
O
K)
O
O
O
EH
EH
(0
00
N
O
64
N
O
EA
O
CD
N
O
N
LO
00
1`
P1
N
0
0
O
O
co
n
co
N
O
O
0
(0
co
v)
O
co
uo0)
to
EA
64
Efi
O
O
0)
Co
N
O
O
O
O
O
r.
0
O
O
O
O
O)
co.
Es
0
0
O
E!3
ER
EA
O
O
O
co
ti
N
ff)
O
O
O
ti
N
CA
Ef3
O
O
O
N
N
N
O
O
O
O
M
0)
0
O
O
c
✓ 0
(0 LL
H
la
0
H
N
w
i6
O
F
O y
4k E
C6
O a_
F
N
O
N
Plan Review
• E
v
.0
0 u
LL a)
E
O
C a'
LL
.0
E • E
a
N
T
o
0)
CO
Cb
CO
N
oo
0)
Ln
to
M
M
a
0)
EIi
rn
O
Cf)
a
N
M
Eq
O
to
1
O
W
O
O
0
0
N
E;H
O
O
M
O)
N
64
M
O)
co
co
O
LO
(1)
CO
0
O
Co
co
O
O
O
P1
N
M
ua
O
O
O
O)
O
M
fA
O
O
N
0)
co
ER
O
0)
O
co
d.
O
O
O
et
lO
Eft
O
O
O
t!)
N
N
(f)
O
O
O
M
O
EH
O
N
0)
Efl
O
O
co
co
M
Eft
O
O
to
O
Efl
0
O
N
fA
Ea-
ff3
64
Eft
ER
EA
EA
EH
En
Hh
O
co
N
O
N
23,316.25 1 $
d*
Ln
co
O
O
N
&7
CO
M
O
64
O
O
(0
co
O
O
ER
O
O
O
N
Co
Ef)
O
O
O
N
O
O
N
M
0
M
0)
0)
O
co
Efl
CO
O
O
0
O
O
co
EA
O
co
O
N
CO
M
M
N
M
N
O
N-
n
M
O
co
co
co
O
co
00
N
O
O
0)
O
to
co
O
0)
O
M
261,160.37
0
O
O
O)
M
M
CO
M
CO
N
O
CO
LO
O
C4•)
O
O
co
O
to
0
O
O
0
O
O
0
0
0
O
M
0
0
O
0
0
O
ff)
Permit Fees Collected
% of fee collected
% of fee collected
% of fee collected
Flat fee per permit
O
O
(0
P1
Flat fee per permit
N
to
•
Plan Review
01 0
C LL
E
m a
v
to
M
N
N
N
co
0,
M
M
1)
to
(0
N
1t)
O
LO
co
ElY
O
O
0)
VY
1,711,049.19
Esi
$ 201,971.00
N
L()
N
CO
N
64
CO
O)
O
O
CO
ua
O
O
00
O)
O
O
0
0
O
EA
O
O
Lf)
N
N
et-
0
O
O
L
CO O
LO
06
N
.64
N
N
M
Ln
co
cri
O
00
Ef3
O
N
N
Ea-
O
O
CO
O
O
ff)
O
O
O
O
Ef)
Co
O
O
O
CO
Cb
tri
M
Cb
Efl
O
O
Efl
10
LO
(0
LO
N
EH
LO
Co
CO
N
Efl
0
O
10
O
co
Ef3
O
O
O
N
r-
N
Efl
O
M
Eft
Ei)
Efl
Ef3
Efl
EA
EA
CO
10
O
0
O
'4)
M
O
C`
O)
co
(0
co
d'
O
EFT
0
CO
N
O
64
LO
N..
co
C>0
N
Ea
O
O
O
O
O)
64
O
O
O
O
O)
co
E»
CO
M
O
M
7
N
LO
EA
O
O
64
CO
M
N-
u?
EH
0,
N
CO
N
Efl
0
O
co
W
Eis
O
O
CO
N
co
N
d*
N
CO
M
to
N_
V
C`
N.
M
CO
O
N
0)
M
N
N
1`
sto
O
O
co
co
Ef3
O
O
N
O)
0
N
LC)
O
O
t-
r-
0,
0
N
O
0)
co'
0
V
N
co
O
O
N
CO
CO
M
co
Es
0
O
O
10
C4•)
V*
O
O
tri
N
O
0)
13,1 25.00 $
Number of Permits
Permit Fees Collected
0
0
0
M
0
o
0
lfi
0
0
CO
% of fee collected
% of fee collected
% of fee collected
Flat fee per permit
Flat fee per permit
27
28
Total Technology
Fee
$ 19,259.44I
$ 44,444.87
1- CO
v
O
f.
N
ER
$ 12,738.00'
oo
(t)
O
(
co
ER
Total Technology
Fee
$ 1,023,700.50
-
ao
M
M
r
ER
o
.-
n
0'
CO
ER
o
ui
r
LO
ER
00
o
CO
P
CO
°o
(ri
M
CO
ER
Total fee
$ 1,481,495.54
Total fee
Total # of
permits
$ 83,237.00
Total # of
permits
co
r
Public Works
Permit Fee
$ 1,082.08
,-
N.
0)
M
N
ER
$ 4,161.85
$ 816.00
$ 3,400.00
Public Works
Permit Fee
$ 179,454.00
$ 2,332.90
$ 5,383.62
O
Cl
I■
0)
00
ER
$ 864.00
0
0
O
0
O
CO.'
ER
C
O
0
0
(t)
co
O
M
ER
$ 398.65
0 0)
0)
O)
ER
$ 1,533.25
$ 876.00
0
0
O
(co
M
ER
C
Z'
N
59 119 121
$ 175.32
$ 404.58
0
4
(co
ER
$ 726.00
(t)
O
M
ER
Land Use
Application
$ 74,465.00
$ 968.05
$ 2,233.95
$ 3,723.25
$ 708.00
O
O
O
co
to
N
ER
Land Use
Application
$ 78,805.00
$ 1,024.47
$ 2,364.15
$ 3,940.25
O
O
4
,-
N-
ER
O
O
L()
ti
0
CN1
69
Pre -app
61
ER
ER
ER
ER
ER
ER
ER
Pre -app
ER
ER
ER
ER
ER
Plan Review
Fee (bldg,
mech, plumb)
E9
ER
ER
ER
ER
Plan Review
Fee (bldg,
mech, plumb,
elect)
ER
ER
ER
ER
ER
ER
1.3% technology fee accepted by Master Builders Association of King and Snohomish Counties per email dated October 28, 2010
Electrical
Permit Fee
$ 255,523.00
$ 3,321.80
O)
0
(t)
(.O
(O
N.:
ER
(t)
N-
(D
1-
f�
CV
ER
$ 4,542.00
0
O
(0
N
O)
00
ER
Electrical
Permit Fee
0
.
ER
,
ER
.
ER
i
ER
i
ER
i
ER
Plumbing
Permit Fee
LO
00
N
(t)
0)
co
ER
0 00
M
0
0)
co
$ 2,085.86
$ 3,476.43
0
00
00
ER
$ 7,575.00
Plumbing
Permit Fee
N
O)
$ 34,698.75
$ 451.08
$ 1,040.96
$ 1,734.94
0
N
M)
co
$ 4,800.00
Mechanical
Permit Fee
I■
O
(O
O
O
ER
N
O
O
O
m:.
4
to
$ 7,333.36
$ 1,428.00
Mechanical
Permit Fee
$ 88,916.90
$ 1,155.92
$ 2,667.51
$ 4,445.85
$ 1,452.00
0
O
O
(t)
O
69
Building
Permit Fee
$ 821,409.82
$ 10,678.33
$ 24,642.29
$ 41,070.49
$ 2,550.00
$ 10,625.00
Building
Permit Fee
437
$ 628,339.85
$ 8,168.42
$ 18,850.20
0)
O)
O
V
()
ER
$ 2,622.00
0
O
cri
N
O)
O
ER
Type of
technology fee
'Permit Fees Collected
c
M
r
3.00%
o
o
L()
O
O
O
R
Flat fee per permit $25.00
Type of
technology fee
o
M
r
0
O
(h
o
o
L()
O
O
O
to
O
0
N
% of fee collected
% of fee collected
% of fee collected
Flat fee per permit
0
0
N
Number of Permits
'Permit Fees Collected
% of fee collected
% of fee collected
% of fee collected
Flat fee per permit)
Flat fee per permit
29
30
ATTACHMENT D
r
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, ADOPTING A CONSOLIDATED
PERMIT FEE SCHEDULE AND REPEALING RESOLUTION
NOS. 1779 AND 1780.
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, the overall budgeted increase for 2014 is 2.9 %; and
WHEREAS, the City wishes to adopt a technology fee to offset the cost of providing
significant customer service improvements including online public access to permit
status and history, electronic plan submittal and review, online inspection scheduling,
and online access to permit records through the City's Digital Records Center;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. For 2014, the Technology Fee shall be set at 5% of the applicable
permit fee.
Section 2. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
FEE
Type A (Short-Term Non - profit)
$ 50.00 + Technology Fee
Type B (Short-Term Profit)
$100.00 + Technology Fee
Type C
(Infrastructure and Grading on Private Property
and City Right -of -Way and Disturbance of City
Right -of -Way)
$250.00 application base fee, Technology Fee, plus
four components based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
Page 1 of 10
31
PERMIT DESCRIPTION
FEE
Type D (Long -Term)
$100.00 + Technology Fee
Plus
Review
Hours over
Retainer
Type E (Potential Disturbance of
City Right -of -Way)
$100.00 + Technology Fee
Retainer
Type F (Blanket Permits)
$250.00 processing fee, plus $5,000.00 cash deposit,
withdraw $100.00 per instance for inspection
Franchise — Telecommunications
$5,000.00 administrative fee
Franchise — Cable
$5,000.00 plus 5% of total revenue
Street Vacation
$1,200.00
Latecomer's Agreements
$500.00 processing fee, plus 17% administrative fee,
plus $500.00 segregation fee
Flood Zone Control Permit
$50.00 + Technology Fee
+ TF
Impact Fees:
Section 3. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
Decision Type
2013
2014
Fee/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Review
Hours over
Retainer
Hee/
Technology
Retainer
Fee (TF)
Appeal
Type 1, 2 and 4 Decisions
-$563
$579
+ TF
SEPA MDNS Appeal
$563
$579
+ TF
Impact Fees:
Fire
$563
$579
Parks
$563
$579
Transportation
$553
$579
Sign Permit (TMC Chapter 19)
Permanent
-$2-34
$238
+ TF
Temporary
$108
$104
+ TF
Pole /Banner Initial Application
- $2-34
$238
+ TF
Special Event
$ -1-90
$104
+ TF
Pole /Banner Annual Renewal
$50
$52
+ TF
New Billboard
3
$579
+ TF
Master Sign Program -Admin
$2,070
$2,130
+ TF
Master Sign Program- BAR
$3,31/1
$3,411
+ TF
Appeal of Sign Code Decision
4563
$579
+ TF
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
32
Page 2 of 10
Decision Type
2013
2014
Fee/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Review
Hours over
Retainer
Fee!
Technology
Retainer
Fee F
Design Review (TMC, Section 18.60.030)
Administrative
$2,130
$2,192
+ TF
Public Hearing
$3,817
$3,927
+ TF
Major Modification
$ -1,305
$1,343
+ TF
Minor Modification
-$5133
$610
+ TF
Variances, Special Permissions & Site Plan Review
Variances (TMC Section 18.72)
$2,692
$2,770
+ HE
+ TF
Parking Variance
(Type 3 -TMC 18.56.140)
$924
$950
+ HE
+ TF
Administrative Parking Variance
(Type 2 -TMC 18.56.140)
$563
$579
+ TF
Environmentally Sensitive Areas Deviation,
Buffer Reduction (TMC Chapter 18.45)
$1,125
$1,466
+TF+
hours over
15
Reasonable Use Exception
(TMC Section 18.45.180)
$2$58
$2,932
+ HE
+ TF
hours over
30
TSO Modification to Development Standard
(TMC 18.41.100)
-$563
$579
+ TF
Exception from Single Family Design Standard
(TMC 18.50.050)
456-8
$579
+ TF
Special Permission Cargo Container
(TMC 18.50.060)
$563
$579
+ TF
Landscape Perimeter Averaging
(TMC 18.52.060)
$563
$579
+ TF
Parking Standard for use not specified
(TMC 18.56.100)
$175
$489
+TF,±
hours over
5
Residential Parking Reduction
(TMC 18.56.065)
$563
$579
+ TF
Shared, covenant, Complementary Parking
Reduction (TMC 18.56.070)
-$56 -3
$579
+ TF
Parking Lot Restriping
(TMC 18.56.120)
_$563
$579
+ TF
Tree Permit and Exceptions
(TMC Chapter 18.54)
$1-88
$103
+ TF
Lot Creation and Consolidation
Boundary Line Adjustment (TMC Chapter 17.08)
$1,597
$1,644
+ TF
Lot Consolidation (TMC Chapter 17.08)
$533
$610
+ TF
Short Plat (2 -4 lots) (TMC Chapter 17.12)
$3,637
$3,742
+ TF
Short Plat (5 -9 lots) (TMC Chapter 17.12)
$4,139
$4,259
+ TF
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
Page 3 of 10
33
Decision Type
2013
2014
Fee/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Review
Hours over
Retainer
Fee/
Technology
Retainer
Fee (TF)
Lot Creation and Consolidation (continued)
Subdivision:
Preliminary Plat (10+ lots)
(TMC Section 17.14.020)
$4,750
$4,888
+ HE
+ TF ±
hours over
50
Final Plat (10+ lots) (TMC Section 17.12.030)
$2,850
$2,932
+ TF ±
hours over
30
Binding Site Improvement Plan (TMC Chapter 17.16)
$3,637
$3,742
+ TF
Planned Residential Development:
Administrative (TMC Section 18.46.110)
$2,070
$2,130
+ TF
Public Hearing (TMC Section 18.46.110)
$4,750
$4,888
+ TF ±
hours over
50
Minor Modification (TMC Section 18.46.130)
4563
$579
+ TF
Major Modification (TMC Section 18.46.130)
$2,310
$2,377
+ TF
Wireless Communication Facility (TMC Chapter', 18.58.050)
Minor (Type 1)
$563
$579
+ TF
Administrative (Type 2)
$1,597
$1,644
+ TF
Major or Height Waiver (Type 3)
$3,194
$3,286
+ HE
+ TF
SEPA & Environmental
Checklist
$1,628
$1,675
+TF
SEPA EIS
$2&50
$2,932
+ TF ±
hours over
30
SEPA Planned Action
$563
$579
+ TF
SEPA Addendum
-$563
$579
+ TF
Sensitive Area Master Plan Overlay
(TMC 18.45.160)
$4,750
$4,888
+TF$
hours over
50
Shoreline Permits
Substantial Development Permit:
(TMC Chapter 18.44)
Project value: $5,000 - $10,000
$1,125
$1,158
+ TF
$10,001 - $50,000
$2,632
$2,709
+ TF
$50,001 - $500,000
$4,198
$4,320
+ TF
More than $500,000
$5,324
$5,478
+ TF
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
34
Page 4 of 10
Decision Type
2013
2014
Fee/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Review
Hours over
Retainer
-Fee/
Technology
Re er
Fee (TF)
Shoreline Permits (continued)
Permit Exemption Letter, Shoreline
-2-31-
$238
+ TF
Conditional Use Permit, Shoreline
(TMC 18.44.050)
$3,803
+ HE
+ TF
$3,696
Shoreline Tree Permit
(TMC Chapter 18.44)
$103
+ TF
- $-1-00
Shoreline Environment Redesignation
$2,850
$2,932
+ TF ±
hours over
30
Noise Variance (TMC Section 8.22120)
Type I
-$462
$475
+ TF
Type II
463
$641
+ TF
Type III
$1,385
$1,425
+ HE
+ TF
Use Permits
Conditional Use Permit (TMC Section 18.64.020)
$3,6 -96
$3,803
+ HE
+ TF
Unclassified Use Permit (TMC Chapter 18.66)
$4,750
$4,888
+ TF ±
hours over
50
TSO Special Permission Use
(TMC Section 18.41.060)
-$924
$950
+ HE
+ TF
Comprehensive Plan Changes (TMC Chapter 18.84)
Rezone (Map Change)
$3,325
$3,421
+ TF ±
hours over
35
Comprehensive Plan Amendment
$3,800
$3,910
+ TF ±
hours over
40
Zoning Code Text Amendment
$4,319
$4,444
+ TF
Miscellaneous Services and Charges
Development Agreement
$1,900
$1,955
+ TF ±
hours over
20
Code Interpretation (TMC Section 18.90.010)
$332
$341
+ TF
Zoning Verification Letter
$332
$341
+ TF
Legal Lot Verification
4532
$548
+ TF
Preapplication Meeting
-$462
$475
+ TF
Mailing Fee to Generate Labels, per project
$'137
$449
Public Notice Mailing Fee per address for each
mailin•
$1
$1
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
Page 5 of 10
35
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
Section 4. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
$65.00 + Technology Fee
$501 to $2,000
$65.00 for the first $500, plus $4.30 for each additional $100, or fraction
thereof, to and including $2,000 + Technology Fee
$2,001 to $25,000
$129.50 for the first $2,000, plus $19.60 for each additional $1,000, or
fraction thereof, to and including $25,000 + Technology Fee
$25,001 to $50,000
$600.40 for the first $25,000, plus $15.30 for each additional $1,000, or
fraction thereof, to and including $50,000 + Technology Fee
$50,001 to $100,000
$983.25 for the first $50,000, plus $10.60 for each additional $1,000, or
fraction thereof, to and including $100,000 + Technology Fee
$100,001 to $500,000
$1,511.60 for the first $100,000, plus $8.50 for each additional $1,000, or
fraction thereof, to and including $500,000 + Technology Fee
$500,001 to $1,000,000
$4,906.30 for the first $500,000, plus $7.00 for each additional $1,000, or
fraction thereof, to and including $1,000,000 + Technology Fee
$1,000,001 to $5,000,000
$8,443.25 for the first $1,000,000, plus $4.70 for each additional $1,000,
or fraction thereof, to and including $5,000,000 + Technology Fee
$5,000,001 and up
$27,243.25 for the first $5,000.000, plus $4.50 for each $1,000 or fraction
thereof + Technology Fee
1. Non - Structural Plan Review Fee. A non - structural plan review fee shall be paid at the
time of submitting plans and specifications for review. The non - structural plan review fee shall be 65% of
the calculated permit fee as set forth in the permit fee schedule. The non - structural plan review fee
specified herein is a separate fee from the permit fee and is in addition to the permit fee.
2. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a
structural plan review fee shall be charged. The structural plan review fee shall be 33% of the calculated
non - structural plan review fee.
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
36
Page 6 of 10
Section 5. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Contract Amount)
Mechanical Permit Fee
$32.50 for issuance of each permit (base fee) + Technology Fee
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
$250 or less
$65.00 + Technology Fee
For each additional fixture
$251 to $500
$65.00 for first $250, plus $7.83 for each $100 or fraction thereof, to
and including $500 + Technology Fee
For each building sewer and each trailer park sewer
$501 to $1,000
$84.60 for the first $500, plus $8.70 for each $100 or fraction thereof, to
and including $1,000 + Technology Fee
$1,001 to $5,000
$128.10 for the first $1,000, plus $9.65 for each $1,000 or fraction
thereof, to and including $5,000 + Technology Fee
$5,001 to $50,000
$166.70 for the first $5,000, plus $10.05 for each $1,000 or fraction
thereof, to and including $50,000 + Technology Fee
$50,001 to $250,000
$639.20 for the first $50,000, plus $8.40 for each $1,000 or fraction
thereof, to and including $250,000 + Technology Fee
$250,001 to $1,000,000
$2,319.20 for the first $250,000, plus $7.40 for each $1,000 or fraction
thereof, to and including $1,000,000 + Technology Fee
$1,000,001 and up
$7,869.20 for the first $1,000,000, plus $6.70 for each $1,000 or
fraction thereof + Technology Fee
Section 6. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance— Issuance of each permit (base fee)
$32.50 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
$65.00 + Technology Fee
For each additional fixture
$14.00 + Technology Fee
For each building sewer and each trailer park sewer
$24.80 + Technology Fee
Rain water system — per drain (inside building)
$14.00 + Technology Fee
For each water heater and /or vent
$14.00 + Technology Fee
For each industrial waste pretreatment interceptor, including its
trap and vent, except for kitchen type grease interceptors
$28.00 + Technology Fee
For each grease interceptor for commercial kitchens
$29.10 + Technology Fee
For each repair or alteration of water piping and /or water treating
equipment, each occurrence
$14.00 + Technology Fee
For each repair or alteration of drainage or vent piping, each
fixture
$14.00 + Technology Fee
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
Page 7 of 10
37
For each medical gas piping system serving one to five
inlets /outlets for a specific gas
$82.00 + Technology Fee
For each additional medical gas inlets /outlets
$16.20 + Technology Fee
For each lawn sprinkler system on any one (1) meter including
backflow protection devices therefor.
$29.10 + Technology Fee
For atmospheric -type vacuum breakers not included in lawn
sprinkler backflow protection:
1 to 5: $14.00 + Technology Fee
Over 5: $14.00 for first 5 plus $3.25 for each additional +
Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2 -inch diameter and smaller: $29.10 + Technology Fee
Over 2 -inch diameter: $32.25 + Technology Fee
Section 7. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
1. Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.)
$32.50 + Technology Fee
2. Unit Fee Schedule (in addition to item in subparagraph 6.1):
For each gas piping system of one to five outlets
$65.00 + Technology Fee
For each additional gas piping system outlet, per outlet
$14.00 + Technology Fee
Section 8. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE - FAMILY DWELLINGS
New single - family dwellings (including a garage)
$152.85 + Technology Fee
Garages, pools, spas and outbuildings
$81.90 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
38
Page 8 of 10
2. SINGLE - FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration -no added /altered circuits
$81.90 + Technology Fee
$250 or less
Service change $81.90 with added /altered circuits, plus $11.55 for
each added circuit (maximum permit fee $152.85)
$81.90 + Technology Fee
$251 - $1,000
Circuits added /altered without service change (includes up to 5
circuits)
$54.60 + Technology Fee
$97.00 for the first $1,000 plus $21.60 for each $1,000 or fraction thereof, to
and including $5,000 + Technology Fee
Circuits $54.60 added /altered without service change (more than 5
circuits); $7.65 for each added circuit (maximum permit fee $98.70 ±
Technology Fee)
$54.60 + Technology Fee
$50,001 - $250,000
Meter /mast repair
$68.25 + Technology Fee
$3,567.20 for the first $250,000 plus $9.15 for each $1,000 or fraction
thereof, to and including $1,000,000 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
Inspections or plan review not specified elsewhere (one -half hour
minimum). Safety inspections, plan revisions.
3. MULTI - FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Contract Amount)
Permit Fee
$250 or less
$65.00 + Technology Fee
$80.90 + Technology Fee
$251 - $1,000
$65.00 for the first $250 plus $4.30 for each $100 or fraction thereof, to and
including $1,000 + Technology Fee
$1,001 - $5,000
$97.00 for the first $1,000 plus $21.60 for each $1,000 or fraction thereof, to
and including $5,000 + Technology Fee
$5,001 - $50,000
$183.30 for the first $5,000 plus $17.70 for each $1,000 or fraction thereof,
to and including $50,000 + Technology Fee
$50,001 - $250,000
$979.15 for the first $50,000 plus $12.90 for each $1,000 or fraction thereof,
to and including $250,000 + Technology Fee
$250,001 - $1,000,000
$3,567.20 for the first $250,000 plus $9.15 for each $1,000 or fraction
thereof, to and including $1,000,000 + Technology Fee
Over $1,000,000
$10,440.70 plus 0.5% of cost over $1,000,000 + Technology Fee
Inspections or plan review not specified elsewhere (one -half hour
minimum). Safety inspections, plan revisions.
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
$65.00 + Technology Fee
Temporary service /generators
$80.90 + Technology Fee
Manufactured /mobile home parks and RV park sites, each service
and feeder
$86.25 + Technology Fee
Carnivals:
• Base fee
$80.60 + Technology Fee
• Each concession fee
$10.80 + Technology Fee
• Each ride and generator truck
$10.80 + Technology Fee
Inspections or plan review not specified elsewhere (one -half hour
minimum). Safety inspections, plan revisions.
$65.00 /hour
Adult family home inspection (paid at the time of scheduling the
inspection)
$65.00
Disaster recovery emergency repair permit (residential structures
only)
$20.00
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
Page 9 of 10
39
Section 9. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three hour minimum charge)
$97.50 /hour
Re- inspection fee
$65.00 /hour
Inspection for which no fee is specifically indicated — investigations or safety
inspections
$65.00 /hour
Additional plan review required by changes, additions, or revisions to approved plans
(minimum charge one -half hour)
$65.00 /hour
Work commencing before permit issuance shall be subject to an investigation fee
equal to 100% of the permit fee.
100% of the
permit fee
Plan review fee — Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for
review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order to
document compliance with the code.
Work covered without inspection or work not ready at the time of inspection may be
charged a re- inspection fee of $65.00.
Administrative fee for permit extension request longer than one year
$65.00
Section 10. Repealer. Resolution Nos. 1779 and 1780 are hereby repealed
effective December 31, 2013.
Section 11. Effective Date. The permit fee schedules contained in this resolution
shall be effective as of January 1, 2014.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2013.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Shelley M. Kerslake, City Attorney
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 9 -25 -13
NG:bjs
40
Page 10 of 10
ATTACHMENT E
T
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AMENDING ORDINANCE NOS.
2402 §4, 2171 §1 (PART) AND 2121 §1 (PART), AS CODIFIED
IN TUKWILA MUNICIPAL CODE CHAPTER 16.04, "BUILDINGS
AND CONSTRUCTION," TO REMOVE PERMIT FEES;
PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN
EFFECTIVE DATE.
WHEREAS, the City intends to update permit fees on an annual basis with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, all development permit fees will be moved into a consolidated fee
resolution for greater accessibility;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1._ TMC 16.04.250 Amended. Ordinance Nos. 2402 §4, 2171 §1 (part)
and 2121 §1 (part), as codified at Tukwila Municipal Code Section 16.04.250, are
amended to read as follows:
16.04.250 Procedures applicable to all construction permits
Fees
Total
Building-Permit-Fees
$a-te-$5ee
s501-te-$2;eee
..e. 11 -
.11 .
.1 .
or fraction thereof, to and including $2,000
$2,001 to $25,000
• -1 -
... .. • =1 e • .ee •.
$1,000, or fraction thereof, to and including $25,000
W: Word Processing \Ordinances\Remove permit fees from Building Code ord strike -thru 10 -7 -13
NG:bjs
Page 1 of 7
41