Loading...
HomeMy WebLinkAboutReg 2008-04-21 Item 4D - Final Acceptance - South 129th Street Drainage by Brike Excavating & Underground Utilities for $40,286.03 C OUNCIL AGENDA S' 5 Initials ITEM NO. --I t, IG 1 Meeting Date I Prapar d by Mayor's review 1 Council review d 'z 04/21/08 BG h E`er I mss' I s 1 I U ITEM INFORMATION CAS NUMBER: 08-047 I ORIGINAL AGENDA DArE.. APRIL 21, 2008 AGENDA ITEM TITLE Accept as complete South 129 St Drainage Project and release retainage. CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing 1 I Other Mtg Date Mtg Date 04/21/08 Mtg Date Mtg Date Mt Date Mtg Date Mtg Date: SPONSOR Council Mayor Adm Svcs DCD n Finance Fire Legal P &R Police PTY/ SPONSOR'S The contract with Brike Excavating Underground Utilities, LLC, is complete for the SUMMARY South 129 St Drainage Project. Construction began January 7, 2008 and was completed on January 22, 2008. The contract included a new drainage system to allow for the removal of a swale on private property. One change order was issued for additional asphalt. This project is ready for final acceptance and the total contract amount was $40,286.03. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. n Planning Comm. DATE: 04/07/08 RECOMMENDATIONS: SPONSOR /ADMIT. Accept contract as complete and authorize release of retainage. COMO IYIEE Unanimous approval; forward to Regular Consent Agenda. COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $40,286.03 $60,000.00 Fund Source: 412 Surface Water (Annual Small Drainage, page 134, 2008 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION I 04/21/08 I I MTG. DATE ATTACHMENTS 04/21/08 Information Memo dated April 2, 2008 Notice of Completion of Public Works Contract 07 -162 Utilities Committee Meeting Minutes from April 7, 2008 INFORMATION MEMO To: Mayor Haggerton From: Public Works Director Date: April 2, 2008 Subject: S 129' Street Drainage Project Project No. 07 -DR04, Contract No. 07 -162 Project Completion and Acceptance ISSUE Accept construction contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 07 -162 with Brike Excavating Underground Utilities, LLC, of Renton, was issued January 7, 2008. This project provided a new drainage system to allow for the removal of a swale from private property. The new system carries the drainage across S. 129 Street to an infiltration system within the Codiga Farms site, adjacent to the roadway. No piped drainage outfalls to the river exist in the area, so infiltration was the only available option to dispose of the roadway runoff. This contract was totally complete on January 22, 2008. Change Order No 1 was issued in the amount of $2,588.12 as compensation for additional asphalt concrete pavement thickness of 14 contrary to the expected 6" depth portrayed in the contract plans. Contract Award Amount 37,697.91 Change Order No. 1 2.588.12 Total Amount Paid (including tax and retainage) 40.286.03 RECOIVIlVIENDATION It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of retainage, subject to the standard claim and lien release procedures. Attachments: Notice of Completion of Public Works Contract Vicinity Map P \PROJECTS\A- DR Projects \07 -DRO4 (S. 129th Street Drainage Modifcations\Info Memo aoseout BRIKE S 129th Drainage.doc Departmen of R evenue PO Sox 47474 R EVET1tlE Olympia WA 98504 -7474 Contractor's Registration No. BI No. g 601 979 516 Date 2/11/08 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: ter Name Addivss of-Publ c=Agency _.1 Departtnent 7Jse O my _-_--1_ Assigned To City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Date Assigned Notice is hereby given relative to the coinpletion of contract or project described below Description of Contract Contract Number South 129 Street Drainage Modifications; Project #07 -DRO4 07 -162 Contractor's Name Telephone Number Brike Excavating Underground Utilities, LLC 425 -271 -8417 Contractor's Address 15620 SE Renton Issaquah Road, Renton, WA 98059 Date Work Commenced Date Work Completed Date Work Accepted 1/7/08 1/22/08 12/4/07 Surety or Bonding Company Insco Insurance Services, Bond 334733P Agent's Address Developer's Surety Indemnity Co., 17780 Fitch, Suite 200, Irvine, CA 92614 Contract Amount 37,697.91 Additions 2,588.12 Liquidated Damages 0.00 Reductions 0.00 Sub -Total 40,286.03 Amount Disbursed 38,271.72 Amount of Sales Tax Paid at 0.0 0.00 Amount Retained 2,014.31 (If various rates apply, please send a breakdown) TOTAL 40,286.03 TOTAL 40,286.03 17:55-:: Disbursing Officer., `i Comments: No additive sales tax paid per Rule 171 Signature Type or Print Name Diane Jaber Finance Approval Phone Number 206 433 -1871 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6 -27 -01) Utilities Committee Minutes April 7, 2008 Page 2 C. Southcenter Boulevard Water Main Project Completion and Acceptance Staff is requesting full Council approval for foiuial contract acceptance and release of retamage to R. L. Alia Company for the Southcenter Boulevard Water Main project. The project ran over budget (see Utilities Committee minutes dated February 4, 2008). Additional funding will be taken from the ending Water Fund balance. The Water Fund balance will expenence a cost saving of approximately $110,000 as a result of an mterlocal agreement with King County Metro m the Interurban Water Reuse project discussed above. 'UNANIMOUS APPROVAL. FORWARD TO APRIL 21 CONSENT AGENDA. D. South 129 Street Dramaee Protect Completion and Acceptance Staff is requesting full Council approval for formal contract acceptance and release of retamage to y Brike Excavating Underground Utilities for the South 129 Street Drainage project. The project consisted of removal of a drainage swale from private property located near the Codiga Farms site. UNANIMOUS APPROVAL. FORWARD TO APRIL 21 CONSENT AGENDA. III. MISCELLANEOUS Staff reported that the Public Works Depai talent will be audited by Washington Cities Insurance Authority this year. Jim Morrow would like to report out to the Committee after the audit is complete. This past weekend, two separate water mains broke, both on private property. The City supplied parts and labor for repair and will invoice accordingly. Meeting adjourned at 5:45 p.m. Next meeting: Monday, April 21, 2008 5 :00 p.m. Conference Room No. 1. t,ummittee Chair Approval Mi es by KAM. Reviewed by GL.