CAS NUMBER: 08-047 I ORIGINAL AGENDA DArE.. APRIL 21, 2008
AGENDA ITEM TITLE Accept as complete South 129 St Drainage Project and release retainage.
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing 1 I Other
Mtg Date Mtg Date 04/21/08 Mtg Date Mtg Date Mt Date Mtg Date Mtg Date:
SPONSOR Council Mayor Adm Svcs DCD n Finance Fire Legal P &R Police PTY/
SPONSOR'S The contract with Brike Excavating Underground Utilities, LLC, is complete for the
SUMMARY South 129 St Drainage Project. Construction began January 7, 2008 and was completed
on January 22, 2008. The contract included a new drainage system to allow for the
removal of a swale on private property. One change order was issued for additional
asphalt. This project is ready for final acceptance and the total contract amount was
$40,286.03.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. n Planning Comm.
DATE: 04/07/08
RECOMMENDATIONS:
SPONSOR /ADMIT. Accept contract as complete and authorize release of retainage.
COMO IYIEE Unanimous approval; forward to Regular Consent Agenda.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$40,286.03 $60,000.00
Fund Source: 412 Surface Water (Annual Small Drainage, page 134, 2008 CIP)
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
I 04/21/08
I I
MTG. DATE ATTACHMENTS
04/21/08 Information Memo dated April 2, 2008
Notice of Completion of Public Works Contract 07 -162
Utilities Committee Meeting Minutes from April 7, 2008
INFORMATION MEMO
To: Mayor Haggerton
From: Public Works Director
Date: April 2, 2008
Subject: S 129' Street Drainage Project
Project No. 07 -DR04, Contract No. 07 -162
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of retainage.
BACKGROUND
The Notice to Proceed for Contract No. 07 -162 with Brike Excavating Underground
Utilities, LLC, of Renton, was issued January 7, 2008. This project provided a new
drainage system to allow for the removal of a swale from private property. The new
system carries the drainage across S. 129 Street to an infiltration system within the
Codiga Farms site, adjacent to the roadway. No piped drainage outfalls to the river exist
in the area, so infiltration was the only available option to dispose of the roadway runoff.
This contract was totally complete on January 22, 2008. Change Order No 1 was issued in
the amount of $2,588.12 as compensation for additional asphalt concrete pavement thickness
of 14 contrary to the expected 6" depth portrayed in the contract plans.
Contract Award Amount 37,697.91
Change Order No. 1 2.588.12
Total Amount Paid (including tax and retainage) 40.286.03
RECOIVIlVIENDATION
It is recommended that this contract be forwarded to the Tukwila City Council on the
consent agenda for formal acceptance and authorize the release of retainage, subject to the
standard claim and lien release procedures.
Attachments: Notice of Completion of Public Works Contract
Vicinity Map
P \PROJECTS\A- DR Projects \07 -DRO4 (S. 129th Street Drainage Modifcations\Info Memo aoseout BRIKE S 129th Drainage.doc
Departmen of R evenue
PO Sox 47474
R EVET1tlE Olympia WA 98504 -7474 Contractor's Registration No. BI No.
g 601 979 516
Date 2/11/08
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From:
ter
Name Addivss of-Publ c=Agency _.1 Departtnent 7Jse O my _-_--1_
Assigned To
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned
Notice is hereby given relative to the coinpletion of contract or project described below
Description of Contract Contract Number
South 129 Street Drainage Modifications; Project #07 -DRO4 07 -162
Contractor's Name Telephone Number
Brike Excavating Underground Utilities, LLC 425 -271 -8417
Contractor's Address
15620 SE Renton Issaquah Road, Renton, WA 98059
Date Work Commenced Date Work Completed Date Work Accepted
1/7/08 1/22/08 12/4/07
Surety or Bonding Company
Insco Insurance Services, Bond 334733P
Agent's Address
Developer's Surety Indemnity Co., 17780 Fitch, Suite 200, Irvine, CA 92614
Contract Amount 37,697.91
Additions 2,588.12 Liquidated Damages 0.00
Reductions 0.00
Sub -Total 40,286.03 Amount Disbursed 38,271.72
Amount of Sales Tax Paid at 0.0 0.00 Amount Retained 2,014.31
(If various rates apply, please send a breakdown)
TOTAL 40,286.03 TOTAL 40,286.03
17:55-:: Disbursing Officer., `i
Comments: No additive sales tax paid per
Rule 171 Signature
Type or Print Name Diane Jaber
Finance Approval Phone Number 206 433 -1871
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue,
PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO
PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in
accordance with said certificate.
To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype
(TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov.
REV 31 0020e (6 -27 -01)
Utilities Committee Minutes April 7, 2008 Page 2
C. Southcenter Boulevard Water Main Project Completion and Acceptance
Staff is requesting full Council approval for foiuial contract acceptance and release of retamage to
R. L. Alia Company for the Southcenter Boulevard Water Main project.
The project ran over budget (see Utilities Committee minutes dated February 4, 2008). Additional
funding will be taken from the ending Water Fund balance. The Water Fund balance will expenence a
cost saving of approximately $110,000 as a result of an mterlocal agreement with King County Metro m
the Interurban Water Reuse project discussed above. 'UNANIMOUS APPROVAL. FORWARD TO
APRIL 21 CONSENT AGENDA.
D. South 129 Street Dramaee Protect Completion and Acceptance
Staff is requesting full Council approval for formal contract acceptance and release of retamage to
y Brike Excavating Underground Utilities for the South 129 Street Drainage project.
The project consisted of removal of a drainage swale from private property located near the Codiga
Farms site. UNANIMOUS APPROVAL. FORWARD TO APRIL 21 CONSENT AGENDA.
III. MISCELLANEOUS
Staff reported that the Public Works Depai talent will be audited by Washington Cities Insurance
Authority this year. Jim Morrow would like to report out to the Committee after the audit is complete.
This past weekend, two separate water mains broke, both on private property. The City supplied parts
and labor for repair and will invoice accordingly.
Meeting adjourned at 5:45 p.m.
Next meeting: Monday, April 21, 2008 5 :00 p.m. Conference Room No. 1.
t,ummittee Chair Approval
Mi es by KAM. Reviewed by GL.