ITEM INFORMATION
ITEM No.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 10/28/13
AGENDA ITEM TITLE
Sewer
Bid
Award
Repair at
to Green
6450 Southcenter
River Construction,
Blvd
Inc.
10/28/13
Motion
Date 11/04/13
❑ Ordinance
AN Date
❑ Bid Award
Ai tg Date
❑ Public Hearing
Meg Date
❑ Other
Aug Date
CATEGORY LI Discussion
1.!
M Resolution
Mtg Dale
Meg
AN Date
SPONSOR ❑ Council ❑ Meyor ❑ HR ® DCD ❑ Finance • Fire ❑ IT ❑ P&R ❑ Police lwt PIF
SPONSOR'S While the City
SUMMARY clog and ultimately
determine the
responded
has successfully
unbudgeted
crew was cleaning and jetting a sewer main, the jetting head got stuck by a
the hose had to be left in the sewer main. A new manhole is needed to
location of the blockage. Four construction firms were notified and two
with bids. The low bid of $34,164.00 was from Green River Construction, who
worked for the City in the past. Council is being asked to award this
project to Green River Construction, Inc. in the amount of $34,164.00,
❑ CA&P Corte ❑ F &S Corte ❑ Transportation Cmte
❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
COMMITTEE CHAIR: JOE DUFFIE
REVIE ED By ❑ COW Mtg.
Z Utilities Cmte
DATE: 10/21/13
RECOMMENDATIONS:
SPONSOR /ADMIN.
COMMITTEE
Public Works
Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$34,164.00 $0.00 $37,409.58
Fund Source: 402 SEWER FUND
Comments: Project is unbudgeted and funds will be used from the Sewer Fund's ending fund balance
MTG. DATE
RECORD OF COUNCIL ACTION
10/28/13
11/04/13
MTG. DATE
ATTACHMENTS
10/28/13
Informational Memorandum dated 10/18/13
Vicinity Map
Bid Tabulation
Green River Construction's Proposal
Minutes from the Utilities Committee meeting of 10/21/13
11/04/13
33
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Mike Cusick, P.E., Senior Program Manager
DATE; October 18, 2013
SUBJECT: Sewer Repair at 6450 Southcenter Blvd
Project No. 91340203
Bid Award
ISSUE
Award bid to Green River Construction, Inc. for the repair of the sanitary sewer line near 6450 Southcenter Blvd.
BACKGROUND
When City staff was cleaning and jetting the sewer line near the intersection of Southcenter Blvd and 65th Ave S, the
jetting head got stuck in the sewer line. Staff then pushed the jet head to the next manhole up stream of the clog and
removed the jet head from the hose and tried to pull the hose back to the Vactor truck. At that time, the hose became
stuck in the sewer line. Staff was unable to free the hose and it had to be cut and left in the manhole where the Vactor
truck was parked. Staff then tried to video the sewer line but was unable to see the blockage because it was under
water, It was determined that the only way the blockage could be cleared is to install a new manhole where the jet
hose is stuck. This proposed manhole location was determined by the counter on the Vactor truck hose reel.
After the installation of the proposed manhole, staff will be able to determine the exact location of the blockage in the
sewer line, A second excavation may be required once the exact location is found. The sewer line is located near fiber
optic lines and if it is determined that the sanitary sewer was damaged during the installation of the fiber optic lines, the
City will file a claim against the fiber company. If the sewer line is not repaired at this time and the pipe collapses, by-
pass pumping will be required so that sewer service can be maintained to the north hill of Tukwila.
DISCUSSION
Four firms from the MRSC Small Works Roster were asked to submit quotes for this project. King Construction and
Omega Contractors elected not to bid due to scheduling conflicts. The low quote came from Green River Construction
in the amount of $34,164.00, including sales tax, bonding, and insurance. Green River Construction has done
successful work for the City in the past.
Engineer's Bid
FINANCIAL IMPACT Estimate Results
Construction (includes tax) $30,670.95 $34,164.00
Contingency 10% 2,801.00 3,416.40
Total $33.471.95 $37,409.58
As this is an emergency repair, this project is not budgeted and construction costs will come from the Sewer Fund's
ending fund balance.
RECOMMENDATION
Council is being asked to approve the contract with Green River Construction, Inc. in the amount of $34,164.00 for the
installation of the proposed manhole and sewer line repair and consider this item at the October 28, 2013 Committee of
the Whole and subsequent November 4, 2013 Regular Meeting.
attachments: Vicinity Map
Bid Tab
Green River Construction's Proposal
W: \PW Eng \PROJECTS\A- SW Projects \2013 Annual Sewer Repair (91340201) \Info Memo 65th manhole.doc
35
m
c-I
O
N
N
c-I
U
U
0
U
L-7)
U
QUOTE TAB FOR 6450 SOUTHCENTER BLVD. MANHOLE INSTALLATION
CD
z_
CONSTRUCTION
*
*
*
*
*
*
#VALUE!
#VALUE!
OMEGA
CONTRATORS
*
*
*
*
*
*
*
*
vF
#VALUE!
#VALUE!
NORDIC
CONSTRUCTION
m
N.
N
H
m
L
$ 3,500.00
0
O
O
0
O
c-1
N
N
0
m
Lri
$ 61,114.94
GREEN RIVER
CONSTRUCTION
0
O
0
Ln
In
of
N
in-
0
o
0
Ln
00
in?
0
O
0
0
00
IJ
$ 2,964.00
0
o
LD
c-I
m
{/}
ENGINEERS OPINION
COST
$ 28,010.00
Ln
Ql
O
LD
LID
N
i/}
ur)
Ql
0
r•-•
LD
O
m
yn
TALL WORK
TRENCH SAFTEY SYSTEM
TRENCH DEWATERING
SALES TAX
'TOTAL
U
w
H
0
I-
Ln
w
H
0
0'
I—
V7
I-
0
0
0
I—
0
m
w
cc
cc
0
LL
I—
W
cW
0
J
w
I-
<
Lu 0
* V7
* W
* o' 0
*
CONFLICTS
SCHEDULING
39
1W15/9013 10:30 2062462274
PROPOSAL
GREEN RIVER C.ON'=T
PAGE 02/02
October 10, 2013
MANHOLE INSTALLATION
at
65TH Avenue andSouthcenter Boulevard
THIS IS A PREVAILING WAGE JOE
Installation of Side Sewer
Description
Unit
Cost
Perform all work associated
with this project including
bonding and insurance,
Lum Sum
$r
Trench Safety System
Lump Sum
$
Trench Dewatering System
Tax 9.5%
Lump Sum
$ d-gto
Total
$ 3444 ti _
Company Name:
Contact Name:
Address:
Telephone:
Please return to:
Mike Cusick, P.E.
City of Tukwila
Public Works Department
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
Pease return to the City of Tukwila by 5:00 PM October 15, 2013.
40
Utilities Committee Minutes October 21, 2013 — Pape 2
B. Bid Award - Sewer Repair at 6450 Southcenter Boulevard
Staff is seeking Council approval to award a bid to Green River Construction, Inc. in the amount of
$34,164.00 for the repair of the sanitary sewer line near 6450 Southcenter Boulevard. Staff discovered an
indeterminate blockage while recently cleaning and jetting the sewer line, which caused the hose to be stuck
and subsequently cut free. The blockage is going to be cleared by installing a new manhole at the point
where the hose is stuck. One possible cause is damage caused by the installation of fiber optic lines in that
area, and if that is the cause the City will file a claim for damages. The sewer line must be repaired now so
that sewer service can be maintained. Green River Construction was selected due to a low quote and
successful work for the City in the past. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 28
COMMITTEE OF THE WHOLE.
III. MISCELLANEOUS
Meeting adjourned at 5:41 p.m.
Next meeting: Monday, November 4, 2013 — 5:00 p.m. — Conf. Room No. 1.
Committee Chair Approval
Minute by LH. Reviewed by GL.