HomeMy WebLinkAboutReg 2013-11-04 Item 6B - Resolution/Ordinance - Permit User Fee for Technology InvestmentsCOUNCIL AGF;NDA SYNOPSIS
Initials
MeetinsDate
Prepared by
Mayorr review
Council review
10/28/13
NG
Z Resolution
Mtg Date 11/4/13
C Ordinance
11/04/13
NG
r Other
Mtg Dale
Alit Date 11/4/13
SPONSOR Council j Mayor HR DCD F. i nance Fire _ IT P&R Police 121V
SPONSOR'S A Technology Fee was planned as a way to recover the cost of implementing Trakit, the
SUMMARY new permit system that will significantly improve customer service. A portion of this
funding is proposed to allow online retrieval of historical permit data through the City's
Digital Records Center, increasing efficiency. The Council is being asked to consider the
ordinance and resolution to implement a technology fee & consolidating fees into a single
location. A portion of the fee will be used to add .25 FTE to the Digital Records position.
REVIEWED BY COW Mtg.
Utilities Cmte
DATE: 10/14/13,
W
CA&P Cmte
Z F&S Cmte Transportation Cmte
P Parks Comm. E Planning Comm.
COMMITTEE CHAIR: ROBERTSON, EKBERG
Arts Comm.
10/22/13
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITTEE
ITEM INFORMATION
ITEM No.
6.B.
53
STAFF SPONSOR: NORA GIERLOFF
ORIGINAL AGENDA DATE: 10/28/13
AGENDA ITEM TITLE Permit User Fee for Technology Investments
CATEGORY Discussion
Mtg Date 10/28/13
Motion
Mtg Date
Z Resolution
Mtg Date 11/4/13
C Ordinance
Bid _Award
Ally Date
.1 Public Hearing
Ally Date
r Other
Mtg Dale
Alit Date 11/4/13
SPONSOR Council j Mayor HR DCD F. i nance Fire _ IT P&R Police 121V
SPONSOR'S A Technology Fee was planned as a way to recover the cost of implementing Trakit, the
SUMMARY new permit system that will significantly improve customer service. A portion of this
funding is proposed to allow online retrieval of historical permit data through the City's
Digital Records Center, increasing efficiency. The Council is being asked to consider the
ordinance and resolution to implement a technology fee & consolidating fees into a single
location. A portion of the fee will be used to add .25 FTE to the Digital Records position.
REVIEWED BY COW Mtg.
Utilities Cmte
DATE: 10/14/13,
W
CA&P Cmte
Z F&S Cmte Transportation Cmte
P Parks Comm. E Planning Comm.
COMMITTEE CHAIR: ROBERTSON, EKBERG
Arts Comm.
10/22/13
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITTEE
Department of Community Development
Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0 $ $0
Fund Source: NEW USER FEE
Comments: Revenue generated will depend on the fee level chosen
MTG. DATE
RECORD OF COUNCIL ACTION
10/28/13
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
10/28/13
Informational Memorandum dated 10/7/13 with attachments
Minutes from the Community Affairs and Parks Committee meeting of 10/14/13
Minutes from the Finance and Safety Committee meeting of 10/22/13
11/4/13
Ordinance and Resolution in final form
53
54
City of Tukwila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, ADOPTING A CONSOLIDATED
PERMIT FEE SCHEDULE AND REPEALING RESOLUTION
NOS. 1779 AND 1780.
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, the overall budgeted increase for 2014 is 2.9 %; and
WHEREAS, the City wishes to adopt a technology fee to offset the cost of providing
significant customer service improvements including online public access to permit
status and history, electronic plan submittal and review, online inspection scheduling,
and online access to permit records through the City's Digital Records Center;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. For 2014, the Technology Fee shall be set at 5% of the applicable
permit fee.
Section 2. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
FEE
Type A (Short-Term Non - profit)
$ 50.00 + Technology Fee
Type B (Short-Term Profit)
$100.00 + Technology Fee
Type C
(Infrastructure and Grading on Private Property
and City Right -of -Way and Disturbance of City
Right -of -Way)
$250.00 application base fee, Technology Fee, plus
four components based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
W: \Word Processing \Resolutions\Consolidated permit fee schedule -2014 10 -25 -13
NG:bjs
Page 1 of 10
55
PERMIT DESCRIPTION
FEE
Type D (Long-Term)
$100.00 + Technology Fee
Type E (Potential Disturbance of
City Right-of-Way)
'
$100.00 + Technology Fee
$25O.00proceaainghae.p\us$5.00O.00noohdepoait.
withdraw $100.00 per instance for inspection
Type F (Blanket Permits)
Franchise — Telecommunications
$5.000.00 administrative fee
Franchise — Cable
$5,000.00 plus 5% of total revenue
Street Vacation
$1.200.00
Latecomer's Agreements
$500.00 processing fee, plus 17% administrative fee,
plus $500.00 segregation fee
Flood Zone Control Permit
$50.00 + Technology Fee
Section 3. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
Decision Type
Appeal
Fee/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF
Type 1, 2 and 4 Decisions
SEPA MDNS Appeal
Impact Fees:
Fire
$579
+ TF
$579
+ TF
$579
Parks
$579
Transportation
Permanent
$579
$238
+ TF
Temporary
$104
+ TF
Pole/Banner Initial Application
Special Event
$238
+ TF
$104
+ TF
Pole/Banner Annual Renewa
$52
+ TF
New Billboard
$579
+ TF
2014 Master Sign Program-Adnnin
Master Sign Program- BAR
$2,130
+ TF
$3,411
+ TF
Appeal of Sign Code Decision
$579
+ TF
W:\Word Processing \Resolutions\Consolidated permit fee schedule-2014 10-25-13
NG:bjs
56
Page 2 of 10
Decision Type
Design Review (TMC Section 18.60.030)
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Administrative
$2,192
+ TF
Public Hearing
$3,927
+ TF
Major Modification
$1,343
+ TF
Minor Modification
$610
Variances (TMC Section 18.72)
+ TF
$2,770
+ HE
+ TF
Parking Variance
(Type 3-TMC 18.56.140)
$950
+ HE
+ TF
Administrative Parking Variance
(Type 2-TMC 18.56.140)
$579
+ TF
Environmentally Sensitive Areas Deviation,
Buffer Reduction (TMC Chapter 18.45)
Reasonable Use Exception
(TMC Section 18.45.188)
$1,466
+ TF
$2,932
+ HE
+ TF
TSO Modification to Development Standard
(TMC 18.41.100)
Exception from Single Family Design Standard
(TMC 18.50.050)
Special Permission Cargo Container
(TMC 18.50.060)
Landscape Perimeter Averaging
(TMC 18.52.060)
$579
+ TF
$579
+ TF
$579
+ TF
$579
+ TF
Parking Standard for use not specified
(TMC 18.56.100)
Residential Parking Reduction
(TMC 18.56.065)
$489
+ TF
$579
+ TF
Shared, covenant, Complementary Parking
Reduction (TMC 18.56.070)
Parking Lot Restriping
(TMC 18.56.120)
$579
+ TF
$579
+ TF
Tree Permit and Exceptions
(TMC Chapter 18.54)
Lot Creation' and Consolidation
$103
+ TF
BounderyLineAdustment(T7NCChapbarYlO8)
Lot Consolidation/TMCChapter17&0
$1,644
+ TF
$610
+ TF
Short Plat (2-4 lots) (TMC Chapter 17.12)
Short Plat (5-9 lots) (TMC Chapter 17.12)
$3,742
+ TF
$4,259
W:\Word permft fee schedule-201 4 10-25-13
NG:bjs
Page 3 of 10
Decision Type
Subdivision:
2014
Retainer
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Preliminary Plat (1 0+ lots)
(TMC Section 17.14.020)
+ HE
+ TF
Final Plat (10+ lots) (TMC Section 17.12.030)
$2,932
+ TF
Binding Site Improvement Plan (TMC Chapter 17.16)
$3,742
+ TF
Planned Residential Development:
Administrative (TMC Section 18.46.110)
$2,130
+ TF
Pub|icHeahng(TMCSecbonY84UYY8)
$4,888
+ TF
yWinorModificaton(TMCSeotionYfi48Y3O)
$579
+ TF
Major Modification (TMC Sectio 18.46.130
$2,377
+ TF
Wireless Communication Facility (TMC Chapter 18..58.050)
Minor (Type 1)
$579
+ TF
Administrative (Type 2)
$1,644
+ TF
K8 jororHeightVVoivor/7yom3V
$3,286
+ HE
+ TF
Checklist
$1,675
+ TF
SEPABS
$2,932
+ TF
SEPA Planned Action
$579
+ TF
SEPA Addendum
$579
+ TF
Sensitive Area Master Plan Overlay
(TMC 18.45.160)
Shoreline Permits
$4,888
+ TF
Substantial Development Permit:
(TMC Chapter f844)
Project value: $5,000 - $10,000
$1,158
+ TF
$10,001 - $50,000
$2,709
+ TF
$50,001 - $500,000
$4,320
+ TF
More than $500,000
$5,478
+ TF
W:\Word Processing Rm,omnvnoxzvmmndamu permit fee schedule-2014 10-25-13
NG:bjs
58
Page 4 of 10
Decision Type
Retainer
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Shoreline Permits (continued)
Permit Exemption Letter, Shoreline
$238
+ TF
Conditional Use Permit, Shoreline
(TMC 18.44.050)
Shoreline Tree Permit
(TMC Chapter 18.44)
$3,803
+ HE
+ TF
$103
+ TF
Shoreline Environment Redesignation
$2,932
Type I
$475
+ TF
Type II
$641
+ TF
Type III
$1,425
+ HE
+ TF
Conditiona|Usepermd(T7NC3eotionYR64.02D)
$3,803
+ HE
+ TF
UndassifiedUsePenmit(TNC Chapter 1866)
$4,888
+ TF
TSO Special Permission Use
(TMC Section 18.41.060)
Rezone (Map Change
$950
+ HE
+ TF
$3,421
+ TF
Comprehensive Plan Amendment
$3,910
+ TF
Zoning Code Text Amendment
$4,444
+ TF
Development Agreement
$1,955
2014 + TF
Code Interpretation (TMC Section 18.90.010)
$341
+ TF
Zoning Verification Letter
$341
+ TF
Legal Lot Verification
$548
+ TF
Preapplication Meeting
$475
+ TF
Mailing Fee to Generate Labels, per project
$449
Public Notice Mailing Fee per address for each
mailing
$1
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
W:\Word Processing \Resolutions\Consolidated permit fee schedule-2014 10-25-13
NG:bjs
Page 5 of 10
Section 4. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
$65.00 + Technology Fee
$501 to $2,000
$65.00 for the first $500, plus $4.30 for each additional $100, or fraction
thereof, to and including $2,000 + Technology Fee
$2,001 to $25,000
$129.50 for the first $2,000, plus $19.60 for each additional $1,000, or
fraction thereof, to and including $25,000 + Technology Fee
$25,001 to $50,000
$600.40 for the first $25,000, plus $15.30 for each additional $1,000, or
fraction thereof, to and including $50,000 + Technology Fee
$50,001 to $100,000
$983.25 for the first $50,000, plus $10.60 for each additional $1,000, or
fraction thereof, to and including $100,000 + Technology Fee
$100,001 to $500,000
$1,511.60 for the first $100,000, plus $8.50 for each additional $1,000, or
fraction thereof, to and including $500,000 + Technology Fee
$500,001 to $1,000,000
$4,906.30 for the first $500,000, plus $7.00 for each additional $1,000, or
fraction thereof, to and including $1,000,000 + Technology Fee
$1,000,001 to $5,000,000
$8,443.25 for the first $1,000,000, plus $4.70 for each additional $1,000,
or fraction thereof, to and including $5,000,000 + Technology Fee
$5,000,001 and up
$27,243.25 for the first $5,000.000, plus $4.50 for each $1,000 or fraction
thereof + Technology Fee
1. Non - Structural Plan Review Fee. A non - structural plan review fee shall be paid at the
time of submitting plans and specifications for review. The non - structural plan review fee shall be 65% of
the calculated permit fee as set forth in the permit fee schedule. The non - structural plan review fee
specified herein is a separate fee from the permit fee and is in addition to the permit fee.
2. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a
structural plan review fee shall be charged. The structural plan review fee shall be 33% of the calculated
non - structural plan review fee.
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 10 -25 -13
NG:bjs
60
Page 6 of 10
Section 5. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Contract Amount)
Mechanical Permit Fee
Unit Fee Schedule (in addition to base fee above:
$32.50 for issuance of each permit (base fee) + Technology Fee
$250 or less
$65.00 + Technology Fee
$251 to $500
$65.00 for first $250, plus $7.83 for each $100 or fraction thereof, to
and including $500 + Technology Fee
$501 to $1,000
$84.60 for the first $500, plus $8.70 for each $100 or fraction thereof, to
and including $1,000 + Technology Fee
$1,001 to $5,000
$128.10 for the first $1,000, plus $9.65 for each $1,000 or fraction
thereof, to and including $5,000 + Technology Fee
$5,001 to $50,000
$166.70 for the first $5,000, plus $10.05 for each $1,000 or fraction
thereof, to and including $50,000 + Technology Fee
$50,001 to $250,000
$639.20 for the first $50,000, plus $8.40 for each $1,000 or fraction
thereof, to and including $250,000 + Technology Fee
$250,001 to $1,000,000
$2,319.20 for the first $250,000, plus $7.40 for each $1,000 or fraction
thereof, to and including $1,000,000 + Technology Fee
$1,000,001 and up
$7,869.20 for the first $1,000,000, plus $6.70 for each $1,000 or
fraction thereof + Technology Fee
Section 6. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance — Issuance of each permit (base fee)
$32.50 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
$65.00 + Technology Fee
For each additional fixture
$14.00 + Technology Fee
For each building sewer and each trailer park sewer
$24.80 + Technology Fee
Rain water system — per drain (inside building)
$14.00 + Technology Fee
For each water heater and /or vent
$14.00 + Technology Fee
For each industrial waste pretreatment interceptor, including its
trap and vent, except for kitchen type grease interceptors
$28 00 +Technology Fee
For each grease interceptor for commercial kitchens
$29.10 + Technology Fee
For each repair or alteration of water piping and /or water treating
equipment, each occurrence
$14.00 + Technology Fee
For each repair or alteration of drainage or vent piping, each
fixture
$14.00 + Technology Fee
For each medical gas piping system serving one to five
inlets /outlets for a specific gas
$82.00 + Technology Fee
For each additional medical gas inlets /outlets
$16.20 + Technology Fee
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 10 -25 -13
NG:bjs
Page 7 of 10
61
For each lawn sprinkler system on any one (1) meter including
backflow protection devices therefor.
$29.10 + Technology Fee
For atmospheric -type vacuum breakers not included in lawn
sprinkler backflow protection:
1 to 5 .... $14.00 + Technology Fee
Over 5... $14.00 for first 5 plus $3.25 for each additional
+ Technology Fee
$81.90 + Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2 -inch diameter and smaller$29.10 + Technology Fee
Over 2 -inch diameter: $32.25 + Technology Fee
$59.85 + Technology Fee
Section 7. Fuel Gas Piping permit fees will be charged according to the following
schedule:
1.
FUEL GAS PIPING PERMIT FEE SCHEDULE
Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.)
$32.50 + Technology Fee
2. Unit Fee Schedule (in addition to item in subparagraph 6.1.):
For each gas piping system of one to five outlets
$65.00 + Technology Fee
For each additional gas piping system outlet, per outlet
$14.00 + Technology Fee
Section 8. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE - FAMILY DWELLINGS
New single - family dwellings (including a garage)
$152.85 + Technology Fee
Garages, pools, spas and outbuildings
$81.90 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
2. SINGLE - FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration —no added /altered circuits
$81.90 + Technology Fee
Service change $81.90 with added /altered circuits, plus $11.55 for
each added circuit (maximum permit fee $152.85)
$81.90 + Technology Fee
Circuits added /altered without service change (includes up to 5
circuits)
$54.60 + Technology Fee
Circuits $54.60 added /altered without service change (more than
5 circuits); $7.65 for each added circuit (maximum permit fee $98.70
+ Technology Fee)
$54.60 + Technology Fee
Meter /mast repair
$68.25 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 10 -25 -13
NG:bjs
62
Page 8 of 10
3. MULTI - FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Contract Amount)
Permit Fee
$250 or less
$65.00 + Technology Fee
$251 - $1,000
$65.00 for the first $250 plus $4.30 for each $100 or fraction thereof, to and
including $1,000 + Technology Fee
$1,001 - $5,000
$97.00 for the first $1,000 plus $21.60 for each $1,000 or fraction thereof,
to and including $5,000 + Technology Fee
$5,001 - $50,000
$183.30 for the first $5,000 plus $17.70 for each $1,000 or fraction thereof,
to and including $50,000 + Technology Fee
$50,001 - $250,000
$979.15 for the first $50,000 plus $12.90 for each $1,000 or fraction thereof,
to and including $250,000 + Technology Fee
$250,001 - $1,000,000
$3,567.20 for the first $250,000 plus $9.15 for each $1,000 or fraction thereof,
to and including $1,000,000 + Technology Fee
Over $1,000,000
$10,440.70 plus 0.5% of cost over $1,000,000 + Technology Fee
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
$65.00 + Technology Fee
Temporary service /generators
$80.90 + Technology Fee
Manufactured /mobile home parks and RV park sites, each service
and feeder
$86.25 + Technology Fee
Carnivals:
$65.00 /hour
• Base fee
$80.60 + Technology Fee
• Each concession fee
$10.80 + Technology Fee
• Each ride and generator truck
$10.80 + Technology Fee
Inspections or plan review not specified elsewhere (one -half hour
minimum). Safety inspections, plan revisions.
$65.00 /hour
Adult family home inspection (paid at the time of scheduling the
inspection)
$65.00
Disaster recovery emergency repair permit (residential structures
only)
$20.00
Section 9. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three hour minimum charge)
$97.50 /hour
Re- inspection fee
$65.00 /hour
Inspection for which no fee is specifically indicated— investigations or safety
inspections
$65.00 /hour
Additional plan review required by changes, additions, or revisions to approved plans
(minimum charge one -half hour)
$65.00 /hour
Work commencing before permit issuance shall be subject to an investigation fee
equal to 100% of the permit fee.
100% of the
permit fee
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 10 -25 -13
NG:bjs
Page 9 of 10
63
Plan review fee — Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for
review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order to
document compliance with the code.
Work covered without inspection or work not ready at the time of inspection may be
charged a re- inspection fee of $65.00.
Administrative fee for permit extension request longer than one year
$65.00
Section 10. Repealer. Resolution Nos. 1779 and 1780 are hereby repealed
effective December 31, 2013.
Section 11. Effective Date. The permit fee schedules contained in this resolution
shall be effective as of January 1, 2014.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2013.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Shelley M. Kerslake, City Attorney
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 10 -25 -13
NG:bjs
64
Page 10 of 10
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AMENDING ORDINANCE NOS.
2402 §4, 2171 §1 (PART) AND 2121 §1 (PART), AS CODIFIED
IN TUKWILA MUNICIPAL CODE CHAPTER 16.04, "BUILDINGS
AND CONSTRUCTION," TO REMOVE PERMIT FEES;
PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN
EFFECTIVE DATE.
WHEREAS, the City intends to update permit fees on an annual basis with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, all development permit fees will be moved into a consolidated fee
resolution for greater accessibility;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. TMC 16.04.250 Amended. Ordinance Nos. 2402 §4, 2171 §1 (part)
and 2121 §1 (part), as codified at Tukwila Municipal Code Section 16.04.250, are
amended to read as follows:
16.04.250 Procedures applicable to all construction permits
A. Permit and plan review fees applicable to all construction permits are listed in
the most current permit fee resolution.
B. Work covered without inspection or work not ready at the time of inspection
may be charged a re- inspection fee at the hourly rate listed in the most current permit
fee resolution.
W: Word Processing \Ordinances \Remove permit fees from Building Code ord 10 -25 -13
NG:bjs
Page 1 of 3
65
C. Work without a permit. Any person who commences work before obtaining
the necessary permits shall be subject to an investigation fee. The investigation fee
shall be equal to the established permit fee as set forth in the most current permit fee
resolution. This fee, which shall constitute an investigation fee, shall be imposed and
collected in all cases, whether or not a permit is subsequently issued.
D. Fee refunds. The Building Official may refund any permit fee paid by the
original permit applicant that was erroneously paid or collected. The Building Official
may also authorize the refund of not more than 80% of the permit fee when no work has
been done under a permit issued in accordance with the code. Where a plan review fee
has been collected, no refund will be authorized once it has been determined that the
application is complete and the plan review process has commenced. Refund of any
permit fee paid shall be requested by the original permit applicant in writing and not later
than 180 days after the date of fee payment.
E. Expiration of Permits. All building, mechanical, plumbing, fuel gas piping and
electrical permits shall become invalid unless the work on the site authorized by such
permit is commenced within 180 days after issuance or the work is suspended or
abandoned for a period of 180 days after the time the work is commenced. The
Building Official may grant one or more extensions for periods not more than 180 days
each. The extension shall be requested in writing and justifiable cause demonstrated.
All extension requests beyond one year shall include an administrative fee per the
current permit fee resolution with the extension request.
F. Appeals. All references to Board of appeals is amended as follows: Any
person, firm or corporation may register an appeal of a decision or determination of the
Building Official provided that such appeal is made in writing within 14 calendar days
after such person firm or corporation shall have been notified of the Building Official's
decision. Any person, firm or corporation shall be permitted to appeal a decision of the
Building Official to the Tukwila Hearing Examiner when it is claimed that any one of the
following conditions exists.
1. The true intent of the code or ordinance has been incorrectly interpreted.
2. The provisions of the code or ordinance do not fully apply.
3. The decision is unreasonable or arbitrary as it applies to alternatives or
new materials.
4. Notice of Appeal procedures shall be in accordance with TMC Section
18.116.030.
G. Violations. Whenever the authority having jurisdiction determines that there
are violations of this code, a written notice shall be issued to confirm such findings. Any
Notice of Violation issued pursuant to this code shall be served upon the owner,
operator, occupant or other person responsible for the condition or violation, either by
personal service or mail, or by delivering the same to and leaving it with some person of
responsibility upon the premises. For unattended or abandoned locations, a copy of
such Notice of Violation shall be posted on the premises in a conspicuous place, at or
W: Word Processing \Ordinances \Remove permit fees from Building Code ord 10 -25 -13
NG:bjs
66
Page 2 of 3
near the entrance to such premises, and the Notice of Violation shall be mailed by
registered or certified mail, with return receipt requested, to the last known address of
the owner, occupant or both.
H. Penalties. Any person, firm or corporation who shall willfully violate or fails to
comply with a Notice of Violation is liable for the monetary penalties prescribed in TMC
Section 8.45.100.A.2.
Section 2. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney, the City Clerk and the code reviser are authorized to make necessary
corrections to this ordinance, including the correction of clerical errors; references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section /subsection numbering.
Section 3. Severability. If any section, subsection, paragraph, sentence, clause
or phrase of this ordinance or its application to any person or situation should be held to
be invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 4. Effective Date. This ordinance or a summary thereof shall be
published in the official newspaper of the City, and shall take effect and be in full force
and effect January 1, 2014.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2013.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Shelley M. Kerslake, City Attorney
Jim Haggerton, Mayor
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing \Ordinances \Remove permit fees from Building Code ord 10 -25 -13
NG:bjs
Page 3 of 3
67