City of Tukwila
Washington
Resolution No. 1803
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, ADOPTING A CONSOLIDATED
PERMIT FEE SCHEDULE AND REPEALING RESOLUTION
NOS. 1779 AND 1780.
WHEREAS, the City intends to update permit fees on an annual basis, with any
increases tied to growth in City expenses for providing permit services; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
review and processing of permit applications; and
WHEREAS, the City has adopted a biennial budget process; and
WHEREAS, the overall budgeted increase for 2014 is 2.9 %; and
WHEREAS, the City wishes to adopt a technology fee to offset the cost of providing
significant customer service improvements including online public access to permit
status and history, electronic plan submittal and review, online inspection scheduling,
and online access to permit records through the City's Digital Records Center;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. For 2014, the Technology Fee shall be set at 5% of the applicable
permit fee.
Section 2. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
FEE
Type A (Short-Term Non - profit)
$ 50.00 + Technology Fee
Type B (Short-Term Profit)
$100.00 + Technology Fee
Type C
(Infrastructure and Grading on Private Property
and City Right -of -Way and Disturbance of City
Right -of -Way)
$250.00 application base fee, Technology Fee, plus
four components based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 10 -25 -13
NG:bjs
Page 1 of 10
PERMIT DESCRIPTION
FEE
Type D (Long-Term)
$100.00 + Technology Fee
(Potential
Type E(Poten��|Dis�urbonc*of
{�dvRigh
$100� UO+ Technology Fee
Type F (Blanket Permits)
$25OUO processing fee, plus $5.0OO.00 cash deposit,
�
vvithdnavv$1OO.00 per instance for inspection
Fnenchise — Te|ecommunications
$5.UOO.00 administrative fee
Franchise — Cable
$5'0OO.DO plus 596of total revenue
Street Vacation
$1.200.00
Latecomer's Agreements
$500.O0 processing fee, plus 17% administrative fee,
plus $500.00 segregation fee
Flood Zone Control Permit
$5U.00+ Technology Fee
Section 3. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
Decision Type
2014
Retainer
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Appeal
Type 1, 2 and 4 Decisions
SEPA MDNS Appeal
$579
+ TF
$579
+ TF
Impact Fees:
Fire
$579
Parks
$579
Transportation
$579
Sign Permit (TMC Chapter 19)
Permanent
$238
+ TF
Temporary
+ TF
Pole/Banner Initia Application
$238
+ TF
Special Event
+ TF
Pole/Banner Annual Renewal
$52
+ TF
New Billboard
$579
+ TF
Master Sign Program-Admin
$2,130
+ TF
Master Sign Program- BAR
$3,411
+ TF
Appeal of Sign Code Decision
$579
+ TF
W:\Word permit fee euxadule'20141n-2s1a
NG:bjs
Page 2 of 10
Decision
2014
Fee/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Technology
Design Review (TMC Section 18.60.030)
Administrative
$2.192
+TF
Public Hearing
$3.927
+ TF
Major Modification
$1'343
+ TF
Minor Modification
$610
+ TF
Variances, Special Permissions & Site Plan Review
Vohanoeo(T7NC3octionYEi72)
$2.770
+ HE
+ TF
Parking Variance
(Type 3-TMC 1850.140)
$950
+HE
+TF
Administrative Parking Variance
(Type 2-TMC 1856.148)
$579
+ TF
Environmentaily Sensitive Areas Deviation,
Buffer Reduction (TMC Chapter Y845)
$1406
'
+ TF
Reasonabie Use Exception
(TMC Section Y8.4/5Y86V
$2932
'
+ HE
+ TF
TSO Modification to Development Standard
(TMC 18.41.100)
$579
+�F
Exception from Single Family Design Standard
(TMC 18.50.050)
$579
+ TF
Special Permission Cargo Container
(TMC 18.50.060)
$579
+TF
Landscape Perimeter Averaging
(TMC 18.52.060)
$579
+TF
Parking Standard for use not specified
(TMC 18.56.100V
$489
+ TF
Residential Parking Reduction
(TMC 18.56.065)
�57S
+ TF
Shared, covenant, Complementary Parking . .
Reduction (TMC 18.56.070)
$579
+ TF
Parking Lot Restriping
(TMC 18.56.120)
�57g
+ TF
Tree Permit and Exceptions
C Ch Y8.5
$103
+ TF
Lot Creation and Consolidation
Boundary Line Adjustment (TMC Chapter 1{08)
$1.644
+ TF
Lot Consolidation (TMC Chapterf708)
$610
+ TF
Short Plat (2-4 lots) (TMC Chapter 17.12)
$3,742
+ TF
Short Plat (5-Qlots) (TMC Chapter 17.12)
$4.259
+ TF
W:\Word permit fee su»euule-2o141n-2s-10
Page 3 of 10
Decision
2014
Foe/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Lot Creation and Consolidation (continued)
Subdivision:
Preliminary Plat (10+lots)
(T7NC Section 17Y4.02D)
$4888
'
+ HE
+ TF
Final Plat (10+ lots) (TMC Section 1712030)
$2,932
+ TF
BindingSiba|mprovementP|an/T7NC Chapter 17.16)
$3,742
+ TF
Planned Residential Development:
Administrative (TMC Section 18.46110)
$2,130
+ TF
Public Hearing (TMC Section YfL46.YYU)
$4.888
+ TF
K8inorW1udificotion(77NCSeotionf840.Y3D)
$579
+ TF
K8 jorModi5oation/77NC8ectionf840.Y3O>
$2,377
+ TF
Wireless Communication Facility (TMC Chapter 18,58.050)
K8inor(7ypef)
$579
+ TF
Administrative (Type 2)
81.644
+ TF
Major or Height Waiver (Type 3)
$3,286
+ HE
+ TF
SEPA 8,4 Environmental
Checklist
$1.675
+ TF
SEPA EIS
$2.932
+ TF
SEPA Planned Action
$579
+ TF
8EPAAddendum
$579
+TF
Serisitive Area Master PIan Overlay
(77NCf84�iy00)
$4,888
'
+TF
Shoreline Permits
SubstanUa|Oeve|opmentPermit
(TMC Chapter 18.44)
Project value: $5,000 - $10,000
$1.158
+ TF
$10,001-$50.000
$2.700
+ TF
$50,001 - $500,000
$4.320
+ TF
More than $500,000
$5.478
+ TF
vvmvord permit fee achodule-2u141n-2n-13
Page 4 of 10
Decision Type
2014
Foe/
Retainer
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Shoreline Permits (continued)
Permit Exemption Letter, Shoreline
$238
+ TF
Conditional Use Permit Shoreline
'
(TMCff(44.050)
83'803
+HE
+TF
Shoreline Tree Permit
/77NC Chapter Yfi44V
$103
+TF
Shoreline Environment Redesignation
$2,932
+ TF
Noise Variance (TMC Section 8.22.120)
Type
$475
+ TF
Type II
$641
+TF
Type III
$1,425
+HE
+TF
Use Permits
Conditional Use Permit(77NCSmction 18.64.020)
$3.803
+ HE
+ TF
Unclassified Use Permit (T7NC Chapter Y86G)
$4,888
+ TF
TSO Special Permission Use
(TMC Section 106
$850
+ HE
+ TF
Comprehensive Plari Changes (TMC Chapter 18.84)
Rezone (Map Change)
$3,421
+ TF
Comprehensive Plan Amendment
$3.810
+ TF
Zoning Code Text Amendment
$4,444
+ TF
Miscellaneous Services and Charges
Development Agreement
$1.855
+ TF
Code Interpretation (TMC Section 1808010)
$341
+ TF
Zoning Verification Letter
$341
+ TF
Legal Lot Verification
$548
+ TF
Preapplication Meeting
$475
+ TF
Mailing Fee to Generate Labels, per project
$449
Public Notice Mailing Fee per address for each
mailing
$1
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
W:\Word Process lidateo permit fee scxeuule-2u1410-2n-1a
NG:bjs
Page 5 of 10
Section 4. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
$65.00 + Technology Fee
$501 to $2,000
$65.00 for the first $5OO. plus $4.3U for each additional $1UO'orfraction
thereof, to and including $2,000 + Technology Fee
$2,001 to $25,000
$129.50 for the first $2.00O. plus $1S.0O for each additional $1.00U.or
fraction thereof, to and including $25,000 + Technology Fee
$25,001 to $50,000
$600.40 for the first $25.O0U. plus $15.3O for each additional $1.UO0.nr
fraction thereof, to and including $50,000 + Technology Fee
$50,001 to $100,000
$S83.25 for the first $5O.UOD, plus $1O.80 for each additional $1'OOO.or
fraction thereof, to and including $100,000 + Technology Fee
$100.001to$500.000
$1.511.GO for the first $1O0'000. plus $8.5O for each additional $1.00O.or
fraction thereof, to and including $500,000 + Technology Fee
$500,001to$1.000.000
$4,906.30 for the first $5O0.000. plus $7.0O for each additional $1.DUO.or
fraction thereof, to and including $1,000,000 � Technology Fee
$1'000.001to$5.000.000
$8.443.25 for the first $1,000,000, plus $4.7O for each additional $1.00O.
or fracton thereof, to and including $5,000,000 + Technology Fee
$5,000,001 and up
$27,243.25 for the first $G.000.O00. plus $4.50 for each $1.00Oorfraction
thereof + Technology Fee
1. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the
time of submitting plans and specifications for review. The non-structural plan review fee shall be 6596 of
the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee
specified herein is a separate fee from the permit fee and is in addition to the permit fee.
2. Structural Plan Review Fee. Where a structural plan review is deemed nooenaary, a
structural plan review fee shall be charged. The structural plan review fee shall be 33% of the calculated
non-structural plan review fee.
W:\Word permit fee so»euule-2n1410-2s1a
NG:bjs
Page 6 of 10
Section 5. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Contract Amount)
Mechanical Permit Fee
Unit Fee Schedule (in addition to base fee above:
$3250 for issuance of each permit (base fee) + Technology Fee
$25Oorless
$65.00 + Technology Fee
$251 to $500
$65.00 for first $25O' plus $7.83 for each $1OOor fraction thereof, to
and including $500 + Technology Fee
$501to$1.000
$84.60 for the first $5O0, plus $8.7U for each $1O0or fraction thereof, to
and including $1,000 � Technology Fee
$1,001 to $5,000
$128.10 for the first $1,000, plus $9.65 for each $1,000 or fraction
thereof, to and including $5,000 + Technoogy Fee
$5,001 to $50,000
$180.7O for the first $5.O0O. plus $1O.O5 for each $1.00Oorfraction
thereof, to and including $50,000 + Technology Fee
$50,001 to $250,000
$S39.2O for the first $5O.U0O. plus $8.4U for each $1.ODOorfraction
thereof, to and including $250,000 + Technology Fee
$250'001to$1.000.000
$2.31Q.2U for the first $25O.00O. plus $7.4O for each $1.UOOorfraction
thereof, to and including $1.00O'000+ Technology Fee
$1.0UO.O01 and up
$7,869.20 for the first $1.00O.008. plus $G.70 for each $1.UOOor
fraction thereof + Technobgy Fee
Section 6. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance—Issuance of each permit (base fee)
$32.50 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toi|et, bathtub, etc.)
$65.00 + Technology Fee
For each additional fixt na
$14.00+ Technology Fee
For each building sewer and each trailer park sewer
$24.8O+ Technology Fee
Rain water system — per drain (inside building)
$14.00 + Technology Fee
For each water heater and/or vent
$14.00 + Technology Fee
For each industrial waste pretreatment intarooptor, including its
'
trap and vent, except for kitchen type grease interceptors
$28OO+ Technology Fee
For each grease nterceptor for commercial kitchens
$2Q.1O+ Technology Fee
For each repair or alteration of water piping and/or water treating
equipnnent.eaohocuurnence
$14� UU+ Technology Fee
For each repair or alteration of drainage or vent piping, each
fixture
$14.0O+ Technology Fee
For each medical gas piping system serving one to five
inlets/outlets for a specific gas
$O2� 0U+ Technology Fee
$16.20 + Technology Fee
For each additional medical gas nlets/outlets
W:\Word pernhit fee schedule-201 4 10-25-13
NG:bjs
Page 7 of 10
For each lawn sprinkler system on any one (1) meter including
baukfowprotaotond��oeatherofoc
---� 1O+T�hno|ogyF�
For atmospheric-type vacuum breakers not included in Iawn
sprinkler backflow protection:
1to5.... $14.00 + Technology Fee
Over 5... $14.00 for first 5 plus $3.25 for each additional
+ Technology Fee
S81.90 + Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2-inch diameter and smaller$29.10 + Technology Fee
Over 2-inch diameter: $32.25+ Technology Fee
$59.85 + Technology Fee
Section 7. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction wdh
a plumbing permit for an appliance with both plumbing and gas
connection.)
$32.50 + Technology Fee
2. Unit Fee Schedule (in additio to item in subparagraph 6.1.):
For each gas piping system of one to five outlets
$65.00 + Technology Fee
For each additional gas piping system outlet, per outlet
$14.00 + Technology Fee
Section 8. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE-FAMILY DWELLINGS
New single-family dwellings (including a
$152.85 + Technology Fee
Garagos, pools, spas and outbuildings
S81.90 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration—no added/altered circuits
$81.QO+ Technology Fee
Service change $81QOvv�hodd�d/o��redoirou�e plus � ' �
each added circuit (maximum pemn�fee $152.85)
$81� QO+ Technology Fee
Circuits added/altered without service change (includes u to
circuits)
$54.GO+ Technology Fee
Circuits $54 8O�dd�d/a|barod without (more �
5 circuits); $7.65 for each added circuit (maximum permit fee $98.70
+ Technology Fee)
$54 � OU + Technology Fee
Meter/mast repair
$68.25 + Technology Fee
Low voltage systems
$59.8S+ Technology Fee
vvmvord permit fee schedule-20 4 10-25-13
NG:bjs
Page 8 of 10
3. MULTI-FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Contract Amount)
Permit Fee
$25Oorless
$65.00 + Technology Fee
$251 - $1,000
$05.OU for the first $25O plus $4.3O for each $1OOor fraction thereof, toand
including $1.ODO+ Technology Fee
$1.001-$5.000
$87.00 for the first $1.00D plus $21.GD for each $1.00Uur fraction thereof,
to and including $5,000 + Technology Fee
$5,001 - $50,000
$183.30 for the first $5,ODO plus $17.70 for each $1.00Oor fraction thereof,
to and including $50,000 + Technology Fee
$50,001 - $250,000
$979.15 for the first $SO.0OO plus $12.QO for each $1.OUUor fraction thereof,
to and including $250,000 + Technology Fee
$250.001-$1.000'000
$3.507.2O for the first $250.UOO plus $8.1G for each $1.00Uor fraction thereof,
to and including $1,000,000 + Technology Fee
Over $1,000,000
$10.44O/O plus 0.596of cost over $1.00O.OUU+ Technology Fee
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
$65.0O+ Technology Fee
Temporary service/generators
$80.90 + Technology Fee
Manufactured/mobile home parks and RV park sites each '
and feeder
$8G� 25+ Technology Fee
Carnivals:
$65.00/hour
• Base fee
$O0.8O+ Technology Fee
• Each concession fee
$10.80 + Technology Fee
• Each ride and generator truck
$10.80 + Technology Fee
Inspections or plan review not specified elsewhere (one-half hour
minimum). Safety inepections, plan revisions.
$65.00/hour
Adult family home inspection (paid at the time of scheduUng the
inspection)
$65.00
Disaster recovery emergency repair permit (residential structures
only)
$20.00
Section 9. Other in n6 and fees will be charged according to the foliowing
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three hour minimum charge)
$97.50/hour
Re-inspection fee
$85.00/hour
(nspectonforwhiohnohaeieapeci�na||yindic�bad--inveatigationaor�afet
' safety
inspections
$65.00/hour
Additional plan review required by changes, additions, or '
(minimumoharQoono-ho|fhouh
$65.00/hour
Work commencing before permit issuance shall be subject to an investigation fee
equal to1O096of the permit fee.
1UU96ofthe
permit fee
W:\Word permit fee schedu!e-201 4 10-25-13
NG:bjs
Page 9 of 10
Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for
review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order to
document compliance with the code.
Work covered without inspection or work not ready at the time of inspection may be
charged a re-inspection fee of $65.00.
Administrative fee for permit extension request longer than one year
$65.00
Section 10. Repealer. Resolution Nos. 1779 and 1780 are hereby repealed
effective December 31, 2013.
Section 11. Effective Date. The permit fee schedules contained in this resolution
shall be effective as of January 1, 2014.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this qh1 day of e),/ Die , 2013.
ATTEST/AUTHENTICATED:
)
Christi MMC, City Cler
APPROVED AS TO F
Shelle Kers a CI y
Kathy Hoildga
uncil P sident
Filed with the City Clerk:
Passed by the City Council: ))-14--/ 3
Resolution Number:
W:\Word Processing \Resolu ons \Consolidated permit fee schedule-2014 10-25-13
NG:bjs
Page 10 of 10