Loading...
HomeMy WebLinkAboutRes 1803 - 2014 Consolidated Permit Fee Schedule (Repealed by Res 1845) Cover page to Resolution 1803 The full text of the resolution follows this cover page. Resolution 1803 was amended or repealed by the following resolutions . AMENDED REPEALED Section(s) A mended Amended by Res # Section(s) R epealed Repealed by Res # 1845 City of Tukwila Washington Resolution No. 1803 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE AND REPEALING RESOLUTION NOS. 1779 AND 1780. WHEREAS, the City intends to update permit fees on an annual basis, with any increases tied to growth in City expenses for providing permit services; and WHEREAS, the City Council wishes to recover a portion of the City's costs for review and processing of permit applications; and WHEREAS, the City has adopted a biennial budget process; and WHEREAS, the overall budgeted increase for 2014 is 2.9 %; and WHEREAS, the City wishes to adopt a technology fee to offset the cost of providing significant customer service improvements including online public access to permit status and history, electronic plan submittal and review, online inspection scheduling, and online access to permit records through the City's Digital Records Center; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. For 2014, the Technology Fee shall be set at 5% of the applicable permit fee. Section 2. Public Works fees will be charged according to the following schedule: PUBLIC WORKS FEE SCHEDULE PERMIT DESCRIPTION FEE Type A (Short-Term Non - profit) $ 50.00 + Technology Fee Type B (Short-Term Profit) $100.00 + Technology Fee Type C (Infrastructure and Grading on Private Property and City Right -of -Way and Disturbance of City Right -of -Way) $250.00 application base fee, Technology Fee, plus four components based on construction value: 1) Plan Review 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review W: \Word Processing \Resolutions \Consolidated permit fee schedule -2014 10 -25 -13 NG:bjs Page 1 of 10 PERMIT DESCRIPTION FEE Type D (Long-Term) $100.00 + Technology Fee (Potential Type E(Poten��|Dis�urbonc*of {�dvRigh $100� UO+ Technology Fee Type F (Blanket Permits) $25OUO processing fee, plus $5.0OO.00 cash deposit, � vvithdnavv$1OO.00 per instance for inspection Fnenchise — Te|ecommunications $5.UOO.00 administrative fee Franchise — Cable $5'0OO.DO plus 596of total revenue Street Vacation $1.200.00 Latecomer's Agreements $500.O0 processing fee, plus 17% administrative fee, plus $500.00 segregation fee Flood Zone Control Permit $5U.00+ Technology Fee Section 3. Land use permit and processing fees will be charged according to the following schedule: LAND USE FEE SCHEDULE Decision Type 2014 Retainer Plus Hearing Examiner Fees Plus Technology Fee (TF) Appeal Type 1, 2 and 4 Decisions SEPA MDNS Appeal $579 + TF $579 + TF Impact Fees: Fire $579 Parks $579 Transportation $579 Sign Permit (TMC Chapter 19) Permanent $238 + TF Temporary + TF Pole/Banner Initia Application $238 + TF Special Event + TF Pole/Banner Annual Renewal $52 + TF New Billboard $579 + TF Master Sign Program-Admin $2,130 + TF Master Sign Program- BAR $3,411 + TF Appeal of Sign Code Decision $579 + TF W:\Word permit fee euxadule'20141n-2s1a NG:bjs Page 2 of 10 Decision 2014 Fee/ Retainer Plus Hearing Examiner Fees Plus Technology Design Review (TMC Section 18.60.030) Administrative $2.192 +TF Public Hearing $3.927 + TF Major Modification $1'343 + TF Minor Modification $610 + TF Variances, Special Permissions & Site Plan Review Vohanoeo(T7NC3octionYEi72) $2.770 + HE + TF Parking Variance (Type 3-TMC 1850.140) $950 +HE +TF Administrative Parking Variance (Type 2-TMC 1856.148) $579 + TF Environmentaily Sensitive Areas Deviation, Buffer Reduction (TMC Chapter Y845) $1406 ' + TF Reasonabie Use Exception (TMC Section Y8.4/5Y86V $2932 ' + HE + TF TSO Modification to Development Standard (TMC 18.41.100) $579 +�F Exception from Single Family Design Standard (TMC 18.50.050) $579 + TF Special Permission Cargo Container (TMC 18.50.060) $579 +TF Landscape Perimeter Averaging (TMC 18.52.060) $579 +TF Parking Standard for use not specified (TMC 18.56.100V $489 + TF Residential Parking Reduction (TMC 18.56.065) �57S + TF Shared, covenant, Complementary Parking . . Reduction (TMC 18.56.070) $579 + TF Parking Lot Restriping (TMC 18.56.120) �57g + TF Tree Permit and Exceptions C Ch Y8.5 $103 + TF Lot Creation and Consolidation Boundary Line Adjustment (TMC Chapter 1{08) $1.644 + TF Lot Consolidation (TMC Chapterf708) $610 + TF Short Plat (2-4 lots) (TMC Chapter 17.12) $3,742 + TF Short Plat (5-Qlots) (TMC Chapter 17.12) $4.259 + TF W:\Word permit fee su»euule-2o141n-2s-10 Page 3 of 10 Decision 2014 Foe/ Retainer Plus Hearing Examiner Fees Plus Technology Fee (TF) Lot Creation and Consolidation (continued) Subdivision: Preliminary Plat (10+lots) (T7NC Section 17Y4.02D) $4888 ' + HE + TF Final Plat (10+ lots) (TMC Section 1712030) $2,932 + TF BindingSiba|mprovementP|an/T7NC Chapter 17.16) $3,742 + TF Planned Residential Development: Administrative (TMC Section 18.46110) $2,130 + TF Public Hearing (TMC Section YfL46.YYU) $4.888 + TF K8inorW1udificotion(77NCSeotionf840.Y3D) $579 + TF K8 jorModi5oation/77NC8ectionf840.Y3O> $2,377 + TF Wireless Communication Facility (TMC Chapter 18,58.050) K8inor(7ypef) $579 + TF Administrative (Type 2) 81.644 + TF Major or Height Waiver (Type 3) $3,286 + HE + TF SEPA 8,4 Environmental Checklist $1.675 + TF SEPA EIS $2.932 + TF SEPA Planned Action $579 + TF 8EPAAddendum $579 +TF Serisitive Area Master PIan Overlay (77NCf84�iy00) $4,888 ' +TF Shoreline Permits SubstanUa|Oeve|opmentPermit (TMC Chapter 18.44) Project value: $5,000 - $10,000 $1.158 + TF $10,001-$50.000 $2.700 + TF $50,001 - $500,000 $4.320 + TF More than $500,000 $5.478 + TF vvmvord permit fee achodule-2u141n-2n-13 Page 4 of 10 Decision Type 2014 Foe/ Retainer Plus Hearing Examiner Fees Plus Technology Fee (TF) Shoreline Permits (continued) Permit Exemption Letter, Shoreline $238 + TF Conditional Use Permit Shoreline ' (TMCff(44.050) 83'803 +HE +TF Shoreline Tree Permit /77NC Chapter Yfi44V $103 +TF Shoreline Environment Redesignation $2,932 + TF Noise Variance (TMC Section 8.22.120) Type $475 + TF Type II $641 +TF Type III $1,425 +HE +TF Use Permits Conditional Use Permit(77NCSmction 18.64.020) $3.803 + HE + TF Unclassified Use Permit (T7NC Chapter Y86G) $4,888 + TF TSO Special Permission Use (TMC Section 106 $850 + HE + TF Comprehensive Plari Changes (TMC Chapter 18.84) Rezone (Map Change) $3,421 + TF Comprehensive Plan Amendment $3.810 + TF Zoning Code Text Amendment $4,444 + TF Miscellaneous Services and Charges Development Agreement $1.855 + TF Code Interpretation (TMC Section 1808010) $341 + TF Zoning Verification Letter $341 + TF Legal Lot Verification $548 + TF Preapplication Meeting $475 + TF Mailing Fee to Generate Labels, per project $449 Public Notice Mailing Fee per address for each mailing $1 All peer review fees will be passed through to the applicant per TMC Section 18.50.200. W:\Word Process lidateo permit fee scxeuule-2u1410-2n-1a NG:bjs Page 5 of 10 Section 4. Building permit fees will be charged according to the following schedule: BUILDING PERMIT FEE SCHEDULE Total Valuation Building Permit Fees $1 to $500 $65.00 + Technology Fee $501 to $2,000 $65.00 for the first $5OO. plus $4.3U for each additional $1UO'orfraction thereof, to and including $2,000 + Technology Fee $2,001 to $25,000 $129.50 for the first $2.00O. plus $1S.0O for each additional $1.00U.or fraction thereof, to and including $25,000 + Technology Fee $25,001 to $50,000 $600.40 for the first $25.O0U. plus $15.3O for each additional $1.UO0.nr fraction thereof, to and including $50,000 + Technology Fee $50,001 to $100,000 $S83.25 for the first $5O.UOD, plus $1O.80 for each additional $1'OOO.or fraction thereof, to and including $100,000 + Technology Fee $100.001to$500.000 $1.511.GO for the first $1O0'000. plus $8.5O for each additional $1.00O.or fraction thereof, to and including $500,000 + Technology Fee $500,001to$1.000.000 $4,906.30 for the first $5O0.000. plus $7.0O for each additional $1.DUO.or fraction thereof, to and including $1,000,000 � Technology Fee $1'000.001to$5.000.000 $8.443.25 for the first $1,000,000, plus $4.7O for each additional $1.00O. or fracton thereof, to and including $5,000,000 + Technology Fee $5,000,001 and up $27,243.25 for the first $G.000.O00. plus $4.50 for each $1.00Oorfraction thereof + Technology Fee 1. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of submitting plans and specifications for review. The non-structural plan review fee shall be 6596 of the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. 2. Structural Plan Review Fee. Where a structural plan review is deemed nooenaary, a structural plan review fee shall be charged. The structural plan review fee shall be 33% of the calculated non-structural plan review fee. W:\Word permit fee so»euule-2n1410-2s1a NG:bjs Page 6 of 10 Section 5. Mechanical permit fees will be charged according to the following schedule: MECHANICAL PERMIT FEE SCHEDULE Valuation of Work (Total Contract Amount) Mechanical Permit Fee Unit Fee Schedule (in addition to base fee above: $3250 for issuance of each permit (base fee) + Technology Fee $25Oorless $65.00 + Technology Fee $251 to $500 $65.00 for first $25O' plus $7.83 for each $1OOor fraction thereof, to and including $500 + Technology Fee $501to$1.000 $84.60 for the first $5O0, plus $8.7U for each $1O0or fraction thereof, to and including $1,000 � Technology Fee $1,001 to $5,000 $128.10 for the first $1,000, plus $9.65 for each $1,000 or fraction thereof, to and including $5,000 + Technoogy Fee $5,001 to $50,000 $180.7O for the first $5.O0O. plus $1O.O5 for each $1.00Oorfraction thereof, to and including $50,000 + Technology Fee $50,001 to $250,000 $S39.2O for the first $5O.U0O. plus $8.4U for each $1.ODOorfraction thereof, to and including $250,000 + Technology Fee $250'001to$1.000.000 $2.31Q.2U for the first $25O.00O. plus $7.4O for each $1.UOOorfraction thereof, to and including $1.00O'000+ Technology Fee $1.0UO.O01 and up $7,869.20 for the first $1.00O.008. plus $G.70 for each $1.UOOor fraction thereof + Technobgy Fee Section 6. Plumbing permit fees will be charged according to the following schedule: PLUMBING PERMIT FEE SCHEDULE Permit Issuance—Issuance of each permit (base fee) $32.50 + Technology Fee Unit Fee Schedule (in addition to base fee above: For one plumbing fixture (a fixture is a sink, toi|et, bathtub, etc.) $65.00 + Technology Fee For each additional fixt na $14.00+ Technology Fee For each building sewer and each trailer park sewer $24.8O+ Technology Fee Rain water system — per drain (inside building) $14.00 + Technology Fee For each water heater and/or vent $14.00 + Technology Fee For each industrial waste pretreatment intarooptor, including its ' trap and vent, except for kitchen type grease interceptors $28OO+ Technology Fee For each grease nterceptor for commercial kitchens $2Q.1O+ Technology Fee For each repair or alteration of water piping and/or water treating equipnnent.eaohocuurnence $14� UU+ Technology Fee For each repair or alteration of drainage or vent piping, each fixture $14.0O+ Technology Fee For each medical gas piping system serving one to five inlets/outlets for a specific gas $O2� 0U+ Technology Fee $16.20 + Technology Fee For each additional medical gas nlets/outlets W:\Word pernhit fee schedule-201 4 10-25-13 NG:bjs Page 7 of 10 For each lawn sprinkler system on any one (1) meter including baukfowprotaotond��oeatherofoc ---� 1O+T�hno|ogyF� For atmospheric-type vacuum breakers not included in Iawn sprinkler backflow protection: 1to5.... $14.00 + Technology Fee Over 5... $14.00 for first 5 plus $3.25 for each additional + Technology Fee S81.90 + Technology Fee For each backflow protective device other than atmospheric type vacuum breakers: 2-inch diameter and smaller$29.10 + Technology Fee Over 2-inch diameter: $32.25+ Technology Fee $59.85 + Technology Fee Section 7. Fuel Gas Piping permit fees will be charged according to the following schedule: FUEL GAS PIPING PERMIT FEE SCHEDULE Permit Issuance: For issuing each permit (base fee): ($0 if permit is in conjunction wdh a plumbing permit for an appliance with both plumbing and gas connection.) $32.50 + Technology Fee 2. Unit Fee Schedule (in additio to item in subparagraph 6.1.): For each gas piping system of one to five outlets $65.00 + Technology Fee For each additional gas piping system outlet, per outlet $14.00 + Technology Fee Section 8. Electrical permit fees will be charged according to the following schedule: ELECTRICAL PERMIT FEE SCHEDULE 1. NEW SINGLE-FAMILY DWELLINGS New single-family dwellings (including a $152.85 + Technology Fee Garagos, pools, spas and outbuildings S81.90 + Technology Fee Low voltage systems $59.85 + Technology Fee 2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES Service change or alteration—no added/altered circuits $81.QO+ Technology Fee Service change $81QOvv�hodd�d/o��redoirou�e plus � ' � each added circuit (maximum pemn�fee $152.85) $81� QO+ Technology Fee Circuits added/altered without service change (includes u to circuits) $54.GO+ Technology Fee Circuits $54 8O�dd�d/a|barod without (more � 5 circuits); $7.65 for each added circuit (maximum permit fee $98.70 + Technology Fee) $54 � OU + Technology Fee Meter/mast repair $68.25 + Technology Fee Low voltage systems $59.8S+ Technology Fee vvmvord permit fee schedule-20 4 10-25-13 NG:bjs Page 8 of 10 3. MULTI-FAMILY AND COMMERCIAL (including low voltage) Valuation of Work (Total Contract Amount) Permit Fee $25Oorless $65.00 + Technology Fee $251 - $1,000 $05.OU for the first $25O plus $4.3O for each $1OOor fraction thereof, toand including $1.ODO+ Technology Fee $1.001-$5.000 $87.00 for the first $1.00D plus $21.GD for each $1.00Uur fraction thereof, to and including $5,000 + Technology Fee $5,001 - $50,000 $183.30 for the first $5,ODO plus $17.70 for each $1.00Oor fraction thereof, to and including $50,000 + Technology Fee $50,001 - $250,000 $979.15 for the first $SO.0OO plus $12.QO for each $1.OUUor fraction thereof, to and including $250,000 + Technology Fee $250.001-$1.000'000 $3.507.2O for the first $250.UOO plus $8.1G for each $1.00Uor fraction thereof, to and including $1,000,000 + Technology Fee Over $1,000,000 $10.44O/O plus 0.596of cost over $1.00O.OUU+ Technology Fee 4. MISCELLANEOUS ELECTRICAL PERMIT FEES Temporary service (residential) $65.0O+ Technology Fee Temporary service/generators $80.90 + Technology Fee Manufactured/mobile home parks and RV park sites each ' and feeder $8G� 25+ Technology Fee Carnivals: $65.00/hour • Base fee $O0.8O+ Technology Fee • Each concession fee $10.80 + Technology Fee • Each ride and generator truck $10.80 + Technology Fee Inspections or plan review not specified elsewhere (one-half hour minimum). Safety inepections, plan revisions. $65.00/hour Adult family home inspection (paid at the time of scheduUng the inspection) $65.00 Disaster recovery emergency repair permit (residential structures only) $20.00 Section 9. Other in n6 and fees will be charged according to the foliowing schedule: OTHER INSPECTIONS AND FEES Inspections outside of normal business hours (three hour minimum charge) $97.50/hour Re-inspection fee $85.00/hour (nspectonforwhiohnohaeieapeci�na||yindic�bad--inveatigationaor�afet ' safety inspections $65.00/hour Additional plan review required by changes, additions, or ' (minimumoharQoono-ho|fhouh $65.00/hour Work commencing before permit issuance shall be subject to an investigation fee equal to1O096of the permit fee. 1UU96ofthe permit fee W:\Word permit fee schedu!e-201 4 10-25-13 NG:bjs Page 9 of 10 Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to document compliance with the code. Work covered without inspection or work not ready at the time of inspection may be charged a re-inspection fee of $65.00. Administrative fee for permit extension request longer than one year $65.00 Section 10. Repealer. Resolution Nos. 1779 and 1780 are hereby repealed effective December 31, 2013. Section 11. Effective Date. The permit fee schedules contained in this resolution shall be effective as of January 1, 2014. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this qh1 day of e),/ Die , 2013. ATTEST/AUTHENTICATED: ) Christi MMC, City Cler APPROVED AS TO F Shelle Kers a CI y Kathy Hoildga uncil P sident Filed with the City Clerk: Passed by the City Council: ))-14--/ 3 Resolution Number: W:\Word Processing \Resolu ons \Consolidated permit fee schedule-2014 10-25-13 NG:bjs Page 10 of 10