HomeMy WebLinkAboutCOW 2013-11-12 Item 4I - Purchase - 2 Intelligent Transportation System (ITS) Traffic Signal Cabinets from Western Systems for $53,074.34COUNCIL AGENDA SYNOPSIS
------ ------ -- ------ ------ -- Inittalr
Meetin : Date
11/12/13
Pre+ared b
Ma, 'r review
Council review
BG m
S 1 .
® Motion
Mtg Date 11/18/13
❑ Resolution
Mtg Date
11/18/13
BG
❑ Public Hearing
Mtg Date
■ Other
CATEGORY Al Discussion
Mtg Date
Mtg Date
SPONSOR C Council ❑ Mayor ❑ HR
❑ Finance ❑ Fire • IT ❑ P&R • Police ® P1V ,
I DCD
SPONSOR'S This purchase is for 2 new Intelligent Transportation System (ITS) traffic signal control
SUMMARY cabinets. The existing traffic control cabinets at the intersections of Andover Park E/
S 180th St and Andover Park E /Baker Blvd are over 25 years old and were not upgraded
during the 2007 ITS Project. With the remaining budget in the Street Department's Traffic
Control Devices, Council is being asked to purchase 2 ITS traffic signal control cabinets in
the amount of $53,074.34 from Western Systems.
REVIEWED BY ❑ COW Mtg. ❑ CA &P Ctnte ❑ F &S Cante
EJ Utilities Crnte ❑ Arts Comm. ❑ Parks Comm.
DATE: 10/29/13 COMMITTEE CHAIR:
' Transportation
RMATION
ITEM No.
4I
153
STAFF SPONSOR: B013 GIBERSON
ORIGINAL AGENDA DATE: 11/ 12/ 13
AGENDA ITEM TITLE Street Department's Purchase of 2 ITS Traffic Signal Control Cabinets
11/12/13
® Motion
Mtg Date 11/18/13
❑ Resolution
Mtg Date
❑ Ordinance
Mfg Date
H Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
■ Other
CATEGORY Al Discussion
Mtg Date
Mtg Date
SPONSOR C Council ❑ Mayor ❑ HR
❑ Finance ❑ Fire • IT ❑ P&R • Police ® P1V ,
I DCD
SPONSOR'S This purchase is for 2 new Intelligent Transportation System (ITS) traffic signal control
SUMMARY cabinets. The existing traffic control cabinets at the intersections of Andover Park E/
S 180th St and Andover Park E /Baker Blvd are over 25 years old and were not upgraded
during the 2007 ITS Project. With the remaining budget in the Street Department's Traffic
Control Devices, Council is being asked to purchase 2 ITS traffic signal control cabinets in
the amount of $53,074.34 from Western Systems.
REVIEWED BY ❑ COW Mtg. ❑ CA &P Ctnte ❑ F &S Cante
EJ Utilities Crnte ❑ Arts Comm. ❑ Parks Comm.
DATE: 10/29/13 COMMITTEE CHAIR:
' Transportation
Cmte
❑ Planning Comm.
KATE KRULLER
RECOMMENDATIONS:
SPONSOR /ADMIN.
COMMIS
Public Works Department
1E.E Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIA'T'ION REQUIRED
$53,074.34 $53,07434 $0.00
Fund Source: 000.16 STREETS
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/12/13
MTG. DATE
ATTACHMENTS
11/12/13
Informational Memorandum dated 10/25/13
Western Systems Quotation
Minutes from the Transportation Committee meeting of 10/29/13
11/18/13
153
154
TO:
FROM:
BY:
DATE:
SUBJECT:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
Bob Giberson, Public Works Director
Stan Anderson, Street Department Superintendent
October 25, 2013
2013 Street Department's Traffic Control Devices
Purchase of 2 ITS Traffic Signal Control Cabinets
ISSUE
Purchase 2 new Intelligent Transportation System (ITS) traffic signal control cabinets
built to the City of Tukwila's requirements from Western Systems of Everett, WA.
BACKGROUND
This purchase of 2 new ITS traffic signal control cabinets will upgrade the traffic
intersection at Andover Park East/South 180th St and Andover Park East/Baker Blvd
to the new ITS standards. The existing traffic cabinets are over 25 years old and were
not upgraded during the 2007 ITS project.
ANALYSIS
Western Systems is a listed vendor on the Washington State procurement contract
#3709 for traffic signal control cabinets and the sole source vendor for Eagle M -50
Signal controllers. The 2013 Streets Department budget 000.16.542.640.31.01 has a
remaining balance which can be utilized for this purchase.
BUDGET SUMMARY
000.16.542.640.31.01 Traffic Control Devices $53,074.34
RECOMMENDATION
Council is being asked to approve the purchase of 2 ITS Traffic Signal Control
Cabinets from Western Systems in the amount of $53,074.34 and consider this item
at the November 12, 2013 Committee of the Whole Meeting and subsequent
November 18, 2013 Regular Meeting.
Attachment: Western Systems Quotation
W:1Shared Copy OnlylGaillWestern purchase 20131Western Talc cabinet PO Memo 2O t3.docx
155
156
p z a
L•5 � er
909 SE EVERETT MALL WAY #A1 20
EVERETTT, WA 98208
PHONE (425) 43S-1133
FAX (425) 438-1 585
June 18, 2013
Quotation # WSQ W3039SC
Attention: Scott Bates / City of Tukwila
Quotation — SP Controller Cabinet Assemblies (TS2 -2)
Scott,
We are pleased to provide this quotation. All equipment can be purchased through WSDOGA Contract # 3709 will all applicable
discounts factored into the pricing. If you have any questions please let us know.
Bid Item #1; Type SP (TS2 -2) Cabinet
1— Type SP controller cabinet wired per City of Tukwila (TS2 -2) specifications and including: Type SP aluminum enclosure
(unfinished), Best CX green core lock, UL listed and USA Manufactured with; 16- position (TS2 -2) load -bay, auxiliary panel, (1)
detector rack wired for 1 — Bltf / 16 — channels of detection 12 — Opticom, (2) detector racks wired for 1— BIU 116 — channels
of detection, fan & thermostat assembly, detector panel, detector test switch panel, power supply interface panel, power panel,
video detection panel, and unused phase links.
Western Systems Part # 3015010500, 2515013300
Includes the following plug -in devices:
1— Controller EPAC; (TS2 -2) OS9 with SEPAC 3.34G software and NTCIP, dat -key module and data key
SIEMENS Part# EPAC3168M521SEPAC334G, AAD15288P002, P1A06027P001
1— Ethernet switch with base unit, TP module with (8) 10/100TX ports, GBIC open transceiver module and (2) GBIC
Transceivers
GarrettCom Part # 6K16V -AC, 6KP8 -RJ45, GPBMV -20TX, GBIC- LXSC10 -H
1— Smart monitor 16 channel enhanced MMU with FYA support & ethernet
Eberle Design, lnc.(EDI) Part # MMU2- 16LEIP
1— Power supply shelf mount TS2 5A
Eberle Design, Inc.(EDI) Part # PS250
3 — Bus interface units TS2
Eberle Design, lnc,(EDI) Part # BI1!700
16 — Load switches with I/O indicators
Power Distribution & Control (PDC) Part # SSS87110
1 — Flasher
Power Distribution & Control (PDC) Part # SSF87
6 — Flash transfer relays
Detrol Part # 205
4 — Loop amplifier 4 channel rack mount with timing & LCD display (1/2 width)
Eberle Design, Inc.(EDO) Part # ORACLE4e
1 — Opticom phase selector 4 channel with auxiliary interface panel
GTT Part # 764, 768
$ 24,056.84 lump sum
157
Eil,.sternSystems
909 SE EVERETT MALL WAY #A1 20
EVERETT, WA 98208
PHONE (425) 438-1133
FAX (425) 438-1 585
Bid Item #IA; WSDOES Processing Fee
1 — WSDOES usage fee at 034 %,
Western Systems Part # 9999999900
$ 178.02 lump sum
WE APPRECIATE YOUR CONTINUED SUPPORT!
THIS QUOTATION INCLUDES ONLY THE ITEMS LISTED HEREIN If you see anything incorrect please let us know and we will issue a new quotation
Pricing is good for 30 days
Delivery 75 -90 days after release
Terms: Net 30 Days
FOB Destination 1 Freight Pre -Paid and Allowed
Sincerely,
WESTERN SYSTEMS
ix
President
2
158
TRANSPORTATION COMMITTEE - Meeting Minutes
October 29, 2013 — 5:15 p.m. — Conference Room #1
City of Tukwila
Transportation. Committee
PRESENT
Councilmembers: Kate Kruller, Chair; Joe Duffle, Dennis Robertson
Staff: Bob Giberson, Robin Tischmak, Gail Labanara, Frank Iriarte, Pat Brodin, Cyndy Knighton,
David Sorensen, Stan Anderson, Laurel Humphrey
CALL TO ORDER: Committee Chair Kruller called the meeting to order at 5:16 p.m.
. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. 2013 Street Department Purchase: 271 LEOTEK LED Luminaires
Staff is seeking Council approval to purchase 271 LED roadway lighting luminaries from
Consolidated Electronics (CED) of Kent, Washington, in the amount of $217,190.63. Roadway LED
lighting technology can reduce power consumption for lighting fixtures by nearly 50% and provide
greater reliability and longer life. LED fixtures now cost only 20% higher than traditional lighting
fixtures, and the City is continuing to convert to LED in stages. This purchase will be the 3`d phase
of the conversion project. Funding for the purchase is available from maintenance and operations
items in the 2013 Street Fund as well as the 2013 Annual Traffic Signal Program. Fewer accidents
resulting in damaged infrastructure is one reason why street maintenance and operations funds are
now available. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 12 COMMITTEE
OF THE WHOLE.
13. 2013 Street Department Purchase: Intelligent Transportation System Signal Control Cabinets
Staff is seeking Council approval to purchase two Intelligent Transportation System (ITS) traffic
signal control cabinets from Western Systems of Everett, Washington, in the amount of $53,074.34.
These will be used to upgrade the intersections at Andover Park East and South 180`1 and Andover
Park East and Baker Boulevard, which use cabinets that are over 25 years old. Funding for this
purchase is available from the 2013 Traffic Control Devices balance. UNANIMOUS APPROVAL.
FORWARD TO NOVEMBER 12 COMMITTEE OF THE WHOLE.
C. 2014 Overlay and Repair Program
Staff is seeking Council approval to enter into a contract with KPG, Inc. in the amount of
$119,876.81 to provide design services for the 2014 Overlay and Repair Program. KPG, Inc. was
selected from an evaluation pool of five firms due to their experience with the City and with federal
funding and inspection programs. The purpose of this project is to construct asphalt and concrete
pavement overlays at various sections of roadway throughout the City, and the design contract
includes 12 potential locations for 2014. A total of $150,000 is budgeted, including $50,000
remaining from the 2013 Program. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 4
REGULAR CONSENT AGENDA.
159