Loading...
HomeMy WebLinkAboutTrans 2013-11-26 COMPLETE AGENDA PACKETCity of Tukwila Transportation Committee Kate Kruller, Chair • Joe Duffie • Dennis Robertson Distribution: K. Kruller J. Duffle K. Hougardy D. Robertson Mayor Haggerton D. Cline K. Matej L. Humphrey B. Giberson F. I riarte R. Tischmak G. Labanara P. Brodin S. Kerslake Clerk File Copy 2 Extra e -mail pkt pdf to A. Le e -mail cover to: C. O'Flaherty, D. Almberg, B. Saxton, S. Norris, M. Hart, A. Le AGENDA TUESDAY, NOVEMBER 26, 2013 Time: 5:15 PM Place: Conference Room #1 (6300 Building) Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) Showalter Middle School Traffic Management Issues a) Information only Pg. 1 b) Bridge Program Grant Applications b) Committee Approval Pg. 5 c) Beacon Ave South Bridge Load Limit Signs c) Information only Pg. 7 d) TUC Transit Center /APW Street & Water d) Forward to 12/02/13 Regular Pg. 13 Construction Management Contract AECOM & Consent Agenda Supplement No. 21 with IBI Group e) TUC Pedestrian /Bicycle Bridge e) Forward to 12/09/13 C.O.W Pg. 59 Supplement No. 10 with KPFF and Special f) Street Vacation of 41St Ave S f) Forward to 12/09/13 C.O.W Pg. 99 Resolution Setting a Public Hearing Date and Special g) Growing Transit Communities g) Forward to 2014 C.O.W Pg. 105 Resolution Approving Compact 3. SCATBd h) SCATBd 10/15/13 Meeting Summary h) Information Only Pg. 121 SCATBd Draft Operating Procedures SCATBd Draft Letter to Ron Pate, Rail Director SCATBd 11/19/13 Meeting Agenda 4. MISCELLANEOUS 5. ANNOUNCEMENTS Future Agendas: Next Scheduled Meeting: To be determined per 2014 Committee Calendar The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director DATE: November 22, 2013 SUBJECT: Showalter Middle School Traffic Management Issues ISSUE Discuss options for improving traffic flow in and around Showalter Middle School. ANALYSIS City of Tukwila and Tukwila School District staff has met to discuss changes to drop -off traffic signage and markings for Showalter Middle School. Changes for drop -off traffic include improving signage on 46th Ave S to clearly indicate no drop -offs (which will match the current signage on S 144th St). Signage and markings will be changed on Showalter school property over the school district's winter break and Public Works will then install the additional signage on 46th Ave S. Spot enforcement of drop -offs and pick -ups in the right -of- way will be coordinated with the Police Department beginning in early January 2014. FINANCIAL IMPACT The initial cost to Tukwila for the new signage on 46th Ave S is estimated to be $500. Additional Police enforcement will be accomplished with existing forces. The long -term goal is to upgrade the crosswalk at S 144th St and 46th Ave S to include a "Rectangular Rapid Flash Beacon" enhanced crosswalk, which could cost from $20,000 to $40,000. City staff will pursue grant funding for the enhanced crosswalk as grant opportunities arise. RECOMMENDATION For discussion only. Attachment: Federal Highway Administration Brochure on Rectangular Rapid Flash Beacons W: \PW Eng \OTHER\Tukwila School District \Info Memo Showalter MS Traffic Issues.docx 1 1 US.Department of Transportation Federal Highway Administration This summary is one in a series describing Innovative Intersection: Safety Treatments. Thie summaries..; identify new technologies and techniques to improve intersection Report 50 0,Volumes5and 12, were published irj 2003 and 2004, respectively. These treatments show promise for improving safet but comprehensive effectiveness evaluationsare not yet available: Safe Roads fora Safer future Inuestment'in roadway safety saves Hues Rectangular Rapid Flash Beacon (RRFB) Purpose According to the National Highway Traffic Safety Administration, there were a total of 14,340 pedestrian fatalities and 193,000 pedestrian injuries resulting from pedestrian - vehicle crashes nationwide during the 2004 -2006 period. Rectangular Rapid Flash Beacons (RRFB) can enhance safety by reducing crashes between vehicles and pedestrians at unsignalized intersections and mid -block pedestrian crossings by increasing driver awareness of potential pedestrian conflicts. Alternative Names Light Emitting Diode (LED) Rapid -Flash System, Stutter Flash or LED Beacons. Operation RRFBs are user - actuated amber LEDs that supplement warning signs at unsignalized intersections or mid -block crosswalks. They can be activated by pedestrians manually by a push button or passively by a pedestrian detection system. RRFBs use an irregular flash pattern that is similar to emergency flashers on police vehicles. RRFBs may be installed on either two -lane or multi -lane roadways. Potential Benefits RRFBs are a lower cost alternative to traffic signals and hybrid signals that are shown to increase driver yielding behavior at crosswalks significantly when supplementing standard pedestrian crossing warning signs and markings. An official FHWA- sponsored experimental implementation and evaluation conducted in St. Petersburg, Florida found that RRFBs at pedestrian crosswalks are dramatically more effective at increasing driver yielding rates to pedestrians than traditional overhead beacons. The novelty and unique nature of the stutter flash may elicit a greater response from drivers than traditional methods. The addition of RRFB may also increase the safety effectiveness of other treatments, such as the use of advance yield markings with YIELD (or STOP) HERE FOR PEDESTRIANS signs. These signs and markings are used to reduce the incidence of multiple- threat crashes at crosswalks on multi -lane roads (i.e., crashes where a vehicle in one lane stops to allow a pedestrian to cross the street while a vehicle in an adjacent lane, traveling in the same direction, strikes the pedestrian), but alone they only have a small effect on overall driver yielding rates. May 2009 FH WA -SA -09 -009 2 Figure 1: Activated,solarpowered RRFB on a center island at an unsignalized intersection beacons flash using an irregular flash pattern that is sirnilarto emergenr y flashers on police vehicles Figure 2: Activated, solarpowered, roadside RRFB'. at a mid-block crosswalk Figure 3: Combined roadside and median system of solar powered RRFB Learn More Michael Frederick, st. Petersburg Pdeicjhborhood Transportation r \ %ra rages 727.893.7843 michael.frederick @stpete.org Ed Rice, Intersection Safety Team Leader FH!" A Office of Safety 202.366.9064 ed.rice @dot.gov See Also: http: / /mutcd.fhwa.dotgov /resources/ interim_approvalhall/stpetersburgrpt/intro.htm http : / /www.stpete.org /pdf /ite_paper 07.pdf Agency Experience "An Analysis of the Effects of Stutter Flash LED Beacons to Increase Yielding to Pedestrians Using Multilane Crosswalks," along with "The Use of Stutter Hash LED Beacons to Increase Yielding to Pedestrians at Crosswalks' presented at the Transportation Research Board Annual Meeting in 2008, summarized the results of two studies on the effects of RRFBs when used to supplement standard pedestrian crossing warning signs at crosswalks'. The former found that going from a no- beacon arrangement to a two - beacon system, mounted on the supplementary warning sign on the right side of the crossing, increased yielding from 18 percent to 81 percent. There was a further increase in yielding behavior, with a four - beacon system (with two beacons on both the right and left side of the crossing) to 88 percent. "An Analysis of the Effects of Stutter Flash LED Beacons to Increase Yielding to Pedestrians Using Multilane Crosswalks" also evaluated the sites over a 1 -year period, and found that there was little to no decrease in yielding behavior over time. Implementation Considerations Including RRFBs on the roadside increases driver yielding behavior significantly. Including RRFBs on a center island or median as well can further increase driver yielding behavior, although with a lower marginal benefit than roadside beacons. RRFBs can use manual push- buttons or automated passive (e.g., video or infrared) pedestrian detection, and should be unlit when not activated. RRFBs typically receive power by standalone solar panel units, but may also be wired to a traditional power source. Manual on Uniform Traffic Control Devices (MUTCD) Specifications The MUTCD gave interim approval to RRFBs for optional use in limited circumstances in July 2008. The interim approval allows for usage as a warning beacon to supplement standard pedestrian crossing warning signs and markings at either a pedestrian or school crossing; where the crosswalk approach is not controlled by a yield sign, stop sign, or traffic - control signal; or at a crosswalk at a roundabout. The MUTCD interim approval memo also contains other provisions for the implementation of the device and should be reviewed (http://mutcd.fhwa.dot.gov/resources/interim_approval/ia7 1/ fhwamemo.htm). Costs Cost is approximately $10,000 to $15,000 for purchase and installation of two units (one on either side of a street). This includes solar panels for powering the units, pad lighting, indication units (for both sides of street) with RRFBs in the back and front of each unit, signage on both approaches, all posts, and either passive infrared detection or push buttons with audio instructions. Costs would be proportionately higher for additional units placed on a median island, etc. Bi Srutt hweabolt 'i'Ced 'rhricia. e Morn r eocn,a,? one C/d e: eahutt .: Hon tea, and S!. er A,1 .1r; �... of the _`rtt.O f Stuttcr rah /ID b'eacons 0! fl ea Y14(1,77(,/ r PEfts.r. s ti.:.ig .'u t rrra rr. ,,1., ks.'P.: :ceder the Troosportatfoo qi.okoorch .'s,r,rd Doi °, _ernrj, Wo5tif ogtoo, DC, 2008. Von `?; -ute fi RSi! ad E ,IGrmr r "The iit_afttart_rtr 80 /3eaconso)/oue(Ee YicloO'ng to :peciestrions , the km5portation .Rase? 1r 5Q5rd Annual r� kV ::irrat r, t'. 2008. 3 4 TO: FROM: BY: DATE: SUBJECT: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director Grant Griffin, Senior Program Manager November 22, 2013 Boeing Access Road over BNRR Bridge Rehabilitation Project No. 99410408 Grant Applications for Local Agency Bridge Program ISSUE Authorize the submittal of funding applications for federal bridge funds through the Local Agency Bridge Program commonly known as Bridge Replacement Advisory Committee (BRAC) Funding. BACKGROUND The Washington State Department of Transportation (WSDOT) is scheduled to make a Call for Projects for the Local Agency Bridge Program in late November 2013. A number of City bridge projects have been identified for potential grant funding and are listed below. Current City policy requires approval by the appropriate committee before applying for grants. DISCUSSION The Local Agency Bridge Program consists of the following sub - programs: • Replacement • Seismic Retrofit • Paint for Steel Bridges • Rehabilitation • Scour Repairs • Deck and Joint Repairs The Boeing Access Road over BNRR Bridge was funded for rehabilitation in 2012 and is currently in design. It has been recognized that the nearby Airport Way Bridge is also a good candidate for rehabilitation funds and the project estimates show that significant savings could be realized if the two bridges were rehabilitated at the same time. The City would like to submit a BRAC grant application for the Airport Way Bridge and request an early decision from WSDOT in order to obtain rehabilitation funds and construct the projects concurrently. If successful for the Airport Way Bridge, only the Design Phase local match of $40,277.00 would be immediately necessary and funds are available in the 2014 Annual Bridge Inspection and Repairs Project. Airport Way Bridge Project Estimates: Rehabilitation Federal Funds (80 %) Tukwila Match (20 %) $1,633,000.00 $1,306,400.00 $326,600.00 Other BRAC grant funding applications include: Seismic Program • Grady Way Bridge • Frank Zepp (S180th St) Paint Program • Beacon Avenue S Bridge • Frank Zepp (S180th St) Deck and Joint Program • Frank Zepp (S180th St) The Seismic Retrofit, Paint for Steel Bridges, Scour Repairs, and Deck and Joint Repairs Programs have historically been funded at 100% with no City local match required. RECOMMENDATION Committee approval to submit BRAC grant applications for the four bridges listed above. w: \pw eng \projects \a - rw & rs projects \hoeing access rd bridge rehab (99410408) \pe \airport way bridge funding \info memo brac grant applications 2013.docx 5 6 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director' By: Grant Griffin, Senior Program Manager DATE: November 22, 2013 SUBJECT: 2013 Annual Bridge Inspections and Repairs Project No. 91310402 Bridge Load Rating Review and Update Posting Load Limits on Beacon Ave S Bridge ISSUE Load Posting the Beacon Ave S Bridge in accordance with the National Bridge Inspection Standards (NBIS), 23 CFR 650C. BACKGROUND Review of the official bridge files for City of Tukwila owned bridges in the summer of 2013 revealed several deficiencies with respect to bridge Toad ratings. As a result, a contract with Sargent Engineers was executed for a Load Rating Review and Update on July 31, 2013 as part of the 2013 Annual Bridge Inspections and Repairs Program. DISCUSSION Sargent Engineers provided an analysis of several existing bridge load ratings and updated these documents using current load rating standards. The result of applying these current standards resulted in a calculated capacity reduction and the need to post load limiting warning signs on the Beacon Ave S Bridge. The load limit posting for the Beacon Ave S Bridge will state "One Truck At A Time On Bridge ". It would be uncommon for more than one truck to be on the bridge at one time as Beacon Ave S is a residential street. This change will cause the least service impact for bridge users. FISCAL IMPACT The new signs for the Beacon Ave S Bridge should cost less than $500. RECOMMENDATION Information only. Attachments: Load Rating Summary Sheet Sign Choice Email from Sargent Engineers WSDOT Standard Sign W:iP W Eng1PROJECTS'A- RW & RS Projects \Bridge Inspection Programs \Bridge Inspections 2013 (91310402y Sargent Load Rating,Info Memo Beacon Ave Posting.docs 7 Bridge Name: Bridge Number: Tuk 11 - 08001800 Span Types: Bridge Length: 182 Design Load: Rated By: Checked By: JSS Date: Bridge Rating Summary Boeing Access Road Bridge (Airport Way) 4 Span RC Girder H 20 MJS Sept. 2013 Inspection Report Date 4118/2013 Substructure Condition 6 Rating Method LFR Deck Condition 6 Overlay Thickness 3" Superstructure Condition 6 Truck Type 3 Type 3S2 Type 3-3 NRL OL-1 OL-2 RF (INV) 1.08 1.11 1.16 0.00 0.62 0.51 RF (OPR) 1.81 1.85 1.94 0.00 1.03 0.85 Controlling Point Shear in girder Shear in girder Shear in girder Shear in girder Shear in girder Shear in girder NBI Rating RF Tons Controlling Point Inventory (HS-20) 0.79 29 Shear in girder Operating (HS-20) 1.33 48 Shear in girder Remarks: This updates the previous rating. Ratings were not performed on NRL vehicles. 8 Trucks NRL Single-Unit 4 Single-Unit 5 Single-Unit 6 Single-Unit 7 Bridge Rating Summary (Single-unit Trucks) RF (INV) RF (OPR) Controlling Point 0.00 0 If the NRL is less than 1 for operating, the below trucks shall be evaiu ted 0.00 0.00 Shear in girder 0.00 0.00 Shear in girder 0.00 0.00 Shear in girder 0.00 0.00 Shear in girder WSBIS Coding Recommendations: Design Load (WB75-50) 4 Operating Rating: Type (WB75-51) Tons (WB75-52) Inventory Rating: Type (WB75-54) Tons (WB75-55) F 48 F 29 Operating Level (WB76-60) 5 Recommended Posting: There is no recommended posting at this time. 9 Grant Griffin From: Monte Smith <montes @sargentengineers.com> Sent: Tuesday, November 05, 2013 11:14 AM To: Grant Griffin Subject: Beacon Avenue Bridge All elements of the bridge have rating factors above one except for the girders. If we restrict the bridge to one lane then the number of wheel lines going to one girder is 1.60. The bridge was rated with two lanes with 2.59 wheel lines going to the girders. So if we restrict the bridge to one lane the ratings increase by 2.59/1.60 = 1.62. This will raise all of the ratings to above legal loads. Monte Smith Sargent Engineers, Inc. 320 Ronlee Lane NW Olympia, WA 98501 (360) 867 -9284 Fax (360) 867 -9318 ww sargente i_0i 1 10 R12 -1101 11/97 C 4, G B ONE TRUCKI AT ATIMEI ON BODGE A DIMENSIONS (MILLIMETERS) A B C D E F G 900 900 16 22 125C 78 56 DIMENSIONS (INCHES) A B CD E F G 36 36 5/8 7/8 5C 3 1/8 2 1/4 COLORS LEGEND - BLACK (NON -REFL) BACKGROUND - WHITE (REFL) E F E F E 11 12 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director/ BY: Peter Lau, Senior Program Manager DATE: November 22, 2013 SUBJECT: TUC Transit Center Project; Andover Park West Street and Water Projects Project Numbers 90610402, 98810404 and 99840105 1) Construction Management Contract with AECOM Technical Services, and 2) Supplemental Agreement No. 21 to Contract No. 06 -019 with IBI Group ISSUE Approve Construction Management (CM) contract with AECOM Technical Services and Supplemental Agreement No. 21 to Contract No. 06 -019 with IBI Group for the Tukwila Urban Center (TUC) Transit Center; Andover Park West Street and Water Improvement Projects (Transit Center Project). BACKGROUND The Transit Center Project is scheduled for construction in early 2014 as the bid was awarded by Council on November 18, 2013 for $6,037,510. While in -house City staff will provide lead CM for the project, a significant amount of additional CM resources is required to supplement the in -house capabilities. The City solicited for consulting services and received eight CM proposals. The top three firms were then interviewed and included; AECOM, URS and WHPacific. AECOM was rated the highest by the cumulative scores of the selection panel. Along with AECOM's CM support, a new Supplemental Agreement is also needed from IBI Group, the design consultant, to provide design support during the construction phase. DISCUSSION The AECOM contract will include field engineering and inspection documentation compliance support, as well as on -call specialty sub - consultants. The fee of $739,350.06 is reasonable for the scope of work provided by AECOM for this complex project. For the IBI Group, Supplemental Agreement No. 21 for $80,000.00 will supply on -call engineering support. The construction management budget is $1,022,460.00. CM Expenses Budget AECOM Contract CM & Inspection $739,350.06 $1,022,460.00 IBI Sup No. 21 - Construction Eng Support 80,000.00 City CM Staff, WSDOT & Misc. Expenses 200,000.00 Total Contract and Budget $1.019.350.06 $1,,022.460.00 RECOMMENDATION Council is being asked to approve the Construction Management contract with AECOM in the amount of $739,350.06 and Supplemental Agreement No. 21 to Contract No. 06 -019 with IBI Group in the amount of $80,000.00 and consider these items on the Consent Agenda at the December 2, 2013 Regular Meeting. Attachments: CM Consultant Selection Scoring Sheet CM Consultant Contract with AECOM IBI Group Supplemental Agreement No. 21 to Contract No. 06 -019 W:IPW EngIPROJECTSIA- RW & RS Projects\Transit Center (90610402)1Construction - City use only\CM Consultant Selectionllnfo Memo for AECOM CM & IBI CM support, 11 -19 -13 gl.doc 13 Tukwila Urban Center Transit Center Project; Andover Park West Street and Water Improvement Projects Rankings Cyndy (Proposal) Cyndy (Interview) Mike (Proposal) Mike (Interview) Peter (Proposal) Peter (Interview) Final Ranking Translated Final Ranking 40% 60% 40% 60% 40% 60% 0.4 0.6 0.8 0.6 1.2 1.2 0.8 1.8 1.2 1.2 0.4 1.8 1.2 1.2 0.4 1.2 0.8 0.6 NOTE: The lowest ranking is the highest qualified. Local Agency Standard Consultant Agreement Consultant/Address /Telephone AECOM Technical Services 710 Fifth Avenue, Suite 1000 Seattle, WA 98004 206.624.9349 @ Architectural /Engineering Agreement ❑ Personal Services Agreement Agreement Number Project Title And Work Description Tukwila Urban Transit Center, Construction Management Services Federal Aid Number FTA Grant No. WA040081 Agreement Type (Choose one) ❑ Lump Sum Lump Sum Amount $ °'°' ° ° ° ° ° °`° % % @ Cost Plus Fixed Fee Overhead Progress Payment Rate Overhead Cost Method ' ❑ Actual Cost DBE Participation • Yes 0 No Federal ID Number or Social Security Number 95- 2661922 • Actual Cost Not To Exceed ❑ Fixed Overhead Rate Fixed Fee $ 81,328.27 ❑ Specific Rates Of Pay Do you require a 1099 for IRS? Completion Date March 1, 2015 CI Yes • No Total Amount Authorized $ 739,350.06 Management Reserve Fund $ Maximum Amount Payable $ 739, Y 739,350.06 • Negotiated Hourly Rate • Provisional Hourly Rate ❑ Cost Per Unit of Work Index of Exhibits (Check all that apply): ® Exhibit A -1 Scope of Work ❑ Exhibit A -2 Task Order Agreement ❑ Exhibit B -1 DBE Utilization Certification Exhibit C Electronic Exchange of Data ❑ Exhibit D -1 Payment - Lump Sum ® Exhibit D -2 Payment - Cost Plus ❑ Exhibit D -3 Payment - Hourly Rate ❑ Exhibit D -4 Payment - Provisional ❑ Exhibit E -1 Fee - Lump/Fixed/Unit ❑ Exhibit E -2 Fee - Specific Rates Exhibit F Overhead Cost ❑ Exhibit G Subcontracted Work ❑ Exhibit G -1 Subconsultant Fee ❑ Exhibit G -2 Fee -Sub Specific Rates ❑ Exhibit G -3 Sub Overhead Cost ® Exhibit H Title VI Assurances ® Exhibit I Payment Upon Termination of Agreement ® Exhibit J Alleged Consultant Design Error Procedures ® Exhibit K Consultant Claim Procedures ❑ Exhibit L Liability Insurance Increase ® Exhibit M-la Consultant Certification ® Exhibit M -lb Agency Official Certification ® Exhibit M -2 Certification - Primary ® Exhibit M -3 Lobbying Certification ® Exhibit M -4 Pricing Data Certification ❑ App. 31.910 Supplemental Signature Page THIS AGREEMENT, made and entered into this day of , 2013 , between the Local Agency of City of Tukwila , Washington, hereinafter called the "AGENCY" , and the above organization hereinafter called the "CONSULTANT ". DOT Form 140 -089 EF Revised 09/2013 Page 1 of 8 15 WITNESSETH THAT: WHEREAS, the AGENCY desires to accomplish the above referenced project, and WHEREAS, the AGENCY does not have sufficient staff to meet the required commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary services for the PROJECT; and WHEREAS, the CONSULTANT represents that he /she is in compliance with the Washington State Statutes relating to professional registration, if applicable, and has signified a willingness to furnish Consulting services to the AGENCY, NOW THEREFORE, in consideration of the terms, conditions, covenants and performance contained herein, or attached and incorporated and made a part hereof, the parties hereto agree as follows: I General Description of Work The work under this AGREEMENT shall consist of the above described work and services as herein defined and necessary to accomplish the completed work for this PROJECT. The CONSULTANT shall furnish all services, labor, and related equipment necessary to conduct and complete the work as designated elsewhere in this AGREEMENT. II Scope of Work The Scope of Work and projected level of effort required for this PROJECT is detailed in Exhibit "A" attached hereto and by this reference made a part of this AGREEMENT. III General Requirements All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and /or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress and presentation meetings with the AGENCY and /or such Federal, State, Community, City or County officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit "A." The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will outline in written and graphical form the various phases and the order of performance of the work in sufficient detail so that the progress of the work can easily be evaluated. The CONSULTANT, and each SUBCONSULTANT, shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The CONSULTANT, and each SUBCONSULTANT, shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of USDOT- assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this AGREEMENT that may result in the termination of this AGREEMENT. Participation for Disadvantaged Business Enterprises (DBE), if required, per 49 CFR Part 26, or participation of Minority Business Enterprises (MBE), and Women Business Enterprises (WBE), shall be shown on the heading of this AGREEMENT. If D/M/WBE firms are utilized, the amounts authorized to each firm and their certification number will be shown on Exhibit `B" attached hereto and by this reference made a part of this AGREEMENT. If the Prime CONSULTANT is a DBE firm they must comply with the Commercial Useful Function (CUF) regulation outlined in the AGENCY'S "DBE Program Participation Plan ". The mandatory DBE participation goals of the AGREEMENT are those established by the WSDOT'S Highway and Local Programs Project Development Engineer in consultation with the AGENCY. All Reports, PS &E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned. All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit "C." All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for this PROJECT, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or on behalf of the AGENCY of any such instruments of service, not occurring as a part of this PROJECT, shall be without liability or legal exposure to the CONSULTANT. Page 2 of 8 16 IV Time for Beginning and Completion The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing by the AGENCY. All work under this AGREEMENT shall be completed by the date shown in the heading of this AGREEMENT under completion date. The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD or governmental actions or other conditions beyond the control of the CONSULTANT. A prior supplemental agreement issued by the AGENCY is required to extend the established completion time. V Payment Provisions The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this AGREEMENT as provided in Exhibit "D" attached hereto, and by reference made part of this AGREEMENT. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31. A post audit may be performed on this AGREEMENT. The need for a post audit will be determined by the State Auditor, WSDOT External Audit Office and /or at the request of the AGENCY'S PROJECT Manager. VI Sub - Contracting The AGENCY permits sub - contracts for those items of work as shown in Exhibit "G" attached hereto and by this reference made part of this AGREEMENT. Compensation for this sub - consultant work shall be based on the cost factors shown on Exhibit "G." The work of the sub - consultant shall not exceed its maximum amount payable unless a prior written approval has been issued by the AGENCY. All reimbursable direct labor, overhead, direct non -salary costs and fixed fee costs for the sub - consultant shall be substantiated in the same manner as outlined in Section V. All sub - contracts shall contain all applicable provisions of this AGREEMENT. With respect to sub - consultant payment, the CONSULTANT shall comply with all applicable sections of the Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011. The CONSULTANT shall not sub - contract for the performance of any work under this AGREEMENT without prior written permission of the AGENCY. No permission for sub - contracting shall create, between the AGENCY and sub- contractor, any contract or any other relationship. A DBE certified sub - consultant is required to perform a minimum amount of their sub - contracted agreement that is established by the WSDOT Highways and Local Programs Project Development Engineer in consultation with the AGENCY. VII Employment The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct from the AGREEMENT price or consideration or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen's Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a Page 3 of 8 17 third party as a consequence of any act or omission on the part of the CONSULTANT'S employees or other persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the CONSULTANT. The CONSULTANT shall not engage, on a full- or part -time basis, or other basis, during the period of the contract, any professional or technical personnel who are, or have been, at any time during the period of the contract, in the employ of the United States Department of Transportation, or the STATE, or the AGENCY, except regularly retired employees, without written consent of the public employer of such person. VIII Nondiscrimination . During the performance of this contract, the CONSULTANT, for itself, its assignees, and successors in interest agrees to comply with the following laws and regulations: Title VI of the Civil Rights Act of 1964 (42 USC Chapter 21 Subchapter V Section 2000d through 2000d -4a) Federal -aid Highway Act of 1973 (23 USC Chapter 3 Section 324) Rehabilitation Act of 1973 (29 USC Chapter 16 Subchapter V Section 794) Age Discrimination Act of 1975 (42 USC Chapter 76 Section 6101 et seq.) Civil Rights Restoration Act of 1987 (Public Law 100 -259) American with Disabilities Act of 1990 (42 USC Chapter 126 Section 12101 et. seq.) 49 CFR Part 21 23 CFR Part 200 RCW 49.60.180 In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit "H" attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit "H" in every sub - contract, including procurement of materials and leases of equipment, unless exempt by the Regulations or directives issued pursuant thereto. IX Termination of Agreement The right is reserved by the AGENCY to terminate this AGREEMENT at any time upon ten (10) days written notice to the CONSULTANT. In the event this AGREEMENT is terminated by the AGENCY other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT as shown in Exhibit "I" for the type of AGREEMENT used. No payment shall be made for any work completed after ten (10) days following receipt by the CONSULTANT of the Notice to Terminate. If the accumulated payment made to the CONSULTANT prior to Notice of Termination exceeds the total amount that would be due when computed as set forth herein above, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess paid. If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall not apply. Page 4 of 8 18 In such an event, the amount to be paid shall be determined by the AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing the work to the date of termination, the amount of work originally required which was satisfactorily completed to date of termination, whether that work is in a form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of employing another firm to complete the work required and the time which may be required to do so, and other factors which affect the value to the AGENCY of the work performed at the time of termination. Under no circumstances shall payment made under this subsection exceed the amount, which would have been made using the formula set forth above. If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT'S failure to perform is without the CONSULTANT'S or it's employee's default or negligence, the termination shall be deemed to be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed for actual costs in accordance with the termination for other than default clauses listed previously. In the event of the death of any member, partner or officer of the CONSULTANT or any of its supervisory personnel assigned to the PROJECT, or dissolution of the partnership, termination of the corporation, or disaffiliation of the principally involved employee, the surviving members of the CONSULTANT hereby agree to complete the work under the terms of this AGREEMENT, if requested to do so by the AGENCY. This subsection shall not be a bar to renegotiation of the AGREEMENT between the surviving members of the CONSULTANT and the AGENCY, if the AGENCY so chooses. In the event of the death of any of the parties listed in the previous paragraph, should the surviving members of the CONSULTANT, with the AGENCY'S concurrence, desire to terminate this AGREEMENT, payment shall be made as set forth in the second paragraph of this section. Payment for any part of the work by the AGENCY shall not constitute a waiver by the AGENCY of any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the CONSULTANT, or for failure of the CONSULTANT to perform work required of it by the AGENCY. Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights with respect to any future act or omission by the CONSULTANT. X Changes of Work The CONSULTANT shall make such changes and revisions in the complete work of this AGREEMENT as necessary to correct errors appearing therein, when required to do so by the AGENCY, without additional compensation thereof. Should the AGENCY find it desirable for its own purposes to have previously satisfactorily completed work or parts thereof changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as herein provided under Section XIV. XI Disputes Any dispute concerning questions of fact in connection with the work not disposed of by AGREEMENT between the CONSULTANT and the AGENCY shall be referred for determination to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this AGREEMENT; provided, however, that if an action is brought challenging the Director of Public Works or AGENCY Engineer's decision, that decision shall be subject to de novo judicial review. If the parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the procedures found in Exhibit "J ", and disputes concerning claims will be conducted under the procedures found in Exhibit "K ". XII Venue, Applicable Law, and Personal Jurisdiction In the event that either party deems it necessary to institute legal action or proceedings to enforce any right or obligation under this AGREEMENT, the parties hereto agree that any such action shall be initiated in the Superior court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto agree that all questions shall be resolved by application of Washington law and that the parties to such action shall have the right of appeal from such decisions of the Superior court in accordance with the laws of the State of Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior court of the State of Washington, situated in the county in which the AGENCY is located. Page 5 of 8 19 XIII Legal Relations The CONSULTANT shall comply with all Federal, State, and local laws and ordinances applicable to the work to be done under this AGREEMENT. This contract shall be interpreted and construed in accordance with the laws of the State of Washington. The CONSULTANT shall indemnify and hold the AGENCY and the STATE and its officers and employees harmless from and shall process and defend at its own expense all claims, demands, or suits at law or equity arising in whole or in part from the CONSULTANT'S negligence or breach of any of its obligations under this AGREEMENT; provided that nothing herein shall require a CONSULTANT to indemnify the AGENCY or the STATE against and hold harmless the AGENCY or the STATE from claims, demands or suits based solely upon the conduct of the AGENCY or the STATE, their agents, officers and employees; and provided further that if the claims or suits are caused by or result from the concurrent negligence of (a) the CONSULTANT'S agents or employees, and (b) the AGENCY or the STATE, their agents, officers and employees, this indemnity provision with respect to (1) claims or suits based upon such negligence (2) the costs to the AGENCY or the STATE of defending such claims and suits shall be valid and enforceable only to the extent of the CONSULTANT'S negligence or the negligence of the CONSULTANT'S agents or employees. The CONSULTANT'S relation to the AGENCY shall be at all times as an independent contractor. The CONSULTANT shall comply with all applicable sections of the applicable Ethics laws, including RCW 42.23, which is the Code of Ethics for regulating contract interest by municipal officers. The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT'S own employees against the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51 RCW. Unless otherwise specified in the AGREEMENT, the AGENCY shall be responsible for administration of construction contracts, if any, on the PROJECT. Subject to the processing of a new sole source, or an acceptable supplemental agreement, the CONSULTANT shall provide On -Call assistance to the AGENCY during contract administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper construction techniques, job site safety, or any construction contractor's failure to perform its work in accordance with the contract documents. The CONSULTANT shall obtain and keep in force during the terms of the AGREEMENT, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. Insurance Coverage A. Worker's compensation and employer's liability insurance as required by the STATE. B. Commercial general liability written under ISO Form CG 00 01 12 04 or its equivalent with minimum limits of one million dollars ($1,000,000) per occurrences and two million dollars ($2,000,000) in the aggregate for each policy period. C. Vehicle liability insurance for any automobile used in an amount not less than a one million dollar ($1,000,000) combined single limit. Excepting the Worker's Compensation Insurance and any Professional Liability Insurance secured by the CONSULTANT, the AGENCY will be named on all policies as an additional insured. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements required by the AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the execution of this AGREEMENT to the AGENCY. No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY. The CONSULTANT'S professional liability to the AGENCY shall be limited to the amount payable under this AGREEMENT or one million ($1,000,000) dollars, whichever is the greater, unless modified by Exhibit "L ". In no case shall the CONSULTANT'S professional liability to third parties be limited in any way. Page 6of8 20 The AGENCY will pay no progress payments under Section V until the CONSULTANT has fully complied with this section. This remedy is not exclusive; and the AGENCY and the STATE may take such other action as is available to it under other provisions of this AGREEMENT, or otherwise in law. XIV Extra Work A. The AGENCY may at any time, by written order, make changes within the general scope of the AGREEMENT in the services to be performed. B. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the work under this AGREEMENT, whether or not changed by the order, or otherwise affects any other terms and conditions of the AGREEMENT, the AGENCY shall make an equitable adjustment in the (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms and shall modify the AGREEMENT accordingly. C. The CONSULTANT must submit any "request for equitable adjustment ", hereafter referred to as "CLAIM ", under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final payment of the AGREEMENT. D. Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed. E. Notwithstanding the terms and conditions of paragraphs (A) and (B) above, the maximum amount payable for this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement to this AGREEMENT. XV Endorsement of Plans If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering data furnished by them. XVI Federal and State Review The Federal Highway Administration and the Washington State Department of Transportation shall have the right to participate in the review or examination of the work in progress. XVII Certification of the Consultant and the Agency Attached hereto as Exhibit "M -1(a and b)" are the Certifications of the CONSULTANT and the AGENCY, Exhibit "M -2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions, Exhibit "M -3" Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying and Exhibit "M -4" Certificate of Current Cost or Pricing Data. Exhibit "M -3" is required only in AGREEMENTS over $100,000 and Exhibit "M -4" is required only in AGREEMENTS over $500,000. XVIII Complete Agreement This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as an amendment to this AGREEMENT. XIX Execution and Acceptance This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements, representations, warranties, covenants, and agreements contained in the proposal, and the supporting material submitted by the CONSULTANT, and does hereby accept the AGREEMENT and agrees to all of the terms and conditions thereof. Page 7 of 8 21 In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the "Execution Date" box on page one (1) of this AGREEMENT. By Consultant F -C-0/1j DOT By Agency Page 8of8 22 Tukwila Transit Center Project City of Tukwila Exhibit A -1 SCOPE OF SERVICES Construction Management and Contract Administration Services for the Tukwila Transit Center Project City of Tukwila AECOM Technical Services, Inc. ( "Consultant ") proposes to provide to the City of Tukwila, Washington ( "Client ") construction management services for the Tukwila Transit Center Project (hereinafter called "Project "). These services will include inspection, construction management, and contract administration assistance during the construction of the project as detailed in the following: I. INTRODUCTION The following scope of services is based upon the assumptions outlined herein. Associated costs are detailed in EXHIBIT E -1. Assumptions: • The proposed project team will include a part-time resident engineer and document administrator; and a full -time assistant resident engineering and construction inspector. Allowances for materials testing and surveying are included in this scope. • A standard working week for project staff is 40 hrs. Should the Client direct fewer hours, the Consultant will not guarantee to perform all of the scope items included in the corresponding subtask during the time spent off the project. • Services will be performed in accordance with the Local Agency Guidelines (LAG) and the WSDOT Construction Manual. The man -hours proposed by the Consultant are an estimate only and are subject to change based on the actual construction schedule and working hours of the Contractor. • Mileage charges will be invoiced at the current USGAO rates. • Design by Others: It is understood and agreed that the Consultant did not prepare the Contract Documents for the project, and the Client will provide the Consultant the support of the Engineer -of- Record during the course of the Consultant's work. I. DETAILED SCOPE OF WORK Subtask 1 — Administration /Quality Control Consistent with the hours shown in EXHIBIT E -1, the Consultant shall provide overall project management and contract administration associated with the service agreement between the Consultant and the Client. This effort will include the following elements: 1.1 Prepare of Consultant invoicing and progress reporting to the Client. 1.2 Perform internal administration of the Consultant's Task Order. 1.3 Prepare any supplements to the Consultant's Task Order. 1.4 Attend pre- construction conference. 1.5 Make periodic field visits and conduct project reviews for the quality of services provided by AECOM and consistency with AECOM's project quality plan. Page 1 of 5 Updated: 11 /18/2013 23 Tukwila Transit Center Project City of Tukwila Subtask 2 — Document Control Consistent with the hours shown in EXHIBIT E -1, the Consultant shall provide document control services including the following elements: 2.1 Process; track and archive construction records including: Inspectors Daily Reports (IDR's); Requests for Information (RFI's); Submittals; Requests for Approval of Materials (RAM's); Statements of Working Days. Consultant shall maintain submittal and RFI logs to track when documents are received and returned to the contractor. 2.2 Compile and review inspector pay quantity and force account records, and prepare monthly contractor progress estimates. 2.3 Review and archive project record documentation associated with prevailing wage reporting, including Requests to Sublet, Intents to Pay Prevailing Wage, Certified Payroll, Affidavits of Wages Paid, and Contractor employee wage interviews. 2.4 Review and archive Certificates of Materials Origin tracking and reconcile against the Projects Record of Materials. 2.5 Review and archive DBE participation and training goals documentation. 2.6 Prepare and assist with 1 mid - project audit and 1 final regulatory audit of the construction project record. 2.7 Attend and provide minutes for the preconstruction conference and up to 40 weekly contractor construction progress meetings. 2.8 Maintain a material testing log that tracks the test date, type of material test, test result, specification requirement and action taken if a failed result is received from the material testing consultant. 2.9 Maintain a list of approved change orders and potential change orders. Potential change orders will have a force account estimate of the extra work related to that item(s), until an approved change order is executed. Subtask 3 — Field Inspection The Consultant shall provide construction inspection services for up to 280 full -time days, consistent with the hours shown in. EXHIBIT E -1. This effort will include the following elements: 3.1 Prepare daily construction reports recording the contractor's operations performed for each day the Consultant is on site; measure the quantities of materials installed, log equipment and staff present, weather conditions, and any observed problems or construction issues. 3.2 Prepare Daily Payment Notes, Statements of Working Days, and Force Account Records (if necessary). 3.3 Respond to contractor questions which may arise as to the quality and acceptability of furnished materials or work performed. 3.4 Respond to general questions raised by adjacent property owners, businesses, or general public. Complaints or detailed questions shall be referred to the Client. 3.5 Prepare field records and documents in accordance with Projects Record of Materials. 3.6 Coordinate with Resident Engineer and Client for changes and updates to the ROM. 3.7 For each day the Consultant is on site, provide photographs of traffic control set -up and work activities during the course of construction. Photographs will be in digital format and cataloged by date. 3.8 Facilitate coordination with property owners, businesses, King County Metro, and other project stakeholders. 3.9 Facilitate the Contractor's coordination of existing utilities within the project boundaries. Page 2 of 5 Updated: 11/18/2013 24 Tukwila Transit Center Project City of Tukwila 3.10 Review the Record of Materials (ROM) against the material testing results provided by the Project's material testing consultant, and advise the Contractor accordingly. 3.11 Monitor the Contractor's compliance with water quality permits and the requirements of the TESC and SPCC Plans. 3.12 Attend weekly construction meetings up to 40 weekly meetings. 3.13 The Construction Inspector shall review monthly pay estimates with the Contractor and provide recommendations to the Resident Engineer and Client. 3.14 Review the Contractor's construction record drawings on a weekly basis. Upon project completion, verify Contractor provided markups accuracy and forward to the Client. The Consultant Inspector will track and record field changes on drawings and use this information to verify the Contractor's construction record drawings. 3.15 Participate in the Project's final inspection and assist in developing a list of any remaining deficiencies. 3.16 Attend pre- construction conference. 3.17 For the days present on site, the construction inspector shall observe day -to -day construction activities. By providing inspection oversight, the Consultant shall assume no responsibility for proper construction techniques or job site safety but will report to the Contractor and Client any known public safety concerns immediately. The presence of the Consultant's personnel at the construction site is for the purpose of providing to the Client a greater degree of confidence that the completed work will generally conform to the Contract Documents and that the integrity of the design concept as reflected in the Contract Documents has been implemented and preserved by the Construction Contractor. 3.18 The Consultant will endeavor to protect all parties against defects and deficiencies in the work of the Contractor, but cannot guarantee the Contractor's performance and shall not be responsible for construction means, methods, measurements, techniques, sequences of procedures, or for safety precautions and programs in connection with the work performed by the Construction Contractor and any subcontractors. Subtask 4 — Construction Management Provide construction management services, consistent with the hours shown in EXHIBIT B. This effort will include the following elements: 4.2 Supervise the Consultant's field personnel assigned to the project. 4.3 Liaison between the Contractor's management and the Client's management personnel, acting as the direct point of contract for both parties. 4.4 Organize and chair the Pre - construction conference 4.5 Review and approve daily construction reports prepared by the construction inspector. 4.6 Respond to contractor questions which may arise as to the quality and acceptability of furnished materials, work performed, and to general questions raised by adjacent property owners or general public. 4.7 Respond to Contractor RFI's, and defer to the Engineer of Record for a response when appropriate. 4.8 Review Contractor submittals, and defer to the Engineer of Record for a review when appropriate. 4.9 Coordinate off -site fabrication inspection by others. 4.10 Review ROM and material testing results and advise the Contractor accordingly. Page 3 of 5 Updated 11/18/2013 25 Tukwila Transit Center Project City of Tukwila 4.11 Review the Contractor's baseline project schedule, and then monitor that schedule throughout the course of the project for compliance with the provisions of the Contract. Monitoring shall include review of periodic schedule updates submitted by the Contractor. 4.12 Facilitate coordination between the Contractor, Client and project stakeholders regarding status and issues of construction activities. 4.13 Facilitate utility coordination for existing and new utility improvements. 4.14 Chair up to 40 weekly construction meetings. 4.15 Prepare official correspondence to the Contractor and issue upon the Client's approval. 4.16 Issue field directives and stop work notices to the Contractor when necessary, with the Client's approval. 4.17 Issue Correction Notices when appropriate. 4.18 Review monthly pay estimates with the Contractor and provide recommendation to the Client for release of payment. 4.19 Supervise contract close -out activities including as -built drawings, final payment, and completion notices. Consultant shall provide the Client, at contract close -out, construction records to the all applicable funding agencies. 4.20 The Consultant shall assume no responsibility for proper construction techniques or job site safety but will report to the Contractor and Client any observed public safety concerns immediately. The presence of the Consultant's personnel at the construction site is for the purpose of providing to the Client a greater degree of confidence that the completed work will generally conform to the Contract Documents and that the integrity of the design concept as reflected in the Contract Documents has been implemented and preserved by the construction Contractor. 4.21 The Consultant will endeavor to protect all parties against defects and deficiencies in the work of the Contractor, but cannot guarantee the Contractors' performance and shall not be responsible for construction means, methods, measurements, techniques, sequences of procedures, or for safety precautions and programs in connection with the work performed by the construction contractor and any subcontractors. Subtask 5 — Public Outreach / Client Meetings The Consultant's construction inspector shall provide limited assistance with project outreach consistent with the following: The Consultant shall, under direction of the Client, assist with delivering informational flyers for the upcoming construction activities, road closures, temporary traffic controls, and other pertinent information. The Consultant shall also assist the Client in responding to questions and issues raised by private citizens and local businesses relative to the Project. Subtask 6 — Materials Testing The Consultant will retain a materials testing subconsultant to perform soil and concrete testing which includes: gradations, in -place density, Proctor compaction tests, concrete air entrainment, concrete test cylinders, and asphalt composition. These services are budgeted as an allowance and the actual costs of the testing effort may vary. The Consultant shall advise the Client regarding the status of the materials testing budget to allow funds to be added or removed as necessary. Page 4 of 5 Updated 11 /16/2013 26 Tukwila Transit Center Project City of Tukwila Subtask 7 - Survey Verification The Consultant will retain a surveying subconsultant to perform verification surveys of two existing permanent benchmarks and temporary benchmarks established by the Contractor. These services are budgeted as an allowance and the actual costs of the surveying effort may vary. The Consultant shall advise the Client on the surveying budget status to allow funds to be added or removed as necessary. Subtask 8 — Change Order Resolution The Consultant shall provide services up to 80 hours for preparing change order packages, this includes independent cost estimates (ICE), change order forms; and, force account records. Subtask 9 — Claims /Disputes Support No services are provided under this section. III. Consultant Deliverables; including but not limited to: Inspector Daily Reports ii. Construction Photographs —1 Set Weekly Meeting Minutes and Agendas iv. Submittal, RFI, and Material Testing Logs v. Change Order and Potential Change Order Log vi. Declaration of Substantial Completion vii. Monthly Contractor Pay Requests with field note record and quantity documentation viii. Punch -lists and tracking documentation ix. Physical Completion Letter and Recommendation of Final Acceptance Letter x. All Project Records received from the Contractor described under Subtask 2 xi. Other records generated as a result of this Contract, when demanded by the Client, or as deemed necessary by a public record request. IV. Responsibilities of the Client Provide CM oversight and approval authority for all construction activities. ii. Manage the Designer -on- Record team as part of the Project Designer's on -call design support and architectural submittal review. Process all contract documents through the City's approval process (e.g. CM services invoices, construction contract, monthly pay estimates, change order execution, cost reduction proposals, time extensions, etc.). iv. Provide preferred forms and formats, and filing structure to the Consultant. v. Oversee the Consultant on conducting schedule evaluation, monitoring, and evaluate Time Impact Analysis for changes. vi. Provide and assist the Consultant in utility coordination with third -party utilities under project specific or franchise agreements. vii. Review the Pre - Construction Conference agenda and all hand -out materials, before the Consultant conducts the Pre - Construction Conference. viii. Coordinate and schedule any public meetings required before, during and after construction. ix. Provide operations & maintenance interface with other City Staff for ongoing project issues. x. Provide CM tools for Team use including: Project ROM, IDR, Project File Index, Change Order, Force Account tracking and Pay Estimate forms. Page 5 of 5 Updated 11/18/2013 27 Exhibit C Electronic Exchange of Engineering and Other Data In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is to use in preparing electronic files for transmission to the agency. The format and standards to be provided may include, but are not limited to, the following: I. Surveying, Roadway Design & Plans Preparation Section A. Survey Data B. Roadway Design Files C. Computer Aided Drafting Files D. Specify the Agency's Right to Review Product with the Consultant E. Specify the Electronic Deliverables to Be Provided to the Agency F. Specify What Agency Furnished Services and Information Is to Be Provided II. Any Other Electronic Files to Be Provided DOT Form 140 -089 EF Exhibit C Revised 10/2013 28 III. Methods to Electronically Exchange Data A. Agency Software Suite B. Electronic Messaging System C. File Transfers Format DOT Form 140 -089 EF Exhibit C Revised 10/2013 29 Exhibit D -2 Payment (Cost Plus a Fixed Fee) The CONSULTANT shall be paid by the AGENCY for completed work and services rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work specified in Section II, "Scope of Work." The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31. A. Actual Costs: Payment for all consulting services for this PROJECT shall be on the basis of the CONSULTANT'S actual cost plus a fixed fee. The actual cost shall include direct salary cost, overhead, direct non -salary costs, and fixed fee. 1. Direct Salary Costs: The Direct Salary Cost is the direct salary paid to principals, professional, technical, and clerical personnel for the time they are productively engaged in work necessary to fulfill the terms of this AGREEMENT. The CONSULTANT shall maintain support data to verify the direct salary costs billed to the AGENCY. 2. Overhead Costs: Overhead Costs are those costs other than direct costs, which are included as such on the books of the CONSULTANT in the normal everyday keeping of its books. Progress payments shall be made at the rate shown in the heading of this AGREEMENT under "Overhead Progress Payment Rate." Total overhead payment shall be based on the method shown in the heading of the AGREEMENT. The two options are explained as follows: a. Fixed Rate: If this method is indicated in the heading of the AGREEMENT the AGENCY agrees to reimburse the CONSULTANT for overhead at the percentage rate shown. This rate shall not change during the life of the AGREEMENT. b. Actual Cost: If this method is indicated in the heading of the AGREEMENT the AGENCY agrees to reimburse the CONSULTANT the actual overhead costs verified by audit, up to the Maximum Total Amount Payable, authorized under this AGREEMENT, when accumulated with all other Actual Costs. A summary of the CONSULTANTS cost estimate and the overhead computation is shown in Exhibit "E" attached hereto and by this reference made part of this AGREEMENT. When an Actual Cost method is used, the CONSULTANT (prime and all sub - consultants) will submit to the AGENCY within six (6) months after the end of each firm's fiscal year, an overhead schedule in the format required by the AGENCY (cost category, dollar expenditures, etc.) for the purpose of adjusting the overhead rate for billing purposes. It shall be used for the computation of progress payments during the following year and for retroactively adjusting the previous year's overhead cost to reflect the actual rate. DOT Form 140 -089 EF Exhibit D -2 Revised 6/08 30 Failure to supply this information by either the prime CONSULTANT or any of their sub - consultants shall cause the AGENCY to withhold payment of the billed overhead costs until such time as the required information is received and an overhead rate for billing purposes is approved. The AGENCY, STATE and/or the Federal Government may perform an audit of the CONSULTANT'S books and records at any time during regular business hours to determine the actual overhead rate, if they so desire. 3. Direct Non -Salary Costs: Direct Non -Salary Costs will be reimbursed at the Actual Cost to the CONSULTANT. These charges may include, but are not limited to, the following items: travel, printing, long distance telephone, supplies, computer charges and sub - consultant costs. a. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by the AGENCY. The CONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with the AGENCY'S Travel Rules and Procedures. However, air, train, and rental car costs shall be reimbursed in accordance with 48 CFR Part 31.205 -46 "Travel Cost b. The billing for Direct Non -Salary Costs shall include an itemized listing of the charges directly identifiable wh the PROJECT. c. The CONSULTANT shall maintain the original supporting documents in their office. Copies of the original supporting documents shall be supplied to the AGENCY upon request. d. All above charges must be necessary for the services provided under this AGREEMENT. 4. Fixed Fee: The Fixed Fee, which represents the CONSULTANT'S profit, is shown in the heading of this AGREEMENT under Fixed Fee. This amount does not include any additional Fixed Fee, which could be authorized from the Management Reserve Fund. This fee is based on the Scope of Work defined in this AGREEMENT and the estimated person - hours required to perform the stated Scope of Work. In the event the CONSULTANT enters into a supplemental AGREEMENT for additional work, the supplemental AGREEMENT may include provisions for the added costs and an appropriate additional fee. The Fixed Fee will be prorated and paid monthly in proportion to the percentage of work completed by the CONSULTANT and reported in the Monthly Progress Reports accompanying the billings. Any portion of the Fixed Fee earned but not previously paid in the progress payments will be covered in the final payment, subject to the provisions of Section IX entitled "Termination of Agreement." 5. Management Reserve Fund: The AGENCY may desire to establish a Management Reserve Fund to provide the Agreement Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed 31 the lesser of $100,000 or 10% of the Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included for the Management Reserve Fund is shown in the heading of this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in excess of the Management Reserve Fund shall be made in accordance with Section XIV, "Extra Work. "6. Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and the Management Reserve Fund. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in Section XIV, "Extra Work." No minimum amount payable is guaranteed under this AGREEMENT. B. Monthly Progress Payments: The CONSULTANT may submit billings to the AGENCY for reimbursement of Actual Costs plus the calculated overhead and fee on a monthly basis during the progress of the work. Such billings shall be in a format approved by the AGENCY and accompanied by the monthly progress reports required under Section III, "General Requirements" of this AGREEMENT. The billings will be supported by an itemized listing for each item including Direct Salary, Direct Non - Salary, and allowable Overhead Costs to which will be added the prorated Fixed Fee. To provide a means of verifying the billed salary costs for CONSULTANT employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles, salary rates, and present duties of those employees performing work on the PROJECT at the time of the interview. C. Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT, contingent upon receipt of all PS &E, plans, maps, notes, reports, electronic data and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit, all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to the AGENCY within thirty (30) days of notice of the overpayment. Such refund shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. The CONSULTANT has twenty (20) days after receipt of the final POST AUDIT to begin the appeal process to the AGENCY for audit findings. D. Inspection of Cost Records: The CONSULTANT and their sub - consultants shall keep available for inspection by representatives of the AGENCY, STATE and the United States, for a period of three (3) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, claim or audit arising out of, in connection with, or related to this contract is initiated before the expiration of the three (3) year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed. 32 Exhibit E -1 Consultant Fee Determination Summary Sheet City of Tukwila - Tukwila Transit Center ACOM AECOM Labor - Home Office Employee Classification Hours Rate Cost Mike Horton PM / QC 188.00 $ 72.43 $13,616.88 188.00 $13,616.88 $13,616.88 Overhead (OH Cost — Including Salary Additives): OH Rate x DSC of 156.22% x $13,616.88 $21,272.29 Fee Fee Rate x DSC of 30.00% x $13,616.88 $4,085.06 Labor Subtotal - Home Office $38,974.23 AECOM Labor - Field Office Employee Classification Hours Rate Cost Jim Fillis RE 800.00 $ 82.02 $65,614.56 Janet Lee ARE 1,712.00 $ 42.84 $73,342.08 Tom Bowers Field Lead 1,600.00 $ 52.31 $83,688.96 Silvia Manescu Documentation 300.00 $ 39.92 $11,976.84 Leroy Clark Inspection 320.00 $ 49.66 $15,892.42 Jesse Rogers Arch. Inspection 200.00 $ 34.81 $6,962.52 Jim Mulhearn Scheduling 0.00 $ 70.00 $0.00 4,932.00 $257,477.38 Total DSC $257,477.38 Overhead (OH Cost — Including Salary Additives): OH Rate x DSC of 122.43% x $257,477.38 $315,229.56 Fee: Fee Rate x DSC of 30.00% x $257,477.38 $77,243.21 Labor Subtotal - Field Office $649,950.15 Labor Subtotal $688,924.38 Reimbursable Vehicles - Mileage Expenses Subconsultant Materials Testing Allowance Surveying Cost $ 16,000.00 $ 6,425.68 $22,425.68 Cost $20,000.00 $8,000.00 $28,000.00 Agreement Total (including fee) $739,350.06 Fixed Fee Total $81,328.27 33 Exhibit F Breakdown of Overhead Cost Please see the attached sheets. 34 71f Washington State Department of Transportation Paula J. Hammond, P.E. Secretary of Transportation July 17, 2012 John McNamara, Government Accounting & Cost Compliance AECOM 701 Edgewater Drive Wakefield MA 01880 -6242 RE: Aecom Technical Services, Inc. Overhead Schedules Fiscal Year End September 30, 2011 Dear Mr. McNamara: Transportation Building 310 Maple Park Avenue S.E. P.O. Box 47300 Olympia, WA 98504 -7300 360 - 705 -7000 TTY: 1- 800 - 833 -6388 www.wsdot.wa.gov We have completed a desk review of your overhead schedule for the above referenced fiscal year. Our review included the documentation provided by Aecom Technical Services, Inc. The schedule was audited by the Cleary & Gill, LLC for compliance with Part 31 of the Federal Acquisition Regulations. Cleary & Gill, LLC accepted an overhead rate for the year ended September 30, 2011, home office rate at 156.22% of direct labor and a field office rate at 122.43% of direct labor. The reviewed data included, but was not limited to; the schedule of the indirect cost rate, a description of the company, basis of accounting and description of Aecom Technical Services, Inc. accounting system and the basis of indirect costs. Based on our work, we are issuing this letter of review establishing Aecom Technical Services, Inc. overhead rate for the fiscal year ending September 30, 2011. The Company Wide Rate (Composite Rate) is 147.66% of direct labor. Included within this rate are the Home Rate of 156.22% of direct labor, and the Field Rate of 122.43% of direct labor. Costs billed to actual agreements will still be subject to audit of actual costs. Please check with the WSDOT Consultant Services Office (HQ) and /or the WSDOT Area Consultant Liaison to determine when this reviewed rate will be applicable to your WSDOT agreement(s). Also, remember that when you provide next year's overhead schedule to our office, you will also need to submit either your internally prepared Compensation Analysis for our review, or use the National Compensation Matrix (NCM) format to prepare your alternate analysis and we will review that. The NCM is a tool that establishes compensation amounts presumed reasonable for certain executive positions. The 35 Mr. McNamara July 17, 2012 Page 2 Compensation Analysis and NCM are described further in the AASHTO Audit Guide, Chapter 7. We will need your Compensation Analysis, or alternative analysis based on use of the NCM, in order to complete our review of your overhead schedule. If you, or any representatives of Aecom Technical Services, Inc., have any questions, please contact Martha Roach, Jeri Sivertson, or Steve McKerney at (360) 705 -7003. Sincerely, 'G?Z plate yi;?�i.�l/L Martha S. Roach Agreement Compliance Audit Manager MR:ds Enclosure cc: Steve McKerney, Director of Internal Audit Jeri Sivertson, Assistant Director of Internal Audit Larry Schofield, MS 47323 Jessica Goldsberry, Aecom US West Region Finance & Accounting File 36 Exhibit H Title VI Assurances During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, and successors in interest agrees as follows: 1. Compliance with Regulations: The CONSULTANT shall comply with the Regulations relative to non- discrimination in federally assisted programs of the AGENCY, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time (hereinafter referred to as the "REGULATIONS "), which are herein incorporated by reference and made a part of this AGREEMENT. 2. Non - discrimination: The CONSULTANT, with regard to the work performed during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of sub - consultants, including procurement of materials and leases of equipment. The CONSULTANT shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the REGULATIONS, including employment practices when the AGREEMENT covers a program set forth in Appendix B of the REGULATIONS. 3. Solicitations for Sub - consultants, Including Procurement of Materials and Equipment: In all solicitations either by competitive bidding or negotiations made by the CONSULTANT for work to be performed under a sub - contract, including procurement of materials or leases of equipment, each potential sub - consultant or supplier shall be notified by the CONSULTANT of the CONSULTANT'S obligations under this AGREEMENT and the REGULATIONS relative to non - discrimination on the grounds of race, color, sex, or national origin. 4. Information and Reports: The CONSULTANT shall provide all information and reports required by the REGULATIONS or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by AGENCY, STATE or the Federal Highway Administration (FHWA) to be pertinent to ascertain compliance with such REGULATIONS, orders and instructions. Where any information required of a CONSULTANT is in the exclusive possession of another who fails or refuses to furnish this information, the CONSULTANT shall so certify to the AGENCY, STATE or the FHWA as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Non - compliance: In the event of the CONSULTANT'S non - compliance with the non- discrimination provisions of this AGREEMENT, the AGENCY shall impose such AGREEMENT sanctions as it, the STATE or the FHWA may determine to be appropriate, including, but not limited to: Withholding of payments to the CONSULTANT under the AGREEMENT until the CONSULTANT complies, and/or; • Cancellation, termination, or suspension of the AGREEMENT, in whole or in part DOT Form 140 -089 EF Exhibit H Revised 6/05 37 6. Incorporation of Provisions: The CONSULTANT shall include the provisions of paragraphs (1) through (5) in every sub - contract, including procurement of materials and leases of equipment, unless exempt by the REGULATIONS, or directives issued pursuant thereto. The CONSULTANT shall take such action with respect to any sub - consultant or procurement as the AGENCY, STATE or FHWA may direct as a means of enforcing such provisions including sanctions for non - compliance. Provided, however, that in the event a CONSULTANT becomes involved in, or is threatened with, litigation with a sub - consultant or supplier as a result of such direction, the CONSULTANT may request the AGENCY and the STATE enter into such litigation to protect the interests of the AGENCY and the STATE and, in addition, the CONSULTANT may request the United States enter into such litigation to protect the interests of the United States. 38 Exhibit I Payment Upon Termination of Agreement By the Agency Other Than for Fault of the Consultant (Refer to Agreement, Section IX) Lump Sum Contracts A final payment shall be made to the CONSULTANT which when added to any payments previously made shall total the same percentage of the Lump Sum Amount as the work completed at the time of termination is to the total work required for the PROJECT. In addition, the CONSULTANT shall be paid for any authorized extra work completed. Cost Plus Fixed Fee Contracts A final payment shall be made to the CONSULTANT which when added to any payments previously made, shall total the actual costs plus the same percentage of the fixed fee as the work completed at the time of termination is to the total work required for the Project. In addition, the CONSULTANT shall be paid for any authorized extra work completed. Specific Rates of Pay Contracts A final payment shall be made to the CONSULTANT for actual hours charged at the time of termination of this AGREEMENT plus any direct nonsalary costs incurred at the time of termination of this AGREEMENT. Cost Per Unit of Work Contracts A final payment shall be made to the CONSULTANT for actual units of work completed at the time of termination of this AGREEMENT. DOT Form 140 -089 EF Exhibit! Revised 6/05 39 Exhibit J Alleged Consultant Design Error Procedures The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage due to the alleged error by the consultant. Step 1 — Potential Consultant Design Error(s) is Identified by Agency's Project Manager At the first indication of potential consultant design error(s), the first step in the process is for the Agency's project manager to notify the Director of Public Works or Agency Engineer regarding the potential design error(s). For federally funded projects, the Region Highways and Local Programs Engineer should be informed and involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an agency staff person other than the project manager, who has not been as directly involved in the project, to be responsible for the remaining steps in these procedures.) Step 2 - Project Manager Documents the Alleged Consultant Design Error(s) After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the Director of Public Works or Agency Engineer's concurrence, the project manager obtains more detailed documentation than is normally required on the project. Examples include: all decisions and descriptions of work; photographs, records of labor, materials and equipment. Step 3 — Contact the Consultant Regarding the Alleged Design Error(s) If it is determined that there is a need to proceed further, the next step in the process is for the project manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged error(s). The project manager and other appropriate agency staff should represent the agency and the consultant should be represented by their project manger and any personnel (including sub - consultants) deemed appropriate for the alleged design error(s) issue. Step 4 — Attempt to Resolve Alleged Design Error with Consultant After the meeting(s) with the consultant have been completed regarding the consultant's alleged design error(s), there are three possible scenarios: • It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, then the process will not proceed beyond this point. It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case, then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement with the consultant. The settlement would be paid to the agency or the amount would be reduced from the consultant's agreement with the agency for the services on the project in which the design error took place. The agency is to provide H &LP, through the Region DOT Form 140 -089 EF Exhibit J Revised 6/05 40 Local Programs Engineer, a summary of the settlement for review and to make adjustments, if any, as to how the settlement affects federal reimbursements. No further action is required. There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5. Step 5 — Forward Documents to Highways and Local Programs For federally funded projects all available information, including costs, should be forwarded through the Region Highways and Local Programs Engineer to H &LP for their review and consultation with the FHWA. H &LP will meet with representatives of the agency and the consultant to review the alleged design error(s), and attempt to find a resolution to the issue. If necessary, H &LP will request assistance from the Attorney General's Office for legal interpretation. H &LP will also identify how the alleged error(s) affects eligibility of project costs for federal reimbursement. If mutual agreement is reached, the agency and consultant adjust the scope of work and costs to reflect the agreed upon resolution. H &LP, in consultation with FHWA, will identify the amount of federal participation in the agreed upon resolution of the issue. If mutual agreement is not reached, the agency and consultant may seek settlement by arbitration or by litigation. 41 Exhibit K Consultant Claim Procedures The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following procedures should only be utilized on consultant claims greater than $1,000. If the consultant's claim(s) are a total of $1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant's claim(s) that total $1,000 or less. This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential claim by the consultant. Step 1 — Consultant Files a Claim with the Agency Project Manager If the consultant determines that they were requested to perform additional services that were outside of the agreement's scope of work, they may be entitled to a claim. The first step that must be completed is the request for consideration of the claim to the Agency's project manager. The consultant's claim must outline the following: • Summation of hours by classification for each firm that is included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Timeframe of the additional work that was outside of the project scope; • Summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; and • Explanation as to why the consultant believes the additional work was outside of the agreement scope of work. Step 2 — Review by Agency Personnel Regarding the Consultant's Claim for Additional Compensation After the consultant has completed step 1, the next step in the process is to forward the request to the Agency's project manager. The project manager will review the consultant's claim and will met with the Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the FHWA is participating in the project's funding, forward a copy of the consultant's claim and the Agency's recommendation for federal participation in the claim to the WSDOT Highways and Local Programs through the Region Local Programs Engineer. If the claim is not eligible for federal participation, payment will need to be from agency funds. If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Highways and Local Programs (if applicable), and FHWA (if applicable) agree with the consultant's claim, send a request memo, including backup documentation to the consultant to either supplement the agreement, or create a new agreement for the claim. After the request has been approved, the Agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. No further action in needed regarding the claim procedures. DOT Form 140 -089 EF Exhibit K Revised 6/05 42 If the Agency does not agree with the consultant's claim, proceed to step 3 of the procedures. Step 3 — Preparation of Support Documentation Regarding Consultant's Claim(s) If the Agency does not agree with the consultant's claim, the project manager shall prepare a summary for the Director of Public Works or Agency Engineer that included the following: • Copy of information supplied by the consultant regarding the claim; Agency's summation of hours by classification for each firm that should be included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; Explanation regarding those areas in which the Agency does /does not agree with the consultant's claim(s); • Explanation to describe what has been instituted to preclude future consultant claim(s); and • Recommendations to resolve the claim. Step 4 — Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency Documentation The Director of Pubic Works or Agency Engineer shall review and administratively approve or disapprove the claim, or portions thereof, which may include getting Agency Council or Commission approval (as appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain concurrence from WSDOT Highways and Local Programs and FHWA regarding final settlement of the claim. If the claim is not eligible for federal participation, payment will need to be from agency funds. Step 5 — Informing Consultant of Decision Regarding the Claim The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final decision regarding the consultant's claim(s). Include the final dollar amount of the accepted claim (s) and rationale utilized for the decision. Step 6 — Preparation of Supplement or New Agreement for the Consultant's Claim(s) The agency shall write the supplement and /or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. 43 Exhibit M -1(a) Certification Of Consultant Project No. Local Agency I hereby certify that I am ,co`�� and duly authorized representative of the firm of AECOM Technical Services, Inc. whose address is 710 Second Avenue, Suite 1000, Seattle, WA 98104 and that neither I nor the above firm I here represent has: (a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT) to solicit or secure the AGREEMENT; (b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out this AGREEMENT; or Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any); (c) I acknowledge that this certificate is to be available to the Washington State Department of Transportation and the Federal Highway Administration, U.S. Department of Transportation in connection with this AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. /9/3 Date DOT Form 140 -089 EF Exhibit M -1(a) Revised 6/05 44 Exhibit M -1(b) Certification Of Agency Official I hereby certify that I am the AGENCY Official of the Local Agency of City of Tukwila Washington, and that the consulting firm or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this AGREEMENT to: (a) Employ or retain, or agree to employ to retain, any firm or person; or (b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution, donation, or consideration of any kind; except as hereby expressly stated (if any): I acknowledge that this certificate is to be available to the Washington State Department of Transportation and the Federal Highway Administration, U.S. Department of Transportation, in connection with this AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. Date DOT Form 140 -089 EF Exhibit M -1(b) Revised 6/05 Signature 45 Exhibit M -2 Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions I. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency; B. Have not within a three -year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission or fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state, or local) transaction or contract under a public transaction; violation of federal or state antitrust statues or commission of embezzlement. theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state, or local) with commission of any of the offenses enumerated in paragraph (I) (B). of this certification; and Have not within a three (3) year period preceding this application/proposal had one or more public transactions (federal, state, or local) terminated for cause or default. H. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. Consultant (Firm): AECOM Technical Services, Inc. (Date) (Signatur President or Authorized Official of Consultant DOT Form 140 -089 EF Exhibit M -2 Revised 6/05 46 Exhibit M -2 Attachment Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions AECOM Technical Services, Inc. (ATS) performs thousands of contracts each year. From time to time, occasions arise when ATS does not complete the performance of an awarded contract resulting in its termination. These situations include (i) where a client is unsuccessful in securing funding for a particular project that is then terminated, (ii) where a client terminates a contract for convenience, (iii) where ATS ceases performance for nonpayment or other breach of contract in accordance with contract terms, or (iv) for default. Within the past three (3) years, ATS (i) has not failed to complete a contract where the other party to such contract was not in breach unless the contract afforded ATS that right, and (ii) ATS has not had a contract terminated by a client wherein that termination was ultimately determined to be other than for convenience with the exception of the following instance: a) In November of 2012, AECOM received a notice from the City of Sarasota, Florida, notifying AECOM that it has terminated its contract with AECOM for the design of a sewer lift station for default. AECOM disagrees with the termination and will look to contest it. Meanwhile, AECOM is working with the City to resolve any issues in an amicable manner. 47 Exhibit M -3 Certification Regarding The Restrictions of The use of Federal Funds for Lobbying The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: 1.No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. 2.1f any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Fonn -LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly. Consultant (Firm): AECOM Technical Services, Inc. ( ate) DOT Form 140 -089 EF Exhibit M -3 Revised 6/05 (Signature resident or Authorized Official of Consultant 48 Exhibit M -4 Certificate of Current Cost or Pricing Data This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 15.401 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403 -4) submitted, either actually or by specific identification in writing, to the contracting officer or to the contracting officer's representative in support of Tukwila Urban Center Transit Center Project are accurate, complete, and current as of November 18, 2013 * *. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the offeror and the Government that are part of the proposal. Firm AECOM Technical Services, Inc. Name Ci,geni 4,5 es4tp -- -tom/ 7;;45 //4rgy 4'1 Date of Execution*** / / * Identify the proposal, quotation, request for price adjustment, or other submission involved, giving the appropriate identifying number (e.g., RFP No.). Insert the day, month, and year when price negotiations were concluded and price agreement was reached. ** * ** Insert the day, month, and year of signing, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to. DOT Form 140 -089 EF Exhibit M -4 Revised 6/05 49 SUPPLEMENTAL AGREEMENT NUMBER 21 TO CONSULTANT AGREEMENT NUMBER 06 -019 THIS SUPPLEMENTAL AGREEMENT is entered into between the City of Tukwila, Washington, herein -after referred to as the City ", and MI Group, hereinafter referred to as "the Consultant ", in consideration of the mutual benefits, terms, and conditions hereinafter specified. The City desires to supplement the agreement entered into with the Consultant and executed on, February 23, 2006 and identified as Agreement No. 06 -019. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1. Scope of Services, is hereby changed to include work described in Attachment B for On- Call Construction Support services on the Tukwila Transit Center, Andover Park West Street and Water Improvement project. 2. Payment, shall be amended as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "C" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $80,000 without express written modification of the Agreement signed by the City. The maximum amount payable under this agreement as supplemented inclusive of all fees and other costs is now $1,790,922. 3. Time for Performance, shall be amended as follows: The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 31, 2014, unless an extension of such time is granted in writing by the City. DATED this day of , 20 CITY OF TUKWILA CONSULTANT Jim Haggerton, Mayor By: Printed Name: cku L ce u (1 e Tide: 1 "e-C-4-0 t/ 11 / 17 2.015 50 IBI GROUP ATTACHMENT B Scope of Work Agreement No 06 -019; City Project No 90610402, 98810404, 99840105 Tukwila Transit Center; Andover Park West & Water Improvement Project On -Call Construction Support Services Prepared for City of Tukwila by IBI Group November 18, 2013 51 IBI GROUP SCOPE OF WORK TUKWILA TRANSIT CENTER; ANDOVER PARK WEST & WATER IMPROVEMENT PROJECT ON -CALL CONSTRUCTION SUPPORT SERVICES Prepared for City of Tukwila Document Control Page CLIENT: City of Tukwila PROJECT NAME: REPORT TITLE: Tukwila Transit Center; Andover Park West & Water Improvement Project On-CaII Construction Support Services IBI REFERENCE: 24735 VERSION: DIGITAL MASTER: [File Location] ORIGINATOR: Erin King REVIEWER: Lee Ann Mangin AUTHORIZATION: Paul Lavallee CIRCULATION LIST: HISTORY: Final to Client November 18, 2013 52 IBI GROUP SCOPE OF WORK TUKWILA TRANSIT CENTER; ANDOVER PARK WEST & WATER IMPROVEMENT PROJECT ON -CALL CONSTRUCTION SUPPORT SERVICES Prepared for City of Tukwila Table of Contents Introduction 1 Task 16: Construction Administration Support Services 1 Assumptions 1 Work Activities 1 November 18, 2013 53 IBI GROUP SCOPE OF WORK TUKWILA TRANSIT CENTER; ANDOVER PARK WEST & WATER IMPROVEMENT PROJECT ON -CALL CONSTRUCTION SUPPORT SERVICES Prepared for City of Tukwila Introduction This scope of work includes services to provide on -call construction phase support services on design and architectural fronts, defined in the following sections and necessary to accomplish the work by the City. The following scope describes the work to be conducted and assumptions and deliverables to be provided. The term "Consultant" or "Consultant Team" refers to IBI Group and its team of sub - consultants including KPFF, Shannon & Wilson, Nakano Landscape Architects, and Tres West Engineers. "City" refers to the City of Tukwila, the client organization responsible for the project. Task 16: Construction Administration Support Services This supplemental agreement includes services related to On -Call Construction Support services. The Consultant conducts these services at the request of the City to support construction of the project. Support services shall include but not be limited to architectural, urban and landscape design and aesthetic elements of the project as well as environmental hazards, geotechnical review and other specialty expertise by the design team. Special Provisions sections are included in the work activities below for reference to more detailed information about the support services and areas of work to be performed. Assumptions Work under this task shall consist of providing support to the City's Construction Team during the construction phase for the project as described below. We will work under the direction of the City's Construction Project Manager. Work Activities 16.1 Project Management Work under this task includes the following: • Consultant shall submit monthly invoicing and progress reports • Consultant shall execute all sub - consultant supplemental agreements • Consultant shall coordinate and manage all sub - consultant work, including ad hoc meetings as necessary to resolve RFIs (Requests for Information) • Consultant shall communicate proactively with the City including calls and ad hoc coordination meetings as necessary • Consultant shall conduct all necessary quality management activities such as checking and coordinating all design reviews and review of all submittals to the City 16.2 Submittal Review The following design elements identified within the Special Provisions for this project require specialized review and approval: November 18, 2013 54 IBI GROUP SCOPE OF WORK TUKWILA TRANSIT CENTER; ANDOVER PARK WEST & WATER IMPROVEMENT PROJECT ON -CALL CONSTRUCTION SUPPORT SERVICES Prepared for City of Tukwila • Shop drawings of architectural and landscape architectural elements related to custom transit shelter, transit center planters, and transit plaza areas (see Sections 8 -26, 8 -27, 8 -30 through 8 -53) • Submittals for all attachments to the transit shelters including but not limited to electrical and communication access points, CCTV cameras, light fixtures. • Samples for architectural and landscape architecture elements related to custom transit shelters (see Sections 8 -26, and 8 -30 through 8 -53) • Selection of stone features for the transit plaza areas (see Section 8 -27) • Mockups of architectural elements related to custom transit shelter, transit center planters, and transit center features (see Sections 8 -26, 8 -27, 8 -30 through 8 -53) Additional civil, electrical and structural submittals as requested by City's Construction Project Manager 16.3 Pre - installation Conferences The following products are identified within the Special Provisions for this project as requiring pre - installation /pre- construction conferences with the City and Contractor(s): • Architectural elements related to customer transit shelter, transit center planters, and transit center features (see Sections 8 -30, 8 -32, 8 -33, 8 -35, 8 -50, 8 -51, and 8- 53) Work under this task may include the following: • Attendance at pre - installation conferences with installers, manufacturers or fabricators as required for the particular activity to review progress or other construction activities, preparations and coordination requirements • Coordination with City on scheduling of pre - installation conferences, review of Contractor's proposed attendees, agenda, and participation in the meeting 16.4 General Construction Support Services Work under this task shall include performing construction support for the architectural, urban and landscape design, and other engineering support services as requested during construction. Specific items of work may include the following: • Responding to Contractor's requests for Information • Provide design review and recommendations on proposed Contractor change orders, substitutions or other construction changes • Provide design support and recommendations for Field Directives to the City Construction Team • Review tests results to confirm compliance with requirements specified when requested by the City to assist with solutions to problems. • Review shop and site mockups to demonstrate aesthetic effects, verify material selections from Sample submittals, to review installation coordination and to confirm compliance with specified installation requirements • Support the City in preparation for Disputes Review Board meetings as needed. • Support the City in schedule review and updates, as needed. • Support the City in public outreach, as needed. November 18, 2013 55 IBI GROUP SCOPE OF WORK TUKWILA TRANSIT CENTER; ANDOVER PARK WEST & WATER IMPROVEMENT PROJECT ON -CALL CONSTRUCTION SUPPORT SERVICES Prepared for City of Tukwila 16.5 Construction Meetings The Consultant will attend various Project related meetings for this task. Work under this task may include the following: • Attend the Pre - construction Conference • Attend coordination and progress meetings with the Contractor, City staff, project stakeholders or utility providers, when requested by the City • Attend construction meetings and field reviews when requested by the City 16.6 Deliverables Items provided by the Consultant may include: Documentation from site meetings, changes, RFI responses and field directives • Sketches and drawings to support change requests November 18, 2013 56 EXHIBIT C Fee The Consultant shall provide on -call services on a Time and Materials basis for the not -to- exceed amount of $80,000. The Consultant shall invoice the on -call construction support services for each of the City's project numbers to comply with the funding sources of the project. November 18, 2013 57 58 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director/ -. BY: Cyndy Knighton, Senior Program Manager DATE: November 22, 2013 SUBJECT: Tukwila Urban Center Pedestrian /Bicycle Bridge Project No. 90510403, Contract No. 07 -123 with KPFF Supplement No. 10 ISSUE Approve Supplement No. 10 with KPFF for the TUC Pedestrian /Bicycle Bridge design in the amount of $221,419.54. BACKGROUND Since 2005, KPFF has been under contract with the City to design the Pedestrian /Bicycle Bridge over the Green River. A Type, Size, and Location (TS &L) report was approved by Council in 2011 with the direction to design a Twin Tied Arch bridge with no accommodation for a future bridge crossing over West Valley Highway. Since then, the design has proceeded through the 30% level. Staff continued efforts to obtain grant funds to build the project and earlier this year an award from the WSDOT Regional Mobility Office was made in the amount of $6.87M over two state biennial budget cycles. These funds were originally identified to complete right of way acquisition and construction but a change at the Regional Mobility office allows these funds to be spent on any phase of the project. DISCUSSION As the design has progressed and consultation with outside permitting agencies has commenced, additional work beyond the original scope of work has been identified that must be completed in order to obtain all required environmental approvals and non -city permits. For example: Department of Fish and Wildlife has requested the City consider redesigning portions of the east bridge landing to preserve two large Douglas firs; the U.S. Coast Guard maintains some jurisdiction over the Green River and maintains permit approval, necessitating additional work; and the King County Flood Control District (KCFCD) and Federal Emergency Management Agency (FEMA) require additional study to document the project does not negatively impact river hydraulics. This additional work (task 5 and 6) adds approximately $44K to the fee. The original scope of work did not include a right -of -way acquisition phase. With the WSDOT Regional Mobility grant award, this project has funding to proceed with acquiring the necessary property. This supplemental agreement adds the negotiation and acquisitions as a separate task. Should the City end up in contracted negotiations or need to pursue acquisition through eminent domain, additional scope and fee may be required. Discussions with one affected property owner, the Riverview Plaza office site, have been challenging. Staff originally requested right of entry to conduct surveying in mid -2012. At this time, the owner has not granted the City the right to enter onto the property and is concerned with the impacts. This scope of work includes additional design efforts to study more bridge landing and trail w: \pw eng \projects \a - rw & rs projects \tuc ped bicycle bridge (90510403) \info memo supp #10 final design kpff 11- 25- 13.docx 59 INFORMATIONAL MEMO Page 2 connection options on and around the property. The fee associated with these two related tasks (task 3 and 8) is about $131K. Lastly, a small amount of additional work, administration for the new work and extended contract time is required to supplement the original scope of work and fee in the amount of about $47K. A small amount of additional survey work is required (task 2) to support the design and additional civil design (task 4) is required for necessary wall design and coordination with utilities and WSDOT. The additional scope and fee will complete the design, environmental permitting and right -of -way acquisition (unless protracted negotiations or eminent domain proceedings are ultimately required) for the TUC Pedestrian /Bicycle Bridge project. FINANCIAL IMPACT The $130,845 associated with the ROW acquisition is budgeted in 2014 in the draft CIP sheet (attached). The remainder of the additional fee is not budgeted in the design phase but funds from the ROW phase in the amount of $90,574 can be reallocated to the design phase. The WSDOT Regional Mobility Grant reimbursable amount is $147,613.03, with a required 33% match of $73,806.51. RECOMMENDATION Council is being asked to approve Supplement No. 10 to Contract No. 07 -123 with KPFF in the amount of $221,419.54 and consider this item at the December 9, 2013 Committee of the Whole Meeting and subsequent Special Meeting that same night. Attachments: Contract 07 -123 Supplemental Agreement No. 10 Draft CIP Sheet W:1PW EngIPROJECTSIA- RW & RS Projects\TUC Ped Bicycle Bridge (90510403)IINFO MEMO Supp #10 Final Design KPFF 11- 25- 13.docx 60 ,== Washington Slate -/r itaparimont Twassportalicsi Supplemental Agreement pp g Number 10 Organization and Address KPFF Consulting Engineers 1601 Fifth Ave, Suite 1600 Seattle, WA 98101 Phone: Original Agreement Number 07 -123 (k) Project Number 05 -RWO3 Execution Date Completion Date 12/31/2014 Project Title Tukwila Urban Center, Ped/Bicycle Bridge PSE New Maximum Amount Payable $ 1,833,856.32 Description of Work Modification of existing contract for incorporation of additional tasks, as identified in the Exhibit A -1 Scope of Work. The Local Agency of the City of Tukwila desires to supplement the agreement entered into with KPFF Consulting Engineers and executed on and identified as Agreement No. 07 -123 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See Exhibit A -1, Scope of Work_ 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Contract completion date is extended to December 31 7014 111 Section V, PAYMENT, shall be amended as follows: This supplement increases the contract value by S771 419 39 increasing the previously authorized Maximum Amount Payable of S1 617 436 93 to S1 833 856 17 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: David K McMullen, PR By: City of Tukwila DOT Form 140 -063 EF Revised 9/2005 Consultant Signature Approving Authority Signature Date 61 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 1 Exhibit A -1 Scope of Work Tukwila Urban Center, Pedestrian /Bicycle Bridge Supplement No. 11 - Additional Hydraulic, Surveying, Permitting, and Right of Way Acquisition Services PROJECT DESCRIPTION KPFF is currently under contract with the City of Tukwila (City) for the Plans, Specifications and Cost Estimate (PSE) Phase of the Tukwila Urban Center Pedestrian and Bicycle Bridge project. This supplement provides additional services related to: • Incorporation of Trail Alignment Alternatives and Parking Lot (re)Configuration, including associated Surveying and Utility Locating • United States Coast Guard (USCG) Permitting Requirements outside the initial scope • Hydraulic Analysis of the Green River, and associated Surveying • Permitting Assistance associated with Design and Construction of an undercrossing of the Union Pacific Railroad (UPRR) at the Tukwila Commuter Rail Station • Right of Way Acquisition, and associated Surveying • Management and Coordination associated with incorporation of the above listed modifications into the project. PROJECT OBJECTIVES The overall objectives of this supplement include: • Obtain technical data necessary for completion of the PSE Phase • Acquire right of way necessary for project construction • Obtain USCG bridge permits, and • Obtain UPRR permits for and undercrossing at the Tukwila Commuter Rail Station. During and /or at the conclusion of the PSE Phase, the City can exercise the option to supplement KPFF's contract to include design documents for the undercrossing at the Tukwila Commuter Rail Station or for support during the Construction Management Phase. 62 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 2 PROJECT TEAM This supplement includes effort by the following project design team members: Prime Consultant Structural Engineering Civil Engineering Surveying Environmental and Permitting Services River Hydraulics Right of Way Acquisition KPFF Consulting Engineers KPFF Consulting Engineers KPFF Consulting Engineers KPG Inc. Landau Associates Watershed Science 85 Engineering Universal Field Services 63 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 3 SCOPE OF WORK The following is a scope of work for additional hydraulic, surveying, permitting, and right of way acquisition services in support of this project's PSE Phase. In addition to the basic services scoped in this document, the Consultant has included additional services that can be performed at the City's request. TASK NO. 1.0 - PROJECT MANAGEMENT AND ADMINISTRATION Task No. 1.10 - Monthly Invoices and Coordination PSE design team members prepare monthly invoices for work completed, which are then compiled by KPFF into a single invoice for the City. This task incorporates efforts for including Universal Field Services and Watershed Science 85 Engineering in this process. This task also includes incorporation of changes made in this supplement to the design team invoices. Because the City has a separate funding source for Right of Way services, charges associated with this task will be identified separately on invoices. KPFF does not anticipate providing a separate invoice for Right of Way services. Task No. 1.20 - Design Team Supplemental Agreement Preparation KPFF shall prepare contracts for Universal Field Services and Watershed Science 85 Engineering, and supplemental contracts for KPG, Inc. and Landau Associates. Task No. 1.30 - Project Schedule Updates The PSE Phase project design schedule shall be revised to incorporate the modifications made by this supplement. The schedule shall continue to be updated on an as needed basis. Task No. 1.40 - Design Team Meetings and Coordination The consultant team anticipates needing an additional six (6) internal meetings to coordinate modified project tasks and incorporate scope changes into the project design. Additionally, KPFF will perform general coordination and be the main point of contact for the multidiscipline team. KPFF will collect and disseminate information for the team. Task No. 1.50 - Project Team Meetings with City An additional two (2) meetings with the City will be required to coordinate tasks associated with this scope of work. 64 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 4 Deliverables: • Monthly progress reports and invoices • As- needed Project Schedule Updates • Team meetings o Participation in internal consultant team meetings (assume 6 meetings) o Participation in project meetings with the City (assume 2 meetings) 65 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 5 TASK No. 2.0 - TOPOGRAPHIC AND BOUNDARY SURVEY The following is a scope of work for additional survey items needed as design proceeds on this project. KPG has included time and expense for project meetings, management of surveying and drafting efforts, professional review and quality control in our proposal. Task No. 2.10 - Additional Survey and Mapping Subtask No. 2.11 - Locate Catch Basins Locate catch basins in west side of West Valley Highway. Subtask No. 2.12 - Extend Survey of Green River Trail The survey of the Green River Trail shall be extended northerly approximately 100 -feet to the limit of proposed improvements. 66 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 6 TASK No. 3.0 - ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN Task No. 3.10 - Survey at Riverview Plaza Parking Lot KPG shall provide the field survey and mapping to augment the Riverview Plaza parking lot, including studies and alignments of alternative routes. Subtask No. 3.11 - Utility Locating A separate cost for private utility locating services has been included, which assumes 24 hours of underground utility sensing and locating. Task No. 3.20 - Walkway Section/ Parking Lot Trail Alignment Studies KPG shall provide alternative layouts and improvements to the Riverview Plaza property, including parking lot reconfiguration. This work will include additional design studies for proposed improvements, meetings with property owners of Riverview Plaza, and coordination with the property owner's consultants. KPFF civil will review alignment alternatives and parking configuration / reconfiguration, and attend coordination meetings with property owners and City staff. Deliverables • Trail Alignment Alternatives and Selected Alternative Plan (including conceptual parking lot reconfigurations.) KPFF civil shall provide cost estimates for two (2) alternative alignments, compare the estimated costs to the current alignment, and identify changes to project cost as a result of alignment revisions. Task No. 3.30 - 30% Plans KPFF civil will progress selected alternative alignment to 30% design. Anticipated work includes preparation of new plan sheets for horizontal alignment, vertical alignment, site preparation, utility relocation, storm drainage, pavement markings and signing, and paving plans. Task No. 3.40 Update Storm Drainage Report Storm Drainage report will need to be revised to assess impacts due to revised alignment. This may trigger stormwater detention requirements, and will also change basin delineation. Task No. 3.50 - Update Cost Estimate Cost estimate will be revised to integrate quantities for preferred alignment. 67 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 7 TASK No. 4.0 - CIVIL ENGINEERING Task No. 4.10 - Grading and Paving KPFF shall develop preliminary wall profile for grading of sidewalk facilities for Christensen Road, adjacent to Riverview Plaza, to accommodate grading. Work will include assessment of retaining wall type, and then development of PS&E for selected retaining wall. KPFF shall develop preliminary wall profiles for miscellaneous walls along the pedestrian facility west of the west bridge landing to accommodate grading. Wall type is anticipated to match selected wall type chosen for the Christensen Road section. Task No. 4.20 - Utilities KPFF shall coordinate with SPU to show the Cedar River Pipeline No. 4 on the basemap. Facilities will be located based on existing structures. Limits of concrete encasement will be shown. Encasement for wet end located by centerline of original alignment of West Valley Highway will be located by offsets from west end, since West Valley Highway alignment has been redefined. Records research will be done with WSDOT for SR181 (West Valley Highway) to define any improvements done to protect record gaps between protection for river crossing and protection for SR181. 68 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 8 TASK No. 5.0 - ENVIRONMENTAL AND PERMITTING SERVICES Landau Associates will provide supplemental environmental and permitting services for this project. The scope of services is based on discussions with and information provided by the U.S. Coast Guard (USCG) regarding bridge permitting requirements, a City of Tukwila (City) Shoreline Planner and a Washington State Department of Fish and Wildlife (WDFW) Area Habitat Biologist regarding impacts to trees adjacent to the Green River, and 30 percent plan review documentation referencing an illumination study associated with proposed bridge lighting. Project Background The City plans to construct a pedestrian /bicycle pathway between the intersection of Baker Boulevard and Christensen Road on the west side of the Green River to the west shoulder of West Valley Highway. During our initial site review to support project scoping in 2011, it was determined that the Green River was not a Section 10 Rivers and Harbors Act navigable waterway subject to U.S. Army Corps of Engineers (USACE) regulatory oversight. After further research and initial agency coordination during contract review, however, it was determined that the Green River is considered a navigable waterway subject to USCG bridge permit (General Bridge Act). The initial effort for addressing the USCG bridge permit application anticipated that the application would be made with the JARPA based on review of the Governor's Office of Regulatory Assistance (ORA) website in 2011, which would be a typical and cost - effective approach, particularly since preparation of the JARPA is included in the design teams approved scope of work. Based on recent discussion with the USCG, a project- specific decision is being made to require a Navigation Survey as part of the permitting process. The Navigation Survey is identified as a recommended, but not required, element of the bridge permit application in the USCG Bridge Permit Application Guide. The purpose of the Navigation Survey is to identify the type and clearance requirements for watercraft that utilize the waterway in the project area. In addition, the USCG has indicated that the application should include a cover letter formatted to the USCG Bridge Permit Application Guide, which is presented similar to a checklist form. In addition, pre- application coordination with a WDFW Area Habitat Biologist and a City Shoreline planner has identified the need to assess impact to riparian vegetation on the 16113 West Valley Highway property as a result of the proposed project. The City shoreline code specifically references retention of non - invasive trees, particularly those that provide shading to the river. A project survey has been completed to identify tree location and diameter, however tree height and crown spread needed to determine extent of shading has not been determined. Furthermore, the project survey provides identification of trees as either conifer or deciduous, but does not appear to indicate species needed as part of determination of invasive species. Landau Associates understands support is needed in determining characteristic of trees in the vicinity of the proposed project. 69 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 9 Bridge lighting concepts are indicated as being under consideration in the 30 percent design review submittal, and the submittal acknowledges further study is needed to determine how proposed lighting would impact the river and surrounding properties. The results of such a study will be required to be incorporated into SEPA and shoreline permitting. Determination of lighting impacts is not included in Landau Associates existing contract, and it is understood that support in completing the study will be required. Task No. 5.10 - USCG Navigation Survey and Bridge Permit Application The purpose of this task is to conduct the required Navigation Survey and prepare the General Bridge permit application materials to USCG standards. To conduct the Navigation Survey, Landau Associates will contact local waterway users /managers to determine the type and characteristic of watercraft common to the stretch of the Green River affected by the proposed project. Contact with local waterway user groups /managers will include: • City officials • City Chamber of Commerce • WDFW • USACE • Port of Seattle and select number of tenants. Landau Associates will document findings into a memorandum format that will include a summary of methods and results. Landau will also prepare the application cover letter formatted to the USCG Bridge Permit Application Guide. Landau will prepare draft documentation for review and comment by KPFF and the City, and then final documentation. Assumptions: • No team meetings or onsite meetings with waterway user groups are included in this scope of services. • Contact with no more than three Port tenants will be required as part of the Navigation Survey. • Waterway user group survey will be limited to email /phone correspondence. • Vessel traffic from the Port does not pass downstream of the Duwamish River Turning Basin (i.e., approximate River Mile 6). Deliverables: • An electronic (MS Word) copy of the draft Navigation Survey memorandum and application cover letter. • An electronic (Adobe PDF) and one paper copy of the final Navigation Survey and application cover letter. 70 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 10 Task No. 5.20 - Tree Assessment Landau Associates will conduct a tree assessment on the 16113 West Valley Highway property within 50 feet of the proposed bridge alignment and bridge landing. For the assessment, Landau Associates will identify the species, approximate height and crown spread, and general age class and health of trees identified on project survey. Landau will also conduct an assessment of the approximate extent of shade provided by identified trees. The shade assessment will be based on analysis of the height and crown spread of trees and altitude of the sun at 8:00 a.m., 10:00 a.m., and noon, on the Winter Solstice (i.e., altitudes with potential to provide the maximum extent of shade over the Green River). The extent of shade for each identified tree will be modeled using AutoCAD software. Landau will amend the project survey to identify tree species, required tree protection zone, approximate extent of shading provided by identified trees. Methods and results of the tree assessment will be summarized in shoreline permitting documentation included in Landau Associates' existing contract. Assumptions: • Determination of age class will be made following shoreline permitting requirements (i.e. young, mature, over mature). • Tree assessment field effort will require a single site visit by two Landau Associates staff members and will take no more than 8 hours to complete. • The City will arrange for any necessary right of entry to complete the tree assessment. • Landau Associates will be provided with AutoCAD survey files, including LandXML files. Deliverables: • Draft and final tree assessment documentation to be incorporated into shoreline permitting documentation included under existing contract. Task No. 5.21 - Biological Assessment KPFF civil engineers shall establish revised bridge alignments to accommodate WDFW request to save two large Douglas -Fir trees located along the east bank of the Green River. Two alignments will be created, one to clear only the tree located furthest to the south, and another to clear both large trees. 71 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 11 Task No. 5.30 - Lighting Study Support Landau Associates will provide support to KPFF in developing the lighting study associated with proposed bridge illumination. Because lighting concepts are under development, the needs for completing the lighting study are yet to be determined. As a result, Landau Associates is including a level of effort to include no more than 2 hours of Associate, 16 hours of Senior, and 8 hours of Senior CAD support as a placeholder budget for this to -be- determined scope. As requirements of the lighting study are developed, Landau Associates will communicate the anticipated level of effort associated with delegated tasks and will identify any need for budget modification when the scope is better defined. Deliverables: • To be determined 72 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 12 TASK No. 6.0 - HYDRAULICS Watershed Science 85 Engineering (WSE) shall provide hydraulic support to the bridge design as necessary, and shall perform a no -rise evaluation. Specific tasks proposed for this investigation are described below. Task No. 6.10 - Site Inspection and Meeting WSE will visit the site of the proposed bridge. It is assumed access will be available along the east bank of the river, at the present homestead on West Valley Highway (WVH) and where the east abutment and connection to WVH will be located. Budget is also included for one meeting with KPFF staff and /or City personnel as needed. KPFF civil engineers shall Meet with City Shoreline Permit representative and discuss city requirements for establishment of survey needs, river cross sections and 100 -year flood plain delineations necessary for permit review. Task No. 6.20 - Review Existing Data WSE will obtain the latest King County 100 -year HEC -RAS hydraulic model of the Green River, and become familiar with the model layout and assumptions in the reach of the proposed bridge. WSE will also obtain the latest project plan set from KPFF and any other data necessary to adequately represent the layout and elevations of the bridge alternative(s). Any basemap or topographic data acquired or collected by KPFF will also be provided to WSE. Task No. 6.30 - Update Baseline Hydraulic Model Available topographic data will be used, either from County LiDAR or KPFF surveys, to update the hydraulic model at the site of the proposed bridge. Additional cross - section(s) will be added to the model to establish reliable hydraulic results at this location. Channel bathymetry from upstream and downstream cross - sections will be interpolated and adjusted to establish reasonable bed data for the river channel. Roughness values at the new cross - sections(s) will be selected based upon the site visit and such that the established upstream profile in the existing King County modeling is not changed significantly. Task No. 6.40 - Simulate Bridge Alternatives Budget is allowed for simulating and evaluating two distinct alternatives for the proposed bridge design, under 100 -year flood conditions. These can either be evaluated simultaneously as part of an alternatives selection process, or as a single preferred alternative followed if necessary by a revised design should the original simulation result in unacceptable rise or impact. 73 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 13 Task No. 6.50 - Evaluate Impacts WSE will process the results of the model runs, including determining the design water surface profile and the with - project profiles under each bridge alternative. WSE will consult with and present the results of the model runs to KPFF. As budget allows, slight refinements to each bridge alternative will be tested with the model, as needed to establish no -rise. Task No. 6.60 - Summary Memorandum A brief technical memorandum or letter will be drafted to summarize the hydraulic analysis and the modeling results. Assuming the results demonstrate no -rise, this will also be reported in a format as needed by the City of Tukwila. Upon KPFF review and comment on the draft memo, a final document will be prepared and submitted. Task No. 6.70 - Survey for Hydraulics KPG shall provide the following survey tasks related to river hydraulics: Subtask No. 6.71 - River Cross Sections Mapping shall be provided at the proposed river crossing location. This information will be provided to the hydraulics consultant for incorporation into the hydraulic model, and to generate cross sections. One (1) day of 3- man field crew is allocated for this task. KPG will survey 2 sections for the bridge, one south and one north of the proposed crossing. The northerly cross section will be near the storm drain outfall at the north end of the Nelson Parcel. Shots for an additional cross section or along the toe of the bank can be obtained if time permits. Subtask No. 6.72 - Convert 85 Add FEMA 100 Year Flood Line to Base Map Placement of the 100 year flood plain shall be established as defined by FEMA mapping in the base map correlated to the project datum. No field work is anticipated in this effort. 100 year flood plain will be obtained from current Flood Insurance Rate Maps (FIRM), or other available resource. Task No. 6.80 - Establish 100 -Year Floodplain (KPFF Civil) KPFF civil engineers shall obtain the 100 -year floodplain elevation based on FEMA mapping and cross sectional data on the Green River, and convert data to current survey datum. The FEMA floodplain elevation shall be shown per FEMA river section data on Nelson Parcel. The FEMA floodplain elevation of Riverview Plaza site shall be shown. KPFF shall also work with the City to clarify applicability of FEMA floodplain elevation for the Riverview Plaza site, as FEMA mapping does not show the current levee around the site. 74 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 14 TASK NO. 7.0 - NOT USED TASK No. 8.0 - RIGHT OF WAY ACQUISITION It is assumed federal funds are participating in the project, particularly the Right of Way phase, therefore Universal Field Services, Inc. (UFS) will complete all Right of Way services in accordance with the City of Tukwila (City) and Washington State Department of Transportation's (WSDOT) approved Right of Way Acquisition Procedures, the federal Uniform Relocation Assistance and Real Property Acquisitions Policies Act (URA), WSDOT Local Agency Guidelines - Section 25 (Right of Way Procedures), and the Washington Administrative Code (WAC 468- 100) state Uniform Relocation Assistance and Real Property Acquisition. The project primarily consists of business use properties. Based on schematic drawings and exhibits, and discussions with KPFF, it is assumed up to eight (8) separate tax parcels (includes City of Tukwila) will require various real property rights, as shown in Table A. It is assumed there will be one (1) residential occupant displaced by this project. According to the City, the owner (Nelson) of the residential site recently purchased another residence, possibly because of the pending project. Relocation eligibility and entitlements are subject to discussions with the City and the owner. This scope of work will assume the property owner is displaced by the project. Additional parcels or real property rights other than those shown in Table A will require an amendment to this scope of work and related fee estimate. Right of Way plans are not available for review and use at this time. This scope of work is based on the following: • Discussions with the City's design team KPFF. • Recent tour of the project limits. • Review of limited public on -line information (mapping / ownership information). • Preliminary Schematic Drawing and Exhibits - Right of Way plans not available. Task No. 8.10 - Preparation and Administration Discuss, strategize and plan overall process with the City, KPFF and UFS staff. Attend project kickoff meeting and up to six (6) progress meetings at the City's office. Progress meetings can be facilitated by conference calling if preferred. Provide up to twelve (12) monthly progress reports indicating the work completed for the invoiced month, anticipated work for the following month, and identify issues requiring the City's input or assistance. UFS will provide sample acquisition and relocation documents for the City's review and approval for use. The City's pre- approved forms will be used when provided. When appropriate, prepare parcel files to include fair offer letters, acquisition and ancillary documents, a standard diary form indicating all contacts with owner(s), and other items necessary for negotiations. 75 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 15 Deliverables: • Attend Project Kickoff Meeting - City office • Attend six (6) Progress Meetings • Provide twelve (12) Progress Reports • Coordinate City approval of Acquisition and Relocation forms for project use • Prepare parcel acquisition files for negotiations Task No. 8.20 - Title /Ownership Review Subtask No. 8.21 - UFS Title /Ownership Review Obtain title reports from the City or KPFF and perform reviews of existing right of way and ownership information. (If requested, UFS will order title reports or any updates). Review special exceptions described in each title report to determine the City's acceptance of title at closing. Provide the City with a parcel summary memo listing ownerships, title exceptions, etc. Deliverable: • Prepare parcel summary memo listing ownerships, title exceptions, etc. Subtask No. 8.22 - Review 10 Additional Title Reports, Plot Easements The original scope included 3 title reports comprised of two Riverview Plaza parcels and the Nelson property. Additional title reports for KPG review include: • Four (4) title reports for two additional Riverview Plaza parcels, City trail parcel, and the Seattle Public Utilities right of way. Any plotable easements shall be added to the base map. • Four (4) title reports for parcels at all four corners of the intersection of Baker Boulevard and Andover Park East to verify easement. Review of title reports to verify easements for sidewalks that appear to extend past the right of way. Any plotable easements shall be added to the base map. • Two (2) title reports for parcels at the northwest and southwest corners of the intersection of Baker Boulevard and Christensen Road. Review title reports to verify easements for sidewalks that appear to extend past the right of way. Any plotable easements shall be added to the base map. 76 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 16 Task No. 8.30 - Data Collection and limit Identification Subtask No. 8.31 - Determine Right of Way (KPG) The east right of way line of West Valley Highway and the south boundary of Seattle Public Utilities right of way south of the Nelson parcel will be determined and added to the base map. Subtask No. 8.32 - Right of Way Limits and Easements (KPFF Civil) KPFF civil engineers will identify limits of right of way takes, as well as temporary and permanent easements for the project. Limits will be provided to the survey team, and the right of way acquisition team, for legal description and exhibits for use by the right of way acquisition team. Subtask No. 8.33 - Temporary Right of Entry /Access Permit As part of the feasibility planning and preliminary design phase for the project, the City and the consulting team may require temporary access to gather pertinent information for investigational geotechnical, environmental studies, hydrology, and land survey purposes, etc. It is intended Right of Entry (ROE) Permits will be inclusive of all purposes as stated in this task. It is assumed property owners will not be compensated for the temporary grant of access and all properties will be left in the same condition as was prior to entry. See Table A below for parcels requiring ROE Permits. The City or KPFF will provide exhibits as attachments to each permit depicting the extents of the ROE area. Deliverable: • Obtain one (1) Right of Entry Permit due to common ownership. Subtask No. 8.34 - Legal Description and Exhibits for Acquisition Eight (8) Legal descriptions and exhibits shall be prepared for right -of -way acquisition. • Prepare legal descriptions and graphic exhibits for temporary easements as well as for permanent easements for each of the four Riverview Plaza parcels (8 legal descriptions). • Provide staking or painting of easements for viewing purposes. Deliverables • Updated Survey Project Base Map (two hardcopies, one electronic copy) • Copies of title reports • Acquisition legal descriptions with graphic exhibits 77 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 17 Task No. 8.40 - Public Outreach Assist City in preparation of a boilerplate "Introduction Informational Letter" for delivery to all impacted property owners. The letter will describe the purpose of the project, the project schedule, identify the City's consultants (Engineering, Land Survey, Right of Way Acquisition /Appraisal) and the purpose of each. Deliverable: • Boilerplate "Introduction Letter" for delivery by City to all impacted property owners via regular U.S. Mail. UFS will assist with delivery if needed. Task No. 8.50 - Project Funding Estimate UFS will sub - contract and manage completion of the Project Funding Estimate (PFE) with our WSDOT approved project appraiser. Generally, the PFE is a tool to be used for confirming estimated Right of Way costs and primarily for consideration of utilizing the Appraisal Waiver process when the estimated amount of just compensation to property owners is at or below the City's WSDOT approved Appraisal Waiver limit and when the acquisition is uncomplicated. The PFE will be prepared in accordance with the City's WSDOT approved Right of Way Acquisition procedures, and WSDOT's Local Agency Guidelines - Section 25 (Right of Way Procedures). As part of the PFE, individual parcel worksheets will be prepared to estimate the amount of just compensation using comparable sales data and information obtained from project Right of Way plans. Estimated amounts of just compensation from each parcel worksheet will be entered into a project summary worksheet to include other items of right of way related costs for review and use by the City. UFS will coordinate with the City to determine which parcels qualify for the Appraisal Waiver process. Based on discussions with KPFF and review of preliminary schematic maps and exhibits, up to eight (8) separate tax parcels may be impacted by the project. Subject to completion of the PFE, it is assumed up to three (3) Appraisal and Appraisal Review reports, and five (5) AOS worksheets may be required. Total number of Appraisals is subject to change based on project design revisions, confirmation of the larger parcels, complexity of each acquisition, estimated amounts of just compensation determined in the PFE, and upon requests from property owners when administrative offers are presented. Upon completion of the PFE, UFS will coordinate with the City and submit to WSDOT for review. 78 Exhibit A — Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge — Supplement #10 Page 18 It is recommended the City complete all Environmental Site Assessments (ESA) prior to completion of the PFE to better estimate the potential related project risks and costs. Estimated clean-up costs for contaminated parcels should be ascertained prior to commencing Appraisal and Appraisal Reviews as discussed in the Appraisal and Appraisal Review task. Deliverables: • Project Funding Estimate (PFE) Task No. 8.60 - Relocation Plan A relocation plan will be developed based on WSDOT's Right of Way Manual and LAG Manual Section 25. According to the City, the owner (Nelson) of the residential site recently purchased another residence, possibly because of the pending project. Relocation eligibility and entitlements are subject to discussions with the City and the owner. This scope of work assumes the property owner is displaced by the project. It is assumed there will be one (1) residential owner - occupant of a single family home displaced as a result of this project (see Table A). UFS will develop a relocation plan resulting from personal assessment interviews with the occupant(s) to determine their needs for replacement sites; research potential replacement sites through discussions with local real estate brokers, search the multiple listing service, local newspapers, internet sites and publications; prepare initial pre -move inventories and estimates for moving costs and relocation entitlements. Upon completion of the Relocation plan, UFS will coordinate with the City and submit to WSDOT for review and approval. If additional displacements are subsequently discovered, the Relocation Plan will be amended by UFS and submitted to WSDOT for review and approval. Additional relocations will require an amendment to this scope of work and related fee estimate. Deliverable: • Relocation Plan Subtask No. 8.61 - FHWA Funds Authorization for ROW Shortly after the Right of Way Plans (prepared by KPFF), the PFE, and Relocation Plan have been submitted to WSDOT and assuming NEPA clearance has been obtained, the City would typically receive a letter from FHWA through WSDOT Highways and Local Programs authorizing the use of federal funds to acquire Right of Way. This letter of authorization is required in order for the City to receive federal funding participation and reimbursement for costs incurred with Appraisal, Appraisal Review, Acquisition Negotiations, and Relocation Assistance services. Deliverable: • For informational purposes only 79 Exhibit A — Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge — Supplement #10 Page 19 Task No. 8.70 - Appraisal & Appraisal Review Upon completion of the PFE and the City's receipt of authorization from FHWA to use federal funds for Right of Way acquisition, UFS will coordinate with the City to determine which parcels will require Appraisal and Appraisal Reviews. Universal will subcontract and manage the Appraisal and Appraisal Review process with appraisal firms previously qualified by WSDOT and certified by the State of Washington. Appraisal reports will be completed by the Appraiser discussed in the Project Funding Estimate task. The Appraisal and Appraisal Review reports will be prepared in accordance with the Uniform Standards of Professional Appraisal Practices, Washington State Department of Transportation (WSDOT) Local Agency Guidelines, current WSDOT Right of Way Manual (in particular, Chapters 4 and 5), and the URA. Subject to completion of the PFE and City direction, it is assumed up to three (3) Appraisal and Appraisal Review reports may be required. Total number of Appraisals and Appraisal reviews is subject to change based on project design revisions, confirmation of the larger parcels during the PFE process, complexity of each acquisition, estimated amounts of just compensation determined in the PFE and at the request of property owners when administrative offers are presented. UFS staff to attend all appraisal inspections (3 each) to ensure the property owner understands the real property rights being appraised, ascertain what is personal property and real property, and to help build the trust and rapport needed during negotiations and to assist in reaching amicable agreements. Appraisal scope of work and expenses thereof for specialty studies exclude: hazardous materials research, testing and estimating (ESA Phase 1, 2, or 3), parking modification estimates, irrigation modifications, business sign relocates, etc. UFS will prepare Administrative Offer Summary (AOS) worksheets for qualifying parcels, in lieu of Appraisals. Offers to property owners that are based on AOS worksheets are considered Administrative offers (see note below) . 80 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 20 Note: For offers exceeding S 10,000 and less than 525,000, property owners must be informed if the offer is not based on an Appraisal and that one will be prepared if requested. If the property owner elects, an appraisal report together with a corresponding appraisal review report must be completed and a revised offer considered. This requirement may have an impact on the approved right of way budget and project schedule. Deliverables: • Three (3) Appraisal reports in accordance with the Uniform Standards of Professional Appraisal Practices, Washington State Department of Transportation (WSDOT) Local Agency Guidelines, current WSDOT Right of Way Manual (in particular, Chapters 4 and 5), and the URA. • Three (3) Appraisal Review reports in accordance with the Uniform Standards of Professional Appraisal Practices, Washington State Department of Transportation (WSDOT) Local Agency Guidelines, current WSDOT Right of Way Manual (in particular, Chapters 4 and 5), and the URA. • Five (5) Administrative Offer Summary (AOS) worksheet Task No. 8.80 - Acquisition Negotiation, Relocation and Closeout Subtask No. 8.81 - Acquisition Negotiation Acquire real property rights from up to eight (8) separate tax parcels (including City of Tukwila) as shown in Table A below. Appraisals, Appraisal Reviews, and AOS worksheets completed in the Appraisal 85 Appraisal Review task will be submitted to the City for written approval establishing the amount of Just Compensation to the property owner. Upon written approval from the City, UFS will prepare the offer package(s) and promptly present offers to purchase all the required real property interests and negotiate in good faith to reach a settlement with each property owner(s). Offers will be presented in person when at all possible. Negotiations will be conducted in accordance with statutory and regulatory requirements and will include: Coordinate administrative settlement approvals with the City; Negotiate as necessary with lien holders, assisting escrow in the closing process; Prepare and maintain parcel files to include fair offer letters, acquisition documents, a standard diary form indicating all contacts with owner(s), and other items necessary for negotiations. Negotiations shall not be deemed to have failed until at least three significant meaningful contacts have been made and documented with each owner and /or their representative through direct personal contacts. Out - of -area owner(s) will be contacted by telephone and by certified mail. If negotiations reach an impasse, UFS will provide the City with written notification. The filing and cost of condemnation proceedings shall be the responsibility of the City. 81 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 21 Deliverables: • Acquisition Negotiation services with owners of up to eight (8) separate tax parcels. • Completed parcel files including necessary records of all Right of Way Acquisition services. Subtask No. 8.82 - Relocation According to the City, the owner (Nelson) of the residential site recently purchased another residence, possibly because of the pending project. Relocation eligibility and entitlements are subject to discussions with the City and the owner. This scope of work assumes the property owner is displaced by the project. It is assumed there will be one (1) residential owner - occupant of a single family home displaced as a result of this project. Universal will provide Relocation Assistance and Advisory Services under the guidelines of the federal URA, WSDOT LAG Manual - Section 25 and the City's approved Policies and Procedures, as directed. Relocation services are generally outlined as follows: • Inform displaced occupants, in writing, of their potential displacement, eligibility, entitlements, and provide an explanation of their relocation benefits. • Assist in search of replacement site(s). • Assist displaced occupant(s) in filing relocation claims for payment. • Maintain a current relocation diary for each displaced occupant. • Maintain necessary records to support state audit of the relocation services portion of the project. Deliverables: • Relocation Advisory and Assistance Services for one (1) residential owner - occupant. • Completed relocation assistance files. Subtask No. 8.83 - Parcel Closeout - Escrow Closing Upon securing required acquisition agreements, UFS will submit the necessary acquisition documents and closing instructions to the designated Title /Escrow Company. Work with the Title /Escrow Company in order to obtain release documentation from the encumbrance(s) of public record that are not acceptable to the City in order to provide clear title to the property being acquired, subject to the City's title clearing guidelines. The Escrow Company shall prepare and obtain the owner(s) signature on the necessary closing documents. UFS will coordinate signatures on closing documents for submittal to the City and payment(s) to the owner(s); coordinate with the Escrow /Title Company in filing documents with King County. 82 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 22 Deliverable: • Deliver completed original Acquisition and Relocation parcel files to the City Task No. 8.90 - Right of Way Certification Since there are federal funds participating in the project, Right of Way Certification will be coordinated and completed through WSDOT. Right of Way acquisition and relocation files will be prepared and completed to the satisfaction of a WSDOT Right of Way review to support federal aid participation. UFS will further coordinate right of way activities with WSDOT's Local Agency Coordinator, Mr. Tom Boyd, as needed throughout the project. Additional Work If other tasks are required to be performed or there are changes in pertinent information or if negotiations exceed the industry standard for a good faith effort to negotiate (three "in- person" landowner contacts), UFS reserves the right to request additional compensation as an equitable adjustment. UFS shall not be responsible for delays caused beyond its control. Assumptions: The City / KPFF will provide the following: • Exhibit maps to accompany Right of Entry Agreements • Preliminary Commitments (Title Reports) for all parcels shown in Table A. If requested, UFS will order title reports or any updates. The title company will bill the City directly for each report. • Approve designation of the escrow company used for this project. The escrow company will bill the City directly for all escrow services provided. • Right of Way Plans and Drawings, Maps, Exhibits, Right of Way Staking, etc., as necessary. • The necessary Environmental Site Assessments prior to commencing the PFE as discussed in the Project Funding Estimate task. • Legal descriptions in electronic format for all real property rights to be acquired. • Form approval, in electronic format, of all legal conveyance documents prior to use (i.e. offer letters, purchase and sale agreements, escrow instructions, easements, deeds, leases and permits). • Review and approval of all determinations of value, established by the project appraisers. Provide written authorization prior to offers being made to property owners. 83 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #10 Page 23 • Review and approval of all relocation entitlements prior to presentation to the displaced person. • Payment of any and all compensation payments to property owners, recording fees, relocation payments, legal services and any incidental costs which may arise necessary to complete each transaction. • Send "Introduction Letters" to property owners as necessary. 84 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian /Bicycle Bridge - Supplement #10 Page 24 TABLE A - PARCEL ACQUISITION No. Tax Parcel No Taxpayer / Owner Current Use Right of Entry Permit Total Fee Simple Partial Fee Simple Perm Trail Easement Temp. Const. Easement AR / AOS (See Note 3) 1 000580 -0033 Nelson Single Family Residence X (See Note 1) AR 2 252304 -9081 City of Tukwila River Trail To Be Determined AOS 3a 252304-9039 (north) BRCP Riverview Plaza LLC Office Building X X X AR 3b 252304-9039 (south) Office Building X X 4a 252304-9077 (north) BRCP Riverview Plaza LLC Office Building To Be determined AR 4b 252304-9077 (south) Office Building X X 5 252304 -9078 BRCP Riverview Plaza LLC Office Building X AOS 6 252304 -9048 Seattle Public Utilities Water Utility X X AOS 7 022310 -0040 Park East Real Estate LLC Office / X X AOS 8 022310 -0099 Andover Plaza LLC Retail X X AOS Notes: 1. According to the City, the owner (Nelson) of the residential site recently purchased another residence, possibly because of the pending project. Relocation eligibility and entitlements are subject to discussions with the City and the owner. 2. It is assumed parcels 3a/ 3b and 4a/ 4b are correctly identified as larger parcels. 3. AR (Appraisal and Appraisal Review) / AOS (Administrative Offer Summery - in lieu of Appraisal) EXHIBIT E -1 KPFF Consulting Engineers CONSULTANT FEE DETERMINATION SUMMARY OF COST Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) Reimbursables FF Rate Mileage Reprographics Subcontract Subtotal Total Hours X Rate 22.00 X 0.00 X 272.00 X 40.00 X 236.00 X 180.00 X 10.00 X 0.00 X DSC Subtotal Cost $1,375.00 $0.00 $13,809.44 $1,730.80 $7,762.04 $6,334.20 $248.10 $0.00 $31,259.58 $31,259.58 $45,376.41 $31,259.58 $9,377.87 Subconsultant Costs (See Exhibit G) $0.00 $135,405.53 GRAND TOTAL: $221,419.39 Date: 11/20/2013 86 EXHIBIT G -1 KPG CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian /Bicycle Bridge, Supplement No. 10 Classification Senior UD /L /E P: roject;E /S Designer UD /L/E CAD Technician Survey Crew OfFice Admin Total Hours X Rate = Cost 14.00 X $64.;90 = $908.60 6.00 X : $56.56 = $339.36 96.00 X $40.13 = $3,852.48 100.00 X $31.25 = $3,125.00 36.00 X $47.66`: = $1,715.76 0.00 X $23.08 = $0.00 DSC Subtotal $9,941.20 Overhead (OH) Cost OH Rate x DSC of 163.17°x/0 $9,941.20 $16,221.50 Fixed Fee (FF) FF Rate 30.00% $9,941.20 $2,982.36 Reimbursables Utility Locates (LS - Add'I Survey & Mapping) Title Reports (LS Add'I ROW Services) Subcontract (Utility Locate) (Blank) (Blank) Subtotal $640.00 $6,000.00 $120.00 $6,760.00 Subconsultant Total: $35,905.06 Date: 11/20/2013 87 EXHIBIT G -1 Universal Field Services CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian /Bicycle Bridge, Supplement No. 10 Classification Quality Assurance: Project Manager Acquisition Specialist Relocation Specialist Sr, Administrative Specialist Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate Reimbursables Mileage Mapping, Photos Parking, Parking, Printing, Long Distance Calls Project Funding Estimate Appraisal Sub Appraisal Review Sub Administrative Fee Subtotal Total Hours X Rate 25.00 X 84.50 X 329.00 X 89.00 X 86.00 X 2.1; 0 5.0.00% DSC Subtotal Cost $1,256.00 $3,549.00 $12,502.00 $3,382.00 $2,494.00 $23,183.00 $23,183.00 $23,183.00 piles x $0.565 /mile) Strickland eischman & Hoss (LS) Strickland Heischman & Hoss (LS) The Granger, Company 2.0% (B &O Taxes, etc.) $16,714.94 $6,954.90 $1,762.80 $450.00 $6,000.00 $11,000.00 $2,250.00 $385.00 $21,847.80 Subconsultant Total: $68,700.64 Date: 11/20/2013 88 EXHIBIT G -1 Landau Associates CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian /Bicycle Bridge, Supplement No. 10 Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate Reimbursables Mileage Reprographics Field Equipment/Supplies (�) nf), Subtotal Total Hours X Rate 0.00 X 8.00 X 86.00 X 12.00 X 8.00 X 20.00 X 7.00 X 48.00 X Cost DSC Subtotal $0.00 $376.00 $3,440.00 $432.00 $248.00 $500.00 $203.00 $1,152.00 $6,351.00 $6,351.00 $12,439.70 $6,351.00 $1,905.30 ssment) dge Permitting) essment) $40.00 $14.77 $49.27 $104.04 Subconsultant Total: $20,800.04 Date: 11/20/2013 89 EXHIBIT G -1 Wa hed Scie a 1=1 � n CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian /Bicycle Bridge, Supplement No. 10 Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) Reimbursables FF Rate Mileage Reprographics Subcontract Subtotal ter Total Hours X Rate 7.00 X 32.00 X 0.00 X 38.00 X 0.00 X 2.00 X Cost DSC Subtotal $3,365.25 $3,365.25 $448.48 $1,726.46 $0.00 $1,153.22 $0.00 $37.09 $3,365.25 $5,605.17 $1,009.58 $19.78 $19.78 Subconsultant Total: $9,999.78 Date: 11/20/2013 90 2,1 *t. 2.12'. rate catch basins in west side of W. valley I- Iwy'.. :tend survey of Green River Trail Labor Subtotal: Reimbursables ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN Survey at Riverview Plaza Parking Lot Utility Locating Walkway Section) Parking Lot Trail Alignment Studies Trail ReaI nmest Alternatives For Riverview Plaza Riverview frontage f property studies Meetings for Riverview Plasa property owner coordinattan. Alternative alignments schematic cast estimate comparison 30% Plans Site Preparation Utilities Storrn Drainage and Grading Paving Plans `. Pavement Marking Plans < Update Storm Drainage Report Update Cost Estimate Labor Subtotal: Reimbursables CIVIL (KPFF) Grading and Paving. Utilities $0 $0 $0 $0 $279 $279 $838 $2,566 $344 $2,057 $1,867 $2,845 $2,057 $2,057 $5,760 $2,566 $23,516 $0 $860 $951 $1,811 $6,640 $3,806 $0 $5,105 $3,168 $1,848 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,926 $120 $0 $0 $0 $0 0 $0 $0 $0 0( $0 $0 $0 $8,451 Labor Subtotal: Reimbursables Environmental & Permitting Services USCG Navigation Survey and Bridge Permit Application Tree Assessment Biological Assessment (KPFF Civil) L'.hting Study Support Labor Subtotal: RIVER HYDRAULICS WATERSHED Reimbursables . „ $27,538 .• $7,137 $34,675 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 so $0 $0 $0 $0 $0 $0 $0 so $0 $0 so 80 80 80 $0 $0 $0 s0 $37,562 $34,675 $0 $0 $4,902 $0 $4,902 $0 $7,485 $10,011 $0 $3,200 $25,702 $20,696 $0 $104 Site Inspection and Meeting Review Existing Data Update Baseline Hydraulic Model Simulate Bridge Alternatives Evaluate Impacts Summary Memorandum Survey for Hydraulics River cross sections Convert and add FEMA 100 year flood line to base map Establish 100 -Year Floodplaln Labor Subtotal: Reimbursables $2,186 $0 $0 $0 $0 $o $0 $0 $0 $2,616 $4,802 $0 $0 $0 $0 $0 $0 $0 $0 $2,811 $393 $0 $3,203 $0 $0 $0 $0 $0 $0 $o $o $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $o $0 $0 $0 $0 $0 $18,005 Labor Subtotal: Reimbursables RIGHT -OF -WAY ACQUISITION (UNIVERSAL FIELD SERVICES) Preparation & Administration Monthly Invoices and Coordination Subconsultant Agreement Preparation & Management Design Team Progress Meetings (Assume 6) Attend Kick -off Meeting :. Title /Ownership Review. UFS Title /Ownership Review Revleww 10 Additional Title Reports, Plot Easements (KPG) Data'. Collection and Limit Identification Determine Right of Way (KPG) Right -of -Way Limits and Easements Temporary Right of Entry /Access Permit. Legal Descriptions and Exhiblts for Acquisition Public Outreach Project Funding Estimate (PEE) Relocation Plan FHWA Funds Authorization for ROW Appraisal & Appraisal Review.: Acquisition Negotiation, Relocation and Closeout Parcel Acquisition Negotiation 1. Nelson 1. Frohmuth Single Family Residence Parcel (000580.0033) ;.. 2 - City of Tukwila River Trail Parcel (252304 -9081) 3A- BRCP Riverview Plaza LLC Office Building Parcel (252304.0039) 38 - BRCP Riverview Plaza LLC tJffice Building Parcel (252304 -9039) 4A- BRCP Riverview Plaza LLC Office Building Parcel (252304 -9077) 4B - BRCP Riverview Plaza LLC Office Building Parcel (252304 -9077) BRCP Riverview Plaza LLC °fiiee Buytting'Parcel (252304 -9078) 6- Seattle Public Utilities Storm Water Utility Parcel (252304 -9048) - Park Real Estate LLC Office Bldg /Bank Parcel (002010 -0040) 8 - Andover Plaza LLC Retail Parcel (002310 -0099) Relocation (Nelson f Frolmuth Parcel) Parcel Closeout - Escrow Closing Right -of -Way Certification Labor Subtotal: Reimbursables $14,377 $0 $0 $0 $0 $0 $0 $0 $6,120 $484 $0 $0 $3,601 $0 $0 $0 $0 $0 $1,141 $1,783 $0 $1,274 $0 $2,114 $93,282 $0 $0 $0 $0 $0 $0 $0 $0 $14,377 $0 Labor Sum i $86,014 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,205 $0 $29,145 $4,717 $2,511 $2,511 $2,511 $2,511 $3,097 $3,182 $3,982 $3,982 $6,497 $0 $930 $46,853 $21,848 $46,853 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,696 $9,980 2,1 *t. 2.12'. rate catch basins in west side of W. valley I- Iwy'.. :tend survey of Green River Trail Labor Subtotal: Reimbursables ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN Survey at Riverview Plaza Parking Lot Utility Locating Walkway Section) Parking Lot Trail Alignment Studies Trail ReaI nmest Alternatives For Riverview Plaza Riverview frontage f property studies Meetings for Riverview Plasa property owner coordinattan. Alternative alignments schematic cast estimate comparison 30% Plans Site Preparation Utilities Storrn Drainage and Grading Paving Plans `. Pavement Marking Plans < Update Storm Drainage Report Update Cost Estimate Labor Subtotal: Reimbursables CIVIL (KPFF) Grading and Paving. Utilities $0 $0 $0 $0 $279 $279 $838 $2,566 $344 $2,057 $1,867 $2,845 $2,057 $2,057 $5,760 $2,566 $23,516 $0 $860 $951 $1,811 $6,640 $3,806 $0 $5,105 $3,168 $1,848 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,926 $120 $0 $0 $0 $0 0 $0 $0 $0 0( $0 $0 $0 $8,451 Labor Subtotal: Reimbursables Environmental & Permitting Services USCG Navigation Survey and Bridge Permit Application Tree Assessment Biological Assessment (KPFF Civil) L'.hting Study Support Labor Subtotal: RIVER HYDRAULICS WATERSHED Reimbursables . „ $27,538 .• $7,137 $34,675 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 so $0 $0 $0 $0 $0 $0 $0 so $0 $0 so 80 80 80 $0 $0 $0 s0 $37,562 $34,675 $0 $0 $4,902 $0 $4,902 $0 $7,485 $10,011 $0 $3,200 $25,702 $20,696 $0 $104 Site Inspection and Meeting Review Existing Data Update Baseline Hydraulic Model Simulate Bridge Alternatives Evaluate Impacts Summary Memorandum Survey for Hydraulics River cross sections Convert and add FEMA 100 year flood line to base map Establish 100 -Year Floodplaln Labor Subtotal: Reimbursables $2,186 $0 $0 $0 $0 $o $0 $0 $0 $2,616 $4,802 $0 $0 $0 $0 $0 $0 $0 $0 $2,811 $393 $0 $3,203 $0 $0 $0 $0 $0 $0 $o $o $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $o $0 $0 $0 $0 $0 $18,005 Labor Subtotal: Reimbursables RIGHT -OF -WAY ACQUISITION (UNIVERSAL FIELD SERVICES) Preparation & Administration Monthly Invoices and Coordination Subconsultant Agreement Preparation & Management Design Team Progress Meetings (Assume 6) Attend Kick -off Meeting :. Title /Ownership Review. UFS Title /Ownership Review Revleww 10 Additional Title Reports, Plot Easements (KPG) Data'. Collection and Limit Identification Determine Right of Way (KPG) Right -of -Way Limits and Easements Temporary Right of Entry /Access Permit. Legal Descriptions and Exhiblts for Acquisition Public Outreach Project Funding Estimate (PEE) Relocation Plan FHWA Funds Authorization for ROW Appraisal & Appraisal Review.: Acquisition Negotiation, Relocation and Closeout Parcel Acquisition Negotiation 1. Nelson 1. Frohmuth Single Family Residence Parcel (000580.0033) ;.. 2 - City of Tukwila River Trail Parcel (252304 -9081) 3A- BRCP Riverview Plaza LLC Office Building Parcel (252304.0039) 38 - BRCP Riverview Plaza LLC tJffice Building Parcel (252304 -9039) 4A- BRCP Riverview Plaza LLC Office Building Parcel (252304 -9077) 4B - BRCP Riverview Plaza LLC Office Building Parcel (252304 -9077) BRCP Riverview Plaza LLC °fiiee Buytting'Parcel (252304 -9078) 6- Seattle Public Utilities Storm Water Utility Parcel (252304 -9048) - Park Real Estate LLC Office Bldg /Bank Parcel (002010 -0040) 8 - Andover Plaza LLC Retail Parcel (002310 -0099) Relocation (Nelson f Frolmuth Parcel) Parcel Closeout - Escrow Closing Right -of -Way Certification Labor Subtotal: Reimbursables $14,377 $0 $0 $0 $0 $0 $0 $0 $6,120 $484 $0 $0 $3,601 $0 $0 $0 $0 $0 $1,141 $1,783 $0 $1,274 $0 $2,114 $93,282 $0 $0 $0 $0 $0 $0 $0 $0 $14,377 $0 Labor Sum i $86,014 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,205 $0 $29,145 $4,717 $2,511 $2,511 $2,511 $2,511 $3,097 $3,182 $3,982 $3,982 $6,497 $0 $930 $46,853 $21,848 $46,853 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,696 $9,980 2.1 1 locate catch be Z12 Extend su y ins in we Green RI side of W. Valley H Trail ry Labor Subtotal: Reimbursables $0 $0 $0 ALTERNATIVE ALIGNMENT G MENT PRELIMINARY DESIGN Survey at Riverview Plaza Parking Lot Utility Locating Walkway'Secticdl Parking Lot Trail Alignment Studies Trail Rc allgnment Alternatives For Riverview Plaza Riverview frontage 1 property studies Meetings for Riverview Plaxa property owner coordination. Alternative alignments schematioicost estimate comparison 30% Plans Site Preparation Utilities Storm Draklage and Grading Paving 1Plans Pavement Marking Puns Update Storm Drainage Report Update Cost Estimate Labor Subtotal: Reimbursables CIVIL (KPFF) Grading and Paving. Utilities `. Labor Subtotal: Reimbursables 80 40 0 120 0 S14 '1-mr 80 80 16 80 96 0 $279 $279 5838 $2,566 $344 $2,057 $1,867 $2,845 52,057 $2,057 55,760 $2,566 $23,516 $0 $27,538 $7,137 $34,675 $o Environmental & Permitting Services USCG Navigation Survey and Bridge Permit Application Tree Assessment Biological Assessment (KPFF CMI) Lighting Study Support. Labor Subtotal: Reimbursables $0 $0 $4,902 $0 54,902 $0 RIVER HYDRAULICS WATERSHED Site Inspection and Meeting Review Existing Data Update Baseline Hydraulic Model Simulate Bridge Alternatives Evaluate Impacts Summary Memorandum Survey for Hydraulics River cross sections Convert and add FEMA 100 year flood tine to has Establish :100 -Year Floodplain Labor Subtotal: $2,186 50 $0 $0 $0 $0 $0 $0 $0 $2,616 $4,802 Reimbursables NOT USED Reimbursables RIGHT -OF -WAY ACQUISITION (UNIVERSAL FIELD SERVICES) Preparation & Administration Monthly Invoices and Coordination' Sub consuttantAgreement Preparation & Management sign Team Progress Meetings (Assume 6) Attend Kick -off; Meeting Title /Ownefship Revi UFS TittelOwnershlp Review Review 10 Additional Title Reports, Plot Easements (KPG) Data Collection and Limit Identification Determine Right of Way (KPG Right -of -Way Limits and Easemet Temporary Right of Entry /Access Penni Legal Descriptions and Exhib! Public Outreach Project Funding Estimate (PFE) elocati0n Plan FHWA Funds Authorizatic Appraisal & Appraisal Review, Acquisition Negotiation, Relocati Parcel Acquisition! Negotiati 1 Nelson 1 Frohmuth Single Family Residence Parcel (000580-0033) $0 $0 $0 $0 $0 0 40 80 16 $0 514,377 Aci7ulsitlon or RS and Closeou $0 0 $0 $0 0 $0 $0 2 € City 0f Tukwila River Trail Parcel (292304 - 90810 3A- BRCP Riverview Plaza LLC Office: Building Parcel (252304 -9039 B - BRCP Riverview Plaza LLC Office Building Parcel (252304 - 9039). 4A - BRCP Riverview Plaza LLC Office: Building Parcel (252304 - 9077): 48 • BRCP Rivervi ew Plaza LLC Office Building Parcel 252304 -8077 5 - BRCP Rvervtew Plaza LLC 0 c Building Parcel (252304 -9078) 6 - Seattle Public Utilities Storm Water Utility Parcel (252304. 9048). - Park Real Eutate LLC Office 81 8- Andover Plaza LLC Retail Parcel (002310 -0099) k- Parcel(002310- 0040),1 8.82 Relocation ((Nelson 1 Frohmuth: Parcel) 8.83 Parcel Closeout - Escrow Closin .90',' Right -of -Way Certification' $0 $0 $0 $0 $0 Labor Subtotal: 0 Reimbursables 0 40 0 80 16 0 0 Labor Sum 22 272 40 236 180 10'' 0 $0 50 $0 50 $0 $0 0 $14,377 0 $86,014 2.11 ,ocate'catch basins in west side of W. Valley Hwy 2.12 Extend; survey of Green River Trail Labor Subtotal: 0 2 Reimbursables 5 8 $860 $951 0 $1,811 3.0 ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN 10 Survey' at Riverview Plaza Parking Lot Utility Locating Walkway Section/ Parking Lot Trail Alignment 5 3.21 Trail Alternatives For Riverview Plaza 12 12 16 $6,640 $3,806 $0 32 $5,105 3.22 Riverview frontage / property studies 3,23 Meeall Piave property o $3,168 $1,848 3.24 Alternative alignmenisschematic cost mate comparison $0 3.30 30% Plans $0 Site Preparation $0 3.32 Utilities, $0 torm Drainage and Grading $0 3.34 Paving Plans $0 Pavement Marking Plans $0 3.40 Update Storni Drainage Report $0 .50 Update Cost Estimate $0 Labor Subtotal: 14 30 60 16 $13,926 Reimbursables 4.0 4.1 4.20 5.0 CIVIL (KPFF) Grading and Paving. Utilities Environmental & Permitting Services Labor Subtotal: Reimbursables 5.10 `- USCG Navigation Survey and Bridge Permit Application Tree Assessment 5.21 Biologioni Assessment (KPFF Civil) 5.30 Lighting Study Support i. Labor Subtotal: Reimbursables 6.0 RIVER HYDRAULICS (WATERSHED) 6.10 Site Inspection and Meeting FN:� 5..0454 Rl: 0 0 SE, 0 0 0 0 $120 $0 $0 $0 $0 $o $0 $0 $0 $0_c $0 3.20' Review Existing Data $0 Update Baseline Hydraulic Model $0 6.40 Simulate Bridge Alternatives $0 Evaluate )mpac $0 Summary Memorandum $0 .70 Survey for Hydraulics 50 6.71 River cross Sect° $2,811 Convert and add FEMA 100 year flood line to base map $393 6.80 Establish 100 -Year Floodplain ,. 7.0 NOT USED Labor Subtotal: Reimbursables 11 12 0 ............. $0 $3,203 $0. $0 $0 Labor Subtotal: 0 0 0 0 0 0 $0 Reimbursables 8.0 8.11 RIGHT -OF -WAY ACQUISITION (UNIVERSAL FIELD SERVICES) Prepare tion& Administration Monthly Invoices and Coordination 5 $01 $0 SUtconsultant Agreement Preparation & Management 8.13 Design Team Progress Meetings (Assume 6):' $0 $0 8.14 id Kick -off Meeting $0 8.20 8.21 Title /Ownership Rev UFS Tide /Ownership Review $0 8.22 eview 10 Additig Title Reports, Plot Easements (KPG) 40 10 $6,120 Data Collection and Limit Identification 8.31 Determine Right of Way (KPG) $484 8.32 Right -of -Way Limits and Easements.. $0 8.33 Temporary Right Enb 'AC ass Permit $0 8.34 Legal Descriptions and Exhibits for Acquisition 20 10 $3,601 8.40 Public Outreach $0 8,50 Project Funding Estimate(PFE),; $0 8.60 Relocation Plan $0 8,61 FHWA Funds Au zation for RO W $0 8.70 Appraisal & Ap I Review $0 8.80 Acquisition Negohatio loseout Parcel Acgi ion Negoti Nelson / Frohmuth Single Family Residence Parcel (000580.0033) $0 - City of Tukwila River Trail Parcel (282304 -9081) $0 3A RCP Riverview Plaza LLC Office Building Parcel (252304 -9039) $0 38 -BRCP Riverview Plaza LLC Office Building Parcel (252304 -9039) $0 4A -BRCP Riverview Plaza LLC Office Building Parcel. (252304 -9077) $0 48.- BRCP Rivervi Plaza LLC Office Building Parcel (252304. 9077) $0 BRCP Riverview PI; LL 1ceBuitding Parc4 $0 6- Seattle Public Utlliti Storm Water Utility Parcel (252304. 9046) $0 Park Real E Office SIi /Bank Parcel 72310- 0040).; ,. $0 Andover Plaza LLC Retail Parcel (002310-0099) $0 a82, Relocation (Nelson ;x Frohmu th Parcel) $0 Parcel Closeout - E5cr Closing' $0 8.90' Right -of -Way Certification $0 Labor Subtotal: 61 24 0 $10,205 Reimbursables Labor Sum 14 ,, 96 100 36 $29,145 2. 1 2,12 Catch rin Extend survey of G Nr� y in west side of W. Valley H 'eon River Trail Labor Subtotal Reimbursables ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN Survey at Riverview Plaza Parking Lot Utility Locating. Walkway Section/ Parking Lot Trail Alignment Studies; TralI Realignment Alternatives For Riverview Plaza Riverview frontage 1 property studies Meetings for Rive view Plaza property owner coordination. Altemative alignments schematic cost estimate comparison 30% Plans Site Preparation Utilities Storm Drainage and Grading Paving Plans: Pavement Marking Plans Update Storm Drainage Report Update Cost Estimate Labor Subtotal: Reimbursables 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 CIVIL (KPFF) Grading and Paving. Utilities Labor Subtotal: Reimbursables Environmental & Permitting Services USCG Navigation Survey and Bridge Permit Application Tree Assessment Biological Assessment (KPFF Civil) Lighting StudySUpport Labor Subtotal: Reimbursables $0 $0 $0 $0 $0 $0 RIVER HYDRAULICS WATERSHED Site Inspection and Meeting} Review Existing Data Update Baseline Hydraulic Model Simulate Bridge Alternatives i. Evaluate Impacts Summary Memorandum Survey for Hydraulics River crass sections Convert and add FEMA 100 year flood line ti Establish 100 -Year Ftbodplain Labor Subtotal: Reimbursables NOT USED Labor Subtotal: Reimbursables 8.0 RIGHT -OF -WAY ACQUISITION (UNIVERSAL FIELD SERVICES) .10 Preparation & Administration Monthly Invoices and Coordination SubconsultantAgreement Prepar Man. en .14 20 Titi Design Team Progress Meeting Attend Kick-off Meeting 0wnership Review (AS la Um 6) 21 UFS Tifle/Ownership Revien 8.22 Review90 Additional Title Reports Plot Ea ements (KPG). 8.30 Data loltectiion 8. Determin Ind Limit Identification? 61951 of Way (KPG) 8.32 Right -o y Limits and Easements 8.33 Tei P any R iht of Entry/A Pe 8.34 Legal Descr ions nd Exhibit fo Acquisition 8.40 8.50 8.60 Public Outreacfr` Project Funding Estim, Relocation P n; PFE) 61 :FHWA Funds Authoriz 8.70 Appraisal & Appraisal R 8.80 iew n for ROW Acquisition Negotiation, Relocatic Parcel Acquisition Negotia nd eau,' 0 0 0 0 3 3 6 21 3.5 3.5' 10 1 24 05 $0 $0 $0 $0 $1 141 $837 $1 783 $566 $1 812 0 $0 $0 274 $0 $143 $288 $2 114 0 $806 1 Nel on / Frohmuth Sin le Family Residence Parcel 00 80.0031 50 - City Tukt River Trail P 3A -RR P Ric le arc Plaza LLI el(252304 -9081) Office Building Parcel (25230 2 4 39) 3 25 4 8 - BRCP Live 111 4A - BRCP Rivei ie 4B BRCP River Plaza LLC'Offce Building Parcel (252304-9039) Plaza LLC Office Building Parcel (252304 -9077) LLC Office Building P Plaza LLC Once B Plaz BRCP River Ild col (252304-9077) 3 25 4 1' 3 25 4 3 4 ng.Parcel (2 7 } 11 4 30 6 6 - Seattle Public Utilities Storm Water Utility Parcel (25230 Park Real Estate LLC Office Bldg /Bank Parcel (002310- Andover Plaza LLC Retail Parcel (002310 -0099) -9t 5 30 6 140. 4 40 8 40 8 32 :Reioca ion (Nelson / Frohmuth Parcel Parcel Closeout - Escrow Closin 83 10 65 'c 8.90 Right-of-Way Certification 2 4 6 4,717 $659 $2,511 $2,511 $2,511 $2,511 $3,097 $3,182 $3,982 $3,982 $6,497 $0 $930 Labor Subtotal: 25 84.5 329 89 86 Reimbursables Labor Sum 25 85 329 8 86 1 $46,853 $21,848; $46,853 cY ,oNY' tl Locate catch basins in west side of W. Valley Hwy Extend survey of Green River Trail Labor Subtotal: Reimbursables 3.0 3.10 3.11 3.20 3.21 3.22 3.23 3.24 3.30 3.31 3.32 3.33 3.34 3.35 3.40 3.50 ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN Survey at Riverview Plaza Parkng Lot Utility Locating Walkway Section/ Parking Lot Trail Alignment Studies Trail Realignment Alternatives For Riverview Plaza Riverview frontage / property studies Meetings for Riverview Plaza property owner coordination. Alternative alignments schematic cost estimate comparison 30% Plans Site Preparation Utilities Storm Drainage and Grading Paving Plans Pavement Marking Plans Update Storm Drainage Report Update Cost Estimate 0 Labor Subtotal: 0 Reimbursables $0 $0 $0 $0 $0 $o $0 $0 $0 $o $0 $o $0 $0 $0 $0 4.0 4.10 4.20 CIVIL (KPFF) Grading and Paving. Utilities Labor Subtotal: 0 Reimbursables 5.0 5.10 5.20 5.21 5.30 Environmental & Permitting Services USCG Navigation Survey and Bridge Permit Application Tree Assessment Biological Assessment (KPFF Civil) Lighting Study Support Labor Subtotal: 0 Reimbursables $0 $0 $0 $0 $7,485 $10,011 $0 $3,200 $20,696 $104 6.0 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.71 6.72 6.80 RIVER HYDRAULICS (WATERSHED) Site Inspection and Meeting Review Existing Data Update Baseline Hydraulic Model Simulate Bridge Alternatives Evaluate Impacts Summary Memorandum Survey for Hydraulics River cross sections Convert and add FEMA 100 year Flood line to base map Establish 100 -Year Floodplain $0 $0 $0 $0 00 so 00 $0 $0 Labor Sub Reimburse NOT USED 8.10 8.11 8.12 8.13 8.14 8.20 8.21 8.22 8.30 8,31 8.32 8.33 8.34 8.40 8.50 8.60 8.61 8.70 8.80 8.81 Labor Subtotal: Reimbursables RIGHT -OF -WAY ACQUISITION UNIVERSAL FIELD SERVICES Preparation & Administration Monthly Invoices and Coordination Subconsultant Agreement Preparation & Managemen Design Team Progress Meetings (Assume 6) Title/Ownership Review UFS Title/Ownership Review Review 10 Additional Title Reports, Plot Easements (KPG) Data Collection and Limit Identification Determine Right of Way (KPG) Right -of -Way Limits and Easements Temporary Right of Entry/Access Permit Legal Descriptions and Exhibits for Acquisition Public Outreach Project Funding Estimate (PFE) Relocation Plan FHWA Funds Authorization for ROW Appraisal & Appraisal Review Acquisition Negotiation, Relocation and Closeout Parcel Acquisition Negotiation 8.82 8.83 6.qt) 1 - Nelson / Frohmuth Single Family Residence Parcel (000580 -0033) 2 - City of Tukwila River Trail Parcel (252304 -9081) 3A - BRCP Riverview Plaza LLC Office Building Parcel (252304 -9039) 36 - BRCP Riverview Plaza LLC Office Building Parcel (252304.9039) 4A - BRCP Riverview Plaza LLC Office Building Parcel (252304 -9077) 4B - BRCP Riverview Plaza LLC Office Building Parcel (252304 -9077) 5 - BRCP Riverview Plaza LLC Office Building Parcel (252304 -9078) 6 - Seattle Public Utilities Storm Water Utility Parcel (252304 -9048) 7 - Park Real Estate LLC Office Bldg/Bank Parcel (002310 -0040) 8 - Andover Plaza LLC Retail Parcel (002310 -0099) Parcel Closeout - Escrow Closing Right -of -Way Certification abor Subtotal: Reimbursable! Labor Sum 0.0 8.0 86.0 12.0 8.0 20.0 7.0 I 48 .0 $0 so $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,696 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Tukwila Urban Center - Pedestrian /Bicycle Bridge Project No. 90510403 DESCRIPTION: Construct a new pedestrian /bicycle bridge over the Green River. JUSTIFICATION: Pedestrian /bicycle connection between Tukwila's Urban Center and commuter rail /Amtrak station. Supports local and regional goals and policies regarding land use and transportation in Urban Center. Pedestrian System Report identified the optimal location for bridge crossing to be south of the Best STATUS: Western Hotel. Type, Size, and Location Report was completed in 2011. Council approved a design of a twin -tied arch bridge with no accommodation for a future bridge crossing over West Valley Highway. MAINT. IMPACT: To be determined. Design grants: State Enhancement for $190k & $500k, Transit Oriented Development (TOD) planning grant COMMENT: of $55k, and Federal CMAQ grant of $751 K. WSDOT Regional Mobility construction grant of $6.870M. Project is on Park Impact Fee list with funding of $2 million with an 80 %/20% split for $1.6M. Interfund loan of $665k from the Water Enterprise fund will be repaid with future park impact fees. FINANCIAL Through Estimated in $000's 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Design 585 748 300 1,633 Land (R/W) 1,100 1,100 Const. Mgmt. 1,000 1,000 Construction 6,485 6,485 TOTAL EXPENSES 585 748 1,400 7,485 0 0 0 0 0 10,218 FUND SOURCES Awarded Grant 540 713 243 1,496 Awarded Reg Mobility 870 6,000 6,870 Park Impact Fees ! 35 55 55 145 Interfund Loan (Water) 665 665 City Oper. Revenue 45 0 232 765 0 0 0 0 0 1,042 TOTAL SOURCES 585 748 1,400 7,485 0 0 0 0 0 10,218 0 Project Loca 2014 - 2019 Capital Improvement Program 12 97 98 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Derek Speck, Economic Development Administrator DATE: November 22, 2013 SUBJECT: Street Vacation of 41st Avenue South Resolution Setting a Public Hearing Date ISSUE Council is being asked to approve a resolution setting a Public Hearing date of January 27, 2014 to consider vacating the portion of 41st Ave S that adjoins S 144th St. BACKGROUND Since 1999 the City has been acquiring and clearing property at the intersection of Tukwila International Blvd and S 144th St for the Tukwila Village redevelopment project in order to eliminate blight and to revitalize the neighborhood. A portion of 41St Ave S lies within Tukwila Village project boundaries. Early in its inception, the Tukwila Village project included the possibility of vacating 41st Ave S in order to enable better site planning and more efficient development. DISCUSSION The City owns all of the parcels along the east and west sides of this portion of 41st Ave S. If the street is vacated, the title of the land would then belong to the City as land, but not "right of way ". The City could then sell this property in combination with the land that is part of the Tukwila Village development. 41st Ave S is the only public road providing access to the parking lot that is on Normandy Court property. As such, the City is legally bound to ensure the Normandy Court property continues to have reasonable access to a public road such as S 144th St or Tukwila International Blvd. Since 2012 the City, Tukwila Village developer and owners of Normandy Court have discussed ways to provide easements such that Normandy Court has continuous access to public streets. Currently, the owners of Normandy Court are considering a binding letter proposal offered by the Tukwila Village developer as an incentive to fully support the project. If the Council decides to approve an ordinance to vacate 41st Ave S, the ordinance would include a condition requiring those easements to be put into place. The Samara Apartments have a 25' wide easement across the Normandy Court parking lot from the Samara property to 41st Ave S. Although the City is not legally bound to provide public access to the Samara property since it already has good access on 42nd Ave S, the Samara and City desire to have continued access for emergency vehicles. Therefore, the Tukwila Village site plan has anticipated roadways that will allow emergency vehicle access to Samara's easement. FINANCIAL IMPACT As the City owns the street and adjacent parcels, there will be no cost or budgetary impact. RECOMMENDATION Council is being asked to approve the resolution setting a Public Hearing date of January 27, 2014 to consider vacating the portion of 41St Ave S that adjoins S 144th St and consider this item at the December 9, 2013 Committee of the Whole meeting and subsequent Special Meeting that same night. Attachments: Draft Resolution Legal Description Survey Map Normandy Court Location Map Z:1Tukwila Villagellnfo Memo Resolution Setting PH 41st Ave S Street Vacation - sb.doc 99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, FIXING THE TIME FOR A PUBLIC HEARING FOR VACATION OF RIGHT -OF -WAY WITHIN THE CITY OF TUKWILA DEDICATED FOR STREET PURPOSES, GENERALLY DESCRIBED AS PORTIONS OF 41ST AVENUE SOUTH. WHEREAS, since 1999 the City has been acquiring and clearing property at the intersection of Tukwila International Boulevard and South 144th Street for the Tukwila Village redevelopment project in order to eliminate blight and revitalize the surrounding neighborhood; and WHEREAS, the portion of 41st Avenue South adjoining South 144th Street is situated within the boundaries of the Tukwila Village properties and is necessary to be redeveloped for the efficient site planning and development of Tukwila Village; and WHEREAS, pursuant to RCW 35.79.010, a public hearing on the street vacation must be set by resolution; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. A public hearing regarding the vacation of that portion of 41st Avenue South adjoining South 144th Street, as more particularly described on the attached map and legal description, shall be held before the Tukwila City Council in the City Council Chambers at Tukwila City Hall, 6200 Southcenter Boulevard, Tukwila, Washington, on January 27, 2014, which is not less than 20 nor more than 60 days from the date of passage of this resolution, at which time all persons interested in said right -of -way vacation are invited to appear and be heard. Section 2. The City Clerk is directed to post written notice of pendency of the public hearing in three public places in the City of Tukwila and in one additional conspicuous place on the right -of -way sought to be vacated at least 20 days prior to the date set for the public hearing. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Special Meeting thereof this day of , 2013. 100 ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President APPROVED AS TO FORM BY: Shelley M. Kerslake, City Attorney Attachments: Map and Legal Description Filed with the City Clerk: Passed by the City Council: Resolution Number: 101 LEGAL DESCRIPTION RIGHT -OF -WAY VACATION That portion of 41st Avenue South as dedicated by the Plat of Cherry Lane, recorded in Volume 48 of Plats, at Page 21, records of King County, Washington, Lying North of a line parallel with and 30.00 feet North of the South line of the Southeast quarter of the Southwest quarter of Section 15, Township 23 North, Range 4 East, Willamette Meridian. Containing approximately 23,967 square feet. Project Name: Tukwila Village May 31, 2012 Page 1 of 1 BDG 15255L.001.doc Exhibit: 1 5255 EXH01 -VAC. dwg 102 , 1"=80, PARCEL L o P. boo 900 —9 -66 GEC o.Uvloe e009002400314 RIGHT -OF -WAY VACATION 23,967± S.F. O M - N O S. 144TH ST . S' LINE SE1/ W� /4 SEC.15 File:P: \15000s\ 15255 \survey \15255tEXH01 — VAC.dwg Date /Time:5/31/2012 2:49 PM BRIAN GILLOOLY SCALE: HORIZONTAL 1 " =80' VERTICAL N/A 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251-6222 Z (425)251 -8782 FAX CIVIL ENGINEERING, LAND • PLANNING, SURVEYING, ENVIRONMENTAL SERVICES For: TUKWILA VILLAGE JOB NUMBER 15255 15255L.001.DOC Title: RIGHT -OF -WAY VACATION SHEET DESIGNED XXX 'DRAWN 1 0f 1 STM (CHECKED BDG (APPROVED BDG l DATE 05 -31 -12 , 103 Normandy Court Property The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 11/19 -2013 Source: King County iMAP - Property Information (http://www.metrokc.gov/GISiiMAID) L.A1 King County TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Community Affairs and Parks Committee Transportation Committee FROM: Jack Pace, DCD Director BY: Nora Gierloff, Deputy DCD Director DATE: November 19, 2013 SUBJECT: Growing Transit Communities Compact ISSUE The Puget Sound Regional Council has invited the City of Tukwila to partner with a regional coalition of governments, non - profits and community stakeholders in supporting the Growing Transit Communities Strategy by signing the Growing Transit Communities Compact. BACKGROUND In October 2010, the region was awarded a $5,000,000 regional planning grant from the U.S. Department of Housing and Urban Development Office of Sustainable Housing and Communities. These grant funds supported a multi -year PSRC program called Growing Transit Communities. The Council was given an overview and status report on this program at your March 25, 2013 meeting. The Growing Transit Communities Partnership, a broad coalition of stakeholders from the public, private and nonprofit sectors including the City of Tukwila, came together in 2010 to identify what will be needed to create the sustainable, equitable communities envisioned in adopted regional plans and supported by the region's commitment of nearly $20 Billion in high - capacity transit investments. These plans and investments present a once -in -a- lifetime opportunity to shape the region and ensure that transportation improvements support sustainable development and foster vibrant, healthy neighborhoods for all. DISCUSSION This summer, following an extensive 18 -month collaborative process, the Partnership adopted the Growing Transit Communities Strategy. This document presents consensus approaches to developing the region's high- capacity and high frequency transit areas, and what tools and resources are needed to implement the region's adopted plans with a focus on three overarching goals: • Attract more of the region's residential and employment growth near high- capacity transit • Provide housing choices affordable to a full range of incomes near high- capacity transit • Increase access to opportunity for existing and future community members in transit communities The goals and recommendations in the Growing Transit Communities Strategy are wide - ranging, developed with the recognition that some approaches may work in some locations but not in others, and that each partner retains flexibility to pursue the actions most appropriate to 105 INFORMATIONAL MEMO Page 2 local needs and conditions. The region's continued success will require an ongoing, dedicated partnership of a wide variety of public, private, non - profit, and community stakeholders. The full text of the Growing Transit Communities Strategy as well as more detailed summaries of work program elements are available at http: / /www.psrc.orq /growth /growing - transit- communities. For more information, please contact Michael Hubner at (206) 971 -3289 or at mhubnerpsrc.org. FINANCIAL IMPACT Signing the Compact would have no direct budget impact. RECOMMENDATION The Council is being asked to approve the resolution and consider this item in January 2014. ATTACHMENTS A. Draft Resolution B. Growing Transit Communities Compact C. Growing Transit Communities Strategy Executive Summary 11deptstore \City Common\DCD n Clerk 's \GrowingTransitCommunities 111- 25- 13_GTC_CommitteeMemo.docx 106 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, AFFIRMING THE CITY OF TUKWILA'S SUPPORT FOR THE GROWING TRANSIT COMMUNITIES COMPACT. WHEREAS, the central Puget Sound region has adopted VISION 2040, a long - range strategy to advance the ideals of our people, our prosperity and our planet by integrating land use, economic and transportation decisions in order to meet the needs of current and future generations, achieve economic prosperity with social equity, and support a healthy environment, including addressing global climate change; and WHEREAS, VISION 2040 includes among its goals: (1) maintaining a prosperous and sustainable regional economy by supporting businesses and job creation, investing in all people, sustaining environmental quality, and creating great central places, diverse communities, and a high quality of life; (2) focusing growth within already urbanized areas to create walkable, compact, and transit - oriented communities; and (3) meeting housing needs through preservation and expansion of a range of affordable, healthy and safe housing choices; and WHEREAS, the voters of the central Puget Sound region have committed to a $15 billion investment in light rail, commuter rail, bus rapid transit and local streetcar service that creates a once -in -a- lifetime opportunity to plan for and support the growth of communities near high- capacity transit; and WHEREAS, transit - oriented development is a land use pattern with many social, economic, and environmental benefits, including more sustainable and efficient use of urban land, support for regional and local economies, reduced combined housing and transportation costs per household, and improved access and mobility for residents; and WHEREAS, the Growing Transit Communities Partnership was formed as a diverse coalition of governmental and nongovernmental partners that was funded by a grant from the federal Partnership for Sustainable Communities for the express purpose of leveraging regional transit investments to create thriving and equitable transit communities around light rail and other high- capacity transit stations; and Attachment A 107 WHEREAS, progress toward creating equitable transit communities will depend on active participation from a full range of partners over the long term, including transit agencies, businesses, and non - profit organizations, as well as local jurisdictions and the Puget Sound Regional Council; and WHEREAS, the Growing Transit Communities Partnership has developed the Growing Transit Communities Strategy, which recommends adoption of specific actions and tools by regional and local governments, by both public and private stakeholders, in order to create, grow, and enhance equitable transit communities throughout the region; and WHEREAS, it is in the interest of elected officials; public agencies; and leaders of and for affordable housing, communities and neighborhoods, business, education, the environment, philanthropy, finance, real estate, and transportation to cooperatively engage in the work related to the Growing Transit Communities Strategy for its successful completion; and WHEREAS, the Growing Transit Communities Strategy will be managed by the Puget Sound Regional Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. This resolution is established to acknowledge the support and need for coordinating efforts to successfully implement the Growing Transit Communities Strategy, and to authorize execution of the Growing Transit Communities Compact on behalf of the City of Tukwila. Section 2. The undersigned individual hereby executes this resolution on behalf of her respective agency and authorizes a designee to sign the Growing Transit Communities Compact. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2013. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President APPROVED AS TO FORM BY: Shelley M. Kerslake, City Attorney Filed with the City Clerk: Passed by the City Council: Resolution Number: 108 Growing Tran Co unities Compact Preamble VISION 2040 was approved as the central Puget Sound region's plan for sustainable development following a broad - based, collaborative planning process. Central Puget Sound region voters also approved a series of high- capacity light rail and transit projects —a commitment of approximately $15 billion —that will serve the region's most densely populated and diverse communities for decades to come. These investments present a once -in -a- lifetime opportunity to shape the region's urban form and ensure that transportation improvements support sustainable development and foster vibrant, healthy neighborhoods for all. Recognizing what this unprecedented opportunity means for the region and its residents, a broad coalition of stakeholders came together to identify what will be needed to create the sustainable, equitable communities envisioned in the region's plans. The result was the Growing Transit Communities Partnership. The Growing Transit Communities Partnership produced the Growing Transit Communities Strategy as a tool to implement VISION 2040 and local comprehensive plans adopted under the state Growth Management Act, and which is supported by this Compact. Its goals and recommendations are wide - ranging, developed with the recognition that some tools and approaches may work in some locations but not in others, and that each partner retains flexibility and discretion in pursuing the strategies most appropriate to local needs and conditions. However, the envisioned outcomes, consistent with VISION 2040, require an ongoing dedicated partnership of many interests, including cities, counties, transit agencies, businesses and employers, housing authorities, public health agencies, affordable housing providers, educational institutions, community -based organizations, and development interests. And while the Compact is not legally binding and does not mandate adoption of any particular policies or actions, it expresses the need for many and diverse partners to work together over time to achieve its goals, recognizing that opportunities for success cannot be achieved unless we work together. Therefore, as signatories to the Compact, we commit ourselves to working in partnership to achieve the goals and strategies in this Compact, while respecting the diversity of interests, perspectives, and responsibilities throughout the region. Attachment B Growing Transit Communities Compact 1 August 23, 2013 1 109 Whereas the central Puget Sound region has adopted VISION 2040, with the following vision statement: Our vision for the future advances the ideals of our people, our prosperity, and our planet. As we work toward achieving the region's vision, we must protect the environment, support and create vibrant, livable, and healthy communities, offer economic opportunities for all, provide safe and efficient mobility, and use our resources wisely and efficiently. Land use, economic, and transportation decisions will be integrated in a manner that supports a healthy environment, addresses global climate change, achieves social equity, and is attentive to the needs of future generations. and; Whereas the central Puget Sound region is expected to add 1.3 million people and 1.1 million jobs by the year 2040; and Whereas VISION 2040 includes among its goals (1) maintaining a prosperous and sustainable regional economy by supporting businesses and job creation, investing in all people, sustaining environmental quality, and creating great central places, diverse communities, and a high quality of life, and (2) focusing growth within already urbanized areas to create walkable, compact, and transit oriented communities, and (3) meeting housing needs through preservation and expansion of a range of affordable, healthy and safe housing choices; and Whereas the voters of the central Puget Sound region have committed to a $15 billion investment in light rail, commuter rail, bus rapid transit and local streetcar service that creates a once -in -a- lifetime opportunity to plan for and support the growth of communities near high capacity transit; and Whereas in 2010 the region adopted Transportation 2040, a long -range transportation plan designed to implement VISION 2040 that calls for implementation of an aggressive transit strategy to keep up with increasing population and employment growth, including completion of Sound Transit 2 projects, additional Link light rail extensions to Everett, Tacoma, and Redmond, and local transit service increases of more than 100 percent in peak periods and over 80 percent in off -peak periods; and Whereas The Regional Economic Strategy recognizes that transportation investments must address the diverse needs of the region's economy and support key employment sectors, provide more convenient and varied transportation options, and improve travel reliability to maintain and enhance quality of life in the region for workers and support local businesses; and Whereas approximately 45% of households currently residing in proximity to existing and planned light rail corridors are moderately or severely housing cost burdened; and Whereas current income distribution for the region shows 13% of households earn between 0 -30% of the area median income, 12% of households earn between 30 -50% of the area median income, and 18% of households earn between 50 -80% of the area median income; and Whereas new market -rate housing trends and subsidized housing resources are not providing sufficient housing choices in transit communities for households earning under 80% of the area median income; and Growing Transit Communities Compact 1 August 23, 2013 2 110 Whereas the combined cost burden of housing plus transportation can be substantially reduced by locating affordable housing opportunities in proximity to transit; and Whereas the report "Equity, Opportunity, and Sustainability in the Central Puget Sound Region" identifies a widespread pattern within the region of unequal household access to educational, economic, transportation, environmental health, and neighborhood resources; and Whereas many communities that are now or may be served by high- capacity transit are home to low- income and minority households and small locally- and minority -owned businesses that are at a potentially higher risk of displacement due to a range of factors; and Whereas transit - oriented development is a land use pattern with many social, economic, and environmental benefits, including more sustainable and efficient use of urban land, support for regional and local economies, reduced combined housing and transportation costs per household, and improved access and mobility for residents; and Whereas the Growing Transit Communities Partnership, a diverse coalition of governmental and nongovernmental partners, was funded by a grant from the federal Partnership for Sustainable Communities for the express purpose of helping to implement VISION 2040 by leveraging regional transit investments to create thriving and equitable transit communities around light rail and other high- capacity transit stations; and Whereas the Equity Network Steering Committee has defined equity to mean that all people can attain the resources and opportunities that improve their quality of life and enable them to reach their full potential; and Whereas the Growing Transit Communities Partnership defines equitable transit communities as follows: Equitable transit communities are mixed -use, transit - served neighborhoods that provide housing and transportation choices, and greater social and economic opportunity for current and future residents. Although defined by a half -mile walking distance around high- capacity transit stations, they exist within the context of larger neighborhoods with existing residents and businesses. These communities promote local community and economic development by providing housing types at a range of densities and affordability levels, commercial and retail spaces, community services and other amenities integrated into safe, walkable neighborhoods. Successful equitable transit communities are created through inclusive planning and decision - making processes, resulting in development outcomes that accommodate future residential and employment growth, increase opportunity and mobility for existing communities, and enhance public health for socially and economically diverse populations Whereas Growing Transit Communities Partners recognize that transit communities throughout the region will have unique roles, functions, and opportunities, and will develop with different uses at varying intensities; and Whereas creating vibrant transit - oriented communities can be substantially advanced through the development of additional tools and funding for infrastructure improvements in communities along transit corridors; and Growing Transit Communities Compact 1 August 23, 2013 3 111 Whereas Growing Transit Communities Partners believe that progress toward creating equitable transit communities will depend on active participation from a full range of partners over the long term, including transit agencies, businesses, non - profit organizations, as well as local jurisdictions and the Puget Sound Regional Council; and Whereas the Growing Transit Communities Partnership has developed a Toolkit of Strategies and Actions that recommend adoption of specific actions and tools by regional and local governments, by both public and private stakeholders, in order to create, grow, and enhance equitable transit communities throughout the region; and Whereas updates to local comprehensive plans and development regulations, transit agency plans, and the refinement of regional growth and transportation plans present continuing opportunities to implement the Toolkit of Strategies and Actions; Now, therefore, the signatories to this Regional Compact: Agree that the region's long -range growth management, economic, environmental, and transportation goals depend heavily on continued investment in more and better public transportation services ; and Acknowledge the acute need for additional resources and tools to create and preserve affordable housing throughout the region; and Recognize that cities and counties will require new resources to create the critical physical and social infrastructure that will support growth, including transportation, utilities, recreation, and public services; and Agree that progress toward equitable transit communities requires a cooperative, regional approach with diverse partners across governmental and nongovernmental sectors that supports and builds upon existing and ongoing planning efforts by regional and local governments and transit agencies; and Commit to build upon the work of the Growing Transit Communities Partnership through the promotion of equitable transit communities in light rail station areas and transit nodes located within the region's three long -range light rail transit corridors, and around transit nodes outside these corridors in other parts of the region; and Recognize that each corridor is at a different stage of high- capacity transit system development, and that future stations may be identified and sited that should also be considered under this Compact; and Understand that this Compact is designed to express the intent of diverse partners to work together toward common goals, with specific actions identified by partners appropriate to their roles and responsibilities; and Recognize that the policies and programs promoted by the Growing Transit Communities Partnership may also benefit community development around other transit investments and corridors, including but not limited to bus rapid transit, streetcar, commuter rail, intercity express bus, and ferries; and Support a continuing process of collaboration and coordinated action to advance the development of equitable transit communities, as guided by the following goals, signatories to this Compact will strive to: Growing Transit Communities Compact 1 August 23, 2013 4 112 Attract more of the region's residential and employment growth to high capacity transit communities. VISION 2040 calls for a compact pattern of growth within the Urban Growth Area, particularly in regional and subregional centers served by high capacity transit. The Growing Transit Communities work program has demonstrated that the region's light rail corridors alone have the potential to support this vision by attracting at least 25% of the housing growth and 35% of the employment growth expected in the region through the year 2040. Attracting additional TOD market demand to other regional corridors that are served by other types of high capacity transit is also essential. To advance the Regional Growth Strategy adopted in VISION 2040, promote economic development, and realize the multiple public benefits of compact growth around rapid transit investments, the signatories to this Compact will strive to: • Use a full range of tools, investments, and economic development strategies, to attract the potential demand for residential and commercial transit oriented development within transit communities consistent with and in furtherance of regional policies and plans, and • Plan for and promote residential and employment densities within transit communities that support ridership potential and contribute to accommodating growth needs within each high - capacity transit corridor. Additional transit communities along the region's other high- capacity transit mode corridors will also attract significant portions of future residential and employment growth. Provide housing choices affordable to a full range of incomes near high- capacity transit. Adopted regional policy recognizes housing as a basic human need and calls for local policies and tools that provide for an adequate supply of housing affordable at all income levels, to meet the diverse needs of both current and future residents. Region -wide, affordable housing need is defined by current household incomes, where 18% of households earn between 50% and 80% of AMI, 12% earn between 30% and 50% of AMI, and 13% earn less than 30% of AMI. In transit communities, projected need for affordable housing is higher, especially for households in the lowest income range due to their greater reliance on transit. Depending on local market conditions, efforts to meet that need will focus on new housing, housing preservation, or combined strategies. In order to meet a substantial portion of this need within walking distance of rapid transit services, the signatories to this Compact will strive to: • Use a full range of housing preservation tools to maintain the existing level of affordable housing within each transit community, and • Use a full range of housing production tools and incentives to provide sufficient affordable housing choices for all economic and demographic groups within transit corridors, including -new housing in the region's transit communities collectively that is proportional to region -wide need or greater to serve transit - dependent households. Growing Transit Communities Compact 1 August 23, 2013 5 113 These goals apply to the region's transit corridors collectively, and do not suggest a specific desired outcome for any individual transit community. Further, fully attaining these goals will require new tools, resources, and subsidies beyond those that exist today. Increase access to opportunity for existing and future residents of transit communities. Adopted regional policy recognizes the need to address the diverse housing, transportation and economic needs of current and future residents so that all people may prosper as the region grows. This requires special attention to communities that lack access to transportation choices, quality schools, and other social and physical neighborhood components that allow community members to thrive and succeed. In order to more equitably meet the needs of all residents of the region, the signatories to this Compact will strive to: • Improve access to opportunity in the transit corridors through targeted investments that meet the needs of residents and businesses in communities with limited access to opportunity, targeted affordable housing investments in communities with good access to opportunity, and transit connections linking areas with good access to opportunity and areas with limited access to opportunity. • Use a full range of community engagement strategies to increase the involvement of diverse and historically under - represented groups in transit community development, empower communities to influence decisions at all levels of government, and ensure opportunities for participation throughout decision - making processes. In order to maximize this historic opportunity, show regional leadership, and act as a national model of how diverse stakeholders can make transformative decisions that advance a region's goals for its people, its prosperity, and the planet, the signatories to this Compact pledge to work individually and collaboratively toward the goals described above, and toward the implementation of the Growing Transit Communities Strategy, as appropriate to each jurisdiction and organization. PSRC will periodically convene representatives of Compact signatories as an Advisory Committee to evaluate the region's progress over time toward achieving equitable transit communities. PSRC's regional monitoring program will track progress of implementing and achieving the goals described in this compact. Growing Transit Communities Compact 1 August 23, 2013 6 114 Signatories to the Growing Transit Communities Compact Name, Title, Organization Date Name, Title, Organization Date Name, Title, Organization Date Name, Title, Organization Date Name, Title, Organization Date Name, Title, Organization Date Name, Title, Organization Date Name, Title, Organization Date Name, Title, Organization Date For more information on the Growing Transit Communities Partnership, please contact Program Manager Ben Bakkenta (bbakkenta@psrc.org or 205 - 971 -3236) or visit. the Growing Transit Communities website at http: / /www.psrc.org /growth /growing- transit- communities/ Growing Transit Communities Compact 1 August 23, 2013 7 115 Crowing Transit Communities Strategy Executive Summary Our region has a shared vision for a sustainable future that will benefit our people, our prosperity, and our planet. VISION 2040, the central Puget Sound region's long -range plan for growth, transportation, and economic development, describes the commitments, actions, and stewardship needed over many decades by many stakeholders to achieve far- reaching goals. As the region grows to 5 million people —a more than 30 percent increase —by the year 2040, a key goal calls for growth within existing urban areas and especially in compact, walkable communities that are linked by transit. The region's recent commitments to invest over $15 billion in high- capacity transit (light rail, bus rapid transit, express bus, streetcar, and commuter rail) present an once -in -a- lifetime opportunity to locate housing, jobs, and services close to these transit investments, and to do so in a way that benefits surrounding communities. A region -wide coalition of businesses, developers, local governments, transit agencies, and nonprofit organizations —the Growing Transit Communities Partnership —spent three years working together to create solutions that will encourage high - quality, equitable development around rapid transit, The Challenges Growth, as envisioned in VISION 2040, should benefit all people by increasing economic development and access to jobs, expanding housing and transportation choices, promoting neighborhood character and vitality, and improving public health and environmental quality. But, this is easier said than done. In particular, this growth may magnify several challenges currently facing the region: Living in and working in walkable, transit - served communities. Recent market studies show that there is significant unmet demand for housing and jobs located within walking distance of transit. Many people want to live and work in compact, complete, and connected communities, but investments in transit and in transit station areas have fallen behind. Attracting growth to transit communities will require policies to encourage more housing and jobs near transit along with investments in the infrastructure and services for a growing population. Housing choices for low and moderate income households near transit. Forty -three percent of the region's households make less than 80 percent of the area median income. However, most new market - rate housing that is accessible to transit is unaffordable to these households. With new investment in transit communities, many lower -cost units are at risk of displacement. For the lowest income households, many of whom are transit dependent, the supply of subsidized housing is far short of the need. Building mixed - income communities that meet these needs will require improved strategies to minimize displacement, and preserve and produce diverse housing types affordable to a full range of incomes. Equitable access to opportunity for all the region's residents. Analysis of indicators across the region reveals that too many people do not have access to education, employment, mobility, health, and neighborhood services and amenities. These community resources are the building blocks that create the opportunity to succeed and thrive in life. Transit communities, with their access to the region's jobs, institutions, and services are critical focal points for achieving greater equity for the region's diverse residents. As these communities grow through public and private investment, equitable development will require targeted community improvements and strategies to connect existing and future residents to greater regional resources. Attachment C 116 Why Now? In the last decade, central Puget Sound voters have approved a series of high- capacity light rail and other transit investments —a commitment of approximately $15 billion —that will serve the region's most densely populated and diverse communities for decades to come. These investments present an once -in -a- lifetime opportunity to support and improve existing communities and meet regional goals through strategies to make great places for people to live and work. In order to do this, the region must: Leverage transit investment to build sustainable communities. Transit investments, such as light rail, streetcars, commuter rail, and bus rapid transit, create value by connecting communities to the larger region. Transit communities are the best opportunity for the region to become more sustainable, prosperous, and equitable. Create new resources and tools. Current resources available to governmental and non - governmental agencies alike are not enough. New tools and funding sources will be necessary to meet infrastructure, economic development, housing, and other community needs. Work together across the region and across sectors. It will take collaboration among a wide spectrum of public, private, and nonprofit agencies and organizations working together to promote thriving and equitable transit communities. There are roles for everyone in this process. The Strategy How will this all be accomplished? The Growing Transit Communities Strategy calls for regional and local actions that respond to the challenges and opportunities in transit communities and represent major steps toward implementing the growth strategy in VISION 2040. The Strategy was developed by the Growing Transit Communities Partnership, an advisory body of various public, private, and nonprofit agencies and organizations working together to promote successful transit communities. The Growing Transit Communities Partnership, funded by a three -year grant from the federal Partnership for Sustainable Communities and housed at the Puget Sound Regional Council, established three main goals for the Strategy: • Attract more of the region's residential and employment growth near high- capacity transit • Provide housing choices affordable to a full range of incomes near high- capacity transit • Increase access to opportunity for existing and future community members in transit communities Too/kit of Strategies and Actions Twenty -four strategies, guided by a People + Place Implementation Typology, constitute the "playbook" for the Growing Transit Communities Strategy. From overarching regional approaches to local and individual actions, together these provide a set of coordinated steps toward ensuring a prosperous, sustainable, and equitable future. The Strategy presents 24 strategies recommended by the Growing Transit Communities Partnership and includes specific actions for PSRC, transit agencies, local governments, and other regional partners. The recommendations address the three main goals for transit communities. As a whole, the strategies are a call to action for partners across the region to redouble efforts to create great urban places and build equitable communities around transit. Fully recognizing the strong policy foundation embodied in regional and local plans, as well as the innovative work in implementing those plans to date, the Partnership makes these recommendations as a challenge to do more than is being doing today. 117 The Toolkit of Strategies and Actions fall into four groupings: The Foundation Strategies recommend a regional and local framework for ongoing work to support transit communities. Modeled on the relationships and values at the heart of the Growing Transit Communities Partnership, these strategies envision an ongoing regional effort involving a variety of partners and community members in decision making and implementation at all levels. The Strategies to Attract Housing and Employment Growth recommend actions to make great urban places that are attractive to households and businesses, remove barriers to development, and support development in emerging markets. The Strategies to Provide Affordable Housing Choices recommended actions to define and quantify housing needs, preserve existing affordable housing and supply new housing choices, and capitalize on the value created by the private market — enhanced by transit investments —in order to achieve the broadest range of affordability in transit communities. The Strategies to Increase Access to Opportunity recommend actions to understand regional disparities in access to opportunity, identify existing and potential new resources and tools to meet community needs, and build support for equitable opportunities through education, coalitions, and leadership. 1. Establish a regional program to support thriving and equitable transit communities 2. Build partnerships and promote collaboration 3. Engage effectively with community stakeholders 4. Build capacity for community engagement 5. Evaluate and monitor impacts and outcomes 6. Conduct station area planning 7. Use land efficiently in transit communities 8. Locate, design, and provide access to transit stations to support TOD 9. Adopt innovative parking tools 10. Invest in infrastructure and public realm improvements 11. Assess current and future housing needs in transit communities 12. Minimize displacement through preservation and replacement 13. Increase housing support transit - dependent populations 14. Implement a TOD property acquisition fund 15. Expand value capture financing as a tool for infrastructure and affordable housing 16. Make surplus public lands available for affordable housing 17. Leverage market value through incentives 18. Implement regional fair housing assessment Acces Oppo 19. Assess community needs 20. Invest in environmental and public health 21. Invest in economic vitality and opportunity 22. Invest in equitable mobility options 23. Invest in equitable access to high quality education 24. Invest in public safety in transit communities Successful implementation will require shared commitment and collaboration among governments, major stakeholders, and community members. There are roles for many different regional and local partners, each with a distinct jurisdiction, authority, and mission. Consistent with those roles, all are asked to use the Toolkit of Strategies and Actions as a "playbook" 118 for taking action to advance the regional vision of creating thriving and equitable transit communities in a manner that is a best fit to each community. People f Place Implementation Typology No two transit communities are alike. Accordingly, there is no one -size- fits -all approach to the strategies that will help a transit community thrive a plemtation approaches and grow with equitable outcomes for current and future community members. The Strategy presents the People + Place Implementation Typology as a regional framework for local implementation. Working with stakeholders from each of three major light rail corridors, the trransFZcorn Growing Transit Communities Partnership analyzed conditions in 74 study areas as a basis for a set of locally tailored recommendations. Based on indicators of the physical, economic, and social conditions in each transit community, the results of this typology analysis suggest eight Implementation Approaches. Key strategies and investments address the needs and opportunities in different communities, while also advancing regional and corridor -wide goals. The Implementation Approaches and typology analysis are intended to complement and inform existing regional and, especially, local plans as they are implemented, evaluated, and refined in the coming years. The Next Steps The Growing Transit Communities Strategy includes a three -part implementation plan to promote thriving and equitable transit communities in the central Puget Sound region. The Regional Compact affirms the support of a variety of partners from throughout the region for the Partnership's work and a commitment to work toward regional goals by implementing the Strategy. The Toolkit of Strategies and Actions and the People + Place Implementation Typology, as described above and detailed in the body of this report, include 24 recommended strategies, eight implementation approaches, and corridor specific priorities that will guide an evolving approach to transit communities. The Individual Work Plans are local government, agency, or organization specific work plans, to be developed individually and in consultation with PSRC staff, which define short- and medium -term actions that can implement the Strategy. The nature and format of the Individual Work Plans will vary to reflect the diversity of public and private partners, legislative and decision - making processes, and actions adopted. By working together, the central Puget Sound region can achieve its vision for a sustainable future that advances our people, our prosperity, and our planet. The Growing Transit Communities Strategy lays out essential tools and actions to get us there. September 2013. For more information on the Growing Transit Communities Strategy, please visit www.nsrc.orq. 119 120 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) October 15, 2013 MEETING SUMMARY Members Mayor Pete Lewis (Chair) Councilmember Marcie Palmer (Vice - Chair) Councilmember Kate Kruller Councilmember Wayne Snoey Councilmember Carol Benson Mayor Dave Hill Councilmember Dana Ralph Stacy Trussler Andrew Glass Hastings Councilmember Garry Ladenburg Brian Ziegler Rick Perez Councilmember Bill Peloza Councilmember Stacia Jenkins I. Open Meeting City of Auburn City of Renton City of Tukwila City of Covington City of Black Diamond (Alternate) City of Algona City of Kent (Alternate) WSDOT King County Executive (Alternate) City of SeaTac Pierce County (Alternate) City of Federal Way (Alternate) City of Auburn (Alternate) City of Normandy Park After opening comments and introductions the Board approved the meeting summary for the September 17, 2013 SCATBd meeting. II. Reports Chair Lewis asked for volunteers for the nominating subcommittee for SCATBd's 2014 Officers, Councilmembers Kruller, Ladenburg, and Jenkins volunteered to serve on the nominating subcommittee. Chair Lewis also asked for volunteers for a subcommittee to review the SCATBd Procedures document, Councilmembers Snoey, Palmer, and Peloza volunteered to serve on the subcommittee. Chair Lewis urged members to attend the legislative listening sessions being held though out the area. Chair Lewis asked that Board members talk about our transportation funding crisis it terms of it impacting local jobs and the economy. Board members asked the Chair to send them for 4 or 5 talking points to help highlight this funding crisis message with State Legislators. III. City of Kent, South Central Ave Rehabilitation Project Update, Mark Howlett Mark Howlett, Design Engineer Manager for the City of Kent, briefed the Board on Kent's Central Avenue South rehabilitation project. Mr. Howlett said that Central Avenue is a principle arterial that connects the urban centers of Kent and Auburn and carries about 121 27,000 vehicles per day. He said that the closure of the Alvord T Bridge has also increased traffic volumes on Central Avenue, and it also serves as a relief route for SR 167. He said the pavement on Central Avenue is failing in many locations and there are substandard and missing sidewalk sections along the length of the project. The rehabilitation project includes full width overlay of the entire roadway to add additional service life to the road, replace the curbs, gutters and sidewalks, and some minor drainage system improvements. Mr. Howlett said the total project cost was $5 million, and about $4.2 million is unfunded. IV. King County Snow /Ice Response Plan, Chris Wierzbicki Chris Wierzbicki, King County Road Services Division Deputy Director, briefed Board members on King County's snow and ice response plan. Mr. Wierzbicki said in 2010, when the last major snow and ice event occurred, King County was able to plow about 30% of is unincorporated area roads. He said that because off current revenue shortfalls, King County will only be able to plow of 10% of those unincorporated area roads in the event of a snow and ice storm. King County Road Service Division gets most of its money from property taxes, and property tax revenues have dropped by 44% since 2009. This drop in drop in property tax revenues has resulted in a third reduction in King County Road Services Division funding. He said King County has lost about 50% of its employees, including staff that are certified to work on snow and ice removal. Mr. Wierzbicki said that unincorporated area residents will have limited access to and from their homes, and said that they will have to start planning ahead in the event of a snow and ice storm. He said King County is working with cities to coordinate snow and ice response efforts. Board members said that the County and SCATBd jurisdictions should put together a map that shows cities and county corridors that will be plowed in a snow or ice events. Mr. Wierzbicki mentioned the King County Road Alert website and said the County received grant funds to encourage a partnership with cities in sharing road- related information on the County's Road Alert web page including snow and ice event information. Board members also mentioned that Metro Transit has developed a countywide map transit snow routes. Board members also asked their public works staff to discuss possible opportunities to assist the County to plow arterials in unincorporated islands such as King County's Central Avenue South between Kent and Auburn. V. Washington State Rail Plan Update, Keri Woehler. (1.22) Keri Woehler, WSDOT's Rail Operations Program Manager, briefed the Board on the draft Washington State Rail Plan. Ms. Woehler said the draft Plan was released for public review and comments are due to WSDOT by December 2, 2013. She said the purpose of the Rail Plan is to fulfill federal and state requirements; and provides an integrated plan for freight and passenger rail, and includes 5 and 20 year rail funding strategies. She said the plan . builds on previous rail plans and will serve as a strategic blueprint for future public investment in the state's rail transportation system. Ms. Woehler highlighted the current strengths of Washington's rail system. She said the system currently providing good mobility for existing train volumes, provides an extensive 2 122 rail network that connects citizens and industry, and is a fuel - efficient passenger and freight transportation mode. She said future rail challenges include meeting future demand, preserving access to national and global markets, short rail line modernization and compatibility with Class I railroads; increasing ridership on intercity passenger rail, and maintaining a safe rail system. The draft Plan identified the rail system needs which included addressing constraints to ensure that rail capacity meets future demand, preserve the existing rail capacity and infrastructure, and enhancing the efficiency and reliability of existing services. The draft plan recommends that State action and investments in rail be based on performance measures, and continued incremental improvement of intercity passenger rail needs. Ms. Woehler said the next steps included finalizing the Washington State Rail Plan in December 2013, incorporate the results into State's Freight Mobility Plan and Washington Transportation Plan; and to continue collaborative planning with rail stakeholders and partners to refine and focus investment priorities. The Board asked staff to draft a SCATBd Rail Plan comment letter that addresses grade separation projects, the looming freight mobility crisis, and the passenger rail. Board members recommended that the comment letter be based on the SCATBd letter that was sent to Governor Inslee in August that highlighting the need for a transportation funding package. Other Attendees: Brandon Carver, Des Moines Torn Gut, SeaTac Mark Howlett, Kent Chad Bieren, Kent Jeremy Jewkes, WSDOT Chris Wierzbicki, King County Susan Oxholm, King County Dan Anderson, King County Keri Woehler, WSDOT Denis Dowdy, Auburn Cathy Mooney, Kent 3 123 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) OPERATING PROCEDURES Revised , 2013 The purpose of these procedures is to guide the conduct of business of the South County Area Transportation Board (SCATBd) and its Technical Advisory Committee (TAC). These procedures shall be reviewed and revised annually as needed. I. SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) A. Mission: The Board shall serve as a South County forum for information sharing, consensus building, and coordination to resolve transportation issues, identify priorities, and promote transportation plans and programs that benefit the South County area (Mission Statement adopted January 16, 1996) B. Goals: (Goals adopted July 19th, 1994. and subsequently amended) Goal 1: Develop and promote a transportation system that will provide personal mobility choices for South County residents consistent with the transportation goals of the Growth Management Act and Goal 2 Develop and promote transportation and related actions that accommodate economic development, through efficient movement of people, freight, and goods within the South County and contiguous areas. C. Role: The SCATBd is the forum established for the South King County area at which elected officials may provide input into local, regional, state and federal transportation- related issues or any other related issues as the members determine. D. Membership and Voting: Membership shall be extended to the following local jurisdictions and agencies. The Board shall operate by consensus whenever possible, but in those matters requiring a vote, voting shall he assigned as indicated below: 124 2 The voting members of SCATBd and their voting rights shall be as follows: Full Voting Members Number of Reps. Voting Rights Sound Transit Metro Transit Membership and Dues' Sound Transit Metro Transit3 Regional Competition° Other' City of Algona 1 Yes Yes Yes Yes Yes City of Auburn 1 Yes Yes Yes Yes Yes City of Black Diamond 1 Yes No Yes Yes Yes City ofBurien 1 Yes Yes Yes Yes Yes City of Covington 1 Yes Yes Yes Yes Yes City of Des Moines 1 Yes Yes Yes Yes Yes City of Enumclaw 1 Yes No Yes Yes Yes City of Federal Way 1 Yes Yes Yes '. Yes Yes City of Kent 1 Yes Yes Yes ' Yes Yes City of Maple Valley 1 Yes Yes Yes Yes Yes City of Milton 1 Yes Yes Yes Yes Yes City of Normandy Park 1 Yes Yes Yes Yes Yes City of Renton 1 Yes Yes Yes* ' Yes City of SeaTac 1 Yes Yes Yes Yes Yes City of Tukwila 1 Yes Yes Yes Yes Yes City of Pacific 1 Yes Yes Yes Yes Yes Muckleshoot Indian Tribe 1 Yes Yes Yes Yes Yes King County 3 Yes Yes Yes Yes Yes The limited voting members of SCATBd and their voting rights shall be as follows: Limited Voting Members Number of Reps. Voting Rights Membership and Dues . Sound Transit Metro Transit Regional Competition Other 1 Pierce County 1 No No No No Yes The non - voting members of SCATBd shall be as follows: Non - Voting Member Number of Representatives Pierce Transit 1 Port of Seattle 1 Port of Tacoma 1 Puget Sound Regional Council 1 South Sound Chambers of CommerceCoalition 1 Sound Transit 1 Washington State Department of Transportation 1 'Administrative issues, such: additional members and use of dues ' Recommendations to Sound :Transit on policies and capital and service plans and implementation 3 Recommendations to King County Metro Transit on policies and capital and service plans and implementation 4 identification of projects for the regional competition, if prescribed by process approved by the King County caucus of the Transportation Policy Board ( *projects in Renton south of the Cedar River) Other recommendations including • Recommendations to WSDOT on policies, programs and projects. • Recommendations to the PSRC on plans, policies, programs and projects such as the Transportation 2040 update and regional funding policies, strategies or programs. • Input to the State Legislature and committees and commissions established by the Legislature on transportation policy, budget and priorities and legislative proposals and studies. • Recommendations to the federal delegation on federal legislation including reauthorization and funding priorities and other transportation - related programs. 2 125 3 Other limited voting and non - voting members may be added as the Board determines. Each limited voting and non - voting member should appoint one representative and one alternate to the Board. The limited voting member designated alternate may vote in place of designated limited voting representatives in the absence of the designated limited voting representative. E. Officers: 1. Chair: Responsible for 1) conducting and ensuring fair opportunity for discussion, 2) signing correspondence and speaking on behalf of SCATBd, 3) providing direction on agenda preparation. 2. Vice - Chair: Responsible to act as chair in his /her absence. 3. Term of Office: One year from January. Elections in. December 4. Officers must be elected officials F. Meeting Schedule: The regular meeting date for SCATBd shall be the third Tuesday of the month, from 9:00 a.m. to 11:00 a.m. The meeting location shall be held at an appropriate location within South King County. The agenda package shall be distributed in advance of the meeting. Adjustments to the regular meeting schedule and meeting location shall occur as needed. G. Board Actions Require a Quorum of Full Voting Members: 1. A quorum is: 50 percent plus 1 full voting members.' 2. Type of Actions Board Can Take: The Board may undertake activities consistent with its purpose and shall prepare an annual work program for the following year for submittal to its member jurisdictions by January 31 of each year. 3. Type of Actions Board Cannot Take: The Board cannot take action to approve /disapprove or adopt any position on behalf of member jurisdictions /agencies without authorization to do so from those jurisdictions. In issuing communication or statements, it should be made clear that the Board is not acting on behalf of its member jurisdictions /agencies. 4. Schedule for Action Items: Action items will be presented at one meeting and acted on at a second meeting unless three - quarters of the voting Board members present agree that the circumstances require action to be taken at that time PROVIDED that there is a quorum of voting members (at least 50 percent plus one). 5. Minority Statements: Any individual full voting Board member or limited voting member -shall have the right at the time of the vote to request that a statement of a minority position be included in Board communications or otherwise distributed with an approved Board statement. 11. Subcommittees of the Board: Subcommittees of the Board shall be established as needed. 3 126 4 II. TECHNICAL ADVISORY COMMITTEE A. Purpose: The TAC shall provide technical assistance as requested by the Board and shall advise the Board on emergent transportation issues for the Board's consideration including regional project identification and countywide project selection. B. Membership: Each SCATBd member (full, limited, or non - voting member) shall appoint an appropriate representative to the Technical Advisory Committee (TAC). C. Meeting Schedule: The TAC shall meet when requested by the Board to provide technical assistance and advise on emergent transportation issues. III. OTHER A. Standard Agenda: 'The SCATBd agenda shall follow this standard format unless unusual circumstances require a different arrangement. 1. Call to Order 2. Approval of Minutes 3. Report of the Chair 4. Communications and Citizens Requests to Comment 5. Major Agenda Topics B. Audience Comments during Meetings: At the Chair's discretion, comments may be taken from the audience. The Chair should call on audience members wishing to make comments. SCATBd members can ask to have audience members speak. Audience comments should be limited to two minutes. C. Distribution of Materials: Letters and documents may be distributed with the agenda at the direction of the Chair as authorized by the policies and procedures of the jurisdiction providing staff support. D. Citizen Involvement: Interested citizen groups shall be placed on the distribution list for Board meetings to ensure that those groups are kept informed of Board activities. 4 127 South County Area Transportation Board MS: KSC -TR -0814 201 South Jackson Street Seattle, WA 98104 -3856 Phone: (206) 684 -1417 Fax: (206) 684 -2111 Date, 2013 Ron Pate, Rail Director PO Box 47407 310 Maple Park Avenue SE Olympia, WA 98504 -7407 Dear Mr. Pate, Thank you for the opportunity to comment on the Washington State Rail Plan, public review draft. The South County Area Transportation Board (SCATBd) is a collaborative effort of local elected officials who are committed to improving the region's transportation system. SCATBd represents an area that encompasses 15 south King County cities including 690,000 city and county residents, and is home to over 300,000 jobs. The south King County area also has one of the largest manufacturing and industrial areas in the Pacific Northwest, and our area's transportation system plays an important role in supporting the economic vitality of the region and state through the efficient movement of people and goods. The two Class 1 rail lines run north /south thought the South King County area. Local Transportation Funding Short -Falls The draft plan forecasts increasing demand for passenger and freight rail services in Washington State, and an increase in rail traffic will affect traffic delay and safety at grade crossings in our valley cities. Table D1 of the draft plan lists a number of partially funded and unfunded grade separation projects in the south King County area. However, because of mounting funding shortfalls, SCATBd jurisdictions are unable to fund these needed grade separation projects. SCATBd members recommend the draft plan highlight the local agency funding shortfalls for these grade separation projects and the impacts of not building these grade separation projects on the movement of people and freight. In order to continue and facilitate state -level revenue and funding discussions, we need to acknowledge our local funding shortfalls in our various local and state transportation planning documents such as the Washington State Rail Plan and the Washington State Freight Mobility Plan. At -Grade Crossings Transportation Impacts to Local Communities One of the themes that emerged from the draft Washington State Rail Plan stakeholders outreach efforts included community impacts of rail. Stakeholders identified the need to address traffic congestion and safety at at -grade crossings, and to evaluate opportunities for freight and passenger rail to contribute to local economic development. The draft rail plan section entitled "Challenges and Other Issues Facing Class 1 Rail Roads, Relationships Between Communities and Class 1 Railroads (page 46)" should be expanded to include a more in -depth analysis on the impacts of freight rail and passenger rail traffic at grade crossings. The analysis should include a focus on the impacts of freight and passenger rail operations on surface movement of people and Algona • Auburn • Black Diamond e Burien • Covington • Des Moines • Enumclaw • Federal Way • Kent • King County • Maple valley Mucldeshoot Indian Tribe • Normandy Park e Renton • SeaTac • Tukwila • Pacific • Pierce County • Pierce Transit • Port of Seattle • Port of Tacoma • Puget Sound Regional Council • South Sound Chambers of Commerce Coalition • Sound Transit • Transportation Improvement Board • Washington State Department of Transportation • Washington State Transportation Commission 128 freight at grade crossings. The analysis should also include the economic and social impacts of travel delays experienced by travel of emergency vehicles, truck freight traffic, passenger vehicles, and transit. Impacts of Potential Increase in Coal and Crude Oil Train Traffic SCATBd would also like to see an expanded discussion and analysis on the impacts of potential coal and crude oil train traffic on track availability for freight /trade movement of goods in and out of our region. Currently, several proposals are under consideration to enhance port capacity, including a bulk coal export facility at Cherry Point in Whatcom County. If the Cherry Point bulk export facility were to be developed, it could add up to eighteen, mile- and -a -half long trains per day. Oil refineries in our state have typically received crude oil shipments from Alaska and elsewhere by ship, barges or pipelines, but refiners are increasingly turning to trains to take advantage of a boom in oil from North Dakota's Bakken region. This potential increase in coal and crude oil trail traffic could result in significant impacts to both current and future freight and passenger train traffic in our state. This potential increase in coal and crude oil train traffic is a major concern for SCATBd members because of the potential impacts to South King County cities and our regional economy. Our region's economy relies on the rail corridor to move parts and finished projects and an increase in coal and crude oil train traffic could impact existing and future rail - dependent economic development. This increase in coal and crude oil train traffic would also have significant impacts at grade crossings, impacting the flow of freight and goods flowing to and from our ports to the industrial and warehousing areas in the Green River Valley area. SCATBd supports the draft rail plan's vision that is guided by the six transportation system policy goals established by the state legislature which includes: economic vitality, preservation, safety, mobility, environment, and stewardship. SCATBd members are keenly aware of the economic importance of Washington's freight and passenger rail system and the key role it plays in the multimodal transportation system that keeps people, freight and goods moving in Washington State. Our local transportation systems also provide an important foundation for Washington's economy. It provides the vital connections that link our homes to our work places and carry products to Inarkef Again, thank you for the opportunity to comment on the draft Washington State Rail Plan and if you have any questions, please do not hesitate to contact us. Sincerely, Pete Lewis Marcie Palmer Chair Vice Chair South County Area Transportation Boar Algona • Auburn • Black Diamond • Burien • Covington • Des Moines • Enumclaw • Federal Way • Kent • King County • Maple Valley • Muckleshoot Indian Tribe • Normandy Park • Renton • Seaiac • Tukwila • Pacific • Pierce County • Pierce Transit • Port of Seattle • Port of Tacoma • Puget Sound Regional Council • South Sound Chambers of Commerce Coalition • Sound Transit • Transportation Improvement Board • Washington State Department of Transportation • Washington State Transportation Commission 129 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) MEETING Tuesday, November 19, 2013 9:00 — 11:00 a.m, SeaTac City Hall 4800 South 188th Street SeaTac AGENDA 1. Open Meeting • Introductions • Approve summary of October 15, 2013 SCATBd Meeting (Attachment A) Action 9:00 a.m. 2. Reports, Communications and Citizen Requests to Comment • Chair or Vice Chair • Participant Updates from RTC and Other Regional Committees • Legislative Update • Report SCATBd Agreement Subcommittee (Attachment B) • Report from the Officers Nominating Committee • Citizen Comment Reports and Discussion 9:05 a,m. 3. Washington Rail Plan SCATBd Comment Letter (Attachment C) Report and Discussion 9:40 a.m. 4. Metro Service Reduction Proposal - Victor Obeso, Metro Service Development Manager Report and Discussion 10:00 a.m. 5. Sound Transit Long Range Plan Briefing — Chelsea Levy, Sound Transit Report and Discussion 10:30 a.m, 130