HomeMy WebLinkAbout13-184 - City of Seattle / Department of Transportation - Staff, Equipment and Engineering ServicesFILE COPY
Contract 13 -184. - (0)
Supplement No. 2
Project No. 91410402
Letter of Understanding
Between Seattle Department of Transportation and City of Tukwila
This Letter of Understanding is an attachment to Interagency Agreement between Seattle DOT (SDOT)
and the City of Tukwila to provide staff and equipment services for the expected duration of the service
period.
SDOT Contact Person:
Paul Roberts
SDOT Structural Operations & Maintenance Manger
(206) 684 -8325
paul.roberts@seattle.gov
City of Tukwila Contact Person:
Grant Griffin
Project Manager
206 - 431 -2446
grant.griffin@tukwilawa.gov
Project:
SDOT will provide staff and U -BIT operation services to the City of Tukwila for purposes of accessing
the 42nd Avenue S. Bridge for inspection. The City of Tukwila will provide traffic control and a UBIT
Basket Operator approved by SDOT.
Duration of Services:
The duration of service is up to two (2) days scheduled in the second quarter of 2014
Location:
The location of the project will take place at the 42nd Avenue S Bridge in Tukwila, Washington
Staff to be provided:
SDOT will provide one qualified U -BIT Truck Operator.
Equipment to be provided:
SDOT will provide one Under Bridge Inspection Truck (U -BIT).
Insurance:
It is understood that the UBIT will be covered under the City of Seattle's self - insurance program during
the period that services are rendered to the City of Tukwila.
`)zVi C Lit
C1 Jim Haggerton, Mayor, City of Tukwila
Accepted:
Date
Paul Roberts, City of Seattle Date
13 -184
Interagency Agreement Council Approval N/A
Between Seattle Department of Transportation and the City of Tukwila to
provide Staff, Equipment and /or Engineering Services
This Interagency Agreement is made and entered into by and between the Seattle Department of
Transportation; hereinafter called SDOT, and the City of Tukwila, a political subdivision of the State of
Washington, hereinafter called Tukwila for the purpose of providing staff, equipment and /or engineering
services.
WHEREAS, SDOT has qualified staff and equipment necessary to perform the work desired by
Tukwila, that can help achieve cost savings and benefits in the public's interest.
NOW THEREFORE, the parties hereby enter into an Agreement as follows:
I. OVERVIEW
A. SDOT may provide staff, equipment and /or engineering services to work on Tukwila
projects. Tukwila shall identify a project in a Letter of Understanding (LOU) to SDOT for
review /approval.
B. SDOT is not obligated to provide staff, equipment or engineering services.
II. LETTER OF UNDERSTANDING
A. Tukwila shall prepare a LOU and identify a contract person(s) for a project or service. The
LOU shall identify the number of staff, equipment and /or engineering services expected for
the project's duration, and other provisions as deemed necessary.
B. The LOU shall be subject to approval in writing by SDOT's Director, and Tukwila or their
designated representative. The LOU becomes a valid Agreement when exacted by SDOT
and Tukwila or their designated representative.
III. PAYMENT
A. The leading party shall be reimbursed for all actual cost incurred for a project. Said cost
shall include all engineering, clerical, administrative, inspection services, material, and
annual administrative overhead.
B. The party receiving staff, equipment, and /or engineering services shall be billed on no more
than a monthly basis. These bills will reflect actual costs, to include salary, benefits and the
administrative overhead rates. All payments shall be due within 30 days of the billing date,
with one percent per month interest being charged to the receiving party as a delinquent
charge starting 30 days after the billing date.
C. In the event a lawsuit is instituted to enforce the payment obligations of the party receiving
staff, equipment and /or engineering services, the prevailing party shall be entitled to recover
all costs of such a lawsuit, including reasonable attorney's fees.
IV. SERVERSBILITY
A. This Interagency Agreement will be effective upon it's signing by both parties and will
remain in effect until terminated by 30 day's advance notice by either party.
,2 6R/6 //t/4-6,S
Agreement between SDOT and Tukwila to provide staff and equipment services
Page 2
B. In the event of termination of a Project or Service prior to the completion of the objective
contained within the LOU, all direct and indirect phasing -out cost shall be paid by the party
requesting termination. Termination cost claimed shall not exceed the actual costs incurred
as a result of termination of the Project or Services.
V. INDEMNIFICATION ANDHOLD HARMLESS
A. Each party hereto agrees to indemnify and hold harmless the other party, and it's officers,
agents, and employees, from all claims (including demands, suits, penalties, losses, damages
or costs of any kind whatsoever) to the extent such a claim arises or is caused by the
indemnifying party's own negligence or that of its officers, agents, or employees.
VI. OTHER PROVISIONS
A. No liability shall attach to SDOT or Tukwila by reason of entering into this Interagency
Agreement except as expressly provided herein.
B. This Interagency Agreement contains the entire written agreement of parties and supersedes
all prior discussion. This Interagency Agreement may be amended only in writing, signed by
both parties.
C. In providing services under this Interagency Agreement, SDOT shall be deemed an
independent contractor for all purposes and its employees shall not in any manner be deemed
to be employees or agents of Tukwila for any purpose. SDOT shall be responsible for all
federal and /or state tax, industrial insurance and Social Security liability that may result from
the performance of and compensation for these services and shall make no claim of career
service or civil service rights which may accrue to the lending party employee under State or
local law.
In consideration of the mutual benefit accruing herein, the parties hereto agree that the Interagency
Agreement as set forth herein will be performed by the parties under the terms of this Interagency
Agreement.
The parties hereto have executed this Interagency Agreement on the day and the year last written below.
City of Tukwila, Washington
Mayor
City ukwila
Nmitrytlx,c 151 WO
Date
Seattle Department of Transportation
Director of Roadway Structures
Seattle Department of Transportation
Date
i3
Letter of Understanding
Between Seattle Department of Transportation and City of Tukwila
This Letter of Understanding is an attachment to Interagency Agreement between Seattle DOT (SDOT)
and the City of Tukwila to provide staff and equipment services for the expected duration of the service
period.
SDOT Contact Person:
Paul Roberts
SDOT Structural Operations & Maintenance Manger
(206) 684-8325
Paul.roberts@seattle.gov
City of Tukwila Contact Person:
Grant Griffin
Senior Program Manager
(206) 431 -2446
Grant.Griffin@TukwilaWA.gov
Project:
SDOT will provide staff and U -BIT operation services to the City of Tukwila for purposes of access the
Boeing Access Bridge for inspection.
Duration of Services:
The duration of service is for four (4) days scheduled in the fourth quarter of 2013.
Location:
The location of the project will take place at the Boeing Access Bridge.
Staff to be provided:
SDOT will provide one qualified U -BIT Truck Operator and one qualified U -BIT Basket Operator.
Equipment to be provided:
SDOT will provide one Under Bridge Inspection Truck (U -BIT).
Insurance:
It is understood that the UBIT will be covered under the City of Seattle's self- insurance program during
the period that services are rendered to the City of Tukwila.
Accepted:
T Str ct
S
i�nV i�r l , 2or5
Date
Paul Roberts, ural Operations & Maintenance Manager
Date