HomeMy WebLinkAboutReg 2013-12-02 Item 5C - Resolution - 2013 Surface Water Comprehensive PlanCOUNCIL AGENDA SYNOPSIS
Initiate
Meeting Date
Prepared by ,, ,.
Ma) orr review
Coincil review
12/02/13
BG
1/14 e
E Ordinance
Mtg Date
E Bie L/loard
Mtg Date
El Public Hearing
'Arts Date
El Other
A Its Date
SPONSOR Council 1 Mayor E HR E DCD E Finance Fire E IT E P&R E Police Z PTV
SPONSOR'S This Resolution will approve the updated Surface Water Comprehensive Plan. Additional
SUMMARY components were added to the 2003 Plan that include; changes in regulations required
under the City's National Pollutant Discharge Elimination System (NPDES) Permit, our
current GIS inventory, the Tukwila South annexation area, and completed CIP projects.
New policies and potential hiring may be developed. Council is being asked to approve the
Resolution adopting the 2013 Surface Water Comprehensive Plan.
REVIEWED BY
1 - - - COW Mtg.
E CA&P Cmte F&S Cmte E Transportation Cmte
Cmte 0 Arts Comm. fl Parks Comm. E Planning Comm.
COMMITTEE CHAIR: JOE DUFFIE
'2 Utilities
DATE: 11/18/13
RECOMMENDATIONS:
SPoNsoR/ADmIN.
COMMITTEE
Public Works Department
ITEM INFORMATION
ITEM No.
5.C.
39
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DA1E: 12/02/13
AGENDA ITEM TITLE Resolution Adopting the 2013 Surface Water Comprehensive Plan
CATEGORY Discussion
Mtg Date
E Motion
Mtg Date 1
z Resolution
Mtg Date 12/02/13
E Ordinance
Mtg Date
E Bie L/loard
Mtg Date
El Public Hearing
'Arts Date
El Other
A Its Date
SPONSOR Council 1 Mayor E HR E DCD E Finance Fire E IT E P&R E Police Z PTV
SPONSOR'S This Resolution will approve the updated Surface Water Comprehensive Plan. Additional
SUMMARY components were added to the 2003 Plan that include; changes in regulations required
under the City's National Pollutant Discharge Elimination System (NPDES) Permit, our
current GIS inventory, the Tukwila South annexation area, and completed CIP projects.
New policies and potential hiring may be developed. Council is being asked to approve the
Resolution adopting the 2013 Surface Water Comprehensive Plan.
REVIEWED BY
1 - - - COW Mtg.
E CA&P Cmte F&S Cmte E Transportation Cmte
Cmte 0 Arts Comm. fl Parks Comm. E Planning Comm.
COMMITTEE CHAIR: JOE DUFFIE
'2 Utilities
DATE: 11/18/13
RECOMMENDATIONS:
SPoNsoR/ADmIN.
COMMITTEE
Public Works Department
Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 412 SUFACE WATER FUND
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
12/02/13
MTG. DATE
ATTACHMENTS
12/02/13
Informational Memorandum dated 11/15/13
Draft Resolution
Electronic copy of Surface Water Comp Plan on City's website
Minutes from the Utilities Committee meeting of 11/18/13
39
40
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee Vlease reel` ° the
FROM: Bob Giberson, Public Works Director e‘ectrortic coo/ oi the
BY: tiA ace Watef
2013 S
Ccolvpreheasive Vlan
Ryan Larson, Senior Engineer
f I
DATE: November 15, 2013 bekov'T
SUBJECT: Surface Water Comprehensive Plan
Project No. 91041202
Resolution adopting the 2013 Surface Water Comprehensive Plan
ISSUE
Approve Resolution adopting the 2013 Surface Water Comprehensive Plan.
BACKGROUND
The City hired CH2M Hill to update the current Surface Water Comprehensive Plan (SWCP) to
reflect changes in regulatory requirements and drainage needs within the City. The current
SWCP was completed in 2003 and does not reflect changes in regulations required under the
City's National Pollutant Discharge Elimination System (NPDES) Permit, our current GIS
inventory, completed CIP projects, the Tukwila South annexation area, nor newly identified
needs.
DISCUSSION
The 2003 SWCP was reviewed and updated based on current and projected needs. Additional
components were added to provide a more comprehensive review of the City's surface water
system. The updated 2013 SWCP contains the following overall changes:
• Drainage basin limits were revised based on new survey information
• Tukwila South area was added
• A map book was added showing all surveyed drainage facilities
• The CIP project list was revised to reflect new and completed projects
• A review was conducted on existing NPDES requirements to ensure full City compliance
• A field survey was conducted to map culverts that block fish passage
In additional, the 2013 SWCP makes specific policy recommendations designed not only to
meet minimum regulatory requirements, but also to proactively provide improvements to the
overall function of constructed and natural drainage systems. These recommendations are:
• A new/revised list of recommended capital improvement projects
• Increase environmental stewardship and education activities to promote awareness of
and a sense of responsibility for surface water and natural drainage systems
W:\PW Eng\PROJECTS\A- DR Projects\Surface Water Comp Plan (91041202)\info Memo - Plan Adoption .docx
41
INFORMATIONAL MEMO
Page 2
• Provide better documentation, tracking, and reporting of inspections and enforcement
actions
• Provide proactive maintenance activities beyond those currently required to further
reduce sediment loading within stream systems
• Retrofit existing public surface water systems to provide water quality treatment by
establishing an annual water quality capital project and dedicated funding
• Develop a policy concerning ownership of new private drainage systems
• Develop a policy concerning maintenance of existing private drainage systems to
ensure that they are properly maintained
• Develop a vactor decant policy and locate a permanent site to decant solids from
street sweepings and catch basin cleaning
• Further develop an inspection program for privately owned storm water facilities
including hiring necessary staff to ensure private surface water systems are being
properly maintained
• Hire a 'habitat manager' to focus on habitat protection and restoration activities
consistent with the WRIA 9 Salmon Recovery Plan
An electronic copy of the 2013 Surface Water Comprehensive Plan has been placed on the
City's website and is accessible through the following link:
http://www.tukwilawa.gov/pubwks/swcomp/Surface/020Water%20Comprehensive%20Plan.pdf
RECOMMENDATION
Council is being asked to approve the Resolution adopting the 2013 Surface Water
Comprehensive Plan and consider this item on the Consent Agenda at the December 2, 2013
Regular Meeting.
Attachments: Draft Resolution
2013 Surface Water Comprehensive Plan - Please see electronic copy reference above
42 W:\PW Eng \PROJECTSIA- DR Projects\Surface Water Comp Plan (91041202)1Info Memo - Plan Adoption .docx
tY
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, ADOPTING A
SURFACE WATER COMPREHENSIVE PLAN, AND
REPEALING RESOLUTION NO. 1262.
WHEREAS, surface water management protects people, property, and the general
environment from damage caused by rainfall, water runoff, and waterborne pollution;
and
WHEREAS, the City of Tukwila is regulated under the Washington State
Department of Ecology's Western Washington Phase II Municipal Stormwater Permit;
and
WHEREAS, Tukwila created a Surface Water Utility in 1989 to fund maintenance
and improvements to the natural and constructed surface water systems in the City;
and
WHEREAS, the Surface Water Comprehensive Plan identifies specific actions and
strategies to manage and control the rate and quality of surface water in Tukwila;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. The plan and appendices titled "2013 Surface Water Comprehensive
Plan", dated February 2013 and prepared by CH2M HILL, are hereby adopted by this
reference as if set forth in full, and supersede the plan dated November 2003.
Section 2. The timing and budgeting of projects in the City's annual six-year
Capital Improvement Program (CIP) will determine when the capital program listed in
the Surface Water Comprehensive Plan will be done and how the project costs will be
paid.
Section 3. Repealer. Resolution No. 1262 is hereby repealed.
W:\Word Processing\Resolutions\Surface Water Comp Plan adopted 114-13
RL:bjs
Page 1 of 2
43
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of , 2013.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Shelley M. Kerslake, City Attorney
W:\Word Processing \Resolutions\Surface Water Comp Plan adopted 11-4-13
RL:bjs
44
Page 2 of 2
UTILITIES COMMITTEE
Meeting Minutes
November 18, 2013 — 5:00 p.m. — Conference Room 1
City of Tukwila
Utilities Committee
PRESENT
Councilmembers: Joe Duffie, Chair; Allan Ekberg and Verna Seal
Staff: David Cline, Bob Giberson, Frank Iriarte, Gail Labanara, Robin Tischmak, Mike Cusick, Ryan
Larson, Laurel Humphrey
CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:02 p.m.
I. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. 2013 Annual Sewer Repair Program Change Order No. 1 Approval
Staff is seeking Council approval of a change order to Contract No. 13 -134 with King Construction Co.
Inc., in the amount of $28,825.85 for an expansion to the scope of work involved in the installation of side
sewers at 6532 and 6542 Southcenter Boulevard. After work began on August 19, 2013, three unforeseen
factors were discovered, resulting in necessary changes to the scope of work as follows:
• During excavation, the contractor encountered boulders greater in size than one half cubic yard,
removal of which added an additional three days to the timeline.
• The contractor had to concrete encase a 10 -foot portion of the sewer because it passed under a
water main with less than 18" of clearance, adding additional costs to the project.
• The contractor discovered an additional 2 connections to the existing septic tank in the crawl space
at 6532 Southcenter Boulevard, requiring an addition day of labor.
Contingency for this project was set at 10 %, or $4,905.60. The remaining funds to cover this change order
are available from the 55th Avenue South Sewer Repair Project, which was completed under budget. The
new contract completion date will be December 1, 2013. UNANIMOUS APPROVAL. FORWARD TO
NOVEMBER 25 COMMITTEE OF THE WHOLE.
B. Resolution: Adopting the Surface Water Comprehensive Plan
Staff is seeking Council approval of a resolution adopting the 2013 Surface Water Comprehensive Plan,
which was prepared by CH2M Hill and reflects changes in regulatory requirements and drainage needs
within the City. The updated 2013 Plan contains the following:
*Revised drainage basin limits
*Field survey to map culverts that block fish passage
*New map book showing all surveyed drainage facilities
*Revised CIP project list
*Review of NPDES requirements
*Tukwila South added
In addition, the 2013 Plan includes specific policy recommendations (as described in the information
memo) that go beyond just meeting regulatory requirements by proactively providing improvements to the
overall function of constructed and natural drainage systems. Recommendations regarding staffing could
be considered as part of the 2015 -16 Budget review. Councilmember Ekberg inquired about a potential
terminology issue that overemphasizes residential areas over commercial, when both should be considered.
Staff stated that is not the intent of the Plan and will look into it prior to the Council meeting.
UNANIMOUS APPROVAL. FORWARD TO DECEMBER 2 REGULAR CONSENT AGENDA.
45