HomeMy WebLinkAboutSpecial 2007-12-10 Item 3A - Bid Award - Northwest Playground Equipment Inc for Fort Dent Playground COUNCIL AGENDA SYNOPSIS
Meeting Date Przpared by =.'s j a ev rz:v
I1LM
.i �'ou,i tl review
ice., Z 0 12/10/07 RS A w
7508 1 1 I R'
1 1 3‘q•
._;ITEM °;_INFORMATION
CAS NUMBER: 07-153 I ORIGINAL AGENDA DATE: 12/10/07
AGENDA ITEM TITLE Fort Dent Playground Bid Award
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 12/10/07 Mtg Date 12/10/07 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date
SPONSOR Council M Adm Svcs DCD Finance Fire Legal P&R Police PW
SPONSOR'S The 2008 CIP includes replacement of Play Equipment at the Fort Dent Playground. The
SUMMARY cost of equipment will increase by 15% in 2008 therefore it is recommended to purchase
the equipment in 2007, with plans to install in 2008. The Parks and Recreation Director
recommends this Bid Award to Northwest Playground Equipment Inc. in the amount of
$169,616.29.
REVIEWED BY COW Mtg CA &P Cmte 111 F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. 1 Parks Comm. Planning Comm.
DA'Z'E: 11/27/07
RECOMMENDATIONS:
SPoNsoR /ADMIN. Recommends the bid award as presented.
CoMI•IITTEE Unanimous Approval; Forward to Committee of the Whole /Special Mtg
COSTAMPACT L FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$186,577.92 $204,422.08
Fund Source: ACC 301.00.594.760.62.71
Comments: CIP page number 12
MTG._DATE' `-RECORD -OF COUNCIL ACTION
MTG. DATE ATTACHMENTS
12/10/07 Information Memo from Rick Still dated 11/20/07
Minutes from the Community Affairs and Parks Committee meeting of 11/27/07
r y' Parks and Recreation Department
t 3 1 o Bruce Fletcher, Director
'908 MEMORANDUM
TO: Mayor Steve Mullet
Community Affairs and Parks Committee
FROM: 4 5 Rick Still, Deputy Director of Parks and Recreation
DATE: November 20, 2007
SUBJECT: Fort Dent Playground Bid Award
Project Number 03- PK07- FTDENT -07
ISSUE
Award the Fort Dent Playground Project Contract to Northwest Playground Equipment, Inc.,
of Issaquah, Washington.
BACKGROUND
Fort Dent Park is our largest and the most frequented park in our park system. Besides being
so heavily used the play equipment is getting old and needs to be replaced. The large and
small play equipment areas are split by a parking access way. It has been the long term goal
for this park to have new equipment that is located on the other side of this access road.
ACTION TAKEN
SLA Landscape Architecture was contracted to design the new play equipment area to make
the park safer and to provide new play features for all of the children that use this park.
A Bid was obtained from Northwest Playground Equipment as part of the Washington State
Bid program, Contract Number 14803, for $169,616.29.
BUDGET AND BID SUMMARY (All amounts include sales tax.)
Bid Results Architect's Estimate Remaining Budget
Bid Amount $169,616.29 $170,000.00 $17,422.08
Contingency (10 16.961.63 17.000.00
Total 186.577.92 $187.000.00 17.422.08
RECOMMENDATION
Authorize the Mayor to award a construction contract for the Fort Dent Playground Project to
Northwest Playground Equipment, Inc. in the amount of $169,616.29.
cc: City Administrator
Director of Parks Recreation
Attachments: Equipment Quote and Agreement
Northwest Playground Equipment, Inc.
,:r.:_
P.O. Box 2410.345 N.W. Dogwood, Issaquah, WA 98027
Phone (425) 313 -9161 FAX (425) 313 -9194
EQUIPMENT QUOTE
QUOTE#
To: City of Tukwila Date: 12/2/2007
Ft Dent Park
Phone.
Contact: Rick Still Fax
I Item Qty. Description Price Total Price
TA070001 B 1 Playmaker Structure- Option B 8/13/07 w/ Playweb Climber 43,372.95 $43,372 95
Engineered wood fiber, 12" Compacted, layer of fabric for
1 3,700 sf in main area plus 1,536 for swing area 8,575 19 $8,575 19
$0.00
$0.00
Installation of Structure and existing swing and safety
1 surfacing 18,493.43 $18,493.43
$0.00
Site work to include renting and placing of steel plates for
access- silt fence- sod removal and disposal, asphalt path
demo and haul off, subgrade prep including import and export
as needed, underdrains and collector lines per plans,
concrete curb installation, asphalt path installation, finish
1 grade site to minus 4" 74,060 00 $74,060.00
$0.00
50.00
Does not include removal of current play equipment (except
swings), topsoil, seeding, soils testing, landscaping,
temporary fencing. Soils on site must meet the City's
compaction requirements. $0 00
$0 00
$0.00
1 Playworld's Performance Bond at 3% 4,950 00 $4,950.00
Washington State Contract #14803 Pricing:
Freight: 6,302.60
Sales Tax: 8 9% $13,862.12
Total: $169,616.29
Please Note:
A locate service for underground utilities must be completed before your scheduled installation.
Does not include cost for permits.
Tax not included unless specifically stated.
Delivery times are currently 6± weeks after order for play equipment.
Orders cancelled after 2 weeks will be subject to a restocking fee and any freight costs incurred
This quote is valid for 60 days.
Payments due and unpaid shall bear interest from the date payment is due at a rate of 18% annually
Acceptance of Proposal: The above items, prices and conditions are satisfactory and are hereby accepted
Thank you for considering Northwest Playground Equipment, Inc. for your Park, Playground, Shelter
and Sports Equipment requirements.
Playground Consultant Approved By
C -1
CITY OF TUKWILA
Short Form Contract
Contractor Name: Northwest Playground Equipment, Inc. Contract No.
Address: P.O. Box 2410 Project No. 03- PK07- FTDENT -07
Issaquah, WA 98027 Budget Item: 301.00.594.760.62.71
Telephone: 425- 313 -9161 Project Name: Fort Dent Playground
Contractor's License NO. NORTHPE044DJ Contractor's State Tax No.
Dept. of L &I Worker's Comp. Acct. No. UBI No. 601691557
Surety Agent: Lee Insurance Service Inc State Bid Contract 14803
Surety Address: 11410 98 Ave.
Kirkland, WA 98033 Bond Registration No. CBIC Insurance
Bond No SA1740
Completion Date
Please initial all attachments, then sign and return copies ONE and TWO to City of Tukwila,
Parks and Recreation Department, 12424 42" Avenue South, Tukwila, WA 98168, FAX 206-
767 -2341. Please make a copy for your records until a fully executed copy is returned to you.
AGREEMENT
This Agreement, made and entered into this day of 20 by and
between the City of Tukwila, hereinafter called the City, and Northwest Playground Equipment, Inc,
hereinafter called the Contractor.
The City and the Contractor hereby agree as follows:
Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the
project entitled Fort Dent Play Equipment, Project No. 03- PK07- FTDENT -07 including all changes
to the work and account work, in accordance with the Supplemental General Requirements, Section
1 -04.2.
1. SCOPE OF WORK
The Scope of work for this project is detailed in the attached Plans dated October 2, 2007 and
Specifications dated October 23, 2007 for the Fort Dent Play Equipment and is summarized as
follows: the scope of work shall include transport, delivery and provision of all materials,
installation, equipment and labor for development of the Fort Dent Playground including but not
limited to, clearing and grading; berm shaping, and installation drainage systems. All materials,
labor and equipment required for development of the Fort Dent Playground shall be provided by
Contractor.
2. TIME OF COMPLETION
The scope of work shall be completed in all respects within one hundred eighty (180) calendar
days from the date of the written notice to proceed.
3. CONTRACT SUM
The City shall pay the Contractor for the performance of the work in the sum of $169,616.29
including Washington State sales tax.
Agreement Form C -2
4. PAYMENTS
The City shall make payments on account of the contract based upon the percentage of lump
sum work completed, payment will be based on the cost percentage breakdown of the lump sum
bid price(s) submitted at the preconstruction conference, less a 5% retainage of the progress
payment amount until the project is accepted and final payment is processed
5. ACCEPTANCE AND FINAL PAYMENT
Final payment shall be due 30 days after completion of the work, provided the contract is fully
performed, accepted and all releases have been received from the Department of Revenue and
Department of Labor Industries and settlement of any liens, whichever is later.
6. GENERAL CONDITIONS
The City and the Contractor agree upon the following general conditions which shall govern:
A. Contract Documents
The contract includes this Agreement dated December 11, 2007, Bid Proposal dated
November 20, 2007, as well as Plans dated October 2, 2007, and Specifications dated
October 23, 2007. The intent of these documents is to include all labor, materials,
appliances and services of every kind necessary for the proper execution of work, and the
terms and conditions of payment therefore. The documents are to be considered as one,
and whatever is called for by any one of the documents shall be as binding as if called for
by all. The Contractor agrees to verify all measurements set forth in the above documents
and to report all differences in measurements before commencing to perform any work
hereunder.
B. Materials, Appliances and Employees
Except as otherwise noted, the Contractor shall provide and pay for all materials, labor,
tools, water, power and other items necessary to complete the work. Unless otherwise
specified, all material shall be new, and both workmanship and materials shall be of good
quality. Contractor warrants that all workmen and subcontractors shall be skilled in their
trades.
C. Surveys, Permits and Regulations
The City shall furnish all surveys unless otherwise specified. Permits and licenses
necessary for the prosecution of the work shall be secured by the Contractor and paid for by
the City. Easements for permanent structures or permanent changes in existing facilities
shall be secured and paid for by the City unless otherwise specified. The Contractor shall
comply with all laws and regulations bearing on the conduct of the work and shall notify the
City in writing if the drawings and specifications are at variance therewith.
D. Protection of Work, Property and Persons
The Contractor shall adequately protect the work, adjacent property and the public and shall
be responsible for any damage or injury due to his act or neglect and perform any repairs at
the contractor's expense.
E. Access to Work
The Contractor shall permit and facilitate observation of the work by the City and its agents
and public authorities at all times.
Fort Dent Play Equipment 12 -11 -07
NW Playgoumd, Inc
Agreement Form C
F. Changes in the Work
The City may order changes in the work, the contract sum being adjusted accordingly. All
such orders and adjustments shall be in writing. Claims by the Contractor for extra cost
must be made in writing before executing the work involved.
G. Correction of Work
The Contractor shall re- execute any work that fails to conform to the requirements of the
contract and that appears during the progress of the work, and shall remedy any defects
due to faulty materials or workmanship which appear within a period of one year from date
of completion of the contract and final acceptance of the work by the City unless the
manufacturer of the equipment or materials has a warranty for a longer period of time,
which warranties shall be assigned by Contractor to City. The provisions of this article apply
to work done by subcontractors as well as to work done by direct employees of the
Contractor.
H. Owner's Right to Terminate Contract
Should the Contractor neglect to prosecute the work properly, or fail to perform any
provision of the contract, the City, after seven days' written notice to the contractor, and his
surety, if any, may without prejudice to any other remedy the City may have, make good the
deficiencies and may deduct the cost thereof from the payment then or thereafter due the
Contract or, at the City's option, may terminate the contract and take possession of all
materials, tools, appliances and finish work by such means as the City sees fit, and if the
unpaid balance of the contract price exceeds the expense of finishing the work, such
excess shall be paid to the Contractor, but if such expense exceeds such unpaid balance,
the Contractor shall pay the difference to the City.
I. Payments
Payments shall be made as provided in the Agreements. Payments otherwise due may be
withheld on account of defective work not remedied, liens filed, damage by the Contractor to
others not adjusted, or failure to make payments properly to the subcontractors.
J. Contractor's Liability Insurance
Contractor will carry public liability and property damage insurance with carriers satisfactory
to the City, in the following amounts:
50,000 property damage
500,000 public liability (each person)
$1,000,000 public liability (each occurrence)
$1,000,000 automobile liability (each occurrence)
with endorsements naming the City as an additional insured and will provide the City with
certificates of insurance prior to start of construction and with 30 days notice prior to
cancellation.
K. Performance Bond
The Contractor shall furnish to the City prior to start of construction a performance bond in
an amount of 100% of the contract in a form acceptable to the City.
Fort Dent Play Equipment 12 -11 -07
NW Playgoumd, Inc.
Agreement Form C
L. Liens
The final payment shall not be due until the Contractor has delivered to the City a complete
release of all liens arising out of this contract or receipts in full covering all labor and
materials for which a lien could be filed, or a bond satisfactory to the City indemnifying the
City against any lien.
M. Separate Contracts
The City has the right to let other contracts in connection with the work and the Contractor
shall properly cooperate with any such other contracts.
N. Attorneys Fees and Costs
In the event of legal action hereunder, the prevailing party shall be entitled to recover its
reasonable attorney fees and costs.
O. Cleaning Up
The Contractor shall keep the premises free from accumulation of waste material and
rubbish and at the completion of the work he shall remove from the premises all rubbish,
implements and surplus materials and leave the building broom clean.
P. Indemnification
The Contractor shall indemnify, defend and hold harmless the City, its officers, agents and
employees, from and against any and all claims, losses or liability, including attorney's fees,
arising from injury or death to persons or damage to property occasioned by an act,
omission or failure of the Contractor, its officers, agents and employees, in performing the
work required by this Agreement. With respect to the performance of this Agreement and
as to claims against the City, its officers, agents and employees, the Contractor expressly
waives its immunity under Title 51 of the Revised Code of Washington, the Industrial
Insurance Act, for injuries to its employees and agrees that the obligation to indemnify,
defend and hold harmless provided for in this paragraph extends to any claim brought by or
on behalf of any employee of the contractor. This waiver is mutually negotiated by the
parties. This paragraph shall not apply to any damage resulting from the sole negligence of
the City, its agents and employees. To the extent any of the damages referenced by this
paragraph were caused by or resulted from the concurrent negligence of the City, its agents
or employees, this obligation to indemnify, defend and hold harmless is valid and
enforceable only to the extent of the negligence of the Contractor, its officers, agents, and
employees.
Q. Prevailing Wages
The Contractor shall pay all laborers, workmen and mechanics the prevailing wage and
shall file the required "Statement of Intent to Pay Prevailing Wages" in conformance with
RCW 39.12.040.
R. Discrimination Prohibited
The Contractor shall comply with all Equal Employment Opportunity regulations and shall
not discriminate against any employee, applicant for employment, or any person seeking
the services of the Contractor on the basis of race, color, religion, creed, sex, age, national
origin, marital status or the presence of any sensory, mental or physical handicap.
Fort Dent Play Equipment 12 -11-07
NW Playgoumd, Inc.
Agreement Form C
IN WITNESS WHEREOF, the parties hereto executed this Agreement the day and year first
above written.
CITY OF TUKWILA CONTRACTOR: Northwest Playground
Equipment, Inc.
By: By:
SIGNATURE SIGNATURE
Printed Name: Steven M. Mullet Printed Name:
Title: Mayor Title:
Date: Date:
ATTEST /AUTHENTICATED:
Jane E. Cantu, CMC, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
BY:
Fort Dent Play Equipment 12 -11 -07
NW Playgoumd, Inc
PERFORMANCE BOND
Bond to City of Tukwila, Washington
Bond No.
We, and
(Principal) (Surety)
a corporation, and as a surety corporation authorized to become a surety upon
Bonds of Contractors with municipal corporations in Washington State, are jointly and severally
bound to the City of Tukwila, Washington "Owner in the penal sum of
Dollars
the payment of which sum, on demand, we bind ourselves and our
successors, heirs, administrators, executors, or personal representatives, as the case may be.
This Performance Bond is provided to secure the performance of Principal in connection with a
contract dated 20_ between Principal and Owner for a project entitled
Fort Dent Play Equipment
Contract No. "Contract The initial penal sum shall equal 100% of the Total Bid
Price, including sales tax, as specified in the Proposal submitted by Principal
NOW, THEREFORE, this Performance Bond shall be satisfied and released only upon the
condition that Principal:
Faithfully performs all provisions of the Contract and changes authorized by Owner in the
manner and within the time specified as may be extended under the Contract;
Pays all laborers, mechanics, subcontractors, lower tier subcontractors, material men, and
all other persons or agents who supply labor, equipment, or materials to the Project;
Indemnifies and holds Owner, its officers, and agents harmless from and against all claims,
liabilities, causes of action, damages, and costs for such payments for labor, equipment,
and materials by satisfying all claims and demands incurred under the Contract, and
reimbursing and paying Owner all expenses that Owner may incur in making good any
default by Principal; and
Indemnifies and holds Owner harmless from all claims, liabilities, causes of action,
damages and costs, including property damages and personal injuries, resulting from any
defect appearing or developing in the material provided or workmanship performed under
the Contract.
The indemnities to Owner shall also inure to the benefit of the Consulting Landscape Architect and
other design professionals retained by Owner in connection with the Project.
PROVIDED, however, that after the Final Acceptance of this Contract and the expiration of the lien
period, and if there are no liens pending, then the penal sum of this Performance Bond shall be
reduced to the sum of
Dollars (10% of Total Bid Price), to insure against all defects appearing
or developing in the material provided or workmanship performed under this Contract within one
year after Final Acceptance.
The liability of Surety shall be limited to the penal sum of this Performance Bond.
No change, extension of time, alteration, or addition to the terms of the Contract or to the Work to
be performed under the Contract shall in any way affect Surety's obligation on the Performance
Bond. Surety hereby waives notice of any change, extension of time, alteration, or addition to the
Performance Bond C
terms of the Contract or the Work, with the exception that Surety shall be notified if the Contract
time is extended by more than twenty percent (20
If any modification or change increases the total amount to be paid under the Contract, Surety's
obligation under this Performance Bond shall automatically increase in a like amount. Any such
increase shall not exceed twenty -five percent (25 of the original amount of the Performance
Bond without the prior written consent of Surety.
This Performance Bond shall be governed and construed by the laws of the State of Washington,
and venue shall be in King County, Washington.
IN WITNESS WHEREOF, the parties have executed this instrument in two (2) identical
counterparts this day of 20
Principal Surety
Signature of Authorized Official Signature of Authorized Official
By
Title Attorney in Fact
(Attach Power of Attorney)
Name and address of local office of
agent and /or Surety Company:
Surety companies executing bonds must appear on the current Authorized Insurance List in the State of
Washington per Section 1 -02.7 of the Standard Specifications.
Fort Dent Play Equipment 12 -11 -07
NW Playgoumd, Inc.
was'' City of Tukwila
J,: il` Community Affairs and Parks Committee
•.u
rso8
COMMUNITY AFFAIRS AND PARKS COMVI IITTEE
Meeting Minutes
November 27, 2007 S :•DO p.m.
PRESENT
Councilmembers: Pam Linder, Chair; Pam Carter and Dennis Robertson
Staff: Bruce Fletcher, Rick Still, Stephanie Gardner, Rhonda Berry and Kimberly Matej
CALL TO ORDER: Chair Linder called the meeting to order at 5:01 p.m.
I. PRESENTATIONS No presentations.
H. BUSINESS AGENDA
A. Fort Dent Play Eauipment Bid Award
Staff is seeking full Council approval to award a contract to Northwest Playground Equipment, Inc. in
the amount of $169,616.29 for new play equipment at Fort Dent Park. Award of the contract prior to
January 1, 2008, is important in order to avoid a price increase. Installation of the equipment is expected
to be completed within six months.
The play equipment currently located at Fort Dent Park will be removed once construction of the new
equipment is complete. The new equipment will be installed in a different location within the Park than
the existing equipment.
The Committee noted some discrepancies in the contract which staff will correct prior to forwarding to
full Council. UNANIMOUS APPROVAL. FORWARD TO DECEMBER 10 COW MEEM G.
B. Tukwila Community Center Snrav Park Bid Award
Staff is seeking full Council approval to award a contract to Northwest Playground Equipment, Inc. in
the amount of $209,244.54 for construction of a spray park. Staff research has identified Tukwila
Community Center as the best Location for the spray park due to existing programs, special events, ample
parking and a continuous staff presence.
$220,000 plus $5,000 for design work has been budgeted for this project. Park construction is expected
to be completed by April or May. UNANIMOUS APPROVAL. FORWARD TO DECEMBER 10
COW MEETING.
C. 2007 Third Ouarter Report to Council
The Committee reviewed the status of program goals as outlined in the Third Quarter Report.
INFORMATION ONLY.
III. MISCELLANEOUS
Parks and Recreation staff reported that the next Open Space Plan Public Forum is scheduled for Wednesday,
December 12 at the Tukwila Community Center beginning at 6:00 p.m.
Macadam Winter Garden construction is expected to be completed by December 5. Committee Chair Linder
requested staff plan a soft- opening for the Park prior to Mayor Mullet leaving office.
Meeting adjourned at 5:54 p.m.
.eJ L Committee Chair Approval
Minutes by KAM.