HomeMy WebLinkAboutTrans 2013-12-10 COMPLETE AGENDA PACKETCity of Tukwila
Transportation Committee
Kate Kruller, Chair
• Joe Duffie
• Dennis Robertson
AGENDA
Distribution:
K. Kruller
J. Duffle
K. Hougardy
D. Robertson
Mayor Haggerton
D. Cline
K. Matej
L. Humphrey
B. Giberson
F. I riarte
R. Tischmak
G. Labanara
P. Brodin
S. Kerslake
Clerk File Copy
2 Extra
e -mail pkt pdf to A. Le
e -mail cover to: C.
O'Flaherty, D. Almberg,
B. Saxton, S. Norris,
M. Hart, A. Le
TUESDAY, DECEMBER 10, 2013
Time: 5:15 PM Place: Conference Room #1 (6300 Building)
Next Scheduled Meeting: To be determined per 2014 Committee Calendar
IS. The City of Tukwila strives to accommodate individuals with disabilities.
Please contact the Public Works Department at 206 - 433 -0179 for assistance.
Item
Recommended Action
Page
1.
PRESENTATION(S)
2.
BUSINESS AGENDA
a) Draft Resolution Relating to Apprenticeship Program
a)
Committee Direction —
Pg. 1
Potential to C.O.W. in 2014
b) Regional Meeting Follow -ups
b)
Discussion Only
4.
MISCELLANEOUS
c) Review 2013 Transportation Committee Goals
c)
Information only
Pg. 5
5.
ANNOUNCEMENTS
Future Agendas:
Next Scheduled Meeting: To be determined per 2014 Committee Calendar
IS. The City of Tukwila strives to accommodate individuals with disabilities.
Please contact the Public Works Department at 206 - 433 -0179 for assistance.
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Transportation Committee
FROM: Kate Kruller, Transportation Chair
DATE: December 6, 2013
SUBJECT: Draft Resolution Relating to Apprenticeship Program
ISSUE
As part of the 2013 Transportation Committee goals, committee members have been
exploring the implementation of an apprenticeship utilization goal for Public Works
construction contracts.
BACKGROUND
Committee members have previously expressed support for implementing
apprenticeship utilization goals as a way to help ensure a viable workforce in the future.
Previous committee discussions have focused on similar programs in the region, and a
preliminary draft was reviewed at both the August 27th and October 15th Transportation
Committee meetings.
DISCUSSION
Committee discussion will focus on a revised draft resolution that would establish levels
of apprenticeship utilization and direct City Administration to develop guidelines for such
a program.
RECOMMENDATION
Committee direction; potential to Committee of the Whole in January 2014.
Attachment: Draft Resolution
W: \PW Eng \OTHER \Robin Tischmak \InfoMemo Apprenticeship Program.docx
1
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, PROMOTING THE USE OF
APPRENTICES IN PUBLIC WORKS PROJECTS OVER $1-
MILLION DOLLARS AND DIRECTING THE CITY
ADMINISTRATION TO DEVELOP IMPLEMENTING
APPRENTICESHIP GUIDELINES.
WHEREAS, a highly skilled workforce is essential for enhancing economic growth
and the continued prosperity of workers; and
WHEREAS, apprenticeship is a proven, highly- effective training model, providing
consistent wage progression to family wage careers; and
WHEREAS, shortages of skilled construction workers limit job growth and affect our
economic development and this "skill gap" problem will continue to grow, due to the
large numbers of skilled worker retirements and increased construction activity; and
WHEREAS, the responsibility to train the next generation of skilled workers rests
with both the public and private sectors; and
WHEREAS, the City of Tukwila is committed to working in partnership with labor
and business to create a skilled workforce that reflects the diversity of our population
and promotes community development; and
WHEREAS, recent actions of the Washington State Apprenticeship and Training
Council (WSATC) have made apprenticeships more widely available in the construction
industry; and
WHEREAS, growing participation in apprenticeship programs today will ensure a
viable workforce in the construction trade industry tomorrow; and
WHEREAS, the City Council finds that it would be in the best interests of public
health, safety and welfare for the City to implement an apprenticeship utilization goal in
qualifying public works construction contracts;
W: \Word Processing \Resolutions \Resolution template 4 -10 -13
:bjs
Page 1 of 2
2
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DOES RESOLVE AS FOLLOWS:
Section 1. Apprenticeship Utilization Goal. The City of Tukwila shall require
good faith efforts from contractors to use WSATC- registered apprentices as follows:
A. Levels of apprenticeship utilization shall be:
1. Fifteen percent (15 %) of the total labor hours for the life of the contract, for all
qualified City construction contracts over $1- million dollars that are awarded on or
after January 1, 2014.
The contractor shall provide quarterly reports, as well as a final report, indicating
the total labor hours and the apprenticeship hours utilized by the contractor and all
subcontractors on the project.
2. These requirements may be modified by the City Administration for a specific
project for the following reasons:
a. a lack of availability of qualified apprentices;
b. a disproportionately high ratio of material costs to labor hours, which does
not make feasible the required minimum level of apprentice participation;
c. participating contractors have demonstrated a good faith effort to comply with
the requirements of this resolution;
d. where utilization conflicts with federal requirements.
Section 2. Apprenticeship Utilization Guidelines. The City Administration is
hereby directed to develop for Council approval apprenticeship utilization guidelines for
the purpose of implementing the apprenticeship utilization goal and policy as
established in Section 1 herein.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2014.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk [Name], Council President
APPROVED AS TO FORM BY:
Shelley M. Kerslake, City Attorney
W: \Word Processing \Resolutions \Resolution template 4 -10 -13
:bjs
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Page 2 of 2
3
4
TO•
City of Tukwila
Jim Haggerton, Mayor
Department of Public Works Bob Giberson, P.E., Director
Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director
BY: Robin Tischmak, City Engineer
DATE: December 6, 2013 (Revised from May 13, 2013)
SUBJECT: 2013 Transportation Work Plan
ISSUE
Updated information includes completed tasks for the list of 2013 funded transportation projects and
items that were included on the list, but were not brought forward to the Transportation Committee.
DISCUSSION
Public Works discussed the 2013 work program at the January 15th and May 14th, 2013 Transportation
Committee meetings. Anticipated schedules and potential committee agenda items were presented, as
well as direction from the committee regarding preferences or requests on how agenda items are to be
included.
* Indicates those items that were approved as Transportation Committee Goals.
Second Quarter
1. TUC Access (Klickitat) — Final LID Assessment Roll (Complete)
2. Annual Bridge Inspections — Award contract(s) for inspections and repair project(s) (Complete)
3. Transportation Improvement Program (TIP) — Council adoption (Complete)
4. 42nd Ave S Safety Rail Along River — Guardrail analysis (Complete)
Third Quarter
1. *CIP Project Review Policy (Complete)
2. Boeing Access Road Bridge Rehabilitation — Approve design contract (Complete)
3. Overlay & Repair - E Marginal Way — Approve design contract (Complete); award construction
contract (No program constructed in 2013)
4. ADA Improvements — Approve design contract (Complete); award construction contract
5. Safe Routes to Schools (Cascade and Thorndyke) — Approve contracts for design; award
construction bid for Cascade View Elementary trail (Design contract awarded)
6. TUC Transit Center & Andover Park W (Tukwila Pkwy to Strander Blvd) — Award construction bid
(Complete)
7. Interurban Ave S (S 143rd St to Ft Dent) — Approve design contract (Complete); award
construction contract (Will occur in 2014)
8. 2013 Overlay /Repair — Award construction contract; approve 2014 design contract (Complete)
9. Traffic Impact Fee Intersection Improvement Projects (5) — Approve contracts for design
i. Andover Park E /Industry Dr
ii. Andover Park E/Minkler Blvd
iii. W Valley Hwy /S 156th St
iv. S 133rd St/SR 599
v. Macadam Rd S/S 144 St
10. Tukwila Urban Center Access (Klickitat) — Project Closeout (Complete)
11. Southcenter Parkway Extension - Project Closeout (Complete)
C:\ Users \susan\AppData \Local \Microsoft \Windows \Temporary Internet Files \ Content .Outlook \360AGYOJ \InfoMemo 2013 (Revised 12 -4 -13) TC WorkProgram Goals.docx
5
INFORMATIONAL MEMO
Page 2
12. School Zone Issues
13. Traffic Impact Fees
Fourth Quarter
1. *Public Safety Oriented Sidewalk Policy
2. *Tukwila International Blvd Corridor Improvements
3. *Apprenticeship Policy
4. 42 "d Ave S — Phase III (Southcenter Blvd to S 160th St) — Continue /complete design; present
periodic status updates and /or present issues that may need Council input or direction
5. TUC Pedestrian /Bicycle Bridge — Finish design; submit grant applications
6. Transportation Element of Comp Plan — Adopt Comprehensive Plan
Other Transportation Issues
SCATBd Agendas (Each meeting)
BNSF Freight Mobility Issues (COW Item)
RECOMMENDATION
Information only.