Loading...
HomeMy WebLinkAboutReg 2007-12-03 Item 6G - Ordinance - Permit Fee Schedule for Building Mechanical Plumbing and Fuel-Gas Piping LA, H% COUNCIL AGENDA Siwosis I 4 S R Initials ITEM No. _,!4.04%,(10 MYleetir� Date Prepay y 1 !Mayor's mien Council review ',us1 `,p. 11/26/07 1 RS 1 AAtf/- 1 1 1 12/03/07 I Rail' A-�` I rsos I I U I I v I 1 Co. 3. ITEM INFORMATION CAS NUMBER: 0 1 1 1 4 4 1 ORIGLNAL AGENDA DATE: 11/ 26/07 AGENDA ITEM TITLE Proposed ordinance increasing building permit fees. CATEGORY Discussion Motion Resolution C Ordinance Bid Award Public Hearing Other Mtg Date 11/26/07 Mtg Date Mt Date Mtg Date 12/3/O pits Date Mtg Date Mtg Date SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW SPONSOR'S Proposed ordinance would provide for a 4% increase in the permit fees for building, SUMMARY mechanical, plumbing and fuel -gas piping permits for the years 2008 and 2009. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DAl'E: 10/ 09107 RECOMMENDATIONS: SPONSOR /ADMLN. Review and Approval COMMITTEE Approval; Forward to Committee of the Whole 1 COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED so $0 so Fund Source: N/A Comments: N/A MTG. DATE RECORD OF COUNCIL ACTION 1 11/26/07 1 Forward to next Regular Meeting MTG. DATE 1 ATTACHMENTS 11/26/07 Information memo dated 11/19/07 I Draft ordinance Minutes from the Community Affairs Parks Committee Meeting of 10/09 /07 12/3/07 Ordinance in Final Form I 1 1 1 jC_ ;yt J i F+. Gr 181 GGG rr3k' t€ 7908 City of Tulkwila Washington Ordinance No. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, AMENDING ORDINANCE NO. 2171, AS CODIFIED AT TUKWILA MUNICIPAL CODE CHAPTER 16.04, SECTION 16.04.250, "SCHEDULE OF PERMTT FEES," TO ADOPT NEW PERMIT FEE SCHEDULES FOR BUILDING, MECHANICAL, PLUMBING, AND FUEL -GAS PIPING PERMITS; PROVIDING FOR SEVERABILTTY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, permits issued by the City of Tukwila are not valid until the fees prescribed by law have been paid; and WHEREAS, current permit fee schedules were established in 2003, and WHEREAS, the City Council desires to increase the cost recovery rate for permit administration and inspection services to reflect the increased costs incurred by the City; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. TMC 16.04.250 Amended. Ordinance No. 2171, as codified at TMC Chapter 16.04, "Buildings and Construction," is hereby amended to read as follows: 16.04.250 Schedule of Permit Fees A. Building Permit Fee Schedule. Total Valuation 1 Building Permit Fees $1 to $500 I $30 $501 to $2,000 $30 for the first $500, plus $3.90 for each additional $100, or fraction thereof, to and including $2,000 l $2,001 to $25,000 $88.50 for the first $2,000, plus $18.00 for each additional $1,000, or fraction thereof, to and including $25,000 $25,001 to $50,000 $502.00 for the first $25,000, plus $13.00 for each additional $1,000, or fraction thereof, to and including $50,000 $50,001 to $100,000 $827.00 for the first $50,000, plus $9.00 for each additional $1,000, or fraction thereof, to and including $100,000 $100,001 to $500,000 $1,270.00 for the first $100,000, plus $7.20 for each additional $1,000, or fraction thereof, to and including $500,000 $500,001 to $1,000,000 $4,150.00 for the first $500,000, plus $6.00 for each additional $1,000, or fraction thereof, to and including $1,000,000 $1,000,001 and up $7,150.00 for the first $1,000,000, plus $4.00 for each additional $1,000, or fraction thereof C'Documents and Settingsl411 Users \DuF1op\ ell;AMSDATA\Ordinances Scludule of Permit Fees do JP:Fsn 1129/2007 Page 1 of 5 B. Plan Review Fee. When submittal documents are required by IBC Section 108 or IRC Section R108, a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fee shall be 65% of the permit fee as set forth in the permit fee schedule. The plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. C. Other Fees. 1. Inspections outside normal business hours: $60 per hour (two hour minimum charge). 2. Re- inspection fee: $60 per hour, assessed upon call for third inspection of same correction notice. 3. Inspections for which no fee is specifically indicated: $60 per hour (one- half hour minimum charge). 4. Additional plan review necessary due to additions or revisions to the plans: $60 per hour. 5. Work commencing before permit issuance shall be subject to an investigation fee of 100% of the usual permit fee. Valuation of Work (Total Mechanical Permit Fees Contract Amount) 1 $250 or less 1 $60 1 $251 to $500 $60 for first $250, plus $7.00 for each $100 or fraction thereof, to and including $500 $501 to $1,000 $77.50 for the first $500, plus $7.80 for each $100 or fraction thereof, to and including $1,000 $1,001 to $5,000 $116.50 for the first $1,000, plus $8.60 for each $1,000 or fraction thereof, to and including 55,000 $5,001 to $50,000 $151.00 for the first $5,000, plus $9.60 for each $1,000 or fraction thereof, to and including $50,000 $50,001 to $250,000 $556.00 for the first $50,000, plus $7.50 for each $1,000 or fraction thereof, to and including $250,000 $250,001 to $1,000,000 $2,056.00 for the first $250,000, plus $6.60 for each $1,000 or fraction thereof, to and including $1,000,000 $1,000,001 and up $7,006.00 for first $1,000,000, plus $6.00 for each $1,000 or fraction thereof 6. Plan review fee: 25% of the calculated permit fee. 7. Work commencing before permit issuance shall be subject to an investigation fee of 100% of the usual permit fee. 8. Inspections outside of normal business hours: $60 per hour. 9. Re- inspection fee assessed: $60 per hour. 10. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed. $60 per hour (one -half hour minimum). 11. Renewal of expired permits. The fee shall be one -half the amount required for a new permit for such work, provided that suspension or abandonment has not exceeded one year. Renewals after expiration of more than one year shall require a full permit fee and plan review fee where applicable. C:1Documents and Se tins\AII UsealDesk lop \KeII SDATAIOrdinanca\Sc1edule of Permit Fees.doc 1P:Itsn 11/26/2007 Page 2 of 5 D. Plumbing Permit Fee Schedule. 1. Permit Issuance Issuance of each permit (base fee): $32.00. 2. Issuance of each supplemental permit $15.60. 3 Unit Fee Schedule (in addition to items 1 2 above): 1 For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) 1 $60 1 For each additional fixture $12 1 For each building sewer and each trailer park sewer $22 1 Rain water system per drain (inside building) $12 1 For each water heater and /or vent $12 For each industrial waste pretreatment interceptor, including its trap and $12 vent, except for kitchen -type grease interceptors 1 For each grease trap (connected to not more than four fixtures) $15.60 For each grease interceptor for commercial kitchens (greater than 750 gallon $26 capacity) For each repair or alteration of water piping and /or water treating $12 equipment, each occurrence 1 For each repair or alteration of drainage or vent piping, each fixture $12 1 For each medical gas piping system serving one to five inlets /outlets for a $73 specific gas E. Fuel Gas Piping Permit Fees. 1. Permit Issuance: For issuing each permit (base fee): ($0 if permit is in conjunction with a $32 plumbing permit for an appliance with both plumbing and gas connection) 1 For issuing each supplemental permit 1 $15.60 1 2. Unit Fee Schedule (in addition to items in E.1. above): 1 For each gas piping system of one to five outlets 1 $60 1 For each additional gas piping system outlet, per outlet 1 $7.30 1 3. Other Inspections and Fees (fuel gas piping): Inspections outside of normal business hours 1 $60 /hour 1 Re- inspection fee 1 $60 /hour 1 Inspection for which no fee is specifically indicated $60 /hour Additional plan review required by changes, additions, or revisions to $60 /hour approved plans (minimum charge one -half hour) Work commencing before permit issuance shall be subject to an 100% of the investigation fee equal to 100% of the permit fee permit fee Plan review fee: The fee for review shall be 25% of the total fuel gas piping permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to show compliance with the code. Renewal of expired permits: The fee shall be one -half the amount required for a new permit for such work, provided that suspension or abandonment has not exceeded one year. Renewals after expiration of more than one year shall require a full permit fee and plan review fee where applicable. C:\Documents and Settings\All Users\ De, ktopVKelIy \MSDATA \Ordinanes'Schedule of Permit Fees.doc JP:Ian 11/26.2007 Page 3 of 5 F. Electrical Permit Fees. NEW SINGLE FAMILY DWELLINGS 1 New single family dwellings (including a garage) $140 1 Garages, pools, spas and outbuildings 1 $75 1 1 Low voltage systems 1 $55 1 SINGLE FAMILY REMODEL AND SERVICE CHANGES Service change or alteration no added /altered circuits 1 $75 1 Service change with added /altered circuits for each added circuit $75 plus $10 (maximum permit fee $140) Circuits added /altered without service change (includes up to 5 $50 circuits) Circuits added /altered without service change (more than 5 circuits) $50 plus $7 for each added circuit (maximum permit fee $90) 1 Meter /mast repair 1 $65 1 1 Low voltage systems 1 $55 1 MULTI-FAMILY AND CONEVIIERCIAL (including low voltage) VALUATION OF ELECTRICAL PERMIT FEE CONTRACT 1 $250 or less 1 $58 $251 $1000 $58 for the first $250 plus $4.00 for each $100 or fraction thereof, to and including $1,000. $1,001 $5,000 $84 for the first $1,000 plus $20 for each $1,000 or fraction thereof, to and including $5,000. $5001 $50,000 $164 for the first $5,000 plus $16.40 for each $1,000 or fraction thereof, to and including $50,000. $50,001 $250,000 $902 for the first $50,000 plus $12.00 for each $1,000 or fraction thereof, to and including $250,000. $250,001 $1,000,000 $3,302 for the first $250,000 plus $8.50 for each $1,000 or fraction thereof, to and including 51,000,000. 1 Over $1,000,000 1 $9,677 plus 0.5% of cost over one million. 1. Plan review fee. In addition to the permit fee, when plan review is required, a plan review fee must be paid at the time of permit application equal to 25% of the permit fee, with a minimum of $58. MISCELLANEOUS FEES Temporary service (residential) $58 1 Temporary service /generators $75 Manufactured /mobile home service (excluding garage or outbuildings) 580 Carnivals: Base fee 1 575 1 Each concession 1 1 Inspections or plan review not specified elsewhere $60 /hour 2. Work covered without inspection or work not ready at the time of inspection may be charged a trip fee at the hourly rate listed above. 3. Work without a permit. Any person who commences electrical work before obtaining the necessary permits shall be subject to twice the established fees as C:\Documents and SettingsWl UsersiDesktop1Ke11y /MSDATA \Ordinanca;Schedule of Permit Fees.doc JP:ksn 11/26/2007 Page 4 of 5 set forth in the electrical fee schedule or increased by $100, whichever is greater. This fee, which shall constitute an investigation fee, shall be imposed and collected in all cases, whether or not a permit is subsequently issued. Gr Fee Refunds. The Building Official may refund any permit fee paid by the original permit applicant that was erroneously paid or collected. The Building Official may also authorize the refund of not more than 80% of the permit fee when no work has been done under a permit issued in accordance with the code. Where a plan review fee has been collected, no refund will be authorized once it has been determined that the plan review process has commenced. Refund of any permit fee paid shall be requested by the original permittee in writing and not later than 180 days after the date of fee payment. Section 2. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. Section 3. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force on January 1, 2008, after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 2007. ATTEST/ AUTHENTICATED: Steven M. Mullet, Mayor Jane E. Cantu, CMC, City Clerk Filed with the City Clerk: APPROVED AS TO FORM BY: Passed by the City Council: Published: Effective Date: Office of the City Attorney Ordinance Number: C:1Documents and Setting AJI UsenADesktop\ Kel lylMSDATAICrdinances\Schedule of P:nnit Fee<_.doc JP:ksn 11/2612007 Page 5 of 5