CITY OF TU K WILA
WASHINGTON
ORDINANCE NO. 523 irra '3
An ORDINANCE adopting a Comprehensive Street Program
for the City of Tukwila for the ensuing one year,
pursuant to RCW 35.77.010.
WHEREAS the City of Tukwila had previously adopted aC:omprehensive
Street Program by Ordinance No. 347, and
WHEREAS the City Gouncil of the City of Tukwila has reviewed the street
construction accomplished to date under the existing Comprehensive Street Program,
and determined current and future street needs for the City of Tukwila, and
WHEREAS the City Council of the City of Tukwila has now revised and
extended the Comprehensive Street Program for the ensuing one year, and
WHEREAS a Public Hearing was held on said revisions and extensions on
July 17, 1'968 at the City Hall of the City of Tukwila
NOW THEREFORE, the City Council of the City of Tukwila do ordain as follows:•
SECTION I. The maps and lists attached hereto, marked as Exhibit 'sA and hereby
indorporated by reference, are hereby adopted as the Comprehensive Street Program
for the City of Tukwila for the ensuing one year.
SECTION 2. In accordance with the provisions of RCW 35.77.010, a copy of this
ordinance, and attachments shall be filed by the City Clerk with the Director
of Highways of the State of Washington within thirty (30) days of the date of the
adoption of this ordinance.
PASSED by the City Council of the City of Tukwila this 5th day of
August 1968
CL tK
APPROVED AS TO FORM
ATTORNEY
APPROVED by the Mayor of the City of Tukwila, Washington this 5th day of
August, 1968.
>T
Published Record- Chroncile MAYOR
August 9, 1968
A. Primary Arterials
1. 58th Avenue South Interurban Avenue to South 149th, street
widening, sidewalks, curbs, gutters, storm sewers and grading.
Also, paving with asphalt and street lighting.
2. 58th Avenue South from South 149th to a connection with 152nd
Street and west to Macadam Road procurement of right -of -way,
clearing, grading, storm sewers, curbs, gutters, asphalt paving,
street lighting and sidewalks.
3. South 344th Street 53rd Avenue South to 58th Avenue South,
widening, grading, storm sewers, curbs, gutters, asphalt paving,
street lighting and sidewalks.
4. 53rd Avenue South and Macadam Road South 139th Street to
South 151st, streetwidening, grading, storm sewers, curbs,
gutters, asphalt paving, street lighting and sidewalks.
5. South 180th Christensen Road to Southcenter Parkway, street
widening, grading, storm sewers, curbs, otters, asphalt paving,
street lighting and sidewalks.
$237,250.00
6. South 180th Street Southcenter Parkway to West boundary of
City of right -of -way, clearing, grading, storm
sewers, curbs, gutters, asphalt paving, street lighting and
sidewalks.
7. Tukwila Parkway west and extension of Southcenter Parkway
South to 188th grading, storm sewers, curbs, gutters,
asphalt paving, street lighting and sidewalks.
B. Secondary Arterials
ARTERIAL STREET PROGRAM
REVISED TO JULY 1968
TOTAL COST PRIMARY ARTERIALS
1. South 152nd Street Macadam Road to 57th Avenue South, widening,
grading,'stormsewers, curbs, gutters, asphalt paving, street lighting
and sidewalks.
46,000.00
2. South 152nd Street 57th Avenue South to 62nd Avenue South,
procurement of right -of -way, clearing, grading, storm sewers, curbs,
gutters, asphalt paving, street lighting and sidewalks.
62,700.00
3. South 151st Street 62nd Avenue South to 65th Avenue South, to
South 154th, widening, grading, storm sewers, curbs, gutters,
asphalt paving, street lighting and sidewalks.
$128,360.00
$108,4
77,875.00
$210,850.00
$143,800.00
$683,600.00
$1,590.210.00
$117,100.00
ARTERIAL STREET PROGRAM (contt)
4. Andover Park West from Tukwila Parkway to South 180th, grading,
storm sewers, curbs, gutters, asphalt paving, street lighting
and sidewalks.
$417,900.00
5. Andover Park East Tukwila Parkway to South 180th, grading,
stormsewers, curbs, gutters, asphalt paving, street lighting.
$453,650.00
6. 139th Street be extended, proceeding Easterly from the intersection
of 56th Place South to Hiway 181 (Interurban Ave. South)
Grading, storm sewers, curbs, gutters, asphalt paving, Street
lighting and sidewalks.
50,000.00
TOTAL SECONDARY ARTERIALS
$1,147,350.00
TOTAL PRIMARY AND SECONDARY ARTERIALS
$2,737,560.00