Loading...
HomeMy WebLinkAboutCOW 2007-07-09 Item 3A - Resolution - Reject Bids for Green River Pedestrian and Utility Bridge Project w COUNCIL AGENDA SYNOPSIS ti Initials ITEM NO. 0 Y 1� Meeting Date 1 Prepared by Mayor's review 1 Council review Q= 14'9' •:r 7/09/07 1 BG AMA AfrY vo rr fi r_" 7/16/07 1 BG `ekf1' I a rsoa 1 I u 1 1 1 1 ITEM INFORMATION CAS NUMBER: 07-087 I ORIGINAL AGENDA DATE: JULY 9, 2007 AGENDA ITEM TITLE Reject all bids for Green River Pedestrian and Utility Bridge Project CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date 7/09/07 Mtg Date Mtg Date 7/16/07 Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW/ SPONSOR'S Four bids were submitted for the repair and sealing of the Green River Pedestrian and SUMMARY Utility Bridge. The bids were within the budget however all of the bidders were non responsive to the experience requirement. None of the submitters had worked on wood bridges over water, which requires special expertise to protect the bridge and the environment. REVIEWED BY COW Mtg. CA &P Cmte F&S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DAZE: 6/25/07 RECOMMENDATIONS: SPoNsoR /ADMIN. Reject all bids by resolution. colvDdri rEE Unanimous approval; forward to COW. COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 Fund Source: 104.01 Bridges (page 31, 2007 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 7/09/07 7/16/07 MTG. DATE I ATTACHMENTS 7/09/07 Information Memo dated June 19, 2007 Map of bridge location Bid Tabulation Resolution rejecting all bids Transportation Committee Minutes from June 25, 2007 7/16/07 INFORMATION MEMO To: Mayor Mullet From: Public Works Directod Date: June 19, 2007 Subject: Green River Pedestrian and Utility Bridge No. 0000TUK18 Project No. 07 -RWO2 BID REJECTION ISSUE Reject all bids for repairs and sealing the Green River Pedestrian and Utility Bridge. BACKGROUND This project was designed to provide repairs and sealing of the Green River Pedestrian Bridge on the Green River Trail near South 180 Street and Andover Park East. The repairs include replacement of the wooden deck and repairs to deteriorating sections of the bridge truss. The sealing includes coating the entire bridge with a stain/sealant to preserve the wood from further deterioration. The project was advertised for bids on May 31 and June 7 and bids were opened June 15, 2007. Four bids were received with the apparent low bid of $209,500.00 from Cadence Construction. The engineer's estimate was $192,100. ANALYSIS The bids were reviewed and tabulated and no errors or irregularities were found in the bids. However, the apparent low bidder and the other bidders, are non responsive to the experience requirement. Cadence Construction has worked primarily on residential renovation projects up to $55,000 with no experience working on a wooden truss bridge over water. Further, the remaining three bidders have worked on similar size projects, but none with wood bridges over water. Working with wood bridges and work over the river requires special expertise to protect the bridge and the environment. RECOMMENDATION Reject all bids for the construction bid for the Green River Pedestrian and Utility Bridge and re- design and re- advertise in two packages. The first package will be bridge repair and the second will be bridge painting. attachments: Vicinity Map Bid Tabulation Bid Rejection Resolution (P- Projxts\A- RW RS Projxcs \OTRWO2 Gr Riv Pod BiGr Riv Ped Br Bid Rcjewo¢ Info Memo) ibu 4 Evans! 1 Black Dr s u, St D° a S S 161 Baker Blvd 1 �°St b2 °�P t S 164 I v w S trander Blvd ���i��� S 164 St a -0 c R Q a (.1 T reck '`t S 166S Dr J Q� c n );//t ro S 168 St 4; 4 c Corporate -5 Drive N Corporate Drive S Mink -er B vd s i l Ct ~z?a �5 U land Dr Upland Y Te Q Q 3 r Mi dland Dr r, i r Sa xon s ti 'Drive l s' Q p D c f q) St Triland Dr i in ro VI S 180 St h Q SW43St to Segale Pk Dr x S 18i r------. %Ri vers i de /'J 5 4 Q. -3-:- 4 I C') Dr .7/ ft) je a Q Q n, a P �O a To `Z dd Q is Q S P 9a/ �QO� Bl ve- a j 3 Low Dion h e park ltr t A C l ,.y� S Glacier St 6-1 le B 2 cu ,65 ti I 5 Q �4 Green River Ped Utility Bridge 364 L4 Repairs and Maintenance 1. City of Tukwila Vicinity rf z Map d M ay 8 2007 ms s iso8 1 0 0 0 0 0 0 0 O o 0 co 0 0 0 0 coor- 000 0 -a: m 0 0 (O to 6) N O L() 00 a L N CO 0) N 0 m n a) 0 c W 0 0 0 0 0 0 V o o 0 0 0 0 0 W 0 0 0 0 0 0 07-rw02 0 N. 0 0 0 0 C_ Q a C7 O 1` O O O C- O W 1- N 1n M� 0 1.6 Z r o o o oo o 0 0 V o oo_ D o_ o D o_ oo oo 0 0 0 N N 0 M CO L y- N a) W 0 0 0 0 0 0 0 0 0 0 0 0 0 j., 0 0 0 0 0 0 0 a o 0 0 0 0 0 N a0 N 0 O 10 Z r o O o 0 0 0 0 C 0 0 0 0 0 0 0 CO N 0 0 0 0 0 o 0 r` CO to CO O O to U jr coon) o C r N 0 o W 0 0 0 0 0 0 Z 41 0 0 0 0 0 0 0 co (O 0 o Ti ocfloo O e a N. co Lc)c) co 1- Q C I� O to t Z N d' T J 0 Z 0 0 0 0 0 0 0 o O o 0 o 0 0 Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000 0 1- 00o cc) 0 0 C) 0 0 0 0 0 0 0 (n o o o in 0 0 10 E 0 rtnO Lc) oO o o o00r`oo r` 0 W U M CO O 0)) of 0 co U M CO O to 0 CO i W 0 0 0 0 0 0 W 0 0 0 0 0 0 CO 0 Q 0 0 0 0 0 0 0 0 0 0 0 0 0 r C 0 0 0 0 0 0 0 0 0 C O O Y 0 0 0 0 0 0 Q d 0 0 0 1` 0 0 M 'a a r to O to O O 0 0 N 0 to C W Z M Tt co o Z 0 co r co Tr r Z Z J -1 -1 J LL u. 0 I- Z J J J J L1 LL 0 I- f m a Z 2 a Z Z o 0 0 M N a m Q a) Q V u) CC a) co E a) m c r 0 0 ca 0 rn_ cc d v) L c U (1) k c U Q J n LD a a y n i m d d Q to 'L C O Q y C O co 10 it tC O` 0 RS O c 0 6 O i O N- fa Y dN. x «it W o 0_ �•�1- o 6 _c a 0 o N C 2 U o N L C` 0 1.1-, Z W a aa) c W a c 0 W a) H 2 H m 0 0 F- m R. m U o 4) 0 0 2 N 2 O N 4- H L p 'C H Z N ch NI D 1_17' I- Z 0 0 UCDO.m 00 �cqco oo DRAFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REJECTING THE BIDS SUBMITTED FOR THE GREEN RIVER PEDESTRIAN AND UTILITY BRIDGE PROJECT #07 -RW02, AND AUTHORIZING STAFF TO RE- DESIGN THE PROJECT AND RE- ADVERTISE FOR BIDS. WHEREAS, sealed bids were solicited for the Green River Pedestrian and Utility Bridge Project #07 -RW02; and WHEREAS, all the bids received from four bidders were publicly opened, examined and declared by the City Clerk's Office on June 15, 2007; and WHEREAS, the engineer's estimate for this repair and sealing project was $192,100.00, and the budgeted amount was $270,000.00, and the bids received ranged from $192,100 to $307,753; and WHEREAS, none of the bids were responsive to the requirement for ten years of similar experience for the type and size of this project; and WHEREAS, RCW 35.23.352 provides for the rejection of any or all bids by resolution of the City Council; and WHEREAS, staff recommends the rejection of all bids, and further recommends re- designing the work and re- advertising for bids; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. All bids for the Green River Pedestrian and Utility Bridge Project are hereby rejected. The bid deposits received by the City shall be returned to the bidders with notification of the rejection. Section 2. City staff is hereby authorized to re- design the work and re- advertise for bids. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 2007. ATTEST/ AUTHENTICATED: Verna Griffin, Council President Jane E. Cantu, CMC, City Clerk APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Office of the City Attorney Resolution Number: C:1Documents and Settings\All Users\ Desktop \Kelly\MMSDATA\Resoluuons \Green River Bridge Bid Reject.doc GL:ksn 7/2/2107 Page 1 of 1 f o t TA City of Tukwila 9 u Transportation Committee o 0:4;f\..:0" ,V 1909 TRANSPORTATION COMMITTEE Meeting Minutes June 25, 2007- 5:00 p.m. PRESENT Councilmembers: Pam Carter, Chair; Pam Linder and Joe Dune Staff: Jim Morrow, Gail Labanara, Robin Tischmak and Kimberly Matej Guests: Chuck Parrish CALL TO ORDER: Committee Chair Carter called the meeting to order at 5:01 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Green River Pedestrian and Utility Bridge Repairs and Sealing Bid Reiection Staff is seeking approval to reject all bids received for the Green River Pedestrian and Utility Bridge Repairs and Sealing project. Staff is requesting the bid rejection because no bidder was found to meet the criteria for i experience as set forth in the bid packet. The project will be re -bid in two separate packages one for bridge repair and the second for bridge painting. This decision to re -bid the project into two packages is based on a short survey of vendors who are willing and experienced to complete only one task but not the other. UNANIMOUS APPROVAL. FORWARD TO JULY 9 COW FOR DISCUSSION. B. SR -518 Route Development Plan Proposed Modifications Sea -Tac International Airport desires to develop a parcel of land north of SR -518. In order to do this, Washington State Department of Transportation WSDOT) needs to amend the Route Development Plan (RDP) for SR -518 and 24 Ave. S. /S. 154 /SR -99. The Airport and City of SeaTac would like to offer two additional alternative scenarios for this interchange in the RDP; however, in order for WSDOT to make modifications to their RDP, they require concurrence of all effected parties. At this time, effected parties include: the Cities of SeaTac, Burien and Tukwila; Port of Seattle and the WSDOT. After reviewing the two additional alternative scenarios, and determining that either option is more advantageous to the City of Tukwila in comparison to the current route, the Committee authorized Jim Morrow, Public Works Director, to sign his concurrence with modifying the WSDOT RDP to reflect these alternatives as options. The Committee authorized Jim's signature based on the following: the concurrence of the additions do not endorse a specific option or lock the City into any commitment; there are no decisions being made regarding the interchange or RDP; and both alternatives are advantageous to the City of Tukwila. Finally, staff will return to Committee and full Council once these modifications require action by the City of Tukwila. INFORMATION ONLY. III. ANNOUNCEMENTS No announcements. IV. MISCELLANEOUS Meeting adjourned at 5:36 p.m. Next meeting: Monday, July 9, 2007 5:00 p.m. Conference Room 1 Committee Chair Approval Minutes by KAM. Review by GL.