AGENDA ITEM TITLE Emergency Management Issues
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
illtg Date 05/14/07 Mtg Date 05/21/07 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date:
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW/
SPONSOR'S A status update that addresses identified emergency management deficiencies which
SUMMARY includes a brief description of the deficiency, the proposed corrective action, and the cost
to implement over a four -year period. Deficiencies include standby generators for City
facilities, DERT trailers for First Responders and a public shelter, a full -time staff position,
improved public information, a permanent EOC, and traffic signal backups.
REVIEWED BY COW ivltg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 04/16/07
RECOMMENDATIONS:
SPONSOR /ADMIN.
Ca-ND/In-FEE Unanimous approval; forward to COW for discussion.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$6,209,000.00 $0.00 $0.00
Fund Source:
Comments:
MTG. DATE 1 RECORD OF COUNCIL ACTION
04/23/07 1 Requested a presentation at the 5/7/07 Council meeting.
1
05/07/07 Forward to 5/14/07 Committee of the Whole Meeting 1
MTG. DATE ATTACHMENTS
05/07/07 Information Memo dated 5/1/07 from Director of Emergency Management
Information Memo dated 4/11/07 from Finance Director
05/14/07 Revised Information Memo dated 5/8/07 to correct figures on Pg 6 from Director of Emergency Mgmt
Information Memo dated 5/9/07 from Public Works Director and Finance Director
INFORMATIONAL MEMORANDUM
To: Mayor Mullet
From: Director of Emergency Management
Date: May 8, 2007
Subject: Emergency Preparedness Are We Ready?
ISSUE:
Prepare a prioritized list of emergency preparedness needs.
BACKGROUND:
In today's world, emergencies and disasters take many forms, including natural disasters,
technological and infrastructure failures, terrorist attacks, and health emergencies such as
pandemic disease outbreaks. A well planned and implemented response is vital to the safety and
well -being of Tukwila's citizens; an ineffective response, on the other hand, threatens our First
Responder Team, our citizens and their property, and can exacerbate damages to the City and its
economy.
Over the past three years, the City has had to respond to a variety of events: four flooding events,
typical winter storms, and a severe windstorm. Overall the City has done an excellent job in
planning, responding, and recovering from these events. The City has been lucky because the
events have been relatively short- termed and the First Responder Team (Police, Fire and Public
Works) has been able to handle the incidents. However, the City is unprepared for a sustained,
major disaster that would require full mobilization of its emergency management organization.
DISCUSSION:
Since the official establishment of Tukwila's Emergency Management Program in May 2003,
after action reports and end -of -year program status reports have consistently identified a number
of issues that should be addressed if the City is to be better prepared. What follows is a status
update that addresses identified needs to include a brief description of the need, the proposed
corrective action, and the cost (personnel and dollars) to implement.
Corrective Actions Completed To Date
1. Designated an Emergency Management Director
2. All Hazards Emergency Management Plan has been written (Before NIMS).
3. Created an Emergency Operations Center Golf Maintenance Facility.
4. EOC Operations Manual written (Before NIMS)
5. U.S. Army Corps of Engineers has recertified Tukwila's 205 Levee System.
6. Authorized a CERT Training Position.
7. Increased the Emergency Management Budget from 50,000 to 100,000.
8. Draft Emergency Communication Plan prepared.
Emergency Preparedness Are We Ready? Page 2 of 2
Existing Issues
Traffic Signal Backup:
The City has been installing battery backup capability at key intersections. The batteries will
last approximately 2 -hours when the signals are in a full- operational mode and up to 10-
hours when placed in a flashing mode. During sustained power outages, these batteries must
be replaced and recharged on a regular basis.
Issue: Having sufficient battery backup capability for operating traffic signals at major
intersections.
Corrective Action: Additional batteries and a separate charging system.
Cost: $10,000
Public Shelter Capability:
It is the responsibility of local government to provide emergency shelter and temporary
housing for disaster victims within its own capabilities, and to request and facilitate the
implementation of shelter assistance provided by private relief agencies and other state and
federal programs. Emergency shelters should have the capability to address the needs of the
general population and the high -risk population. Six sites within the City have been
identified as potential shelter areas 5 schools and the Tukwila Community Center.
Issue: Having sufficient resources to open a 100 person, City- sponsored shelter. Sixteen
(16) trained personnel needed for each 8 -hour operational shift. (Does not include
security personnel).
Corrective Action: Purchase a self contained Disaster Emergency Response Trailer
(DERT). Have a pool of trained personnel need approximately 200 trained people
(City employees and volunteers) in order to get the 48 people needed for each 24 -hour
period.
Cost: DERT costs $100,000. Supplies must be rotated on an annual basis annual
maintenance costs are approximately $10,000 $15,000.
First Responder Support:
It is the responsibility of the City to provide medical assistance, shelter, food, water, and
commodities for emergency response personnel throughout the duration of the incident.
Also, if the First Responders are to be able to concentrate on their jobs, they need to know
that their families are safe Safe Home is a program that relieves that worry.
Issue: Having sufficient resources to care for, shelter and feed 100 response and recovery
personnel over a sustained period. Shelter operations will need ten trained people for
each 8 -hour operational shift. In addition the Safe Home Program needs to be
implemented.
Emergency Preparedness Are We Ready? Page 3 of 3
Corrective Action: Purchase a self contained DERT for First Responders (which would
be separate from the Public Shelter DERT). Implement Safe Home.
Cost: DERT costs $100,000. Supplies must be rotated on an annual basis annual
maintenance costs are approximately $10,000- $15,000.
Improved Public Information:
Successfully preparing for and responding to a disaster relies heavily upon keeping the public
informed. The first responsibility in an emergency is to minimize injury to people and
damage to property. The second responsibility is the general day -to -day public information
as to what is being done to protect their welfare, training offered, and their responsibility in
times of an emergency.
Issue: Communicating with the public and keeping the public informed.
Corrective Action: Electronic reader boards permanently installed at every City facility.
Establish an information center. Consistent messages /updates provided to the radio
stations used by the School District. Establish an employee call -in line (Done). Establish
a citizen call -in line to inform the public if City facilities are open. Establish a phone
bank for residents /citizens to call seeking information and to report problems. Capability
to go door -to -door to deliver emergency public health messages messages must be
translated into many languages.
Cost: $150,000 for reader boards. Costs and staffing requirements are unknown for the
other improvement suggestions. Requires a pool of personnel (employees and
volunteers) to man the telephones and deliver the messages.
Adeauacv of Citv Facilities:
Restoring City services will depend upon City facilities being able to function during an
emergency event.
1. Standby Power:
Issue: City's capability to provide essential services is strained. Nine key facilities have
limited or no power backup systems.
Corrective Action: Install backup generators at all key City facilities.
Cost: City Hall: 380,000 Fire Sta 51: 180,000
6300 Bldg: 280,000 Fire Sta 52: 145,000
TCC: 370,000 Fire Sta 53: 123,000
Minkler Shop: 255,000 Fire Sta 54: 116,000
George Long: $150,000
Emergency Preparedness Are We Ready? Page 4 of 4
Earthquake Resistance:
a. City Facilities
Issue: A number of key City facilities are unable to withstand an earthquake.
Corrective Action: Study underway to ascertain capability and what is needed to bring
key facilities up to code.
Cost: TBD
b. Bridges
Issue: Of the 21 city owned bridges, 11 are seismically deficient and 7 should be either
retrofitted or replaced.
Corrective Action: Note: a prioritized list has been established. Number 1 priority is
Boeing Access Rd Bridge (over UPRR BNSF railroads). Concentrate resources on
retrofitting/replacing the deficient bridges.
Cost: Fixing the No. 1 priority City cost estimated at 3,000,000; Federal share is
12,000,000.
Full -time Staffing for Emergencv Management Program:
Since 9/11 and the creation of the Department of Homeland Security, preparing for an
emergency has been a top priority within the United States. The federal government has
mandated that local governments create and implement long lasting emergency management
programs that have the capability to meet and respond to any situation. This directive has
created a tremendous workload upon City staff.
1. Staffing
Issue: City does not have any full -time, dedicated emergency management staff.
Corrective Action: Hire a full -time Emergency Management Coordinator
Cost: Annual expense is 80,000.
2. Plan Preparation
Issue: Existing plans need to be updated for NIMS compliance Comprehensive
Emergency Management Plan; EOC Operations Manual. Need to perform the federally
mandated Hazard Identification, Vulnerability, and Risk Assessment; and Hazard
Mitigation Plan.
Emergency Preparedness Are We Ready? Page 5 of 5
Corrective Action: Staff time is the limiting factor. Hire a full -time Emergency
Management Coordinator that will report to the Director of Emergency Management.
Cost: None. Previously identified staff position needed.
Ememencv Operations Center (EOC):
Coordination of emergency response and recovery operations, and development of plans and
strategies should occur in a location that is large enough for the organization to come
together during the incident. The City has identified over 40 individual functions /positions
that will be needed. An effective, safe workspace that includes interoperable
communications and telecommunications capability is just as important as clear operating
procedures, staff roles, and responsibilities.
1. Permanent EOC
Issue: Inadequate sized EOC located at the Golf Maintenance Shop. Cannot
accommodate all of the anticipated personnel needed to manage a disaster event.
Corrective Action: Build a permanent EOC behind the 6300 Building.
Cost: Design and Construction 750,000.
2. EOC Communications
Issue: VRM capability for the Police and Fire Departments.
Corrective Action: Install two (2) VRM's in the EOC
Cost: $20,000
RECOMMENDATION:
The First Responder Team and the Finance Safety Committee recommend addressing the
identified issues in the following prioritized /phased approach:
Year 1 Estimated Cost
Standby Generator for Fire Station 53 123,000
Standby Generator for Fire Station 52 145,000
Standby Generator for City Hall 380,000
First Responder Support 100,000
Standby Generator for Fire Station 54 116,000
Finance and Safety Committee recommends the following additions:
Full -time Staff Position 80,000
Emergency Preparedness Are We Ready? Page 6 of 6
Improved Public Information (partial) 50.000
Total: S 994.000
Year 2 Estimated Cost
Standby Generator for George Long Bldg. 150,000
Standby Generator for Community Center 370,000
*Permanent Staff Position $80,000
Standby Generator for 6300 Building 280.000
Finance and Safety Committee recommends that the Permanent Staff Position be
accelerated to Year 1.
Cost of permanent staff position not included in total
Total: S 800.000
Year 3 Estimated Cost
Standby Generator for Minkler Shop 255,000
Standby Generator for Fire Station 51 180,000
*Improved Public Information 100,000
City- Sponsored Public Shelter Capability 100,000
Permanent EOC with communications 770,000
Traffic Signal Backup 10,000
Finance and Safety Committee recommends accelerating a portion ($50,000) of the
Improved Public Information initiative.
*Total cost for Year 3 does not include the full cost of the improved public information
initiative.
Total: $1.415.000
Year 4 Estimated Cost
Replace Boeing Access Rd Bridge 53.000.000
Recurrinn Annual Costs
Full -time Staff Position $80,000
Replenish supplies for First Responder Support $15,000
Replenish supplies for City- Sponsored Public Shelter $15,000
INFORMATION MEMO
To: Mayor Mullet
City Council members
tf
From: Jim Morrow, Public Works Director
Kevin A. Fuhrer, Finance Director
Date: May 9, 2007
Subject: Emergency Management Year 1 Initiatives
Following the direction received from Mayor Mullet at the May 7, 2007 regular
council meeting, we have met to review and discuss in greater detail the anticipated
Year 1 implementation issues from an operational and financial perspective. The
standby generators, first responder support, full -time staff position and improved
public information components are each discussed separately below.
Standby Generators
We will need to retain the services of a consultant for the design work. It is
anticipated that a period of two (2) months will elapse from the point at which a
Request for Proposal (RFP) is prepared to awarding a contract.
The estimated cost of design for the four (4) city facilities is $125,000 and it
should be noted that the costs of generator installation previously discussed did
not include design costs.
Upon letting the consultant contract, the design work should be reasonably
completed within a 4 -month timeframe. A call for construction bids will likely
be advertised in November/December 2007 with a construction contract award
expected in January/February 2008. Final installation for the four (4) facilities
should be completed in July /August 2008.
First Responder Support
The self contained Disaster Emergency Response Trailer (DERT) will likely be
purchased from the same manufacturer that the American Red Cross utilizes. It
is anticipated that the $100,000 DERT will be fully placed into service by year-
end 2007. This may require Council approval for a sole- source purchase.
Full -Time Staff Position
As noted at the May 7, 2007 council meeting, budget capacity is available in the
2007 adopted budget for a .5 Full -Time Equivalent (FTE) Emergency
Management Coordinator. In consultation with the Administrative Services
Director, the soonest a final hiring can be completed is January 2008.
Improved Public Information (Partial)
As a start, electronic reader boards will be installed along with back -up
generators at the three (3) fire stations. It is estimated that the $50,000 identified
should be sufficient and will be included in the standby generator project in 2008.
ANALYSIS
The total Year 1 estimated costs identified in our May 7 review amounted to
$994,000. Given the work plan discussed above, we anticipate 2007 expenditures
in the order of $225,000 to $275,000.
Potential funding options have been narrowed to issuing bonds, utilizing annual
excess resources, or a combination thereof. Considering the type and size of
expenditures anticipated in 2007, we recommend utilization of excess resources.
Furthermore future implementation costs for 2008 and beyond should be allocated
within the 2008 -2013 Financial Planning Model and Capital Improvement Program
with funding decisions determined in conjunction with development of the 2008
Annual Budget.
As a follow -up to the question of non -voted debt capacity, a total of $34,646,060
remains as of December 31, 2006. Applying the 75% policy limit, the amount is
reduced to $25,984,545.
In closing we look forward to further discussion of this topic on May 14, 2007.