HomeMy WebLinkAboutCOW 2006-10-23 Item 4C - Resolution - 2007 Public Works Fee Schedule '4N4 a.
COUNCIL AGENDA SYNOPSIS
o tz%
ITEM No.
1, Meeting Date Prepared by 1 Mayor's review 1 ncil review
Q, +a� o 10/23/06 1 MC 1 .ter. I (L)
11/06/06 1 1
7908
ITEM INFORMATION
CAS NUMBER: 06-124 I ORIGINAL AGENDA DATE: OCTOBER 23, 2006
AGENDA ITEM TrILE Resolution for Public Works Fee Schedule for the 2007 Sewer Rates
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 10/23/06 Mtg Date Mtg Date 11/06/06 Mtg Date Mtg Date Mtg Date Mtg Date
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PIV
SPONSOR'S The City's sewer rate change is needed to meet operational and capital expenditures for
SUMMARY the sewer enterprise fund. The monthly residential flat rate will increase from $8.00 to
$8.80 per residential connection, and from $14.00 to $15.40 for up to 750 cubic feet or
fraction thereof for the commercial /industrial customers. The sewer charges are included
in the Resolution setting the Public Works fee schedule.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 10/17/06
RECOMIVEENDATIONS:
SPONSOR /ADMIN. Approve resolution increasing the City's sewer fees
COMMITTEE Unanimous approval; forward to COW
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source: 402 Sewer Fund
Comments:
MTG. DATE I RECORD OF COUNCIL ACTION
10/23/06 1
11/06/06 1
MTG. DATE I ATTACHMENTS
10/23/06 1 Exhibit D Resolution adopting the 2007 Public Works Fee Schedule
Comparison of Single Family Sewer Rates from neighboring jurisdictions
I Memo from Public Works Director dated 10/11/06
11/06/06 1
1
1
INFORMATION MEMO
To: Mayor Mullet
From: Public Works Director
Date: October 11, 2006
Subject: Water and Sewer Rates for 2007
ISSUE
Approve resolution increasing sewer rates to meet operational and capital expenditures for the
sewer enterprise fund.
BACKGROUND
Metropolitan King County has adopted Ordinance No. 15522 showing the monetary
requirements for sewage disposal. The King County monthly fee for the disposal of sewage is
increasing from $25.60 per month to $27.95 per residence or per residential equivalent. As a
component agency, Tukwila passes these costs on to their sewer customers.
Also of note the King County sewage capacity charge will increase from the current $34.05 per
month for fifteen years to $42.00 per month for fifteen years for any sewer connection
occurring between January 1, 2007, and December 31, 2007. For any new sewer connections
occurring between January 1, 2008, and December 31, 2008, the amount will be $50.00 per
month for fifteen years.
In addition to the King County sewage disposal fee, the Tukwila base rate is scheduled for an
increase in accordance with the rate model that analyzes the City's operational and capital
needs. The City sewer rate will increase from $8.00 to $8.80 per residential connection, and
from $14.00 to $15.40 for up to 750 cubic feet or fraction thereof for the commercial/
industrial customers.
the needs of the water enterprise fund as well. The last rate
Public Works has analyzed
IP
increase for monthly water charges was in 2000. Wholesale price increases will start next year
and into 2008. A rate increase is being proposed to maintain rate stabilization and diffuse
larger rate increases that could happen later (see following table). A portion of this increase
will provide the funds necessary for continuing operational and capital needs.
Mayor Mullet
Page 2
October 11, 2006
Fire protection charges are the rate for private fire protection lines and have not been increased
since 1996. These charges defray expenses related to building sprinkler systems and hydrants.
An increase from $5.00 to $6.00 in the base computation rate is proposed.
No increase in Storm and Surface Water fees is proposed for 2007.
RECOMMENDATION
Approve the resolution for Public Works fee schedule for 2007 sewer rates.
attachment: Resolution approving a Public Works Fee Schedulenfo Memo 10-11 -06)
EXHIBIT_ EXHIBIT t
prof
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ADOPTING A PUBLIC WORKS FEE SCHEDULE
WHEREAS, each year the City analyzes the rate model for the three utility water, sewer and
surface water enterprise funds; and
WHEREAS, the City needs to recoup a greater percentage of the cost of operating and
maintaining its infrastructure for water, sewer and surface water utilities; and
WHEREAS, Tukwila's fees are significantly lower than the average of neighboring jurisdictions;
and
WHEREAS, adopting the fees in a separate document will allow them to be more easily updated
in the future;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Public Works fees will be charged according to the following schedule:
Public Works Fee Schedule
Permit Description 1 Cost
Type A (Short-Term Nonprofit) 1 $50
Type B (Short-Term Profit) 1 $100 1
$250 Application Base Fee, plus four components
based on construction value
Type C 1) Plan Review
(Disturbance of City Right -of -Way) 2) Construction Inspection
3) Pavement Mitigation
4) A Grading Plan Review
Type D (Long -Term) 1 $100
Type E $100
(Potential Disturbance of City Right of Way)
$250 Processing Fee, plus $5,000 cash deposit,
Type F (Blanket Permits) withdraw $100 /instance for inspection
Additional Inspections 1 $47.00 per inspections
Franchise- Telecommunications 1 $5,000 Administrative Fee
Franchise Cable 1 $5,000 plus 5% of total revenue
Street Vacation 1 $1,200
$500 Processing Fee, plus 17% administrative fee,
Latecomer's Agreements plus $500 segregation fee
Flood Zone Control 1 $50
TUK2 \VOL1\PUBWORKS \GAIL\Resolution PW Fees Sept 2006.doc
Public Works Fee Schedule (cont.)
Permit Description Cost
Water Meter Installation
.75" 600
1" 1,100
1.5" 2,400
2" 2,800
3" 4,400
4" 7,800
6" 12,500
Water Meter Deduct 1 $25
Copy of City of Tukwila's Tnfrastructure
Design and Construction Standards $50
Residential Sewer Service Flat rate of $8.80 per month
(single dwelling unit) (TMC 14.16.030 No. 1)
X"=) Residential Sewer Service Flat rate $8.80 per month for each dwelling unit
(multiple dwelling unit, permanent type) (TMC 14.16.030 No. 2)
Commercial and Industrial Flat rate of $15.40 per month and in addition any
Sewage Service usage over 750 cubic feet of water per month shall
be at the rate of $15.40 per 750 cubic feet. (TMC
14.16.030 No. 4)
Sewer Late Charge $5.00 per month on sewer accounts more than 30
days in arrears. (TMC 14.16.030 No. 5)
Surface Water Utility Rates per year Service Charge Service Charge
Category Per acre Per 4,356 sq. ft.
1. Natural 77.00 7.70
2. 0 20% Developed Surface $167.30 $16.73
3. 21— 50 Developed Surface $306.70 $30.67
4. 51— 70% Developed Surface $457.70 $45.77
5. 71— 85% Developed Surface $551.30 $55.13
6. 86 100% Developed Surface $643.20 $64.32
7. Single Family Residential Parcels 62.00 per parcel N/A
TUK2 \VOL1\PUBWORKS \GAIL\Resolution PVT Fees Sept 2006.doc
I iA1 r ti tQ N CI) 1-- co c)\ S co. t 06 cn ".;:i in\
a r I. 1 I. 1
p O cc)
0 0\ F 0.
tsp. p
o
o i p N N N N N
O
N 1
U.1 0 z
12 S la
0 r
o w o c-
Q
t C'` v p
;p-
ua tO .acE
0
v
p v i a 1 p
3 MM p p N p r 'r N yil i+ 1i� p
L
O r
6�
(1) O v m
1 N
0
1 o N
2,
Q 4I O
IL Z
{ice cec 'Qj V i
-a
0
Z 1 N 0 0 1 W W
Z 0 N Z 7- J Z
v Z J1 1 Z
1 7 1.0 '5 O 1 Z! O
1 ct' 1
7 m Q,, 0\
U 01