HomeMy WebLinkAboutReg 2006-10-16 Item 5C - Final Acceptance - 2005 Small Drainage Program by Dennis R. Craig Construction COUNCIL AGENDA SYNOPSIS
Initials ITEM No.
s 12
Meeting Date 1 Prepared by Mayor's review 1 j'qunci1 review
o I 10/16/06 BG Ann .{.et- 1//1.
5, /1
ITEM INFORMATION
1 CAS NUMBER: 06-118 I ORIGINAL AGENDA DATE: OCTOBER 16, 2006
AGENDA ITEM TrnLE Accept as complete 2005 Small Drainage Project and release retainage.
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date Mtg Date 10/16/06 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date:
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal Pe7R Police PIS
SPONSOR'S The contract with Dennis R. Craig Construction, Inc. is complete for the 2005 Small
SUMMARY Drainage Project. Construction began November 4, 2005 and was entirely completed on
August 22, 2006. The contract eliminated drainage problems at three sites. Overruns
were spread out over 45 bid items and cannot be attributed to any one specific cause.
This project is ready for final acceptance and the total contract amount was $388,019.56.
REV IEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 10/3/06
RECOMMENDATIONS:
SPONSOR /ADMIN. Accept contract as complete and authorize release of retainage.
COMMITTEE Unanimous approval; forward to Regular Consent Agenda.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$388,019.56 $797,000.00
Fund Source: 412.02 Surface Water
Comments:
1 MTG. DATE I RECORD OF COUNCIL ACTION
1 10/16/06
MTG. DATE I ATTACHMENTS
10/16/06 Information Memo dated September 26, 2006
Notice of Completion of Public Works Contract 05 -117
Utilities Committee Meeting Minutes from October 3, 2006
1 1
I
INFORMATION MEMO
To: Mayor Mullet
From: Public Works Director
Date: September 26, 2006
Subject: 2005 Small Drainage Program
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of retainage in the amount of
$19,400.98.
BACKGROUND
The Notice to Proceed for Contract No. 05 -117 with Dennis R. Craig Construction, Inc., of
Redmond, Washington, was issued November 4, 2005, for construction of the 2005 Small
Drainage Program, Project No. 05 -DR01. This project completed three drainage sites:
Site No. 1 45 Ave S (approximately S 123' to S 124 St)
Site No. 2 43' Ave S (S 142' St to S 140 St)
S 140 St (43 Ave S to 45 Ave S)
45 Ave S (S 140 St to S 139 St to outfall to creek)
Site No. 3 42' Ave S (south of Southcenter Blvd)
Site No. 1 eliminated the drainage problems on the east side of 45 Ave S, north of S 124 St.
Site No. 2 eliminated the failing storm drain under the house on S 140 St. Site No. 3
eliminated the drainage problem on the west side of 42n Ave S.
This contract was totally complete on August 22, 2006. No change orders were issued. The
unit bid price overrun listed below was spread out across 45 unit price bid items and cannot be
attributed to any one specific cause. The contract costs are summarized below:
Contract Award Amount 377,481.65
Unit Bid Quantity Overruns 10,537.91
Subtotal 388,019.56
Sales Tax (N /A Rule 171) 0.00
Total Amount Paid (incl. retainage) 388,019.56
RECOMMENDATION
It is recommended that this contract be forwarded to the Tukwila City Council on the consent
agenda for formal acceptance and authorize the release of retainage, subject to the standard
claim and lien release procedures.
BG:ad
attachment: Notice of Completion of Public Works Contract
(P:Projm \A- DR Projear105DRO1 2005 SDP1Co¢smction\Info Memo Closeout DRCC 2005 SDP)
State of Washington
Department of Revenue
J PO Box 47474
REVENUE Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 600 357 430
Date 8/28/06
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From:
r a d f Fub_I Agency Y 3e_pa eut 13s 4}n1y
Assigned To
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned
Notice is hereby given relative to the completion of contract or project described below
Description of Contract Contract Number
2005 Small Drainage Program (Project No. 05 -DR01) 05 -117
Contractor's Name Telephone Number
Dennis R. Craig Construction, Inc. 425- 882 -2922
Contractor's Address
P.O. Box 595, Redmond, WA, 98073 -0595
Date Work Commenced Date Work Completed Date Work Accepted
11/4/05 8/14/06
Surety or Bonding Company
Travelers Casualty and Surety Company of America, Bond No. 104600773
Agent's Address
Bush Cotton Scott, LLC, P.O. Box 3018, Bothell, WA 984041 -3018
Contract Amount 377,481.65
Additions 10,537.91 Liquidated Damages 0.00
Reductions
Sub -Total 388,019.56 Amount Disbursed 368,618.58
Amount of Sales Tax Paid at 0.0 0.00 Amount Retained 19,400.98
(If various rates apply, please send a breakdown.)
TOTAL 388,019.56 TOTAL 388,019.56
Dtsbutlrsm Ofeer
Comments: Sales Tax Rule 171 applies to this Signature
storm drain work within City right -of -way.
Type or Print Name Diane Jaber
Finance Approval Phone Number 206 -433 -1871
6
The Disbursing Officer must complete and mail THREE copies of This notice to the Department of Revenue,
PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO
PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in
accordance with said certificate.
To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype
(TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov.
REV 31 0020e (6- 27 -01)
Utilities Committee
October 3, 2006 5:00 p.m.
Present: Pam Linder, Chair; Verna Griffin, and Dennis Robertson, Council members.
Jim Haggerton, council member Excused.
Jim Morrow, Director of Public Works; Frank Iriarte, Deputy Director; Bob
Giberson, Acting City Engineer; Pat Brodin, Operations Manager; Gail Labanara,
Public Works Analyst; and Diane Jenkins, Administrative Assistant to the Council.
Business Agenda
A. 2005 Small Drainage Program Project Completion and Acceptance
Mr. Giberson presented the 2005 Small Drainage Program for Completion and Acceptance.
Dennis R Craig, Inc. was the contractor for this project. This company is also contracted to
perform the 2006 Small Drainage Project. The project went well. Mr. Giberson reviewed
�J the work done on the three sites involved. There were no change orders. Unanimous
Approval. Forward to regular council consent agenda.
B. Strander Boulevard Storm Drainage and Pump Station #17 Project Completion and
Acceptance
Mr. Giberson presented the Strander Boulevard Storm Drainage and Pump Station #17 for
Completion and Acceptance. Frank Coluccio Construction Company was the contractor for
this project. Ms. Linder asked why the project took so long to complete. Mr. Giberson
related that it due to weather conditions and when the paving could be scheduled. He noted
that there was a new outfall to the river which addressed flooding concerns along Strander
Boulevard. Unanimous Approval. Forward to regular council consent agenda.
Old Business
Mr. Morrow provided an update on the petitioning of Department of Transportation to close two
lanes of I -5 while the gantry is moved for Sound Transit. S. 144 is expected to be closed for
three days.
Mr. Morrow also referenced a letter received from the United States Army Corps of Engineers
regarding 32 trees along the levee that the Corps would like removed. He continued and
explained that there are multiple agencies involved: King County Flood Control, National
Marine Fisheries, Washington State Fish and Wildlife, Mukilteo Indian Tribe, Federal
Emergency Management Act (FEMA), etc. These agencies do not agree on what action should
be taken. The National Marine Fisheries may choose to invoke the endangered species act.
Mr. Morrow will not be taking immediate action on the removal of the trees. Ms. Linder asked
Mr. Morrow to draft a memo updating the council on this issue. Ms. Linder asked what would
happen if the levee is decertified. Mr. Morrow explained that businesses would be required to
purchase flood insurance. If they built their facility while the levee was certified, they would be
eligible to purchase subsidized flood insurance. New construction would be required to build
2 feet above flood elevation. The Army Corps of Engineers is scheduled to make their
recommendation in a few weeks.
Adjournment: 5:50 p.m.