HomeMy WebLinkAboutCOW 2006-06-12 Item 5D - Bid Award - Dennis R. Craig Inc for 2006 Small Drainage Program
COUNCIL AGENDA SYNOPSIS
,�J 9s
o.f y' Initials ITEb1NO.
i q I 0 1 I Me'II tZ Day 1 Prepared r I r Ma %£'z rwierr i Jundl r-su� 1
c ,t 1y /a I 6/12/06 I RL ON/ I te___ It i
4 k '-...`...r 6/19/06 I r Lt;� 1 1 5 d
7908 I I I I I
I I I I
ITEM INFORMATION
CAS NUMBER: 06-070 IORUGIN.- u. AGENDA DATE: JUNE 12, 2006
AGENDA ITEM TITLE Bid Award for the 2006 Small Drainage Project
CATEGORY Diui&e ion Motion Resolution Ordinance Bid Award Public Hearing Other
\Ug Date 6/12/06 Mtg Date \Ug Date \U Dote .Lg Date 6/19/06 MUg Dat' lftg Date
SPONSOR commit Major Adm Svcs DCD Finan Fire Legal P&R. Police P11
SPONSOR'S The project was advertised on May 16 and 23, 2006. Three bids were received and
SUMMARY opened on May 31, 2006. The low bid of $326,066.15 was from Dennis R. Craig, Inc.
Dennis R. Craig, Inc. worked successfully on the 2004 and 2005 Small Drainage
Projects and references indicate that they have performed well on similar type
projects with other agencies.
REVIEWED BY COW Mtg CA &P Cmte F&S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 6/6/06
RECOMMENDATIONS: f
SPON =sox /AD\EL\N. Award contract to Dennis R. Craig, Inc.
COM TITEE Unanimous approval; forward to COW. 1
COST IMPACT FUND SOURCE 1
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$326,066.15 $481,000.00
Fund Source: 412 Surface Water Fund (page 139, 2006 CIP)
Comments:
MTG. DATE 1 RECORD OF COUNCIL ACTION
6/12/06 1
I I
6/19/06 1 I
1 I
MTG. DATE I ATTACHMENTS
6/12/06 j Information Memo dated May 31, 2006
1 Map of Site Locations 1
1 Bid Tabulation
(Consultant's Recommendation Letter Bid Review Letter
1 Utilities Committee Meeting Minutes from June 6, 2006
I 1
INFOlliilATION l\Ifu'>lO
To:
From:
Date:
Subject:
Mayor Mullet
Public Works Director
May 31, 2006
2006 Small Drainage Program
Project No. 06-DROl
Bid Award
'>i'y
;r){J
,
ISSUE
Award the 2006 Small Drainage Program to Dennis R. Craig Construction, Inc., of Redmond, Wasbington, in
the amount of $326,066.15.
BACKGROUND
The Annual Neighborhood Drainage Program budgeted $622,000 for construction of projects in 2006. This
amount included the completion of the 2005 Small Drainage Program estimated at $141,000 leaving S481,000
for construction of projects in 2006. The 2006 Small Drainage Program will construct the following projects:
Site No. I - West Yalley Highway Outfall Repair
Site No.2 - Strander Blvd. Outfall Repair
Site No.3 - Christensen Road Outfall Repair
Site No.4 - South 143'" Street Outfall Repair
Site No.5 - Interurban Ave. Drainage Swale Re-grading
Site No.6 - Southgate Creek Driveway Removal
This project was advertised on May 16 and May 23, 2006. Three bids were received and opened on May 31
The bids were checked and tabulated. No errors were found. Dennis R. Craig Construction is the low bidder
with a bid of $326,066.15.
At~ALYSIS
The low bid is of S326,066.15 is 24% over the engineer's estimate of $262,534 40. An analysis of the bid
results found that most of the differences were in five of the bid items. On four of these items, the Engineer's
Estimate did not accurately account for the costs associated with difficult site access issues. On the remaining
item, an incorrect cost was used that did not include materials. Bid results from the three bidders were
consistent with each other and no irregular bid results were found. It was concluded that the Engineer's
Estimate was in error and that the low bid from Dennis R. Craig Construction be accepted for the construction
of the project.
Dennis R. Craig Construction has worked successfully with TukwiIa on past projects including the 2004 and
2005 Small Drainage Programs. Reference checks also indicated that Dennis R. Craig Construction has
performed well on similar type projects with other agencies.
BUDGET AND BID SUMMARY (All amounts include sales tax.)
Bid Amount
Contingency (10%)
Total
Bid Results
$ 326,066.15
32,606.62
$ 358,672.77
Engineer's Estimate
$ 262,534 40
26,253.44
$ 288,787.84
Budget
$ 481,000.00
$ 481,000.00
RECOMMENDATION
Award the construction bid for the 2006 Small Drainage Program to Dennis R. Craig Construction, Inc., in the
amount of $326,066.15.
2tIaChmeD.l'): Project Location Map
Bid Tabulation
Consultant RecoIDl11eOOation
Consultant ~r of E:qJlanation on Concerning Low Enc,.ofueer s Estimare
(r~A.O~~D$~J'..bb~BilA~20C6$J)?}
s87A 2006 Annual Neighborhood
s a. s�tp Drainage Program
1.
V
110-
b
g T 5 Mk
16 1
S C 4E
St. St
al o�
S
Q g
p a
1 93.4. Hanks
Site 6 Ng t\ f -N
I.
■1 s
rank- *A' 1 1 Site 5
e t g t
i
144 St q at:,
Site 4
s K tii
y i a nt b
T� 3 r
Si eta time t
r 3 Site 3
L
Site 2
5
y S .tu au. 3
V Site 1
MdvMp Cato
yB Wend Dr
el I
5180 St q
a
y a
s
t 8 GIS
IV s Tukwila
In
2006 Small Drainage Program
06-DR01 Ceritfied Bid Tabulation
June 1, 2006
KPG
ENGINEERS ARCHITECTS LANDSCAPE ARCHITECTS
i5S 9th Avc:nue N
Seattle, WA 98109
TELWG/:l86-1640
FAX iOQ/Z86--J639
Mr Ryan Larson, P.E.
Senior Surface Water Management Engineer
City of Tukwila Public Works
Tukwila, WA 98188
Re: 2006 Small Drainage Program
Project No. 06-DR01
Recommendation for Contract Award
Dear Ryan:
KPG, Inc has reviewed the projects and references submitted by Dennis R
Craig for the referenced project All references checked indicated that
Dennis R Craig has performed the type of work detailed in the project
referenced and have met the industry standard for quality
We are therefore recommending that the City award Project No 06-DR01
entitled 2006 Small Drainage Program to Dennis R Craig Construction.
Please call me at (206) 267-1063 if you should have any questions or require
further information.
Sincerely yours,
~<Jt J~
Matt Thomas, PE
Project Engineer
June 6, 2006
KPG
E~GIXEER5 ARCHITECTS L\...."L>SC.-\PE ARClllTECTS
-; 5$ 9i:!-L _-\.. ",nUt:: ~
S<-:;.de, W.-\ 93W9
TEL O!05f=.Si5-16-fO
F.\X ~C5!:!~5-16S9
Mr Ryan Larson, P.E.
Senior Surface Water Management Engineer
City of Tukwila Public Works
Tukwila, WA 98188
Re. 2006 Small Drainage Program
Project No. 06-DR01 - Bid Review
Dear Ryan:
We have reviewed the bids received for the 2006 Outfall Repair Projects and offer the
following observations when comparing the low bidder to the Engineers Estimate.
Three (3) bids were received, with Dennis R. Craig Construction providing the low bid of
$326,066.15, approximately $63,000 over the Engineer's Estimate of $262,53400 The
majority of this difference occurs in the following 5 line items:
Item 5 - Clearing and Grubbing
Item 8 - Gravel Borrow
Item 17 - Ditch Excavation
Item 19 - Storm Drain Pipe, 18"
Item 21 - Outfall Check Valve
$8,400 difference
$8,100 difference
$17,000 difference
$18,000 difference
$15,000 difference
Items 5,8,17 and 19
All of these bid items require hauling of material to and from each of the 5 individual outfall
sites along the Green 1 Duwamish River Trail. These cost differences are consistent amongst
the 3 bids received; therefore, we would conclude that we did not adequately account for the
costs associated with accessing these remote sites for construction.
Item 21
Our hand calculations identify a material cost of $4,700, with an estimate of $1,500 for the
installation for a total of $6,200 each. The installation cost of $1,500 was erroneously
entered into the Engineer's Estimate rather than the total estimated cost of $6,200 This
results in a difference of nearly $15,000.
Dennis R Craig's bid on the other 22 items in the proposal were generally consistent with the
Engineer's Estimate, and the 5 items noted above were generally consistent between the 3
bids received. Therefore, we would conclude that the DR Craig bid is reasonable for the
work that is proposed on this contract. Please call me at (206) 267~1 052 if you have any
questions or need additional information.
.
Utilities Committee
June 6, 2006
Present: Jim Haggerton, Chair; Pam Linder, Verna GrifIm
Pat Brodin, Bob Giberson, Ryan Larson
A. Duwamish Gardens Acquisition ALEA Funding Assistance Resolution Ryan discussed
the previous grant proposals with the Committee in April 2006 and this resolution is a
requirement of the lAC funding. This project is currently unfunded and will be added to the
2007 CIP The local match may be zero, depending on success with other grant sources, yet
we have tentatively committed $50,000 on the grant application. Jim mentioned that the
Resolution seems to be a generic format. Ryan will find out iflAC will allow us to modify
the Resolution to better match typical Tu1.'wila Resolution format. Council packet will
include maps and the ALEA grant application. Unanimous approval; forward Resolution
to COW.
.'
B. 2006 Small Drainage Program Bid Award Ryan discussed the discrepancy between the
information memo and the bid tabulation in the engineer's estimate costs, which will be
corrected. The Engineer's Estimate was significantly lower than the bid amounts and upon
analysis, the main discrepancy was the difficulty of replacing the outfalls and work within
Southgate Creek. Staff will add a section on the validity and confidence level of the
Engineer's Estimate along with a letter from KPG. The specific locations were briefly
discussed. Unanimous approval; forward bid award of 5326,066.15 to COW.
C. 2006 First Quarter Report Several items were discussed, including: the timeline for the
LID Special Benefit Study for the Tukwila Urban Access Project (Klickitat), reclaimed water
issues (purple pipe), the reduction of water loss and the use of the new video equipment to
help eliminate sewer infiltration/inflow Information Onlv.
d
Committee Chair Approval
!vfinutes by BG, reviewed by PB, RL, GL
C:\Documents and Settings\Gam.:\l}' DiJcwnems\WTh\VORD\UC Minure5 BQb 2006-06-C-6.doc