Loading...
HomeMy WebLinkAboutReg 2006-04-17 Item 5C - Final Acceptance - Emergency Erosion Repair Project by American Civil Constructors West Coast COUNCIL AGENDA SYNOPSIS 2 Inettais ITEMNo. �1i, i Meeting Date j Prepared by 1 Mayor's review ounczl review 4/17/0 1 BG Q41-6 ,4 4.4 �I-J)k CJ C 190's ITEM INFORMATION I CAS NUMBER: 06-043 I ORIGINAL AGENDA DALE. APRIL 17, 2006 AGENDA ITEM TITLE Accept as complete 42 Ave S Bridge Emergency Erosion Repair and release retainage. CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Nits Date 4/17/06 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date: SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &R Police PW SPONSOR'S The contract with American Civil Constructors West Coast, Inc. is complete for the 42 SUMMARY Ave S Bridge Emergency Erosion Repair Project. Construction began August 17, 2005 and was substantially completed on August 31, 2005. Total contract completion was achieved in February 2006 after the final erosion control plants were installed. No change orders were issued and the project is ready for final acceptance. The contract total was $54,269.44. REVIEWED BY COW Mtg. CA &P Cmte F&S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 4/10/06 RECOMMENDATIONS: SPONSOR /ADMIN. Accept contract as complete and authorize release of retainage. COMMITTEE Unanimous approval; forward to Regular Consent Agenda. COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $54,269.44 Fund Source: 104.01 Bridge Fund Comments: 1 MTG. DATE I RECORD OF COUNCIL ACTION 4/17/06 1 1 MTG. DATE I ATTACHMENTS 4/17/06 1 Information Memo dated April 4, 2006 Notice of Completion of Public Works Contract 05 -083 Transportation Committee Meeting Minutes from April 10, 2006 INFORMATION MEMO To: Mayor Mullet Public W orks Directo~ April 4, 2006 42nd Ave S Brid~e - Emer~ency Erosion Repair Project Completion and Acceptance From: Date: Subje~t: ISSUE Accept construction contract as complete and authorize the release of retainage in the amount of $2,494.00. BACKGROUND The Notice to Proceed for Contract No. 05-083 with American Civil Constructors West Coast, Inc., of Seattle, Washington, was issued August 17, 2005, for construction of the 4200 Ave S Bridge Emergency Erosion Repair (Project No. oo-RW04). This project provided emergency repairs and additional protection to the riverbank at the northwest bridge abutment. The work included extending the existing steel sheet pile wall to the north, placement of controlled density fIll (CDF or low-strength flowable fill) behind the sheet pile wall, and erosion control plants and bank reinforcement. This contract was substantially completed on August 31, 2005. Total contract completion was achieved in February 2006 after the fInal erosion control plants were installed. No change orders were issued. Closeout paperwork has been completed and verified, and the project is now ready for final acceptance. The contract costs are summarized as follows: Contract Award Amount Sales Tax @ 8.8% Total Amount Paid Onc!. retainage) $ 49,880.00 4,389.44 $ 54,269.44 RECOMMENDATION It is recommended that this contract be forwarded to the Tukwila City Council on the consent agenda for formal acceptance and authorize the release of the retainage, subject to the standard claim and lien release procedures. BG:ad attachment: Notice of Completion of Public Works Contract (P:Proj<as\A- RW & RS Projcas\OORW04\200S DmageIJnfo Memo - Ace Projca Comp/<<iDa aDd A=ptw:<) ~ State of Washington ~partrnentofRevenue ~.... PO Box 47474 REVENUE Olympia WA 98504-7474 Contractor's Registration No. (UBI No.) 602210360 Date 3/24/06 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From: ,%~1~i~r~lE~~ii~~@!~#J[~~~g;jYf.--' Assigned To City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Date Assigned Notice is hereby given relative to the completion of contract or project described below Description of Contract Contract Number 42nd Ave S Bridge Emergency Erosion Repair (Project 00-RW04) 05-083 Contractor's Name Telephone Number American Civil Constructors West Coast, Inc. (206) 763-1230 Contractor's Address P.O. Box 80945, 700 South Riverside Drive, Seattle, W A 98108 Date Work Commenced Date Work Completed Date Work Accepted 8/17/05 8/31/05 Surety or Bonding Company Western Surety Company, 10375 Park Meadows Drive, Ste 300, Littleton, CO 80124 Agent's Address NIA Contract Amount $ 49,880.00 Additions $+ 0.00 Reductions $- 0.00 Sub-Total $ 49,880.00 Amount of Sales Tax Paid at 8.8% $ 4,389.44 (Ifvarious rates apply, please send a breakdown.) TOTAL $ 54,269.44 Liquidated Damages $ 0.00 Amount Disbursed $ 51,775.44 Amount Retained $ 2,494.00 TOTAL $ 54,269.44 jJl\i~~~~~\Tni]litifJftjirQ$~f1~~~1it{~~;t~~~~f~%f~~~ Comments: Finance Approval u- ) . Signature Type or Print Name Diane Jaber Phone Number (206) 433-1871 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, W A 98504-7474, immediately after acceptance ofthe work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753-3217. Teletype (ITY) users please call (800) 451-7985. You may also access tax information on our Internet home page at http://dor.wa,gov. REV 31 0020e (6-27-01) *~. Transportation Committee April I 0, 2006 Present: Joe Duffie, Chair; Pam Carter, Joan Hernandez Jim Morrow, Frank Iriarte, Bob Giberson, Pat Brodin 42nd Ave S Brid1!e Emer1!encv Erosion Repair Proiect Completion and Acceptance Jim briefly discussed the background of this emergency project due to river erosion. The contract went well and is ready for formal closeout and retainage release. Joan asked for before and after photographs to be presented to the Council. Unanimous approval. forward to Re1!ular Consent A1!enda for acceptance. \\ Information Only. Jim mentioned that our Urban Center AccesslKlickitat Project passed the first hurdle last week, being one offIve projects out of nine, that SCATBd TAC is forwarding on to SCATBd for further review on April 20. We are going after the regional pot of STP federal funds. Fcommittee Chair Approval Minutes by BG, C:\Docurnents and Settings\Gail\M:y Docurnents\WINWORD\TC Minutes 2006-04-10,doc Page 1 of1