HomeMy WebLinkAboutReg 2006-04-17 Item 5C - Final Acceptance - Emergency Erosion Repair Project by American Civil Constructors West Coast COUNCIL AGENDA SYNOPSIS
2 Inettais ITEMNo.
�1i, i Meeting Date j Prepared by 1 Mayor's review ounczl review
4/17/0 1 BG Q41-6 ,4 4.4 �I-J)k CJ C
190's
ITEM INFORMATION
I CAS NUMBER: 06-043 I ORIGINAL AGENDA DALE. APRIL 17, 2006
AGENDA ITEM TITLE Accept as complete 42 Ave S Bridge Emergency Erosion Repair
and release retainage.
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date Nits Date 4/17/06 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date:
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &R Police PW
SPONSOR'S The contract with American Civil Constructors West Coast, Inc. is complete for the 42
SUMMARY Ave S Bridge Emergency Erosion Repair Project. Construction began August 17, 2005
and was substantially completed on August 31, 2005. Total contract completion was
achieved in February 2006 after the final erosion control plants were installed. No change
orders were issued and the project is ready for final acceptance. The contract total was
$54,269.44.
REVIEWED BY COW Mtg. CA &P Cmte F&S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 4/10/06
RECOMMENDATIONS:
SPONSOR /ADMIN. Accept contract as complete and authorize release of retainage.
COMMITTEE Unanimous approval; forward to Regular Consent Agenda.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$54,269.44
Fund Source: 104.01 Bridge Fund
Comments:
1 MTG. DATE I RECORD OF COUNCIL ACTION
4/17/06 1
1 MTG. DATE I ATTACHMENTS
4/17/06 1 Information Memo dated April 4, 2006
Notice of Completion of Public Works Contract 05 -083
Transportation Committee Meeting Minutes from April 10, 2006
INFORMATION MEMO
To:
Mayor Mullet
Public W orks Directo~
April 4, 2006
42nd Ave S Brid~e - Emer~ency Erosion Repair
Project Completion and Acceptance
From:
Date:
Subje~t:
ISSUE
Accept construction contract as complete and authorize the release of retainage in the amount
of $2,494.00.
BACKGROUND
The Notice to Proceed for Contract No. 05-083 with American Civil Constructors West Coast,
Inc., of Seattle, Washington, was issued August 17, 2005, for construction of the 4200 Ave S
Bridge Emergency Erosion Repair (Project No. oo-RW04). This project provided emergency
repairs and additional protection to the riverbank at the northwest bridge abutment. The work
included extending the existing steel sheet pile wall to the north, placement of controlled
density fIll (CDF or low-strength flowable fill) behind the sheet pile wall, and erosion control
plants and bank reinforcement.
This contract was substantially completed on August 31, 2005. Total contract completion was
achieved in February 2006 after the fInal erosion control plants were installed. No change
orders were issued. Closeout paperwork has been completed and verified, and the project is
now ready for final acceptance.
The contract costs are summarized as follows:
Contract Award Amount
Sales Tax @ 8.8%
Total Amount Paid Onc!. retainage)
$ 49,880.00
4,389.44
$ 54,269.44
RECOMMENDATION
It is recommended that this contract be forwarded to the Tukwila City Council on the consent
agenda for formal acceptance and authorize the release of the retainage, subject to the standard
claim and lien release procedures.
BG:ad
attachment: Notice of Completion of Public Works Contract
(P:Proj<as\A- RW & RS Projcas\OORW04\200S DmageIJnfo Memo - Ace Projca Comp/<<iDa aDd A=ptw:<)
~ State of Washington
~partrnentofRevenue
~.... PO Box 47474
REVENUE Olympia WA 98504-7474
Contractor's Registration No. (UBI No.) 602210360
Date 3/24/06
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From:
,%~1~i~r~lE~~ii~~@!~#J[~~~g;jYf.--'
Assigned To
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Date Assigned
Notice is hereby given relative to the completion of contract or project described below
Description of Contract Contract Number
42nd Ave S Bridge Emergency Erosion Repair (Project 00-RW04) 05-083
Contractor's Name Telephone Number
American Civil Constructors West Coast, Inc. (206) 763-1230
Contractor's Address
P.O. Box 80945, 700 South Riverside Drive, Seattle, W A 98108
Date Work Commenced Date Work Completed Date Work Accepted
8/17/05 8/31/05
Surety or Bonding Company
Western Surety Company, 10375 Park Meadows Drive, Ste 300, Littleton, CO 80124
Agent's Address
NIA
Contract Amount $ 49,880.00
Additions $+ 0.00
Reductions $- 0.00
Sub-Total $ 49,880.00
Amount of Sales Tax Paid at 8.8% $ 4,389.44
(Ifvarious rates apply, please send a breakdown.)
TOTAL $ 54,269.44
Liquidated Damages
$
0.00
Amount Disbursed $ 51,775.44
Amount Retained $ 2,494.00
TOTAL $ 54,269.44
jJl\i~~~~~\Tni]litifJftjirQ$~f1~~~1it{~~;t~~~~f~%f~~~
Comments:
Finance Approval u- ) .
Signature
Type or Print Name Diane Jaber
Phone Number (206) 433-1871
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue,
PO Box 47474, Olympia, W A 98504-7474, immediately after acceptance ofthe work done under this contract. NO
PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in
accordance with said certificate.
To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753-3217. Teletype
(ITY) users please call (800) 451-7985. You may also access tax information on our Internet home page at http://dor.wa,gov.
REV 31 0020e (6-27-01)
*~.
Transportation Committee
April I 0, 2006
Present: Joe Duffie, Chair; Pam Carter, Joan Hernandez
Jim Morrow, Frank Iriarte, Bob Giberson, Pat Brodin
42nd Ave S Brid1!e Emer1!encv Erosion Repair Proiect Completion and Acceptance
Jim briefly discussed the background of this emergency project due to river erosion. The
contract went well and is ready for formal closeout and retainage release. Joan asked for
before and after photographs to be presented to the Council. Unanimous approval.
forward to Re1!ular Consent A1!enda for acceptance.
\\
Information Only. Jim mentioned that our Urban Center AccesslKlickitat Project
passed the first hurdle last week, being one offIve projects out of nine, that SCATBd
TAC is forwarding on to SCATBd for further review on April 20. We are going after the
regional pot of STP federal funds.
Fcommittee Chair Approval
Minutes by BG,
C:\Docurnents and Settings\Gail\M:y Docurnents\WINWORD\TC Minutes 2006-04-10,doc