ITEM INFORMATION
I CAS NUMBER: 06-017 IORIGILTALAGENDA DAIS: FEBRUARY 13, 2006
AGENDA I i M TITLE Bid Award for the City Shops ReRoof Project
CATEGORY g] Discusszon Motion Resolution Ordinance Bzd Award Public Heanng Other
2/13/06
ilItg Date Mtg Date illtg Date Mtg Date elltg Date Mtg Date Mtg Date
SPONSOR Council ma Adm Svcs DCD Finance Firs Legal P&R Police PIV
SPONSOR'S The project was advertised on December 22, 29 and January 5 and 12, 2006. Ten bids
SUMMARY were received and opened on January 20, 2006. The low bid of $219,766.00 was from
Western Roofing Service. References indicate that Western Roofing has performed well on
similar type projects. The additive alternate item of seismic upgrades is priced too high
and is not recommended for award.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DAI'E. 2/7/06
RECOMMENDATIONS:
SPoNsoR /ADMIN. Award contract to Western Roofing Service.
CoMD,lrrrEE Forward to COW and Regular with approval.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$219,766.00 $240,000.00
Fund Source. 303 Minor Facilities (page 72, 2006 CIP)
Comments Engineers estimate was $200, 000 so that amount was designated from the 303 Fund, yet additional funds are
available and the budget has been increased to $240, 000
MTG. DATE I RECORD OF COUNCIL ACTION
2/13/06
MTG. DATE I ATTACHMENTS
2/13/06 1 Information Memo dated January 31, 2006 (revised after UC meeting)
Bid Tabulation
Bid Opening January 20, 2006
Bid Opening June 29, 2005 (all bids (one) rejected by Council)
Utilities Committee Meeting Minutes from February 7, 2006* 1
I
*these minutes not available at ti i;,L ot puo l i ca on
INFORJ.vIATION MEMO
To:
From:
Date:
Subject:
Mayor Mullet
PublIc Works Direct~
January 31, 2006
City Shops ReRoof - Bid Award
Project No. 03-BG08
ISSUE
Award the bid for the City Shops ReRoof project.
BACKGROUND
Wayne Ivary & Associates was retained to design the roof replacement and potential seismic upgrades
for the Minkler Shops buildings "C" (equipment shed) and "D" (Superintendent offices). Building "A"
is the main office and building "B" is the lunchroom and garage The polymeric recoating of the
George Long Shops was added to the bid documents, hence the name "City Shops ReRoof."
ACTION TAKEN
The design and bid documents were fmalized and bids were advertised in June 2005 with only one bid
received in the amount of $338,856 51. The bid was rejected since the budget and estunate was
$200,000. The bid documents were repackaged and advertised again in December 2005 and January
2006 Ten bids were opened on January 20,2006, with the apparent low base bid (Minkler and
George Long Shops roofs) received from Western Roofmg Service in the amount of $219,77600. The
base bids ranged up to $371,947.00 The range of bids for the additive alternate bid item (Minkler
seismic upgrades) was $16,124.16 (Krueger Sheet Metal) up to $60,928.00 (Western Roofmg Service).
References were checked for Western Roofmg Service and they have performed very well on similar
size and type projects
The base bid is very close to the budget and the Engineer's Estimate and is recommended for award.
The 303 Fund originally had the Engineer's Estimate of $200,000 budgeted, but the budget will be
increased to $240,000 to cover the base bid and 10% contingency. The Additive Alternate item is
priced too high and is not recommended for award.
BUDGET AND BID SUMMARY
Bid Amount
Sales Tax (8.8%)
Bid Total
Contingency (10%)
Total
Bid Results
$ 202,000.00
17,776.00
$ 219,766.00
20,200.00
$ 239,966.00
Engineer's Estimate
$ 200,000.00
17,600.00
$ 217,600.00
Budget
$ 240,000.00
$ 217,600.00
$240,000.00
RECOMMENDATION
Award the base bid for the City Shops ReRoof project to Western Roofmg ServIce of Redmond in the
amount of $219,766.00, including sales tax.
BG"ad
attachments: Bid Tabulation, January 20,2006, and June 29,2005, Bid Opening results
(p:Projects\A- BG Proj~""1.S\03BG03\Info ~{emo A....-ard Shops ReRoof -W~~m Roofing Sen.-ice}
City Shops ReRoof Re-Bid
CITY OF TUKWILA
OFFICE OF THE CITY CLERK
Jane E. Cantu, CMC, City CII
BID OPENING
City Shops Reroof RE-BID
PROJECT NO. 03-BGOS
January 20, 2006 - 10:00 A.M.
SECURITY BASE BID (ITEMS 1 & 2) ADDITIVE ALTERNATE
BIDDER NAME & BID GRAND TOTAL (Ai) TOTAL APPARENT
DATE STAMP OF RECEIPT REC'D. ? (including (including LOWEST BID[
W. S. S. T. @ 8.8%) W. S. S. T. @ 8.8%) (RANK ORDE
Scholten Roofing, Inc.
01-19-06 @ 8:40 AM yes $363,011.20 $43,139.20
(via UPS Next Day Air)
Western Roofing Service
01-19-06 @ 10:43 AM yes $219,776.00 $60,928.00
Lloyd A. Lynch, Inc.
01-19-06 @ 11:35 AM yes $238,954.18 $60,540.67
Queen City Sheet Metal & Roofing, Inc.
01-19-06 @ 2:58 PM yes $333,474.17 $32,801.02
Pacific Rainier Roofing, Inc.
01-19-06 @ 3:36 PM yes $360,825.41 $17,189.32
Snyder Roofing
01-19-06 @ 3:44 PM yes $276,271.00 $47,797.00
Krueger Sheet Metal
01-19-06 @ 4:00 PM yes $274,774.40 $16,124.16
Haight Roofing Co., Inc.
01-19-06 @ 4:22 PM yes $371,947.00 $22,152.00
Epic Construction, LLC
1-19-06 @ 4:38 PM yes $241,020.29 $43,847.49
Wayne's Roofing, Inc.
1-19-06 @ 4:59 PM yes $288,588.73 $34,261.12
ENGINEER'S ESTIMATE N/A $217,600.00 $50,000.00
The above figures appear as written within bid documents; and as read aloud at bid
opening. THEY DO NOT however, REPRESENT ANY BID AV'JARDi apparent low, or
otherwise.
DATED this 20th day of January, 2006.
/sl
1~r-,~ r.: r-rd-J j r>Of~;{"" (.... rL--
CITY OF TUKWILA
OFFICE OF THE CITY CLERK
Jane E. Cantu, CMC, City Clerk
City Shops Re-Roof
Project No. 03-BG08
. BID OPENING
We\dnesday, June 29, 2005
The following does NOT represent a bid award
~~--_:-:.:- ,--",: '~;_..: "
, '.' ~--~,
--
.-
-
~ -~-=-- .,,-~. '. '- - -
-- - --
-- ~- - ~ -
--,
.-
- -
,_______ --'Cu"'--
. - '--
__ _ ,'-0 .CO- -0 ~_= ~
-0-- '--C-. ----
,.
_ _ ___. __0-_. _ ..n___
=:'~O'-~-.i~-::..::= _- -~ ~-
- -
, ,-
-,.""->--'=" ~ - - ,-=-. ;'
. -
_ -0. ---
'-. . - - . -- -- --
E~r:NT'; ,:_~:;t-T_;;,,:~~I'~w;.t~r~~~Ji$-'~" c ,.
-
-"
- - -.". -- - . ~ -
- - -- - --, - -
- - ~ - - - '._-
.- .-- -- - --,-' - .--
.- - ._.'.- - -
-
---.- -- -
- -- - ---
<=-.'_'. _,~_ -."0 -
-..-- .-
-
- , -.".,"-
=- _;0" _=:._"'''' ._0-0-0
._._ ~-,-_,' _ ~_ _ ~oO-~-;:;~~.~:;;:t.:o.~:c--~ --~
-
~ r .C=-., - __
._-.
u
-- - -- -
--- -- - - ~..
--- -
._ ~_' u______
'-- - ,.--..".
,-
.-
.' -- - - .
------ - -. - ---. ,.-
- . - __u_
, .-
-= - ~ . _- '-0-=--'-"-"-
-- - .------"
- ----,.
- ,
-,
-,.
-
-
u_.=-_'_. -.: .
.-
.- -
-
--
Lloyd A. Lynch, Inc.
3:45 p.m.
YES
$338,856.51
---;--
'-
,-,<"T__
--
_ _ , - - _ ~ _ - ___. -- -0
- .. -- --- - - - -- .
fE~G!NEERrs ESTIMATE/' ..~ '0
- --- .
-~ "'; _.~ ",--'c_,-_'=.
_,~ co- __ - ~
~ ----- -
The above figures appear as written within bid documents; and as read aloud at bid opening.
THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise.
DATED this 29th day of June, 2005.
Jane E. Cantu, CMC, City Clerk
Clerical note: Bid package was received Tuesday, June 28, 2005.