ITEM INFORMATION
CAS NUMBER. 06-012
IORIGINALAGENDA DArr,. FEBRUARY 6, 2006
AGENDA ITEM TITLE Accept as complete Tukwila International Blvd Phase I Mid Block Crosswalks
and release retainage.
CATEGORY Discussion Motion Resolution Ordinance Bic Award Public Heanng Other
Altg Date At Date Mtg Date Mtg Date Mtg Date Alts Date Altg Date: 2/6/06
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PIV
SPONSOR'S The contract with Totem Electric of Tacoma, Inc. is complete for the Tukwila International
SUMMARY Blvd Phase I Mid Block Crosswalks Project. Construction began May 9, 2005 and was
substantially completed on July 25 One change order for minor utility conflicts and
providing conduits for future expansion totaled $6,290.70. The final contract total was
$122,281.08.
REVIEIXED BY COW Mt CA &P Cmte F &S Cmte Transportation Cmte
Utilities ante Arts Comm. Parks Comm. Planning Comm.
DATE: 1/23/06
RECOMMENDATIONS:
SPONSOR /ADMIN. Accept contract as complete and authorize release of retainage.
CoMMrrrEE Accept contract and forward to Consent agenda for approval.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$122,281.08 $150,000.00
Fund Source. 104.02 Commercial Streets Fund
Comments.
MTG. DATE 1 RECORD OF COUNCIL ACTION 1
2/6/06
MTG. DATE ATTACHMENTS
2/6/06 Information Memo dated December 6, 2005
Notice of Completion of Public Works Contract 04 -098
Transportation Committee Meeting Minutes from January 23, 2006
INFORMATION MEMO
To: Mayor Mullet
From: Public Works Director
Date: December 6, 2005 CC
Subject: Tukwila International Blvd. Phase I Mid -Block Crosswalks
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of retainage in the amount of
$5,619.54.
BACKGROUND
The Notice to Proceed for Contract No. 04 -098 with Totem Electric of Tacoma, Inc., was
issued on May 9, 2005, for the construction of two mid -block crosswalks one near the new
KFC /Taco Bell and the other near the old Northfield car wash.
This contract was completed on July 25, 2005. There was one change order in the amount of
$6,290.70 during construction for several minor utility conflicts and providing conduits for
future expansion of the electronic warning sign system. Closeout paperwork has been completed
and verified, and the project is now ready for final acceptance.
The contract cost is summarized as follows:
Contract Award Amount 106,100.00
Change Order 6,290.70
Sales Tax 8.8% 9,890.38
Total Amount Paid (incl. retainage) 122,281.08
ACTION TAKEN
The final payment has been issued, final records are being prepared, and this acceptance will
formalize the closeout of this project.
RECOMMENDATION
It is recommended that this contract be forwarded to the Tukwila City Council on the consent
agenda for formal acceptance and authorize the release of the retainage, subject to the standard
claim and lien release procedures.
attachment: Notice of Completion of Public Works Contract
(P.Ptojett iA- RW RS Pmjaul9IRWO3 TIB101id Block XiupA[nfo Mono Closeout TOTEM)
State of Washington
Department of Revenue
PO Box 47474
'REVENUE Olympia WA 98504.7474 Contractor's Registration No. (UBI No) 278 043 550
Date 11/14/05
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From:
N'T,.#`i �F+ =F..,: :`%"a�:�7=3s =iF "-Y%'- �cc�" yr' w.<
Wit
'Q ;r;[a�.^'•�': a=ny: 'ro���' 3 :.z. 4
y 291)r
�atme II
s ��:t.�»3_:ZSk- r- nt ti ✓'n?
�L,-'
Assigned To
City of Tukwila
6200 Southcenter Blvd.
Tukwila,WA 98188 Date Assigned
Notice is hereby given relative to the completion of contract or project described below
Description of Contract Contract Number
Tukwila Intl. Blvd. Phase I Mid Block Crosswalks (91 RW03) 04 098
Contractor's Name Telephone Number
Totem Electric of Tacoma, Inc. 253 383 5022
Contractor's Address
P.O. Box 1093, Tacoma, WA, 98401 1093
Date Work Commenced Date Work Completed Date Work Accepted
5/9/05 7/25/05
Surety or Bonding Company
Travelers Casualty and Surety Company of America (Bond Number 104371017)
Agent's Address
Hentschell Associates, Inc., 621 Pacific Ave., #400, Tacoma, WA 98402
Contract Amount 106,100.00
Additions 6,290.70 Liquidated Damages 0.00
Reductions 0.00
Sub -Total 112,390.70 Amount Disbursed 116,661.54
Amount of Sales Tax Paid at 8.8 9,890.38 Amount Retained 5,619.54
(If various rates apply, please send a breakdown.)
TOTAL 122,281.08 TOTAL 122,281.08
iinSA `z3�_'s,.j 00-4xr.' '.2-�aa44AA a ::SY:t PYP
Comments:
Signature
Type or Print Name Diane Jaber
Finance Approval l� Phone Number (206) 433 -1871
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue,
PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO
PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in
accordance with said certificate.
To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217 Teletype
(TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http.//dor.wa.E
REV 31 0020e (6-27-01)
Transportation Committee
January 23, 2006
Present: Joe Duffie, Chair; Pam Carter, Joan Hernandez
Jim Morrow, Frank Iriarte, Bob Giberson, Pat Brodin, Gail Labanara, Derek
Speck, Lucy Lauterbach, Chuck Parrish, Lee Ann Mangin, Phil Klinkon, Paul
Lavalee- consultants
1. Tukwila International Boulevard (TIB) Mid Block Crossing_ Completion Totem Electric
constructed the two mid -block crosswalks on TIB. The work was done in July, 2005 with one
change order. Joan asked the reasons for the change order. Bob Giberson said it was needed to
cover extended conduits that had to be moved to avoid fiber optic and surface water lines. More
Junction boxes and hand -holds were' also needed. Some of the work will allow expansion of the
system if it is needed in the future. The signals work well, and are well -used. On a related
matter, Jim M talked about the possibility of putting a countdown (walk signs that count down
the time you have to cross an intersection) in the walk signals on S. 144 /TIB, but they are
expensive and need to be fully assessed. Full Committee approval; Committee recommended
project acceptance on the consent agenda of a Regular Meeting_,
2. Tukwila Transit Center Proiect Consultant Agreement The bus stops on Andover Park
West and Just north of Baker are some of the busiest in the City This transit center project
would redesign the stops and shelters, making them part of the larger vision of improving the
Tukwila Urban Center With the redevelopment of the Westfield Mall, $500,000 will be donated
to improving the transit center. Metro and the City will also each donate 5200,000 to the project.
Staff had a difficult time choosing a consultant, because so many highly capable firms submitted
bids. In the end they chose the IBI group. One strength of IBI is their subcontractors who are the
Sounder Station team engineers. A timely consultant agreement with 1BI will allow enough
preliminary design work to be done so that the City and Metro can apply for an FTA grant,
which is due in mid April. Pam C asked if this transit center's shelters would have a similar look
as those on TIB. That is unclear at this point, though Jim M would like a similar design city -wide
for ease of maintenance. Full Committee approval; Committee recommended agreement to
COW and Regular Meeting.
3. PSRC Funding Jim M explained that PSRC gets its federal funding via the state. Past
practice has been for the Policy committee to divide the funding up, with 50% staying at the
PSRC Regional level, and 50% going to the four counties in the region. From there a formula
including population, lane miles, and employment was used to allocate the county funds.
Tukwila's share was around $350,000. A new proposal would use the same regional criteria and
competitive process that are used at the PSRC level, with the county funds. Tukwila is solidly
against this proposal, as it would leave out mid sized and small cities Pam will work on this
issue at the PSRC level, and Jim will continue to oppose it with his peers Information.
K--- Committee chair approval
p p L. Lauterbach